Loading...
HomeMy WebLinkAboutAgenda - 06-04-2002-10a 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 4, 2002 Action Agenda Item No. 10.0 SUBJECT: Status Report for Rogers Road Weletline Connections DEPARTMENT: Housing 8 Community PUBLIC HEARING: (Y/N) Nc __ Development ATTACHMENT(S): INFORMATION CONTACT: Tare L. Flow, exit 2490 Project Area Map TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 96841501 Durham 688-7331 Mebane 338-227-2031 PURPOSE: To receive a states report of the grant program for the funding of corrections between eligible properties and the mein waterline installed by the Orange Water and Sewer Authority in the Rogers Road neighborhood. BACKGROUND: The Board of Commissioners appropriated, in FY 2000-01, a total of $676,000 from the Solid Wastellandfill Operations Fund to finance the installation of water mains in the Rogers Road community. The Orange Water and Sewer Authority managed the construction project under an agreement with the County, and construction was completed in December2001. On February 5,2002,the BOCC approved a County-funded program that would provide grants to property owners In the Rogers Road welcome project target area. The grant would cover the costs associated with connecting individual residences to newly constructed water mains. These costs would include OWASA availability fees and water meters and the installation of lateral lines fmm the water meter to the house. Assistance is available for eligible properties for which the pertinent application materials are received no later than December 31,2004. The approved Assistance Policy for the Rogers Road Waterline Connection Program others grants for waterline connections for households with incomes below 80%of the area median income. The income limits are based on the HUD published FY 2002 Median Income of $71,300 for a family of four in the RelaigibOUrham-Chapel Hill Metropolitan Statistical Area The current income Ilmlte are provided in the chart below. 2 2002 Income Limits for the County of Orange f4UDiger ra n 30TJo of Bollsebo�ld --34I •d, " tnI 8*1PW,t MYM�rno 2 lT:,' . .° 1?r_ i$74,950 $24.950 $38,100 2 $11100 $28,500 $"'500 3 $19250 $32100 $46960 4 $21,400 $35,650 $51 5 $23,100 __$38,500 L $50,750 6 $24,800 __$41,350 $63,100 7 $26,500 $44200 $67,450 B $28,250 $47 050 $71,800 At program inception, staff estimated that the majority of property owners(about 80%)would meet the eligibility requirements for the gram program. The Housing and Community Development Department began taking appllca0ons for the grant program after February 5,2002 by appointment only. Further, in an effort to inform the neighborhood of the program, a Community Meeting was held on Monday. April 8k at the Faith Tabernacle Church. Then, as a result of that meeting, an application day was scheduled in the community on Saturday, May 180 in an effort to make it easier for residents to apply for the program. The following summarizes the Implementation oflhis program to dale. Aoolicini Intake Applications received Feb. 5 through May 17, 2002 11 Applications received Saturday, May 18,2002 18 Applications received May 20-24,2002 7 Total Applications Received 36" Represents approximately 38% of the total number of habitable structures. Parcels owned by program applicants are highlighted on the attached pmject area map. Ellaibllity Analysis Eligible applicants (72%) 26 Ineligible applicants (22%) 8 Incomplete applicants (6%) 2 Total applicants 36 Addifronal Information Approximately five (5)property owners have chosen to pay the connection fees directly to OWASA. Only one of these property owners has applied for the County grant program. e FINANCIAL IMPACT: The County Engineer reports that there are 113 parcels with 96 habitable structures located in the community. The total estimated cost to provide individual service lines to all of the identified properties is$195.00D. This amount Includes availability fees of$33,000 and the cost of installation of lateral lines from the meters (including the cost of the meter)to the individual homes of$162,000. The cost forms program Is covered by an earlier appropriation from the Count's General Fund. RECOMMENDATION(3): The Manager recommends that the Board receive the report as information. I i�.,. t� t a t� s4q.xy `"xs; '�x3y^ grx " fir N';a £�xl?� kf ti � ie5 �� �A`,.1��'44 Y•y9� � tF yttS `4n�'`' In In