HomeMy WebLinkAboutORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B ORD-2024 - 041j
J ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date : November 19 , 2024
Action Agenda
Item No . 8 -g
SUBJECT : Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and
Approval of Budget Amendment # 3 - 13
DEPARTMENT : Asset Management Services ,
Finance and Administrative
Services
ATTACHMENT ( S ) : INFORMATION CONTACT .
1 . Construction Contract Angel Barnes , 919 . 245 . 2628
2 . Year-to - Date Budget Summary Jovana Amaro , 919 . 245 . 2651
Alan Dorman , 919 . 245 . 2658
i
c
PURPOSE : To :
1 ) Approve the County entering into a construction contract with Brady Services , Inc . for the
construction of the Sportsplex Ice Rink Chiller and Cooling Tower Replacement ; and
2 ) Authorize the County Manager to execute the Agreement , subject to final review by the
County Attorney , and any subsequent amendments for contingent and unforeseen
requirements up to the approved budget amount on behalf of the Board .
3 ) Approve Budget Amendment # 3 - 13 .
E
t
I
BACKGROUND : In 1995 , the Triangle Sportsplex was built , including an ice rink . The design and
construction included a water- cooled chiller and a cooling tower to create and maintain the ice .
The current chiller system utilizes ammonia , which is often found in older chillers used for ice
E
rinks . However , this presents health and safety risks if ammonia is released due to equipment
failure or maintenance mistakes . Furthermore , both the existing cooling tower and chiller system
have exceeded their useful life , and ammonia is no longer supplied by major chiller manufacturers .
The ice rink cannot function without the chiller continuously operating to maintain the ice , as the
chiller pumps cold brine beneath the ice rink floor to create and preserve the ice .
The recommended solution is to replace the ammonia chiller with an air- cooled chiller that can
produce sufficiently cold water for ice - making . This single unit will replace both the cooling tower
and the water- cooled chiller . The construction of this project is expected to take approximately
four (4 ) weeks . During this time , the ice rink will be non - operational for a total of two (2 ) weeks , or
no more than fourteen ( 14 ) days . The work involves adding a new concrete pad for the air- cooled
chiller , installing new piping and connections inside the chiller room , and setting up pumps and
electrical systems while the existing water- cooled chiller remains operational . After completing all
preliminary work , the existing chiller will be shut down , the system will be drained , and the brine
will be flushed out of the current piping . Then , the new piping and chiller will be connected .
The purchase would be made through a competitive group purchasing program , OMNIA Partners ,
Contract Number 3341 awarded to Brady Services , Inc . This exception to the competitive bidding
requirements is found in North Carolina General Statute 143 - 129 (e ) ( 3 ) , " Purchases or repair work
involving a combination of installation labor and equipment acquisition made through a
competitive bidding group purchasing program, which is a formally organized program that offers
competitively obtained purchasing services at discount prices to two or more public agencies. For
the purposes of this subdivision, "repair work " is (i) limited to the repair of heating and cooling
systems, (ii) may not exceed a total cost of two million dollars ($2, 000, 000) for installation labor
or other related costs incidental to equipment acquisition, and (iii) is procured using a competitive
bidding group purchasing program that is qualified to sell to the United States of America or any
agency thereof. "
Orange County Asset Management Services negotiated the contract with Brady Services , Inc . for
$ 176007000 . AS part of the FY 2023 -24 Capital Improvement Plan , $ 600 , 000 was approved for
this project . Due to the size of the project , some previously authorized Sportplex projects will be
delayed and the funds repurposed to support the ice rink chiller replacement . These delayed
projects include Ice Rink locker and flooring replacements ; the design phase of a new
locker/shower and change area ; routine replacements of HVAC systems ; security and information
technology ( IT) equipment upgrades ; and routing replacements for fitness center and kidsplex
equipment . In addition to these repurposed funds , $ 462 , 354 in additional financing is required to
make this significant replacement in a timely manner . This repurpose of previously approved
funds and request for additional funding would amend the following project ordinances in the
Sportsplex Renewal and Replacement Fund .
Sportsplex = Facilities Maintenance (-$ 132, 646) = Project #36001
Revenues for this project :
Current FY 2024-25 FY 2024 -25
FY 2024-25 Amendment Revised
Alternative Financing $ 2801000 ( $ 1327646 ) $ 1477354
Total Project Funding $ 280 , 000 ($ 132 , 646 ) $ 147 , 354
Appropriated for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Project Expenditures $ 2807000 ( $ 1327646 ) $ 1477354
Total Costs $ 280 , 000 ( $ 132 , 646 ) $ 147 , 354
Sportsplex = Fitness (=$ 100, 000) = Project #36002
Revenues for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Transfer from Sportsplex Operating Fund $ 1001000 ( $ 100 , 000 ) $ 0
Total Project Funding $ 100 , 000 ( $ 100 , 000 ) $ 0
Appropriated for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Project Expenditures $ 100 , 000 ( $ 100 , 000 ) $ 0
Total Costs $ 100 , 000 ($ 100 , 000 ) $ 0
Sportsplex - Ice Rink ($337, 646) = Project #36003
Revenues for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Alternative Financing $ 8001000 $ 595 , 000 $ 113951000
Transfer from Sportsplex Operating Fund $ 0 $ 205 , 000 $ 2057000
Total Project Funding $ 8001000 $ 800 , 000 $ 1 , 6001000
Appropriated for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Project Expenditures $ 8001000 $ 800 , 000 $ 116001000
Total Costs $ 8001000 1 $ 800 , 000 1 $ 176001000
Sportsplex - New Facilities (=$50, 000) - Project #36005
Revenues for this project : j
Current FY 2024 -25 FY 2024-25
FY 2024 -25 Amendment Revised
Transfer from Sportsplex Operating Fund $ 50 , 000 ($ 50 , 000 ) $ 0
Total Project Funding $ 50 , 000 ( $ 50 , 000 ) $ 0
Appropriated for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Project Expenditures $ 507000 ( $ 50 , 000 ) $ 0
Total Costs $ 50 , 000 ( $ 50 , 000 ) $ 0
i
f
t
Sportsplex - Kidsplex (=$55, 000) = Project #36007
Revenues for this project :
Current FY 2024-25 FY 2024 -25
FY 2024 -25 Amendment Revised
Transfer from Sportsplex Operating Fund $ 55 , 000 ($ 55 , 000 ) $ 0
F777
Total Project Funding $ 553000 ( $ 55 , 000 ) $ 0
Appropriated for this project :
Current FY 2024 -25 FY 2024 -25
FY 2024 -25 Amendment Revised
Project Expenditures $ 55 , 000 ($ 55 , 000 ) $ 0
Total Costs $ 55 , 000 ( $ 55 , 000 ) $ 0
FINANCIAL IMPACT . The approval of Budget Amendment # 3 - B would repurpose $ 337 , 646 in
authorized expenditures from delayed projects and provide additional authorization of $ 462 , 354
to the Sportsplex Renewal and Replacement Fund . The additional borrowing will cost an
estimated $ 722 , 428 over twenty (20 ) years , with a peak annual costs of $46 , 235 . The additional
borrowing will be covered by Sportsplex operating revenue .
ALIGNMENT WITH STRATEGIC PLAN : This item supports :
• GOAL 1 : ENVIRONMENTAL PROTECTION AND CLIMATE ACTION
OBJECTIVE 2 . Invest in our infrastructure to reduce the environmental impact of the
County fleet/facilities and improve safety .
OBJECTIVE 6 . Protect water supply/watersheds .
RECOMMENDATION ( S ) : The Manager recommends that the Board :
1 ) Approve the County entering into a construction contract with Brady Services , Inc . for the
construction of the Sportsplex Ice Rink Chiller and Cooling Tower Replacement ;
2 ) Authorize the County Manager to execute the Agreement , subject to final review by the
County Attorney , and any subsequent amendments for contingent and unforeseen
requirements up to the approved budget amount on behalf of the Board ; and
3 ) Approve Budget Amendment #3 - B .