AGENDA
ORANGE UNIFIED TRANSPORTATION BOARD
November 18, 2024, 6:30 pm
131 W Margaret Ln, Hillsborough, NC 27278
OUTBoard meetings are held in person and open to the public. Any member of the general public
who wishes to make public comment should attend or email Orange County Transportation
Director Nishith Trivedi at ntrivedi@orangecountync.gov. All comments will be read to the
OUTBoard during the public comment portion of the meeting.
1. Call to Order
2. Consideration of Additions or Changes to Agenda
3. Public Comments
4. Minutes—October 21, 2024
5. Regular OUTBoard Agenda
a. Orange County Bicycle and Pedestrian Plan
i. Action: Provide Comments
b. 2024 Annual Report and 2025 Work Plan
i. Action: Recommend Approval
c. OUTBoard Election
i. Action: Select Chair, Vice Chair, and Secretary
6. Staff Report/Updates
a. MPO, RPO, and NCDOT
7. Adjournment-The next meeting—January 2025
It is the policy of Orange County Transportation Services to ensure that no person shall, on the
ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be
denied the benefits of, or be otherwise subjected to discrimination under any program or activity
as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE UNIFIED TRANSPORTATION BOARD MEETING MINUTES
Monday September 30, 2024, 6:30 pm
131 W. Margaret Lane, Hillsborough, NC 27278
1 Attendance: Members Present
2 Natalie Ziemba Cedar Grove Township
3 Micheal Hughes At Large
4 Joshua Mayo At Large
5 Amy Cole At Large
6 Art Menius Little River Township
7 GregoryWoloszczuk Chapel Hill Township
8 Heidi Perry At Large
9 Gene Owen At Large
10 Chloe Pankratz Youth Delegate
11 Darlene Weaver Orange County Staff
12 Kelly Milligan Orange County Staff
13 Nishith Trivedi Orange County Staff
14
15 AGENDA ITEM 1: CALL TO ORDER
16 The meeting was called to order and the roll was taken.
17
18 AGENDA ITEM 2: CONSIDERATIONS OF ADDITIONS TO AGENDA
19 No additions to the agenda
20
21 AGENDA ITEM 3. PUBLIC COMMENTS
22 No public comments
23
24 AGENDA ITEM 4. MINUTES—September 30th, 2024
25 Motion:Art Menius?—with changes:
26 • Amy Cole did not attend September 30th meeting.
27 • Spell out the MSTA
28 • Meeting held at the Whitted Building, not West Campus
29 • Clarify stakeholder language in 2024 Safe Routes to School Plan
30 • Clarify the high priority items
31 Second: Gregory Woloszczuk
32 Approval: Unanimously
33
34 AGENDA ITEM 5. OUTBOARD AGENDA
35
36 a. Transportation Multimodal Plan
37 Nish T. presented the final Transportation Multimodal Plan. The Plan was originally about 500-600
38 projects. It is now 300 or so and mainlyfocusing on 100%of it is Orange County projects.The document
39 itself, includes the public engagement analysis,the public engagement process,the public engagement
40 summary, as well as all the activities,the prioritization, scoring prioritization process, all the comments
41 received throughout the planning process. Nothing has really changed through the whole thing other
42 than the removal of town projects. We now have a full draft document that explains the whole
43 consolidation,the purpose behind it,the schedule,the planning process. Conversation was held about
44 the lack of public response to the plan.The lack of public comments has been an ongoing issue with any
45 county plan. Art M. made the recommendation to move the public engagement comments to an
46 appendix so it was not the first information viewed.This would follow the formatting of the Transit Short
47 Range Plan. Discussion was held on the Bike PED map presented in the Transportation Multimodal Plan,
48 but nothing is finalized on the map/plan as Stantec will be working on the Bike PED Plan moving forward.
49
50 Motion with corrections/changes made to the document:Art Menius
51 Second: Heidi Perry
52 Unanimously Approved
53
54 b. Non-STIP—Quarterly Review
55 Nish T. presented the County's Non-State Transportation (Non-STIP) improvement projects. He has gone
56 through the entire of list of Non-STIP projects summarized the nonstop projects a little better with the
57 funding and the summary of in the abstract to give you a better understanding what the Non-STIP are,
58 these are just the main highlights that was continued from the previous cycle. The list is up to date and
59 Nish will continue to update based on the discussion of crosswalks and bridges during this meeting.
60
61 AGENDA ITEM 6. STAFF REPORT/UPDATES
62 a. MPO, RPO,and NCDOT
63 Nish provided updates—I40 widening has had some pushbacks and should be completed 2026.All the
64 projects that were submitted in SPOT 7 that got scored that are in division stuff right now is going
65 through express design—this includes widening of Hwy 70. Speed reduction on Hwy 70 has become a
66 higher priority because of the recent news last month of the kid that got killed on US 70.This is
67 something we will be working closely with NCDOT on to address safety moving forward.
68
69
70 AGENDA ITEM 8:ADJOURNMENT
71 OUTBoard meeting was adjourned at 7:59pm.The next meeting is scheduled for November 18th, 2024.
���E ORANGE COUNTY GOVERNMENT
ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri
,�
NoKrH CARQLLNA Ora"g;„8�,�,u„5nt
Item 5.a.
Subject: Orange County Bicycle and Pedestrian Plan
PURPOSE: Provide comments on County's Bicycle and Pedestrian Plan.
BACKGROUND: Stantec was selected to conduct Orange County's first Bicycle and Pedestrian
Plan for the unincorporated parts of the County. The consultant will exercise best planning
practices for analysis, public engagement, recommendations and potential implementation. Final
Bicycle and Pedestrian Plan will be used to update the Orange County Transportation Multimodal
Plan. Staff requests any comments Orange Unified Transportation Board (OUTBoard) may have
and they will be passed onto the consultant.
RECOMMENDATIONS:
Provide comments on County's Bicycle and Pedestrian Plan.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
���E ORANGE COUNTY GOVERNMENT
ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri
,�
NoKrH CAROLINA Ora"g;„8�,�,u„5nt
Item 5.b.
Subject: 2024 Annual Report and 2025 Work Plan
Attachment: 2024 Annual Report and 2025 Work Plan
PURPOSE: Approve the Orange Unified Transportation Board (OUTBoard) 2024 Annual Report
and 2025 Work Plan.
BACKGROUND: Each year, the OUTBoard culminates its efforts with the Annual Report, which
highlights the accomplishments of the past year and outlines plans for the upcoming year. The
2024 Annual Report and 2025 Work Plan (Attachment 1) have been drafted to reflect the
achievements of the County's multimodal transportation advisory board over the past year, as
well as the goals set for the next year. Staff recommends approval of this report and work plan.
RECOMMENDATIONS:
Approve the 2024 Annual Report and 2025 Work Plan.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919) 245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE COUNTY BOARDS AND COMMISSIONS
ANNUAL REPORT/ WORK PLAN
Board/Commission Name: Orange Unified Transportation Board (OUTBoard)
Report Period: January 2024-December 2024
The Board of Commissioners appreciates the dedication of all the volunteers on their
boards and commissions and welcomes input from various boards and commissions
throughout the year. Please complete the following information, limited to the front and
back of this form. Other background materials may be provided as a supplement to, but
not as a substitute for, this form.
Person to address the BOCC and contact information: Michael Hughe — OUTBoard
Chair
Primary County Staff Contact Person: Nishith Trivedi, Transportation Director
How many times per month does this board/commission meet, including any special
meetings and sub-committee meetings?
• 1 meeting per month.
Brief Statement of Board/Commission's Assigned Charge and Responsibilities.
1. The OUT Board is charged with advising the Board of County Commissioners on the
planning and programming of transportation infrastructure improvements and other
County transportation planning initiatives, as directed by the Board.
2. Upon request, OUT Board may advise other boards regarding transportation.
What are your Board/Commission's most important accomplishments?
1. Recommended County approve the NC 54 Multimodal Corridor Study.
2. Recommended County approve updated County Priorities for Strategic Prioritization
of Transportation 7.0 this includes making NC 10 and Regional Transit Center in
Hillsborough County Priorities.
3. Advocated for Congestion Management and Air Quality Grant for 3 MOD vans in
Central Pine Rural Planning Organizastion, along with FTA 5339 discretionary grant.
4. Updated OUTBoard Policies and Procedures including quorum, meeting date, time
and location.
5. Recommended County approve the Sidewalk Maintenance Agreement for bridge
replacement project for state build sidewalk from home depo and Aldo, south to the
new bridge
6. Recommended County approve Orange County Transportation Services Public
Involvement Plan.
7. Provided comments on list of local and regional transportation Plan, programs and
projects including DCHC MPO Safe Streets For All grant,
8. Approved the Safe Routes to School update Scope of Work for 2024
List of Specific Tasks, Events, or Functions Performed or Sponsored Annually.
1. Continue improving coordination, collaboration, and comprehensive transportation
planning with local, regional, state, and federal agencies.
2. Continue improving upon countywide multimodal safety assessment and determine
unique ways Orange County can help meet MPO safety performance measures and
targets.
3. Continue pursuing all funding sources for County transportation priorities and track
status of project implementation.
1. Continue monitoring locally and regionally adopted plans for updates and
amendments like Orange County plans, Comprehensive Transportation Plan,
Metropolitan Transportation Plan and others.
2. NCDOT's bi-annual STIP
i. 1st year, recommend to BOCC Orange County's transportation priorities for
MPO/RPO SPOT consideration.
ii. 2nd year, provide comments on the draft STIP
3. Regularly review NCDOT implemented projects and MPO/RPO activities.
i. Bi-annually review Small Projects Program for non-STIP funding.
ii. Discuss any OCPT and TAS activities.
4. BOCC initiatives as assigned.
5. OUTBoard membership, offices and other items assigned by the BOCC.
Describe this board/commission's activities/accomplishments in carrying out BOCC
goal(s)/priorities, if applicable.
Priority 6: Develop plan and tools to improve how County and citizens communicate with
each other; foster two-way exchange.
• Regularly update Transportation Planning and OUTBoard website
• Publish online all public meeting notices issued by local, regional, and state
agencies related to transportation plan and projects in the County
Priority 20: Support transit, pedestrian, and bicycle facilities and other alternatives to the
single passenger automobile.
• Ensure transit, bicycle, and pedestrian facilities are addressed in each
transportation plan, project, and program.
• Quarterly discuss County transit activities with OCPT and TAS.
• Participate in addressing bicycle. Sidewalk, and pedestrian safety for Safe Routes
for schools and residents in Orange County
• Actively participate in states SPOT/STIP process as well as MPO/RPO activities
ensuring multimodal issues are addressed.
Describe the collaboration relationship(s) this particular board has with other advisory
boards and commissions?
• Upon request, OUT Board may advise other boards regarding transportation.
Identify any activities this board/commission expects to carry out in 2024 as they relate
to established BOCC goals and priorities. If applicable, is there a fiscal impact (i.e.,
funding, staff time, other resources) associated with these proposed activities (please
list).
1. Continue expanding Moblity-on-Demand
2. Continue advancing the Regional Transit Center in Hillsborough
2. Implementation of the complete street and vision policy through grants, transit tax and
CIP.
3. Participated in aspects of the OCPT 5311 Rural area and 5339 combined capital
grants- analysis, and recommendations to support transit services and funding to non-
urbanized areas.
4. Support the departments Transit Plan and Short-Range Transit Plan updates
6. Updated the Safe Routes to school project to include safety for all schools in Orange
County.
7. Implement NC 54 Multimodal Corridor Improvements through complete street and
vision zero
8. Complete US 70 Multimodal Corridor Study by providing recommendations on
improvements for roads, bikes, and pedestrians and requesting County approve the
study
9. Advance the County's Transit Dashboard with transportation performance measures
and other improvements.
What are the concerns or emerging issues your board has identified for the upcoming
year that it plans to address, or wishes to bring to the Commissioners' attention?
1. Monitor connectivity and infrastructural changes with the local jurisdictions,
surrounding counties, regional agencies, and along utility easements to create a more
comprehensive multimodal transportation system.
2. Work with NCDOT to promote funding of multimodal projects in rural areas to a greater
degree.
3. Promote alternative transportation modes during peak hours via public-private
partnerships through County TDM Program.
4. Continue work with NCDOT in completing pedestrian counts as a function of the
Municipal Schools Transportation Assistance (MSTA) study conducted at Grady
Brown Elementary School and Cedar Ridge High School and share findings from the
final report.
5. Improve transportation planning process by encouraging local schools and other
public agencies to be more involved through public engagement.
6. Pursue alternative means of addressing local match and local administration
requirements for non-highway projects when plausible options exist for rural, low-
density areas of the County; at the same time, encourage municipal partners to pursue
similar options in urbanized, higher-density municipal areas.
ORANGE TRANSPORTATION
COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT
COUNTY
NoKm CALIQLLNA PUBLIC TRANSIT
OrangeCounty
Item 5.c.
Subject: OUTBoard Elections
PURPOSE: Elect Chair, Vice-Chair and Secretary
BACKGROUND: Per the Orange County Advisory Board Policy,the Chair,Vice-Chair and Secretary
serve one-year term. They are also eligible to serve three consecutive one-year terms. Currently
the Orange Unified Transportation Board (OUTBoard) Chair and Vice-Chair are eligible to serve
another term. OUTBoard has not elected a secretary.
Role and Responsibilities for each position is outlined below:
1. Chair:
a. Calls all meetings
b. Serves as the presiding officer and conducts advisory board meetings.
c. Acts as the authorized spokesperson for the advisory board.
d. Assists staff in developing the advisory board meeting agenda.
e. Appoints and dissolves subcommittees, and the Chair and members thereof,of the body
in consultation and with approval of the advisory board.
f. Sets goals for the advisory board in consultation with the Orange County Board of
Commissioners.
g. Carries out advisory board assignments as required by the Orange County Board of
Commissioners.
h. Reviews all advisory board minutes and proposed recommendations or assigns another
member of the advisory board to do so.
i. May excuse members from attending advisory board meetings up to two (2) times per
twelve (12) month period.
2. Vice Chair:
a. Serves as the presiding officer and conducts advisory board meetings in the absence of
the Chair.
b. Has all the responsibilities of the Chair in the Chair's absence.
3. Secretary:
a. Takes (or oversees the taking of) minutes for all advisory board meetings.
b. Submits minutes to the Chair to be distributed to advisory board members in advance
of meetings.
c. Submits approved advisory board minutes to the Clerk to the Orange County Board of
Commissioners for retention and distribution to the Orange County Board of
Commissioners.
d. Assures that other records of the advisory board are kept as directed by the Chair or the
Orange County Board of Commissioners.
RECOMMENDATIONS:
Elect Chair, Vice-Chair and Secretary
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
NCDOT PROJECTS LOCATED/N BGMPO- UNDER DEVELOPMENT
Let/Start Completion
TIP/WBS# Description Date Date Cost Status Project Lead
SS-6207G NC 87(East Webb Avenue)at Flanner Street,Pedestrian 5/11/23 9/17/14 $60,000 Planning and design activities Dawn McPherson
50502 signal installation and crosswalk pavement markings. underway.Utility relocations
underway.Construction complete
9/17/24.Waiting on final inspection.
U-6011 Intersection improvements at US 70(South Church Street) 12/18/24 FY2027 $3,000,000 Planning and design activities Chris Smitherman
47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified.Utilities
47146.2.1 underway.
47146.3.1
15BPR.54 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/21/25 FY2028 $5,000,000 Planning and design activities Kristy Alford
Holden Street)over 1-85 Business and on Structure#148 on I- underway
40 over Haw River in Alamance County
1-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/31/25 FY2027 $48,000,000 Planning and design activities Brian Ketner
48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery.
48689.2.1
48689.3.1
50547 NC 49 at Green Level Church Road/James Boswell Road- 4/17/25 FY2026 $650,000 Planning and design activities Trung Nguyen
Realign Intersection underway.25%plans complete.CFI
meeting held.
U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 8/18/26 FY2028 $13,200,000 Planning and design activities Suzana Matta
47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway,Includes EB-5882.ROW
47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition 80%
47159.3.1
BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 9/16/25 FY2026 $5,900,000 Planning and design activities David Stutts
underway
EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/25/25 FY 2027 $120,000 Municipal Agreement required to City of
Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen
Robinson
EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/25/25 FY2027 $200,000 Municipal Agreement required to City of
(Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen
Robinson
U-6131 Install dual left turn lanes in westbound direction at NC 54(W. 1/15/26 FY2028 $3,500,000 Planning and design activities Brandon Green
Harden Street)at NC 49(Maple Ave.)in Burlington pending
EB-5988 Construct sidewalk on Lee Ave./W.Lebanon Ave.to SR 1454 12/10/26 FY2028 $272,000 Municipal Agreement required to Town of
(W.Haggard Ave.)in Elon begin work Elon/Stephen
Robinson
AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby
enhancements at the Burlington-Alamance Regional Airport underway
BGMPO Oct 2024
Page 1
NCDOT PROJECTS LOCATED/N BGMPO- UNDER DEVELOPMENT
Let/Start Completion
TIP/WBS# Description Date Date Cost Status Project Lead
U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada 3/16/27 FY2030 $21,000,000 Planning and design activities Brandon Green
50234.1.1 Road)to US 70(South Church Street)in Burlington underway-Field Inspection held.
50234.2.1 ROW acquisitions 75%complete.
50234.3.1
BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 10/7/27 FY2029 $1,200,000 Planning and design activities Daniel Dagenhart
underway-Plans at 65
B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19. David Stutts
48709.1.1 SR 1928(Trollingwood Road)in Haw River Planning and design activities
48709.2.1 underway.
48709.3.1
U-6013 Widen NC 119 to multi-lanes from SR 1981(Trollingwood- 5/16/28 FY2031 $6,200,000 Planning and design activities Suzana Matta
47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway,ROW certified and
47158.2.4 (non-system)in Mebane. utilities underay.
47158.3.4
U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 10/16/29 FY2031 $900,000 Planning and design activities Brandon Green
Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending.(Funded for Prelim.
in Burlington Engineering only)
U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $6,337,000 Planning and design activities Suzana Matta
47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway
47144.2.1
47144.3.1
1-6009 Interchange improvements at 1-40/1-85 and SR 1158 6/20/30 FY2032 $936,000 Planning and design activities Brandon Green
47962.1.1 (Huffman Mill Road). Construct additional right turn lane on I- pending.(Funded for Prelim.
47962.2.1 40 WB Ramp and improve operations at SR 1308(Garden Engineering only)
47962.3.1 Road)intersection in Burlington
BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $700,000 Planning and design activities Daniel Dagenhart
underway
BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart
pending
BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $700,000 Daniel Dagenhart
SM-6107D E.M.Holt Elementary School located at 4751 NC 62, TBD TBD $750,000 Planning and design activities Brian Thomas
51319 Burlington,NC,south of Burlington.Internal campus underway.Work performed by
improvements as identified in Traffic Operations Study SCH-F- school system with reimbursement
2019-074 to contain school-related traffic queues on campus. by department.Work complete.
Waitinq on start and completion
Page 2 BGMPO Oct 2024
NCDOT PROJECTS LOCATED/N BGMPO- UNDER DEVELOPMENT
Let/Start Completion
TIP/WBS# Description Date Date Cost Status Project Lead
SM-6107E Alexander Wilson Elementary School located at 2518 NC 54, TBD TBD $750,000 Planning and design activities Brian Thomas
51446 Haw River,NC,in Swepsonville.Alamance County Schools to underway.Work performed by
provide funds as needed in excess of program cap.Internal school system with reimbursement
campus improvements as identified in Traffic Operations by department.Work complete.
Study SCH-F-2021-065 to provide traffic queue storage on Waiting on start and completion
SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson
51338 Level.Convert intersection to all way stop control. underway
SS-6207AB SR 1500(Gibsonville Ossipee Road)at SR 1553(Midway TBD TBD $25,000 Planning and design activities Dawn McPherson
51339 Church Road/Guilford County Farm Road),southwest of underway
Ossipee.Convert intersection to all way stop control.
SS-6207AE SR 1003(Lindley Mill Road)at SR 2172(Moores Chapel TBD TBD $52,000 Planning and design activities TBD
51426 Cemetery Road)near Graham.Convert intersection from two underway
way stop to all-way stop with overhead flasher.
SS-6207AG NC 87 at SR 2172(Moores Chapel Cemetery Road)near TBD TBD $49,000 Planning and design activities Dawn McPherson
51428 Graham.Convert intersection from two way stop to all-way underway
stop with overhead flasher.
SS-6207AH SR 2424(S.Maple Street)at W.Gilbreath Street in Mebane. TBD TBD $25,000 Planning and design activities Dawn McPherson
51471 Convert intersection to all way stop operation. underway
SS-6207AI SR 1003(Lindley Mill Road)at SR 1005(Greensboro Chapel TBD TBD $25,000 Planning and design activities Dawn McPherson
51472 Hill Road),south of Saxapahaw.Convert intersection to all underway
way stop traffic control.Change existing overhead flasher to
all red displays.
SS-6207AJ SR 1581(Stony Creek Church Road)at SR 1587(Pagetown TBD TBD $25,000 Planning and design activities Dawn McPherson
51429 Road),north of Burlington.Convert intersection to all way stop underway
control.
SS-6207Y SR 1001(Union Ridge Road)at SR 1002(Jeffries Cross TBD TBD $33,000 Planning and design activities Dawn McPherson
51342 Road),north of Burlington.Convert intersection to all way stop underway
control.Revise existing overhead flasher to all red displays.
Signal Inv#07-0002.
48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve TBD TBD $650,000 Planning and design activities Trung Nguyen
turning radii for trucks underway -ROW underway
Page 3 BGMPO Oct 2024
10/8/2024
North Carolina Department of Transportation
Active Projects Under Construction-Alamance Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204438 B-5728 REPLACE BRIDGE#112 OVER REEDY FORK CREEK SMITH-ROWE,LLC Howell,Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 2/17/2025 78.17 91.86
ON NC 87 IN OSSIPEE
C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70(SOUTH APAC ATLANTIC INC. Howell,Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/13/2025 100.00 55.26
CHURCH STREET)AT SR 1226/SR 1311(UNIVERSITY THOMPSON ARTHUR
DRIVE)IN BURLINGTON DIVISION
C204905 10 SECTIONS OF SECONDARY ROADS. CAROLINA SUNROCK LLC Howell,Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024
C204959 29 SECTIONS OF SECONDARY ROADS. VECELLIO&GROGAN INC Hayes,PE, $5,067,692.35 7/8/2024 11/15/2025 7/6/2024 11/15/2025 3.00 15.26
DBA SHARPE BORHTERS Meredith D
DG00588 NC 87 AND SR 1719(SELLARS MILL ROAD/ FSC II LLC DBA FRED Howell,Bobby J $3,205,254.10 11/1/2023 5/1/2025 6/10/2024 5/1/2025 52.00 53.68
POMEROY ST) SMITH COMPANY
DG00631 R-5787FA INTERSECTIONS OF VARIOUS US,NC AND SR EASTERN EARTHSCAPES Howell,Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 30.00 32.39
ROUTES &CONSTRUCTION LLC
DG00633 R-5787K INTERSECTIONS OF VARIOUS US,NC AND SR HOLLINS CONSTRUCTION Howell,Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 18.60 35.35
ROUTES SERVICES INC
Page 1 of 1
NCDOT DIV 7 PROJECTS LOCATED IN CPRPO - UNDER DEVELOPMENT
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
SS-6207T Portions of Twenty-One (21 ) Routes. Curve Warning Sign 9/20/23 9/30/24 $200,000 Planning and design activities underway. Dawn McPherson
51112 Installation. Construction underway.
BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/26 FY2028 $2,900,000 Planning and design activities underway Daniel Dagenhart
BP7.R009.1 ROW acquisition underway.
BP7.R009.2
BP7.R009.3
1-5958 Pavement rehabilitation on 1-40 / 1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Trung Nguyen
45910.1 .1 (Buckhorn Road) to west of SR 1006 (Orange Grove Road).
45910.3.1
BP7-R017 Replace Bridge #14 on SR 1548 (Schley Road) 9/7/28 FY2030 $1 ,500,000 Planning and design activities underway Daniel Dagenhart
BP7.R017.1 ROW acquisition underway.
BP7.R017.2
BP7.R017.3
R-5821A Construct operational improvements including 6/17/31 FY2033 $3,194,000 PE funding approved 10/10/17, design Suzana Matta
47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating
47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study
47093.3.2 Road).
TARPO-Orange Co Oct 2024
Page 1
North Carolina Department of Transportation 10/2/2024
Active Projects Under Construction - Orange Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 48 45.82
COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan
US-15/501 . CORPORATION
C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 10/15/2024 98 93.28
LLC
C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 29.14 24.59
LLC
DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 39 34.72
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND
CONSTRUCTION LLC
DG00633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 22.85 39.77
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION
SERVICES INC
Page 1 of 1
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
SS-6207T Portions of Twenty-One(21)Routes.Curve Warning Sign 9/20/2023 9/30/24 $200,000 Planning and design activities underway. Dawn McPherson
51112 Installation. Construction started.
SS-6207A NC 54 Pedestrian improvements between SR 1902(Manning 2/15/2024 10/31/2024 $171,000 Planning and design activities underway. Dawn McPherson
50337 Drive)and SR 1937(Old Fayetteville Road)in Chapel Hill Materials have arrived and work has
and Carrboro. Improvements will include refuge islands, begun.
crosswalks and pedestrian signals. Improvements to be
completed by state forces.
U-4726DF Bicycle detection at signalized intersections in Carrboro 8/15/2024 Spring 2025 $36,000 Plans at 90%completion-Plan review Town of
comments returned back to the Town of Carrboro/Stephen
Carrboro for revisions. Re-Let(Low bid Robinson
concurrence package under review)
C-5181 Jones Creek Greenway Project-Fill Gap between the 11/21/2024 FY2026 $654,000 Environmental document approved Town of
Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen
also implement program to support on-vehicle trips to Morris Carrboro develops and submits. Robinson
Grove Elementary School
HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Suzana Matts
Beacons(RRFB), raised center island,pedestrian signage,
and approximately 125 linear feet of sidewalk on NC 86 at
Critz Drive in Chapel Hill
HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno River 1/16/2025 FY2027 $153,800 Agreement executed, Hillsborough to Town of
from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen
plans. Review of final plans underway. Robinson
BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 1/16/2025 7/31/2025 $1,311,000 Construction funding to be requested once Trung Nguyen
49998.1.1 15/501/NC 86(South Columbia Street)interchange in municipal agreements are executed.
Chapel Hill. Construct sidewalk and install pedestrian Chapel Hill MA executed,Carrboro MA
signals,crosswalks,and refuge islands at selected locations. has also been executed. Utility
Relocations Underway.
P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons
46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough and deisgn activities underway
46395.3.3
BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander Foster
Page 1 DCHCMPO Oct 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
EB-5721 Upgrade existing off-road path and construct new section of 9/25/2025 FY2026 $2,400,000 Bids opened 7/17/23-Bids rejected. Town of Chapel
path of Bicycle Route#1 from Cleland Drive to Willow Drive Project on Hold.Chapel Hill to seek Hill/Stephen Robinson
in Chapel Hill additional funding and relet at a future
date.
HO-0013 Chapel Hill from Franklin Street and Rosemary Street,and 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Stephen Robinson
51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed.
51177.2.1 Street in downtown Chapel Hill. Install new mast arm and
51177.2.2
51177.3.1 curb and sidewalk improvements.
C-5650 Construct sidewalk on one side of SR 1919(Smith Level 4/19/2026 FY2028 $1,718,000 Carrboro approved to incorporate water Town of
Road/S.Greensboro St.)from Public Works Drive to the line work into design. Env doc returned w Carrboro/Stephen
northern end of Old Pittsboro Road in Carrboro comments on 12/10/21. Document to be Robinson
updated to include additional limits for
resurfacing. NCDOT waiting on revised
1-3306AC 1-40 at NC 86-Upgrade to superstreet from Northwood Drive 5/19/2026 FY2029 $4,350,000 Planning and design activities underway Radha Attaluri
to Ramp C/D at 1-40 interchange
BP7-R009 Replace Bridge#11 on SR 1336(Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart
ROW acquisisition complete.
EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/17/2026 FY2029 $848,000 Municipal agreement needs to be Town of
1772(North Greensboro Street)to south of Norfolk Southern requested and executed to begin work. Carrboro/Stephen
Railroad Tracks in the Town of Carrboro Robinson
EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be Town of Chapel
1741/SR 1838(Old Durham Chapel Hill Road)in Chapel Hill requested and executed to begin work. Hill/Stephen Robinson
EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 10/1/2026 FY2028 $3,104,000 Municipal agreement executed and project Town of Chapel
south of Norfolk Southern Railroad to NC 86(MLK Jr. Blvd.) development underway. Hill/Stephen Robinson
in Chapel Hill
1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 Planning and design activities pending Trung Nguyen
45910.1.1 (Buckhorn Road)to West of SR 1006(Orange Grove Road)
45910.3.1
Page 2 DCHCMPO Oct 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
B-6037 Replace Bridge#49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $10,600,000 Planning and design activities underway Brandon Green
BP7-R013 Replace Bridge#90 on SR 1940(Damascus Church Road) 9/16/2027 FY2030 $800,000 Planning and design activities underway Daniel Dagenhart
Plans at 25%
EB-5880 Construct sidewalk on the north side of SR 1005(Jones 9/30/2027 FY2029 $441,000 Municipal agreement needs to be Town of
Ferry Road)from Davie Road to SR 1010(West Main St.)in requested and executed to begin work. Carrboro/Stephen
Carrboro Robinson
EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2027 FY2029 $230,000 Municipal agreement needs to be Town of
1005(Jones Ferry Road)in Carrboro requested and executed to begin work. Carrboro/Stephen
Robinson
BR-0247 Replace Bridge#29 on US 70 Business/NC 86 over Cates 11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key
Creek
BR-0091 Replace Bridge#32 on US 70 over the Eno River 10/17/2028 FY2032 $4,000,000 Planning and design activities underway Jon Gaillard
BP7-R015 Replace Bridge#86 on SR 1942(Jones Ferry Road) 9/6/2029 FY2031 $1,700,000 Planning and design activities underway. Daniel Dagenhart
Detour needs improvements so will need
to see if resurfacing funds available or
switch to TIP project.TBD
U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 7/16/2030 FY2033 $49,238,000 PE funding approved 5/14/15, Planning Radha Attaluri
50235.1.1 40 to Eno River in Hillsborough and Design activities underway,
50235.2.1 Coordinate with 1-0305B which was
50235.3.1 formerly 1-5967.
BP7-R007 Replace Bridge#63 on Pleasant Green Road 9/5/2030 FY2033 $2,500,000 Planning and design activities underway Daniel Dagenhart
Page 3 DCHCMPO Oct 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
1-0305B Interchange improvements at 1-85 and SR 1009(South 10/15/2030 FY2033 $16,900,000 PE funding approved 9/8/17, Planning and Colin Mellor
34142.1.5 Churton Street)in Hillsborough Design activities underway, Coordinate
34142.3.3 with 1-0305 and U-5845. (1-0305B was
34142.3.4 formerly 1-5967)
34142.2.4
R-5821A Construct operational improvements including 6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17,design Suzana Matta
47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended,
47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville Coordinating with NC54 West Corridor
47093.3.2 Road). Study
1-0305(A) Widening of 1-85 from west of SR1006(Orange Grove Road) 1/20/2032 FY2036 $132,000,000 PE funding approved 6/5/18, Planning and Colin Mellor
34142.1.2 in Orange Co.to west of SR 1400(Sparger Road)in Orange design activities underway, Project
34142.2.2 Co. reinstated per 2020-2029 STIP(funded
34142.3.2 project)and delete project 1-5983
1-0305C Interchange improvements at 1-85 and NC 86 in 11/16/2032 FY2035 $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor
34142.1.6 Hillsborough and Design activities underway, 1-0305C
was formerly 1-5984.
EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $372,000 Review comments provided to Carrboro in Town of
June 2023 for revisions and resubmittal. Carrboro/Stephen
Resubmittal under review. Robinson
SS-6207AF SR 1004(Efland-Cedar Grove Road)at SR 1306(Lebanon TBD TBD $25,000 Planning and design activities underway Dawn McPherson
51427 Road),west of Hillsborough.Convert intersection to all way
stop traffic control(without flasher).
Page 4 DCHCMPO Oct 2024
North Carolina Department of Transportation 10/2/2024
Active Projects Under Construction - Orange Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 48 45.82
COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan
US-15/501 . CORPORATION
C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 10/15/2024 98 93.28
LLC
C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 29.14 24.59
LLC
DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 39 34.72
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND
CONSTRUCTION LLC
DG00633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 22.85 39.77
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION
SERVICES INC