Loading...
HomeMy WebLinkAboutAgenda - 05-21-2002 - 7a ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 21, 2002 Action Agenda Item No. Za SUBJECT: Proposed Orange County 2002-2003 Secondary Road Improvement Program DEPARTMENT: Planning and Inspecdons PUBLIC HEARING: (YIN) Yes ATTACHMENT($): INFORMATION CONTACT: 1. Letter iron J.M. Mills, Division Engineer Karen Lincoln, eat. 2594 2. Legal Notice 3. Proposed Secondary Road Improvement Program TELEPHONE NUMBERS: 4. Map Hillsborough 7325161 Chapel Hill 968-0501 Durham 666-7331 Mebane (336)2274031 PURPOSE: To discuss and receive comment on the Orange County 2002 — 2003 Seconder Road Improvement Progrem proposed by North Carolina Department of Transportation (NCDOT). BACKGROUND: Chapter 136 .S of the General Statutes of North Carolina (NCGS) require, that NCDOT meet with the Board of County Commissioners at a public meeting to present to am discuss with the Wad and other citizens proposed secondary mad paving projects (Seconder Road Improvement Program). NCDOT, in compliance with NCGS 136-04.8, has poste l in IN county courthouse a county map showing tentative secondary road paving projects and he published notice (see attached) of the public hearing in county newspapers (Me Mebam Enterprise,The News of Orange and The Chapel Hill News). The anticipated 2002 —2003 allocation for Orange County secondary made tobale $ 1,330,804. 1 includes Me following: Paving Rural Unpaved Roads(11 mad segments-8.40 miles) $1,273,000 Contingency 57,804 Total $1,330,804 The anticipated 2002 — 2003 allocation represents a decrease of 18.7% from the 2001 — 200: Orange County Secondary Road Improvement Program allocation. FINANCIAL IMPACT: There is no direct financial impact associated with this item. RECOMMENDATION(S): The Administration recommends that the Board hold the public hearing to discuss and receive comments regarding the 2002 — 2003 Secondary Road Improvemen Program for Orange County. 2 SrA1 ov No1ax CA1 0a DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LY o=ETf GoVmRNMAa Sacasra April 2212002. ROSOVE APR 2 3 2002 Mr. Barry Jacobs,Chalmian Orange County Commissioners 2105 Moorefields Road Hillsborough, NO 27VB Dear Mr. Jacobs: Attached is the proposed 2002-03 Secondary Road Construction Program for Orange County. Places make this information available to the other Commissioners. We are looking forward to meeting with the County Commissioners on Tuesday, May 21, 2002. Sincerely, J. . Mills, P.E. D ISION ENGINEER Alla. m Atta. cc: J. Douglas Galyon, Member, Board of Transportation w/atta LZOhn M. Link, Jr., County Manager Watts. Beverly Blythe, Clerk Watts. C. N. Edwards, Jr., District Engineer 3 NOTICE —� Representatives of the Department of Transportation will meet with the Orange County Commissioners on Tuesday, May 21, 2002 at 7:30 p.m. In the F. Gordon Battle Courtroom of the Orange County Courthouse in Hillsborough, North Carolina to discuss with the Board and other cif¢ens present, plans and proposals for the 2002-03 Secondary Road Construction Program. A county map showing tentative secondary road paving projects is posted in the courthouse. 4 OEANGE CO1= PROPOSED 2002-20035ECONDARY ROAD OWO4ENT PROGRAM M02-2003 SEWNOARY ALLOCATION(AN'IPC@ATEO) $1}30$0410 MAP PRIONTT SR ESTIMATED NO. NO. NO. NAME AND DESCRIITION LENGTH COST Paviae Raral DaoavN ROade 1 SF 1132 ShmnmcR Road from SR 11310 End 0.20 40,000 of Maimerence 2 6F 1529 Coanny Lane from OR 1528 to End of 0.20 40,000 Malnlmmcc 3 7F 1897 DryC A Road firm SR 1734 to 0.25 sopo EndofMamtananee 4 OF 1350B Hartamy Chmch Road from SR 1364 to 0.50 100,000 EndofM taonnce 5 OF 1518 'May Road from SR 1517 to Rood 0.60 120,000 ofM mlmmm 6 IOF 1355 AllisonRnadfiom NC86to5R1357 0.90 180,000 7 11 1342 NoM Emzia Road fiom End ofPaaxmmt 0.50 160,000 to EndcfMaintenance 8 12 1347 Charles Dad End Road kara SR 1343 to 0.70 140,000 EndofMambaxance 9 13 1539 Ricfiatdl from OR 1538 O End 0.55 110,000 ofM nllmmoe 10 14 1500A A ROedfrom NC86to SR1501 1.50 310,000 Il 15 1501 Allisun Onve frwa SR 1500 to NC 86 220 23000 (Partial Faodms) Total Road Paving SAO $1,2T3,000 5 Con4ug y mh naod fw Cost Ovemme, Mu SeRry lmptue ,Addition to 557,800.00 SYMM,Fanug and Mamtmmm of Rut Fun D�mt Dn s.and hoperty Ow Pm aipeGm Faving. NOTE: PROGRAM SD CT TO AVAILABR.ITV OF FIR G,MGDT.OF-WAY, FNVDLONMFNTAL AND RISTORSCAL REVIBW. WMGM-OF.WAV IS NOTAVAD.ARLE ON T�ABOVRU AVR DROADSORADDITONALFDNDSAREALLOCATED,OTHERROA S W Q,L BE PROGRMIM@D IN ORDER OF PRiORI'CY. ORANGE COUNT/ PROPOSED 2002-2003 SECONDARY ROAD IMPROVEMENT PROGRAM I 4 . p S r � A 4 r 1. l 1, SR 1133,SImrW:FmA 7. SRIW.N. Farkm 3. SR 15A,Ui Ly 8. SR 1847,Main Bee]EM ft" S. SR 1887,Dry Cm&R 9. 8R 1539.NC L 9 O. SR130B HmmW ChU ftE 10.SR 1MM Alfmn ROad 5. SR 1518,TIIryR 11,SR 1W1,Alvan Dries 6.SR laO.Ml6M Rntl I