Loading...
HomeMy WebLinkAboutAgenda - September 20, 2023 School Capital Needs Workgroup Agenda with minutes ORANGE COUNTY BOARD OF COMMISSIONERS CHAPEL HILL-CARRBORO BOARD OF EDUCATION ORANGE COUNTY BOARD OF EDUCATION Capital Needs Work Group September 20, 2023 Meeting— 8:30-10am The Capital Needs Work Group is conducting a Virtual Meeting on September 20, 2023. Members of the Group will participate in the meeting remotely. Panelists: Jean Hamilton, Bonnie Hauser, Jessica Goodell, Al Ciarochi, Alan Dorman, Andre Stewart, Catherine Mau, David Sturtz, Dwayne Foster, Gary Donaldson, Greg Wilder, Patrick Florence, Perdita Holz, Rani Dasi, Rob Olsen, Steven Arndt, Travis Myren, Kelly Guadalupe 1. Welcome—Commissioner Jean Hamilton, Chair of Work Group 2. Woolpert Inc. Update: Results of data analysis on current state: Key findings on condition of schools and information on space types and adequacy(20-30 minutes) • Questions on conditions assessment: • Catherine: please remember to change the terminology to Carolina terminology for educational spaces • Jean: On the horizontal axis I can read that as, for academic support CHCCS, almost 40% of those spaces are undersized. What are the mechanics of this? • Answer: We calculated square footage of each space, categorized by function, then we looked at floor plans and did some quality control. Each space was given a square foot minimum, majority of those given from NC DPI. For some, NC DPI didn't have space requirements. We backed those down so it applied no matter if it's below 400 students or not. We look at those standards for each room type, in terms of minimum sq. footage. If space is less than 90% of minimum square foot size,then we call it undersized. So we then counted every space and saw the count of those that are present and less than 90%of standard. • Bonnie: One school has a secured entry but no office you enter in to. How would that show up here? • Answer: That's an adjacency issue. Exterior canopies or controlled entry points don't have a square foot here. It's binary: present or not. What you're describing is that you really want a controlled entry point to go to an office, and this isn't how many of our older schools are designed. Those kind of considerations is what goes in to the options development. We created the options methodically, from conservative to biggest reasonable change. If you see something that might be missing,that you want it to be a standard,the entry point to be an office, then call it out when we get to that school,and we can model the remedy cost. • Questions on capacity: • Jean: Mobile classrooms, were they included? • Answer: They were excluded. We assessed and counted them. They were in draft original calculations but I removed them because you don't plan for long term use of mobile units • Bonnie: In Orange County we have a waitlist on pre k, is it counted? Does this factor in the new class sizes for elementary? • Answer: yes &yes • Jean: Remind me what the sweet spot is? • Answer: A building, you want it to be between 80 and 100% utilized. You want a little room to breathe,but not space that isn't being utilized. From an FCI standpoint,between 0 and 30 is the ideal to fair range,over a 5 year horizon. On the graph it's the blue shaded area. Ideally all circles are in the blue area. This would imply you've kept up with deferred maintenance, etc. • Jean: The size of the circles, what does that represent? • Answer: Gross square footage of facility. Your older schools, particularly at the elementary level,were designed with an homogenous design structure. Over time school size has increased to sustainably afford a holistic education for kids. • Bonnie: Did you look at air quality? I have parents and teachers saying that kids are sicker when school is in session and also there's a research area around sick schools. • Answer: We didn't specifically test indoor air quality. We did look at reports provided and looked at HVAC systems. We double checked reports,and where there was a note on poor air quality we recommended some systems for replacement. We also looked at the envelope: walls, roofs, etc. • Rani: What does educational space types percentages mean? • Answer: Carrboro elementary, for example we identified that 61% of those space types were available in the building. 9%of those were below standard size. Then 48% of things we were looking for were identified. • Answer: If you were to ask why the FCI for Carrboro Elementary would be the same as Northside, and the answer would be what you've fixed at Carrboro elementary previously, that's keeping its FCI lower. • Bonnie: Thinking about this for Tuesday on the colors,it's a good thing, but it's showing in red. • Answer: Our theme is red is high blue is low,but we could adjust that. • Bonnie: For the presentation, what is the projections on capacity for both school districts? • Answer: We haven't received this from Ored yet. They said they'll have it in October. We understand the trend line in Chapel Hill is flat to declining. We're planning with that swag at this point. When we get the Ored projections we'll see if that changes any of the options • Bonnie: I think that's important to clarify. On Tuesday there will be a very big audience for this. • Perdita: My recollection about Carrboro HS when it was constructed was that it was always intended to get another wing when capacity indicated it was needed. That's one of the reasons it was built smaller. • Bonnie: Capacity numbers of these schools seems higher than we believe and one of the challenges we've had is the capacities often exclude pre k usage. Capacity seems high. We see Efland Cheeks at 120%utilization not 102%. • Catherine: I went back and combed through every SAPFO report comparing it to the square footage. It appears that the 1999 addition to Efland never made it on to the SAPFO charts. There was a new metric introduced in the year 2000 and I believe it got caught up in that. • Perdita: SAPFO didn't get signed until 2003, so it's odd that something from 1999 wouldn't be included. • Answer: We looked at SAPFO capacities. I divide capacity by square footage of building. That gives me an idea of square foot per student. It's a great equalizer across districts. What I noticed is that there were wild swings and very high assumptions behind that in some cases. Quite frankly I didn't buy some of those numbers. When I look at the classroom counts,what you have in the buildings,it gave us some pause on using SAPFO without further investigation. So we went to Ored and asked about capacities, and the gist was that "we've been given these capacities". • Bonnie: Hillsborough Elementary is a choice school and it's at capacity, but this shows it's at 76%capacity. My fear is that the capacity numbers include pre-k and enrollment doesn't include pre-k. but that's a guess • Answer: That's not the case.Utilization is total number enrolled divided by total capacity.Enrollment doesn't include pre-k enrollment. How are they using the pre-k spaces? If a classroom is there and not being used as a classroom, then that's lowering the utilization. • Bonnie: I'd like to discuss the numbers further, there is a problem with them • Jean: Getting the numbers right is important. Let's look forward and not get hung up too much about numbers from the past. We should know now about capacity and utilization. • Answer: Our basic assumption is based on classrooms available, what can the building hold? What the program in building is doing with its space is a different question. That's operational capacity. What we have is a buildings capacity. Those can be different and both can be valid. In a long term capital plan we want to look at what a building can do. 3. Discussion and Group Next Steps • Bonnie: There's a couple of things on our side. We're looking at an alternative middle school. Those have very small classrooms so we don't get same capacity. There's a question about a k-8 year round. I don't know how to factor those things in. • Rani: I know we talked about October timing on how to go forward on SAPFO. • Jean: SAPFO process has slowed down so it's not clear we need a meeting in October to talk about SAPFO. However I would like a meeting in October. Thank you for this presentation. It's a lot. I'd like to talk more about the questions that have come up. • Rani: The implication is that we'll use the current process for SAPFO and November reporting will be based on current standards • Jean: SAPFO is a document for deciding on building new schools and caps towns would put on development, but neither of those are the case at this time. There's no impact of that currently, so I think we're ok. And folks that are redistricting can use the numbers they feel best. I don't want to get derailed by SAPFO process vs. looking at future. • Rani: It's good for schools to have guidance on process going forward. Legends on the slides would be helpful, and red typically means bad • Travis: We're putting together a timeline for the SAPFO consideration. We'll have Ored and SAPFO projections and can compare and contrast those. Ored will be ready in mid-October and SAPFO projections won't be ready until December. • Jean: Next meeting can we continue the discussion? • David: Woolpert has been talking to County staff and they've offered to do some modeling, and we can discuss a reasonable range for funding at our next meeting. We will craft recommendations in line with reasonable increase ideas on funding. So that it moves you forward on these needs while also being feasible and attainable. • Jean: Also it's ok to give the aspirational. • David: yes • Jean: We have a community that cares about schools so we don't want to limit ourselves. Looking forward to meeting next week,let's be sure to define things and have legends, acronym explanations, etc. given our community and how they care and want to understand what this looks like. 4. Next Meeting is October 18, 2023 Adjourn Capital Needs Work Group virtual meetings are open to the public to attend remotely. Should any member of the public wish to view this meeting, please click the following link to register: Capital Needs Workgroup Registration Link After registering, you will receive a follow-up email which will allow you to access and view the meeting. If you have any comments or questions, would like to submit any written comments to the group, or would like an emailed copy of the entire agenda package for this meeting, please email Kelly Guadalupe at kguadalupekoran ems. nc._ov before 3:00 pm on September 19, 2023