HomeMy WebLinkAboutAgenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 17, 2024 Action Agenda Item No. 6-a SUBJECT: Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility DEPARTMENT: Asset Management Services ATTACHMENT(S): INFORMATION CONTACT: 1. CPL Cost Proposal Travis Myren, County Manager, 919- 2. Professional Services Contract 245-2308 3. CPL Response to RFQ Alan Dorman, AMS Director, 919-245- 2627 UNDER SEPARATE COVER ONLY AVAILABLE ELECTRONICALLY 4. 239-Page RFQ for Design Services for Crisis Diversion Facility T:IAMSICrisis Diversion FacilitVlRFQ 367-005427 Crisis Diversion Facility 1 . df PURPOSE: To review the cost proposal submitted by CPL for design services related to the construction of the Crisis Diversion Facility, and approve and authorize the Chair to sign the contract after final review by the County Attorney. BACKGROUND: The Crisis Diversion Facility is intended to divert individuals experiencing a behavioral health crisis from hospital emergency departments and the County's Detention Center by offering 1) behavioral health urgent care services for assessment, stabilization, treatment, and aftercare planning for patients 4 years old and older; and 2) facility-based crisis services for adults for longer-term treatment. In the FY 2023-33 Capital Investment Plan (CIP), the Board approved $2,047,155 for design services for the Crisis Diversion Facility and $22,952,845 for construction in FY 2024-25. Additionally, in the FY 2024-34 CIP, the Board approved $1,100,000 to acquire land for the facility. The County is negotiating to purchase property, but needs to begin design work so construction can begin in the summer of 2025. The County issued a request for qualifications (RFQ) for the design and related services for the Crisis Diversion Center, with only one firm, CPL, responding to the RFQ. CPL was previously selected to perform preliminary and schematic-level design and analysis services for developing the Crisis Diversion Facility. CPL's proposal was reviewed by the evaluation committee, consisting of County Manager Travis Myren; Interim Deputy County Manager Caitlin Fenhagen; Tony Maripietri, Chair of the Crisis Diversion Facility Subcommittee of the Behavioral Health Task Force; and Asset Management 2 Services Director Alan Dorman. CPL was selected based on the strength of its response to the RFQ, and submitted a final proposal of$1,719,650. Within the proposal, $143,890 is devoted to schematic design services to evaluate up to two (2) different sites for the Crisis Diversion Facility. No funds beyond those will need to be expended until a final site has been purchased. FINANCIAL IMPACT: CPL's proposal for the design and related services for the construction of the Crisis Diversion Facility, at the cost of$1,719,650, was funded in the FY 2023-33 CIP. ALIGNMENT WITH STRATEGIC PLAN: This item supports: • GOAL 2: HEALTHY COMMUNITY OBJECTIVE 1. Improve harm reduction, prevention, and support services for adults and children experiencing behavioral health issues, substance use disorder, and intellectual or developmental disability. OBJECTIVE 4. Reduce impacts and barriers for justice-involved children and adults through deflection, diversion, therapeutic interventions, and re-entry support, including housing. RECOMMENDATION(S): The Manager recommends that the Board approve the contract with CPL and authorize the Chair to sign it after final review by the County Attorney. 3 co L September 5,2024 Via Email Mr.Alan Dorman, Director (adorman(aorangecountync.gov) Orange County Asset Management Services 405 Meadowlands Drive Hillsborough, NC 27278 RE: BEHAVIORAL HEALTH CRISIS DIVERSION CENTER Orange County Hillsborough, NC Dear Alan: On behalf of CPL,we are pleased to submit the following proposal for design services for the operational and facility planning on a new Behavioral Health Crisis Diversion Center in Hillsborough, North Carolina. PROJECT UNDERSTANDING CPL understands Orange County(Client)wishes to contract with CPL to provide architectural, interior, structural and MEP design services associated with the new Crisis Diversion Center. CPL will contract with Timmons Group for civil engineering services, Palacio for cost-estimating, and RHA Health for clinical operational planning. The project consists of a new construction two-story 27,000 square-foot building that is reflective of recent program adjustments to the Behavioral Health Urgent Care (BHUC)from 24 private rooms to 18 private rooms. Other program areas included in the project consist of: • Front Entrance/Waiting Areas • Rear Entrance • 16-bed Adult Inpatient Facility Based Crisis Center (FBC) • Medical Areas • Facility Security • Outpatient Services • General Purpose Areas • Community Partner Offices CPL also understands no site is currently selected for the Crisis Diversion Center and our design team will play an integral role in evaluating potential sites. SCOPE OF SERVICES Task I-Schematic Desicfn CPL will lead the Schematic Design phase, which will consist of further site evaluations for the Crisis Diversion Center. We are assuming evaluation of up to two (2) sites may be necessary. As part of this effort, the design team will also re-work departmental plans, blocking/stacking diagrams, and site layout to test the feasibility of each site. RHA will provide guidance on impacts to clinical operations to ensure best practices are considered for service delivery. Participation in the Construction Manager (CMAR) RFP and selection process is also included in our SD scope of services. Task II-Design Development Based on the approved Schematic Design plans/site from Task I, CPL will proceed with the detailed planning sessions to advance the design in more detail. These efforts will include the creation of room data sheets, medical equipment, and furniture layouts, MEP coordination, finishes, and millwork. In CPL Architecture I Engineering I Planning 6302 Fairview Road, Suite 102,Charlotte, NC 28210 704.331.9131 CPLteam.com 4 LETTER OF AGREEMENT CIO Crisis Diversion Center Orange County September 5,2024 to Page 2 of 4 addition, further development of the site and exterior landscaping will be done in parallel with the exterior design. Deliverables for Design Development will include,at a minimum: 1. Code Review/Life Safety Plan 2. Site Drawings 3. Structural Framing Plans 4. New Work Floor,Ceiling,and Finish Plans S. Interior Elevations 6. Equipment and Furniture Plans 7. Building Sections and Elevations (Renderings as needed) 8. Electrical, Mechanical, Fire Alarm,and Plumbing Plans and Details 9. Project Specifications (outline form at this phase) 10. Cost Estimating Task III-Construction Documents CPL will coordinate with the design team to prepare Construction Documents in compliance with the North Carolina State Building Code (2018 edition), NFPA, DHSR Rules and Regulations, and other applicable standards. FGI compliance is not required for this project as it has not been adopted by DHSR for Crisis Diversion Centers. CPL also understands release of an early design package may be necessary in order to procure critical path items needed to expedite the construction schedule identified by the Construction Manager. Task IV-Bid Phase Services CPL will submit the documents to State authorities having jurisdiction (DHSR). All permits and approvals for the project will be paid for and secured by the Client. CPL will work with the Construction Manager to answer Requests for Information (RFIs), provide clarifications, and issue addenda as required for pricing. Task V-Construction Phase Services CPL will provide twenty-four (24) site visits during construction with a field report written for each visit. Project meetings, inwall / overhead review, punch list, pre-DHSR and DHSR inspections will occur during these site visits. CPL will also provide construction administration services consisting of the review of submittals,shop drawings,certification of monthly pay requests,responding to RFIs that arise during the course of construction and response to all DHSR review comments. SCHEDULE No schedule has been established. We agree to provide services to the Client in the most expeditious manner practical. ASSUMPTIONS Our fee proposal is based upon the following assumptions: 1. Reimbursable expenses are included in the fee. 2. Site visits are indicated under Task V. 3. One (1) early Construction Document set in addition to the final is assumed in our proposal. 4. Placement and coordination of medical equipment is included in the scope of work; however, procurement is excluded. S. Furniture design, coordination and procurement are included within the architectural/interiors scope of work(fee). 6. Construction Phase Services is based on a 12-month schedule. 7. Shallow foundations and steel construction were the basis of design for the structural fee proposal. 8. Retaining walls are excluded from this scope of work. 9. Test and Balance and Special Inspections are excluded from this proposal. 5 LETTER OF AGREEMENT co Crisis Diversion Center Orange County September 5,2024 to Page 3 of 4 10. MEP infrastructure will be based on the SD narratives previously submitted, which includes the design of geothermal wells. 11. Commissioning shall be provided by the Client. 12. Refer to Timmons Group and Palacio's fee proposals for additional exclusions and clarifications. 13. Any items not contained in our Scope of Services or contrary to the assumptions listed above will be deemed additional services. If requested by the Client,additional services will be provided on an hourly basis at our Standard Hourly Billing rates,or as a fixed fee mutually agreed to in advance by both parties. CLIENT RESPONSIBILITIES The Client shall appoint an "Owner's Representative" to act as the point of contact for CPL. It shall be the responsibility of the client to provide the following: • Unrestricted access to the project site. • Reasonable advance notice of scheduled meetings. • Decisions on critical issues in a timely manner. • Payment of all invoices in accordance with this agreement. COMPENSATION CPL agrees to provide the professional design services listed in the Scope of Services. Our fee proposal is based upon work-effort projections and applicable billing rates for the scope of work anticipated for this project. We propose a fixed fee of$1,719,650.00 for Construction Documents through Construction Administration and Closeout services. This fee includes reimbursable expenses and is summarized in the following table. Description Fee Task I-Schematic Design $143,890.00 Task II thru V-Construction Documents thru Construction Phase Services CPL-Architectural &Interior Design $623,960.00 CPL-Furniture Design &Procurement $32,000.00 CPL-MEP Engineering $474,500.00 CPL-Structural Engineering $120,000.00 Timmons-Site,Civil,and Landscape Design $176,100.00 Timmons-Environmental (T&M) $53,200.00 Timmons-Wastewater $7,000.00 RHA Health-Clinical Operations $51,000.00 Palacio-Cost Estimating $38,000.00 Total Fee $1,719,650.00 We will bill monthly for the progress of the work. Normal and customary reimbursable expenses are included in our fee. ADDITIONAL SERVICES • Items not specifically defined in the Scope of Services. 6 LETTER OF AGREEMENT CIO Crisis Diversion Center Orange County September 5,2024 am Page 4 of 4 CONCLUSION This document serves as the Owner - Architect Agreement. If these terms are acceptable, please countersign and return one copy to our office. The proposed fee is valid for 90 days from the date of this proposal. We look forward to working with you on the successful completion of this project. Sincerely, CPL Adam Chahulski,AIA, LEED AP, NCARB Sr Vice-President Enclosures: As noted cc: Mr.Travis Myren (tmyren(d�ioranaecountync.gov) I:\Carolinas\Proposals\CLT\2024 Proposals\Orange County ACCEPTED: ORANGE COUNTY By: Title: Dated: 7 5410 Trinity Road P 919.866.4951 T I M M O N S GROUP Suite 102 F 919.859.5663 YOUR VISION ACHIEVED THROUGH OURS. Raleiah, NC 27607 wwwAimmons.com LETTER OF AGREEMENT Client: CPL Team Date: 08/23/2024 Contact: Adam Chahulski Principal: Blake Hall, PE/PLA Phone No: 980.275.5891 E-mail: AChahulski@CPLteam.com Project Name: Orange Crisis Diversion Center Dear Josh: Timmons Group is pleased to offer this proposal for master planning services for Orange County. We look forward to working with you to achieve your vision for this project. Thank you for allowing Timmons Group to provide professional services on this project. We will provide the requested services, complying with established standards, while being mindful of costs to the Client (the "Client") named above according to the terms and conditions of this Letter of Agreement (the "Agreement'). Prior to submittal to a public agency,all documents will be sent to the Client,if requested,to ensure a complete understanding by all parties. We will proceed upon receipt of this signed Agreement. Please note that fees quoted are valid for sixty(60) days from the date first written above. SCOPE AND SCHEDULE OF SERVICES: Timmons Group will provide the services as detailed on the Scope of Services attached as Exhibit A (the "Scope of Services"). We will provide services in a timely and efficient manner and will keep you informed of the job status and any necessary changes. Any changes required to the Scope of Services must be approved in writing before such changes take effect. As of the date first written above, any changes in the Scope of Services caused by governing codes or Client revisions may require a schedule and/or fee change. PAYMENT SCHEDULE:Client agrees to pay Timmons Group for its Services as selected and set forth below: LX_1 FIXED FEE Fees for this Agreement will be billed on a monthly basis as a fixed fee per the Scope of Services in Exhibit A. EXHIBITS: The following Exhibits are attached hereto and expressly made part of this Agreement. [X] EXHIBIT A SCOPE OF SERVICES [X] EXHIBIT B TERMS AND CONDITIONS This Agreement shall be controlled by the provisions listed above and the Terms and Conditions in the attached Exhibit B. If there is any conflict between the provisions of this Letter of Agreement and the Terms and Conditions, the Terms and Conditions shall control. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 1 of 22 8 5410 Trinity Road P 919.866.4951 T I M M O N S GROUP Suite 102 F 919.859.5663 YOUR VISION ACHIEVED THROUGH OURS. Raleiah, NC 27607 www.timmons.com LETTER OF AGREEMENT We will proceed upon receipt of this signed agreement. Should you have any questions, you can reach Blake Hall directly at 919.316.0126 or via email at blake.hall@timmons.com. { Timmons Group ACKNOWLEDGED AND ACCEPTED: On behalf of the Client, this Agreement, including Exhibit A [Scope of Services] and Exhibit B [Terms and Conditions], is accepted and agreed to as of the date written below. By: Name: Title: Date: CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 2 of 22 9 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE SURVEY SERVICES All land surveying efforts provided by Timmons Group will meet or exceed the Minimum Standards of Land Surveying in North Carolina as adopted by the Board under regulatory authority of Title 21, Chapter 56, Section .1600 of the North Carolina Administrative Code, and the North Carolina G.S. 47-30 Requirements. See Exhibit "A" below followed by our detailed Scope of Land Surveying Services. Exhibit "A" 1 a n Click to begin ti1VgftTF1'gT ;,}tffi Esc C!"r.' SCOPE OF LAND SURVEY SERVICES Task S01 —Control and Boundary Survey Timmons Group will provide a Boundary Survey of Orange County, NC PIN 9873510737, 9873415972, CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 3of22 10 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE 9873425076, 9873425271, 9873422375. See Exhibit"A" above for the approximate limits of the property boundary surveying work outlined in pink. This task will include the following items: • Research, fieldwork and office calculations necessary to accurately locate the property boundaries according to the requirements established by NC General Statutes. • 5/8-inch diameter Iron rebars with green fluorescent caps to be set as primary horizontal control points along the traverse. The existing property corners will be tied into the traverse. • Horizontal datum for basis of bearing shall be the North Carolina Coordinate System of 1983 (NCCS83) based upon NAD83, 2011 epoch. • Field location and mapping of possible encroachments along the perimeter of the property will be noted based on physical evidence on the date of the survey. • Interior site improvements will be shown per the topographic survey scoped below. • Any missing corners along the outer perimeter of the combined parcels will be re-set with 5/8-inch diameter rebar with a red fluorescent cap. • Prepare a boundary Survey Map that can be recorded by the client at the Orange County register of Deeds office. Timmons Group can complete the recordation of the map. This can be completed on a time and material bases and invoiced as a reimbursable cost. • Prepare an AutoCAD digital file of the boundary to be used as a base for the civil engineering design work. • This survey will be prepared without the benefit of a title commitment therefor all existing easements may not be shown. Task S02—Topographic Survey Task includes preparation of a field run topographical survey for the area to include location of visible improvements; storm and sanitary sewer alignments with invert data (including 1 structure outside of limits); and surface indications of subsurface utilities. Contouring to be plotted at a 1' interval. Topographic limits will include the area outlined in green on Exhibit "A". Task S03 — Underground Utility Location An underground utility survey will be performed to designate and map underground facilities within the topographic limits. This utility survey will include horizontal designation through geophysical methods and is defined as Quality Level "B" by the American Society of Civil Engineers (ASCE). The accuracies of the markings are subject to the depth and electrical conductivity of the utility as well as site conditions and manhole access. Plastic and fiber optics lines without tracer wires may be unlocatable. This service does not include the use of ground penetrating radar and test pits. Exclusions: sanitary and storm laterals, roof drains, irrigation systems and abandoned lines. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 4 of 22 11 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Task SO4 - Recombination Plat The plat will meet the recordation requirements for the governing municipality. This task also includes submission of the plat for review and making revisions per review comments but does not include submission or recordation fees. These fees can be billed as a reimbursable expense. The fee includes setting iron rods. Exclusions— Field locating wetland/stream flags, subdivision platting, offsite surveys, ALTA, tree surveys Task S05 -Annexation Plat and Description Utilizing the survey data collected from task items S01 Timmons group shall prepare an annexation plat and description for the property acceptable to Planning Department. The plat and description will be based upon the Boundary Survey as completed by Timmons Group and the record deed information. The annexation plat and description will be stamped and sealed by a professional Land Surveyor licensed by the State of North Carolina. This task does not include the Governmental intake, processing, review, approval or recording fees, all Governmental fees are the responsibility of the client. Client Responsibilities The Client is to provide the Timmons Group Land Surveyors with complete and unencumbered access to the property and adjacent properties as needed to complete the field surveying work. GEOTECHNICAL SERVICES Task G01 —Geotechnical Services Our proposed scope of geotechnical services will consist of performing soil test borings, laboratory testing of soils, and preparation of a geotechnical engineering report. At the time of this proposal, a site layout and grading plan was not available. Our assumptions and proposed tasks are discussed below. Assumptions This geotechnical scope assumes the following conditions. If conditions vary from those assumed below adjustments to the fee may be required: • As the location of the site for development has not been finalized, no information is known regarding tree cover. This scope assumes that no more than 3 days of clearing will be needed to access boring locations. If 3 days is not adequate to reach boring locations, additional fee will be required to complete the scope. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 5of22 12 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleigh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE • The site will be accessible by either ATV or truck mounted drill rig. If difficult access conditions (such as crossing wetlands or creeks)are encountered to access boring locations, additional fees will apply. • Work can be performed during standard work hours (8am to 5pm) Monday through Friday. • We assume the client will coordinate site access through any locked gates. • We assume that there will be no private underground utilities in the vicinity of the borings or that the client will coordinate location of any private underground utilities prior to drilling operations. • We assume that no more than 10 feet of cut/fill will be needed to mass grade the site. If cut depths exceed 10 feet in the building pad, additional fee may be needed to reach boring depths required for proper analysis. • We assume building loads and subsurface conditions are such that the proposed structure can be supported on shallow foundations. If loads are higher than those assumed or subsurface conditions are such that a deep foundation system is needed, additional fee may be needed for deeper borings to support the design. Field Exploration The field exploration will consist of the following: • A geotechnical professional will perform a site reconnaissance and locate exploration locations using GPS equipment. • Contact NC 811 to mark existing public underground utilities near boring locations. • Perform Twenty Standard Penetration Test (SPT) borings in accordance with ASTM D1586 to depths ranging from approximately 10 to 50 feet. Eleven (11) borings will be performed in the proposed building area to depths ranging from approximately 20 to 50 feet. Eight (8) borings will be performed in the proposed pavement areas to depths ranging from approximately 10 to 15 feet. Two (2) borings will be performed in the proposed BMP area to depths ranging from approximately 10 to 20 feet. Boring depths are referenced to the existing ground surface. Total drilling footage is expected to be up to approximately 450 linear feet. Borings will be performed to indicated depths, or auger refusal, whichever occurs first. • Within borings, split-spoon samples will be collected in conjunction with SPT testing. Split-spoon samples will be collected at 2-foot depth intervals in the top 10 feet and at 5-foot intervals thereafter. Upon completion of borings, borehole water levels will be recorded, and the boreholes will be backfilled with drill cuttings up to the original ground surface. Soil samples will be returned to our office for visual classification and laboratory testing. All excess spoils will be disposed of on site. • Bulk soils samples will be collected from the borings and returned to our laboratory for testing. Laboratory Testing We will perform laboratory testing on representative soil samples for the purpose of classifying the soils and estimating geotechnical engineering properties. We plan to perform Atterberg limits, grain size analyses, natural moisture contents, Standard Proctor, and California Bearing Ratio (CBR) testing. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 6of22 13 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Geotechnical Engineering Report A geotechnical engineering report will be prepared based on performed borings, laboratory testing, and our engineering analysis. The report will include the following: • Site plan showing locations of the exploration. • Description of the exploration sampling methods as well as soil test boring logs. • Water levels encountered in the borings. • Depths to rock, if encountered in the borings. • Laboratory test results. • Depth and location of unsuitable materials, if encountered in borings. • Foundation recommendations for proposed structure at the site. These recommendations will be based on anticipated loads provided by the structural engineer and foundation bearing capacity. • General information regarding site preparation including re-use of on-site soils as fill, identification of deleterious soils encountered in the borings, impact of weather and construction equipment on grading, fill compaction recommendations, and preparation of soil subgrades. • Pavement thickness recommendations. • Seismic Site Classification in accordance with the North Carolina Building Code. • A Seasonal High Water Table Test (SHWT) report sealed by a licensed soil scientist (LSS) in the State of North Carolina. WATER/WASTEWATER SERVICES Task U01 - Hydrant Flow Testing To determine the hydraulic boundary conditions for the project site, Timmons Group will perform the following tasks: • Request waterline mapping from the Town of Hillsborough and assess the existing water system near the project site to determine the appropriate hydrant(s)to perform the hydrant flow testing. • Coordinate with the Town of Hillsborough to perform one (1) instantaneous hydrant flow test at or near the proposed point of connection to the existing water system. • Perform all field hydrant flow testing during one site visit. • Provide a flow test summary report incorporating the results of the test(s), a map showing the locations of the test hydrant(s) and an available pressure vs. flow curve based on the results. Task UO2 -Water System Hydraulic Analysis To determine the hydraulic performance of the proposed water system, Timmons Group will perform the following tasks: • Calculate domestic demands based on NCDEQ Regulations, Local Regulations, fixture count, and/or engineering judgment. • Build a computerized hydraulic model of the development based on the current utility design. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 7of22 14 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE • Perform hydraulic calculations based on the available flow and pressure observed during testing and the projected demands. • Review and confirm sizing of the on-site water distribution piping to meet the flow and pressure requirements. • Provide a model results sheet showing a graphical system layout, design criteria summary and residual pressure results for domestic scenarios as well as fire suppression. Assumptions And Clarifications • This proposal specifically excludes design, permitting, construction administration, and other construction phase services. • This proposal does not include survey or SUE. • Review/Submittal fees are the responsibility of the owner. • Testing may not be performed per the requirements of NFPA 291 regarding the minimum required reduction in residual pressure during the test. If testing is required to meet this portion of NFPA 291, additional fee may be necessary. • If the existing water system is not capable of supporting the proposed development, additional system testing, modeling, and the design of remedial improvements may be required, and this will require additional scope and fee to be negotiated. • Minimum fire flow (sprinkler, hydrant flow, ISO or IFC) demands shall be determined and provided by others. • This scope includes one submission and one revision/resubmittal. Additional revisions and submissions may require additional fees. • Unless otherwise specified, hydraulic analyses are based on a single plan of development. If on- site changes or phased development occurs, additional fee may be required. Project Schedule • Perform hydrant testing and provide flow test summary report within four weeks of receiving written notice to proceed (dependent upon weather and coordination with water system owner). • Perform hydraulic modeling and provide results sheet within three weeks after all necessary information is obtained. ENVIRONMENTAL SERVICES Under this Agreement, Timmons Group will provide professional services relative to the approximately 7.8-acre project located on parcels southwest of the intersection of Waterstone Drive and Highway 86 in Hillsborough, NC (Orange County) outlined below. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 8of22 15 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE \ I V 11 TTL � i --------------- - -- - - - --------- - ------ Assumptions: • Timmons Group anticipates the Client will coordinate site access and will provide any necessary documentation for field staff performing the work. • Timmons Group anticipates the Client will facilitate the completion of the necessary access permission forms for the U.S. Army Corps of Engineers (USACE)for the wetland/stream confirmation. Time & Material Services The scope outlined below will be billed based on the actual hours required to complete the work as specified. If the final project limits exceed 30 acres or the project location changes, additional scope and fee may be required. Task W01 -Wetland/Stream Delineation Timmons Group will review existing, readily obtainable environmental information on the site such as USGS mapping, aerial photography, NWI mapping and soil survey information. A wetland delineation of the subject property will be performed in accordance with the 1987 U.S. Army Corps of Engineers (USACE) Wetland Delineation Manual and appropriate Regional Supplement. A stream determination will be conducted using the North Carolina Department of Environmental Quality(NCDEQ)Stream Identification methodology, version 4.11. The flagged wetland limits will be GPS located for mapping purposes (Note that GPS location is for confirmation and planning purposes and is not a substitute for traditional field survey, and in the event wetlands and streams may be impacted by the project jurisdictional features should be located by traditional survey CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 9of22 16 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE means). A preliminary wetland delineation map showing the approximate size, shape and location of wetlands and/or waters of the U.S. present on the subject property will then be prepared. Task W02 - Wetland/Stream Confirmation & Buffer Determination Timmons Group will facilitate the confirmation of wetland and stream locations through feature flagging and submittal of a Jurisdictional Determination (JD) package to the USACE and a Buffer Determination Request to NCDEQ Division of Water Resources (DWR) (or appropriate local government agency). This package will consist of a narrative, delineation map, wetland delineation field data sheets, and stream data forms. The buffer determination package will include similar maps of the streams and stream data forms. Timmons Group will conduct a joint site visit**with the USACE and NCDEQ DWR (or appropriate local government agency)to review the site conditions, flagged wetland limits and confirm findings. A Preliminary Jurisdictional Determination (PJD) concurrence letter or an informal concurrence for the wetland delineation will be requested from the USACE and a Buffer Determination Letter will be obtained from DWR (or appropriate local government agency). Should the agencies not be able to meet jointly, the additional site visit will be billed Time & Materials with prior approval from the Client. This scope does not include any local government buffer confirmation fees which may apply. Task W03 - Phase I ESA Timmons Group will complete a Phase I Environmental Site Assessment in full compliance with the scope and limitations of the American Society of Testing and Materials (ASTM) Standard E 1527-21 (Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process). • In accordance with ASTM Standards as prescribed by the United States Environmental Protection Agency All Appropriate Inquiry (EPA AAI) process, reasonably available environmental regulatory database listings and historical information will be accessed and reviewed prior to evaluating the presence and/or locations of recognized environmental conditions (RECs) as defined by ASTM Standards. Utilized historic resource data will include, but not be limited to, aerial photographs, city directories, topographic maps, and fire insurance maps. Any identified RECs and/or areas of potential environmental concern will be a focal point of site inspection. • Timmons Group will complete a site inspection of the Subject Property which will include a visual reconnaissance of the immediately adjoining properties. RECs and/or areas of potential environmental concern will be documented photographically. • Records on file with the North Carolina Department of Environmental Quality (DEQ), and/or Orange County, as available, will be reviewed to identify active and/or historic facilities that may represent a REC or an area of potential environmental concern. Any risk(s) associated with these facilities will be assessed, as able. • Per ASTM Standards, an environmental liens search must be completed. An environmental lien is a charge, security, or encumbrance on title to a property to secure the payment of a cost, damage, debt obligation, or duty arising out of response actions, cleanup, or other remediation of hazardous substances or petroleum products. The search for environmental liens must be provided by CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 10 of 22 17 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE the Client while Timmons Group will also complete a search through a Freedom of Information Act (FOIA) request. • In order to qualify for one of the Landowner Liability Protections (LLPs) offered by the Comprehensive Environmental Response, Compensation, and Liability Act(CERCLA), the "User" or party for whom the Phase I ESA is prepared must complete the ASTM Standard E 1527-21 User Questionnaire provided by Timmons Group. Failure to provide this information could result in a determination that "all appropriate inquiry" is not complete and forfeiture of CERCLA protection. In addition to the User, interviews will be conducted with the present owner and one (1) or more state and/or local agency officials (as applicable and accessible)with the objective to obtain information identifying RECs in connection with the Subject Property. • Upon completion of the site reconnaissance, file reviews, and interviews, a report on the findings of the Phase I ESA will be prepared in accordance with ASTM Standard E 1527-21. Included within the Phase I ESA report will be recommendations for additional investigations as warranted. • The performance of this Phase I ESA specifically excludes any subsurface investigations, structural integrity assessments, radon investigations, chain-of-title reports/investigations, cultural resources investigations, wetland/stream delineation, or any sample collection and analysis (including asbestos containing materials and lead based paint). • Per ASTM standards, the Phase I ESA will be valid for 180 days or 6 months. This scope covers one fee for an ERIS report. If more than one ERIS report is needed, a revised scope with additional fee may be required. This scope anticipates release with Task W01 Delineation for a joint site inspection. If released separately, additional fee may be required. Task W04 - Protected Species Review & Consultation Timmons Group will conduct a Threatened and Endangered Species Review for the project area. Prior to the site inspection, Timmons will conduct a NC Natural Heritage Program (NCNHP) and US Fish and Wildlife Service (USFWS) IPAC database search for the project area. During the site inspection, Timmons will review existing habitat conditions on-site as they relate to protected species with the potential to occur in the area. If provided, conceptual layouts for the site will be reviewed and utilized in coordination. No additional site planning, conceptual modeling, or site visits will be conducted as part of this effort. Information obtained from database results, any previously conducted site visits, and any previously produced conceptual layouts will be used to make a preliminary determination of potential impact to federally listed species. Following the site inspection, if no other federal review is anticipated and/or protected species surveys or impacts are anticipated, Timmons Group will initiate consultation with the USFWS to verify potential impacts to protected species. Recommendations for mitigating any potential species that may affect the project will be provided following consultation. Any additional Habitat Assessments or Species Surveys and/or additional investigations/coordination required by USFWS (including Requests for Additional Information) is not included in this scope but can be provided under a separate Statement of Work. Please note, the USFWS has CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 11 of 22 18 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE requested no formal consultation be conducted if 404 permitting is anticipated unless there are expected protected species surveys or impacts. This task does not include species surveys. This task does not include species surveys. This scope anticipates release with Task W01 Delineation for a joint site inspection. If released separately, additional fee may be required. Task W05 -Tree Inventory Timmons Group will locate all deciduous trees 12" dbh or greater and non-deciduous trees 24" or greater dbh on site as required by the Town of Hillsborough LIDO Section 6.22.3.2. Trees will be located using handheld GPS equipment and a point file in AutoCAD and/or GIS shapefile will be created. The proposed inventory area will be provided to the Timmons Group Environmental Team before field work is conducted. If the project size exceeds 20-acres, Timmons will perform 100' x 100' sample survey areas for each separate undisturbed portion of the site containing an acre or more per the LIDO. A CAD file including all collected points with the tree genus and species, DBH, and latitude/longitude information and a map depicting all inventoried trees and their calculated critical root zones will be provided. *This fee does not include a tree protection plan. Task W06 - PCN for Nationwide Permit, Water Quality Certification, & Buffer Authorization A Pre-Construction Notification (PCN) for a 404 Nationwide Permit (NWP), corresponding 401 Water Quality Certification (WQC), and Riparian Buffer Authorization will be prepared and submitted to the USACE and DWR for the proposed development. The PCN submittal will contain a narrative describing in detail the purpose of the project and the necessity of the proposed disturbance to demonstrate that this disturbance is warranted. This task includes wetland and stream mitigation coordination but does not include mitigation fee payment or payment of NCDEQ DWR's review fee. This scope is for one Pre-Construction Notification which meets the requirements for an NWP. If proposed impacts do not meet the requirements for a Nationwide Permit and/or if multiple permitting phases are proposed, a revised scope will be required. Requests for Additional Information, if required by the agencies, will be handled under Time and Material Task W06. Task W07- 401/404 & Riparian Buffer Permit Processing Responses to requests for additional Information (RAls) will be prepared to answer any questions posed by the USACE and DWR as a result of the PCN application, as needed. Negotiation of NWP and WQC will be undertaken to facilitate regulatory approval of the project. This task includes mitigation coordination, but does CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 12 of 22 19 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE not include mitigation fee payment, or payment of NCDEQ DWR's review fee. This task also includes additional time spent for site plan revisions and additional RAls. Items NOT included in the Scope of Services of this Agreement: Timmons Group will only perform services authorized per this agreement. Anything not expclitly listed will not be completed, this includes but is not limited to the below which can be added for an additional fee. • Traditional survey of wetland flags • Phase II or III Environmental Site Assessments • Protected Species Surveys • Historical Resource Coordination/Surveys • Permitting Fees (application fees, cost of public notices, mitigation costs, etc.) • Nutient Offet Mitigation Credit Coordination • Mitigation Design • Pre-Application Meetings • Wetland Permit Compliance ENGINEER SERVICES Task E01 -Schematic Design The team will prepare schematic design level construction drawings based on the final concept design. Coordination of initial permitting requirements with the Town of Hillsborough • Utility availability investigation • Coordinate Layouts with Architect& Owner • Revise Layouts Per Review Comments • Utility System Concept Plan • Stormwater Management Concept Plan • Team Coordination & Meetings • Coordination with NCDOT • Project Management& QA/QC Upon completion of schematic design, the team will contribute to the Design Narrative documenting the schematic design phase. The team will document project requirements, design parameters and objectives and the results of the schematic design meetings and will provide any necessary text or graphics to supplement the narrative prepared by CPL. Task E02 - Design Development The design team will prepare Design Development construction drawings based on the approved schematic design drawings. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 13 of 22 20 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE • Refine Site Layout Plan • Develop Utility Plan • Develop Stormwater Management Plan • Review Geotechnical Report • Develop Grading Plan • Develop Erosion Control Concept Plan • Team Coordination & Meetings • Project Management& QA/QC • Outline Specifications (Division 2) Task E03 -Construction Documents The design team will prepare Final Design construction drawings based on the approved design development drawings. • Notes & Details • Site Layout& Landscape Plan • Utility Plan, Details, Profiles and Calculations • Detailed Grading Plan • Detailed Drainage Plan and Calculations • SWM Plan and Calculations • Storm Drainage calculations (gravity pipes, culverts, inlet spread, inlet throats, hydraulics) • Design and calculations for up to one (1) SCM • Erosion Control Plan and Details • Team Coordination & Meetings • Phase I Erosion Control Plan — preliminary disturbance limits • Phase II Erosion Control Plan — ultimate disturbance limits • Erosion control sequence narrative • Erosion Control Details, Calculations, and Quantities in conformance with structural practices and specifications in conformance with Orange County and NC Erosion and Sediment Control Handbook • Miscellaneous details and calculations • QA/QC • Technical Specifications (Division 2) • Bid Form Coordination with Architect Task E04 - Bidding Timmons will assist CPL with bidding services. Timmons will prepare a bid set of construction site plans and specifications, attend a pre-bid meeting, respond to questions from bidders and contribute to any required addenda. • Attend Pre-Bid Conference • Respond to Bid Inquiries • Prepare Addenda CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 14 of 22 21 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Task E05 -Construction Administration Construction administration services are based on a 14-month construction schedule. • Attend Pre-Construction Conference • Site Visits During Related Construction Activities • Review Submittals & Shop Drawings • Miscellaneous Construction Administration • Punchlist Inspection Task E06 - Project Closeout The design team will prepare record drawings based on red-lined drawings from the contractor as well as contribute as necessary to any O&M manuals prepared by CPL. • Water and Sewer Certifications as required • SCM Certification • Back-Punch Inspection • Compilation of Contractor's Record Dwgs. Task E07 - Permitting • Pre-application meeting suggested. Applicable town & county staff will be invited to attend & answer any questions. • The design team will coordinate with the Town of Hillsborough for all site development permitting submittals. • Apply for town-issued ZCP (Zoning Compliance Permit). • Construction drawing review by TRC. • Assist with Nitrogen offset fee calculation, Erosion Control Surety Calculations, and Public Improvement Surety Calculations • Site Plan & application materials reviewed by TRC. All TRC comments must be addressed before application will be scheduled for hearing before the Board of Adjustment. • Revise plans and respond to Town review Comments • Submit to NCDEQ for Erosion and Sediment Control Permits • NCDEQ Water and Sewer Permits as required • NCDOT driveway Permits • NCDOT Encroachment agreements Task E08—Special Use Permit Assistance (if required) Timmons Group will assist the client with preparation and submittal of the required special use plan application package to the Town of Hillsborough as noted below for this process. • Attend pre-application conference with the Town of Hillsborough CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 15 of 22 22 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE • Support legal counsel/owner's representative with review of special use permit paperwork requiring civil input for application and responses. • Attend one (1) Board of Adjustment • Provide Supporting Document/Exhibits as needed for meetings. • Respond to Town of Hillsboro reviews and comments. • Hold progress meetings/calls with client to review progress. Task E09— Rezoning Assistance (if required) Timmons Group will assist the client with preparation and submittal of the rezoning package to the Town of Hillsborough as noted below for this process. • Attend pre-application conference with the Town of Hillsborough • Support legal counsel/owner's representative with review of permit paperwork requiring civil input for application and responses. • Attend one (1) Board of Adjustment • Provide Supporting Document/Exhibits as needed for meetings. LANDSCAPE ARCHITECTURE SERVICES Task L01 - Code Compliant Planting Plan Timmons Group will prepare planting plans and supporting notes, details, and specifications suitable for locality approval and construction. Planting plans will utilize civil engineering base files and will be incorporated into the site plan package. All site related features including building, paving, utilities, signage, and light pole locations will be coordinated to eliminate conflicts with proposed landscaping. Planting plans may include tree canopy coverage, perimeter buffering, screening of above ground utilities, parking lot screening and interior parking lot plantings. Existing vegetation and plantings will be preserved wherever possible and credited towards locality requirements. Timmons Group will prepare a Tree Conservation Plan and supporting notes, details, and specifications suitable for locality approval and construction. We will coordinate with OA and civil team for site related demolition plan and notes. Because our mass grading plan will need to gain Urban Forestry approval, our Tree Conservation Plan will identifying potential disturbance to critical root zones. Anticipated deliverables are as follows: • Planting Plan meeting minimum locality code requirements • Planting Notes and Details • Planting Specifications (to be issued with construction documents) • Tree Conservation Plan • Tree Conservation Notes and Details CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 16 of 22 23 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Coordination with plan review staff, design team, etc. for construction plan submittals and review sets is included. One, in-person meeting with the client and/or design team for coordination purposes and up to three conference calls are included. Task L02 - Enhanced Planting Plan and Amenity Space/Hardscape/Streetscape Design Utilizing the Code Compliant Planting Plan, Timmons Group will prepare an enhanced planting plan, supporting notes, and details. This plan will address planting beyond what is required to meet streetscape, buffer yards, foundation plantings, and tree canopy minimums providing a more wholistic approach to the landscape of the development. We will work closely with the architect to understand the additional reflective spaces in their design program. From this understanding, we will develop schematic design level amenity/hardscape plans. Upon approval from the owner and Architect, we will prepare the Construction Documents of the amenity/hardscape areas that will be suitable for owner review, pricing, and competitive bidding purposes. Anticipated documents and coordination items are as follows: • Enhanced Planting Plan • Enhanced Planting Notes and Details • Amenity/Hardscape Schematic Layout Plan • Amen ity/Hardscape Plans depicting specialty hardscape location, size, and materials for site amenity features • Amenity/Hardscape Details depicting specialty hardscape size and materials for site amenity features • Hardscape Specifications (to be issued with construction documents) • Coordination with the civil engineer for grading and drainage plan adjustments and spot elevations for site amenity spaces • Three (3) meetings/conference calls with the owner, architect, and design team for project coordination are included. Task L03 - Construction Administration We will assist OA in conducting a Pre-Demolition Meeting on site. When required, we will participate in up to six (6) weekly progress site visits combined with OAC meetings. We will review RFI's and issue addenda as necessary and review sitework submittals by the contractor. Anticipated deliverables, travel, and/or meetings are as follows: • On-Site OAC meetings and site visits as needed • Response to RFI's • Sitework submittal reviews CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 17 of 22 24 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Task L04 - Closeout We will assist OA in providing record drawings and any changes to the project manual. Anticipated deliverables, travel, and/or meetings are as follows: Record drawings Assumptions/Clarifications Tree Inventory will be completed and includes minimums required by Town of Hillsborough Urban Forestry. This information will be made available and can be converted to a DWG format. Exclusions Timmons Group will not perform the following services under this Agreement except at the request of the Client and for an additional fee. • Lighting Design • Development review/ Permitting fees CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 18 of 22 25 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleigh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Proposed Fee Summary Survey Services Task S01 — Control and Boundary Survey $ 7,000 Fixed Fee Task S02 —Topographic Survey $ 12,000 Fixed Fee Task S03 — Underground Utility Location $ 2,500 Fixed Fee Task SO4 — Recombination Plat $ 4,500 Fixed Fee Task S05—Annexation Plat & Description $ 2,500 Fixed Fee Geotechnical Services Task G01 —Geotechnical Services (Not to Exceed) $ 27,500 T&M Task G02 —Clearing Fee (Not to Exceed) $ 7,500 T&M Water/Wastewater Services Task U01 — Hydrant Flow Testing $ 2,000 Fixed Fee Task UO2—Water System Hydraulic Analysis $ 5,000 Fixed Fee Environmental Services Task W01 —Wetland/Stream Delineation $ 4,600 T&M Task W02 —Wetland/Stream Confirmation & Buffer Determination $ 4,600 T&M Task W03 — Phase 1 ESA $ 4,200 T&M Task W04 — Protected Species Review & Consultation $ 2,000 T&M Task W05—Tree Inventory $ 26,000 T&M Task W06 — PCN for Nationwide Permit, Water Quality Certificate $ 5,800 T&M & Buffer Authorization Task W07 —401/404 & Riparian Buffer Permit Processing $6,000 T&M Engineer Services Task E01 —Schematic Design $ 11,500 Fixed Fee Task E02 — Design Development $ 23,000 Fixed Fee Task E03 — Construction Documents $ 46,000 Fixed Fee Task E04 — Bidding $ 2,875 Fixed Fee Task E05— Construction Administration $ 28,750 Fixed Fee Task E06 — Project Closeout $ 2,875 Fixed Fee Task E07 — Permitting $ 15,000 Fixed Fee Task E08— Special Use Permit Assistance (if required) $ 12,500 Fixed Fee Task E09— Rezoning Assistance (if required) $ 15,000 Fixed Fee Landscape Architecture Services Task L01 — Code Compliant Planting Plan $ 10,000 Fixed Fee Task L02 — Enhanced Planting Plan & Amenity Space/Hardscape/ $ 12,500 Fixed Fee Streetscape Design Task L03 — Construction Administration $ 5,800 Fixed Fee Task L04 — Closeout $ 1,800 Fixed Fee TOTAL PROPOSED FEE $311,300.00 CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 19 of 22 26 5410 Trinity Road p 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT A SCOPE OF SERVICE Exclusions: Timmons Group will not perform the following services under this Agreement except at the request of the Client and for an additional fee: Master Plan renderings and 3D models (to be provided by Moseley) CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 20 of 22 27 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT B TERMS AND CONDITIONS 1. SCOPE OF SERVICES: The Scope of Services performed under this Agreement shall be as described in Exhibit A of the Letter of Agreement. Separate Change Orders signed by authorized representatives of Timmons Group and the Client may, from time to time, describe additional or different services to be performed under this Agreement, such Change Orders are incorporated by reference herein. These Terms and Conditions shall apply to the Change Orders except to the extent expressly modified by such Change Order. Timmons Group services with regard to the specific properties covered by this Agreement and subsequent Change Orders, if any, shall hereinafter be referred to as the "Project" or"Projects." 2. STANDARD OF CARE AND CODE COMPLIANCE: Timmons Group shall provide its services under this Agreement consistent with the professional skill and care ordinarily provided by members of the same profession practicing in the same or similar locality under the same or similar circumstances. Timmons Group shall exercise usual and customary professional care in its efforts to comply with all applicable codes, laws, regulations and the policies of regulatory agencies in effect as of the date of the Agreement (collectively, "legal requirements"). Design changes made necessary by newly enacted codes, laws, regulations and the policies of regulatory agencies after the date of this Agreement shall be treated as an additional service subject to an executed Change Order, and Timmons Group shall be entitled to appropriate additional compensation. Timmons Group shall not be liable for any damages arising from conflicting interpretations of any legal requirements by different officials. In the event of a conflict between legal requirements applicable to the Project, Timmons Group shall notify the Client of the nature and impact of such conflict, and the Client agrees to cooperate and work with Timmons Group in an effort to resolve the conflict. 3. INSTRUMENTS OF SERVICE: All documents, including, but not limited to, drawings, specifications, plans, reports and other forms of electronic data prepared and furnished by Timmons Group, are Instruments of Service pursuant to this Agreement and remain the property of Timmons Group. Client may retain one such copy of all such documents, for record purposes, which documents may only be used for the Project. Any adaptation by Client of said documents, whether intentional or inadvertent, without Timmons Group's verification shall be at Client's sole risk and without liability or legal exposure to Timmons Group or Timmons Group's employees. Client agrees to assume all risks associated therewith and to hold Timmons Group harmless and indemnify it from and against any claims, liabilities, damages, losses and costs, including but not limited to attorney's fees, arising therefrom or in connection therewith. 4. GOVERNING LAW: This Agreement shall be governed according to the laws of the place of the Project, without regard to its conflicts of laws provisions. 5. THIRD PARTY RIGHTS: This Agreement shall not create any rights or benefits to parties other than the Client and Timmons Group. 6. ASSIGNMENT: This Agreement may not be assigned without the prior written consent of the Client and Timmons Group, such consent not to be unreasonably withheld. 7. PROJECT SITE SAFETY: Timmons Group's Project site responsibilities are limited solely to the activities of Timmons Group and Timmons Group's employees on the Project site. These CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 21 of 22 28 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. EXHIBIT B TERMS AND CONDITIONS responsibilities shall not be inferred by any party to mean that Timmons Group has responsibility for Project site safety. The Client and Timmons Group agree that Project site safety is the sole and exclusive responsibility of the Project's owners or contractor(s). The parties likewise agree that the Project contractor(s) is solely responsible for Project means, methods, techniques, sequences of operation and procedures, and that Timmons Group shall have no obligations relating to these contractor(s) duties. 8. LIMITATION OF LIABILITY: To the fullest extent permitted by law, except as expressly stated in this Agreement, Timmons Group makes no representations or warranties, express or implied. Notwithstanding any other provision of this Agreement, the maximum liability, in the aggregate, to the Client and anyone claiming by or through the Client, of Timmons Group and its officers, directors, shareholders, partners, employees, agents and subconsultants, and any of them, for any and all claims, losses, or damages, including attorney's fees, in any way related to or arising from the Project or this Agreement, shall not exceed Timmons Group's total fee under this Agreement, or $50,000, whichever is less. 9. DISPUTE RESOLUTION: In the event of any action or proceeding brought by either party against the other under this Agreement, other than default on payment, the prevailing party shall be entitled to recover all costs and expenses, including its court reporter fees, expert witness fees, and reasonable attorney's fees. If Timmons Group initiates legal proceedings to collect payment, it may recover, in addition to all amounts due, its reasonable attorneys' fees and other expenses related to the proceedings. Such expense shall include the cost, at the Timmons Group normal hourly billing rates, of the time devoted to such proceedings by its employees. The parties agree to litigation in a court of competent jurisdiction or in the jurisdiction where the Project is located. 10. INDEMNIFICATION: Timmons Group agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Client, its officers, directors and employees, against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, to the extent caused solely and directly by the negligent performance of professional services by Timmons Group or its agents under this Agreement. The Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless Timmons Group, its officers, directors, employees and agents, against all damages, costs and liabilities, including reasonable attorney's fees, caused solely by the Client's negligent acts in connection with the Project or that of its Contractor(s), subcontractors or consultants or anyone for whom the Client is legally liable. Neither Timmons Group nor the Client shall be obligated to indemnify the other party in any manner whatsoever for the other party's own negligence. 11. MISCELLANEOUS: This Agreement constitutes the entire agreement of the Parties. All prior agreements, whether written or oral, are merged herein and shall be of no force or effect. This Agreement cannot be changed, modified or discharged orally, but only in an agreement in writing. If any term, condition, or provision of this Agreement is found unenforceable by a court of law or equity, this Agreement shall be construed as though that term, condition, or provision did not exist, and its unenforceability shall have no effect whatsoever on the rest of this Agreement. This represents drafting by both parties and in the event of ambiguities, the principle of interpretation against the drafter shall not apply. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 22 of 22 r 29 Palacio Collaborative PALACIO400 Galleria Pkwy SE,Suite 1500 Atlanta,GA 30339 404.609.9006•palaciocollaborative.com 08.15.2024 (Revised 08.16.2024) Adam Chahulski, AIA, NCARB, LEEP AP Sr.Vice President CPL 6302 Fairview Rd, Suite 102 Charlotte, NC 28210 AChahulski@CPLteam.com Re: Orange County Crisis Diversion Facility, Orange County, NC Dear Adam, Thank you for the opportunity to provide Cost Management Services for the Orange County Crisis Diversion Facility project. We have provided a fee proposal below based on the project being a +/- 27,000sf upgraded new-build facility and associated sitework with an anticipated construction budget of+/-$16,000,000 using the CM-at-Risk delivery method. DESIGN50%SCHEMATIC Includes production of two(2)separate estimates (two building/site options), pre/post review,estimate revisions, modest allowance for alternates pricing, budget/scope alignment, and CM estimate review& reconciliation 0%DESIGN DEVELOPMENT00 Includes estimate production, pre/post review,estimate revisions, modest allowance for alternates pricing, budget/scope alignment, and CM estimate review& reconciliation CONSTRUCTION DOCUMENTS ESTIMATE $ 8,500 Same scope of work as design development TOTAL COST MANAGEMENT FEE $57,750 Notes • We have included cost in the Schematic Design stage estimate for up to two different pricing exercises. • Estimate delivery timeline will be negotiated prior to start of work. Please anticipate at least a two (2)week turnaround and up to five (5)weeks to deliver a draft estimate for client's review • The estimate production schedule will not start until all necessary documents are received. Receiving updated documents during estimate production may result in at least a three (3) day addition to the delivery schedule • Skipping a proposed design phase will result in a fee adjustment that equates to the higher figure between: o Fee of estimated phase+50%of skipped phase o Fee of skipped phase+50%of estimated phase • Providing an update of the completed design phase estimate to accommodate a +75% submittal will result in a 25%surcharge 30 Reimbursable Expenses No reimbursable expenses including travel, lodging, meals, parking, and auto mileage are anticipated or included in the fee. All meetings are presumed to be virtual. Supplemental Services • An additional fee to provide separate estimate breakouts for construction phases, departments, funding sources, by building, by floor, etc. will be negotiated once the impact on this effort is understood. Hourly Rates • Chief Cost Manager-$210/1-lour • Senior Cost Manager II -$185/1-lour • Senior Cost Consultants-$185/Hour • Senior Cost Manager I -$175/Hour • Cost Manager II -$155/Hour • Cost Manager I -$145/1-lour We look forward to working with you on this exciting project. Do not hesitate to call me if you have any questions. Sincerely, Michael D. Palacio, CPE President I Chief Cost Manager Client Signature Date PALACIO COLLABORATIVE 1 2 31 STATE OF NORTH CAROLINA AFFIDAVIT ORANGE COUNTY ************************** Adam Chahulski,AIA, NCARB, LEED AP (the individual attesting below), being duly authorized by and on behalf of CPL Architects and Engineers, P.C. (the entity bidding on project hereinafter"Employer") after first being duly sworn hereby swears or affirms as follows: 1. Employer understands that E-Verify is the federal E-Verify program operated by the United States Department of Homeland Security and other federal agencies, or any successor or equivalent program used to verify the work authorization of newly hired employees pursuant to federal law in accordance with NCGS §64-25(5). 2. Employer understands that Employers Must Use E-Verify. Each employer, after hiring an employee to work in the United States, shall verify the work authorization of the employee through E-Verify in accordance with NCGS§64-26(a). 3. Employer is a person, business entity, or other organization that transacts business in this State and that employs 25 or more employees in this State. (mark Yes or No) a. YES X , or b. NO 4. Employer's subcontractors comply with E-Verify, and if Employer is the winning bidder on this project Employer will ensure compliance with E-Verify by any subcontractors subsequently hired by Employer. This day of 120 . Signature of Affiant Print or Type Name: Adam Chahulski,AIA, NCARB, LEED AP State of North Carolina, County D Signed and sworn to (or affirmed) before me,this the o 0 day of , 20_. v Z My Commission Expires: v v' Ln rm Notary Public v 32 [Departmental Use Only] TITLE FY NORTH CAROLINA PROFESSIONAL SERVICES CONTRACT ORANGE COUNTY (CONTRACT SPECIFIC REVISIONS 9/6/2024 NOT TO BE USED WITH OTHER CONTRACTS) THIS PROFESSIONAL SERVICES CONTRACT(hereinafter called "Agreement"), made as of the day of , 20 , by and between a professional (architectural/engineering/landscape architectural-select one) firm with a partner or principal registered in North Carolina as a licensed with offices in North Carolina (hereinafter called the "Designer") and Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or"Owner"). WITNESSETH: Whereas the Owner published a Request for Qualifications and the undersigned Designer submitted a responsive Statement of Qualifications evaluated and approved by Owner; and Whereas the Designer and the Owner now wish to form and memorialize their agreement for services and for the consideration herein named do hereby agree as follows: ARTICLE 1 SCOPE OF WORK 1.1 Scope 1.1.1 This Agreement is for professional services to be rendered by Designer to Owner with respect to a project known as (herein referred to as the "Project").The Project is located in Orange County, North Carolina. It is described more particularly in Attachment A. 1.1.2 By its execution of this Agreement,the Designer represents and agrees that it is qualified and fully capable to perform and provide professional services and other services required or necessary under this Agreement in a fully competent, professional and timely manner, and that its Consultants are also fully capable and qualified to perform and provide the services that they will provide hereunder. 1.1.3 Time is of the essence of this Agreement. 1.1.4 The services to be performed under this Agreement consist of Basic Services, as described and designated in Article 4 hereof and in Attachment B to this Agreement, and such Additional Services as are designated in Article 5 of this Agreement or as may from time-to-time be agreed upon by the Owner and Designer by Amendment or Addendum to this Agreement. Compensation to the Designer for Basic Services under this Agreement shall be as set forth herein, and compensation for Additional Services shall be as set forth herein or in any Amendment or Addendum providing for them. All services performed by the Designer not identified as Additional Services in Article 5 or in a written Amendment or Agreement entered into by the Owner and the Designer and providing for additional compensation for such additional services relating to the Project shall be deemed to be Basic Services provided without additional compensation. ARTICLE 2 DEFINITIONS 2.1 Definitions 2.1.1 Additional Services—Those services to be performed by Designer beyond the Basic Services. See Section 1.1.4 and Article 5. 1 Revised 01/24 33 2.1.2 Basic Services—Those services to be performed by Designer as outlined in Attachment B. See Article 4 and Attachment B. 2.1.3 Compensation for Basic Services—Those fees to be paid by Owner for Basic Services. See Section 7.1 and 7.2. 2.1.4 Contractor—The construction contractor(s). 2.1.5 Consultants—Subconsultants, partners and other entities working with or on behalf of the Designer. See Section 3.3.1 and Attachment E. 2.1.6 Board of County Commissioners-The Board of Commissioners of Orange County, North Carolina. 2.1.7 County Manager-The Orange County employee bearing that title. 2.1.8 Milestone Dates—Those dates where certain results are expected. See Attachment D. 2.1.9 Project-All phases of the Project as described in Section 1.1.1 and Attachments A and B including but not limited to the schematic design, design development, construction document, bidding and contract award, construction and post-construction phases. 2.1.10 Reimbursable Expenses—Those costs incurred by the Designer for the benefit of this project and which the County will pay. See Section 7.5. 2.1.11 Total Project Cost—The total amount of money which may be paid for services on this project. See Section 4.2.1. ARTICLE 3 RESPONSIBILITIES OF THE DESIGNER 3.1 Services to be Provided. 3.1.1 The Designer shall provide the Owner with all professional services required to satisfactorily complete all phases of the Project within the time limitations set forth herein and in accordance with industry standards. Such services are as shown in Attachment B,the description of services. (Contract Specific Revision 9/6/24) All services of the Designer shall be provided in accordance with the terms and conditions of this Agreement. 3.2. Standard of Care 3.2.1 The Designer and its Consultants shall exercise reasonable care and diligence in performing their services under this Agreement in accordance with industry standards of similar professional design practice throughout the United States and in accordance with federal, state and local laws and regulations applicable to the performance of these services.The Designer shall serve as a representative of the Owner in accordance with the terms and conditions of this Agreement to guard the Owner against defects and deficiencies in the Project.. (Contract Specific Revision 9/6/24) 3.2.2 The Designer shall be responsible for gross negligence, errors or omissions, in the drawings, specifications, and other documents prepared by the Designer or its Consultants. It shall be the responsibility of the Designer throughout the period of performance under this Agreement to use reasonable professional care and judgment to guard the Owner against defects and deficiencies in the Project. (Contract Specific Revision 9/6/24) 3.2.3 The Designer shall correct at no additional cost to the Owner any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts in the drawings, specifications and other documents prepared by the Designer or its Consultants. 3.2.4 The Designer shall assure that all drawings, specifications and other documents prepared by the Designer or its Consultants hereunder are in accordance with applicable laws, statutes, building codes and regulations and that all necessary or appropriate applications for approvals are submitted to federal, state and local governments or agencies in a timely manner so as not to delay the design or construction activities of the Project. 2 Revised 01/24 34 3.2.5 The Designer and its Consultants shall perform all services in a reasonably timely manner in accordance with all mutually agreed schedules for the Project or required under this Agreement, and as provided in the construction agreement and any General Conditions of the Owner's construction agreements with the contractors for the Project. 3.2.6 At the mutual agreement of the Owner and Architect, or when the Architect has been found liable in a court of competent jurisdiction,the Architect shall reimburse the Owner for costs, damages, and expenses, including attorney's fees, incurred by the Owner when such costs, damages, and expenses result from negligent errors, omissions, or delays of the Designer or its Consultants. (Contract Specific Revision 9/6/24) 3.3 Designer's Consultants 3.3.1 The Designer's Consultants for the project, along with their key project personnel, are listed in Attachment E to this Agreement. No changes in the Consultants or key personnel indicated shall be permitted except with the prior written consent of the Owner. 3.3.2 All of the Designer's contracts with its Consultants shall be in writing and shall expressly provide that if this Agreement is terminated for any reason,the Owner may, at its sole option,take the assignment of the Consultants' contract with the Designer,that such assignment shall automatically take place upon notification in writing by the Owner to the Consultants and the Consultants shall continue to be bound by the contract after such assignment. A copy of each contract between the Designer and a Consultant shall be furnished to the Owner within seven (7) days of its execution. ARTICLE 4 BASIC SERVICES 4.1 Basic Services 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in Attachment B to this Agreement. 4.1.2 The Basic Services will be performed by the Designer in the phases described in Attachment B. 4.1.3 The Owner shall have the right and option to require the Designer to prepare separate bid packages with no additional compensation due the Designer. Such bid packages must be approved by Owner prior to submission and, at the Owner's option, may include but not be limited to: A. Demolition and preliminary site work; B. General work, plumbing, mechanical, electrical,fire protection; C. Landscaping and irrigation; D. Signage; E. Furniture. F. Water and sewer infrastructure G. 4.2 Project Cost Estimates 4.2.1 At the times designated herein, the Designer shall develop an estimate of the total cost of the Project (the "Total Project Cost"), including Designer's fees, costs of the construction, costs of equipment,furnishings,furniture and signage, permit fees and appropriate contingencies, and exclusions,where applicable.These costs shall be prepared and submitted to the Owner substantially in the format shown in Attachment C to this Agreement,with supporting documents listing quantities, unit price, labor rates, man-hour estimates, overhead and profit. Total Project Cost shall be 3 Revised 01/24 35 mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing of this Total Project Cost agreement shall be identified as a milestone in Attachment D. If cost estimating is not part of the project scope,the Total Project Cost shall be specified here: [BLANK] 4.2.2 Project cost estimates shall be prepared by qualified staff members of the Designer or the authorized Project Consultants listed on Attachment E, or a qualified cost estimating Consultant to the Designer who are acceptable to the Owner. 4.2.3 Total Project Cost estimates shall be prepared at points in the production of the Designer's work: A.At completion of design; and B. At completion of ; and C. At completion of of the construction documents; and D. 4.2.4 If applicable per section 4.2.3, when the first of these estimates of Total Project Cost has been approved in writing by the Owner, it shall be used by the Owner as a basis for appropriating funds specifically for the Project. Once this Total Project Cost has been so approved by the Owner and the conditions of the project (cost environment,time schedule, etc.) are reasonably similar,the Designer shall be obligated, without additional compensation, to adjust the design of the Project to assure that it remains within the approved Total Project Cost. 4.2.5 Should bidding or negotiation with contractors produce prices which, when added to the other elements of the approved Total Project Cost, produce a cost that is in excess of the approved Total Project Cost, the Designer shall participate with the Owner in negotiation and design adjustments to the extent such are necessary to obtain prices within the approved Total Project Cost. All activity of the Designer with respect to these matters shall constitute Basic Services and shall be performed by the Designer without additional compensation. If negotiation and design adjustments fail to bring costs within the Total Project Cost the Owner may reject all bids and Designer will redesign or reduce portions of the project in an effort to reduce the bid prices to within the Total Project Cost and rebid the project. All such redesign is included within Basic Services. If this second letting for bids does not produce bids that are within the approved Total Project Cost initially or after negotiations with the contractor,the Designer is not obligated to further redesign the Project. 4.3 Proiect Conferences 4.3.1 For the duration of the development of the Project,the Designer and its Consultants shall meet periodically with the Owner.The Designer shall meet with Owner as necessary to properly fulfill the requirements of this Agreement. The minimum regularly scheduled meetings which the Designer shall be required to attend are listed below: 4.4 Construction Administration 4.4.1 As part of Basic Services,the Designer shall provide all of the mutually agreed administrative services described in the Owner's contracts with the contractors for the Project. ARTICLE 5 ADDITIONAL SERVICES 5.1 Compensation is due for Additional Services that are not otherwise included in Basic Services (Attachment B) provided by the Designer or its Consultants only when the Owner requests such Additional Services in writing and after both Owner and Designer agree to the terms of providing such Additional Services through an amendment to this Agreement. 4 Revised 01/24 36 5.1.1 Designer or its Consultants shall provide fully detailed presentation models or professional artist's renderings at the written direction and approval of the Owner, if such services are not included in Basic Services Attachment B. 5.1.2 Designer or its Consultants shall make all necessary revisions in drawings, specifications, or other documents when the drawings, specifications, or other documents are inconsistent with written approvals or instructions previously given by the Owner. 5.1.3 Designer or its Consultants shall prepare supporting data and other services in connection with a significant Owner initiated change order if Designer can demonstrate that such services cause a direct substantial increase in Designer's cost of rendering its Basic Services hereunder. 5.1.4 Designer or its Consultants shall prepare to serve and serve as an expert witness for the Owner in connection with dispute resolution, arbitration, or legal proceedings, unless the subject matter of the proceedings includes matters arising out of or related to the Designer's or Consultant's performance or service with respect to the Project; however, preparing to serve or serving as a fact witness for the Owner in such proceedings or rendering testimony necessary to secure governmental approval of zoning or land use clearances for the Project shall not constitute an Additional Service. 5.1.5 Designer or its Consultants shall provide all such services as are made necessary by the negligence or default of a Consultant or subconsultant. Such services shall be provided at no additional cost to Owner. 5.1.6 Designer or its Consultants shall provide additional or extended services during the Construction Phase made necessary by(a) defective work of Consultant(s) or contractor(s); (b) prolongation of construction past the scheduled completion date, provided the prolongation is not due to the fault or negligence of the Designer, its employees, Consultants or agents; or(c) default under the construction contract due to delinquency or insolvency. 5.1.7 Designer or its Consultants shall Provide additional services and costs necessitated by special out-of-town travel required by the Designer and approved in advance in writing by the Owner, other than visits to the Project and other than travel reasonably required to fully accomplish the Basic Services. 5.1.8 Designer, and its Consultants if necessary, shall attend special public hearings for the Project, other than those listed herein,which are called by the Board of County Commissioners. ARTICLE 6 DURATION OF DESIGNER'S SERVICES 6.1 Scheduling of Services 6.1.1 Attachment D to this Agreement is the Key Milestone Listing which defines the sequence and timing of the design and construction activities. The Designer and its Consultants shall schedule and perform their activities so as to meet the Milestone Dates shown. No deviation by the Designer or his Consultants from the Key Milestone Listing shall be allowed without prior written approval by the Owner. 6.1.2 The Designer's schedule for the performance of its activities and the activities of its Consultants shall be in accordance with the outline in Attachment D. The Designer shall also prepare and submit to the Owner for review and approval a schedule of all known items of information, approvals or decisions to be furnished or made by the Owner, including the dates by which the Owner shall have all information necessary from the Designer with respect to that item, approval or decision and the date by which the item of information, approval or decision should be communicated to the Designer. The Owner shall always have a reasonable time within which to provide such item of information, approval or decision and shall not have any responsibility for any delay occurring by reason of the Owner's being unable,through no fault of the Owner,to supply such item of information, approval or decision. 5 Revised 01/24 37 6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its efforts, including providing additional manpower or overtime, as necessary,to perform its services in accordance with the Key Milestone Listing at no additional cost to the Owner. 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully executed original of this Agreement. 6.2 Adjustments to the Schedule 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty (60) days through no fault of the Designer, or if the Owner increases or decreases the scope or size of the Project by ten percent (10%) of currently estimated Total Project Cost,the Designer shall give prompt written notice to the Owner. Provided that such notice has been given,the Designer may request in writing an adjustment in the Key Milestone Listing dates, which shall be granted by the Owner to the extent reasonable. ARTICLE 7 DESIGNER'S COMPENSATION 7.1 Compensation for Basic Services 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this Agreement. 7.2 Breakdown of Compensation for Basic Services Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: 7.2.1 Schematic Design Phase. (Insert Lump Sum or Time and Materials as appropriate) fee of 7.2.2 Design Development Phase. fee of 7.2.3 Construction Document Phase. Lump sum fee of 7.2.4 Bidding and Contract Award. Lump sum fee of 7.2.5 Construction Phase. Lump sum fee of 7.2.6 Post Construction Phase. Lump sum fee of 7.2.7 Additional Basic Services (Select all that apply): fee of fee of fee of fee of 7.3 Payment for Basic Services Rendered, as described in Attachment B 7.3.1 Payment to the Designer for Basic Services shall become due and payable as progress deliverables and categories of services are completed. Upon completion of each category, payment will be made by the Owner within 30 calendar days of receipt of an invoice which is in form and substance 6 Revised 01/24 38 acceptable to the Owner. When applicable such invoice shall include supporting documentation, as designated by Owner, for any reimbursable expenses claimed by Designer. In the event the Owner finds any part or parts of all or any portion of an invoice presented by the Designer not to be acceptable, it shall identify to the Designer the part or parts which are not acceptable and shall pay the part or parts of the invoice which are acceptable, if any. This paragraph is not intended to indicate Owner satisfaction of any work or services. No deductions shall be made from the Designer's fees for basic services except in accordance with this Agreement or to reimburse the Owner for costs or expenses incurred or anticipated to be incurred for which the Designer is liable. 7.3.2 If the Owner increases or decreases the scope of the Project by percent ( %) or more of the currently estimated Total Project Cost, the compensation for Basic Services shall be equitably adjusted. 7.4 Compensation for Hourly Not-to-Exceed and Additional Services 7.4.1 With respect to Hourly Not-to-Exceed Services performed by the Designer in accordance with this Agreement,the Designer shall be compensated at the hourly rates or unit pricing shown in Attachment F to this Agreement. 7.4.2 With respect to Additional Services performed by the Designer in accordance with Article 5 or any Addendum or Amendment to this Agreement, the Designer shall be compensated at the hourly rates shown in Attachment F to this Agreement, unless the Owner and the Designer otherwise agree in writing. 7.5 Reimbursable Expenses 7.5.1 Reimbursable expenses are in addition to the fees for , and are for the following expenditures to the extent reasonable and actually incurred by the Designer, its employees, or Consultants with respect to the Project: A. , or other items mutually agreed upon between the Owner and Designer as described in Attachment B. Any unit price agreements are designated in Attachment F. 7.5.2 Designer and its Consultants may be entitled to reasonable mark-up on actual expenses which are incurred subject to written approval by Owner. 7.6 Accounting Records 7.6.1 Accounting records of the Designer's compensation for Additional Services and Reimbursable Expenses pertaining to the Project shall be maintained by the Designer and its Consultants in accordance with generally accepted accounting practices and shall be available for inspection by the Owner or the Owner's representatives at mutually convenient times for a period of five (5)years after the later of final completion of the Project or issuance of a certificate of occupancy for the Project. 7.7 Total Compensation 7.7.1 Total compensation to the Designer, including Basic Services, Additional Services and Reimbursable Expenses shall not exceed ARTICLE 8 RESPONSIBILITIES OF THE OWNER 8.1 Cooperation and Coordination 8.1.1 The Owner shall meet with the Designer as necessary at mutually convenient times to provide information necessary to enable the Designer to develop a detailed written analysis and complete needs summary of the Project. 7 Revised 01/24 39 8.1.2 The Owner shall examine documents submitted by the Designer and shall make reasonable efforts to render decisions pertaining thereto no later than the dates specified in the schedule for such decisions described in Article 6.1.2. 8.1.3 shall be the Owner's Construction Projects Administrator and shall act in the Owner's behalf and as its representative with respect to the Project and shall have the authority to render decisions and approve changes in the scope of the Project within guidelines established by the County Manager and the Board of County Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. Owner may replace the individual serving as Construction Projects Administrator at any time. Should such replacement occur Designer will be so informed within a reasonable time. 8.2 Surveys and Testing 8.2.1 The Owner shall furnish the Designer with a certified land survey of the site,giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and complete data pertaining to existing buildings, other improvements and trees, and other pertinent information reasonably requested by the Designer including that concerning available service and utility lines, both public and private, above and below grade, including inverts. 8.2.2 The Owner shall provide the services of a geotechnical engineer or other consultant, or compensate for such sub-consultant services provided by the Designer,when such services are reasonably deemed necessary by the Designer, and agreed and consented to in writing by Owner, as shown on the Designer's schedule described in Article 6.1.2,to provide reports,test borings,test pits, soil bearing values, percolation tests, air and water pollution tests,ground corrosion and resistivity tests and other necessary operations for determining subsoil, air and water conditions, all together with reports and appropriate professional recommendations thereof to ensure construction materials and geotechnical requirements of the construction contract are met. 8.2.3 All services, data, information, surveys and reports required of the Owner pursuant to this Article 8, shall be furnished at the Owner's expense and, absent any negligence or failure to follow professional standards on the part of Designer, the Designer shall be entitled to rely upon the accuracy and completeness of such services, data, information, surveys and reports. 8.3 Permits and Approvals 8.3.1 The Owner shall secure and pay for all necessary permits, licenses, approvals, easements, assessments, and charges required for the construction, use or occupancy of permanent structures or for permanent changes in existing facilities.The Designer shall provide the Owner with a schedule of all required approvals and of the dates by which application for such approvals must be made in order to avoid any risk of delay to the Project, prepare necessary application forms, present documents requiring approval by the Owner and submit documents with the Owner's approval to the appropriate approval agency. ARTICLE 9 INSURANCE 9.1 General Requirements 9.1.1 The Designer shall purchase and maintain and shall cause each of its Consultants to purchase and maintain during the period of performance of this Agreement, and for five (5) years after the later of final completion of the Project or issuance of a Certificate of Occupancy of the Project, insurance for protection from claims under workers' or workmen's compensation acts; Comprehensive General Liability Insurance (including broad form contractual liability and complete operations covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Designer's or Consultants' employees or any other person and to real and personal property including loss of use resulting thereof; Comprehensive Automobile Liability Insurance, including hired and non-owned vehicles, if any, covering personal injury or death, and property damage; and Professional Liability Insurance, covering personal injury, bodily injury and property damage and claims arising out of or related to the performance under this Agreement by the Designer or its agents, Consultants and employees. (Contract Specific Revision 9/6/24) 8 Revised 01/24 40 9.1.2 The minimum insurance ratings for any company insuring the Designer shall be Best's A-. Should the ratings of any insurance carrier insuring the Designer fall below the minimum rating,the County may, at its option, require the Designer to purchase insurance from a company whose rating meets the minimum standard. 9.2 Limits of Coverage 9.2.1 Designer shall obtain, at its sole expense, Commercial General Liability Insurance, Automobile Insurance, Workers' Compensation Insurance, Professional Liability Insurance, and any additional insurance as may be required by Owner's Risk Manager as such insurance requirements are described in the Orange County Risk Transfer Policy and Orange County Minimum Insurance Coverage Requirements (each document is incorporated herein by reference and may be viewed at http://www.orangecountync.gov/departments/purchasing_division/contracts.php). If Owner's Risk Manager determines additional insurance coverage is required such additional insurance shall be designated here (if no additional insurance required leave blank or mark N/A as being not applicable). Designer shall not commence work until such insurance is in effect and certification thereof has been received by the Owner's Risk Manager. 9.2.2 All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the Owner as an additional insured party for the insurance. 9.3 Proof of Coverage 9.3.1 Evidence of such insurance shall be furnished to the Owner. Upon cancellation, non-renewal or reduction,the Consultant shall procure substitute insurance so as to assure the Owner that the minimum limits of coverage are maintained continuously throughout the periods specified herein. 9.4 Indemnity 9.4.1 To the extent authorized by North Carolina law the Designer agrees, without limitation, to indemnify and hold harmless the Owner from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Designer except to the extent same are caused by the negligence or willful misconduct of the Owner. 9.5 Owner's Insurance Option 9.5.1 At any time during the performance of this Agreement, the Owner may, at its sole option, provide for itself,for the Designer and for its Consultants any or all of the insurance coverage required under the Article. 9.5.2 If the Owner elects to provide such coverage it shall notify the Designer in writing and provide to the Designer such certificate or certificates of coverage as may be applicable. 9.5.3 If the Owner elects to provide such coverage it shall be entitled to pro rata reduction in the fees for Basic Services equal to the cost of providing such coverage to the Designer and its Consultants. ARTICLE 10 AMENDMENTS TO THE AGREEMENT 10.1 Changes in the Designer's Basic Services 10.1.1 Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the Owner and the Designer. The Designer shall proceed to perform the Services required by the 9 Revised 01/24 41 Amendment only after receiving a fully executed Amendment from the Owner or a written notice from the Owner directing the Designer to proceed, whichever is earlier. 10.2 Owner Changes 10.2.1 The Owner may, without invalidating this Agreement, make written changes in the Designer's Basic Services or Additional Services of this Agreement by preparing and executing a Change Order. Within three (3) days of receipt of such a Change Order, the Designer shall notify the Owner in writing of any change contained therein that the Designer believes significantly increases or decreases the Designer's services with respect to the Project and request an adjustment in compensation with respect thereto. If the Change Order significantly increases or decreases the Designer's services,the Designer's compensation may be equitably adjusted. ARTICLE 11 TERMINATION AND SUSPENSION 11.1 Termination for Convenience of the Owner 11.1.2 This Agreement may be terminated without cause by the Owner and for its convenience upon seven (7) days written notice to the Designer. 11.2 Other Termination 11.2.1 After seven (7) days written notice to the other party of its material breach of the Agreement,this Agreement may be terminated by the noticing party, provided that the other party has not taken all reasonable actions to remedy the breach. 11.2.2 Designer acknowledges that Owner is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable or not appropriated for the performance of Owner's obligations under this Agreement,then this Agreement shall automatically expire without penalty or further cost to Owner immediately upon written notice to Designer of the unavailability or non-appropriation of public funds. 11.2.3 In the event of a change in the Owner's statutory authority, mandate or mandated functions, by state or federal legislative or regulatory action, which adversely affects Owner's authority to continue its obligations under this Agreement,then this Agreement shall automatically terminate without penalty or further cost to Owner upon written notice to Designer of such limitation or change in Owner's legal authority. 11.2.4 Either party may terminate this Agreement upon notice to the other party that obligations pursuant to this Agreement are made impractical due to declarations of emergency by Orange County or by North Carolina due to events directly impacting Orange County. Both parties shall remain responsible for all payment and performance due up to the receipt of such notice, but shall have no further obligation or responsibility beyond that date provided the terminating party has taken all reasonable steps to complete the performance of its obligations. 11.2.5 Owner shall have sole authority to determine the reasonableness of Designer's actions to remedy any breach or complete performance of its obligations. 11.3 Compensation after Termination 11.3.1 In the event of termination for the convenience of the Owner,the Designer shall be paid that portion of its fees and expenses that it has earned to the date of termination, plus five percent (5%) of its compensation for Basic Services earned to date or of its unearned compensation for Basic Services, whichever is less. (Contract Specific Revision 9/6/24) 10 Revised 01/24 42 11.3.2 In the event of termination by reason of a material breach of the Agreement by the Owner, the Designer shall be entitled to the same compensation as it would have received had the Owner terminated the Agreement for convenience, and the Designer expressly agrees that said compensation is fair and appropriate as liquidated damages for any and all costs and damages it might incur as a result of such termination. 11.3.3 In the event of termination by reason of a material breach of the Agreement by the Designer, upon adjudication by a court of competent jurisdiction,the Designer shall be paid that portion of its fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the Owner due to errors or omissions of the Designer or by reason of the Designer's breach of this Agreement. (Contract Specific Revision 9/6/24) 11.3.4 Should this Agreement be terminated as provided under this Article 11 the Owner shall be granted, at no additional cost, ownership of all documents, drawings, and electronic databases relating to the Project, including the ownership of all drawings, specifications, documents and materials relating to the Project prepared by or in the possession of the Designer.The Designer shall turn over to the Owner within seven (7) days and in good unaltered condition reproducibles of all original drawings, specifications, documents, electronic data bases and materials (instruments of service.) In the event of such termination, and should the Owner use such instruments of service, without retaining the author's of the instruments of service, the Owner shall indemnify and hold the Designer harmless, to the extent authorized by North Carolina Law, from and against any cost, expense, damage or claim including the cost of defense arising out of the loss of life, personal injury or damage to tangible property occasioned wholly or in part by its contractor(s), agents or employees in connection with Owner's use of such instruments of service and other work provided as part of Basic Services and Additional Services, as may have been amended.The Designer specifically agrees to incorporate the provisions of this paragraph in all contracts for the services of Designer's Consultants.The Owner agrees that the Designer may retain one set of drawings for its records. (Contract Specific Revision 9/6/24) 11.3.5 Should this Agreement be terminated by the Owner for cause,the Owner shall, nevertheless, have the right to require the Designer and its Consultants to perform such additional effort as may be necessary to provide professionally certified and sealed drawings and to deliver to the Owner such certified and sealed drawings with respect to any phase or item of the project,for which effort the Designer shall be compensated in accordance with this Agreement. Upon request of the Owner,the Designer shall submit to Owner all relevant documentation, including but not limited to,job cost records,to support its claims for final compensation. (Contract Specific Revision 9/6/24) 11.4 Suspension 11.4.1 The Owner may, in writing, order the Designer to suspend, delay or interrupt all or any part of its Services on the Project for the convenience of Owner. 11.4.2 In the event the Designer believes that any suspension, delay or interruption of any or all of the Work on the Project, may require an extension of the duration of Basic Services or an increase in the level of staffing by Designer, it shall so notify the Owner and propose an amendment of the Key Milestone Listing for consideration of the Owner. Such amendment or extension shall be effective only upon the written approval of the Owner,which will not be withheld unreasonably. 11.4.3 A suspension, delay or interruption of the Project shall not terminate this Agreement; provided, however,that if such suspension, delay or interruption causes a suspension of the Designer's services for a period exceeding ninety(90) days,the Designer's compensation for Basic Services may be equitably adjusted upon mutual agreement of the parties. 11.5 Waiver 11.5.1 The payment of any sums by the Owner under this Agreement or the failure of the Owner to require compliance by the Designer with any provisions of this Agreement or the waiver by the Owner of any breach of this Agreement shall not constitute a waiver of any claim for damages by the Owner for any breach of this Agreement or a waiver of any other required compliance with this Agreement by the Designer. 11 Revised 01/24 43 11.5.2 Owner and Designer mutually waive any claim against each other for consequential damages. Consequential Damages include: A. Damages incurred by Owner for loss of use, income, financing, or business. B. Damages incurred by Designer for office expenses, including personnel, loss of financing, profit, income, business, damage to reputation, or any other non-direct damages. ARTICLE 12 ADDITIONAL PROVISIONS 12.1 Confidentiality 12.1.1 The Designer and its Consultants shall use their best efforts not to disclose or permit the disclosure of any confidential information relating to the Project, except to its agents, employees and other Consultants who need such confidential information in order to properly perform their duties relative to this Agreement. 12.2 Limitation and Assignment 12.2.1 The Owner and the Designer each bind themselves,their successors, assigns and legal representatives to the terms of this Agreement. Neither the Owner nor the Designer shall assign or transfer its interest in this Agreement without the written consent of the other. There are no third party beneficiaries of this Agreement and nothing in this Agreement, express or implied, is intended to confer on any person other than the parties hereto (and their respective successors, heirs and permitted assigns), any rights, remedies, or obligations. 12.3 Governing Law 12.3.1 The Owner and the Designer agree this Agreement is governed by the laws of the State of North Carolina and Orange County. Designer shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti- discrimination laws, policies, rules, and regulations and the Orange County Non-Discrimination Policy and Orange County Living Wage Policy(each Orange County policy is incorporated herein by reference and may be viewed at http://www.orangecountync.gov/departments/purchasing division/contracts.php.). Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit and does not limit the definition of breach to discrimination. By executing this Agreement Designer certifies that it has not been identified, and has not utilized the services of any agent or subcontractor identified, on the list created by the State Treasurer pursuant to G.S. 147-86.58. By executing this Agreement Designer certifies that Designer has not been identified, and has not utilized the services of any agent or subcontractor identified, on the list created by the State Treasurer pursuant to G.S. 147-86.81. By executing this Agreement Designer affirms it is and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. 12.4 Dispute Resolution 12.4.1 Any dispute arising under pursuant to the Project shall be addressed under the terms of the Dispute Resolution Rules and Procedures for Orange County Design, Building Construction, Renovation, and Repair Projects. These rules and regulations are available upon request. 12.4.2 Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina, and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. 12.5 Extent of Agreement 12 Revised 01/24 44 12.5.1 This Agreement represents the entire and integrated agreement between the Owner and the Designer and supersedes all prior negotiations, representations or agreements, either written or oral.This Agreement may be amended only by written instrument signed by both the Owner and the Designer. 12.6 Severability 12.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable,the remainder of this Agreement shall be enforceable without such provision. 12.7 Ownership of Documents 12.7.1 All designs, drawings, specifications, design calculations, notes and other works developed in the performance of this contract shall become the property of the Owner and may be used on any other project without additional compensation to the Designer. Designer does not warrant the use of the documents by the Owner or by any person or entity for any purpose other than the Project as set forth in this agreement. 12.8 E-Verify 12.8.1 Pursuant to the terms of North Carolina General Statutes no county may enter into a contract unless the Designer and its subconsultants comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable,failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Designer's breach of this Agreement. By executing this Agreement Designer affirms Designer is in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. 12.9 Electronic Signatures 12.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed hereto evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. 12.10 Iran Divestment and Israel Boycott 12.10.1 Designer certifies that, as of the date listed below, it is not on the Final Divestment List as created by the State Treasurer pursuant to N.C.G.S. § 147-86.58 or the final boycott list created by the State Treasurer pursuant to N.C.G.S. §147-86.81 nor shall Designer utilize in the performance of this Agreement any subcontultant or consultant identified on such lists. 12.11 List of Attachment and Referenced Documents and Priority 12.11.1 The design documents consist of this Agreement and the attached and referenced documents. The attachments and referenced documents are listed in this Section 12.11.1 and are incorporated herein and made part of this Agreement by reference. In the event of any inconsistency between or among the terms of this Agreement and any of the incorporated listed documents such inconsistency or conflict shall be interpreted in the following order of priority: This Agreement Attachment A- Description of the Project Attachment B- Description of Basic Services Attachment C- Format of Total Project Cost Estimate(s) Attachment D- Key Milestone Listing Attachment E-Consultants and Key Personnel 13 Revised 01/24 45 Attachment F- Hourly Rates Schedule Request for Qualifications Statement of qualifications IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first above written in a number of counterparts, each of which shall, without proof or accounting for other counterparts, be deemed an original contract. ORANGE COUNTY: DESIGNER: By: By: Printed Name and Title Printed Name and Title 14 Revised 01/24 46 ORANGE COUNTY-INTERNAL USE ONLY Finance Information Vendor Name: Vendor Contact Person: Phone: Address: City State: Zip: Department: Amount: Purpose: Budget Code(s): Vendor# Vendor Status with NCSOS: Vendor is a BOCC consultant: ❑Yes ❑No Contract Details Contract Type: ❑New ❑Amendment(Original Contract: )(Most Recent Amendment ) Effective Date End Date Notice Date (Notice Purpose ) Award ❑Approved by Board(Agenda Date: ❑ Made or Administered by Signature Authority ❑ BOCC Express Delegation(Agenda Date: Policy 9.4: ❑Under$5,000; ❑ Service Under$90,000; ❑ Construction Under$250,000 ❑ Budget Policy Section XV(Capital Improvement Project: ) Bidding ❑ Informal Bidding($30k-$90k); ❑ Formal RFP($90k+); ❑ Other(<$30k); ❑Exception(#-----) Department Affirmation ❑This agreement is approved as to technical form and content and I as Department Director affirmatively state work on this project has not been initiated prior to execution of the agreement. ❑ This agreement is approved as to technical form and content. Services related to this agreement have already begun or been completed.Description of the nature of the emergency condition that was addressed: Department Director's Signature Date: Information Technologies This agreement has been reviewed and is approved as to information technology content and specifications: Office of the Chief Information Officer Date: ❑Inapplicable because no hardware/software purchases or related services Risk Management This agreement is approved for sufficiency of insurance standards,specifications,and requirements: Office of the Risk Management Officer Date: Financial Services This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act: Office of the Chief Financial Officer Date: Legal Services This agreement is approved as to legal form and sufficiency: Office of the County Attorney Date: Clerk to the Board All Docusign contracts must be copied to the Clerk upon completion: occlerkdocs@orangecountync.gov The following signature block is for hard copies only and is not required for Docusign contracts: Received for record retention: Office of the Clerk to the Board Date: 15 Revised 01/24 47 Attachment A - Description of the Project 16 Revised 01/24 48 Attachment B - Description of Basic Services 17 Revised 01/24 49 Attachment C - Format of Total Project Cost Estimate ORANGE COUNTY Attachment C---Project Cost Estimate PROJECT IDENTIFICATION: PROJECT CITY or LOCATION: (Definitions/explanations are provided on pg 2 to assist in completion of this form.) CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL A. Site Preparation 1. Demolition $0 2. Site Work $0 B. Construction 1. Utility Services $0 2. Building Construction(new space) $0 3. Building Construction(existing) $0 4. Plumbing(new space) $0 5. HVAC(new space) $0 6. Electrical(Includes TV&Radio Studio) $0 7. Fire Supression and Alarm Systems $0 8. Telephone, Data,Video $0 9. Associated Construction Costs $0 10. Other: $0 C. Equipment 1. Fixed $0 2. Moveable $0 ESTIMATED CONSTRUCTION COSTS $0 Items below may be calculated by percentage or lump sum. If using lump sum,make entry in$field. DESIGN FEE % (%of Estimated Construction Costs) $0 PRECONSTRUCTION COSTS % (%of Estimated Construction Costs) $0 CONTINGENCIES % (%of Estimated Construction Costs) $0 ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 Escalation=percent per month multiplied by number of months (From Est.Date to mid-point of construction)= months %per month ESCALATION COST INCREASE (Total of Estimated Costs x Escalation%) $0 ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 APPROVED BY: TITLE DATE 18 Revised 01/24 50 DEFINITIONS Item on Form Definition Attach basis and justification for estimate. Include description,quantities,units, CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. A. 1.Demolition Includes but may not be limited to lead or asbestos testing and removal, building or interior space demolition in whole or part. A.2.Site Work Includes but may not be limited to grading,excavating, poor soils or rock removal, utilities relocation,roads,walks,parking,streambank repairs, stormwater management,retaining walls,rainwater harvesting systems,landscaping. Attach explanation of any special building, mechanical,or electrical service B. 1. Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or other utility service. B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, utilities,signage,security,displaced parking,staging,lock cores, keys,permits. B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be added if needed. PRECONSTRUCTION Includes but may not be limited to land surveys,lead/asbestos surveys, COSTS environmental assessments,copying,postage,costs of print advertising,and destructive testing. For CM at Risk, preconstruction costs are consistent with the requirements of the preconstruction services agreement. CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and omissions,concealed site conditions, utility conflicts,and extended overhead resulting from weather or other delay. 19 Revised 01/24 51 Attachment D - Key Milestone Listing 20 Revised 01/24 52 Attachment E - Consultants and Key Personnel 21 Revised 01/24 53 Attachment F - Hourly Rates Schedule 22 Revised 01/24 54 V, I. Jj - L .r ORANGE COUNTY NORTH CAROLINA QUALIFICATIONS Orange County Professional Architectural and Engineering Services for the Orange County Crisis Diversion Facility coCPL ARCHITECTURE August 9,2024ENGINEERING PLANNING RFQ#367-005427 CPLteam.com 55 Table of Contents 1 Cover Letter ........................................................................................................ 3 2 Qualifications of the Provider .................................................................. S 3 How the Provider Will Adhere to the Scope of Work .............. 9 4 Roles and Responsibilities of all Project Team Members ... 16 5 Similar Projects ............................................................................................... 21 6 Other Factors That May be Relevant to the Project ............. 30 7 Provider's Professional Liability Insurance .................................. 33 8 Acknowledgment of Receipt of Any Addenda ........................ 3S 9 E-Verify ................................................................................................................ 37 10 Orange County Non-Discrimination Certification Form ... 39 11 Supplemental Vendor Information .................................................. 42 I - Y r 11ll l it ir F 7 I 2 CPL 56 RNW Cover Letter 1, C-- 1_ 57 co L August 9, 2024 Jovana Amaro, Purchasing Agent, Orange County jamaro@orangecountync.gov Re: Orange County- Professional Architectural and Engineering Services for the Orange County Crisis Diversion Facility(RFQ#367-005427) Dear Ms.Amaro and Members of the Selection Committee: On behalf of CPL,we are pleased to submit our qualifications and proposal for professional architectural and engineering services for the Orange County Crisis Diversion Facility. More than ever,these facilities are so important to our local communities because they provide different care options for individuals going through mental health and substance abuse crisis.They create real options for early intervention and recovery. CPL has assisted many of our community partners over the years with design solutions for Crisis Diversion Facilities, as well as provided guidance on clinical operations and management of these facilities. In addition to CDFs, our team has a wealth of experience with Behavioral Health projects, including over 30+years of guiding projects through North Carolina's Division of Health Service Regulation plan review department, as well as working with independent skilled operators of these facilities. Among our Behavioral Health project experience: • RHA Health Services Erlanger Western Carolina Hospital • Vaya Health Mission Health • Atrium Health Wayne UNC Healthcare • Caldwell UNC Healthcare Wake Forest Baptist Medical Center • Cone Health Orange County CPL is committed to providing operationally efficient design that truly enhances patient and caregiver experiences.With three offices in North Carolina (Charlotte, Greenboro, and Raleigh) and a team of over 500+ multi-disciplined architects,engineers and planners,we focus on performance, innovation and adaptability—we challenge conventional thinking while planning for the future. We believe we are the right team for this project based on past experience,as well as our intimate knowledge of the work done to date and efforts needed to deliver this project to Orange County. Very truly yours, CPL �P6_ Adam Chahulski,AIA, NCARB, LEED AP Senior Vice President/ Principal-in-Charge 704.770.8999 1 AChahulski@CPLteam.com CPL Architecture I Engineering I Planning 6302 Fairview Road,Suite 102,Charlotte, NC 28210 704.331.9131 CPLteam.conn 1 2. Qualifications of the Provider WCPL 5 2.QUALIFICATIONS OF THE PROVIDER 59 We are engineers, architects, planners and technical specialists. We are community leaders, business owners and friends. f r 41. 1Me At CPL, we feel inspired CPUs services every day to make our Being full-service means bringing CPL BY THE NUMBERS world a better place innovation to our clients in terms of service delivery. Our highly 1975 through exceptional design, collaborative and multi-disciplined Year Founded dedicated service and team is capable of solving every lasting client relationships. challenge posed by your project. 500+ Total Staff CPL History & Philosophy Our design professionals could 95 CPL is a multi-disciplinary firm literally create a city - from the Licensed Architects that has been serving public earliest planning stages to the and private clients since 1975. ribbon cutting- approaching every 76 We have grown in size from aspect of each project with full Licensed Engineers a small civil engineering firm service, personal attention and of a half dozen employees to a principal participation. Our in-house 47 multi-disciplinary firm of more expertise includes: LEED Accredited Professionals than 500 professionals in seven 24 states. Our team of dedicated • Architecture and Interior Design Offices professionals offer expertise in Mechanical, Electrical & Plumbing architecture, engineering, planning Engineering 11 and construction administration Interior Designers services. Civil Engineering • Landscape Architecture 9 CPL'S Philosophy AICP Certified Planners P Y • Structural Engineering • Our Belief in Full Service Capabilities • Transportation Engineering 5 • • Municipal Services & Planning Landscape Architects Our Focus on Personal Attention • Our Commitment to Principal High Performance Design and 6 Participation Energy Performance Contracting WELL Accredited Professionals • CPL Creative Labs & Emerging Technologies 6 1 CPL 2. QUALIFICATIONS OF THE RPOVIDER Project Organizational Chart Our team has been anticipating this project and looking forward -� to further developing our relationship with Orange County. This ORANGE COUNTY is a very important project for CPL and in support of this, our core team is backed by a staff of over 500+ professionals within NORTH CAROLINA the CPL system to ensure capable resources are available and focused on a successful process and outcome. .00 00 Project Leadership � MEP Engineering Team ♦ Adam Chahulski, � Michael Pena PE, CBCP �00 AIA, NCARB, LEED AP / MEP Coordinator PL Quality Control Principal-in-Charge / ♦ CPL / Gregory Kyzer PE Rutu Tadkod Mechanical Engineer � CPL Project Manager CPL Roberto Rivas PE _ 1 Geothermal Systems Engineer ' CPL Architecture, Planning, and Michael Ranieri PE Interior Design Team ` Electrical Engineer / Pam Houston, CPL / RA, EDAC, Lean Six Sigma Yellow Belt Healthcare Planner Ron Davis NICET II / / CPL — Fire Protection / i .10 %-,. Plumbing Engineer I Danielle Scesney, AIA, NCARB CPL i i Project Architect ♦ 00 CPL Cost Estimating � �' = — — � ♦ � / -.. ` Molly Livingstone, RID, CHID, NCIDQ, R. Kaye Smith AAHID, LEED AP BD+C, IIDA / Cost Estimator � Structural and Civil � Palacio / Engineering Team Interior Designer / � CPL Larry Werts, PE, SE , � / Structural Engineer Robin Washco, AIA, NCARB ` CPL ♦ Exterior Skin Designer Blake Hall, PE, PLA / CPL 00 ##* Site/Civil Engineer / ♦ _ _ _ 00 ` Timmons Group 4-0ft% 0o / ♦ i i CPL 1 7 2.QUALIFICATIONS OF THE PROVIDER 61 Our Valued Consultants TIMMONS GROUP PALACIO Site/Civil Engineering Cost Estimating (DBE, MBE, NC HUB) Recognized for more than 30 years as one of Palacio Collaborative is a minority-owned full-service Engineering News Record (ENR)'s Top 500 Design construction cost management firm with 6 locations Firms,Timmons Group provides a wide range of serving clients nationwide.A certified DBE, MBE, and NC engineering, survey, and technology services to HUB firm,their team has over 150 years of combined team public and private clients. Founded in 1953,our firm experience in providing Clients accurate construction has grown to include 17 offices from coast to coast. cost estimates through innovative tools and proactive We opened our doors in North Carolina in 2007 and collaboration. Palacio completed over 450 government operate from offices in Raleigh, Charlotte, Greensboro, projects nationwide including federal,judicial,and Wilmington, and Elizabeth City. municipal facilities.Additionally,they estimated for over 225+ healthcare projects. Timmons Group has significant experience working with state and local governments;we have provided Our services include preliminary budgeting/budget complete civil site engineering and survey for a verification, conceptual cost modeling/estimating, design variety of new and renovated public health and safety phase estimating, alternatives pricing,value engineering, facilities throughout North Carolina.These projects sustainable design impact analysis, and contractor require extensive planning and site evaluations to estimate review and reconciliation. ensure proper roadway access to minimize response times;evaluation of driveway access and sight lines to ensure safe ingress and egress from the facilities; close coordination with municipal and state Departments of Transportation; site layout, grading, drainage and water, and sewer systems and stormwater management planning. Timmons Group has significant experience with publicly funded and municipal projects in North Carolina. We have completed over 40 projects with the North Carolina Office of State Construction 8 1 CPL r y •s 1 - ti r 3. How the Provider Will Adhere to the Scope of Work MCPL 9 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE OF WORK 63 lak. ��a« _ 1 ---wlti� F f 4 :�R w ; . q fl'i Our Approach We design healing spaces that elevate This project requires a team with a track-record of the human spirit. success in working together. You need a team that has the capacity and experience to manage technically Our leadership is by example, not by resume or complex projects at multiple locations on the same personalities. We promote the breaking down of site with different stakeholders and operational silos and designing as a team where information is organizations; one that keeps your projects on budget shared across disciplines. CPL has the respect of the and schedule, who are experts in behavioral healthcare design and construction communities because of our designs, and will make your project a priority. Our team continued success on projects of this type and size. has the experience you need. As a full-service firm, collaboration is at the heart As Principal, Adam Chahulski will see that appropriate of what we do. We combine the expertise of various resources are assigned and overall project goals are disciplines to approach projects from every angle. being met. Day-to-day management of projects and We will put the right people in the right place for your communication will be handled by Rutu Tadkod, our project's success. designated project manager. All requests and required services will either be completed by Rutu or delegated to the appropriate team member. Representation at all meetings will include team members with the appropriate level of understanding and expertise. 10 1 CPL 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE�$WORK 3a. An Indication of Your Understanding In 2019, Orange County participated in a Sequential of the Project Intercept Mapping (SIM) exercise to determine North Carolina is experiencing increasing numbers current Behavioral Health resources and gaps. of individuals in behavioral health crisis. Local The SIM exercise resulted in creating a work group hospital emergency departments (ED) and detention and sophisticated data collection resulting in the facilities are the most often used resources during identification of needs and solutions. these episodes of crisis. Local ED's often do not have the capacity to treat persons with primary The data, current crisis continuum services, and behavioral health needs resulting in individuals being identified gaps support the need for a robust crisis "boarded" for several hours or even days before a continuum to: placement can be located or the person is safe to be discharged.This ED stay sometimes occurs without Provide a safe place for de-escalation and effective assessment, treatment or linkage to the treatment including case management and linkage ongoing community services and support needed to to the assessed level of care. This will occur as the prevent ED utilization for future psychiatric crises. preferred alternative to the jail or local The availability of other specialized community- emergency department. based crisis services can assess, treat, and connect Provide multiple levels of care within the Crisis individuals more quickly to behavioral health specific Continuum in order to stabilize individuals. resources which support an individual's path to recovery. • Decreased delays in the initiation of treatment and increased engagement in the outpatient service A number of individuals who commit crimes typically array. The availability of other specialized community- do so due to their unstable and untreated behavioral based crisis services to support an individual's path health concerns. This is often a direct result of a lack to recovery. of medication and treatment options and/or lack of suitable community resources, supports or referrals. A partnership and venture to develop crisis continuum Charges, usually misdemeanor and nuisance type services will succeed in paving the path toward charges result in incarceration. This puts a strain on creating a crisis center in Orange County to be the the local criminal justice and public safety entities, first line option and alternative to ED for persons with particularly law enforcement, detention centers and behavioral health crises. courts in Orange County. This strain has negative clinical, fiscal, and societal affects. While extensive efforts were put forth in the schematic phases of this project for program development, CPL looks forward to re-validating those needs and understanding any changes or assumptions since these efforts were completed. •I boo +n t 9 4 • +� ! + i • • CPL 11 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE OF WORK 65 Operated by RHA, the proposed Behavioral Health The BHUC will be staffed by a multi-disciplinary Urgent Care (BHUC) will become the primary access team that includes physicians and extenders, point for children, adolescents, and adults in crisis licensed clinicians, registered nurses (RN), qualified in Orange County and will become a part of their professionals (QP), certified peer support specialists statewide array of mental health, substance use, and (CPSS), and administrative support. Contractual intellectual/ developmental disability services. This relationships may be developed for medical and BHUC will be co-located among a full continuum of licensed clinical staff, as well as security officers via an services at the proposed site. Orange County Law Enforcement agency. Prescriber staff will have routine hours on-site, with 24/7/365 The location of this facility is a central component on-call availability. Telemedicine equipment will be of the proposed plan to decrease ED utilization in available for situations when telehealth is needed; Orange County and increase access to and utilization however, clinical services will be delivered face-to of services for members of the community seeking face whenever possible. Everyone who presents at the crisis support, routine care, and/or community-based BHUC, regardless of age or disability, will participate in services. CPL understands the initially identified an initial evaluation to identify their primary needs and site is no longer a viable option for the new Crisis establish a preliminary treatment plan. Diversion Center and looks forward to assisting Orange County in identifying new sites and testing the feasibility of them for this project. This initial effort may include re-stacking and blocking of the proposed building, including potential program modifications to facilitate site adaptation. 17 61,r � LN Mao W� -- 1 -� y . r 12 CPL 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE��WORK Outpatient Services will be available on the same day access FBC/Detox services more quickly, but also for individuals presenting Monday through Friday engages them in preventative and outpatient services, between the hours of 8:OOAM and 8:OOPM, or the reducing the need for transfers to the hospital. The following business day for individuals presenting immediate linkage option from BHUC to FBC/Detox after hours or on weekends. Meanwhile, an individual includes medical clearances to prevent the individual who presents with Urgent or Emergent needs will having to enter an ED for behavioral health assessment receive a CCA and/or a Crisis Assessment, a referral and treatment. Additionally, due to medical clearance to the appropriate level of outpatient care, and/ being provided on BHUC site, external referrals to or will have access to one of the BHUC's 23-hour other behavioral health/detox units can be made observation bays. without the person entering the local ED. This portion of the program will not only allow for Under the proposed plan, law enforcement will utilize further assessment, observation, treatment, and the proposed new location for all behavioral health safety planning while the individual is working to drop-offs as the facility is proposed to be an IVC manage his or her recovery, but also grants the designated facility. With the additional expansion of co- individual access to staff who can offer additional located services and continued education and training support, coaching, and connection to recovery and for law enforcement officers. Supporting individuals treatment resources. in their efforts to remain in the community and out of the hospital ED is a primary objective of the proposed The Facility-Based Crisis (FBC) and Non-Hospital plan. As noted previously, Orange County has identified Medical Detox component of the proposed program a clear need for increased behavioral health capacity will be comprised of a sixteen-bed unit for adults with aimed at the expansion of the crisis continuum to more mental health and detox from substances in Orange effectively stabilize and support individual in crisis. County. The unit will be co-located with the BHUC, alongside a full array of outpatient services. The co-location of these programs will allow for increased coordination, communication, and integration, Following their participation in a BHUC assessment, bringing together programs that are now provided individuals in need of more intensive residential at multiple locations throughout the community). support will be referred to the FBC as an alternative RHA has demonstrated success with crisis service to inpatient or hospital-based care. Historically, delivery, as well as after-care referral and coordination individuals seeking behavioral health crisis services of care with other providers. Staff will continue to through the ED have encountered long wait times work closely with other service providers to ensure in their efforts to receive inpatient care and have ongoing communication and collaboration throughout then experienced lengthy hospital stays. The BHUC the community to ensure active engagement and program, in contrast, enables individuals to not only successful outcomes for individuals served. V I CPL 13 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE OF WORK 67 3b. Descriptions of Similar Projects that the Other success factors for Crisis Diversion Centers Provider has Completed that Involved Crisis center around the engagement of the community, Diversion Facilities or Similar Medical-related local hospitals, and law enforcement agencies. CPL facilities located in North Carolina. successfully led a campaign with Orange County to The design of Crisis Diversion Facilities must be bring awareness to the proposed design by hosting flexible and adaptable to acknowledge that our engagement sessions to receive feedback and understanding of mental and behavioral health will questions to ensure the design was holistically thought continue to evolve and change the way we design. about - ensuring care begins before a patient walks From the plan layout, down to the electrical outlets through the doors. that are specified, the entire design needs to be cohesive. Details matter, and safety is of the utmost 3c. Description of recent experience with importance for both staff and patients. successfully maintaining project schedules and budgets. As evident by our project experience noted in section Project Scheduling 5 of this RFP, CPL is a behavioral health expert.These Managing the schedule begins with clear are projects that are local, completed, or ongoing communication and agreement with respect to scope in North Carolina. As of July of this year, our most and project milestones. From a personnel standpoint, recent Crisis Diversion Center design opened its the Principal and Project Manager work together with doors to Alamance County operating as a 16-bed FBC staff to ensure that the design schedule is maintained. and 10-bay BHUC. The project's success revolved Because we can provide all engineering disciplines around working alongside RHA Health, the clinical in-house, these communication tasks are simplified provider, to ensure the design matched the delivery of and direct. Internal progress meetings are established care, but also offered patients a tranquil environment to ensure that project milestones are met. Design that is paramount to their health. staff assigned to this project will be responsible for meeting all the requirements for information gathering, programming, design, and document preparation within specific phases. t i I s ! t Xgr 14 CPL 3. HOW THE PROVIDER WILL ADHERE TO THE SCOPE�F WORK Budget Management 3d. An indication of your understanding of the area We work in concert with your team to understand where the project is located budget constraints at the start of a project and CPL is proud to serve our North Carolina clients. identify risks and opportunities that will inform We have experience in this geographic location and the target cost of the project. Partnerships with are familiar with local regulations. Through over our cost estimator and selection of a Construction 32 years of practice in North Carolina, our team's Manager will be crucial to maintain the overall leadership has deep knowledge of local approval and budget. Through Target Value Delivery (TVD) our regulatory processes and the construction and supplier team will ensure that cost is an input to the design, community. not an output. We have recently completed two TVD projects at FirstHealth of the Carolinas Cancer Center With three North Carolina office locations, we will ($68M) and Alamance Regional Medical Center Heart serve your project with our Charlotte office. We can & Vascular ($34M) that were both on schedule and draw from our offices in Greensboro and Raleigh for within budget. additional support as needed. 100% Ability to Impact Cost Cost of Design Changes LU u z a U O F � ' Typical Q Design Effort ` Ca O U oro PROJECT TIME Pre-schematic Schematic Design Construction Bidding& Construction Development Document Negotiation Phase Design Phase Phase Phase Phase Phase Planning Designing Procurement Construction CPL 15 t I xg'E i A. � �y i 4. Roles and Responsibilities of all Project Team Members 16 ■CPL 4. ROLES AND RESPONSIBILITIES OF ALL PROJECT TEAM M�MBERS Adam Chahulski AIA, NCARB, LEED AP 4a. Principal-in-Charge 4b. Office Location:Charlotte, NC Adam has over 19 years of design experience specific to Registered Architect: 11732 the healthcare market sector working on projects ranging from one room renovations to 500,000 sq.ft. Project Experience: bed tower additions.As a healthcare planner,Adam is Alamance County Crisis Diversion responsible for developing innovative programs to meet Center, Burlington, NC CPL client needs and budgets of all types and complexities. Caldwell County Crisis Diversion Adam also serves as a subject matter expert on crisis Center, Lenoir, NC center projects. Orange County Crisis Diversion Center, Hillsborough, NC Rutu Tadkod 4a. Project Manager 4b. Office Location: Raleigh NC Rutu is a dedicated professional with experience in professional License Numbers: N/A planning and designing architectural and interior solutions for residential and commercial spaces. She Project Experience: attends and leads client vision sessions,coordinates Alamance County Crisis Diversion detailing across various disciplines to assure system and Center, Burlington, NC CPL material compatibility and participates in the development Atrium Health Wake Forest of project specifications. Baptist Winston East Clinics, Winston-Salem, NC Pam Houston RA, EDAC, LSSYB 4a. Healthcare Planner With over 20 years of healthcare design experience and 4b. Office Location: Raleigh NCAIA:258833 ,4 extensive regulatory knowledge, Pam is a Healthcare Planner in our Raleigh office.Covering the full spectrum Project Experience: of healthcare-related facilities, she works with national Orange County Crisis Diversion healthcare clients on projects of varying sizes and Center, Hillsborough, NC CPL scopes to advance health and wellness through Alamance County Crisis Diversion collaborative design. Pam has exceptional leadership and Center, Burlington, NC communication skills and is known for providing powerful insights and timely service. Danielle Scesney AIA, NCARB 4a. Project Architect � � Danielle is a registered architect with CPL and is involved 4b. Office Location:Charlotte, NCRegistered Architect: 13960 in all aspects of the design and construction phases of healthcare projects. She has experience with multiple Project Experience: project types from small renovations to 120,000 sq.ft. Caldwell County Crisis Diversion new builds. Danielle's attention to detail and eagerness Center, Lenoir, NC CPL to collaborate is maintained throughout all phases of a Jonas Paul Behavioral Hospital, project resulting in effective yet creative designs.As an Lenoir, NC experienced user of BIM technology,she is continuously ' Wayne UNC ED BHU Expansion, involved in the design from programming to 3-D imagery Goldsboro, NC to building CDs and coordinating with consultants. CPL 1 17 4. ROLES AND RESPONSIBILITIES OF ALL PROJECT TEAM MEMBERS 71 Molly Livingstone RID, CHID, NCIDQ, 4a. Interior Designer AAHID, LEED AP BD+C, IIDA 4b. Office Location:Charlotte, NC As a Interior Designer with 18 years of experience, Molly Registered Interior Designer:216 is proficient with many diverse project types.Specializing Project Experience: in healthcare design,she works with clients to develop Caldwell County Crisis Diversion jL innovative interior designs and palettes each of which Center, Lenoir, NC CPL reflect and complement the architectural details and Jonas Paul Behavioral Hospital, feeling of the space. Molly guides clients through our Lenoir, NC innovative design process providing her expertise to Wayne UNC ED BHU Expansion, implement the project vision. Goldsboro, NC Robin WashCo AIA, NCARB 4a. Exterior Skin Designer 4b. Office Location:Charlotte, NC Robin has over 16 years of experience in architectural Registered Architect: 12772 design services, primarily focused on healthcare facilities. Throughout her career,she has gained a wide breadth Project Experience: i of expertise in designing,delivering and managing Orange County Crisis Diversion successful, impactful projects from conception through Center, Hillsborough, NC CPL execution.This experience has built a strong foundational Jonas Paul Behavioral Hospital, skill-set that allows her to adapt and evolve with every Lenoir, NC new challenge. Wayne UNC ED BHU Expansion, Goldsboro, NC Michael Pena PE, CBCP 4a. MEP Coordinator&Quality Control �y A CPL veteran who has served the firm for nearly two 4b. Office Location:Greensboro NC decades, Mike wears many hats,operating concurrently Professional Engineer:052834 as a Principal Mechanical Engineer,the leader of our Greensboro office's mechanical,electrical and plumbing Project Experience: (MEP) engineering team and a dedicated member of our Rochester Regional Health-Riedman CPL Sustainable Design Team. His expertise encompasses a Health Center, Rochester, NY wide range of facilities and a variety of heating,ventilation ' Hollins University,West Hall HVAC Replacement (Geothermal), and air conditioning (HVAC) systems. Hollins,VA Gregory Kyzer PE 4a. Mechanical Engineer 4b. Office Location:Greenville, NC Greg is experienced as lead mechanical engineer Professional Engineer:027581 managing other engineers and designers for preparation of HVAC, piping,and plumbing contract documents Project Experience: including plans,specifications and calculations on Caldwell County Crisis and institutional, industrial,commercial, healthcare, Detoxification Center, Lenoir, NC CPL pharmaceutical,and multi-family residential projects. FirstHealth of the Carolinas, Duties have also included on-site surveying and evaluation Outpatient Cancer Center, of large-scale mechanical systems, preparation and Pinehurst, NC submission of documentation for project LEED certification and presentations to prospective clients. 18 1 CPL 4. ROLES AND RESPONSIBILITIES OF ALL PROJECT TEAM M MBERS Roberto Rivas PE 4a. Geothermal Systems Engineer 4b. Office Location:Greensboro NC 17-1. Roberto is a member of the mechanical engineering professional Engineer:035078 team and has particularly extensive experience in heating,ventilation and air conditioning (HVAC) design. Project Experience: His expertise encompasses mechanical designs for Hollins University, Rathaus Remodel healthcare and universities with a focus on Geothermal (Geothermal), Hollins,VA CPL Heat Pumps (GHP) . Hollins University,Tinker Hall (Geothermal), Hollins,VA Michael Ranieri PE 4a. Electrical Engineer 4b. Office Location:Greensboro NC Mike has over three decades of experience in the professional Engineer:020216 electrical field with expertise in the analysis,design and specification of electrical systems. His responsibilities project Experience: include developing conceptual designs,delegating project ' FirstHealth of the Carolinas, assignments and serving as a mentor to junior team Outpatient Cancer Center, CPL members. He holds professional licensure in six states Pinehurst, NC and provides service for the higher education focusing York County, New Coroner's Office, on both new construction and renovation and retrofit York County, SC projects. Roll DaviS NICET II 4a. Fire Protection/Plumbing Engineer With close to 4 decades of experience, Ron is a talented 4b. Office Location:Greensboro NC Plumbing Designer who works with the mechanical, NICET II:63035 electrical and plumbing (MEP)engineering team. He has expertise in designing fire protection and plumbing Project Experience: f systems for a variety of higher education and his FirstHealth of the Carolinas, CPL responsibilities also include coordinating water and Outpatient Cancer Center, natural gas utility enforcement with agency officials and Pinehurst, NC participating in construction phase services such as York County, New Coroner's Office, submittal reviews and punch lists. York County, SC Lam/ WertS PE, SE 4a. Structural Engineer 4b. Office Location: Rochester, NY A Structural Engineer with more than two decades professional Engineer:051437 of extensive and widely varied experience, Larry has become an integral leader of our structural engineering Project Experience: team. His expertise encompasses design work for various Field of Dreams Assisted Living and types of healthcare buildings.As a seasoned professional, Memory Care Center,Allegany, NY CPL Larry has provided oversight for a bevvy of projects which required extensive analysis prior to the design of new structures. CPL 1 19 4. ROLES AND RESPONSIBILITIES OF ALL PROJECT TEAM MEMBERS 73 Blake Hall PE, PLA 4a. Site/Civil Engineer 4b. Office Location: Raleigh, NC Blake is a proactive and detail-oriented Civil Engineer professional Engineer: 038616 and Landscape Architect in our Raleigh, NC office.With his significant amount of experience, Blake has a strong Project Experience: record of meeting/exceeding aggressive schedules and Orange County Crisis Diversion standards of quality through successful teamwork,with Center Feasibility Study, Orange Timmons Group leadership and technical expertise in all aspects of site County, NC development and infrastructure improvement projects NC Dept of Health & Human for both public and private clients. Services Office Consolidation, Garner, NC R. Kaye Smith 4a. Cost Estimator 4b. Professional License Numbers: Kaye has over 30 years of experience in the Design and N/A Construction industry with certifications in MCACES and On-Screen software technologies. She is a Senior Project Experience: Cost Manager and co-leads the Carolinas' spearheading VA Medical Center Behavioral projects ranging from$100,000 to over$100 Million Health Building*,Altoona, GA Palacio providing timely and accurate cost estimates. Spartanburg Regional Heart& Vascular Hospital Addition & Renovation, Spartanburg, SC c }% N H (UO1 +' C 4c. Description of the Current Workload >. m m tn for Identified Individuals0 CL o X iM Based on review of our current workload, CPL = L LL o has the available capacity to accomplish the d L' c ;� ,, U (n a o work outlined in the Request for Qualifications 'o, 0 = N c i M for this project.We are accustomed to a w- E c o �' a '� i U a v c c °' a � �, � � U Z producing multiple concurrent contracts and o E m - a; c c a c c ' c 'c C 0 0 are organized to do so—with adequate reserve a a (u a o o ( = a v M x .` = a: xg -lid U — E d 3 c L staffing to cover any contingencies. oL L. ' L 'o M 3 c W C W W m } to Q = U U fid' 2 O WorkloadTeam Member Current Project& Projected Adam Chahulski 10% 10% 10% 5% 20% 25% Rutu Tadkod 25% 10% 10% 30% Pam Houston 21% 8% 7% 44% Danielle Scesney 20% 5% 50% Molly Livingstone 50% 5% 30% Robin Washco 5% 30% 50% Michael Pena 85% Gregory Kyzer 25% 50% Roberto Rivas 25% 10% 50% Michael Ranieri 15% 13% 52% Ron Davis 5% 13% 62% 20 1 CPL Iwo I—Ai i. _ - ,f @\. i c 5. Similar Projects IMCPL 21 S. SIMILAR PROJECTS 75 Jonas Hill Hospital and Behavioral Health Clinic Inpatient/Outpatient Facility Caldwell UNC Healthcare 5a. Project Name: Jonas Hill Hospital and Behavioral Health Clinic Inpatient/Outpatient Facility The facility comprises 27 beds for adult inpatient Date of the Project: 2020 psychiatric care and an integrated outpatient clinic 5b. The Location of the Client: Lenoir, NC offering education, resources and support for patients and their families. It features a unique, open-concept 5c. A Contact Name Including Relevant Contact design with high ceilings and barrier-free spaces filled Information: Jim Smith, Director Facility Services with natural light to encourage interaction between Tel: 828.757.5153 staff and patients. Careful consideration went into the selection of materials, finishes and furniture to create a CPL spearheaded architectural and interior design serene and safe space for healing. The design aimed to for the Jonas Hill Hospital and Behavioral Health alleviate anxiety by emphasizing muted tones, natural Clinic. This facility, a division of Caldwell Memorial woods and regional imagery, fostering a sense of Hospital, focuses on the treatment of individuals with familiar comfort for both patients and staff. mental health conditions while actively fostering community awareness and engagement. Pic f f a �w 22 CPL 5.SIMILAR MOJECTS F �wWo­ 1 r: �II Fm BMW .��m li 11111m fI CPL 23 5.SIMILAR PROJECTS 77 Caldwell County Crisis and Detox Center Caldwell County 5a. Project Name: Caldwell County Crisis The FBC was an approximate 5,200 sq. ft. addition to and Detox Center an existing outpatient facility that has 12-beds to serve Date of the Project: 2017 adults with mental health issues, substance abuse 5b. The Location of the Client: Lenoir, NC issues, and developmental disabilities. It will offer 24hr care to those in need, and combined with the outpatient 5c. A Contact Name Including Relevant Contact center, will provide a continuum of care offering Information: Sandy Feutz, Chief Operating Officer counseling and medication management for (RHA Health Services) Tel: 828.775.1264 long-term recovery. CPL was hired by Caldwell County, in conjunction with During the design process CPL worked closely with RHA Health Services, to provide architectural and RHA to ensure proper materials, fixtures, and finishes engineering design services for a new Facility Based were specified for the safety of patients and staff, Crisis Center (FBC) that will serve local residents of but also collaborated on making the space a healing Alexander, Caldwell, and McDowell Counties. environment void of an Institutional feet. Incorporation of universal room sizes allowed for future expansion from single to double occupancy rooms to expand capacity without the need for horizontal expansion. 4 Ij F �1 !1 r VIX J� 24 CPL 5.SIMILAR MOJECTS Orange County Behavioral Health Crisis Facility Orange County 5a. Project Name: Orange County Behavioral Health The Crisis Diversion Center is envisioned as being Crisis Facility welcoming, safe, and calming with no wrong door - Date of the Project: In Progress protecting patient dignity and providing access to care 5b. The Location of the Client: Hillsborough, NC from case managers, peer specialists, social services, and community resource specialists. 5c. A Contact Name Including Relevant Contact The CPL team worked collaboratively with the Orange Information: Travis Myren, County Manager County Crisis Diversion Facility Subcommittee and Tel: 919.245.2300 through visioning sessions, bubble diagrams, flow mapping and more, arrived at the solutions and Orange County, North Carolina has engaged with CPL recommendations in this report. Additionally, there to perform preliminary and schematic level design were two community engagement meetings to ensure and analysis services for a new Behavioral Health input was heard from all interested parties. Crisis Diversion Facility. The building will be 1-story and approximately 31,000 The County's goal is to create a facility with square feet and consist of four functions: Intake and programming that offers a comprehensive crisis Triage, Behavioral Health Urgent Care (BHUC, less continuum providing: than 24-hour care), Facility Based Crisis Center (FBCC, • Rapid crisis response for Orange County citizens overnight care) and the Community Resource and Call experiencing a behavioral health crisis. Center. Separate entrances will be provided, the front • Observation units for individuals to de-escalate, for the general public and the rear for Law Enforcement receive treatment, or await connection to a higher and EMS. Both entrances will be welcoming and level of care. calming for arriving patients. Intake, waiting and triage areas will be designed to keep pediatric and adult • Medical clearance to decrease Emergency patients separate. Daylighting and views, multipurpose Department usage. spaces and access to outside amenities are a priority in • Follow-up care and coordination post-crisis to the design. connect individuals to community treatment. • A 24/7/365 drop-off center for law enforcement and first responders to decrease utilization of emergency room and detention center for 41 individuals experiencing a mental health crisis."` • A 16-Bed facility to provide further evaluation and stabilization for Mental Health Crises and Non- ,t . <. a . ., • , TWIN Hospital Detox supports. -- - • A Peer Living Room Program that promotes r �`•' , safety, self-advocacy, and resiliency and supports individuals as they work toward person wellness -. ; ti goals. CPL 1 25 5.SIMILAR PROJECTS 79 Alamance County Crisis Diversion Center RHA Health Services 5a. Project Name: Alamance County Crisis from the BHUC and east arm, which are Business Diversion Center occupancy, by a 2-hour building separation. The Date of the Project: 2024 building is Type II-B construction and fully sprinklered. 5b. The Location of the Client: Burlington, NC The first floor is 16,497 sq. ft. and the second floor is 5c. A Contact Name Including Relevant Contact 11,826 sq. ft. Information: Sara Huffman, Vice President The campus is planned to provide an outdoor space Tel: 336.214.6584 for the FBC that is remote and private from community businesses. A central lobby provides access to the FBC Designed for RHA Health Services, the Burlington and second floor. A secured entrance provides a safe Facility Based Crisis Center and Behavioral Health assessment zone which supports both the FBC and Urgent Care is a facility that will serve the City of BHUC. A central stair and elevator were added after the Burlington and Alamance County.The project is an start of construction to facilitate access and flow. up-fit on a developer-lead campus. The Facility Based Crisis Center can accommodate Initially designed to span three buildings, the program up to 16 patients in 8 single occupancy rooms and 4 was consolidated into two of the buildings which double occupancy rooms. Patients have access to an were then connected to maximize usable area. The open-plan activity and dining room, a group room, north arm houses the Facility Based Crisis Center quiet room, and outdoor space. A catering kitchen (FBC) and the Behavioral Health Urgent Care (BHUC). provides food service. The Behavioral Health Urgent The second floor accommodates administrative Care includes 8 patient observation stations. Both the offices and meeting spaces for RHA Health Services FBC and BHUC use an on-site lab and laundry room. staff. The east arm of the building includes a retail The Administration/Office Space on level 2 includes 39 pharmacy, peer living, workforce training, and child individual offices, open office desks for 16 staff, and 3 services. The FBC is 1-2 occupancy and separated large conference rooms. may.a ti. 1' �J ' t i 26 CPL 80 5.SIMILAR PROJECTS Behavioral Health Emergency Department Expansion/Renovation Wayne UNC Health Care 5a. Project Name: Behavioral Health Emergency Department Expansion/Renovation Date of the Project: 2025 (est.) 5b. The Location of the Client: Goldsboro NC 5c. A Contact Name Including Relevant Contact Information: Tim Parnell, Tel: 3 919-587-4363 = CPL was retained by Wayne UNC Health to design an expansion to their existing Emergency Department in order to solve a growing census of behavioral health patients and ED throughput. The project consists of I a 16-bed behavioral holding unit that was designed ■ in zones/pods to flex between adolescent and adult patients. The rooms also flex to accommodate lower acuity patients, making the new 8,800 sq. ft. addition truly adaptable to patient and community needs. The project will free up higher acuity rooms in their existing Emergency Department allowing for better room turnover and wait times. Additionally, it removes the risk of patient elopement from unit to unit. Tip �I � I CPL 27 S. SIMILAR PROJECTS 81 Atrium Health Wake Forest Baptist Adolescent and Pediatric Behavioral Health Unit Atrium Health Wake Forest Baptist 5a. Project Name: Atrium Health Wake Forest Baptist Now located under the same roof as the hospital's Adolescent and Pediatric Behavioral Health Unit adult mental health services, this 16,000 sq. ft. space Date of the Project: 2020 supports a patient-centered model of care while 5b. The Location of the Client: Winston-Salem, NC fostering a multidisciplinary and collaborative work environment for staff and physicians. For example, 5c. A Contact Name Including Relevant Contact the facility features patient rooms designed with age- Information: Bill Payne, Tel: 743.999.1769 appropriate finishes and furnishings, flexible dining and activity areas, therapy and exam rooms, overnight Atrium Health Wake Forest Baptist (AHWFB) is spaces and family support areas. a pre-eminent academic medical center offering comprehensive healthcare services to the triad area. The strategic relocation of the Adolescent and Pediatric As part of their comprehensive master plan, AHWFB Behavioral Health Unit enhances patient and family partnered with CPL to relocate their Adolescent access, provides operational efficiencies for the and Pediatric Behavioral Health Unit from the main behavioral health care teams and allows for a smooth hospital to an adjacent outpatient campus. transition back into the community. , . �F 28 CPL S. SIMILAR P3 OJECTS Pf �o Or 0 ti ;vQ "of Ah �0 y CPL 29 fu� •:J 1d E -- 1 "- ..................... ................... 6. Other Factors That May be Relevant to the Project 30 ■CPL 6. OTHER FACTORS THAT MAYBE RELEVANT TO THE`PROJECT Geothermal Experience The U.S. Department of Energy (DOE) has advocated Hollins University, Tinker Residence Hall for the implementation of ground source heat CPL was commissioned to study alternatives for pumps as a proven method for decarbonization and the replacement of the existing HVAC system. Upon electricity demand reduction. Per the DOE, "buildings analyzing three options, the design was prepared to with geothermal heat pumps (GHP) could reduce utilize high efficiency water source heat pumps to heat electricity demand by as much as 13% by 2050 and cool the building spaces. These heat pumps are versus decarbonizing without GNPs." Other agencies connected to a new geothermal well installed behind have clearly defined the benefits of ground source the residence hall. heat pumps to include: reduction of heating and cooling costs with a non-fossil fuel source, minimal Hollins University, Alumnae College, maintenance requirements, longer lifespan than Rose Hill & Rath House alternatives, and the creation of a more comfortable CPL provided design services for the installation of environment for working, living and learning. geothermal systems for this client who was conscious Currently, the implementation of ground source heat of maintaining energy reduction strategies throughout pump technology is one of the most cost-effective and their college campus. impactful efforts available to building owners seeking to reduce carbon emissions. Lees Macrae College, Student Recreation Center and President's Office CPL has extensive experience with geothermal heat This project involved the complete rehabilitation of an pumps. These projects include: existing gymnasium originally constructed in 1936. The HVAC system is connected to a geothermal system to SUNY Geneseo Letchworth Dinning Hall reduce energy costs. This LEED-Certified dining hall is conditioned via a ground source heat pump system and achieves 75% East Irondequoit Central School District thermal effectiveness. All fan and pump motors are CPL has been working with this client on a continuing of premium efficiency, and the ground loop pumps are basis for thirty years. For the construction of their new on variable speed drives. middle school building, CPL designed the mechanical systems to utilize a geothermal loop system. Broome-Tioga BOCES This project involved the investigation of an Walls Residences, Main Office Building existing geothermal system. CPL thoroughly This sustainable facility was constructed to feature a evaluated the existing system and provided design geothermal system and solar array to provide energy recommendations for replacement of the system. savings for this not-for-profit agency. Poughkeepise Public Library This mechanical system was designed to provide comfort for multiple zones within the library. Geothermal (ground source) pumps utilize the earth's temperature for heating and cooling the building to reduce municipal energy usage. CPL 1 31 6. OTHER FACTORS THAT MAYBE RELEVANT TO THE PROJECT 85 Grant Funding Experience When available funding isn't enough—or doesn't CPUs team of grant-writing professionals has led the exist—that's where we come in. CPL routinely helps way in assisting clients through the complexities of healthcare institutions navigate the grant application grant programs, leveraging our status as a United process, putting clients in touch with the right funding States Department of Energy Teaming Partner. This resources, and assessing needs to effectively put experience equips us with a profound understanding your funds to good use. of the application process, enabling us to forge strong connections with diverse funding and regulatory CPL is your best trekking partner. agencies along the way. Flexible spaces, technology-ready infrastructure and energy efficient buildings define today's thriving As your partner, we shift the journey from reactive healthcare environments. Yet when it comes to to proactive, and leverage our edge with your unique securing funds for key projects to achieve this ideal, fingerprint and vision. Our foresight and planning the journey can be stubborn and grueling. Limited credentials strategically position us to identify potential capital, strict use regulations, time constraints, fierce "shovel-ready" projects, prepare competitive grant competition, and more, make navigating the rocky applications, and deliver financial support for your terrain of public grants an arduous climb. greatest impact. ' p �I Wil. _ p 32 CPL 1; I s�Y 1 7. Provider's Professional Liability Insurance ■CPL 33 7. PROVIDER'S PROFESSIONAL LIABILITY INSURANCE 87 AC CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD YYYY) 4/16/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Chris Romano AssuredPartners Design Professionals Insurance Services, LLC PHONE FAX 3697 Mt. Diablo Blvd Suite 230 ('C, A/c No Ext:714-427-3489 A/c No: Lafayette CA 94549 AOURLEss: DesignProCerts@AssuredPartners.com INSURER(S)AFFORDING COVERAGE NAIC# License#:6003745 INSURER A:Valley Forge Insurance Company 20508 INSURED CPLARCH-01 INSURER B:Continental Insurance Company 35289 CPL Architects, Engineers,and Landscape Architect,DPC dba:CPL INSURER C:XL Specialty Insurance Company 37885 255 Woodcliff Dr. INSURER D, Fairport NY 14450 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:534483125 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER MM/DD/YYYY MM/DD/YYYY A X COMMERCIALGENERALLIABILITY Y Y 7037093451 4/22/2024 4/22/2025 EACH OCCURRENCE $1,000,000 DAMAGE To RENTED CLAIMS-MADE X OCCUR PREMISES Ea occurrence $1,000,000 X Contractual Liab MED EXP(Anyone person) $15,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY PELT LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY Y Y 7037093448 4/22/2024 4/22/2025 COMBINED SINGLE LIMIT $1,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident B X UMBRELLA LIAB X OCCUR Y Y 7037095216 4/22/2024 4/22/2025 EACH OCCURRENCE $10,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DED X RETENTION$1 n nnn $ B WORKERS COMPENSATION Y 7037102875 4/22/2024 4/22/2025 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUDED? ❑ N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 C Professional Liab&Poll.Liab DPR5027357 4/22/2024 4/22/2025 Per Claim 5,000,000 Retro Date:01/01/1975 Annual Aggregate 7,000,000 Claims Made Form DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Umbrella policy is follow-form to its underlying Policies:General Liability/Auto Liability/Employers Liability. CERTIFICATE HOLDER CANCELLATION 30 day notice of cancellation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Proof of Insurance AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD 34 1 CPL 8. Acknowledgment of Receipt of Any Addenda MCPL 35 8.ACKNOWLEDGMENT OF RECEIPT OF ANY ADDENDA 89 Addendum Acknowledgement Form Consultants must acknowledge receipt of addendums posted by Orange County before the RFP/RFQ deadline. Please initial for Addendums received. Firm Name: CPL Architects and Engineers, P.C. Addendum No 1 Addendum No 2 Addendum No 3 Addendum No 4 Addendum No 5 Page 9 of 9 361 CPL 90 71 1 • 9. E-VERIFY 91 STATE OF NORTH CAROLINA r AFFIDAVIT ORANGE COUNTY Adam Chahulski,AIA, NCARB, LEED AP .(the individual attesting below), being duly authorized by and on behalf of CPL Architects and Engineers, P.C. (the entity bidding on project hereinafter"Employer") after first being duly sworn hereby swears or affirms as follows: 1. Employer understands that E-Verify is the federal E-Verify program operated by the United States Department of Homeland Security and other federal agencies, or any successor or equivalent program used to verify the work authorization of newly hired employees pursuant to federal law in accordance with NCGS§64-25(5). 2. Employer understands that Employers Must Use E-Verify. Each employer, after hiring an employee to work in the United States,shall verify the work authorization of the employee through E-Verify in accordance with NCGS§64-26(a). 3. Employer is a person, business entity,or other organization that transacts business in this State and that employs 25 or more employees in this State. (mark Yes or No) a. YES X , or b. NO 4. Employer's subcontractors comply with E-Verify,and if Employer is the winning bidder on this project I Employer will ensure compliance with E-Verify by any subcontractors subsequently hired by Employer. This day of 20_. �Z�lz Ignaturj�of Affiant Print or Type Name: Adam Chahulski,AIA, NCARB, LEED AP State of North Carolina, Meck�cnburL{County JWJ11191Fort"r Signed and sworn to or affirmed before me this the (th " .•`�`���, +���```•. da of 5t 20 Zq: z '°(JBLIG My Commission Expires: ,°�, � ' •.;fit `r �p,Gyr . 20 [a 5120 1 202 •"''�`Qticouea' ,:�•`� —� Notary P f�' 9 r 4 f�4 r owe --V IF e 4 . 1 - x- - y-r '4^ w -'� .�S :-.,.� r �- � t fit=• 10M Orange County N • nation Certif ication • 10. ORANGE COUNTY NON-DISCRIMINATION CERTIFICATION FORM 93 ORANGE COUNTY NONDISCRIMINATION CERTIFICATION The undersigned bidder or proposer hereby certifies and agrees that the following information is correct: 1. In preparing its enclosed bid or proposal, the undersigned bidder or proposer has considered all bids and proposals submitted from qualified, potential subcontractors and suppliers, and has not engaged in discrimination as defined in Section 12-52 of the Orange County Non-discrimination Ordinance. 2. Without limiting any other remedies that Orange County may have for a false certification, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for Orange County to reject the bid or proposal submitted with this certification, and terminate any contract awarded based on such bid or proposal. It shall also subject the bidder or proposer to disqualification from participating in county contracts or bid processes for up to two years. 3. As a condition of contracting with Orange County, the undersigned bidder or proposer agrees to promptly provide to Orange County all information and documentation that may be requested by Orange County from time to time regarding the solicitation and selection of suppliers and subcontractors in connection with this solicitation process. Failure to maintain or failure to provide such information constitutes grounds for Orange County to reject the bid or proposal and to terminate, without penalty to Orange County, any contract awarded on such bid or proposal. All such information and documentation shall be maintained for a period of three years after the expiration of the contract. 4. As part of its bid or proposal, the undersigned bidder or proposer shall provide to Orange County a list of all instances within the past ten years where a complaint was filed or pending against bidder or proposer in a legal or administrative proceeding alleging that bidder or proposer discriminated against its subcontractors, vendors, suppliers, or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. 5. As a condition of submitting a bid or proposal to Orange County the undersigned bidder or proposer agrees to comply with the Orange County Non-discrimination Ordinance. Falsification of this certification shall constitute a violation of the Orange 40 CPL QA 10.ORANGE COUNTY NON-DISCRIMINATION CERTIFICATI'6N FORM County Non-Discrimination Ordinance and shall be grounds for rejection of the bid or proposal or termination of an existing contract, without fault or further obligation to Orange County. 6. As a condition of submitting a bid or proposal to Orange County the undersigned bidder or proposer agrees that Orange County may consider the information submitted as part of this certification in its determination of the responsibility of the undersigned bidder or proposer. The undersigned bidder or proposer, as the case may be, waives the right to challenge the rejection of a bid or proposal when such rejection is based, in its entirety, on information submitted as part of this certification. The bidder or proposer certifies the undersigned has full authority to sign on its behalf. By: Adam Chahulski,AIA, NCARB, LEED AP Printed Name and Title On behalf of CPL Architects and Engineers, P.C. Company or Corporate name CPL 41 wr i .............. . .. ............ Supplemental Vendor 11.SUPPLEMENTAL VENDOR INFOT2�ATION Supplemental Vendor Information: HISTORICALLY UNDERUTILIZED BUSINESSES Company Name: CPL Architects and Engineers, P.C. Date: 8/9/2024 Historically Underutilized Businesses (HUBs) consist of minority, women and disabled business firms that are at least fifty-one percent owned and operated by an individual(s)of the categories.Also included in this category are disabled business enterprises and non-profit work centers for the blind and severely disabled. Pursuant to G.S. 14313-1361(a), 143-48 and 143-128.4, the County invites and encourages participation in this procurement process by businesses owned by minorities, women, disabled, disabled business enterprises and non-profit work centers for the blind and severely disabled. This includes utilizing subcontractors to perform the required functions in this RFP/RFQ. Any questions concerning NC HUB certification, contact the North Carolina Office of Historically Underutilized Businesses at (919) 807- 2330. The Vendor shall respond to question #1 and #2 below. 1) Is Vendor a Historically Underutilized Business? ❑ Yes ® No 2) Is Vendor Certified with North Carolina as a Historically Underutilized Business? ❑ Yes ® No If so, state HUB classification: CPL 43