HomeMy WebLinkAbout2023-539-E-Solid Waste-Draper Aden Associates-Ferguson and Bradshaw Quarry W&R site consolidation
TO: Mr. Robert Williams
Orange County Solid Waste
FROM: C. Tyrus Clayton, Jr., PE
Regional Growth Leader
DATE: September 28, 2023
SUBJECT: Ferguson and Bradshaw Quarry W&R Site Consolidation
Supplemental Task Order Request #2
Survey Location, Environmental Sampling, and Traffic Study
DAA/TRC Project No. 500002.0000.0000
Total Budget Estimate, including T&M = $26,000
At your request, Draper Aden Associates/TRC Engineering (DAA/TRC) is pleased to offer this proposal
support services related to the additional due diligence required by the County to verify parcel owned
by Orange Water and Sewer Authority (OWASA) on the northeast corner of Orange Grove Road and
NC Highway 54 for use as a Waste and Recycling Center. This proposal outlines our understanding of
the project scope, tasks to be completed, assumptions underlying our fee proposal, and fees for the
project.
PROJECT DESCRIPTION: The project will consolidate and replace the two existing waste and recycling
centers located on Bradshaw Quarry Road and the second on Ferguson Road. The proposed site is
located between two centers the County is planning to close located on Bradshaw Quarry Road in the
Cane Creek Reservoir watershed and on Ferguson Road in the University Lake watershed.
SCOPE OF SERVICES
Task 1 – Limited Survey Services: DAA/TRC will provide limited survey services to locate and flag the
property boundary, limits of clearing, and proposed improvements.
A. DAA/DAA/TRC will recover and verify property boundary monumentation as a basis of
location and to establish site control.
B. Mark the perimeter of the property improvements for the proposed Waste and Recycling
Center and access road.
i. Markings will be colored flagging tied to existing vegetation or stakes to be set at an
approximate 50 ft intervals (or less as needed) and at corners or changes in direction.
Markings before and after should be visible from each point marked.
ii. Limited clearing/cutting of smaller vegetation may occur.
C. Project Assumptions, Conditions and Limitations
i. DAA/TRC’s proposal is based upon the set plans provided by OCSW (the client).
Property Boundary is shown on these plans and will be used for calculations of
clearing limit locations.
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
Robert Williams
September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2
Page 2 of 6
ii. This fee is based on the stake out of project limits on plans developed by Draper
Aden/DAA/TRC. Property boundary is shown on said plans and will be used for
calculations of location of project limits.
iii. DAA/TRC will provide field support and quality control with office staff including
project surveyors, survey technicians and licensed surveyors to complete the
requested stakeout. Support will include computation of the locations of the
requested items along with QA/QC review of data.
iv. This is not a boundary survey and is only for onsite visual presentation purposes.
v. No deliverable is proposed for this task, other than flagging in the field.
vi. Should stakes or flagging be lost due to site operations, tampering, or other reasons
outside of TRC’s control, re-staking will be considered an additional service.
Task 2 – Environmental Sampling: DAA/DAA/TRC will mobilize to the site of the proposed Orange
County Solid Waste facility to conduct an assessment of existing soil and groundwater conditions.
The purpose of our assessment will be to identify baseline (background) soil and groundwater
conditions and evaluate potential impacts (if any) from the residuals spray irrigation field 11-8
operated by Orange Water and Sewer Authority.
Soil Analysis: Our assessment will consist of the advancement of two soil borings on the northern and
southern portions of the site and the installation of two temporary groundwater monitoring wells.
The borings will be advanced with a truck-mounted Geoprobe® Direct Push Technology (DPT) rig.
Based on DAA/TRC’s knowledge of the regional groundwater elevations in the vicinity of the site, we
anticipate that groundwater will be encountered at a depth of 10-15 feet below land surface (bls).
We will collect a composite soil sample from each boring at four-foot intervals from acetate sleeves
until groundwater is encountered, transfer the samples into laboratory-supplied containers, and
submit the samples to a North Carolina-certified lab for analyses of the following:
Arsenic Iron Zinc
Aluminum Mercury Oil and grease
Barium Magnesium Nitrate
Calcium Manganese Nitrite
Copper Potassium Total Phosphorous
Cadmium Nickel
Total Chromium Lead
Groundwater Analysis: Following soil sampling, we will install the groundwater wells to a depth of 10-
15 feet below land surface (bls) using Geoprobe DPT. Following boring advancement, we will insert
five feet of 10 PVC slot screen material into each boring to bracket the stabilized water table and
connect the screened pipe to 10 feet of PVC solid riser pipe. We will construct the wells with a sand
pack that will be poured to a depth one foot above the top of the screen interval to isolate the
screened interval from the bentonite seal. We will then seal the well with bentonite pellets that will be
poured directly above and in contact with the sand pack and extend at least one foot or greater to
ground surface.
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
Robert Williams
September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2
Page 3 of 6
Following well construction, we will collect depth-to-water measurements after the groundwater has
had sufficient time to stabilize, develop and sample the wells using new disposable polyethylene
tubing inserted into each temporary well location and connected to a peristaltic pump. During the
well development activities, a handheld YSI multiparameter instrument will be used to measure
temperature, turbidity, dissolved oxygen, conductivity, specific conductance, and pH of the extracted
groundwater to verify that representative samples are collected. Development activities will cease
when the measured parameters have stabilized or until the sample location fails to generate
groundwater due to slow recovery. Following well development and confirmation of stable
parameters, groundwater samples will be pumped from each well directly into laboratory-provided
glassware. The groundwater samples will be transported in an ice-filled cooler under chain-of-
custody protocols and shipped overnight to a North Carolina certified laboratory for analyses of the
following:
Arsenic Aluminum Barium
Chemical Oxygen Demand Fecal Coliform Total Coliform
Calcium Copper Cadmium
Total Chromium Chloride Iron
Magnesium Manganese Mercury
Total Ammonia TKN (as N) Nitrate
Nitrite Nickel Lead
Oil and Grease Phenol Phosphorous
Orthophosphate Potassium Total Dissolved Solids
Total Organic Carbon pH Specific Conductance
Zinc Sulfate
Following sample collection, we will abandon the wells in accordance with 15A NCAC 02C.0113. We
will prepare a letter report for Orange County Solid Water that summarizes our sample collection
activities, provides the laboratory analytical results with comparison to results obtained from
monitoring well(s) installed on Field 11-8 to determine if there is a measurable contribution of
pollutant loading from the spray irrigation system that will impact the allowable pollutant loading
from the septic system planned for the solid waste site.
Assumptions:
A. Site will be accessible with our Geoprobe DPT truck-mounted rig.
B. Standard turnaround time (10 business days) for lab
C. No duplicate samples, trip blanks or equipment blanks
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
Robert Williams
September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2
Page 4 of 6
Approximate Boring/Sampling Locations
Task 3 – Preliminary Traffic Investigation & TIA Scoping: DAA/TRC’s subconsultant, Kimley-Horn, will
consult with the project team regarding site access and circulation and the type of type of operations
anticipated on the site. At this point, we anticipate that trip generation for the proposed site will be
determined by available data for two existing recycling sites that will be consolidated at the subject
site. We will review data to determine average weekday and weekend daily and peak hour rates.
We will obtain readily available average daily traffic count data from NCDOT. Based on this
information, we will investigate historical traffic growth rates for relevant roadway segments. We will
also research readily available public data related to funded transportation projects and
pending/approved developments in the project vicinity.
With this information, we will coordinate and attend one meeting with NCDOT and the Orange
County Staff to discuss and finalize the scope and parameters of the proposed study. Based on these
discussions, we will prepare a memorandum of understanding summarizing the analysis assumptions
for the TIA for review by the County and NCDOT.
Future Task – Traffic Impact Analysis: As the study area and assumptions of this analysis will be based
on the findings of Task 3 above, the scope and fee for the Traffic Impact Analysis will be quoted once
Task 3 is completed.
Additional Services: Any services not specifically provided for in the above scope, as well as any
additional scope the Client requests, will be considered additional services and will be performed at
our then current hourly rates. Additional services we can provide include, but are not limited to, the
following:
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
Robert Williams
September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2
Page 5 of 6
· Traffic counts
· Traffic impact analyses and/or signal warrant analyses
· Driveway permits/right-of-way encroachments
· Off-site roadway design/traffic signal design
Information Provided By Client: The following information shall be provided by the Client:
· Specific information regarding on-site operations
· Proposed development plan, including land uses and intensities as well as site access
· Proposed build-out year.
We shall be entitled to rely on the completeness and accuracy of all information provided by the
Client.
FEES: These lump sum fees will be invoiced monthly based on our estimation of the percentage
complete on each task. Time and material (T&M) fees will be based upon current 2023/2024 bill rates.
1. Survey Services ................................................................................................................................. $ 6,500
2. Environmental Sampling .......................................................................................................... $13,500 (T&M)
3. Preliminary Traffic Investigation .............................................................................................. $6,000 (T&M)
TOTAL .............................................................................................................. $26,000*
(Note: allowances for reimbursable costs (mileage, printing) are included). Total is a budget estimate,
based on time and material tasks. TRC will request written approval prior to exceeding the time and
material estimates.
TERMS AND CONDITIONS: The proposed services will be provided in accordance with the
conditions presented herein and an existing agreement between Draper Aden Associates and Orange
County Solid Waste Management.
Sincerely,
C. Tyrus Clayton, PE
Regional Growth Leader
cc: Bruce Woody (OCSWM)
Cheryl Young (OCSWM)
Ian Spurlock (DAA/TRC)
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
Robert Williams
September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2
Page 6 of 6
Orange County Solid Waste
Ferguson and Bradshaw Quarry W&R Site Consolidation
Supplemental Task Order Request #2
Draper Aden Associates Proposal No. 500002.0000.0000
AUTHORIZATION TO PROCEED
______________________________________ ________________
Orange County Solid Waste Management Date
THIS INSTRUMENT HAS BEEN PRE-AUDITED IN THE MANNER REQUIRED BY THE LOCAL
GOVERNMENT BUDGET AND FISCAL CONTROL ACT:
______________________________________ ________________
Office of the Chief Financial Officer Date
THIS SCOPE OF WORK IS SUBMITTED PURSUANT TO THE TERMS OF THE AGREEMENT DATED
FEBRUARY 22, 2017
BETWEEN DRAPER ADEN ASSOCIATES AND ORANGE COUNTY.
__________________________________ _______________
C. Tyrus Clayton, Jr., PE Date
DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
10/3/2023
10/3/2023
10/3/2023