Loading...
HomeMy WebLinkAbout2024-659-E-Solid Waste-Scope of work Garrett scale house-Proposal for basic services scalehouse building roof repair design services Orange County Solid Waste Management FacilityPage 1 of 4 PROPOSAL FOR BASIC SERVICES SCALEHOUSE BUILDING ROOF REPAIR DESIGN SERVICES ORANGE COUNTY SOLID WASTE MANAGEMENT FACILITY 1. The Basic Services of ENGINEER are as follows: Task 1- Engineering Design ENGINEER will perform, through its subconsultant REI Engineers (REI), the following engineering design calculations: 1. Determine design wind loads in accordance with ASCE 7 as required by the current edition of the State Building Code. 2. Primary and secondary (overflow) drainage for compliance with the current edition of the State Plumbing Code. 3. Existing and proposed roof system R-Value for compliance with the current edition of the State Energy Conservation Code. Task 2 - Technical Drawings and Specifications ENGINEER will prepare, through its subconsultant REI, comprehensive scaled drawings and technical specifications for the project. Task 3 – Project Manual Owner will provide bidding and contract documents, including the invitation to bid, instructions to bidders, agreement, general conditions, etc. to the ENGINEER. ENGINEER will incorporate Owner’s bidding and contract documents and ENGINEER’s technical specifications into a Project Manual for bidding and construction purposes. ENGINEER will submit a draft Project Manual for review by the Owner and incorporate review comments as necessary. ENGINEER will provide the Contract Documents, including complete Project Manual and construction drawings, to the OWNER for bidding and construction phases of the project. Task 4 – Bidding Services During the Bid Phase of the project, ENGINEER will: 1. Conduct the pre-bid conference. 2. Address contractor questions/comments. 3. Prepare addenda, as necessary, to address changes to the Contract Documents and responses to questions. Addenda or addenda items requested by or necessitated by changes made by the OWNER may require additional fees. Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6 Page 2 of 4 In preparing the fees for this task, the ENGINEER has assumed that all Contract Documents will be provided electronically in .pdf to bidders through the County’s website. Print copies of the Contract Documents will not be provided to bidders by the ENGINEER. If re-bidding of the project is necessary due to an insufficient number of bidders, a bid irregularity, or at the desire of the OWNER and through no fault of the ENGINEER, ENGINEER may request additional compensation for handling the re-bid. ENGINEER will assist the OWNER in evaluating the bids by preparing bid tabulations, reviewing the bids for accuracy and completeness, reviewing the required document qualification information contained in the contract documents, and determining the acceptability of contractors, suppliers, and substitute equipment. Within 10 business days of the OWNER providing bid documents to ENGINEER, ENGINEER will make a recommendation to the OWNER for the best-qualified, responsive, responsible bidder to award the contract. If additional work is necessitated by re-evaluation of the bids/bidders or by disqualification of the low bidder(s), additional fees may be requested. Task 5 – Construction Administration ENGINEER, through its subconsultant, will provide the following construction administration services: 1. Review and accept, as appropriate, shop drawings and submittals as required by the Contract Documents. Return unacceptable submittals to contractor as required until compliance with specifications is realized. 2. Hold a pre-construction meeting with the successful contractor to ensure a clear understanding of the plans and specifications. 3. Certify Contractor's monthly invoicing based on status of work performed as determined from project site visits. 4. Route any change orders developed to address changes to the contract requirements. 5. Upon notification by the contractor that the job is substantially complete, a substantial completion inspection will be conducted with REI, Owner, Contractor and Manufacturer personnel. A punch list will be prepared to list any minor items that require further treatment. 6. Upon notification by the contractor that the job is fully complete, a final inspection will be conducted with REI, contractor and Owner personnel. A final inspection report will be submitted upon verifying completion or if necessary, an additional punch list will be prepared. 7. Upon completion of work, verify compliance of warranties and forward to Owner with close out documents and final billing. Task 6 – Construction Quality Assurance Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6 Page 3 of 4 ENGINEER, through is subconsultant, will provide construction quality assurance as follows: 1. Perform quality assurance to verify work follows the Contract Documents. Photographs will be taken as deemed necessary for documentation. 2. Prepare and submit reports from each quality assurance site visit relaying information pertaining to weather, area worked, application methods, material types installed during the site visit and listing of non-conforming items requiring Contractor's correction. 3. ENGINEER has assumed 40 hours for a senior engineering technician to provide quality assurance observations. 2. The responsibilities of OWNER are as follows: 1. Review all project deliverables in a timely manner and forward submittals to ENGINEER as appropriate. 3. The time period for the performance of ENGINEER’s services are as follows: • Tasks 1, 2, and 3 will be completed within 60 days following authorization. • Task 4 will be completed based on the bidding and award schedule set forth in the Contract Documents. • Task 5 and 6 will be completed based on the Contractor’s schedule. 4. The method of payment for services rendered by ENGINEER shall be set forth as follows: Task and Description Fee Task 1 – Engineering Design $ 1,400 Task 2 – Technical Drawings and Specifications $ 5,400 Task 3 – Project Manual $ 3,600 Task 4 – Bidding Services $ 3,600 Task 5 – Construction Administration $ 6,675 Task 6 – Construction Quality Assurance $ 5,600 TOTAL FEE $26,275 ENGINEER will invoice OWNER monthly on a task-by-task basis based on percent complete for each task. 5. OWNER has established the following special provision and/or other consideration or requirements in respect to the Assignment. None. AUTHORIZATION TO PROCEED SIGNATURE PAGE FOLLOWS Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6 Page 4 of 4 PROPOSAL FOR BASIC SERVICES SCALEHOUSE BUILDING ROOF REPAIR DESIGN SERVICES ORANGE COUNTY SOLID WASTE MANAGEMENT FACILITY AUTHORIZATION TO PROCEED ______________________________________ _______________ Orange County Solid Waste Management Date THIS INSTRUMENT HAS BEEN PRE-AUDITED IN THE MANNER REQUIRED BY THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT: ______________________________________ _______________ Office of the Chief Financial Officer Date THIS PROPOSAL IS SUBMITTED PURSUANT TO THE TERMS OF THE AGREEMENT DATED APRIL 17, 2023 BETWEEN ORANGE COUNTY AND GARRETT & MOORE INC. __________________________________ ______________ Garrett & Moore Inc. Date Budget Code50351020-630000 Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6 10/23/2024 10/29/2024 10/30/2024