HomeMy WebLinkAboutAgenda 05-21-24; 4-c - Presentations on Proposed November 2024 Bond Projects ORANGE COUNTY 1
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 21, 2024
Action Agenda
Item No. 4-c
SUBJECT: Presentations on Proposed November 2024 Bond Projects
DEPARTMENT: County Manager's Office
ATTACHMENT(S): INFORMATION CONTACT:
1. Woolpert Optimization Plan Excerpt Kirk Vaughn, (919) 245-2153
2. Woolpert Major Replacement-
Renovation Recommendation
Profiles
PURPOSE: To receive presentations from County and school district staff on their organization's
preferred projects associated with the upcoming November 2024 School Bond.
BACKGROUND: At its January 2024 retreat, the Board of County Commissioners signaled its
preferences for a proposed school bond. The Board set on a $300 million Bond Referendum
which, with existing resources and $100 million in Pay-Go funding, would be sufficient to fund
Option C of the Woolpert Long Range School Optimization Plan. The Board also signaled a
preference for a project-based allocation of capital funding to ensure that the Woolpert priorities
were met. Since then, County and school staff have worked with Woolpert to align the long-term
plan with the current capital spending plans.
County staff will present an update on the process and a subsequent adjustments made to the
Woolpert recommended plan. The current recommended major projects blend Option C and
Option D phase one. The first attachment provides an excerpt from the recommended Woolpert
Optimization Plan. The second attachment provides an index of the major factors that lead to the
recommendation to replace, renovate, or consolidate a school campus. Factors include the age
of the building, the facility condition index, and the educational adequacy of the spaces. School
staff from both districts will then present each district's preferred bond project plans for their
portions of the funds. The Board will have an opportunity to understand how the districts' plans
align or differ from the Woolpert recommendations.
This presentation constitutes the second in a series on proposed school bond projects. Previously
at the Board's May 7, 2024 Business meeting, County staff presented the statutes and policies
that dictate school capital funding. At the upcoming June 4, 2024 Board Business meeting, staff
will request direction on the Board's preferred bond plan, and also request direction for staff, the
school districts and the Orange County 2024 Bond Education Committee.
FINANCIAL IMPACT: There is no financial impact associated with the discussion on school
capital funding.
SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated
with this item.
2
ENVIRONMENTAL IMPACT: There are no Orange County Environmental Responsibility Goal
impacts associated with this item.
RECOMMENDATION(S): The Manager recommends that the Board receive the presentations
from County and district staff and consider implications for implementation for the proposed
November 2024 bond referendum.
Supporting the mission of Chapel Hill-Carrboro City Schools and Orange County Schools to build an
inclusive school community that engages,empowers,and inspires students and provides an educa-
tion that addresses the social,emotional,intellectual,and physical needs of every student.
LONG= RANGE FACILITIES
OPTIMIZATION PLAN
4 - MAM
.N l •snow ILr
�1�A YI• •V � �{'
s � ;
F�
_ A '
i
0 0 L P e P T November2023
4
Comparing options to .
forward .
03 CHCCS OPTIONS
Ark
OPTION A - COMFORTABLE AND OPTION B - COMFORTABLE AND SAFE,
SAFE PLUS 10 YEAR FACILITY NEEDS
5-YEAR INVESTMENT: $139.7M @$27.9M/YEAR 10-YEAR INVESTMENT: $675.1M @ $67.5M/YEAR
W Option A provides for high priority repairs Option B addresses all building needs identified
and system replacements that address build- W in the facility condition assessment. This option
W ing systems that keep students and occupants brings the facility conditions to a like new state.
c warm,cool,safe,and dry. However; there is no change to the educational
c spaces or adequacy of the schools.
z Option A addresses only near term facility z Option B addresses anticipated facility needs of
=i requirements.This option should be executed J the next ten years.This option should be executed
over the next 5 years,which is approximately W over the next 10 ears which is approximately
$27.9 million per year. y pp y
P $67.5 million per year.
c • Smallest investment option y
a • Addresses 20 percent of facility needs a Addresses all facility needs
• No improvement to educational
No improvement to educational
Coll) environment y
c • No improvement to capacity o • No improvement to capacity
c3 • No new or renovated schools c� No new or renovated schools
• Many facility needs not addressed • Largest investment option
CHCCS OPTIONS SUMMARY
INVESTMENT COST/YEAR
OPTION A $139.7 M 5 YEARS $27.9 M
OPTION B $675.1 M 10 YEARS $67.5 M
OPTION C $325.2 M 10 YEARS $32.5 M
OPTION D $546.9 M 15 YEARS $36.5 M
11
5
OPTION C - COMFORTABLE AND SAFE, OPTION D - COMFORTABLE AND SAFE,
PLUS UPGRADED LEARNING TOOLS PLUS NEW CONSTRUCTION
10-YEAR INVESTMENT: $325.2M @ $32.5M/YEAR 15-YEAR INVESTMENT: $546.9M @ $36.5M/YEAR
Option C addresses the high priority facility Option D takes a strategic approach to address-
needs and improves the educational learn- ing the district's portfolio needs through repairs,
ing environment through school renovations, W renovations, and replacements. Option D pro-
LLJ
replacements, and educational adequacy vides for a long-term plan that moves CHCCS out
c improvements. W of its current aged and educationally insufficient
Option C addresses high priority facility needs, o portfolio and into facilities that meet current and
W future educational and programmatic needs of
z adequacy improvements, and school renova- p g
W tions and replacements.This option should be the district.
executed over 10 years at approximately$32.5 W Option D is a significant investment in the future
~ million investment annually. Z of CHCCS. In order to complete this option, it is
• Improves the learning environment by recommended to implement over the next 15
providing students and teachers modern years with an annual investment of approximately
classrooms and tools at the schools in the $36.5 million.
most need Improves the learning environment by pro-
• School replacements address capac- viding students and teachers with modern
c ity needs by building facilities that meet classrooms and tools.
a the current and future enrollment projec- School replacements address capacity needs
tions,the district will improve operational y and improve the learning environment for
efficiencies. the students of CHCCS. Replacement schools
• Mid-range cost option only slightly higher a were identified based on their condition,edu-
than Option A that addresses only the cational adequacy,and utilization.
basic facility needs. Consolidating schools reduces the overall
• Only the schools with the greatest need size of the CHCCS portfolio, which improves
y will gain new modern learning spaces and operational efficiencies.
c tools. Some older schools may reach the y • Significant long-term investment
cD end of their useful life before the construc- Zo Short term disruptions from swing space nec-
tion program is complete. c2 essary to complete construction.
" I I
Smallest Investment No improvement to educational environment or portfolio
Addresses all facility needs No change to educational environment,Largest Investment
Improved learning environment,modern classrooms,addresses Only schools with greatest need gain new modern learning
capacity issues,Similar investment as Option A which only spaces and tools
addresses basic facility needs
Improves learning environment with modern classrooms and Significant long term investment;short term disruptions due to
tools,address capacity issues,reduces portfolio size which construction
improves operational efficiencies
12
6
CHCCS OPTIONS DETAILS
OPTION OPTION
COMFORTABLE COMFORTABLE AND
i i
i i � i
► i
SCHOOL
CARRBORO ES $0.0 M $22.0 M Replacement School
EPHESUS ES $8.5 M $28.2 M High Priority Needs
ESTES HILLS ES $3.4 M $29.5 M Replacement School
FRANK PORTER GRAHAM ES $5.4 M $30.9 M Consolidate
GLENWOOD ES $1.0 M $16.3 M High Priority Needs
MORRIS GROVE ES $4.5 M $24.6 M High Priority Needs
NORTHSIDE ES $0.0 M $13.3 M High Priority Needs
RASHKIS ES $6.4 M $29.7 M High Priority Needs
SCROGGS ES $4.4 M $29.9 M High Priority Needs
SEAWELL ES $0.5 M $23.1 M High Priority Needs
MCDOUGLE ES $15.3 M $60.8 M High Priority Needs
CARRBORO HS $9.2 M $67.1 M High Priority Needs
CHAPEL HILL HS $10.9 M $29.6 M High Priority Needs
E. CHAPEL HILL HS $23.2 M $75.6 M High Priority Needs
PHOENIX ACADEMY $1.5 M $2.8 M Renovation
MCDOUGLE MS $15.3 M $60.8 M High Priority Needs
CULBRETH MS $8.9 M $44.6 M Replacement School
PHILLIPS MS $3.6 M $29.0 M High Priority Needs
SMITH MS $12.5 M $42.2 M Adequacy(Learning Tools)
LINCOLN CENTER $5.2 M $15.0 M -
i
W MIDDLE SCHOOL
ii - - -
i
13
7
[PTION C OPTION I
PLUS UPGRADED ► ' IILS COMFORTABLE ► I SAFE,
$49.5 M Replacement School $49.5 M
$8.5 M Renovation $28.9 M
$49.5 M Consolidate $1.3 M
$1.4 M Consolidate $1.4 M
$1.0 M Renovation $26.3 M
$4.5 M Renovation $11.8 M
$0.0 M Renovation $14.2 M
$6.4 M Renovation $15.1 M
$4.4 M Renovation $12.2 M
$0.5 M Renovation $25.9 M
$15.3 M Renovation $34.3 M
$37.7 M High Priority Needs $37.7 M
$10.9 M High Priority Needs $10.9 M
$23.2 M Renovation $23.2 M
$5.7 M Renovation $5.7 M
$15.3 M Adequacy (Learning Tools) $17.9 M
$71.5 M Replacement School $71.5 M
$3.6 M Replacement School $71.5 M
$16.3 M Adequacy(Learning Tools) $16.3 M
New School (Replacing capacity $71.5 M
from McDougle ES/MS)
14
8
Comparing options todetermine
best path forward for OCS
04 OCS OPTIONS
M11h MA
OPTION A - COMFORTABLE OPTION B - COMFORTABLE AND SAFE,
AND SAFE PLUS 10-YEAR FACILITY NEEDS
5-YEAR INVESTMENT: $80.1M @ $16.OM/YEAR 10-YEAR INVESTMENT: $421.7M @ $42.2M/YEAR
WOption A provides for high priority repairs and Option B addresses all building needs identified
system replacements that address building sys- W in the facility condition assessment. This option
W tems that keep students and occupants warm, brings the facility conditions to a like new state.
c cool,safe,and dry. O However; there is no change to the educational
spaces or adequacy of the schools.
z Option A addresses only near term facility z Option B addresses anticipated facility needs of
W requirements. This option should be executed J the next ten years.This option should be executed
over the next 5 years, which is approximately W over the next 10 which is approximately
$16 million per year. years, pp y
� $42.2 million per year.
c • Smallest investment option y
a • Addresses 20 percent of facility needs a Addresses all facility needs
• No change to educational environment No change to educational environment
z • No adjustments to capacity z No adjustments to capacity
c • No new or renovated schools C.Z No new or renovated schools
cD
• Many facility needs not addressed Largest investment option
OCS OPTIONS SUMMARY
OPTION INVESTMENT TIMELINE COST/YEAR
OPTION A $80.1 M 5 YEARS $16.0 M
OPTION B $421.7 M 10 YEARS $42.2 M
OPTION C $216.0 M 10 YEARS $21.6 M
OPTION D $463.9 M 15 YEARS $30.9 M
15
9
OPTION C - COMFORTABLE AND SAFE, OPTION D - COMFORTABLE AND SAFE,
PLUS UPGRADED LEARNING TOOLS PLUS NEW CONSTRUCTION
10-YEAR INVESTMENT: $216.OM @ $21.6M/YEAR 15-YEAR INVESTMENT: $463.9M @$30.9M/YEAR
WOption C addresses the high priority facility needs Option D takes a strategic approach to addressing
and improves the educational learning environ- the districts portfolio needs through repairs, ren-
cc W ovations, and replacements. Option D provides
W ment through school renovations,replacements,
and educational ade uac im rovements. E:' for a long-term plan that moves OCS out of its cur-
o q y p rent portfolio and into facilities that meet current
W Option C addresses high priority facility needs, o and future educational and programmatic needs
z adequacy improvements, and school renova- of the district.
W tions and replacements. This option should be z Option D is a significant investment in the future
executed over 10 years at approximately $21.6
� J of OCS. In order to complete this option, it is rec-
million invested annually. M ommended to occur over 15 years with an annual
• Improves the learning environment by pro- P investment of approximately$30.9 million.
viding students and teachers modern class- . Improves the learning environment by pro-
rooms and tools at the schools in the most viding students and teachers with modern
need classrooms and tools
• School replacements address capac- . School replacements and renovations
ity needs, by building facilities that meet address over capacity at the middle and high
the current and future enrollment projec- school grade levels and improve the learn-
s tions, the district will improve operational y ing environment for the students of OCS.
o efficiencies. o
0 o Replacement schools were identified based
Q.. • New school alleviates over capacity at the a
on their condition, educational adequacy,
elementary grade level. Additionally, the and utilization.
location is planned in the northwestern area New school alleviates over capacity at the
of the district where growth is occurring and elementary grade level. Additionally, the
anticipated to continue. location is planned in the northwestern area
• Mid-range cost option only slightly higher of the district where growth is occurring and
than Option A that addresses only the basic anticipated to continue.
facility needs.
• Only the schools with the greatest need will z Significant long-term investment
y gain new modern learning spaces and tools. o Short term disruptions from swing space nec-
c Some older schools may reach the end of c� essary to complete construction.
c3 their useful life before the construction pro-
gram is complete.
PRO CON
Smallest Investment No improvement to educational environment or portfolio
Addresses all facility needs No change to educational environment,Largest Investment
Improved learning environment,modern classrooms,addresses Only schools with greatest need gain new modern learning
capacity issues,Similar investment as Option A which only spaces and tools
addresses basic facility needs
Improves learning environment with modern classrooms and Significant long term investment;short term disputations due to
tools,address capacity issues,reduces portfolio size which construction
improves operational efficiencies
16
10
OCS OPTIONS DETAILS
OPTION A OPTION B
COMFORTABLE COMFORTABLE AND SAFE, COMFORTABLE AND SAFE,
AND SAFE PLUS 10-YEAR FACILITY NEEDS
SCHOOL NAME BUDGET BUDGET STRATEGY
CENTRAL ES (Partial Rebuild) $6.1 M $18.1 M Replacement School
EFLAND-CHEEKS ES $1.3 M $16.6 M High Priority Needs
GRADY BROWN ES $4.8 M $15.8 M High Priority Needs
HILLSBOROUGH ES $2.8 M $21.3 M Consolidate with Central ES
NEW HOPE ES $3.0 M $46.6 M Adequacy(Learning Tools)
PATHWAYS ES $4.7 M $15.6 M High Priority Needs
RIVER PARK ES $3.0 M $28.1 M High Priority Needs
NEW ELEMENTARY SCHOOL - - New Elementary School
CEDAR RIDGE HS $6.3 M $24.2 M High Priority Needs
ORANGE HS $5.8 M $75.8 M High Priority Needs
PARTNERSHIP ACADEMY $0.1 M $0.8 M High Priority Needs
A.L. STANBACK MS $18.5 M $52.9 M High Priority Needs
GRAVELLY HILL MS $13.9 M $33.1 M Renovation
ORANGE MS $6.9 M $48.9 M High Priority Needs
ADMINISTRATIVE ANNEX - $1.8 M -
ADMINISTRATIVE ANNEX II _ $0.5 M -
[TRANSP DISPATCH]
CENTRAL OFFICE $0.0 M $1.2 M High Priority Needs
MAINTENANCE DEPARTMENT $0.4 M $2.5 M High Priority Needs
TRANSPORTATION DEPARTMENT $1.7 M $7.9 M High Priority Needs
WELCOME CENTER $0.7 M $10.2 M High Priority Needs
TOTAL $80.1 M $421.7 M
17
11
OPTION C OPTION D
PLUS UPGRADED LEARNING TOOLS COMFORTABLE AND SAFE, PLUS NEW CONSTRUCTION
BUDGET STRATEGY BUDGET
$49.5 M Replacement School $34.5 M
$1.3 M Adequacy(Learning Tools) $3.4 M
$4.8 M High Priority Needs $4.8 M
$1.3 M Consolidate with Central ES $1.3 M
$13.0 M Adequacy(Learning Tools) $13.0 M
$4.7 M High Priority Needs $4.7 M
$3.0 M High Priority Needs $6.7 M
$49.5 M New School $49.5 M
$6.3 M High Priority Needs $6.3 M
$5.8 M Replacement School $153.9 M
$0.1 M Replacement School $9.4 M
$18.5 M Renovation $54.0 M
$48.5 M Renovation $48.5 M
$6.9 M Replacement School $71.5 M
$0.0 M - -
$0.4 M - -
$1.7 M High Priority Needs $1.7 M
$0.7 M High Priority Needs $0.7 M
$216.0 M $463.9 M
18
12
strategicallyThe best recommendation to Vn
in facilities to . .environment at CHCCS . .
05 CIOMMENDATIOkA
I MAE& Ad
Woolpert recommends Orange County consider Option D BENEFITS
as a path forward to strategically invest in school facilities
and improve the learning environment. The recommenda- mentsEnhanced teaching and learning n-
tion considers the facility condition,educational adequacy,uti- ppor advance educational outcommeses and
o
lization, enrollment projections, industry best practices, and opportunities
goals of each district. The recommendation provides CHCCS Improved school utilization provides students
and OCS with a fiscally responsible plan that sustains the dis- the flexible spaces necessary for multiple learn-
tricts'facilities forthe long-term and improves the teaching and ing styles
learning environment. Updated classroom spaces and learning tools to
The recommendation calls for $1 billion investment over 15 meet today's education standards
years.The 15-year time frame is driven by the large investment Right-sized portfolio creates operational
and number of projects that need to be completed. It is sug- efficiencies
gested that the plan be achieved through three construction Investing in the community attracts and retains
phases prioritized by District leadership and designed to min- residents by providing competitive schools
imize student disruption and costs during construction.
RECOMMENDED OPTION-COSTS PER STRATEGY OVER 15 YEARS $269.3M
$215.3M r
■CHCCS OCS $192.5M
102.5M
$71.5M
$48.6M $49.5M
$16.3M $16.4M $24.9M
- , $2.7M $1.3M m . 0
ADEQUACY CONSOLIDATE HIGH PRIORITY NEW SCHOOL RENOVATION REPLACEMENT
NEEDS SCHOOL
ammil
A 00
19
13
PHASE 1 [YEARS 1-51
Phase i addresses the capacity needs of both districts and the facilities in the poorest condition.
Phase 1 builds the only new capacity school recommended in the plan. Phase 1 plans for the con-
struction of a new elementary school for OCS to accommodate West-side growth along with priority
replacement schools for OCS. Phase 1 also includes replacement schools in the worst condition for
CHCCS and closing Frank Porter Graham Elementary school which will be used as swing space during
construction.
PHASE 1 -COSTS PER STRATEGY OVER 5 YEARS $121.OM $115.4M
■CHCCS ■OCS
$71.5M
$49.5M
$37.7 M
$16.3M $13.OM
$2.7M $1.3M
ADEQUACY CONSOLIDATE HIGH PRIORITY NEW SCHOOL REPLACEMENT
NEEDS SCHOOL
o0 00
o0 00
CHAPEL HILL-CARRBORO CITY SCHOOLS
Facility Strategy Budget
Carrboro ES Replacement School $49.5M
New MS New School $71.5M
Estes Hills ES Consolidate $1.3M
Frank Porter Graham ES Consolidate $1.4M
Carrboro High High Priority Needs $37.7M
Culbreth MS Replacement School $71.5M
Smith MS Adequacy $16.3M
Total $249.2M
ORANGE COUNTY SCHOOLS
Facility Strategy no Budget
Central ES(Partial Rebuild) Replacement School $34.5M
New ES New School $49.5M
Hillsborough ES Consolidate $1.3M
Orange MS Replacement School $71.5M
New Hope ES Adequacy $13.OM
Partnership Academy Replacement School $9.4M
Total $179.2M
20
14
Woolpert Major Replacement/Renovation Recommendation Profiles
Space Types> Space . A
a Im.4 min Re q u i re:m7e —Plan Action 1pr Comments
Older school,High Utilization but missing near
7Chap,lHillboro City $$/ half of space types.Plan to build slightly larger to
Carrboro ES 1957 46/° 98/° 61 52% ° accommodate ES consolidation.Provides modern
Replace educational space.
Old,High FCI,half spaces too small.In 10 plus
Chapel Hill-Carrboro City Estes Hills ES 1958 80% 0
Schools 68/0 67% % 88/o years site provides options to address replacing
Consolidate Phillips.
Chapel Hill-Carrboro City Frank Porter ° o Old,High FCI,half spaces too small,Use as swing
1960 76/0 94/0 87% 54 0E88%
Schools Graham ES school for construction.Site can be used in future
Consolidate to accommodate capacity needs at that time
Chapel Hill-Carrboro City Culbreth MS 1969 61% 87% =81% DS % 88% Old,High FCI,High utilization,half the spaces too
Schools
Replace small
Chapel Hill-Carrboro City New Middle Provides for repurposing McDougle campus as
Schools School Dual Language Program and consolidation of two
ES.Improves overall portfolio age.
Old,High FCI,half spaces small,under utilized,
Orange County Schools Central ES 1957 51% 76% 5166 $7% partial rebuild will provide for a more
educationally adequate facility that is better
Partial Rebuild utilzed by consolidating with Hillsborogh
Orange County Schools Hillsborough ES 1952 55% 79% 51% 93%75% Old,High FCI,Half spaces small,close proximity
Consolidate to Central ES
Orange County Schools Orange MS 1968 64% 65% 82% 55'/0 E52% Old,High FCI,Half spaces small,only has half the
Replace required materials in the rooms
Orange County Schools New ElementarySchool Address growth in the western portion of the
county
Definitions
FCI Estimated 10 year capital need to repair the building divided by the cost to replace the building.Values over 50%are considered poor and over 65%are critical replacements
Utilization Current Enrollment against Total Capacity,utilizing the Woolpert capacity(excluding Pre-K classrooms)and November actual enrollment at each school.
All the required spaces that are needed at that level of education.Ex.Classrooms,science rooms,band,libraries.Percentage figure represents percent of room types that are in the building
Space Types against the recommended amount for each type.
Space Types>Min The percentage of spaces of all types that meet the size requirements for modern education.Spaces are marked as undersized if they are less than 90%of the recommended size for that
type of room.
The percentage of required educational materials that are present in each room in the building.These materials could represent whiteboards,adjustable lighting,science lab fume hoods,
Space Requirements band storage rooms,bathrooms,etc.depending on the type of room.