HomeMy WebLinkAboutAgenda - 11-19-2024; 8-g - Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B 1 ORD-2024-041 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 19, 2024 Action Agenda Item No. 8-g SUBJECT: Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B DEPARTMENT: Asset Management Services, Finance and Administrative Services ATTACHMENT(S): INFORMATION CONTACT: 1. Construction Contract Angel Barnes, 919.245.2628 2. Year-to-Date Budget Summary Jovana Amaro, 919.245.2651 Alan Dorman, 919.245.2658 PURPOSE: To: 1) Approve the County entering into a construction contract with Brady Services, Inc. for the construction of the Sportsplex Ice Rink Chiller and Cooling Tower Replacement; and 2) Authorize the County Manager to execute the Agreement, subject to final review by the County Attorney, and any subsequent amendments for contingent and unforeseen requirements up to the approved budget amount on behalf of the Board. 3) Approve Budget Amendment #3-B. BACKGROUND: In 1995, the Triangle Sportsplex was built, including an ice rink. The design and construction included a water-cooled chiller and a cooling tower to create and maintain the ice. The current chiller system utilizes ammonia, which is often found in older chillers used for ice rinks. However, this presents health and safety risks if ammonia is released due to equipment failure or maintenance mistakes. Furthermore, both the existing cooling tower and chiller system have exceeded their useful life, and ammonia is no longer supplied by major chiller manufacturers. The ice rink cannot function without the chiller continuously operating to maintain the ice, as the chiller pumps cold brine beneath the ice rink floor to create and preserve the ice. The recommended solution is to replace the ammonia chiller with an air-cooled chiller that can produce sufficiently cold water for ice-making. This single unit will replace both the cooling tower and the water-cooled chiller. The construction of this project is expected to take approximately four (4) weeks. During this time, the ice rink will be non-operational for a total of two (2) weeks, or no more than fourteen (14) days. The work involves adding a new concrete pad for the air-cooled chiller, installing new piping and connections inside the chiller room, and setting up pumps and electrical systems while the existing water-cooled chiller remains operational. After completing all 2 preliminary work, the existing chiller will be shut down, the system will be drained, and the brine will be flushed out of the current piping. Then, the new piping and chiller will be connected. The purchase would be made through a competitive group purchasing program, OMNIA Partners, Contract Number 3341 awarded to Brady Services, Inc. This exception to the competitive bidding requirements is found in North Carolina General Statute 143-129(e)(3), "Purchases or repair work involving a combination of installation labor and equipment acquisition made through a competitive bidding group purchasing program, which is a formally organized program that offers competitively obtained purchasing services at discount prices to two or more public agencies. For the purposes of this subdivision, "repair work" is (i) limited to the repair of heating and cooling systems, (ii) may not exceed a total cost of two million dollars ($2,000,000) for installation labor or other related costs incidental to equipment acquisition, and (iii) is procured using a competitive bidding group purchasing program that is qualified to sell to the United States of America or any agency thereof." Orange County Asset Management Services negotiated the contract with Brady Services, Inc. for $1,600,000. AS part of the FY 2023-24 Capital Improvement Plan, $600,000 was approved for this project. Due to the size of the project, some previously authorized Sportplex projects will be delayed and the funds repurposed to support the ice rink chiller replacement. These delayed projects include Ice Rink locker and flooring replacements; the design phase of a new locker/shower and change area; routine replacements of HVAC systems; security and information technology (IT) equipment upgrades; and routing replacements for fitness center and kidsplex equipment. In addition to these repurposed funds, $462,354 in additional financing is required to make this significant replacement in a timely manner. This repurpose of previously approved funds and request for additional funding would amend the following project ordinances in the Sportsplex Renewal and Replacement Fund. Sportsplex- Facilities Maintenance (-$132,646) - Project#36001 Revenues for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Alternative Financing $280,000 ($132,646) $147,354 Total Project Funding $280,000 ($132,646) $147,354 Appropriated for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Project Expenditures $280,000 ($132,646) $147,354 Total Costs $280,000 ($132,646) $147,354 Sportsplex- Fitness (-$100,000) - Project#36002 Revenues for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Transfer from Sportsplex Operating Fund $100,000 ($100,000) $0 Total Project Funding $100,000 ($100,000) $0 3 Appropriated for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Project Expenditures $100,000 ($100,000) $0 Total Costs $100,000 ($100,000) $0 Sportsplex- Ice Rink($337,646) - Project#36003 Revenues for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Alternative Financing $800,000 $595,000 $1,395,000 Transfer from Sportsplex Operating Fund $0 $205,000 $205,000 Total Project Funding $800,000 $800,000 $1,600,000 Appropriated for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Project Expenditures $800,000 $800,000 $1,600,000 Total Costs $800,000 $800,000 $1,600,000 Sportsplex- New Facilities (-$50,000) - Project#36005 Revenues for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Transfer from Sportsplex Operating Fund $50,000 ($50,000) $0 Total Project Funding $50,000 ($50,000) $0 Appropriated for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Project Expenditures $50,000 ($50,000) $0 Total Costs $50,000 ($50,000) $0 Sportsplex- Kidsplex (-$55,000) - Project#36007 Revenues for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Transfer from Sportsplex Operating Fund $55,000 ($55,000) $0 Total Project Funding $55,000 ($55,000) $0 Appropriated for this project: Current FY 2024-25 FY 2024-25 FY 2024-25 Amendment Revised Project Expenditures $55,000 ($55,000) $0 Total Costs $55,000 ($55,000) $0 4 FINANCIAL IMPACT: The approval of Budget Amendment #3-B would repurpose $337,646 in authorized expenditures from delayed projects and provide additional authorization of $462,354 to the Sportsplex Renewal and Replacement Fund. The additional borrowing will cost an estimated $722,428 over twenty (20) years, with a peak annual costs of $46,235. The additional borrowing will be covered by Sportsplex operating revenue. ALIGNMENT WITH STRATEGIC PLAN: This item supports: • GOAL 1: ENVIRONMENTAL PROTECTION AND CLIMATE ACTION OBJECTIVE 2. Invest in our infrastructure to reduce the environmental impact of the County fleet/facilities and improve safety. OBJECTIVE 6. Protect water supply/watersheds. RECOMMENDATION(S): The Manager recommends that the Board: 1) Approve the County entering into a construction contract with Brady Services, Inc. for the construction of the Sportsplex Ice Rink Chiller and Cooling Tower Replacement; 2) Authorize the County Manager to execute the Agreement, subject to final review by the County Attorney, and any subsequent amendments for contingent and unforeseen requirements up to the approved budget amount on behalf of the Board; and 3) Approve Budget Amendment #3-B. 5 [Departmental Use Only] TITLE Ice Rink Chiller& Cool Tower FY 2024-2025 RFP RC2022-1001 NORTH CAROLINA CONSTRUCTION AGREEMENT OVER$250,000.00 ORANGE COUNTY THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"), made as of the 20th day of November, 2024, by and between Brady Services, Inc, (hereinafter called the "Contractor"), and Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or"Owner"). WITNESSETH: That the Contractor and the Owner, for the consideration herein named, agree as follows: 1. CONTRACT DOCUMENTS; PRIORITY The Contract Documents consist of this Agreement, the General Conditions which are fully incorporated in this Agreement, the Request for Proposals, designer approved communications and field orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract Documents form the Contract. In the event of any inconsistency between or among the Contract Documents the Contract Documents shall be interpreted in the following order of priority: a. This Agreement and incorporated General Conditions attached as Exhibit 1. b. Designer approved and stamped construction documents and drawings and written specifications. c. Designer approved communications and field orders. d. Request for Proposals and addenda thereto. e. Proposal. 2. SCOPE OF WORK The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner and in accordance with the following enumerated documents, which are made a part hereof as if fully contained herein: a. Construction Drawings prepared by Progressive Design Collaborative, LTD (Sheet G1.01, M0.00, M0.01, M1.01, M5.01, M5.02, M6.01, M7.01, E0.00, E0.01, E1.01, E5.01 dated May 10, 2024) b. Written specifications prepared by the Designer. c. Brady Services, Inc. proposal dated November 4, 2024 which fully describes the work to be Revised 01/24 1 6 performed, such work(hereinafter called the"Work"). d. Related documents listed under Section 1 above. 3. TERM AND SCHEDULING a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. b. The Contractor agrees to complete substantially all Work included by December 30, 2025. c. Time is of the essence with respect to all dates specified in the Contract Documents as Completion Dates. d. The Contractor shall perform the Work in the time, manner and form required by the Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner. 4. STANDARD OF CARE AND DUTIES OF CONTRACTOR a. The Contractor shall exercise reasonable care and diligence in performing the Work in accordance with the generally accepted standards of this type of Contractor practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Contractor is solely responsible for the professional quality, accuracy,timely completion, and submission of all work. b. The Contractor shall not load or permit any part of the Work to be loaded with a weight that will endanger its safety, intended performance or configuration. c. Contractor shall be responsible for all Contractor, Subcontractor, and Sub-subcontractor errors or omissions, in the performance of the Agreement together with the errors and omissions of any agent or employee of the Contractor or any Subcontractor or Sub-subcontractor. Contractor shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes, or conflicts at no additional cost to the Owner. d. Contractor is an independent contractor of Owner. Any and all employees of the Contractor engaged by the Contractor in the performance of any work or services required of the Contractor under this Agreement, shall be considered employees or agents of the Contractor only and not of the Owner, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Contractor. e. Contractor shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal non-discrimination laws, policies, rules, and regulations and the Orange County Non-Discrimination Policy and Orange County Living Wage Policy (each Orange County policy is incorporated herein by reference and may be viewed at http://www.oran ec�opRtync. og v/departments/purchasing division/contracts.php). Any violation of the Orange County Non-Discrimination Policy is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit and does not limit the definition of breach Revised 01/24 2 7 to discrimination. f. If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Contractor represents that it and its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best skill and attention. Except as specifically set forth in the Contract Documents the Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs in connection with the Work. The Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. h. The Contractor shall appoint a competent Project Manager with general authority to manage the Project for the Contractor. The Contractor shall also keep on the Project at all times during the Work of the Contractor a competent Resident Superintendent and necessary assistants who shall not be replaced without prior written approval by the Designer or by the Owner if a Designer is not retained for the Project. i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the Contract Price if and when directed by the Designer. j. The Contractor shall attend all progress conferences and all other meetings or conferences. The Contractor shall be represented at these progress conferences by a representative having the authority of the Project Manager and by such other representatives as the Designer may direct. k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the Contractor. Any Work in which untested materials are used without written approval or written permission of the Owner or Designer shall be removed and replaced at Contractor's expense. 1. The Contractor shall obtain all necessary permits including all permits required to complete the Work in compliance with local, state, and federal law. 5. PAYMENT & TAXES a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- exceed One Million Six Hundred Thousand Dollars ($1,600,000.00). Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the Owner's Representative, generally the Designer if a Designer is retained on the Work, a Request for Payment for work done during the previous calendar month. (i) The Request for Payment shall be in form of a standardized invoice or AIA Document G702-703 appropriately addressed to Owner's Representative at Progressive Design Revised 01/24 3 8 Collaborative, LTD. 3101 Poplarwood Court, Suite 300 Raleigh, NC 27604 and shall show substantially the value of work done during the previous calendar month. (ii) The amount due for payment shall be ninety-five percent (95%) of the value of work completed since the last Request for Payment and this amount shall be paid by the Owner on or before the last business day of the month. Owner shall retain five percent (5%) (the"Retainage"). (1) Upon Owner's Representative's certification that fifty percent (50%) of the Work has been satisfactorily completed Retainage shall be reduced to two and one half percent(21/2%). (2) Upon Owner's Representative's certification that ninety percent (90%) of the Work has been satisfactorily completed Retainage may be discontinued. Retainage may be discontinued, at Owner's Discretion, so long as work continues to be completed satisfactorily and on schedule. (3) The Owner may discontinue withholding retainage in accordance with the provisions ofNCGS-143-(bl)(2)when the project is 50% complete. (iii) Final payment shall not be due to the Contractor until thirty (30) days after Final Completion of the Work, including punch list work, has been satisfactorily (as determined by the County) completed and an appropriate Affidavit, Indemnification, and Release as required in Section 5.4(e) of Exhibit 1 has been received and approved by Owner. b. Should Owner reasonably determine that Contractor has failed to perform the Work related to a Request for Payment, Owner, at its discretion may provide the Contractor ten (10) days to cure the breach. Owner may withhold the accompanying payment without penalty until such time as Contractor cures the breach. (i) Should Contractor or its representatives fail to cure the breach within ten (10) days, or fail to reasonably agree to such modified schedule, Owner may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Contractor. (ii) This section shall not be interpreted to limit the definition of breach to the failure to perform the Work related to a Request for Payment. c. The Contractor has included in the Contract Price and shall pay all taxes assessed by any authority on the Work or the labor and materials used therein. It shall be the Contractor's responsibility to furnish the Owner documentary evidence showing the materials used and sales and use tax paid by the Contractor and each of its subcontractors. d. Should the Owner receive notice that the Contractor has failed to pay a Subcontractor for the Work performed related to a Request for Payment, Owner shall have the authority to withhold payment of the disputed amount until parties resolve their dispute. Failure to pay the Contractor pursuant to this section of the Agreement shall not be deemed to be a breach of the Agreement. Revised 01/24 4 9 6. NON—APPROPRIATION a. Contractor acknowledges that Owner is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. b. In the event that public funds are unavailable or not appropriated for the performance of Owner's obligations under this Agreement, then this Agreement shall automatically expire without penalty to Owner immediately upon written notice to Contractor of the unavailability or non-appropriation of public funds. It is expressly agreed that Owner shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement. c. In the event of a change in the Owner's statutory authority, mandate or mandated functions, by state or federal legislative or regulatory action, which adversely affects Owner's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to Owner upon written notice to Contractor of such limitation or change in Owner's legal authority. 7. NOTICES Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Owner: Contractor: Orange County Brady Services, Inc. Attn: A. Barnes Attn: Scott Small P.O. Box 8181 2025 l6th Street Hillsborough,NC 27278 Greenboro,NC 27405 8. MISCELLANEOUS a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties and Obligations imposed by state, federal or local law, rules,regulations and ordinances. b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or duty granted them under the Contract Documents, nor shall any act or failure to act constitute any approval except as specifically agreed in writing. c. The Work shall be tested and inspected as required by the Contract Documents and as required by law. Unless prohibited by law the costs of all such tests and inspections related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building Codes shall be borne by the Contractor. The costs for material and structural testing shall be conducted by an independent third party at the expense of the Owner. Delays related to any of the aforementioned tests and inspections shall not be grounds for delaying the completion of the work. If any such tests and inspections reveal deficiencies in the Work such that the Work does not comply with terms or requirements of the Contract Documents and the requirements of any code or law the Contractor is solely responsible for the cost of bringing such deficiencies into compliance with the terms of the Contract Documents and any code or law. Revised 01/24 5 10 d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner reject any portion of the Work for failing to comply with the Contract Documents Contractor shall immediately, at Contractor's expense, correct the Work. Any such rejection may be made before or after substantial completion. If applicable, any additional expense borne by the Designer under this section shall be paid at Contractor's expense. e. The County has designated(Angel Barnes)to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. f. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its entirety without the prior written consent of the Owner. g. In the event of a breach by Contractor Owner has sole authority to determine the reasonableness of Contractor's actions to remedy such breach or complete the performance of its obligations. h. Upon request of the Owner, the Contractor shall submit to County all relevant documentation, including but not limited to,job cost records, to support its claims for final compensation and if such request is made final compensation shall not be due until all relevant documentation is received,reviewed, and approved by Owner. 9. CONSEQUENTIAL DAMAGES a. Owner and Contractor mutually waive any claim against each other for consequential damages. Consequential Damages include: (i) Damages incurred by Owner for loss of use, income, financing, or business. (ii) Damages incurred by Contractor for office expenses, including personnel, loss of financing, profit, income, business, damage to reputation, or any other non-direct damages. 10. ENTIRE AGREEMENT All of the documents listed, referenced or described in this Agreement, the written Notice-to-Proceed, together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, labor, materials, and completed construction required by the Contract Documents and all parts thereof is the Work. The Contract Documents constitute the entire agreement between Owner and Contractor. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. If any provision of the Agreement or General Conditions shall be declared invalid or unenforceable,the remainder of the Agreement shall continue in full force and effect. [SIGNATURE PAGE TO FOLLOW] Revised 01/24 6 11 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first above written in a number of counterparts, each of which shall, without proof or accounting for other counterparts,be deemed an original contract. ORANGE COUNTY: CONTRACTOR: By: By: Travis Myren, County Manager Jason Patterson,Asst. Corporate Secretary Printed Name and Title Revised 01/24 J 12 Year-To-Date Budget Summary Fiscal Year 2024-25 Sportsplex Renewal Fund Budget Summary and Replaceme nt Fund Original Budget Revenue $220,000 Interfund Transfer Revenue $799,669 Fund Balance Appropiation Total Original Budget Isi,019,669 Additional Revenue Received Through Budget Amendment#3-B (November 19, 2024) Grant Funds Non Grant Funds $462,354 Additional Interfund Transfer Revenue Additional Fund Balance Appropriation Total Amended Budget $1,482,023 Dollar Change in 2024-25 Approved Budget $462,354 Change in 2024-25 Approved Budget 45.34%