HomeMy WebLinkAbout4.17.23 OUTBoard Packet ORANGE TRANSPORTATION
COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT
COUNTY
NoKrtL CALIQLLNA PUBLIC TRANSIT
�rangeCounty
AGENDA
ORANGE UNIFIED TRANSPORTATION BOARD
Monday April 17, 2023, 5:00 pm
Orange County Department of Transportation
600 NC 86, Hillsborough, NC 27278
OUTBoard meetings are held in person and open to the public. Any member of the general public
who wishes to make public comment should email eange@orangecountync.gov and the
comment will be read to the OUTBoard during the public comment portion of the meeting.
1. Call to Order
2. Consideration of Additions or Changes to Agenda
3. Public Comments
4. Approval of Minutes— February 20, 2023
5. Action Items
a. Implementing County's Complete Street and Vision Zero Policy
i. Action: Discuss and provide recommendation
b. Orange Annual Work Program (AWP)
i. Action: Provide comments
c. US 70 Multimodal Corridor Study
i. Action: Provide comments
6. Staff Report/Updates
a. MPO, RPO, and NCDOT Updates
7. Adjournment -The next meeting - December 2022
It is the policy of Orange County Transportation Services to ensure that no person shall, on the
ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be
denied the benefits of, or be otherwise subjected to discrimination under any program or activity
as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919) 245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE ORANGE COUNTY GOVERNMENT
COUNTY
TRANSPORTATION SERVICES DEPARTMENT
i4[Jk`f Fi C:AkCrL1NA - -. .....
Item 3.a.
Subject: Implement Complete Street and Vision Zero Policy
Attachment: 1. Vision Zero Policy and Complete Street Policy
2. Example Best Practices
PURPOSE: Review Orange County Transportation Priorities for North Carolina Department of
Transportation (NCDOT) Strategic Prioritization of Transportation (SPOT) process.
BACKGROUND: In 2019, NCDOT adopted a new Complete Street Policy and Implementation
guide (link). August 2022, Burlington-Graham Metropolitan Planning Organization (BG MPO) also
adopted a Complete Street and Vision Zero Policy, followed by Orange County Board of County
Commissioners (BOCC) in 2022 (Attachment 1). Orange County now seeks to join the practice of
rural counties getting sidewalks and other non-highway accommodations (e.g. side paths, shared
lanes, bike lanes, etc.), especially in meeting its Transportation Goals and Objectives as stated in
the 2030 Comprehensive Plan.
Many Counties in North Carolina have sidewalks and other bike/ped accommodations in their
unincorporated areas, coordinated with member jurisdictions. Places like Durham County
worked with City of Durham to motivate North Carolina Department of Transportation (NCDOT)
build a 170 foot sidewalk with crosswalk in the County, close to Forest View Elementary School.
Jackson County and Pender County also received state built sidewalks in their rural areas, simply
by taking over maintenance of it via a signed agreement with NCDOT. Attachment 2 are the
standard maintenance agreements for state constructed bike/ped facilities.
Staff presents various options to achieve the same successes as other rural counties who worked
with NCDOT in getting the necessary non-vehicular improvements they sought, options includes:
1. FTA grants—80/20 reimbursement for sidewalks % mile around bus stops
2. Transit funds— 100% reimbursed to County in accordance with Transit Plan
3. County CIP/Special Fund—similar to Hillsborough's Connectivity/Sustainability fund
Other options are also open to discussion. Staff seeks Option 2 or 3. Option 1 requires National
Environmental Protection Agency (NEPA) Environmental Impact Assessment (EIA) for any
construction project involving federal funds.
FINANCIAL IMPACT: Grants are federal funds, requiring local match and local administration,
20% of total project cost must be paid by local government. Transit funds are limited to projects
as identified in the Orange County Transit Plan as and as approved in the Annual Work Program.
County's Capital Improvement Program (CIP) is part of the annual budget process.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this
item:
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or color; religious
or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background;
age; military service; disability; and familial, residential or economic status.
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary for
residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is
applicable to this item:
• CLEAN OR AVOIDED TRANSPORTATION
Implement programs that monitor and improve local and regional air quality by: 1) promoting
public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3)
otherwise minimizing the need for travel.
ACTION:
Discuss and provide recommendation
RES-2022-056,'3 d)',1c)/i&1,,,)p Attachment 2
ORANGE COUNTY BOARD OF COMMISSIONERS
RESOLUTION
FOR THE ADOPTION OF A VISION ZERO POLICY
TO ELIMINATE FATALITIES AND SERIOUS INJURIES THAT RESULT FROM
CRASHES WITHIN THE ORANGE COUNTY AREA BY YEAR 2050
The motion to approve the following resolution was offered by baM�Agg,;, - rV_w_ and
seconded by &m,'J. nd upon being put to a vote was duly adopted.
WHEREAS,hundreds of crashes occur in the County each year,resulting in fatalities and serious
injuries; and
WHEREAS,the number of people dying and suffering serious injuries on our streets is a serious
public health problem which necessitates public action; and
WHEREAS, crash reduction efforts necessitate a comprehensive and specific approach to street
planning,design,policy, enforcement, legal processes,education,and communication; and
WHEREAS, crashes that result in death or serious injury are not inevitable but largely
preventable; and
WHEREAS, Orange County acknowledges the importance of everyone traveling safely within
their communities and that the only acceptable goal is to eliminate traffic-related fatalities and
serious injuries,while increasing safe,healthy, and equitable mobility for all; and
WHEREAS,a commitment to Vision Zero is a commitment to saving lives and ensuring equitable
investment in the safety needs of underserved communities in our region; and
WHEREAS, it is the role of government to do its part to serve and protect the populace; and
WHEREAS, Orange County in coordination with Durham-Chapel Hill-Carrboro Metropolitan
Planning Organization, Burlington-Graham Metropolitan Planning Organization and Triangle
Area Rural Planning Organization support North Carolina Department of Transportation efforts to
meet the state's safety targets per Federal legislations and to support the North Carolina State
Highway Safety Plan goal to reduce fatalities and serious injuries by half by 2035,moving towards
zero by 2050; and
WHEREAS, the Orange County Board of County Commissioners has found that the County is
conducting transportation planning in a continuous, cooperative, and comprehensive manner; and
WHEREAS, Orange County and its member jurisdictions have a strong history of commitment
to prioritizing safety and the Comprehensive Transportation Plan,the Metropolitan Transportation
Plan, and local governments' transportation plans have made demonstrable progress to improve
safety by making systemic changes in the way the transportation network is planned,programmed,
designed,constructed, and operated; and
i
WHEREAS,Orange County will take a proactive approach to develop an effective Transportation
Safety Plan built on a foundation of Safe Systems principles and elements that will translate into
evidence-based implementation processes; and
WHEREAS, creating safer streets is likely to encourage the use of more active transportation
options, thereby increasing population health, access to healthy foods and active transportation
options; and
WHEREAS, Orange County Transportation Services will plan and implement transportation
projects with equity at its forefront, striving to impact the most vulnerable and dependent users of
the most dangerous roadways of the transportation network in the effort to ensure outcomes will
be experienced equitably throughout the region;
NOW THEREFORE, BE IT RESOLVED, that Orange County agrees to support, plan and
program projects that commit to a goal of zero deaths and serious injuries that are a result of crashes
by 2050; and
BE IT FURTHER RESOLVED that Orange County is dedicated to measuring the progress,
challenges, and successes of the Vision Zero commitment and will do so with tangible,reportable
metrics that will be reported upon on an annual basis.
RES-2022-057;S,(I,)"l bli&JOB
ORANGE COUNTY BOARD OF COMMISSIONERS
RESOLUTION
FOR THE ADOPTION OF ORANGE COUNTY COMPLETE STREETS POLICY
The motion to approve the following resolution was offered byC0A&"tss,nr,&-r kcitav- and
seconded byr� , , ( ,,�;�{ and upon being put to a vote was duly adopted.
WHEREAS,the Orange County Board of County Commissioners(BOCC)has found that Orange
County is conducting transportation planning in a continuous, cooperative, and comprehensive
manner in accordance with 23 USC 134 and 49 USC 1607; and
WHEREAS,the BOCC expressed its support for the comprehensive implementation of the North
Carolina Department of Transportation(NCDOT) Complete Streets Policy in all of its applicable
region transportation plans and highway projects as a matter of common practice; and
WHEREAS, Orange County supports local member jurisdictions' Bicycle and Pedestrian
Planning Grants applications; and
WHEREAS, Orange County knows that by balancing all transportation modes and
accommodating all users, adopting a Complete Street policy will help to encourage the planning,
design and construction of safer streets and ensures that the transportation system benefits all users
equitably;and
WHEREAS, a Complete Streets policy can help calm traffic, enhance economic opportunities,
increase physical activity, and create safer environments for residents and visitors;
NOW THEREFORE,BE IT RESOLVED,that Orange County affirms its support of Complete
Streets in the planning, design and construction of highway projects.
i
l
f
CONTRACT REQUISITION FORM -664
CONTRACTORIVENDOR NAME: ,VCc VENDOR#
ADDRESSICITY/ST/ZIP: 7-A V , ail N . ] 5';• W21�+ ^1 N� ;7 ! cs. ,� 1►
v*
TYPE OF CONTRACT:New— Renewal— Amendment— Services Goods^ Consulting_ Construction_ Lease_Other w�►••CAg�4
� rrt+
DESCRIPTION/SCOPE OF WORK: C+r r rr DC tom, ,y+r
v-
r't"
CONTRACT AMT: Q CONTRACT PERIOD: EaAryetZ _ RFP/IFBIRFQ#: N
FUNDING SOURCE: General— State_ Federal_ Grant_ Other
1TEM FUND COST CENTER G/L ACCOUNT WBS ELEMENT GRANT NUMBER TOTAL 1/D ADDITIONAL INFO
LINE#
I � (GrantslPrajects Only)
2
3
COUNTY ATTORNEY COMMENTS:
Contract requires Risk Management approval? YES— NO
RISK MANAGER Signature: Date:
Contract requires BOCC approval? YES✓/NO_ Date of BOCC Approval: �� p� Reviewing Attomey: ]late:
INITIATING DEPARTMENT(Required) BUDGET DIRECTOR(Required only for Business Area 9800)
By: Date: /1 j s By: Date:
COUNTY M FINANCE OF I R Pre.audit Ce I n Comple Yes�No
L--
By' Date: !S- Signature: Date
CLERK TO E BOARD PURCHASING
By: Date: By: Date: (e
IT DIRECTOR Purchasi g Comments:
By: Date:
FUNDS RES DOC ID# /6- I11 l
NORTH CAROLINA SIDEWALK AGREEMENT
DURHAM COUNTY
DATE: 4/24/2015
NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION
AND
WBS Element: 3605.3.02
COUNTY OF DURHAM CFDA: 20.205
THIS AGREEMENT is made and entered into on the last date executed below, by and between the
North Carolina Department of Transportation, an agency of the State of North Carolina, hereinafter
referred to as the"Department' and the County of Durham, hereinafter referred to as the"County".
WITNESSETH:
WHEREAS, Section 1113 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act—A
Legacy for Users(SAFETEA—LU)requires that Surface Transportation Program funds be available
for transportation enhancement activities in the Statewide Transportation Improvement Program; and,
WHEREAS, the County has requested enhancement funding for the construction of sidewalks in
Durham County,
NOW, THEREFORE, the parties hereto, each in consideration of the promises and undertakings of
the other as herein provided, do hereby covenant and agree, each with the other, as follows:
SCOPE OF THE PROJECT
1. The Project consists of installing sidewalk, crosswalk, and traffic signal at the intersection of SR
1306(Erwin Road)and SR 1302(Randolph Road).
PLANNING, DESIGN AND RIGHT OF WAY
2. The Department shall be responsible for the preparation of all environmental documentation
(Categorical Exclusion), including any environmental permits, required for said Project. All work
shall be accomplished in accordance with Departmental and Federal procedures and guidelines.
Agreement ID#5648 1
3. The Department shall be responsible for the development of the design and preparation of
Project plans specifications, quantities and details for said Project. Said work shall be
accomplished in accordance with Departmental and Federal standards and specifications.
4. All work shall be performed within the existing right of way and in accordance with Departmental
standards, policies and procedures. In the event any additional right of way or construction
easement is required for the new sidewalk construction within the County jurisdiction, the County
shall provide said additional right of way/or easement at no expense or liability whatsoever to the
Department. Acquisition of any right of way and/or easements shall be performed in accordance
with all State and Federal procedures.
CONSTRUCTION AND MAINTENANCE
6. The Department shall advertise and award a contract for the construction of the Project in
accordance with the Project plans and with Departmental and Federal policies and procedures.
The Department, and/or its agent, shall administer the contract for construction of the Project.
7.. The County, at its own expense, shall be responsible for all liability and maintenance
responsibilities for the sidewalk within the County's jurisdiction upon completion of the Project.
ADDITIONAL PROVISIONS
8. To the extent authorized by the state and federal tort claim statues, each party shall be
responsible for its respective actions under the terms of this agreement and save harmless the
other party from any claims arising as a result of such actions.
9. All terms and conditions of this Agreement are dependent upon and subject to the allocation of
funds for the purpose set forth in the Agreement and the Agreement shall automatically terminate
if funds cease to be available.
10. By Executive Order 24, issued by Governor Perdue, and N.C. G. S.§ 133-32, it is unlawful for any
vendor or contractor( i.e. architect, bidder, contractor, construction manager, design professional,
engineer, landlord, offeror, seller, subcontractor, supplier, or vendor), to make gifts or to give
favors to any State employee of the Governor's Cabinet Agencies (i.e., Administration,
Commerce, Correction, Crime Control and Public Safety, Cultural Resources, Environment and
Natural Resources, Health and Human Services, Juvenile Justice and Delinquency Prevention,
Revenue, Transportation, and the Office of the Governor).
IT IS UNDERSTOOD AND AGREED that the approval of the Project by the Department is subject to
the conditions of this Agreement.
Agreement ID#5648 2
IN WITNESS WHEREOF, this Agreement has been executed, in duplicate, the day and year
heretofore set out, on the part of the Department and the County by authority duly given.
L.S. ATTEST:
COUNTY O HAM
BY:_� �/ {�4, 1
BY:
TITLE: -� �- TITLE: �� ,�i
DATE: -
N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State
Employee of any gift from anyone with a contract with the State, or from an
person do
business with the State. By execution of any response in this procurement Youat est for you entire
organization and its employees or agents, that you are not aware that any such gift has been offered,
accepted, or promised by any employees of your organization.
Approved by the local governing body of the County of Durham as attested to by the signature of
Clerk of said governing body on Ga 8 I S
(Date)
The instrument has been pre-audited in the manner
C'OUNT�' required by the Local Government Budget a id
••N•rrrrMrr
i rr '•r r
Fiscal Control Act.
a :
(FINANCE OF CER)
. o
~�'•••••••••''� � Federal Tax Identification Number
Remittance Address:
County of Durham Aftr+: [ve_,,,iy c
:ZGU Easf ��,ii S�-
3uE-hum NC r717'70l
DEPARTMENT OF TRANSPORTATION
BY:
(CHIEF ENGINEER)
DATE:
APPROVED BY BOARD OF TRANSPORTATION ITEM O:
(DATE)
Agreement ID #5648 3
04�-517ZZ4\N4
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT MC.CRORY NICiIOLAS J.TENNYSON
GOVEMOR SECRETARY
;
October 1, 2915 c ; IF Cam ,� � -- --�---
Mr. Chuck Wooten I 0CT 2015 f
County Manager Jackson County
491 Grindstaff Cove Road
Sylva, NC 28779
Dear Mr. Wooten:
The Department has finalized the agreement with Jackson County for the construction of a
sidewalk on US 441 from US 441 Business to Catamount Travel Center. Enclosed are two
copies of this agreement for your execution. Please complete page 4 in its entirety and return
both copies to me- Thank you.
Sincerely,
i x 1c�t �A �,�-n
Wanda H. Austin PE CPM
Division Project Manager
Fourteenth Division Office
- ------- - --- ------ --------------------------------
_. - - - -- - - - -- -- - -- ----
Phone: ($2$)5$6-21 253 Wehster Road,S'ylva, North Carolina 28779 Fax:{828)586-4043
NORTH CAROLINA SIDEWALK CONSTRUCTION AGREEMENT
JACKSON COUNTY
DATE: 9/15/2015
NORTH CAROLINA TRANSPORTATION OF
TRANSPORTATION
AND
WBS Elements: 44558
JACKSON COUNTY CFDA: 20.205
THIS AGREEMENT is made and entered into on the last date executed below, by and between the
North Carolina Department of Transportation, an agency of the State of North Carolina, hereinafter
referred to as the"Department"and Jackson County, hereinafter referred to as the"County".
W I T N ESSETH:
WHEREAS, the Department has plans to make certain improvements under WBS 44558 in Jackson
County; and,
WHEREAS, the Department and the County have approved the construction of said Project with
responsibilities for the Project as hereinafter set out.
NOW, THEREFORE, the parties hereto, each in consideration of the promises and undertakings of
the other as herein provided, do hereby covenant and agree, each with the other, as follows
SCOPE OF THE PROJECT
1. The Project consists of construction of 1600 linear feet of sidewalk along US 441 from US 441
Rosiness to a point 0.3 miles south.
PHASES OF THE WORK
2, The Department stall be responsible for all phases of the project, including planning, design,
right of way, utilities, construction and contract administration. All work shall be done in
accordance with Departmental standards, specifications, policies and procedures.
Agreement ID#5972 1
FUNDING
3. The Department shall be responsible for the cost of the project. The estimated cost is$100,000.
MAINTENANCE
4. The County, at its own expense, shall be responsible for all liability and maintenance
responsibilities for the sidewalk upon completion and acceptance of the project,
ADDITIONAL PROVISIONS
5. If changes or revisions are needed, a Supplemental Agreement will be prepared.
& It is the policy of the Department not to enter into any agreement with another party that has been
debarred by any government agency (Federal or State). The County certifies, by signature of this
Agreement, that neither it nor its agents or contractors are presently debarred, suspended,
proposed for debarment, declared ineligible or voluntarily excluded from participation in this
transaction by any Federal or State Department or Agency.
7. To the extent authorized by state and Federal claims statutes, each party shall be responsible for
its respective actions under the terms of this agreement and save harmless the other party from
any claims arising as a result of such actions.
8. All terms of this agreement are subject to available departmental funding and fiscal constraints.
9. This Agreement contains the entire agreement between the parties and there are no
understandings or agreements, verbal or otherwise, regarding this Agreement, except as
expressly set forth herein.
10, The parties acknowledge that the individual executing the Agreement on their behalf is authorized
to execute this Agreement on their behalf and to bind the respective entities to the terms
contained herein and that he has read this Agreement, conferred with his attorney, and fully
understands its contents.
11. A copy or facsimile copy of the signature of any party shall be deemed an original with each fully
executed copy of the Agreement as binding as an original, and the parties agree that this
Agreement can be executed in counterparts, as duplicate originals, with facsimile signatures
sufficient to evidence an agreement to be bound by the terms of the Agreement.
Agreement ID#5972 2
12. By Executive Order 24, issued by Governor Perdue, and N.C. G.S.§ 133-32, it is unlawful for any
vendor or contractor( i.e. architect, bidder, contractor, construction manager, design professional,
engineer, landlord, offeror, seller, subcontractor, supplier, or vendor), to make gifts or to give
favors to any State employee of the Governor's Cabinet Agencies (i.e., Administration,
Commerce, Correction, Crime Control and Public Safety, Cultural Resources, Environment and
Natural Resources, Health and Human Services, Juvenile Justice and Delinquency Prevention,
Revenue, Transportation, and the Office of the Governor).
Agreement ID#5972 3
IN WITNESS WHEREOF, this Agreement has been executed, in duplicate, the day and year
heretofore set out, on the part of the Department and the County by authority duly given.
L.S. ATTEST: JACKSON COUNTY
BY: BY:
TITLE-: TITLE:
DATE:
N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State
Employee of any gift from anyone with a contract with the State, or from any person seeking to do
business with the State. By execution of any response in this procurement, you attest, for your entire
organization and its employees or agents, that you are not aware that any such gift has been offered,
accepted, or promised by any employees of your organization.
Approved by the local governing body of Jackson County on (Date)
This instrument has been pre-audited in the manner
required by the Local Government Budget and
Fiscal Control Act.
(SEAL)
(FINANCE OFFICER)
Federal Tax Identification Number
Remittance Address:
Jackson County
DEPARTMENT OF TRANSPORTATION
BY:
(CHIEF ENGINEER)
DATE:
APPROVE❑ BY BOARD OF TRANSPORTATION ITEM 0: (DATE)
Agreement ID#5972 4
NORTH CAROLINA TRANSPORTATION IMPROVEMENT PROJECT
RECEIVABLE AGREEMENT— BETTERMENTS
PENDER COUNTY
DATE: 10/15/2019
NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION
TIP#: R-3300B
AND WBS Elements: 40237.3.3
PENDER COUNTY
THIS AGREEMENT is made and entered into on the last date executed below, by and between the
North Carolina Department of Transportation, an agency of the State of North Carolina, hereinafter
referred to as the "Department' and Pender County, a local government entity, hereinafter referred to
as the "County".
WITNESSETH:
WHEREAS, the Department has plans to make certain street and highway constructions and
improvements within the County under Project R-3300B, in Pender County; and,
WHEREAS, the Department and the County have agreed that the municipal limits, as of the date of
the awarding of the contract for the construction of the above-mentioned project, are to be used in
determining the duties, responsibilities, rights and legal obligations of the parties hereto for the
purposes of this Agreement; and,
WHEREAS, this Agreement is made under the authority granted to the Department by the North
Carolina General Assembly, including but not limited to, the following legislation: General Statutes of
North Carolina (NCGS), Section 136-66.1, Section 160A-296 and 297, Section 136-18, and Section
20-169, to participate in the planning and construction of a Project approved by the Board of
Transportation for the safe and efficient utilization of transportation systems for the public good; and,
WHEREAS, the parties to this Agreement have approved the construction of said Project with cost
participation and responsibilities for the Project as hereinafter set out.
NOW, THEREFORE, the parties hereto, each in consideration of the promises and undertakings of
the other as herein provided, do hereby covenant and agree, each with the other, as follows:
SCOPE OF THE PROJECT
1. The Project consists of improvements on NC 417 (Hampstead Bypass)from south of NC 210 to
north of SR 1563 (Sloop Point Loop Road).
Agreement ID#8985 1
2. At the request of the County, and in accordance with the Department's Complete Streets Policy,
the Department shall include provisions in its construction contract for the construction of
approximately 14,400 linear feet of sidewalk along US 17 from just south of Vista Lane to Sloop
Point Loop Road. Said work shall be performed in accordance with the Department's policies,
procedures, standards, and specifications, and the following provisions.
PLANNING AND DESIGN
3. The Department shall prepare the environmental and/or planning document, and obtain any
environmental permits needed to construct the Project, and prepare the Project plans and
specifications needed to construct the Project. All work shall be done in accordance with
departmental standards, specifications, policies and procedures.
RIGHT OF WAY
4. The Department shall be responsible for acquiring any needed right of way required for the
Project. Acquisition of right of way shall be accomplished in accordance with the policies and
procedures set forth in the North Carolina Right of Way Manual.
5. It is understood by both parties that all work for the betterments shall be performed within the
existing right of way. However, should it become necessary, the County, at no expense or liability
whatsoever to the Department, shall provide any needed right of way and or construction
easements for the construction of the betterments, and remove from said rights of way all
obstructions and encroachments of any kind or character. Acquisition of any needed right of way
shall be performed in accordance with the following state and federal policies and procedures,
"Right of Way Acquisition Policy and Land Acquisition Policy, contained in the Federal-Aid Policy
Guide, Part 712, Subpart B", and the North Carolina Right of Way Manual (Uniform Relocation
Assistance and Real Property Acquisition Policies Act of 1970). The Department shall be
indemnified and held harmless from any and all damages and claims for damages associated
with the acquisition of any construction easements and/or right of way.
UTILITIES
RESPONSIBILITIES
6. The County shall be responsible for the relocation and adjustment of all municipally-owned
utilities in conflict with the Project and shall exercise any rights that it may have under any
franchise to effect all necessary changes, adjustments, and relocations of communications and
Agreement ID#8985 2
electric power lines; underground cables, gas lines, and, and other pipelines or conduits; or any
privately- or publicly-owned utilities.
A. Said work shall be performed in a manner satisfactory to the Department prior to the
Department beginning construction of the Project. The County shall make every effort to
promptly relocate said utilities in order that the Department will not be delayed in the
construction of the Project.
B. The County shall make all necessary adjustments to house or lot connections or services
lying within the right of way or construction limits, whichever is greater, of the Project.
C. The Department, where necessitated by construction, will make vertical adjustments of
two (2)feet or less to the existing manholes, meter boxes, and valve boxes at no
expense to the County.
D. The Department shall not be liable for any work that the County undertakes with respect
to said utility relocation.
UTILITY RELOCATION BY DEPARTMENT
8. If the County requests the Department to include the relocation and/or adjustment of municipally
owned utilities in its construction contract provisions, and the Department agrees, then a separate
utility agreement will be prepared to state the cost estimate and the reimbursement terms. The
County shall reimburse the Department all or a portion of the costs associated with said
relocation, in accordance with NCGS 136-27.1. Reimbursement will be based on final project
plans and actual costs of relocation.
CONSTRUCTION
9. The Department shall construct, or cause to be constructed, the Project in accordance with the
plans and specifications of said Project as filed with, and approved by, the Department. The
Department shall administer the construction contract for said Project.
MAINTENANCE
10. Upon completion of the Project:
A. The Department shall be responsible for all traffic operating controls and devices which shall
be established, enforced, and installed and maintained in accordance with the North Carolina
General Statutes, the latest edition of the Manual on Uniform Traffic Control Devices for
Agreement ID#8985 3
Streets and Highways, the latest edition of the "Policy on Street and Driveway Access to
North Carolina Highways", and departmental criteria.
B. The improvement(s)shall be a part of the State Highway System and owned and maintained
by the Department.
11. The County, at no expense to the Department, shall assume all maintenance responsibilities for
the betterments and release the Department from all liability relating to such maintenance.
BETTERMENT COSTS AND FUNDING
12. The County shall participate in the Betterment costs of the Project as follows:
A. In accordance with the Complete Streets Policy, the County shall reimburse the
Department fifteen percent (15%), of the actual cost, including administrative costs, of the
work associated with construction of the new sidewalk. Based on the estimated cost of
$455,144, the County shall submit a check for$68,272 to the Department's Division
Engineer upon partial execution of the Agremeent by the County. Both parties undertand
this is an estimated cost and is subject to change.
B. Upon completion of the Project, if actual costs exceed the amount of payment, the
County shall reimburse the Department any underpayment within sixty (60)days of
invoicing by the Department. if the actual cost of the work is less than $455,144, the
Department shall reimburse the County any overpayment. A late payment penalty and
interest shall be charged on any unpaid balance due in accordance with NCGS § 147-
86.23.
ADDITIONAL PROVISIONS
13. It is the policy of the Department not to enter into any agreement with another party that has been
debarred by any government agency (Federal or State). The County certifies, by signature of this
agreement, that neither it nor its agents or contractors are presently debarred, suspended,
proposed for debarment, declared ineligible or voluntarily excluded from participation in this
transaction by any Federal or State Department or Agency.
14. To the extent authorized by state and federal claims statutes, each party shall be responsible for
its respective actions under the terms of this agreement and save harmless the other party from
any claims arising as a result of such actions.
Agreement ID#8985 4
15. The other party to this Agreement shall comply with Title VI of the Civil Rights Act of 1964 (Title
49 CFR, Subtitle A, Part 21) and related nondiscrimination authorities. Title VI and related
authorities prohibit discrimination on the basis of race, color, national origin, disability, gender,
and age in all programs or activities of any recipient of Federal assistance.
16. All terms of this Agreement are subject to available departmental funding and fiscal constraints.
17.This Agreement contains the entire agreement between the parties and there are no
understandings or agreements, verbal or otherwise, regarding this Agreement except as expressly
set forth herein.
18. The parties hereby acknowledge that the individual executing the Agreement on their behalf is
authorized to execute this Agreement on their behalf and to bind the respective entities to the
terms contained herein and that he has read this Agreement, conferred with his attorney, and fully
understands its contents.
19. A copy or facsimile copy of the signature of any party shall be deemed an original with each fully
executed copy of the Agreement as binding as an original, and the parties agree that this
Agreement can be executed in counterparts, as duplicate originals, with facsimile signatures
sufficient to evidence an agreement to be bound by the terms of the Agreement.
20.By Executive Order 24, issued by Governor Perdue, and N.C. G.S.§ 133-32, it is unlawful for any
vendor or contractor( i.e. architect, bidder, contractor, construction manager, design professional,
engineer, landlord, offeror, seller, subcontractor, supplier, or vendor), to make gifts or to give
favors to any State employee of the Governor's Cabinet Agencies (i.e., Administration,
Commerce, Environmental Quality, Health and Human Services, Information Technology, Military
and Veterans Affairs, Natural and Cultural Resources, Public Safety, Revenue, Transportation,
and the Office of the Governor).
IT IS UNDERSTOOD AND AGREED upon that the approval of the Project by the Department is
subject to the conditions of this Agreement.
Agreement ID#8985 5
IN WITNESS WHEREOF, this Agreement has been executed, in duplicate, the day and year
heretofore set out, on the part of the Department and the County by authority duly given.
L.S. ATTEST: PENDER C UNT
BY: BY: —
TITLE: CAuL Ab Va 6OGIY TITLE:
DATE: _ k ``�Qj �awo� DATE:—A\11a 1.0
N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State
Employee of any gift from anyone with a contract with the State, or from any person seeking to do
business with the State. By execution of any response in this procurement, you attest, for your entire
organization and its employees or agents, that you are not aware that any such gift has been offered,
accepted, or promised by any employees of your organization.
This Agreement has been pre-audited in the manner
required by the Local Government Budget and
Fiscal Control Act.
BY:
oa { FINA CEOFFICER)
Federal Tax Identification Number
S U - U 0003�n
Remittance Address:
Ponder County
�0 f)ox 5
b�AM aj O, N)C_13
DEPARTMENT OF TRANSPORTATION
Docu igned by:
(CHIEF EN ERIY71ADDWNF8...
DATE: 1/27/2020
DS
APPROVED BY BOARD OF TRANSPORTATION ITEM O: _�L�7=Z1 � _ (Date
Agreement 0 #8985 6
ORANGE ORANGE COUNTY GOVERNMENT
COUNTY
TRANSPORTATION SERVICES DEPARTMENT
r: �•�...
i4[Jk`f Fi C:Ak(rL1NA - -. .....
Item 3.b.
Subject: Orange County Annual Work Program FY 24
Attachment: 1. Draft Annual Work Program FY 24
PURPOSE: To receive a presentation and provide comments on the Orange County Annual Work
Program (AWP).
BACKGROUND: In 2011, the Orange County Board of Commissioners (BOCC) authorized a
referendum for a half-cent sales tax to expand public transit in Orange County, the funding is
limited to public transit improvements identified in the Orange County Transit Plan approved by
the County, the GoTriangle Board, and the Durham-Chapel Hill-Carrboro Metropolitan Planning
Organization (DCHC MPO) Board. All three boards must approve any material changes and
amendments to the plan. This plan was recently updated due to the discontinuation of the
Durham-Orange Light Rail Transit project in 2019.
An Interlocal Implementation Agreement(ILA)approved by the three boards in 2013 outlines the
roles and responsibilities of each agency for the administration of the funding. It does not
specifically address the development of the annual Work Program. A new ILA was approved by
Orange County BOCC February 2023.The new ILA provides a specific process for the development
of the Work Program including approval by the BOCC ahead of approval by the GoTriangle Board.
The Staff Working Group(SWG) met on February 15th and released the draft FY24 Work Program
for public comment. DCHC MPO currently serves as the Staff Working Group administrator.
Orange County is represented on the SWG by Nishith Trivedi,Transportation Director,with Travis
Myren, Deputy County Manager as the alternate. The DCHC MPO and GoTriangle staff are also
represented on the SWG.
With the approval of the Orange County Transit Plan and ILA, both with a desire to get projects
implemented quickly. Several of those bus operating projects were approved with the FY23 Work
Program, and, unfortunately, additional bus operating improvements and expansions for Orange
County specific projects are not included, with the exception of Mobility-on-Demand. Any new
FY24 Work Program County projects would require an amendment to the Orange County Transit
Plan. If Transit Plan and Work Program approvals take place concurrently, no additional
amendment approval will be necessary. If not, a Transit Plan Amendment would need to be
approved by the BOCC.
When the public comment period closes on March 28, 2023,the SWG Administrator will compile
comments and propose any changes.The final FY24 Work Program will be presented for approval
by the BOCC in April and then by the GoTriangle Board as part of its annual budget process in
June.
600 Hwy 86 N • Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
FINANCIAL IMPACT: Orange County receives quarterly reimbursements from Go Triangle for all
Orange County specific projects approved in the AWG. Orange County does not receive any funds
where local jurisdictions are the project sponsor (e.g. Hillsborough, Chapel Hill, Carrboro and
Mebane).
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this
item:
GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or color; religious
or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background;
age; military service; disability; and familial, residential or economic status.
GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary for
residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is
applicable to this item:
CLEAN OR AVOIDED TRANSPORTATION
Implement programs that monitor and improve local and regional air quality by: 1) promoting
public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3)
otherwise minimizing the need for travel.
ACTION
Provide comments
Attachment 1
GO FORWARD
A COMMUNITY INVESTMENT IN TRANSIT
low-
ORANGE COUNTY
FY24 TRANSIT WORK PROGRAM
DURHAM CHAPEL HILL - CARRBORO
ORANGE COUNTY C H C
NORTH CAROLINA METROPOLITAN PLANNING ORGANIZATION
PLANNING TOMORROW'S TRANSPORTATION
GO Triangle
SUMMARY
The FY24 Work Program balances the careful use of taxpayer dollars with planned transit investments.
While previous Work Programs focused on completing projects included in the 2017 Orange Transit Plan,
the FY24 Work Program looks to initiate new services identified in the current draft Durham County Transit
Plan. Even with the new services, FY24 continues operating improvements for Durham transit users:
• Additional service on Chapel Hill Transit routes A, CM, CW, D, F, HS, J, and NS
• Additional service on GoTriangle routes 400, 405, 800, CRX and ODX
• Continuation of the Hillsborough Circulator
• Expansion of GoTriangle Paratransit service
In addition to the above services, most of which have been provided for many years, there are some
relatively new operating services that will continue in FY24:
• The Hillsborough Amtrak Train Station and co-located bus stop
• An annual installment for replacement bus purchases
The primary capital improvement in the FY24 Work Program remains the Chapel Hill Transit North-South
Bus Rapid Transit (N-S BRT) project. Funding is available in FY24 and beyond to continue the planning,
design, and construction for this project. In addition to the N-S BRT, the following capital projects are
funded:
• The Hillsborough Amtrak Train Station and co-located bus stop
• Design for a new Regional Transit Facility to serve the Triangle
• An annual installment for replacement bus purchases
• Vehicle acquisition and replacement
• Regional Fleet and Facilties Study Implementation - Nelson Road
FY 2024 expenditures balance with revenues, primarily due to significant sales tax revenue growth. The
North-South BRT project implements an important transit plan capital investment.
PROJECTED
'/2 Cent Sales Tax $9,500,000
Vehicle Rental Tax $739,941
$3 Registration Fee $358,222
$7 Registration Fee $831,178
TOTAL $11,429,341
PROPOSED
Transit Infrastructure $11,036,000
Vehicle Acquisition $121,160
BRT $4,000,000
TOTAL $5,248,160
PROPOSEDOPERATING
Transit Plan Administration $629,245
Transit Operations $5,203,218
Tax District Administration $321,253
TOTAL $6,153,716
PROJECTEDDURHAM CAPITAL FUND BALANCE
Fund Balance projected at end of FY 2023 —$4,000,000
Proposed FY 24 Fund Balance Transfer $27,465
TOTAL —$4,027,465
This proposed work plan designates funding to five (5) agencies in FY24: Orange County/OPT, Chapel
Hill/CHT. Hillsborough, GoTriangle, and the DCHC MPO. Programmed expenditures by agency:
PROPOSED
Orange County/OPT $1,262,203
Chapel Hill/CHT $6,847,385
GoTriangle $2,966,482
Town of Hillsborough $286,000
Durham-Chapel Hill-Carrboro MPO $39,806
TOTAL $11,401,876
BACKGROUND
The governing boards of GoTriangle, DCHC MPO, and the Orange County Board of Commissioners
adopted the first Bus and Rail Investment Plan in 2012, prior to the referendum on the transit sales tax.
Following adoption of the transit sales tax referendum and passage of the Orange County transit sales tax
referendum in 2012,an Interlocal Agreement(ILA)was adopted by the three parties in 2013.The ILA guides
the overall implementation of the four transit tax funds and the expanded transit network they are used to
fund. The ILA also created the Staff Working Group (SWG), comprised of staff from the three ILA parties.
�
ORANGE
COUNTY
NORTH CAROLINA
bTransit
D F?-IAM CHAPEL HfLI. CARRODRO
DCHC Triangle
I+-TROPOL LAM PLANMMG ORGAMIATLON
Per the ILA, the SWG is charged with producing a recommended Orange Annual Transit Work Program
(Work Program), comprised of annual operating and capital budgets, including future assumptions of
spending on those operating and capital projects. This Draft FY24 Work Program operates under the
current Orange Transit Plan and anticipates a 2023 adopted Orange Transit Plan by the GoTriangle Board
of Trustees, the DCHC MPO Board, and the Orange County Board of Commissioners. The Draft FY24
Work Program incorporates high-priority projects identified through the planning process for the new
Durham County Transit Plan. Those projects that require an amendment to the 2017 Plan, per the existing
ILA, will undergo that process prior to adoption of the FY24 Work Program.
There is a process underway to examine the ILA and make recommendations for amendments. It is likely
that a new ILA will be adopted and in place for the FY24 Work Program.
FY 2024 DRAFT ORANGETRANSIT WORK PROGRAM
FY 2024 REVENUES
A total of$11.4 million in expected revenues is budgeted in the FY24 Work Program from the four funding
sources available to the transit tax district, as provided in NC law. The largest source of funds is the half-
cent local option sales tax. Administered by GoTriangle, the local sales tax went into effect in 2013. The
total amount of expected revenue in FY24 from the half-cent sales tax for Orange County is$9.5 million. In
addition to the half-cent sales tax, the FY24 Work Program has three other revenue sources: A portion of
the 5% vehicle rental tax that is apportioned to Orange County; $740k is projected for FY24. A $3 county
vehicle registration fee; $358,222 is projected for FY24. A$7 county vehicle registration fee to fund public
transportation systems; $831,178 is projected for FY24.
FY 2024 EXPENDITURES
The expenditures described below are divided between operations (including administration), and capital.
Projected Operations Expenditures: $6,153,716 million
New Operations Projects: $264,945
The FY23 Work Program continues all service enhancements from the 2017 Orange Transit Plan and have
been funded in previous work programs, with no cuts to existing operations. These operations projects
include additional service (above 2013 levels) on the following Chapel Hill Transit (highlighted in blue),
Orange Public Transit (highlighted in Orange), and GoTriangle (highlighted in green) routes:
• CHT A • CHT CM
• CHT CW • CHT D
• CHT F • CHT HS
• CHT J • CHT JS
• Hillsborough Circulator • Mobility On-Demand
• Route 400 • Route 405
• Route 800 • ODX
• CRX
cm
nQr,
u rh am
pe
rn
® Regional Transit Facility
O Hillsborough Train Station e
CHT Improved Routes
CHT INS BRT
OPT Improved Route
----GoTriangle Improved Routes
Esd,HERE,Garmin,JcJ OpenStreetMap conlri hutors.and the GIs user community
In addition to these route-specific improvements, beginning with funding in FY21, Chapel Hill Transit
expanded services throughout its system on Saturdays and Sundays, including expansion of the on-
demand EZ Rider service. More information on each of the operations improvements are available in the
project sheets later in this document.
Nationwide, there has been a shortage of bus operators which has required service reductions in both
Orange and Durham counties. Chapel Hill Transit will focus on returning to normal operations once a full
staffing of bus operators can be achieved prior to any route expansion.
Included as part of the operations budget, administrative services for the transit plan and the transit tax
district are provided by GoTriangle, Orange County, and the Durham-Chapel Hill-Carrboro Metropolitan
Planning Organization (DCHC MPO). The total programmed budget for administrative services in FY24 is
$893,470. Ongoing administrative services increased by 2.5 percent from FY23,which is the standard cost
of living increase for all projects year over year. Administrative costs are broken out into two distinct
functions: transit plan administration and transit tax district administration.
Administration of the transit plan is conducted by two entities: GoTriangle and Orange County. GoTriangle
provides transit planning, public outreach, and legal and administrative support services. Furthermore, the
necessary oversight and administration of GoTriangle's capital and operating projects are handled through
transit plan administration. Orange County hosts the Staff Working Group (SWG) administrator, who is
responsible for coordination of the SWG, which includes staff representatives for the three parties to the
ILA and makes recommendations on budget issues,oversees implementation of the transit plan and annual
work program,and prepares the draft annual work program for adoption.The SWG administrator also drafts
the work program and other supporting documents for the SWG. The total budgeted for transit plan
administration in FY24 is $628,525.
GoTriangle staff manage the financial aspects of the Orange Transit Tax District. In addition to managing
the budgets and reimbursements as called for in the annual work programs, Orange Transit Tax District
staff handle all fiduciary responsibilities for the Orange Transit Plan as a whole, including financial modelling
for the development of the new Orange Transit Plan.The total budgeted for transit tax district administration
is $321,253. This amount includes a request from GoTriangle for an additional 0.25 FTE (1/4 of the cost of
an additional staff member)to improve the services and responsiveness of tax district administration.
Projected Capital Expenditures: $5,248,160
The capital projects budgeted in FY24 are in three categories: bus rapid transit(BRT),transit infrastructure,
and vehicle acquisition. More detail on each project can be found in the project sheets at the end of this
document.
Funding continues for development of Chapel Hill Transit's North-South Bus Rapid Transit (N-S BRT)
project, which will provide service from the Eubanks park-and-ride lot to Southern Village, also serving
downtown Chapel Hill and the UNC campus and hospital. In FY24, $4,000,000 is designated for N-S BRT.
Transit infrastructure accounts for$1,036,000 of planned capital expenditure in FY24. This funding is split
between two projects: the new train station in Hillsborough and Orange County's share of funds for design
of a new regional Research Triangle Park transit facility. Funding for the new Hillsborough train station has
been expected since the current Orange Transit Plan inception in 2017.
The remaining capital funds for FY23, $212,160, is an annual contribution to future purchases of
replacement vehicles for service supported by the transit tax. The useful life of a bus ranges from 10-15
years, and bus purchases for operations that are funded by the Orange Transit Tax Fund are an eligible
expense. GoTriangle is introducing a new methodology for vehicle acquisition planning in FY23. Rather
than setting aside a large amount of funds in the year in which the vehicles are to be ordered, making it
difficult to make any other capital improvements in that year, instead GoTriangle is beginning a "level
buying" program, in which a set amount of money is set aside each year for future purchases.
The proposed FY24 work program will shift at least$27,465 to a fund balance account projected to contain
about$4M dollars at the end of FY 2023.
FY24 Triangle Transit Tax District: Orange County
...
Revenues
Tax District Revenues
Article 43 Half-Cent Sales and Use Tax $ 9,500,000
Article 50 Five-Percent Vehicle Rental Tax $ 739,941
Article 51 Three-Dollar Increase to Regional Vehicle Registration Fee $ 358,222
Article 52 Seven-Dollar County Vehicle Registration Fee $ 831,178
Total Revenues $ 11,429,341
Expenditures
Tax District Administration
Staff Costs $ 192,000
Support Services $ 129,253
Transit Plan Administration
DCHC MPO $ 39,806
Orange County/OPT $ 61,100
GoTriangle $ 528,339
Transit Operations
GoTriangle $ 1,154,730
Orange County/OPT $ 1,201,103
Chapel Hill/CHT $ 2,847,385
Total FY24 Operating Allocation $ 6,153,716
Transit Infrastructure
GoTriangle $ 750,000
Town of Hillsborough $ 286,000
Vehicle Acquisition
GoTriangle $ 212,160
BRT
Chapel Hill/CHT $ 4,000,000
Total FY24 Capital Allocation $ 5,248,160
Total FY24 Workplan Programmed Expenditure* $ 11,401,876
Allocation To Fund balance $ 27,465
Total Programmed Expenditures* $ 11,429,341
Revenues over Expenditures $ -
* NOTE: Prior year carryover to be calculated in May 2023
FY24 Orange County Transit Plan: Operating
Orange County Orange County/ Total Orange County
Transit Tax District DCHC MPO GoTriangle OPT pol Chapel Hill CHT Transit Plan:Operating
Operating
Revenues
Tax District Revenues
Article 43 Half-Cent Sales and Use Tax $ 4,224,375 $ 4,224,375
Article 50 Five-Percent Vehicle Rental Tax $ 739,941 $ 739,941
Article 51 Three-Dollar Increase to Regional Vehicle Registration Fee $ 358,222 $ 358,222
Article 52 Seven-Dollar County Vehicle Registration Fee $ 831,178 $ 831,178
Allocations from Tax District Revenues to Agencies
Transit Plan Administration $ 39,806 $ 528,339 $ 61,100 $
Transit Operations $ - $ 1,154,730 $ 1,201,103 $ 2,847,385
Total Revenues $ 6,153,716 $ 39,806 $ 1,683,069 $ 1,262,203 $ 2,847,385 $ 6,153,716
Expenditures
Tax District Administration
Tax District Administration-Financial Oversight Staff $ 192,000 $ - $ - $ - $ - $ 192,000
Tax District Administration-Financial Oversight-Support Services(0) $ 77,388 $ $ $ $ $ 77,388
Tax District Administration-Audit Services $ 8,200 $ $ $ $ $ 8,200
Tax District Administration-Financial Services $ 43,665 $ $ $ $ $ 43,665
Transit Plan Administration
Transit Plan Administration-Program Management Staff $ - $ $ 25,625 $ $ $ 25,625
Transit Plan Administration-Project Implementation Staff $ - $ $ 173,533 $ $ $ 173,533
TPA-Transit Planning -Support Services $ $ $ 32,390 $ $ $ 32,390
TPA-Legal and Real Estate-Support Staff $ $ $ 120,697 $ $ $ 120,697
TPA-Marketing,Communication and PE-Support Staff $ $ $ 53,505 $ $ $ 53,505
TPA-Marketing,Communication and PE-Support Services $ $ $ 32,390 $ $ $ 32,390
TPA-Regional Technology and Administration-Support Staff $ $ $ 78,310 $ $ $ 78,310
Customer Surveys $ $ $ 11,890 $ $ $ 11,890
Orange County Staff Working Group Participation $ 39,806 $ - $ $ $ 39,806
Transit Plan Administration(SWG Administrator) $ $ - $ - $ 61,100 $ $ 61,100
Transit Operations
Route 800 Improvements $ $ $ 430,262 $ - $ $ 430,262
Route 400 Improvements $ $ $ 368,812 $ $ $ 368,812
Route ODX $ $ $ 201,530 $ $ $ 201,530
Route CRX Improvements $ $ $ 69,379 $ $ $ 69,379
Route 405 Improvements $ $ $ 23,237 $ $ $ 23,237
Paratransit expansion $ $ $ 23,893 $ $ $ 23,893
Youth Gopass $ $ $ 18,143 $ $ $ 18,143
Fare Collection Improvements(0) $ $ $ 19,475 $ $ $ 19,475
Service Expansion $ $ $ - $ $ 1,742,418 $ 1,742,418
Increased Cost of Existing Services $ $ $ $ $ 745,553 $ 745,553
CW Route- Improve mid-day service $ $ $ $ $ 195,375 $ 195,375
HS Route-Weekend service $ $ $ $ $ 164,039 $ 164,039
Continuation of Transit Services $ $ $ $ 415,686 $ - $ 415,686
Increase Cost of Existing Services(ICES) $ $ $ $ 40,697 $ $ 40,697
Hillsborough Circulator Expansion $ $ $ $ 361,920 $ $ 361,920
OPT Mobility on Demand $ $ $ $ 382,800 $ $ 382,800
Allocations from Tax District Revenues to Agencies
Transit Plan Administration $ 629,245
Transit Operations $ 5,203,218 -
Total Expenditures $ 6,153, $6 $ 39,806 $ 1,683,069 $ 1,262,203 $ 2,847,385 $ 6,153,716
Revenues over Expenditures $ $ - $ - $ - $ - $ -
FY24 Orange County Transit Plan: Capital
Orange County Transit GoTriangle Chapel Hill/CHT TownofHillsborough Total Orange County
�Mm "Wax District Capital Transit Plan:Capital
Revenues
Tax District Revenues
Article 43 1/2 Cent Local Option Sales Tax $ 5,275,625 $ 5,275,625
Allocations from Tax District Revenues to Agencies
Bus Rapid Transit(BRT) $ - $ 4,000,000 $ -
Transit Infrastructure $ 750,000 $ - $ 286,000
Vehicle Acquisitions $ 212,160 $ - $ -
Total Revenues $ 5,275,625 $ 962,160 $ 4,000,000 $ 286,000 $ 5,275,625
Expenditures
Bus Rapid Transit(BRT)
North South BRT Supplemental $ - $ - $ 4,000,000 $ - $ 4,000,000
Transit Infrastructure
New Regional Transit Facility(Orange County share) $ $ 350,000 $ - $ $ 350,000
Orange County Bus Stop Improvements $ $ 50,000 $ $ $ 50,000
Regional Fleet and Facilties Study Implementation-Nelson Road $ $ 350,000 $ $ $ 350,000
Hillsborough Train Station $ $ - $ $ 286,000 $ 286,000
Vehicle Acquisitions
Vehicle acquisition and replacement $ $ 212,160 $ $ - $ 212,160
Allocations from Tax District Revenues to Agencies
Bus Rapid Transit(BRT) $ 4,000,000
Transit Infrastructure $ 1,036,000
Vehicle Acquisitions $ 212,160
Allocation to Capital Fund Balance $ 27,465 $ 27,465
Total Expenditures $ 5,275,625 $ 962,160 $ 4,000,000 $ 286,000 $ 5,275,625
Revenues over Expenditures 1 $ $ - $ - $ $
Orange Transit Work Plan-FY24 Workplan Summary
Orange Workplan - Operating
Aaencv FY 2023 Adopted FY 2024 Submission
DCHC MPO $59,600 $39,806
GoTriangle $1,870,690 $2,004,322
Orange County/OPT $956,441 $1,262,203
Chapel Hill/CHT $2,622,453 $2,847,385
Total •.- 0•
Tax District Administration $276,850 $321,253
Transit Plan Administration $548,573 $629,245
Transit Operations $4,683,761 $5,203,218
Total •. .. .. 09
Total Operating $5,509,184 $6,153,716
Total Capital $6,876,977 $5,248,160
TOTALOrange Workplan : . $11,401,876
Agency Workplan Project ID Project Description Category FY 2023 Adopted FY 2024 Submission
DCHC MPO 19MPO_AD1 Staff Working Group Administrator Transit Plan Administration 59,600 -
DCHC MPO 24MPOAD1 Orange County Staff Working Group Participation Transit Plan Administration - 39,806
GoTriangle 21GOTAD1 Tax District Administration-Financial Oversight Staff Tax District Administration 150,750 192,000
GoTriangle 21 GOTAD11 Tax District Administration-Financial Oversight-Support Services(0) Tax District Administration 75,500 77,388
GoTriangle 21 GOTAD12 Tax District Administration-Audit Services Tax District Administration 8,000 8,200
GoTriangle 21GOTAD13 Tax District Administration-Financial Services Tax District Administration 42,600 43,665
GoTriangle 20GOTAD2 Transit Plan Administration-Program Management Staff Transit Plan Administration 25,000 25,625
GoTriangle 21GOTAD3 Transit Plan Administration-Project Implementation Staff Transit Plan Administration 169,300 173,533
GoTriangle 20GOTAD13 TPA-Transit Planning -Support Services Transit Plan Administration 31,600 32,390
GoTriangle 21 GOTAD4 TPA-Legal and Real Estate-Support Staff Transit Plan Administration 91,273 120,697
GoTriangle 21GOTAD5 TPA-Marketing,Communication and PE-Support Staff Transit Plan Administration 52,200 53,505
GoTriangle 21GOTAD12 TPA-Marketing,Communication and PE-Support Services Transit Plan Administration 31,600 32,390
GoTriangle 21 GOTAD6 TPA-Regional Technology and Administration-Support Staff Transit Plan Administration 76,400 78,310
GoTriangle 19GOT002 Customer Surveys Transit Plan Administration 11,600 11,890
GoTriangle 20GOT_TS2 Route 800 Improvements Transit Operations 419,768 430,262
GoTriangle 20GOT_TS3 Route 400 Improvements Transit Operations 359,817 368,812
GoTriangle 20GOT_TS5 Route ODX Transit Operations 196,615 201,530
GoTriangle 20GOT_TS6 Route CRX Improvements Transit Operations 67,687 69,379
GoTriangle 20GOT_TS9 Route 405 Improvements Transit Operations 22,670 23,237
GoTriangle 19GOT_TS8 Paratransit expansion Transit Operations 23,310 23,893
GoTriangle 21 GOT_001 Youth Gopass Transit Operations 5,000 18,143
GoTriangle 21GOT_002 Fare Collection Improvements(0) Transit Operations 10,000 19,475
Orange County/OPT 19OPTTS1 Continuation of Transit Services Transit Operations 398,963 415,686
Orange County/OPT 190PTTS2 Increase Cost of Existing Services(ICES) Transit Operations 40,697 40,697
Orange County/OPT 20OPTTS4 Hillsborough Circulator 2.0(Combined) Transit Operations 40,915 361,920
Orange County/OPT 20OPTTS5 Hillsborough Circulator II Transit Operations 302,186 -
Orange County/OPT 20OPTTS6 OPT Mobility on Demand Transit Operations 173,680 382,800
Orange County/OPT 240PTTS1 Transit Plan Administration(SWG Administrator) Transit Plan Administration - 61,100
Chapel Hill/CHT 24CHTTS1 HS Route-Weekend service Transit Operations - 164,039
Chapel Hill/CHT 19CHTTS2 Increased Cost of Existing Services(ICES) Transit Operations 745,553 745,553
Chapel Hill/CHT 22CHTTS1 Chapel Hill Transit Service Expansion FY13-21 Transit Operations 1,699,900 1,742,418
Chapel Hill/CHT 23CHTTS1 CW Route- Improve mid-day service Transit Operations 177,000 195,375
•. 5,509,184
*FY23 Adopted Amount includes FY22 Actual Carryover&YTD Amendments
Orange Transit Work Plan-FY24 WoLkplan Surnmaa
Orange Workplan - Capital
Agency FY 2023 Adopted' FY 2024 Submission
GoTriangle $1,720,357 $962,160
Orange County/OPT $1,011,965 $0
Chapel Hill/CHT $2,399,204 $4,000,000
TownofCarrboro $1,345,452 $0
TownofHillsborough $400,000 $286,000
Total Capital(Agency)
.�
Agency FY 2023 Adopted' FY 2024 Submission
Transit Infrastructure $3,748,031 $1,036,000
Vehicle Acquisition $562,013 $212,160
BRT $1,812,500 $4,000,000
LRT $144,920 $0
Capital Planning $609,514 $0
Total Capital(Appropriation Category) $6,876,977 i
Total Operating $5,509,184 $6,153,716
Total Capital $6,876,977 $5,248,160
TOTAL Orange Workplan $12,386,161 $11,401,876
Agency Workplan Project ID Proiect Description Category FY 2023 Adopted* FY 2024 Submission
GoTriangle 19GOTC01 ERP System-Transit Plan Capital Planning 133,138
GoTriangle 20GOTCD2 Light Rail Transit LRT 144,920
GoTriangle 18GOTCD8 Hillsborough Park and Ride Transit Infrastructure 56,878
GoTriangle 18GOTCD11 Mebane Bus Stop Improvement Transit Infrastructure 233 -
GoTriangle 18GOTCD12 Bus Stop Improvements(Orange County) Transit Infrastructure 246,140 50,000
GoTriangle 20GOTCD3 Mobile Ticket Validators-Orange share(includes Route 420) Transit Infrastructure 19,271 -
GoTriangle 21GOT_VP1 Vehicle acquisition and replacement Vehicle Acquisition 562,013 212,160
GoTriangle 21GOT_COl Origin Destination Survey Capital Planning 250,000 -
GoTriangle 21 GOT_CO2 GoTriangle Short Range Transit Plan Capital Planning 14,734
GoTriangle 21 GOT_CO3 Transit Facilities Study Capital Planning 33,030
GoTriangle 22GOTCD2 Priority Transit Access Improvements Transit Infrastructure 20,000 -
GoTriangle 23GOTCD4 New Regional Transit Facility(Orange County share) Transit Infrastructure 240,000 350,000
GoTriangle 23GOTCD2 Regional Fleet and Facilties Study Implementation-Nelson Road Transit Infrastructure - 350,000
Orange County/OPT 20OPT_AD2 Planning for new Transit Plan Capital Planning 135,539 -
Orange County/OPT 19OPTAD1 OPT AVL Capital Planning 43,073
Orange County/OPT 20OPTCD1 OPT Bus Stop Signs Transit Infrastructure 1,594
Orange County/OPT 20OPTCD2 Hillsborough Park and Ride Transit Infrastructure 800,000
Orange County/OPT 190PTCD1 OPT Bus Stop Improvements(five stops) Transit Infrastructure 31,759
Chapel Hill/CHT 19CHTCD1 North-South BRT BRT 1,812,500 -
Chapel Hill/CHT 20 CHTCD1 North South BRT Supplemental BRT - 4,000,000
Chapel Hill/CHT 19CHTCD2 CHT ADA Bus Stop Upgrades Transit Infrastructure 448,815 -
Chapel Hill/CHT 20CHTCD1 Lighting in Bus Shelters Transit Infrastructure 53,148
Chapel Hill/CHT 20CHTCD2 Bus Stop Sign and Design Replacement Transit Infrastructure 84,741
TownofCarrboro 18TOCCD1 Estes Drive Bike-Ped Improvements Transit Infrastructure 252,373
TownofCarrboro 18TOCCD2 Estes Drive Transit Access Corridor Study Transit Infrastructure 106,296
TownofCarrboro 18TOCCD4 Morgan Creek Greenway Transit Infrastructure 357,862
TownofCarrboro 18TOCCD5 South Greensboro Street Sidewalk Transit Infrastructure 478,921
TownofCarrboro 20TOCCD01 Carrboro HAWK Signal Transit Infrastructure 150,000 -
TownofHillsborough 18TOHCD1 Hillsborough Train Station Transit Infrastructure 400,000 286,000
Total Capital By Project 6,876,977 .0
*FY23 Adopted Amount includes FY22 Actual Carryover&YTD Amendments
FY24 WORK PLAN SUMMARY
PROJECT SHEETS
Operating Cost Requests
Project Category Project ID Project Description FY24 FY25
Tax District Administration 21GOT AD1 Tax District Administration - Financial Oversight Staff $192,000 $196,800
Tax District Administration 21GOT AD11 Tax District Administration - Financial Oversight-Support Services (0) $77,388 $79,322
Tax District Administration 21GOT AD12 Tax District Administration -Audit Services $8,200 $8,405
Tax District Administration 21GOT AD13 Tax District Administration - Financial Services $43,665 $44,757
Transit Plan Administration 19GOT 002 Customer Surveys $11,890 $12,187
Transit Plan Administration 20GOT AD2 Transit Plan Administration - Program Management Staff $25,625 $26,266
Transit Plan Administration 20GOT AD13 TPA-Transit Planning -Support Services $32,390 $33,200
Transit Plan Administration 21GOT AD3 Transit Plan Administration - Project Implementation Staff $173,533 $177,871
Transit Plan Administration 21GOT AD4 TPA- Legal and Real Estate-Support Staff $120,697 $123,714
Transit Plan Administration 21GOT AD5 TPA- Marketing, Communication and PE-Support Staff $53,505 $54,843
Transit Plan Administration 21GOT AD6 TPA- Regional Technology and Administration -Support Staff $78,310 $80,268
Transit Plan Administration 21GOT AD12 TPA- Marketing, Communication and PE-Support Services $32,390 $33,200
Transit Plan Administration 24MP0 AD1 Orange County Staff Working Group Participation $39,806 $40,801
Transit Plan Administration 240PT TS01 Orange County Staff Work Group Administration $61,100 $62,628
Bus Operations 19CHT TS2 Increased Cost of Existing Services (ICES) $745,553 $764,192
Bus Operations 19GOT TS8 Paratransit expansion $23,893 $24,528
Bus Operations 190PT TS1 Continuation of Transit Services $415,686 $535,050
Bus Operations 190PT TS2 Increase Cost of Existing Services (ICES) $40,697 $70,501
Bus Operations 20GOT TS2 Route 800 Improvements $430,262 $441,699
Bus Operations 20GOT TS3 Route 400 Improvements $368,812 $378,616
Bus Operations 20GOT TS5 Route ODX $201,530 $206,887
Bus Operations 20GOT TS6 Route CRX Improvements $69,379 $71,223
Bus Operations 20GOT TS9 Route 405 Improvements $23,237 $23,855
Bus Operations 20OPT TS4 Hillsborough Circulator 2.0 $361,920 $370,968
Bus Operations 20OPT TS6 OPT Mobility on Demand $382,800 $445,875
Bus Operations 21GOT 001 Youth Gopass $18,143 $18,596
Bus Operations 21GOT 002 Fare Collection Improvements (0) $19,475 $19,962
Bus Operations 22CHT TS1 Service Expansion $1,742,418 $1,784,916
Bus Operations 123CHT TS1 CW Route - Improve mid-day service $195,375 $200,300
Bus Operations 24CHT TS1 IHS Route-Weekend service $164,039 $168,100
Total Operating Costs $6,153,716 $6,499,530
Revised Request New Request
Capital Cost Requests
Project Category Project ID Project Description FY24 FY25
Transit Infrastructure 18GOT CD12 Orange County Bus Stop Improvements $50,000 $0
Transit Infrastructure 18TOH_CD1 Hillsborough Train Station $286,000 $0
Bus Rapid Transit 20CHT CD1 North South BRT Supplemental $4,000,000 $4,000,000
Vehicle Acquisition 22GOT VP1 Vehicle acquisition and replacement $212,160 $220,646
Transit Infrastructure 23GOT CD2 Regional Fleet and Facilities Study Implementation - Nelson Road $350,000 $0
Transit Infrastructure 23GOT CD4 lNew Regional Transit Facility(Orange County Share) 1 $350,000 1 $700,000
Total Capital Costs $5,248,160 $4,920,646
Revised Request New Request
TAX DISTRICT ADMINISTRATION
PROJECT SHEETS
Project 1 21GOT_AD1 Project Tax District Project Staffing
Category Administration Subcategory
Project Description Project
The project request is a continuation of on-going operat- Project Title Tax District Administration -
ing and consolidation of 19GOT_AD1 and 2000T_AD1 Financial Oversight Staff
submissions approved in previous work plans with a re- Agency GoTriangle
vised project name of Tax District Administration Financ
Team. FY24 Costs $192,000
Financial oversight staff to the Orange Transit Plan for
a total of 1.0 FTE. In FY24 the roles will continue im-
prove financial policies, provide financial analysis for the Programmed $196,800
Costs
new Transit plan development including the commuter Cost
rail project, and process quarterly reimbursements and Start Date July 2018
reporting. The 1.0 FTEs will also be responsible for
producing annual operating and capital budgets and ordi-
nances (and amendments thereto), updating the Orange
Transit financialplan/model, annual financial reports, co-
ordinating integration of proposed plans into the budget,
monitoring spending to ensure the Orange transit budget
stays balanced. The team will also navigate and lead the
process of debt issuance, transit fund revenue investing
and the year end financial audit for the Orange Transit
Plan.
DRAFT
FEBRUARY 15, 2023
Project 1 21GOT_AD11 Project Tax District Project Administrative
Category Administration Subcategory Expenses
Project Description Project
The project request splits 21 GOT_AD11 into more Project Title Tax District Administration -
specific detail. This project incorporates the equivalent Financial Staff- Support Services
of 0.6FTE's from the finance and administration sup- Agency GoTriangle
port staff functions.These functions include transit plan
accounting, audit/ACFR process and supervision, fund FY24 Costs $77,388
investments, revenue and recollection, project sponsor
payments and receivables and other additional miscel-
laneous financial support services to the Orange Transit Programmed $79,322
Costs
Plan. Cost
Start Date July 1, 2018
DRAFT
FEBRUARY 15, 2023
Project 1 21GOT_AD12 Project Tax District Project Administrative
Category Administration Subcategory Expenses
Project Description Project
The project request splits 21 GOT_AD11 into more Project Title Tax District Administration -Audit
specific detail. This project incorporates the equivalent Services
of 0.6FTE's from the finance and administration sup- Agency GoTriangle
port staff functions.These functions include transit plan
accounting, audit/ACFR process and supervision, fund FY24 Costs $8,200
investments, revenue and recollection, project sponsor
payments and receivables and other additional miscel-
laneous financial support services to the Orange Transit Programmed $8,405
Costs
Plan. Cost
Start Date July 1, 2018
DRAFT
FEBRUARY 15, 2023
Project 1 21GOT_AD13 Project Tax District Project Administrative
Category Administration Subcategory Expenses
Project Description Project
The project request splits 21 GOT_AD11 into more specif.4 Project Title Tax District Administration -
ic detail. This project incorporates the funds allocated for Financial Services
financial consulting and bank service charges. Agency GoTriangle
FY24 Costs $43,665
FY25 Programmed $44,757
Costs
Start Date July 1, 2018
DRAFT
FEBRUARY 15, 2023
TRANSIT PLAN ADMINISTRATION
PROJECT SHEETS
Project Owl 19GOT 002 Project Transit Plan Project Administrative
Category Administration Subcategory Expenses
Project Description Project
GoTriangle will use these funds to continue the develop- Project Title Customer Surveys
ment and implementation of annual transit customer sur-
veys that help to continually evaluate user experiences Agency GoTriangle
as additional services are implmented. Routes surveyed
include the 400, 405, 800, 805, CRX, and the ODX, all of FY24 Costs $11,890
which provide service to Orange County.
FY25 Programmed $12,187
Costs
Start Date July 2018
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_AD2 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
The project request is a continuation of on-going openj Project Title Transit Plan Administration -
ating: Specifically consolidation Program Management Program Management Staff
functions from 2000T AD2 support services submis- Agency GoTriangle
sions approved in the FY20 Workplan.
GoTriangle will continue to allocate 0.1 FTE of GoTriangl FY24 Costs $25,625
program management staff to the Orange Transit Plan.
In FY24, this staffing will provide oversight and program
management support for GoTriangle's bus facilities and Programmed $26,266
Costs
bus stop amenities planning and development programs Cost
and oversight and program management support for Start Date July 2020
GoTriangle's efforts in support of the Orange Transit
Plan update. Specific tasks includes oversight of project
planning; oversight of project scope, schedule, and bud-
get development and monitoring; oversight of quarterly
reporting; and supervision of GoTriangle's planning and
project delivery teams.
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_AD13 Project Transit Plan Project Contracted
Category Administration Subcategory Services
Project Description Project
The project request is a continuation of on-going oper- Project Title Transit Plan Administration
ating: Consolidation regional transit planning functions -Transit Planning - Support
from 20GOT_AD3 (support consultants)submissions Services
approved in FY20 Workplan Agency GoTriangle
GoTriangle is requesting reimbursement for on-going
support costs (including indirect costs)that benefit the Or-
ange County Tax District. The Support Consultant costs
are split 50% Durham and 50% Orange which include FY25 Programmed $33,200
regional contracts - DCHC Annual Contract and removal Costs
of the NCSU Transit Regional Model contracts. Start Date July 2018
DRAFT
FEBRUARY 15, 2023
Project ID 21 GOT_AD3 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
The project request is a continuation of on-going openj Project Title Transit Plan Administration -
ating: Specifically consolidation Project Implementation Project Implementation Staff
functions from 2000T AD2 support services submis- Agency GoTriangle
sions approved in the FY20 Workplan. FY21 request
is updated to reflect anticipated project implementation FY24 Costs $173,533
responsibilities in the county. 4
GoTriangle will continue to allocate 0.8 FTE for project
implementation activities for the Orange Transit Plan. Programmed $177,871
Costs
In FY24, this team will manage and execute planning, Cost
design, and construction management activities for Start Date July 2020
GoTriangle's bus facilities and bus stop amenities pro-
grams and participate in capital planning, coordination,
and support activities for the Orange Transit Plan update.
Specific tasks include but are not limited to project scope,
schedule, and budget development and monitoring;
quarterly reporting; and management of consultants and
contractors. Planning tasks: planning/prioritization for bus
stop and park-and-ride improvements; management and
technical consultant oversight; environmental planning
and coordination with regulatory agencies for federally
funded projects; and coordination to support CHT's N-S
BRT project. Design/Engineering/Architecture tasks: field
investigations, feasibility analysis, consultant oversight,
and technical support for bus stop and park-and-ride
improvements; design management, project coordina-
tion, and technical support for major facilities projects;
and feasibility analysis and implementation oversight for
BOSS. Construction Management tasks: project manage-
ment, contractor oversight, and construction inspection.
Project Coordination tasks: managing coordination with
GoTriangle's partners; facilitating productive partnering;
promoting schedule and budget adherence and fostering
timely conflict resolution. Project Controls Support tasks:
eBuilder administration; document management; contract
administration; project controls support including budget
and schedule monitoring, risk management support, and
reporting.
DRAFT
FEBRUARY 15, 2023
Project 1 21 GOT_AD4 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
Note: FY2024 - GoTriangle increased the FTE to 0.5 Project Title TPA- Legal and Real Estate -
(from 0.4), and the funding increased by—$19K due to Support Staff
the addition of 10% of a legal position and 6% of a facili- Agency GoTriangle
ties staff.
The project request is a continuation of on-going opera-
FY24 Costs $120,697
tions: Specifically, consolidation of legal and real estate
functions from 2000T AD2 support services submis- Programmed $123,714
Costs
sions approved in the FY20 Workplan. Cost
Funds will be allocated for GoTriangle to continue to Start Date July 2018
allocate 0.5 FTE of Legal and Real Estate - support staff
and miscellaneous administrative and related expenses
to the Orange Transit Plan.
• Legal and Real Estate services related to Hillsborough
Park-and-Ride
• Interlocal Agreements related to Transit Plan administra-
tion
• General counsel needs related to Public Records, Open
Meetings, Ethics, Contracts, and Procurement
• Other property issues requiring real estate acquisition
and management
• Property appraisals, Property Maintenance, Repairs,
Paratransit lease
• Legal Consulting expenses to include but not limited to
debt issuance, capital, and operating project support
DRAFT
FEBRUARY 15, 2023
Project 1113=1 21 GOT_AD5 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
The project request is a continuation of on-going operat- Project Title TPA- Marketing, Communication
ing: Specifically consolidation Marketing, Communication and PE - Support Staff
and Public Engagement functions from 20GOT_AD2 Agency GoTriangle
support services submissions approved in the FY20
Workplan FY24 Costs $53,505
GoTriangle is requesting funding for .5 FTEs that will be
dedicated to public engagement. The Public Engagement
Specialist will work under the Community Engagement Programmed $54,843
Costs
Manager, in the Communications & Public Affairs de-
partment at GoTriangle, directly collaborating with projet Start Date July 2018
teams to plan and execute public involvement activities
related to the development and implementation of the
Orange County Transit Plan. They will support the estab-
lishment and maintenance of relationships with commu-
nity stakeholders that include public officials, strategic
partners, community groups, property owners and
businesses.
1
1 —
1
1
1 ;
1 �
DRAFT
FEBRUARY 15, 2023
Project 1 21 GOT_AD6 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
The project request is a continuation of on-going openj Project Title TPA- Regional Technology
ating: Specifically consolidation technology and contract Administration - Support Staff
administration functions from 2000T_AD2 support ser- Agency GoTriangle
vices submissions approved in the FY20 Workplan
GoTriangle will continue to allocate 0.4 FTE of Regional FY24 Costs $78,310
Technology and Administration - support staff to the 4
Orange Transit Plan. Staffing includes budgeted time for
the Regional Technology Manager, Contract and Grants Programmed $80,268
Costs
Coordinator and Contract Administrator. In FY24 the Cost
Technology and Administration functions will continue : 41 Start Date July 2018
• Proposed continuation of the outcomes of the Regional
Technology study that assess existing technology within
all participating transit agencies, in order to design a co-
ordinated technology integration plan. One such outcom
is the mobile-ticketing transition that will be in the process
of implementation.
• Contract and Grant management services - including
procurement, contract administration, grant allocations,
etc
•Assist with the strategic capital improvement of regional
park and ride program, proposed RTC relocation, and
other infrastructure projects
DRAFT
FEBRUARY 15, 2023
Project 1 21GOT_AD12 Project Transit Plan Project Administrative
Category Administration Subcategory Expenses
Project Description Project
The project request is a continuation of on-going operat- Project Title TPA- Marketing, Communication
ing: Specifically consolidation Marketing, Communication and PE - Support Services
and Public Engagement functions from 20GOT_AD2 Agency GoTriangle
support services submissions approved in the FY20
Workplan FY24 Costs $32,390
GoTriangle is requesting funding for support services
that will be dedicated to engaging equitably with the
community. This project will support ongoing communi- Programmed $33,200
Costs
ty engagement efforts, marketing and communications Cost
activities related to the Orange Transit Plan. Funding will Start Date July 2018
also support our capacity to utilize creative consultant
services, or expand the scope of service through current
consultants, to support materials for community outreach,
public meetings, marketing campaigns, information kits,
web elements, translation and interpretation, etc.
DRAFT
FEBRUARY 15, 2023
Project I 24MP0_AD1 Project Transit Plan Project Administrative
Category Administration Subcategory Expenses
Project Description Project
The Staff Working Group Participation request provides Project Title Orange County Staff Working
resources for MPO participation on the body, including Group Participation
meeting preparation, attendence, and follow-up. MPO Agency DCHC MPO
staff will also complete necessary research, support, an
reporting for full engagement with SWG activities. FY24 Costs $39,806
FY25 Programmed $40,801
Costs
Start Date July 2023
DRAFT
FEBRUARY 15, 2023
Project I 240PT_TS01 Project Transit Plan Project Staffing
Category Administration Subcategory
Project Description Project
The Staff Working Group Administration supports the Project Title Orange County Staff Working
Staff Working Group comprised of Orange County, GoTri- Group Administration
angle, Local Parties, and the DCHC MPO. Meeting duties Agency Orange County
include preparation, coordination, and record keeping.
Additional duties include completing mutually agreed 41 FY24 Costs $61,100
upon Staff Working Group requests like website mainte-
nance and information archives.
FY25 Programmed $62,628
Costs
Start Date July 2023
DRAFT
FEBRUARY 15, 2023
LOCAL BUS OPERATIONS
PROJECT SHEETS
Project 11111VHT_TS2 Project Bus Operations Project Other Bus
Category Subcategory Service
Project Description Project
The original Orange County Bus and Rail Investment Project Title Increased Cost of Existing
Plan based operating costs on $103 per hour. Since then Services (ICES)
operating costs have risen to $113. In order to continue to Agency Chapel Hill Transit
fund these services, per the Interlocal Agreement, Chapeo
Hill Transit utilzes funds from the Orange County Transit FY24 Costs $745,553
Plan to offset some of these costs.
FY25 Programmed $764,192
Costs
Start Date August 2018
DRAFT
FEBRUARY 15, 2023
Project I 190PT_TS1 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
All rural transit services including ADA Paratransit Project Title Continuation of Transit Services
and Demand Response in accordance with the 2015
Paratransit Plan and subsequent update in 2022. Agency Orange Public Transit/Orange
This project focuses on the three (3) rural zone zones County
as approved in previous project sheet"Continuation of FY24 Costs $415,686
Transit Services" (190PTS1).
FY25 Programmed $535,050
Costs
Start Date July 1, 2023
Service Span 8:00 AM-5:00 PM, Weekdays
Frequency N/A
Major Destinations N/A
Transit Centers N/A
am
DRAFT
FEBRUARY 15, 2023
Project 1 190PT_TS2 Project Bus Operations Project Other Bus
Category Subcategory Service
Project Description Project
ICES offsets the increased cost of existing services. Project Title Increased Cost of Existing
Services (ICES)
Agency Orange Public Transit/Orange
County
FY24 Costs $40,697
FY25 Programmed $70,501
Costs
Start Date July 2018
DRAFT
FEBRUARY 15, 2023
Project ILIMI 20OPT_TS4 Project r
Operations Project Bus Service
Category Subcategory
Project Description Project
Consolidation of 3 previously approved projects- Project Title Hillsborough Circulator 2.0
continuation of existing services (Hillsborough cirulator ,
Hillsborough Expansion and Hillsborough Circulator II - Agency Orange Public Transit/Orange
including and not limited to: County
* Extended service hours 6:30 am to 6:00 pm or later FY24 Costs $361,920
* Reduce headway from 1 hour to 45 minutes and
eventually from 45 minuts to 30 minutes FY25 Programmed $370,968
*Additional reverse route ran concurrently Costs
Start Date July 1, 2023
Service Span 6:30 AM-6:00 PM, Weekdays
Frequency 45 Minutes
Major Destinations Town and County government
facilities, UNC and Duke clinics
and urgent care, Durham Tech,
downtown Hillsborough, historic
preservation areas, etc.
Transit Centers N/A
:.
ORANGE a kN
COUNTY rv.. y ee w
HiMorough Cimulator Route
n ,
;�DrangeCo"
+ DRAFT
FEBRUARY 15, 2023
Project I 200PT_TS6 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Mobility on Demand is a micro-transit service with same Project Title Mobility on Demand
day reservation, using ADA accessible vehicles to servic4
rural and urban areas. Project focuses specifically on Agency Orange Public Transit/Orange
underserved and Environmental Justice Community of County
Concern areas for access to urban areas 6-days a week FY24 Costs $382,800
(Monday thru Saturday)from 9 am - 5 pm. Complete
implementation of Phase I and II as approved in the 2022
Transit Plan Update (former 20OPTTS6). FY25 Programmed $445,875
Costs
Start Date July 1, 2023
Service Span 9:00 AM-5:00 PM, Friday
9:00 AM-5:00 PM, Saturday
Frequency On Demand
Major Destinations N/A
Transit Centers N/A
DRAFT
FEBRUARY 15, 2023
Project 1 23CHT_TS1 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Based on customer request and need for service, th Project Title CW Route - Improve Mid-Day
mid-day service would be improved for the CW route. Service
Agency Chapel Hill Transit
FY24 Costs $195,375
FY25 Programmed $200,300
Costs
Start Date August 2022
Service Span 7:00 AM-9:00 PM, Weekdays
8:30 AM-6:30 PM, Saturday
8:30 AM-6:30 PM, Sunday
Frequency 20 to 60 Minutes
Major Destinations Chapel Hill, Carrboro, and the
University of North Carolina
Transit Centers N/A
Ao,,,..m
A10Rill
G mo,�,itiz
r
� urxRpui
1 —
}
tr, 5 1
S
$_
r. i
DRAFT
FEBRUARY 15, 2023
Project 1 24CHT_TS1 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Improvements to the HS route add weekend transit Project Title HS Route -Weekend Service
services and provides connections to higher-density
neighborhoods and multifamily housing. The HS route Agency Chapel Hill/Chapel Hill Transit
covers a large area of Chapel Hill and this project
improves transit access to key destinations along Martin FY24 Costs $164,039
Luther King Jr. Boulevard. The service improvement
benefits lower-income communities and fulfills a stated
public need for weekend service in transit reliant FY25 Programmed $168,100
neighborhoods. Costs
Start Date August 1, 2023
Service Span 8:00 AM-6:30 PM, Saturday
Frequency 70 Minutes
Major Destinations Morris Grove Elementary School,
Rogers Road neighborhood,
Homestead Road, Chapel Hill
High, MLK, Jr. corridor, Franklin
Street/downtown Chapel Hill,
UNC campus and hospitals, Smith
Level Road
411 k Transit Centers None
ot,P a
00e. ....,...M
.,._...r..... .
Ir edlnept
701!#rs Mlr. �■
�'r-nidP RIUhIP
Aan. hP
CS}Y'1:19 PS5dK1t
IFr3dci�thm •• Kit- -
Y 16ac�mn flfieedd
EArelw �L+ � fi,
FrA
a 4ur.,rw
NURTH -k ....:•.r
■
� �`� '• -x 5Q1
04
f � 4 5
r f.
i.a4 o` � p .Q• f .{
54 Ms-
DRAFT
FEBRUARY 15, 2023
REGIONAL BUS OPERATIONS
PROJECT SHEETS
Project I 19GOT_TS8 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Due to span increases on Saturdays, Sundays and Project Title Paratransit Expansion
holidays for routes 400, 700, and 800, there are addition
ADA paratransit costs incurred. These costs are split 641 Agency GoTriangle
to Durham County and 36% to Orange County.
FY24 Costs $23,893
FY25 Programmed $24,528
Costs
Start Date Ongoing
Service Span 9:00 PM-11:00 PM, Saturdays
7:00 AM-9:00 PM, Sundays and
Holidays
Frequency 60 Minutes
Major Destinations Durham and Orange Counties
Transit Centers Durham Station
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_TS2 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
This project consolidates all off-peak span and frequency Project Title Route 800 Improvements
improvements to GoTriangle Route 800 (Chapel Hill -
Southpoint- RTC)since the Tax District began providing Agency GoTriangle
funding for it. On Route 800:
FY24 Costs $430,262
-Weekday midday frequency was increased from 60 to
30 minutes.
- Saturday daytime frequency was increased from 60 to FY25 Programmed $441,699
30 minutes. Costs
- Saturday evening service was extended from 7:15 PM Start Date Ongoing
to 11:20 PM.
- Sunday service was added from 6:45 AM to 7:20 PM.
- It also includes former 19GOT_TS1 extending service Service Span 6:00 AM-11:02 PM, Weekdays
to 9:20 PM (the 800 component) and 18GOT_TS4 adding 6:50 AM-11:10 PM, Saturdays
additional trips (800S). 6:50 AM-9:10 PM, Sundays
Costs are allocated 50% to Durham County and 50% to Frequency 30 or 60 Minutes
Orange.
Major Destinations UNC Chapel Hill,The Streets at
Southpoint, RTP
Transit Centers Regional Transit Center
fflw � 6.Nd A }l .. •+Fw Y
E R,aa1.Kd ,
ga1P
r 11.'.6 7 Y Rrr+1whaK
H E 4 0 rya . i4 fYr
a
.•nrt1.k•
2'r
a
Maicvlp.
f
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_TS3 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
This project consolidates all off-peak span and frequency Project Title Route 400 Improvements
improvements to GoTriangle Route 400 (Durham -
Chapel Hill) since the Tax District began providing funding Agency GoTriangle
for it. On Route 400:
-Weekday midday frequency was increased from 60 to FY24 Costs $368,812
30 minutes.
- Saturday daytime frequency was increased from 60 to FY25 Programmed $378,616
30 minutes. Costs
- Saturday evening service was extended from 6:55 PM Start Date Ongoing
to 10:55 PM.
- Sunday service was added from 7:00 AM to 6:55 PM.
-It also includes former 19GOT_TS1 extending service to 41 Service Span 6:15 AM-10:46 PM, Weekdays
8:55 PM (the 400 component). 7:00 AM-10:55 PM, Saturday
7:00 AM-8:55 PM, Sunday
Costs are allocated 50% to Durham County and 50% to Frequency 30 or 60 Minutes
Orange.
Major Destinations UNC Chapel Hill, Patterson Place,
Duke and VA Medical Centers
Transit Centers Durham Station
ALI
s�
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_TS5 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project
new Orange-Durham Express (ODX) route was Project Title Route ODX
implemented, linking Mebane, Efland, and Hillsborough
in Orange County to the Duke &VA Medical Centers Agency GoTriangle
and downtown Durham during weekday peak hours.
The project encompasses 1-85, 1-40, US-70, and NC-147 FY24 Costs $201,530
between the Orange County line and downtown Durham
and will serve people traveling between Orange County
and Durham at peak times. Key benefits include the FY25 Programmed $260,887
ability to Park-and-Ride to major employers in Durham, Costs
plus reverse commute access for Durham residents to Start Date Ongoing
Orange County employers.
Costs are allocated 50% to Durham County and 50% to Service Span 5:45 AM-8:55 AM and
Orange. 4:00 PM-7:10 PM, Weekdays
Frequency 15 Minutes
Major Destinations Mebane Cone Health P&R,
Durham Tech OCC, Downtown
Hillsborough, Duke &VA Medical
Centers, and Downtown Durham
Transit Centers Durham Station
•�6
• i
i......i. ram".+ fx � w-... •^• '.-
R_ t _ "
t
DRAFT
FEBRUARY 15, 2023
Project 1 20GOT_TS6 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Due to high demand for express service between 4J Project Title Route CRX Improvements
Chapel Hill and Raleigh, additional trips were added to
Route CRX (Chapel Hill - Raleigh Express). The project Agency GoTriangle
encompasses NC-54 and 1-40 between UNC Chapel Hill
and downtown Raleigh and will serve people traveling FY24 Costs $69,379
between Chapel Hill and Raleigh at peak times. The
benefits are more options for trip times, leading to less
crowding. FY25 Programmed $71,223
Costs
This project was originally charged 100% to Orange Start Date Ongoing
County, but proportionate additional investment from
Wake County started in Wake's FY19 work plan.
Service Span 5:45 AM-9:55 AM and
3:00 PM -7:40 PM, Weekdays
Frequency 20-45 Minutes
Major Destinations UNC Chapel Hill, NC State
University, Downtown Raleigh
Transit Centers GoRaleigh Station
�~ All
4 Eod. V T.
CJh
Yt9•nyRa Y 1 TY __ }
M>?4 Rd _f o_ `T M'+Y.iwwfNrrY�98, 1
1 ?d' +-e Y C'q� �7W wluan4N[� -`,,,•�V
Of0 F-T• f .:� �� �
-. ..y,, - Rs q. c•and c
r o
a
!e► _ a .l.�s
Cary � R�laly
1 Ili ,nPnrk � n�3p -
a 1 rY rSlf t
+ 1 # yPe PMny Ru p Pd Gam
DRAFT
FEBRUARY 15, 2023
Project 1113MI 20GOT_TS9 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
Due to high demand for express service between Durham Project Title Route 405 Improvements
and Chapel Hill, additional trips were added to Route
405. The project encompasses the US 15-501 corridor Agency GoTriangle
between Durham Station/Duke University and Chapel HiIIA
Carrboro and will serve people traveling between Durham FY24 Costs $23,237
and Chapel Hill at peak times. Key benefits include more
options for trip times, which leads to less crowding.
� FY25 Programmed $23,855
This project is charged 50% to Durham County and 50% Costs
to Orange County. Start Date Ongoing
Service Span 5:45 AM-9:50 AM and
3:10 PM-7:20 PM, Weekdays
Frequency 30 Minutes
Major Destinations Downtown Durham, Durke
University, Chapel Hill, Carrboro
Transit Centers Durham Station
tr
DRAFT
FEBRUARY 15, 2023
Project 1 21 GOT_001 Project Bus Operations Project Other Bus
Category Subcategory Service
Project Description Project
For youth ages 13-18, transit agencies across Orange, Project Title Youth GoPass
Wake and Durham County will continue to offer a `Youth
GoPass' program. These fare passes are issued by Agency GoTriangle
GoTriangle, GoDurham, GoRaleigh, or GoCary with valid
K-12 School ID Cards, or with transit agency issued iden- FY24 Costs $18,143
tification cards. GoTriangle, GoDurham GoRaleigh, Go-
Cary, and , in partnership with the respecitive County's,
will continue to work with schools along triangle County's Programmed $18,596
Costs
bus network to issue the passes. Passes will also contin-
ue to be available to those with a valid ID at GoDurham Start Date July 2020
Station, GoRaleigh Station, the Town of Cary Finance De-
partment, the GoTriangle Regional Transportation Center
public libraries, and regional centers. This project covers il
the cost of offsetting fares that would have been collected
by GoTriangle in the county share of routes, in addition
to purchasing the supplies needed for this program. The
estimated cost is allocation of GoTriangle- Orange share
of Youth GoPass boardings in Orange County.
Youth
GoPass
' I YouthGoPass.com
INVESTMENT IN TRANSIT
W% 0111
919.485.RIDE (7433) Triangle Raleigh Cary Durham
DRAFT
FEBRUARY 15, 2023
Project 1 21 GOT_002 Project Bus Operations Project Other Bus
Category Subcategory Services
Project Description Project
This project will cover the annual costs associated with Project Title Fare Collection Improvements
updated mobile ticketing technology for GoTriangle bus-
es. Share of cost based on FY19 boardings reported in Agency GoTriangle
Orange County.
This project request also allocates a portion of hold FY24 Costs $19,475
harmless against any reduction of fare revenue as a
result of implementing this uniform fare strategy. The re-
gional fare-working groups priorities include (1) Improving Programmed $19,962
Costs
Pass Distribution and Sales; (2) Balance Revenue and Cost
Ridership Goals; (3) Improve the Passenger Experience; Start Date July 2020
(4) Improve Regional Coordination; (5) Make Transit an
Affordable Option; and (6) Explore New Fare Technolo-
gies. These earmarked funds will be estimated and will
be dependent on the final methodology developed by a
Fare Working Group.
J
I�
0
1J 0k JIII
DRAFT
FEBRUARY 15, 2023
Project ID 22CHT_TS1 Project Bus Operations Project Bus Service
Category Subcategory
Project Description Project at a Glance
This project culminates service improvements to Chapel Project Title Service Expansion
Hill Transit operations using Orange Transit Tax funds
from its inception in 2013. These funds provide additional Agency Chapel Hill Transit
hours of operation at times that were most demanded by
the public: evenings and weekends. This project funds FY24 Costs $1,742,418
evening and weekend service on the following routes:
A, CM, CW, D, F, HS, J, and NS. This project allowed
Chapel Hill Transit to operate Sunday service for the first FY25 Programmed $1,784,916
time. In addition, this project funds expansion of the on- Costs
demand EZ Rider service. Start Date Ongoing
Service Span N/A
Frequency N/A
Major Destinations Chapel Hill, Carborro, UNC
campus and hospitals
Transit Centers N/A
4
t• i
Legend
CNTA
CHT CIA ?
. _-^CNTCW
d
�G170 P._
-CHTF
CNTN8
CHT J
�CNT N8 '.e•
1
DRAFT
FEBRUARY 15, 2023
CAPITAL
PROJECT SHEETS
Project 1 18GOT_CD12 Project Transit Project Other Bus
Category Infrastructure Subcategory Service
Project Description Project
This project will construct accessibility and amenity Project Title Orange County Bus Stop
improvements at high ridership GoTriangle stops within Improvements
Orange County that are currently unimproved and do not Agency GoTriangle
meet Americans with Disability Act (ADA) requirements.
This project is in progress: stop improvements have beerfill
identified and design is complete at four stops. Design is FY24 Costs $50,000
underway at additional locations.
FY25 Programmed N/A
Rising costs and complex site conditions such as flood- Costs
plain, utilities, drainage, and slopes at multiple sites have
increased the estiated construction costs. GoTriangle Start Date July 2023
requests $50,000 in additional Orange County Transit
Plan dollars to be matched by an application for$200,00 0
in federal funds from DCHC MPO's Regional Flexible
Funding program.
This project additionally covered design costs associated
with the five completed Orange County Public Transit
Stops, constructed by Orange County (Transit Plan
project ID 190PTCD01).
DRAFT
FEBRUARY 15, 2023
Project 1 18TOH_CD1 Project Transit Project Other Bus
Category Infrastructure Subcategory Service
Project Description Project
Construct a station along the NCRR corridor in Hills- Project Title Hillsborough Train Station
borough to serve Amtrak and potentially commuter rail
service. Provides the local funding for TIP project P-5701. Agency Town of Hillsborough
FY24 Costs $286,000
FY25 Programmed N/A
Costs
Start Date July 2022
= W Un—St= E Vnan Sty - F
x — a
lA�}
W vue�n 5[n S` E Queen gt N E '
'x W Try o�Sr I I E Tryon 41 r
Nash Ra _ • 1111%borough
�i
W Klnp S, _ W Kl-y E Kino SL
RE W M.,,aret Ln
I w
�W cal.ln`' a�rnsldg
J
F ec C
a
n.sr..re so
o`
qy wnn earl si ems.'°"'1 F�' a cl m � �
n Olrvn y.
r
DRAFT
FEBRUARY 15, 2023
Project I 20CHT_CD1 Project Bus Rapid Project Other Bus
Category Transit Subcategory Service
Project Description Project
The North-South Bus Rapid Transit (BRT) Project will Project Title North South BRT Supplemental
provide frequent, fixed-guideway bus service along NC
86, known locally as Martin Luther King, Jr. Boulevard Agency Chapel Hill/CHT
and South Columbia Street, and the US Highway 15- 501
corridor in Chapel Hill. The project will benefit Chapel Hill FY24 Costs $4,000,000
and the University of North Carolina students, visitors,
and employees.
FY25 Programmed $4,000,000
Costs
Start Date July 1, 2023
DRAFT
FEBRUARY 15, 2023
Project 1 22GOT_VP1 Project Vehicle Project Other Bus
Category Aquisition Subcategory Service
Project Description Project
Orange Transit share of the GoTriangle level buying bus Project Title Vehicle Acquisition and
strategy. GoTriangle will serve as project sponsor as Replacement
these new buses will replace existing buses that have Agency GoTriangle
reached its useful life. There has been an increase of
maintenance cost by maintaining high mileage vehicles FY24 Costs $212,160
and a reduction in reliability. Vehicle purchase requests
correspond to the fleet replacement plan. FY25 Programmed $220,646
9dCosts
Start Date July 2022
DRAFT
FEBRUARY 15, 2023
Project ID 23GOT_CD2 Project Transit Project Other Bus
Category Infrastructure Subcategory Service
Project Description Project
NOTE: Project sheet to be updated with cost estimate Project Title Regional Fleet and Facilities
from 15% schematic design, in progress as a part of the Study Implementation - Nelson
Fleet and Facilities Study. The project sheet will request Road
funding for phases of construction required to operate Agency GoTriangle
services identified in the Transit Plan.
FY24 Costs $350,000
The ongoing fleet and facilities study is evaluating con-
straints and needs for maintenance, storage, fueling,
and servicing capacity as well as work-flow efficiency at FY25 Programmed N/A
the GoTriangle Nelson Road bus operations and mainte- Costs
nance facility. The outcome of this study will include site
selection, schematic design, and cost estimates for a new Start Date July 2023
and/or expanded facility. The study includes a regional
coordination element to identify opportunities for shared
facilities for vehicle storage, servicing, and/or repairs. Theo
study has identified onsite expansion and renovation of
the current Nelson Road facility as the most cost effective
option to address current needs and provide opportunity
to address future fleet needs over the course of the useful
life of the renovated facility (40+ years). The completed
study will include phases and associated costs of han-
dling the fleet required to operate the services identified
in the Bus Plan.
The GoTriangle Operations and Maintenance Facility at
5201 Nelson Rd, Morrisville, NC was originally construct-
ed in 1998. In 2006, the facility was updated to add
space for administrative functions. GoTriangle is currently
operating near capacity of the existing facility. GoTrian-
gle's Regional Fleet and Facilities Study recommends
the design, renovation, and expansion of their Nelson
Road Operations and Maintenance Facility. This capital
improvement will add the needed capacity required to
accommodate GoTriangle's projected fixed-route fleet of
120 buses, including vehicles needed for operations in
Wake, Orange and Durham Counties, through 2050. The
renovation and expansion will also include updates to
better accommodate the facility's administrative func-
tionality. The Regional Fleet and Facilities study has also
projected the need to relocate GoTriangle's paratransit
maintenance and servicing to a new facility to reach full
build-out, the funding for which is not included in this
project's design and construction allocation. Facility costs
to update the Nelson Road facility will be shared across
GoTriangle's service areas.
DRAFT
FEBRUARY 15, 2023
Project 1 23GOT_CD4 Project Transit Project Other Bus
Category Infrastructure Subcategory Service
Project Description Project
The FY24 request includes phase II of the project, which Project Title New Regional Transit Facility
consists of land aquisition, design, and construction of (Orange County Share)
a new regional transit center(RTC). The current feasi- Agency GoTriangle
blity study includes an evaluation of the current facility
and identification of necessary passenger amenities and FY24 Costs $350,000
infrastructure improvements, and a feasibility study to
evaluate the potential new locations for the RTC, taking
into consideration current and future planned routes, land FY25 Programmed $700,000
use, supply, and price. This study will be used to inform Costs
the location and design of phase II. The current feasiblity
study is funded by county transit plans in Wake, Durham, Start Date June 2023
and Orange counties.
The GoTriangle Regional Transit Center(RTC) is the
primary hub for GoTriangle regional bus services con-
necting Wake, Orange, and Orange Counties. This study
includes an evaluation of the current facility and identifi-
cation of necessary passenger amenities and infrastruc-
ture improvements, and a feasibility study to evaluate the
potential new locations for the RTC, taking into consider-
ation current and future planned routes, land use, supply,
and price. The current location of the RTC on Slater Road
in Orange creates overlapping routes leading to ineffi-
ciency, and is not proximate to 1-40 which causes delays
and reduced reliability during peak commuting times.
The feasibility study is evaluating location options that
improve operating efficiency and reliability, connections to
planned BRT and CRT, as well as potential for transit-ori-
ented development.
DRAFT
FEBRUARY 15, 2023
ORANGE ORANGE COUNTY GOVERNMENT
ORANGE TRANSPORTATION SERVICES DEPARTMENT
Noxm CAk=N,4
"RTA is pleased to see funding in the Bus Speed and Reliability Study element of the draft plan
devoted to identify potential corridors for BRT or other bus speed and reliability infrastructure.
This effort can complement the 7 BRT corridors and extensions in Orange and Wake counties and
advance BRT across the Triangle."
- Joe Milazzo
Research Transportation Alliance
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919) 245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE ORANGE COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT ri
COUNTY 0wVeQ)mty
Mimi CAROLINA rve
Item 3.c.
Subject: US 70 Multimodal Corridor Plan
PURPOSE: To receive a presentation and provide comments on the US 70 Multimodal Corridor
Study.
BACKGROUND: In 2019, Board of County Commissioners (BOCC) approved US 70 as a County
Priority for possible consideration in the state's Strategic Prioritization of Transportation (SPOT)
process. It was done so with the understanding the corridor posed significant safety and mobility
issues for all uses. The Comprehensive Transportation Plan in Durham-Chapel Hill-Carrboro
Metropolitan Planning Organization (DCHC MPO) identified this corridor for potential widening
with multimodal accommodations. The CTP in Burlington-Graham Metropolitan Planning
Organization as a corridor needing multimodal improvements. Both CTP were amended in 2022
incorporating the state's new Complete Street Policy.
Following County's approval as a priority and subsequent inclusion in the CTP amendments,
Orange County staff sought a thorough analysis of the corridor in partnership with local
jurisdictions and regional agencies. DCHC MPO provided the funding through the Fiscal Years
2022 and 2023 Unified Planning Work Programs, while Orange County managed the project. A
Core Technical Team (CTT) was created composed of Hillsborough, Mebane, Orange County,
North Carolina Department of Transportation (NCDOT), DCHC MPO and BG MPO staff. NCDOT
Integrated Mobility Division (IMD) and Rail Road Division was invited as critical stakeholders,with
monthly meetings. VHB was the consultant selected to lead the analysis and future planning of
the Multimodal Corridor.
VHB recently concluded the first round of public workshops, continue encouraging input
throughout the planning process and will present their findings to all the respective boards along
the corridor, at the end of the year. OCTS staff presents the summary of Draft Existing Conditions
Report, outcomes from the public workshops, next steps and welcome any comments the Board
and general public may have to offer.
FINANCIAL IMPACT:Study has no financial impact. Final outcomes from the study will determine
potential projects and processes necessary to implement the plan.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this
item:
• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or color; religious
or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background;
age; military service; disability; and familial, residential or economic status.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax(919) 732-2137
orangecountync.gov/transportation
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary for
residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is
applicable to this item:
• CLEAN OR AVOIDED TRANSPORTATION
Implement programs that monitor and improve local and regional air quality by: 1) promoting
public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3)
otherwise minimizing the need for travel.
ACTION:
Provide comments
IJORTHNCDOT TPD NEW*cj Cy O
9
h Y
99T �e0
0
�FNTOF TRANSIR
Q
NCDOT
• Newsletter March 2023
Traffic Forecasts (TF)
"Connecting people, products
Project Level Traffic Forecasting is an essential part of the planning and places safely and efficiently
process. The traffic forecast informs the design of STIP projects. with customer focus, accounta-
Three are currently no traffic forecasts underway in the region bility and environmental sensi-
Burlington-Graham MPO CTP tivity to enhance the economy
and vitality of North Carolina...."
The BGMPO CTP final adoption was June 8, 2022. NCDOT TPD is
working on the more-detailed documentation of each highway recom- - NCDOT Mission Statement
mendation. Final maps and a list of recommendations can be found at
htti)s://connect.ncdot.gov/projects/planning/Pages/CTP-Details.asi)x?
study id=Burlington-Graham. FHWA News
N.C. Freight Plan FHWA News
The Statewide Multimodal Freight Plan Update was adopted by USDOT Responds to Road-
NCDOT Board of Transportation on February 7, 2023. The plan way Safety Crisis
can be viewed on the following website: https:Hconnect.ncdot.gov/ In response to the unacceptable
projects/planning/Statewide-Freight-Plan/Pages/default.aspx increases in roadway fatalities,
USDOT has committed to the
Multimodal Planning Grants 2024 National Roadway Safety
The N.C. Department of Transportation is accepting applications for Stratecl (NRSS), a compre-
the 2023 Multimodal Planning Grant Program, which provides plan- hensive strategy of priority ac-
ning funds for identifying bike and walking paths and transit connec- tions to significantly reduce seri-
tions. ous injuries and deaths while
working toward zero roadway
The plans would address a comprehensive strategy, rather than a fatalities. At its core, the NRSS
single project, for expanding bicycle and pedestrian opportunities in adopts a Department-wide Safe
a community. The plans may address facilities, programs, policies System Approach focused on
and design guidelines that encourage safe walking and bicycling. five key objectives: safer peo-
The deadline for applications to be submitted electronically is 5 p.m. ple, safer roads, safer vehicles,
April 10. Award recipients are expected to be notified by July. safer speeds, and post-crash
care. One year after the launch
of the strategy, recent ef-
forts include:
A 2023 report documenting
progress on 29 actions and
announcing 14 new ones for
National Bike & Roll to School Day
The 12th annual National Bike & Roll to School Day is May 3, 2023, and registration is now open!
Bike & Roll to School Day invites participants to celebrate the joy of active commuting while building a
sense of community and school spirit. Whether addressing the need to make routes to school safer for
active trips or encouraging children and teens to be more active, these events can be powerful tools to
inspire lasting change.
While May 3 is this year's official date, communities are welcome to celebrate any day in May that best
fits their schedules. Register today to loin the movement! (https://www.walkbiketoschool.org/registration/)
Pipe Replacement Requires Temporary Road Closure
State transportation crews will close a section of East Greensboro Chapel Hill Road in Alamance
County to install a new pipe under the roadway.
The road is scheduled to close near South Preacher Roberson Road starting on March 13 at 9 a.m. and
is expected to reopen on March 31.
A signed detour will be provided using Bethel South Fork, Lambe and Lindley Mill roads. Drivers should
remain cautious and alert when approaching the road closure and factor the detour into their trips.
Highway Construction Trade Academy
The NCDOT Office of Civil Rights is hosting a new round of statewide Highway Construction Trade Acad-
emies through the end of April.
This training provides needed skills and resources for career opportunities in the highway construction
industry. The training targets women, minorities and other disadvantaged populations, including veter-
ans, the disabled and residents of poorer Tier 1 counties where there's a need for such training and jobs.
Each HCTA lasts about two weeks. Those interested can email Myrakle Clark (mkclark2@ncdot.gov) or
call 984-480-1085 for more info and pre-register here: (https://connect.ncdot.gov/business/
SmallBusiness/OnTheJobTraining/Pages/HCTA-Pre-Registration-Form.aspx)
NCDOT Statewide Litter Sweep
NCDOT needs volunteers to help clean up trash along roads during the Adopt-A-Highway Fall Litter
Sweep from April 16-30.
Each April and September, NCDOT asks volunteers to help remove litter from roadsides. Volunteers
from local businesses, schools, nonprofits, churches, municipalities, law enforcement and community
groups play an important role in keeping North Carolina's roads clean.
Volunteers can request clean-up supplies such as trash bags, gloves and safety vests from local NCDOT
county maintenance offices. No sign up is required. NCDOT County Coordinator and Maintenance Of-
fice (for supplies) can be found at .https:Hwww.ncdot.gov/littersweep.
North Carolina Truck Network and Restrictions Contact Us
Information can be found on line for designated truck routes: Truck Pam R. Cook,
Network and Restrictions (ncdot.gov) (https:Hconnect.ncdot.gov/ NCDOTTPD
business/trucking/Pages/Truck-Network-and-Restrictions.aspx) There 1 S. Wilmington
is also a link to "Posted Roads", a system which records any secondary Raleigh,
road on the State Highway System that is unable to carry heavy vehi- :: , ..
cles or equipment: Posted Roads (ncdot.gov) (https:// prcook@ncdot.gov
connect.ncdot.gov/resources/Asset-Management/Pages/Posted Visit us on the-
Roads.aspx '
Upcoming Date
Last day to submit adopted FY 24 UPWP with resolution, 5-year planning calendar, and March 31, 2023
MPO self-certification of long-range planning. Documents are to be submitted with sepa-
rate uploads for UPWP, self-certification, and 5-year work plan
Last day to submit revisions to TPD for FY 23 UPWP with signatures April 19, 2023
3rd Quarter 5303 Claim (January 1, 2023 to March 31, 2023) due April 28, 2023
3rd Quarter invoice and work summary due May 10, 2023
Statewide Plans
• NC Moves 2050 Plan—https://www.ncdot.gov/initiatives-policies/Transportation/nc-2050-plan/Pages/
default.aspx
• NCDOT Strategic Transportation Corridors—https://www.ncdot.gov/initiatives-policies/Transportation/strategic
-corridors/Pages/default.aspx
• NCDOT Comprehensive State Rail Plan (25-Year Vision) - https://www.ncdot.gov/divisions/rail/Pages/rail-
plan.aspx
• NC Statewide Multimodal Freight Plan (2023) - https:Hconnect.ncdot.gov/projects/planning/Statewide-Freight-
Plan/Pages/default.aspx
• Great Trails State Plan—https://www.ncdot.gov/divisions/integrated-mobilitv/multimodal-planning/great-trails-
state/Pages/default.aspx
• Statewide Pedestrian & Bicycle Plan (2013) - https://www.ncdot.gov/bikeped/walkbikenc/default.aspx
• Connecting North Carolinians to Opportunities (Public Transportation Strategic Plan-2018) - https://
www.ncdot.gov/divisions/I ntegrated-mobilitv/public-transit-services/statewide-strategic-plan/Documents/
december-2018-strategic-plan.pdf
• NCDOT Resilience Strategy Report (2021) - Department-of-Transportation-2021-Res ilient-Strategy-
Report.pdf(nc.gov)
Helpful Links: To learn more, click on the following links or do an internet search using "NCDOT: and
names in black:
• ncdot.gov—NCDOT home page
• htti)s:Hdrivenc.gov/ - Real-Time Traffic
• https://www.ncdot.gov/contact/Pages/form.asi)x?UnitName=pothole&sourceUrl=/contact/- Report a pothole
• NCDOT Annual Average Daily Traffic (AADT) Mapping Application (arcgis.com) - Interactive Annual Average Daily
Traffic Map
• https://www.ncdot.gov/initiatives-policies/transportation/stip/Pages/defauIt.aspx—NCDOT: State Transporta-
tion Improvement Program
• https://www.ncdot.gov/bikeped/ncbikeways/default.aspx—Interactive Bicycle Routes Map
• https:Hconnect.ncdot.gov/resources/State-Mapping/Pages/Traffic-Survey-Grour).asi) —Links to all traffic
count data information - The BGMPO is counted during odd/even years and released in August of the
following year.
PARTicularsjai
Piedmont Authority for Regional Transportation
RideTheTriad.org
As part of an overall website redesign, PART is taking
the initiative to produce a separate website portal
for our regional URL(Uniform Resource Locators ),
RideTheTriad.org. S A
.�nrrw
RideTheTriad.org currently links to PARTnc.org as a ' _.___ =--------�°• ------
tab.The information in the current tab connects users GTA �R�T
to our partner agencies and their routes and schedules, ride.connected.
along with other useful links that connect users to R
community-wide mobility options. -VV--
LinK
PART's goal in hosting a dedicated website for T�r
regional connectivity is to link riders easily to our vast
network of partner agencies. Partnership support
for this initiative is positive, and we look forward to ®®®®
streamlining information to our community. Stay tuned
for us to roll out our website redesign and kick off
RideTheTriad.org current tab for RideTheTriad.org
When Work And Fun Connect!
PART is on the road to participating in two upcoming Community-Wide Events.
On March 25th, PART will participate in the Kiwanis Club Of Kernersville's 2023 Touch-a-Truck event.This is a
family-friendly interactive, hands-on experience to get up close and personal with large vehicles of all types.The
idea is to showcase vehicles that help protect, build, and sustain our community. Children will be invited on a PART
Express bus to look inside the ride!
On April 22nd, PART will participate in "the biggest Earth Day celebration and one-day environmental education
event in North Carolina"!The Piedmont Earth Day Fair.This event brings together the Triad's leading companies
and organizations committed to sustainability.As the largest Earth Day celebration in the region, the event host
crowds of 8,000+ people. PART is a proud Silver-level event sponsor and will also have staff hosting a tent. PART is
dedicated to doing our part in creating a more sustainable community.
Piedmont Earth Day Fair
The biggest Earth Day celebration and one-day
'�
IIIIIIIIIIIII IlIIIIIIIIIII ���n r a
environmental education event in North Carolina!
V0UC14wAwT1tUC19_" SATURDAY,
APRIL 22
KIWANIS U08 OF KBNEUVIEIE 110AM - 4PM
WS FAIRGROUNDS
FAMILY FUNI LIVE MUSIC!
FOOD TRUCKS!
ENVIRONMENTAL EDUCATION!
FREE PARKING&BIKE VALET I RAIN OR SHINE
2023 Year Of The Trial
The 2023 Year of the Trail event celebrates North
Carolina's vast and diverse collection of trails. It
encourages all residents to recognize their role as
stewards of these valuable resources.The initiative ;.
looks to a future where each of the state's 100 counties
experiences the proven benefits of trails and advocates
for their ongoing growth and development.
As a regional transportation authority focused on
connecting communities, PART will leverage our Social
Media and Website to showcase some of the region's
vast trail and greenway systems and work to link
citizens to mobility options they can utilize to get out
and explore. STORIES FROM"
THE GREAT TRAILS STATE
PART recently received a request from Randolph
County'sTrail Coordinator to sign a resolution in a 2023 IS NC. YEAR CIF THE TRAIL!
show of support for this state-wide initiative, and the
resolution is currently being taken into consideration.
March is Women's History Month
Women's History Month originated as a national celebration in 1981 when Congress authorized and requested the
President to proclaim the week of March 7, 1982,as "Women's History Week."Throughout the next five years, Congress
passed joint resolutions designating a week in March as "Women's History Week." In 1987 after being petitioned by
the National Women's History Project, Congress established the month of March 1987 as "Women's History Month."
Between 1988 and 1994, Congress passed additional resolutions requesting and authorizing the President to proclaim
March of each year as Women's History Month. Since 1995, presidents have issued a series of annual proclamations
designating the month of March as "Women's History Month."These proclamations celebrate women's contributions to
the United States and recognize the specific achievements women have made throughout American history in various
fields.
Follow PART's Social Media as we celebrate Women's History Month!
CELEBRATING
WOMEN ' S
ask- Hib FURY
WNW". MONTH
Q Q ❑ ❑ ❑ F1t.
j J
■A' _
MPO Board 3/8/2023 Item 19
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead
Date Let Date Date
SS-6007AD Convert intersection from two way stop to all way stop at the 3/18/2022 N/A 5/18/2022 $28,000 Construction completed - pending final Dawn McPherson
49823.1 .1 intersection of SR 1710 (Old NC 10) and SR 1712 inspection
49823.3.1 (University Station Road) west of Durham
EB-5721 Upgrade existing off-road path and construct new section of 3/9/2023 FY2022 FY2025 $2,400,000 Construction funding authorization Town of Chapel
path of Bicycle Route #1 from Cleland Drive to Willow Drive pending Hill/Stephen Robinson
in Chapel Hill
U-47261K Construct sidewalk/MUP on Homestead Road from Seawell 4/1/2023 N/A FY2025 $1 ,300,000 Construction funding authorization Town of Chapel
School Road to Weaver Dairy Road in Chapel Hill pending Hill/Stephen Robinson
BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 4/6/2023 FY2023 2/28/2024 $1 ,311 ,000 Planning and design activities underway Chad Reimakoski
49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in
Chapel Hill. Construct sidewalk and install pedestrian
signals, crosswalks, and refuge islands at selected locations.
U-4726DF Bicycle detection at signalized intersections in Carrboro 4/30/2023 N/A FY2025 $36,000 Plans at 90% completion Town of
Carrboro/Stephen
Robinson
C-5181 Jones Creek Greenway Project - Fill Gap between the 6/30/2023 FY2023 FY2025 $654,000 Planning and design activities underway Town of
Carrboro Upper Bolin Trail and Twin Creeks Greenway and Carrboro/Stephen
also implement program to support on-vehicle trips to Morris Robinson
Grove Elementary School
P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2023 N/A FY2025 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons
46395.1 .1 Milepost 41 .7 Norfolk Southern H-line in Hillsborough
46395.3.1
SS-6207A NC 54 Pedestrian improvements between SR 1902 6/30/2023 N/A 12/31/2023 $171 ,000 Planning and design activities underway Dawn McPherson
50337 (Manning Drive) and SR 1937 (Old Fayetteville Road) in
Chapel Hill and Carrboro. Improvements will include refuge
islands, crosswalks and pedestrian signals. Improvements
to be completed by state forces.
EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 7/31/2023 N/A FY2026 $372,000 Planning and design activities underway Town of
Carrboro/Stephen
Robinson
DCHCMPO Feb. 2023
Page 1
MPO Board 3/8/2023 Item 19
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead
Date Let Date Date
HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River 8/31/2023 FY2023 FY2026 $153,800 Planning and design activities underway Town of
from South Churton Street to Faribult Lane in Hillsborough Hillsborough/Stephen
Robinson
C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 3/29/2024 FY2024 FY2026 $1 ,718,000 Planning and design activities underway Town of
Road/S. Greensboro St.) from Public Works Drive to the Carrboro/Stephen
northern end of Old Pittsboro Road in Carrboro Robinson
BR-0091 Replace Bridge #32 on US 70 over the Eno River 11/19/24 N/A =Y2028 $4,000,000 Planning and design activities underway Laura Sutton
4/16/24 FY2027
B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 1/21/2025 FY2025 FY2028 $2,500,000 Planning and design activities underway Brian Ketner
86
BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 N/A FY2028 $4,100,000 Planning and design activities underway Laura Sutton
EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 9/18/2025 FY2025 FY2027 $3,104,000 Planning and design activities pending Town of Chapel
south of Norfolk Southern Railroad to NC 86 (MILK Jr. Blvd.) Hill/Stephen Robinson
in Chapel Hill
EB-5880 Construct sidewalk on the north side of SR 1005 (Jones 9/30/2025 FY2025 FY2027 $441 ,000 Planning and design activities underway Town of
Ferry Road) from Davie Road to SR 1010 (West Main St.) in Carrboro/Stephen
Carrboro Robinson
EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2025 FY2025 FY2027 $230,000 Planning and design activities pending Town of
1005 (Jones Ferry Road) in Carrboro Carrboro/Stephen
Robinson
1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood 10/21/2025 FY2026 FY2028 $4,350,000 Planning and design activities underway Laura Sutton
Drive to Ramp C/D at 1-40 interchange
BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 11/6/2025 N/A FY2028 $1 ,100,000 Planning and design activities underway Tim Powers
BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/3/2026 N/A FY2029 $800,000 Planning and design activities underway Tim Powers
EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2026 FY2028 $2,044,000 Planning and design activities pending Town of Chapel
1741/SR 1838 (Old Durham Chapel Hill Road) in Chapel Hill Hill/Stephen Robinson
DCHCMPO Feb. 2023
Page 2
MPO Board 3/8/2023 Item 19
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead
Date Let Date Date
EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/17/2026 FY2026 FY2029 $848,000 Planning and design activities pending Town of
1772 (North Greensboro Street) to south of Norfolk Southern Carrboro/Stephen
Railroad Tracks in the Town of Carrboro Robinson
BP7-R015 Replace Bridge #86 on SR 1942 (Jones Ferry Road) 10/1/2026 N/A FY2029 $1 ,700,000 Planning and design activities underway Tim Powers
1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2027 FY2028 $8,690,000 Planning and design activities pending Chad Reimakoski
B-5733 Replace Bridge #39 over Booker Creek in Chapel Hill on SR 1/19/2027 N/A FY2029 $5,100,000 Planning and design activities pending Kevin Fischer
1010 (E. Franklin St.)
BR-0195 Replace Bridge #31 on SR 1010 (Franklin Street) over Bolin 2/16/2027 N/A FY2029 Pending Planning and design activities underway Kevin Fischer
Creek in Chapel Hill
1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/19/2027 FY2031 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton
45917.1 .1 Churton Street) in Hillsborough Design activities underway, Coordinate
45917.2.1 with 1-0305 and U-5845
45917.3.1
1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 N/A FY2029 $11 ,156,000 Planning and design activities pending Chad Reimakoski
45911 .1 .1 (Orange Grove Road) to Durham County line
45911 .3.1
BR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates 11/16/2027 N/A FY2029 Pending Preliminary activities pending Kevin Fischer
Creek
R-5821A Construct operational improvements including 6/20/2028 Funded for FY2031 $7,000,000 PE funding approved 10/10/17, design Rob Weisz
47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR Preliminary activities currently suspended,
47093.2.2 1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old Engineering Coordinating with NC54 West Corridor
47093.3.2 Fayetteville Road). Only Study
U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1- 7/18/2028 FY2031 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton
50235.1 .1 40 to Eno River in Hillsborough and Design activities underway,
50235.2.1 Coordinate with 1-5967
50235.3.1
DCHCMPO Feb. 2023
Page 3
MPO Board 3/8/2023 Item 19
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead
Date Let Date Date
BP7-R007 Replace Bridge #63 on Pleasant Green Road 8/2/28 N/A FY2031 $2,500,000 Planning and design activities underway Tim Powers
10/2/25 FY2028
1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 Funded for FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton
47530.1 .1 Hillsborough Preliminary and Design activities underway,
47530.2.1 Engineering Coordinate with 1-0305 and 1-5959
47530.3.1 Only
1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 Funded for FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton
34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange Preliminary design activities underway, Project
34142.2.2 Co. Engineering reinstated per 2020-2029 STIP (funded
34142.3.2 Only project) and delete project 1-5983
DCHCMPO Feb. 2023
Page 4
MPO Board 3/8/2023 Item 19
North Carolina Department of Transportation 2/15/2023
Active Projects Under Construction - Orange Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 18.59 18.59
COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan
US-15/501 . CORPORATION
DG00520 R-5787F INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS DOT CONSTRUCTION Howell, Bobby J $1 ,271 ,240.40 5/10/2021 4/14/2023 1/25/2022 4/14/2023 76.59 45.94
ROUTES INC
D000534 REPLACE BRIDGE #99 OVER NEW HOPE CREEK ON SR 1723 (NEW CONTI ENTERPRISES, Howell, Bobby J $1 ,108,442.00 1/3/2022 11/3/2022 5/9/2022 2/28/2023 100 80.25
HOPE CHURCH ROAD) INC
DG00547 RESURFACE A SECTION OF NC 49 & 6 SECONDARY ROADS IN FSC II LLC DBA FRED Howell, Bobby J $4,299,745.38 4/1/2022 10/31/2022 4/1/2022 3/31/2023 100 97.69
ORANGE COUNTY SMITH COMPANY
DG00568 RESURFACING OF SR 1001 (WALNUT GROVE CHURCH RD.) AND CAROLINA SUNROCK Howell, Bobby J $2,144,122.70 5/2/2022 6/30/2023 10/31/2022
SR 1568 (PLEASANT GREEN RD.) LLC
D000589 HS-2007C INSTALLATION OF THERMOPLASTIC MARKING LINES ON VARIOUS TRP CONSTRUCTION Cvijetic, PE, $1 ,494,249.58 3/15/2023 11/7/2023
SECONDARY ROUTES WITHIN DIVISION 7 GROUP LLC Bojan
D000596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS CAROLINA GROUP Howell, Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022
ROUTES PROPERTIES LLC
DBA CAROLINA
GROUP CONTRACT.
Page 1 of 1