Loading...
HomeMy WebLinkAbout02.19.2024 OUTboard ORANGE ORANGE COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT NOIU i CAROLINA OrangeCounty URLIC TRANSIT AGENDA ORANGE UNIFIED TRANSPORTATION BOARD Monday February 19, 2023, 6:30 pm 131 W. Margaret Lane, Hillsborough, NC 27278 OUTBoard meetings are held in person and open to the public. Any member of the general public who wishes to make public comment should email dweaver@orangecountync.gov and the comment will be read to the OUTBoard during the public comment portion of the meeting. 1. Call to Order 2. Consideration of Additions or Changes to Agenda 3. Public Comments 4. Approval of Minutes— November 2023 &January 2024 5. Regular OUTBoard Agenda a. US 70 Multimodal Corridor Study i. Action: Provide Comments 6. Staff Report/Updates a. MPO, RPO, and NCDOT Updates b. OCTS Update 7. Information Items 1. FY25 Annual Work Program 8. Adjournment -The next meeting- March 18, 2024 It is the policy of Orange County Transportation Services to ensure that no person shall, on the ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987. 600 Hwy 86 N • Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919) 732-2137 orangecountync.gov/transportation 1 MINUTES 2 Orange County OUTBoard 3 Monday, November 20, 2023 4 Attendance Member: Position: Present: 1 Randy Marshall (Vice-Chair) Bingham Township No 2 Natalie Ziemba Cedar Grove Township Yes 3 Gregory WoIoszczuk Chapel Hill Township Yes 4 Roy Schonberg Chapel Hill Township No 5 Jamie Crandell Eno Township Yes 6 Erk Legg Cheeks Township Yes 7 Art Menius Little River Township Yes 8 Todd Jones At-Large Yes 9 Joshua Mayo At-Large Yes 10 Michael Hughes At-Large Yes 11 Sherry Appel At-Large Yes 12 Amy Cole At-Large Yes 13 Adam McGovern At-Large Yes 14 Nish Trivedi, Transportation Director Yes 15 Darlene Weaver Transportation Planning Manager Yes 5 6 Agenda Item 1: Call to Order 7 Meeting started at 6:35 p.m. Art Menius. A roll call was done. 8 9 Agenda Item 2: Consideration of Additions or Changes to Agenda. 10 Roy Schonberg suggested we change the meeting date for January 15, 2024, in observation of Martin 11 Luther King Day.The meeting was changed to January 81", 2024. 12 13 Agenda Item 3: Public Comments 14 No Public Comments received 15 Agenda Item 4:Approval of Minutes—October 2023 16 Art Menius informed us that the Chair and Vice Chair were not present at the last meeting; he was the 17 chair as a regular member. Art Menius pointed our grammar errors for correction. 18 19 Motioned: Natalie Ziemba with corrections. Seconded by Roy Schonberg. 20 21 Approved unanimously 22 23 Agenda Item 5.a.i. Public Involvement Plan 24 Nish Trivedi presented the public involvement plan and explained the document. The goal is to make this 25 a living document and update as required. Sherry Appel wanted to ensure her recommendations were 26 received and reviewed. All comments were received, and the plan was updated accordingly. Nish Trivedi 27 explained that once this document is approved by the Board of County Commissioners we will see have 28 several translations of other languages. 29 30 Motioned by:Joshua Mayo and seconded by Art Menius, approved unanimously. 31 32 Agenda Item 5.b.ii. Safe Routes for Schools 33 Nish Trivedi explained that Bonner Houser helped make this plan possible by connecting us with the 34 interim superintendent. The goal is getting the schools involved. Orange County staff will conduct the in- 35 house plan update process. We provide the scope of work to the superintendent for approval and 36 explained that we could only facilitate external improvements and the school's principals would have 37 facilitate with NCDOT for internal improvements.The expectation is to compete the process from January 38 to December of 2024. We would like to have public workshop during the summer. Darlene Weaver 39 suggested May-June for involvement with the schools. Joshus Mayo mentioned that the Transportation 40 Directors plans the bus routes during the summer. OUTBoard suggested we have a non-voting Youth 41 Delegate on the OUTBoard as representative for student group. 42 43 Motioned: Amy Cole with changes. Seconded: Sherry Appel. 44 45 Approved: Unanimously 46 47 Agenda Item S.c.iii. OUTBoard 2023 Annual Report and 2024 Work Plan 48 The pedestrian MSTA study was not accurate, due the COVID-19 during 2020. Recommend redoing the 49 study, it only included 32 and 50 students. It was mentioned that the students were not in school due to 50 COVID-19 and requested the videos. Sherry Appel requested to know the output vs outcomes, ie. what 51 changed. What was accomplished other than approving plans. Output is what we got, and outcome is 52 what happened. 53 54 Motioned: Art Menius with changes. Seconded: George Woloszczuk 55 56 Approved: Unanimously 57 58 Agenda Item 5.d.iv. Non-STIP 59 Provide Non-STIP OUTboard updates in January and June. Members had several questions about US70, 60 and we provide the website along with zoom options. 61 62 Agenda Item 6: Staff Updates and Reports 63 64 Agenda Item 6.a. 65 Annual elections: Roy Schonberg made a motion to nominate Micheal Hughes as Chair and Art Menius as 66 Vice Chair.Amy Cole seconded the motion. 67 68 Approved: Unanimously 69 70 Agenda Item 6.b. Website updates: Nish Trivedi explained the changes to the websites and updates. 71 72 Agenda Item 6.c. NCDOT Updates :The 1-40 widening the contractor is currently working in the medium 73 between 1-40 and 1-85 in the split between US 15501. The contractor is actively installing drainage pipes 74 and structures, also fine grading in placing the ABCs, and working to insulate the concrete batch plant 75 that is located by 1-40. NC 68 intersection the subcontractor is working on the floor bearings. The 1-40 76 bridge over NC 86 is progressing. Contractor has installed Gritters last week,which was around November 77 the 8th on the bridge phase one and will start at soft paving. They were supposed to start on November 78 the 7th. The contractor is scheduled to perform concrete payment next spring. Estes Rd workers are 79 progressing with installation of concrete for project facilities, curves, gutters, and sidewalks. Homestead 80 Rd is in progress with the widening to accommodate project curve and gutter curve is being actively being 81 placed it says stormwater sewer being installed. NC86 by Martin Luther King has been removed and 82 roadway on construction predominantly completed at this intersection, except for the final assault 83 resurface. 84 85 The meeting was adjourned at 7:45 p.m. 1 MINUTES 2 Orange County OUTBoard 3 Monday,January 08, 2024 4 Attendance Member: Position: Present: 1 Randy Marshall Bingham Township Yes 2 Natalie Ziemba Cedar Grove Township Yes 3 Gregory WoIoszczuk Chapel Hill Township Yes 4 Roy Schonberg Chapel Hill Township No 5 Jamie Crandell Eno Township No 6 Erk Legg Cheeks Township Yes 7 Art Menius (Vice-Chair) Little River Township Yes 8 Todd Jones At-Large Yes 9 Joshua Mayo At-Large No 10 Michael Hughes ( Chair) At-Large No 11 Sherry Appel At-Large No 12 Amy Cole At-Large No 13 Adam McGovern At-Large Yes 14 Nish Trivedi, Transportation Director Yes 15 Darlene Weaver Transportation Planning Manager Yes 5 6 Agenda Item 1: Call to Order 7 Meeting started at 6:30 p.m. by vice-chair. A roll call was done. 8 9 Agenda Item 2: Consideration of Additions or Changes to Agenda. 10 Nothing to add to agenda. 11 12 Agenda Item 3: Public Comments: 13 No public comments. 14 15 Agenda Item 4:Approval of Minutes : 16 November minutes will be added to February packet. 17 18 Agenda Item S.a.Transit Service Areas: 19 Nish Trivedi gave overview of the Transit Service Areas for Orange County. He explained when it was 20 established and how it has expanded and improved. We need a formal process which is manly the 21 outboard to make a recommendation to the Board of County Commissioners to clearly defines our 22 services areas as 10 miles outside Orange County as now we are direct recipients of the FTA 5307 funds. 23 This designation gives us direct access to some of the 5307 and compliance review and defining our service 24 area boundaries. 25 26 Motioned: Randy Marshall. Seconded: Roy Schonberg. 27 28 Approved: unanimously 29 30 31 Agenda Item S.b. Youth Delegate. Nish Trivedi thanked Natalie Ziemba for her assistance as Parks and 32 Recreations representative for example memorandum. The youth delegate will help to facilitate the 33 Orange County Safe Routes to School Plan as a non-voting member. Art Menius asked how this delegate 34 will be selected. Nish Trivedi explained the selection process would be the same as any OUTBoard member, 35 the apply with application would be made available to the public for the public to apply and the Board of 36 County Commissioners would pick the name.This person will be one year appointment. 37 38 Motioned: Roy Schonberg. Seconded: Randy Marshall 39 40 Approved: unanimously 41 42 Agenda Item 6: Staff Updates and Reports- Nish Trivedi reminding everyone about the update to the by- 43 laws to add the Youth Delegate position and informed the board about upcoming projects that would need 44 their approval for Short Transit Plan and Public Engagement process before going to the Board of County 45 Commissioners. We updated OUTBoard upcoming Bike Ped Plan for Orange County. 46 47 The meeting was adjourned at 7:00 p.m. ORANGE ORANGE COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT N0Xr CAROLINA OrangeCounty i URLIC TRANSIT Item 5.b. Subject: US 70 Multimodal Corridor Study Attachment: US 70 Multimodal Corridor Study PURPOSE: To receive a presentation and provide comments on the US 70 Multimodal Corridor Study. BACKGROUND: In 2019, Board of County Commissioners approved the US 70 as a county priority for consideration in the state's Strategic Prioritization of Transportation (SPOT) process. VHB recently completed the US 70 Multimodal Corridor Study. It presents a comprehensive understanding that safety and congestion issues would be addressed through the state's highway mobility and complete streets process for multimodal accommodations. • The study kicked off July 2022 and the final report was received January 2024. • The first public workshops were held in the month of March and provided information using boards and interactives activities like sticker activity for problem identification. • At the second public workshop we shared recommendations we received from the public. • Finally, the draft plan was created with the recommendations along with public comments and how they were addressed. • We developed an implementation plan, along with the final report and will present study and findings to the Towns Boards and Orange County Board of County Commissioners. NCDOT Complete Streets (link) All highway projects now go through a comprehensive "complete" use assessment. The Comprehensive Transportation Plan (CTP) is the governing document for the state's new Complete Street Policy and its implementation. Per the new policy, "during the Comprehensive Transportation Planning process, bicycle, pedestrian, transit, and other multimodal usage shall be presumed to exist along and across certain corridors." NCDOT recognizes that an individual user is a pedestrian, bicyclist,transit rider, EV/gas vehicle driver, etc., and often times in the same day. Therefore, the policy dictates "Consideration of multimodal elements will begin at the inception of the transportation planning process and the decisions made will be documented." Local Authorization — UDO and Collector Street Plans The Orange County Unified Development Ordinance (UDO) section 2.5.3.(v) and reiterated in section 6.10.A.1.(b), includes the requirements for reserving and dedicating right of way or requiring road construction listed in locally adopted Collector Street Plans or on the CTP. Specific mention is also made to the dedication of right of way based on the concepts shown on the CTP and locally adopted transportation plans, in accordance with N.C.G.S. § 136 66.2 and § 136 66.10. Orange County currently has three locally adopted transportation plans: • Efland-Buckhorn-Mebane and Orange Grove Road Access Management Plans • Eno River Economic Development Access Management Plan • NC 54 Multimodal Corridor Study (East and West) 600 Hwy 86 N • Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919) 732-2137 orangecountync.gov/transportation Approval of the US 70 West Multimodal Corridor Study will demonstrate County's commitment to multi-mobility, transit access, and safety of the transportation as an important local priority. It also demonstrates to local, regional and state partners that the County, like NCDOT's Complete Streets, sees the road network as equitable for all travelers, not favoring one over the other, and acknowledges that a traveler throughout the course of their day will walk one place, ride another, drive to and from a third, and bike yet another. Staff seeks OUTBoard comments on the Draft US 70 Multimodal Corridor Study. Next Step: • March — VHB with staff support, presents study to Hillsborough and Mebane for their consideration • March — Staff with VHB support, presents study to OUTBoard for recommendation to Board of County Commissioners (BOCC) • April — May — Staff and VHB presents to BOCC for approval and subsequently to DCHC MPO and BG MPO. FINANCIAL IMPACT: No immediate financial impacts approving the study. Local approval of study allows County opportunity to pursue state and federal funding for transportation improvements along the corridor. It also allows County staff to utilize it in development review process for the dedication of right-of-way for future state funded improvements and the construction of bike/ped facilities through enforcement of County's Unified Development Ordinance (UDO). SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is applicable to this item: • CLEAN OR AVOIDED TRANSPORTATION Implement programs that monitor and improve local and regional air quality by: 1) promoting public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3) otherwise minimizing the need for travel. ACTION: Provide comments ORANGE TRANSPORTATION COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT 0 NoKm CARQLLNA Orang -punty MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Transportation Director DATE: February 5, 2024 SUBJECT: NCDOT Quarterly Luncheon This memo updates the Orange Unified Transportation Board on the Quarterly Luncheon Orange County and member jurisdictions had with North Carolina Department of Transportation (NCDOT). Background: On quarterly bases, Orange County Transportation Services (OCTS) staff coordinates a meeting with NCDOT, member jurisdictions and regional partners. This meeting is opportunity for staff and government officials to provide updates on their respective projects and coordinate their work. Due to the holidays in December, the 2023 fourth quarter meeting was held in January 2024. 2023 Quarter 4 Highlights: • Orange County o US 70 Multimodal Corridor Study — draft plan completed February, Hillsborough and Mebane to take action in March followed by Orange County and MPOs o Safe Routes to School Action Plan Update — in process, WSP conducting Existing Conditions analysis for all Orange County Public Schools. o Planning — new development proposed at NC 54 and Marrow Mill Road, Traffic Impact Analysis review completed. o County Land Use Plan 2050 —two workshops completed with lots of comments on transportation, especially need for rural transit. o New signal installed at Buckhorn Road o Orange County Transportation Staff will work on creating a citizen reporting form for the department website so public can submit comments on road conditions directly to staff. • Hillsborough o Ridgewalk Greenway project is in development, Phase II should occur around the summer o Bus Shelters — in process with Orange County • Chapel Hill o Estes Drive — should be complete between April — June o Homestead Road — on track to finish this summer o Morgan Creek Greenway — 1st round public engagement done, preferred alternative being determined. o Estes Drive Extension — advertised with Bowling Creek Greenway o Camron Avenue — Request for Qualifications advertised o RAISE Grant — in-process for Everywhere to Everywhere o Safe Routes to School Coordinator hired o Vision Zero Plan implemented o Safe Streets for All (SS4A) grant awarded in December • Carrboro o Hawk Signals project almost complete o Safe Routes to School — Request for Proposal in process • Mebane o Mebane Circulator— in coordination with Orange County for inclusion in County's Short Range Transit Plan update Next quarterly meeting is tentatively scheduled for March 2024. Please forward any questions, comments or concerns to me at ntrivedi(a)-orangecountync.gov. NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date SM-6107B SR 1167(Longpine Road)at SR 1146(Kirkpatrick Road). 10/9/23 11/8/23 $185,000 Materials are arriving- Installation Dawn McPherson 50522 Installation of a modular mini-roundabout. is complete. Derek Dixon SS-6207G NC 87(East Webb Avenue)at Flanner Street, Pedestrian 5/11/23 12/31/23 $60,000 Planning and design activities Dawn McPherson 50502 signal installation and crosswalk pavement markings. underway. Utility relocations underway. HS-2007F NC 87 at 1-40 installation of pedestrian improvements 3/7/24 10/12/23 $86,500 Planning and design activities Dawn McPherson underway.Construction complete. EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/26/24 FY 2026 $120,000 Municipal Agreement required to City of Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen Robinson U-6017 Intersection improvements at NC 54(East Harden St.)and 12/21/23 FY2025 $2,100,000 Planning and design activities Chris Smitherman 47162.1.1 NC 49(East Elm St.)in Graham underway-ROW acquisitions 47162.2.1 complete-Utility relocations 47162.3.1 underway-Letting preparations underway 17BP.7.C.18 Replace pipe on Swep-Sax Road/Darrell Newton Road 10/19/23 FY2024 $500,000 Letting preparations underway Vacant U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 3/19/24 FY2026 $6,200,000 Planning and design activities Chris Smitherman 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway, ROW underway and 47158.2.4 (non-system)in Mebane. utilities to begin soon 47158.3.4 48916 Shift NC 61 and NC 100 intersection in Gibsonville to 12/12/24 FY2027 $650,000 Planning and design activities Chris Smitherman improve turning radii for trucks underway -ROW underway AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby enhancements at the Burlington-Alamance Regional Airport underway U-6011 Intersection improvements at US 70(South Church Street) 2/15/24 FY2027 $2,400,000 Planning and design activities Chris Smitherman 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. 47146.2.1 47146.3.1 SS-6207V SR 1963(Holt Street)at SR 1962(S.Third Street).All Way 6/28/24 10/1/24 $32,000 Project approved by BOT and Dawn McPherson 51270 Stop Installation. assigned. BGMPO Jan 2024 Page 1 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date SS-6207S NC 119 at SR 2135(Jim Minor Road)East of Swepsonville. 10/23/23 11/8/23 $110,000 Project approved by BOT and Dawn McPherson 51111 Traffic Signal Installation. assigned.Construction and Final Compliance Complete. SS-6207R SR 2100(East Gilbreath Street/Cooper Road)at SR 2111 10/16/23 11/14/23 $20,000 Project approved by BOT and Dawn McPherson 51110 (Checks Lane)/SR 2109(Cooper Road)South of Graham. assigned.Construction and Final All Way Stop Installation. Compliance Complete. BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 7/16/24 FY2025 $5,900,000 Planning and design activities David Stutts underway EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/30/24 FY2026 $200,000 Municipal Agreement required to City of (Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen Robinson 50547 NC 49 at Green Level Church Road/James Boswell Road- 11/7/24 Spring 2025 $650,000 Planning and design activities Chris Smitherman Realign Intersection underway 15BPR.54 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/21/25 FY2028 $5,000,000 Planning and design activities Kristy Alford Holden Street)over 1-85 Business and on Structure#148 on I- underway 40 over Haw River in Alamance County U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada 3/18/25 FY2028 $10,000,000 Planning and design activities Chad Reimakoski 50234.1.1 Road)to US 70(South Church Street)in Burlington underway-Field Inspection held. In 50234.2.1 ROW for ROW acquisitions. 50234.3.1 U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 5/20/25 FY2027 $13,200,000 Planning and design activities Chad Reimakoski 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882. ROW 47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition underway. 47159.3.1 U-6131 Install dual left turn lanes in westbound direction at NC 54 1/15/26 FY2028 $3,500,000 Planning and design activities Chris Smitherman (W. Harden Street)at NC 49(Maple Ave.)in Burlington pending EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave.to SR 1454 8/25/2026 FY2028 $272,000 Municipal Agreement required to Town of (W. Haggard Ave.)in Elon begin work Elon/Stephen Robinson BGMPO Jan 2024 Page 2 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 10/16/2029 FY2031 $900,000 Planning and design activities Chris Smitherman Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending in Burlington BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 11/5/2026 FY2028 $1,200,000 Planning and design activities Vacant underway-Plans at 65% B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19 David Stutts 48709.1.1 SR 1928(Trollingwood Road)in Haw River 48709.2.1 48709.3.1 BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 8/30/2030 FY2032 $700,000 Planning and design activities Vacant pending BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/7/2030 FY2032 $700,000 Planning and design activities Vacant pending BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 8/2/2029 FY2031 $700,000 Planning and design activities Vacant underway 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 6/20/30 FY2032 $936,000 Planning and design activities Chris Smitherman 47962.1.1 (Huffman Mitt Road). Construct additional right turn lane on I- pending 47962.2.1 40 WB Ramp and improve operations at SR 1308(Garden 47962.3.1 Road)intersection in Burlington U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $6,337,000 Planning and design activities Chris Smitherman 47144.1.1 St)from Tarteton Ave.to Fifth Street in Burlington pending 47144.2.1 47144.3.1 I-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/21/31 FY2033 $12,400,000 Planning and design activities Bryan Key 48689.1.1 (Troll ingwood-Hawfietds Road)in Mebane pending 48689.2.1 48689.3.1 BGMPO Jan 2024 Page 3 1/10/2024 North Carolina Department of Transportation Active Projects Under Construction-Alamance Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C203844 U-3109A NC-119 RELOCATION FROM 1-40/85 TO SR-1921 THALLE CONSTRUCTION Howell,Bobby J $45,389,069.36 6/26/2017 1/28/2021 8/3/2017 12/6/2023 100.00 100.00 (MEBANE ROGERS RD/STAGE COACH RD). CO.,INC. C204438 B-5728 REPLACE BRIDGE#112 OVER REEDY FORK CREEK SMITH-ROWE,LLC Howell,Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 2/13/2025 76.00 64.47 ON NC 87 IN OSSIPEE C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70(SOUTH APAC ATLANTIC INC. Howell,Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/13/2025 70.00 32.89 CHURCH STREET)AT SR 1226/SR 1311(UNIVERSITY THOMPSON ARTHUR DRIVE)IN BURLINGTON DIVISION C204603 1-5711 1-40/1-85 AND SR 1007(MEBANE OAKS ROAD)IN ZACHRY CONSTRUCTION Howell,Bobby J $12,865,732.71 4/26/2021 1/11/2024 4/26/2021 2/15/2024 100.00 94.61 MEBANE INTERCHANGE IMPROVEMENTS CORPORATION C204626 RESURFACE 1 SECTION OF NC 87,1 SECTION OF NC FSC 11 LLC DBA FRED Lorenz,PE,Kris $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/21/2023 100.00 100.00 49 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY C204788 RESURFACING OF SIX SECONDARY ROADS VECELLIO&GROGAN INC Howell,Bobby J $4,366,972.22 3/15/2023 9/15/2024 3/6/2023 11/10/2023 100.00 100.00 DBA SHARPE BROTHERS DG00559 RESURFACE A SECTION OF NC 100,NC 49,US 70&3 BOGGS CONTRACTING, Howell,Bobby J $2,740,478.60 5/1/2022 6/30/2022 5/20/2022 12/4/2023 100.00 100.00 SECONDARY ROADS IN ALAMANCE COUNTY INC DG00589 HS-2007C INSTALLATION THERMOPLASTIC PAVEMENT TRP CONSTRUCTION Cvijetic,PE, $1,494,249.58 3/15/2023 11M2023 9/13/2023 2/28/2024 100.00 85.60 MARKINGS ON VARIOUS SECONDARY ROUTES IN GROUP LLC Bojan DIVISION 7 DG00596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS AT CAROLINA GROUP Howell,Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022 10/14/2023 100.00 100.00 VARIOUS ROUTES PROPERTIES LLC DBA CAROLINA GROUP CONTRACTING DG00630 CULVERT IMPROVEMENTS ON SR 2158(DARRELL CHATHAM CIVIL Howell,Bobby J $874,000,000.00 1/8/2024 9/3/2024 NEWTON DRIVE) CONTRACTING LLC Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date U-4726DF Bicycle detection at signalized intersections in Carrboro 3/28/2024 FY2026 $36,000 Plans at 90%completion- Plan review Town of comments returned back to the Town of Carrboro/Stephen Carrboro for revisions Robinson EB-5721 Upgrade existing off-road path and construct new section of 7/17/2023 FY2025 $2,400,000 Bids opened 7/17/23-Bids rejected. Town of Chapel path of Bicycle Route#1 from Cleland Drive to Willow Drive Project on Hold. Chapel Hill to seek Hill/Stephen Robinson in Chapel Hill additional funding and relet at a future BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US TBD 10/31/2024 $1,311,000 Construction funding to be requested Chad Reimakoski 49998.1.1 15/501/NC 86(South Columbia Street)interchange in once municipal agreements are executed. Chapel Hill. Construct sidewalk and install pedestrian Chapel Hill MA executed, Carrboro MA in signals, crosswalks, and refuge islands at selected final stages of execution. Letting date to locations. be determined after full execution of agreement. P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2023 FY2025 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough 46395.3.1 SS-6207A NC 54 Pedestrian improvements between SR 1902 11/1/2023 5/1/2024 $171,000 Planning and design activities underway. Dawn McPherson 50337 (Manning Drive)and SR 1937(Old Fayetteville Road)in Waiting on materials to arrive. Chapel Hill and Carrboro. Improvements will include refuge islands, crosswalks and pedestrian signals. Improvements to be completed by state forces. 51130 Eliminate slip ramp on SR 1120 (Mt. Willing Road)at SR 12/1/2023 Spring 2024 $75,000 Funding approved by BOT. Maintenance Matthey Whitley 1117 (Oak Grove Church Road) to begin after Traffic Services revision complete. EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 1/25/2024 FY2026 $372,000 Review comments provided to Carrboro in Town of June 2023 for revisions and resubmittal. Carrboro/Stephen Robinson HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno River 3/28/2024 FY2026 $153,800 Agreement executed, Hillsborough to Town of from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen plans. Robinson C-5181 Jones Creek Greenway Project- Fill Gap between the 12/7/2023 FY2025 $654,000 Environmental document approved Town of Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen also implement program to support on-vehicle trips to Morris Carrboro develops and submits. Robinson Grove Elementary School DCHCMPO Jan 2024 Page 1 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date SS-6207T Portions of Twenty-One(21)Routes. Curve Warning Sign 4/1/24 9/30/24 $200,000 Project approved by BOT and assigned. Dawn McPherson 51112 Installation. Planning and design activities underway. C-5650 Construct sidewalk on one side of SR 1919(Smith Level 12/4/2025 FY2028 $1,718,000 Carrboro approved to incorporate water Town of Road/S. Greensboro St.)from Public Works Drive to the line work into design. Environmental Carrboro/Stephen northern end of Old Pittsboro Road in Carrboro document returned with comments on Robinson 12/10/21. Document to be updated to include additional limits for resurfacing. NCDOT waiting on revised plans to be submitted for review. HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Dawn McPherson Beacons (RRFB), raised center island, pedestrian signage, and approximately 125 linear feet of sidewalk on NC 86 at Critz Drive in Chapel Hill B-6037 Replace Bridge#49 over Norfolk Southern Railway on NC 1/21/2025 FY2028 $2,500,000 Planning and design activities underway Chris Smitherman 86 BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 IFY2028 $4,100,000 Planning and design activities underway Alexander Foster EB-5880 Construct sidewalk on the north side of SR 1005(Jones 9/30/2027 FY2029 $441,000 Municipal agreement needs to be Town of Ferry Road)from Davie Road to SR 1010(West Main St.)in requested and executed to begin work. Carrboro/Stephen Carrboro Robinson EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2027 FY2029 $230,000 Municipal agreement needs to be Town of 1005 (Jones Ferry Road)in Carrboro requested and executed to begin work. Carrboro/Stephen Rnhincnn EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 10/2/2025 FY2027 $3,104,000 Municipal agreement executed and Town of Chapel south of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) project development underway. Hill/Stephen Robinson in Chapel Hill 1-3306AC 1-40 at NC 86-Upgrade to superstreet from Northwood 10/21/2025 FY2028 $4,350,000 Planning and design activities underway Radha Attaluri Drive to Ramp C/D at 1-40 interchange DCHCMPO Jan 2024 Page 2 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date BP7-R009 Replace Bridge#11 on SR 1336 (Halls Mill Road) 11/6/2025 FY2028 $1,100,000 Planning and design activities underway Vacant Plans at 65% BP7-R013 Replace Bridge#90 on SR 1940 (Damascus Church Road) 9/3/2026 FY2029 $800,000 Planning and design activities underway Vacant Plans at 25% EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be Town of Chapel 1741/SR 1838 (Old Durham Chapel Hill Road)in Chapel Hill requested and executed to begin work. Hill/Stephen Robinson EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/17/2026 FY2029 $848,000 Municipal agreement needs to be Town of 1772 (North Greensboro Street)to south of Norfolk requested and executed to begin work. Carrboro/Stephen Southern Railroad Tracks in the Town of Carrboro Robinson 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 Planning and design activities pending Chris Smitherman 45910.1.1 (Buckhorn Road)to West of SR 1006(Orange Grove Road) 45910.3.1 1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $16,900,000 PE funding approved 9/8/17, Planning Bryan Key 45917.1.1 Churton Street)in Hillsborough and Design activities underway, 45917.2.1 Coordinate with I-0305 and U-5845 45917.3.1 BR-0247 Replace Bridge#29 on US 70 Business/NC 86 over Cates 11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key Creek R-5821A Construct operational improvements including 6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17, design Chris Smitherman 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR activities currently suspended, 47093.2.2 1006 (Orange Grove Road)to SR 1107/SR 1937(Old Coordinating with NC54 West Corridor 47093.3.2 Fayetteville Road). Study DCHCMPO Jan 2024 Page 3 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date U-5845 Widen SR 1009 (South Churton Street)to multi-lanes from 1-7/16/2030 FY2033 $49,238,000 PE funding approved 5/14/15, Planning Radha Attaluri 50235.1.1 40 to Eno River in Hillsborough and Design activities underway, 50235.2.1 Coordinate with 1-5967 50235.3.1 BP7-R007 Replace Bridge#63 on Pleasant Green Road 8/3/2028 FY2031 $2,500,000 Planning and design activities underway Vacant BP7-R015 Replace Bridge#86 on SR 1942 (Jones Ferry Road) 8/18/2028 FY2030 $1,700,000 Planning and design activities underway Vacant BR-0091 Replace Bridge#32 on US 70 over the Eno River 10/17/2028 FY2032 $4,000,000 Planning and design activities underway Jon Gaillard 1-5984 Interchange improvements at 1-85 and NC 86 in 11/16/2032 FY2035 $20,900,000 PE funding approved 10/10/17, Planning Bryan Key 47530.1.1 Hillsborough and Design activities underway, 47530.2.1 Coordinate with 1-0305 and 1-5959(project 47530.3.1 deleted) B-5733 Replace Bridge#39 over Booker Creek in Chapel Hill on SR 1/16/2029 FY2031 $5,100,000 Planning and design activities pending Jennifer Hernandez 1010 (E. Franklin St.) BR-0195 Replace Bridge#31 on SR 1010 (Franklin Street)over Bolin 2/15/2029 FY2031 Pending Planning and design activities underway Jennifer Hernandez Creek in Chapel Hill 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove 1/20/2032 FY2036 $132,000,000 PE funding approved 6/5/18, Planning Bryan Key 34142.1.2 Road)in Orange Co. to west of SR 1400 (Sparger Road)in and design activities underway, Project 34142.2.2 Orange Co. reinstated per 2020-2029 STIP (funded 34142.3.2 project)and delete project 1-5983 DCHCMPO Jan 2024 Page 4 North Carolina Department of Transportation 1/8/2024 Active Projects Under Construction -Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic,PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 54 32.75 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR US- CONSTRUCTION Bojan 15/501. CORPORATION C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell,Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 9/15/2024 17 16.19 LLC DG00589 HS-2007C INSTALLATION OF THERMOPLASTIC PAVEMENT MARKINGS ON TRP CONSTRUCTION Cvijetic,PE, $1,494,249.58 3/15/2023 11/7/2023 9/13/2023 1/31/2024 100 85.6 VARIOUS SECONDARY ROUTES THROUGHOUT DIVISION 7 GROUP LLC Bojan DG00596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS CAROLINA GROUP Howell,Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022 10/14/2022 100 100 ROUTES PROPERTIES LLC DBA CAROLINA GROUP CONTRACTING Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED IN TARPO- UNDER DEVELOPMENT TIPIWBS# Description Let/Start Date Completion Cost Status Project Lead Date 51130 Eliminate slip ramp on SR 1120(Mt Willing Rd)at SR 1117 12/1/23 Spring 2024 $75,000 Planning and design activities underway Dawn McPherson (Oak Grove Church Rd) SS-6207T Portions of Twenty-One(21)Routes. Curve Warning Sign 4/1/24 9/30/24 $200,000 Project approved by BOT and assigned. Dawn McPherson 51112 Installation. BP7-R009 Replace Bridge#11 on SR 1336(Halls Mill Road) 11/6/25 FY2027 $1,100,000 Planning and design activities underway Vacant BP7.R009.1 Plans @ 65% BP7.R009.2 BP7.R009.3 BP7-R017 Replace Bridge#14 on SR 1548(Schley Road) 11/5/26 FY2028 $800,000 Planning and design activities underway Vacant BP7.R017.1 Plans @ 65% BP7.R017.2 BP7.R017.3 1-5958 Pavement rehabilitation on 1-40/1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Chris Smitherman 45910.1.1 (Buckhorn Road)to west of SR 1006(Orange Grove Road). 45910.3.1 R-5821A Construct operational improvements including 6/17/31 FY2033 $3,194,000 PE funding approved 10/10/17,design Chris Smitherman 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville with NC54 West Corridor Study 47093.3.2 Road). TARPO-Orange Cc Dec 2023 Page 1 North Carolina Department of Transportation 1214/2023 Active Projects Under Construction -Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic,PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 50 29.92 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR US- CONSTRUCTION Bojan 15/501. CORPORATION C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell,Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 9/15/2024 17 16.19 LLC DG00589 HS-2007C INSTALLATION OF THERMOPLASTIC PAVEMENT MARKINGS ON TRP CONSTRUCTION Cvijetic,PE, $1,494,249.58 3/15/2023 11/7/2023 9/13/2023 12/31/2023 88 68.64 VARIOUS SECONDARY ROUTES THROUGHOUT DIVISION 7 GROUP LLC Bojan DG00596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS CAROLINA GROUP Howell,Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022 10/14/2022 100 100 ROUTES PROPERTIES LLC DBA CAROLINA GROUP CONTRACTING Page 1 of 1