Loading...
HomeMy WebLinkAbout9.21.22 OUTBoard Packet ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKaL CALIQLLNA PUBLIC TRANSIT OrangeCounty AGENDA ORANGE UNIFIED TRANSPORTATION BOARD AND TRANSPORTATION ADVISORY SERVICE Wednesday, September 21, 2022, 6:30 pm Whitted Building 300 W Tryon St, Hillsborough, NC 27278 OUTBoard meetings are held in person and open to the public. Any member of the general public who wishes to make public comment should email eange@orangecountync.gov and the comment will be read to the OUTBoard during the public comment portion of the meeting. 1. Call to Order 2. Consideration of Additions or Changes to Agenda 3. Public Comments 4. Approval of Minutes—August 17, 2022 5. Regular OUTBoard Agenda a. Orange County Complete Street and Vision Zero Policy i. Action: Recommend BOCC approve policy by resolutions 6. Staff Report/Updates a. US 70 Multimodal Corridor Study schedule and process b. MPO, RPO, and NCDOT Updates c. OCTS Update 7. Information Items 8. Adjournment-The next meeting - October 2022 It is the policy of Orange County Transportation Services to ensure that no person shall, on the ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation DRAFT 1 MINUTES 2 ORANGE COUNTY OUTBOARDITAS 3 AUGUST 17,2022 4 5 MEMBERS PRESENT: : Michael Hughes, (Chair), At-Large Representative; Randy Marshall (Vice-Chair), Bingham Township 6 Representative; Roy Schonberg, Chapel Hill Township Representative Joshua Mayo,At-Large Representative;; Jamie Crandell, 7 Eno Township Representative; Tom Gray, Hillsborough Township Representative; David Laudicina, Cheeks Township 8 Representative; 9 10 MEMBERS ABSENT: Amy Cole, At-Large Representative; Tony Blake, At-Large Representative; Todd Jones, At-Large 11 Representative; 12 13 STAFF PRESENT: Nish Trivedi, Interim OCPT Director;Cy Stober, Planning&Inspections Director; EmmaLea Ange,Administrative 14 Support;Tina Love,Administrative Support 15 16 TAS MEMBERS PRESENT: Janice Tyler,Aging; Brandi Beeker,Aging, Brandi Beeker,Aging;Serena McPherson, Social Services; 17 Corinthia Barber: Social Services; Maricruz Rios, Social Services; Erica Bryant, Child Support; 18 19 AGENDA ITEM 1: CALL TO ORDER 20 The meeting was called to order 21 22 AGENDA ITEM 2: APPROVAL OF MINUTES 23 MOTION by Randy Marshall to approve the July 20, 2022 OUTBoard Minutes. Seconded by Roy Schonberg. 24 VOTE: UNANIMOUS 25 26 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 27 28 With the resignation of the Chair, Erik Broo. Elections of Chair and Vice-Chair were added to the agenda 29 30 MOTION by Josh Mayo to elect Michael Hughes as OUTBoard Chair. Seconded by Roy Schonberg. 31 VOTE: UNANIMOUS 32 33 MOTION by Michael Hughes to elect Randy Marshall as the OUTBoard Vice-Chair. Seconded by Josh Mayo. 34 VOTE: UNANIMOUS 35 36 AGENDA ITEM 4.A.: TRANSIT ADVISORY SERVICES(TAS)IORANGE COUNTY PUBLIC TRANSPORTATION(OCPT) 37 38 Nish Trivedi reminded the Board that this item was on part of the July OUTBoard agenda and asked for a motion. 39 40 MOTION by Roy Schonberg to recommend approval of the OCTS ADA plan to the BOCC. Seconded by Tom Gray. 41 VOTE: UNANIMOUS 42 43 AGENDA ITEM 4.B.: OCPT STAFF ADMINISTRATIVE UPDATES 44 45 AGENDA ITEM 4.C.: ORANGE COUNTY TRANSPORTATION SERVICES (OCTS) — AMERICANS WITH DISABILITIES ACT (ADA) 46 PARATRANSIT 47 48 AGENDA ITEM 4.B.: OCTS—AGENCY SAFETY PLAN 49 50 Nish Trivedi reminded the Board that this item was also on part of the July OUTBoard agenda and asked for a motion. 51 52 MOTION by Josh Mayo to recommend approval of the OCTS ADA plan to the BOCC. Seconded by Roy Schonberg. 53 VOTE: UNANIMOUS 1 DRAFT 54 AGENDA ITEM 5: STAFF REPORTS/UPDATES 55 56 AGENDA ITEM 5.A.: MPOIRPO AND NCDOT UPDATES 57 58 Nish Trivedi shared updates with the group 59 60 AGENDA ITEM 6: INFORMATION ITEMS 61 62 Nish Trivedi introduced Cy Stober, Planning & Inspections Director to the OUTBoard. 63 64 Cy Stober shared information about his former position with the City of Mebane and the joint groups and projects shared with 65 Orange County and Nish Trivedi 66 67 Nish Trivedi shared the changes in the transportation planning and services for Orange County moving into a new department to 68 include transportation and transit. He let them know that it will also include the OUTBoard advisory board moving from under the 69 umbrella of the Planning Department to the newly formed Transportation Department. 70 71 OUTBoard,TAS and staff discussed the history of TAS and the creation of the OUTBoard and the roles each serves. 72 73 Nish Trivedi discussed and asked for the OUTBoard and TAS members to consider changing meeting days and times and let 74 them know that the meeting location would be changing to another facility. 75 76 AGENDA ITEM 7: ADJOURNMENT 77 OUTBoard meeting was adjourned by consensus 78 2 � ORANGE COUNTY GOVERNMENTri ORA E L TRANSPORTATION SERVICES DEPARTMENT ,� No rH CARQLLNA Ora"g;„8�,�,u„5nt Item 5.a. Subject: Orange County Complete Street and Vision Zero Policy Resolutions Attachment: Draft Resolution PURPOSE: Recommend Board of County Commissioners (BOCC) approve the Orange County Complete Street and Vision Zero policy by resolution. BACKGROUND: The USDOT recently released the funding notice for the new Safe Streets and Roads for All (SS4A) Grant Program to support regional, local, and Tribal initiatives to prevent roadway deaths and serious injuries. In order for the Orange County to position itself to apply for future safety action plan implementation funding, official public commitments (e.g., resolution, policies, ordinances, etc.) are required. RECOMMENDATIONS: The Staff request the OUTBoard recommend BOCC approve the Orange County Complete Street and Vision Zero Policy by resolutions. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty RESOLUTION FOR THE ADOPTION OF A VISION ZERO POLICY TO ELIMINATE FATALITIES AND SERIOUS INJURIES THAT RESULT FROM CRASHES WITHIN ORANGE COUNTY AREA BY YEAR 2050 The motion to approve the following resolution was offered by and seconded by and upon being put to a vote was duly adopted. WHEREAS,hundreds of crashes occur in the County each year,resulting in fatalities and serious injuries; and WHEREAS, the number of people dying and suffering serious injuries on our streets is a serious public health problem which necessitates public action; and WHEREAS, crash reduction efforts necessitate a comprehensive and specific approaches to street planning,design,policy, enforcement,legal processes, education, and communication; and WHEREAS,crashes that result in death or serious injury are not inevitable but largely preventable; and WHEREAS, the Orange County acknowledges the importance of everyone traveling safely within their communities and that the only acceptable goal is to eliminate traffic-related fatalities and serious injuries, while increasing safe,healthy, and equitable mobility for all; and WHEREAS, a commitment to Vision Zero is a commitment to saving lives and ensuring equitable investment in the safety needs of underserved communities in our region; and WHEREAS,it is the role of government to do its part to serve and protect the populace; and WHEREAS, Orange County in coordination with Durham-Chapel Hill-Carrboro Metropolitan Planning Organization, Burlington-Graham Metropolitan Planning Organization and Triangle Area Rural Planning Organization support North Carolina Department of Transportation efforts to meet the state's safety targets per Federal legislations and to support the North Carolina State Highway Safety Plan goal to reduce fatalities and serious injuries by half by 2035,moving towards zero by 2050; and WHEREAS,the Orange County Board of County Commissioners has found that the County is conducting transportation planning in a continuous, cooperative, and comprehensive manner; and WHEREAS, the Orange County and its member jurisdictions have a strong history of commitment to prioritizing safety and the Comprehensive Transportation Plan, the Metropolitan Transportation Plan, and local governments' transportation plans have made demonstrable progress to improve safety by making systemic changes in the way the transportation network is planned, programmed, designed, constructed, and operated; and WHEREAS, the Orange County will take a proactive approach to develop an effective Transportation Safety Plan built on a foundation of Safe Systems principles and elements that will translate into evidence- based implementation processes; and 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919) 245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKrtL CALIQLLNA PUBLIC TRANSIT OrangeCounty WHEREAS, creating safer streets is likely to encourage more active transportation options, thereby increasing population health,access to healthy foods and active transportation options; and WHEREAS, the Orange County Transportation Services will plan and implement transportation projects with equity at its forefront, striving to impact the most vulnerable and dependent users of the most dangerous roadways of the transportation network in the effort to ensure outcomes will be experienced equitably throughout the region. NOW THEREFORE, BE IT RESOLVED, that the Orange County agrees to fund, plan and program projects that commits to a goal of zero deaths and serious injuries that are a result of crashes by 2050. BE IT FURTHER RESOLVED that the Orange County is dedicated to measuring the progress, challenges, and successes of the Vision Zero commitment and will do so with tangible,reportable metrics that will be reported upon on an annual basis. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919) 245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKrtL CALIQLLNA PUBLIC TRANSIT OrangeCounty RESOLUTION FOR THE ADOPTION OF ORANGE COUNTY COMPLETE STREETS POLICY The motion to approve the following resolution was offered by and seconded by and upon being put to a vote was duly adopted. WHEREAS,the Orange County Board of County Commissioners(BOCC)has found that Orange County is conducting transportation planning in a continuous, cooperative, and comprehensive manner in accordance with 23 USC 134 and 49 USC 1607; and WHEREAS,the BOCC expressed its support for the comprehensive implementation of the North Carolina Department of Transportation(NCDOT) Complete Streets Policy in all of its applicable region transportation plans and highway projects as a matter of common practice; and WHEREAS,the Orange County supports local member jurisdictions' Bicycle and Pedestrian Planning Grants application; and WHEREAS,the Orange County knows that by balancing all transportation modes and accommodating all users, adopting a Complete Street policy will help to encourage the planning, design and construction of safer streets and ensures that the transportation system benefits all users equitably; and WHEREAS, a Complete Streets policy can help calm traffic, enhance economic opportunities,increase physical activity, and create safer environments for residents and visitors; and, NOW THEREFORE,BE IT RESOLVED, that the Orange County affirms its support of Complete Streets in the planning, design and construction of highway projects. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation Orange County Bridge Replacements 8/31/2022 3:43 PM LET FY Google Map Link Funding Managed Sub TIP/ Project Structures Structures-Project Route Plan Let Project Source by WBS Description Description Date Manager 2027 http.//maps.goo HFBD DIVISION BP7-R013 BP7 670090 ON SR1940 OVER SR1940 068 SR1940 09/03/26 Tim Powers le.com ma s? 2027 http://maps.goo HFBD DIVISION BP7-R015 BP7 670086 ON SR1005 OVER SR1005 068 SR1942 10/01/26 Tim Powers gle.com/maps?q 2027 https://goo.gl/m CENTRAL B-5733 45689 670039 - 01/19/27 Kristy Alford a s 5'Jkeh14b6H 2026 http://maps.goo CENTRAL BR-0092 67092 670037 ON NC86 OVER NC86 08/19/25 Laura Sutton gle.com/maps?q 2026 htt s: oo. I m HFBD DIVISION BP7-R007 BP7 670063 ON SR1567 OVER SR1567 068 SR1526 10/02/25 Tim Powers 2026 http://maps.Roo HFBD DIVISION BP7-R009 BP7 670011 ON SR1336 OVER SR1336 068 SR1336 11/06/25 Tim Powers le.com ma s? 2025 http://maps.goo CENTRAL B-6037 48404 670049 01/21/25 Brian Ketner gle.com/maps?q 2024 http://maps.goo CENTRAL BR-0091 67091 670032 ON US70 OVER US70 04/16/24 Laura Sutton gle.com/maps?q Source: NCDOT NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date SS-6007AD Convert intersection from two way stop to all way stop at the 5/31/2022 Sep. 2022 $28,000 Construction completed - pending final Dawn McPherson 49823.1 .1 intersection of SR 1710 (Old NC 10) and SR 1712 (University inspection 49823.3.1 Station Road) west of Durham SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) 6/1/2022 Nov. 2022 $261 ,000 Planning and Design activities currently on Chad Reimakoski 47936.1 .1 west of SR 1561/SR 1709 (Lawrence Road) east of hold - Project shelved due to minimal 47936.2.1 Hillsborough. Improvements consist of wedging pavement crash rate during observation period. To 47936.3.1 and grading shoulders. be resubmitted for federal funding. P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2023 FY2025 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons 46395.1 .1 Milepost 41 .7 Norfolk Southern H-line in Hillsborough 46395.3.1 SS-6207A NC 54 Pedestrian improvements between SR 1902 (Manning 10/31/2022 6/30/2023 $171 ,000 Planning and design activities underway. Dawn McPherson 50337 Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill and Carrboro. Improvements will include refuge islands, crosswalks and pedestrian signals. Improvements to be completed by state forces. BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 2/16/2023 2/28/2024 $1 ,311 ,000 Planning and design activities underway. Chad Reimakoski 49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in Chapel Hill. Construct sidewalk and install pedestrian signals, crosswalks, and refuge islands at selected locations. 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) 45910.3.1 1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton 45917.1 .1 Churton Street) in Hillsborough Design activities underway, Coordinate 45917.2.1 with 1-0305 and U-5845 45917.3.1 DCHCMPO Aug. 2022 Page 1 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 FY2029 $11 ,156,000 PE funding approved 10/10/17, Coordinate Chad Reimakoski 45911 .1 .1 (Orange Grove Road) to Durham County line with 1-5967, 1-5984 and 1-0305 45911 .3.1 R-5821A Construct operational improvements including 6/20/2028 FY2031 $7,000,000 PE funding approved 10/10/17, design Rob Weisz 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor 47093.3.2 Road). Study U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1- 7/18/2028 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton 50235.1 .1 40 to Eno River in Hillsborough and Design activities underway, 50235.2.1 Coordinate with 1-5967 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton 47530.1 .1 Hillsborough and Design activities underway, 47530.2.1 Coordinate with 1-0305 and 1-5959 47530.3.1 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton 34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange design activities underway, Project 34142.2.2 Co. reinstated per 2020-2029 STIP (funded 34142.3.2 project) and delete project 1-5983 DCHCMPO Aug. 2022 Page 2 North Carolina Department of Transportation 8/15/2022 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE S T WOOTEN Nordan, PE, $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 6/12/2022 100 89.19 COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 CORPORATION James M C204078 B-4962 REPLACE BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS. CONTI ENTERPRISES, Howell, Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 8/31/2022 100 95 INC C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 9.98 9.98 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan US-15/501 . CORPORATION C204674 RESURFACING 35 SECTIONS OF SECONDARY ROADS IN DURHAM FSC II LLC DBA FRED Nordan, PE, $3,308,745.60 3/1/2022 9/29/2023 3/1/2022 9/29/2023 91 .8 87.98 COUNTY. SMITH COMPANY James M DG00483 RESURFACE SR 1010 (MAIN STREET/FRANKLIN STREET) FROM SR CAROLINA SUNROCK Howell, Bobby J $845,631 .59 5/18/2019 8/7/2020 5/23/2022 8/31/2022 49.80 70.81 1005 (JONES FERRY ROAD) TO NC 86 (COLUMBIA STREET) LLC D000520 R-5787F INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS DOT CONSTRUCTION Howell, Bobby J $1 ,271 ,240.40 5/10/2021 4/14/2023 1/25/2022 4/14/2023 64 32.52 ROUTES INC DG00527 HS-2007C PLACEMENT OF THERMOPLASTIC PAVEMENT MARKING LINES ON TMI SERVICES INC. Cvijetic, PE, $1 ,358,289.72 8/16/2021 12/31/2022 5/18/2022 12/31/2022 1 .35 1 .35 VARIOUS SECONDARY ROADS THROUGHOUT THE DIVISION Bojan DG00534 REPLACE BRIDGE #99 OVER NEW HOPE CREEK ON SR 1723 (NEW CONTI ENTERPRISES, Howell, Bobby J $1 ,108,442.00 1/3/2022 11/3/2022 5/9/2022 11/30/2022 99.92 39.31 HOPE CHURCH ROAD) INC D000547 RESURFACE A SECTION OF NC 49 & 6 SECONDARY ROADS IN FSC II LLC DBA FRED Howell, Bobby J $4,299,745.38 4/1/2022 10/31/2022 4/1/2022 10/31/2022 72 87.43 ORANGE COUNTY SMITH COMPANY D000550 AST TREATMENT OF 32 SECONDARY ROADS IN ORANGE COUNTY WHITEHURST PAVING Howell, Bobby J $1 ,840,813.26 4/1/2022 10/31/2022 CO INC. DG00554 RESURFACE A SECTION OF NC 54 & 14 SECONDARY ROADS IN FSC II LLC DBA FRED Howell, Bobby J $3,755,101 .19 4/1/2022 10/31/2022 4/28/2022 10/31/2022 57 75.26 ORANGE COUNTY SMITH COMPANY Page 1 of 1 NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Completion Cost Status Project Lead Date Date SS-4907BQ Intersection improvements (All Way Stop) at SR 1005 5/1/21 Jun. 2021 $22,500 R/W Construction completed - pending Derek Dixon 44757.1 .1 (Greensboro-Chapel Hill Road) at SR 2369 (Sylvan $153,000 CON final inspection 44757.2.1 School Road) and SR 2371 (Pleasant Hill Road) in Snow 44757.3.1 Camp. 48798 Installation of crosswalks and pedestrian signals and update 8/4/21 Jul. 2022 $150,394 Construction completed - Punchlist Dawn McPherson curb ramps at the intersection of US 70 (South Church Street) items underway Derek Dixon and Edgewood Avenue (non-system) in Burlington. W-5807B Installation of ADA curb ramps and pedestrian accessible Oct. 2021 FY2022 $75,000 Scheduled to be completed 8/12/22 Dawn McPherson 48952.1 .3 signals on SR 1301 (Boone Station Drive) at SR 1301 (St. Chad Reimakoski 48952.2.3 Marks Church Road) and Boone Station Drive (non-system) 48952.3.3 at Glidewell Road/Tiki Lane (non-system) in Burlington SS-6007AE Convert intersection from two way stop to all way stop at SR 3/9/22 FY2023 $30,000 Planning and design activities Dawn McPherson 49822.1 .1 1005 (E. Greensboro Chapel Hill Road) at SR 2351 (Bethel underway - installation of all way 49822.3.1 South Fork Road) in Snow Camp. stop installed 3/9/2022, inspection 5/16/22 47786 Intersection improvements on SR 1007 (Mebane Oaks Rd) at 6/22/22 Aug. 2022 $898,500 Construction to begin once utility Chad Reimakoski SM-5707B SR 2126/2128 (Old Hillsborough Rd) south of Mebane. 7/1/22 relocations are complete Derek Dixon 47903.2.1 Improvements include addition of left and right turn lanes, radii widening, signal installation, resurfacing, and pavement markings. SM-6107B SR 1167 (Longpine Road) at SR 1146 (Kirkpatrick Road). 10/15/22 4/1/23 $185,000 Planning and design activities Dawn McPherson 50522 Installation of a modular mini-roundabout. underway. SS-6207G NC 87 (East Webb Avenue) at Flanner Street, Pedestrian 4/1/23 7/1/23 $60,000 Planning and design activities Dawn McPherson 50502 signal installation and crosswalk pavement markings. underway. BGUMPO Aug. 2022 Page 1 NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Completion Cost Status Project Lead Date Date U-6017 Intersection improvements at NC 54 (East Harden St.) and 6/15/23 FY2025 $2,100,000 Planning and design activities Rob Weisz 47162.1 .1 NC 49 (East Elm St.) in Graham underway - ROW underway 47162.2.1 47162.3.1 W-5707D Safety Improvements to curve on NC 49 located between 6/15/23 Nov. 2023 $450,000 Planning and design activities Chad Reimakoski 44853.1 .4 Buckingham Mountain Road and SR 2363 (Beale Road) in 6/16/22 Nov. 2022 underway; ROW acquisition 44853.2.4 Snow Camp underway 44853.3.4 U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 12/19/23 FY2026 $6,200,000 Planning and design activities Rob Weisz 47158.1 .4 Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd underway, ROW underway 47158.2.4 (non-system) in Mebane. 47158.3.4 U-6011 Intersection improvements at US 70 (South Church Street) 8/20/24 FY2026 $2,400,000 Planning and design activities Brian Ketner 47146.1 .1 and SR 1158 (Huffman Mill Rd) in Burlington underway - ROW acquisition 47146.2.1 pending 47146.3.1 U-5844 Construct multi-lanes on NC62 from SR 1430 (Ramada Road) 3/18/25 FY2028 $10,000,000 Planning and design activities Rob Weisz 50234.1 .1 to US 70 (South Church Street) in Burlington underway 50234.2.1 50234.3.1 U-6014 Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with 3/18/25 FY2027 $13,200,000 Planning and design activities Rob Weisz 47159.1 .1 Bicycle/Pedestrian accommodations from SR 1720 (West underway, Includes EB-5882 47159.2.1 Hanover Rd) to Morningside Drive in Burlington 47159.3.1 B-6052 Replace bridge 68 over NCRR / Norfolk Southern Railroad on 1/20/26 FY2027 $2,500,000 PE funding approved 5/6/19 Kevin Fischer 48709.1 .1 SR 1928 (Trollingwood Road) in Haw River 48709.2.1 48709.3.1 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 (Huffman 6/27/29 FY2031 $936,000 PE funding approved 6/5/18 Brian Ketner 47962.1 .1 Mill Road). Construct additional right turn lane on 1-40 WB 47962.2.1 Ramp and improve operations at SR 1308 (Garden Road) 47962.3.1 intersection in Burlington BGUMPO Aug. 2022 Page 2 NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Completion Cost Status Project Lead Date Date U-6009 Widen and construct center turn lane on US70 (West Church 1/1/40 FY2040 $6,337,000 Planning and design activities on Rob Weisz 47144.1 .1 St) from Tarleton Ave. to Fifth Street in Burlington hold 47144.2.1 47144.3.1 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/1/40 FY2040 $12,400,000 PE funding scheduled for 12/4/24 Laura Sutton 48689.1 .1 (Trollingwood-Hawfields Road) in Mebane 48689.2.1 48689.3.1 BGUMPO Aug. 2022 Page 3 8/2/2022 North Carolina Department of Transportation Active Projects Under Construction - Alamance Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C203844 U-3109A NC-119 RELOCATION FROM 1-40/85 TO SR-1921 THALLE CONSTRUCTION Howell, Bobby J $45,389,069.36 6/26/2017 1/28/2021 8/3/2017 8/31/2022 100.00 99.31 (MEBANE ROGERS RD/ STAGE COACH RD). CO., INC. C204106 U-3109B NC-119 RELOCATION NORTH OF SR-1921 (MEBANE THALLE CONSTRUCTION Howell, Bobby J $8,151 ,660.80 8/27/2018 11/28/2020 10/4/2018 8/31/2022 100.00 87.30 ROGERS RD) TO SOUTH OF SR-1918 (MRS WHITE CO., INC. RD). C204111 U-6015 BURLINGTON - GRAHAM SIGNAL SYSTEM ALS OF NORTH Howell, Bobby J $7,938,392.20 10/29/2018 8/15/2021 2/11/2019 8/31/2022 100.00 95.01 CAROLINA LLC C204438 B-5728 REPLACE BRIDGE #112 OVER REEDY FORK CREEK SMITH-ROWE, LLC Howell, Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 ON NC 87 IN OSSIPEE C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70 (SOUTH APAC ATLANTIC INC. Howell, Bobby J $13,975,135.25 7/6/2022 1/13/2025 CHURCH STREET) AT SR 1226/SR 1311 THOMPSON ARTHUR UNIVERSITY DRIVE IN BURLINGTON DIVISION C204603 1-5711 1-40/1-85 AND SR 1007 (MEBANE OAKS ROAD) IN ZACHRY Howell, Bobby J $12,865,732.71 4/26/2021 1/11/2024 4/26/2021 1/11/2024 48.00 42.30 MEBANE INTERCHANGE IMPROVEMENTS CONSTRUCTION CORPORATION C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF FSC II LLC DBA FRED Lorenz, PE, Kris $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 76.40 41 .08 NC 49 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY D000407 REPLACE BRIDGE #444 ON SR 1768 (HUGHES MILL SMITH-ROWE, LLC Howell, Bobby J $620,550.15 6/3/2021 8/31/2022 9/23/2021 8/31/2022 54.00 99.75 ROAD) OVER JORDAN CREEK D000511 REPLACE BRIDGE #173 ON SR 1149 (HUFFMAN MILL R.E. BURNS & SONS CO., Snell, PE, $2,106,851 .45 5/3/2021 10/25/2022 5/3/2021 10/25/2022 99.20 90.74 ROAD) OVER BACK CREEK INC. William H DG00520 R-5787F INSTALLATION OF ADA COMPLIANT CURB RAMPS DOT CONSTRUCTION Howell, Bobby J $1 ,271 ,240.40 5/10/2021 4/14/2023 1/25/2022 4/14/2023 21 .57 21 .76 AT VARIOUS ROUTES INC DG00527 HS-2007C PLACEMENT OF THERMOPLASTIC PAVEMENT TMI SERVICES INC. Cvijetic, PE, $1 ,358,289.72 8/16/2021 12/31/2022 5/18/2022 12/31/2022 1 .35 1 .35 MARKING LINES ON VARIOUS SECONDARY ROADS Bojan THROUGHOUT THE DIVISION DG00553 RESURFACE THREE SECTIONS OF SECONDARY VECILLIO & GROGAN INC Hayes, PE, $2,739,764.39 4/1/2022 6/30/2022 3/10/2022 6/30/2023 25.00 97.73 ROADS IN ALAMANCE COUNTY DBA SHARPE BROTHERS Meredith D D000556 REPLACE BRIDGE #003 ON SR 1529 (DURHAM R.E. BURNS & SONS CO., Howell, Bobby J $789,559.95 4/19/2022 2/12/2022 4/19/2022 2/12/2023 68.00 61 .18 STREET EXT.) OVER DRY CREEK INC. DG00557 RESURFACING OF FOUR SECONDARY ROADS IN APAC ATLANTIC INC. Howell, Bobby J $1 ,622,818.16 4/1/2022 11/18/2022 7/18/2022 ALAMANCE COUNTY THOMPSON ARTHUR DIVISION DG00559 RESURFACE A SECTION OF NC 100, NC 49, US 70 & BOGGS CONTRACTING, Howell, Bobby J $2,740,478.60 5/1/2022 6/30/2022 5/20/2022 6/30/2023 14.00 8.43 3 SECONDARY ROADS IN ALAMANCE COUNTY INC D000574 RESURFACING OF ONE PRIMARY & SIX APAC ATLANTIC INC. Howell, Bobby J $1 ,588,752.25 6/1/2022 6/30/2023 7/18/2022 SECONDARY ROADS IN ALAMANCE COUNTY THOMPSON ARTHUR DIVISION Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED IN TARPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) west of Jun. 2022 Nov. 2022 $261 ,000 Planning and Design activities currently on Chad Reimakoski 47936.1 .1 SR 1561/SR 1709 (Lawrence Road) east of Hillsborough. hold - Project shelved due to minimal crash 47936.2.1 Improvements consist of wedging pavement and grading rate during observation period. To be 47936.3.1 shoulders. resubmitted for federal funding. 1-5958 Pavement rehabilitation on 1-40 / 1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Chad Reimakoski 45910.1 .1 (Buckhorn Road) to west of SR 1006 (Orange Grove Road). 45910.3.1 1-5959 Pavement rehabilitation on 1-85 from west of SR 1006 (Orange 11/16/27 FY2029 $11 ,156,000 Planning activities pending Chad Reimakoski 45911 .1 .1 Grove Road) to Durham County line. 45911 .3.1 R-5821A Construct operational improvements including 6/20/28 FY2030 $3,194,000 PE funding approved 10/10/17, design Rob Weisz 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study 47093.3.2 Road). TARPO-Orange Co Aug. 2022 Page 1 North Carolina Department of Transportation 8/2/2022 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE S T WOOTEN Nordan, PE, $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 8/31/2022 100 88.94 COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 CORPORATION James M C204078 B-4962 REPLACE BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS. CONTI ENTERPRISES, Howell, Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 8/31/2022 100 95 INC C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 9.98 9.98 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan US-15/501 . CORPORATION C204674 RESURFACING 35 SECTIONS OF SECONDARY ROADS IN DURHAM FSC II LLC DBA FRED Nordan, PE, $3,308,745.60 3/1/2022 9/29/2023 3/1/2022 9/29/2023 91 .8 87.98 COUNTY. SMITH COMPANY James M DG00483 RESURFACE SR 1010 (MAIN STREET/FRANKLIN STREET) FROM SR CAROLINA SUNROCK Howell, Bobby J $845,631 .59 5/18/2019 8/7/2020 5/23/2022 8/31/2022 20 18.71 1005 (JONES FERRY ROAD) TO NC 86 (COLUMBIA STREET) LLC D000520 R-5787F INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS DOT CONSTRUCTION Howell, Bobby J $1 ,271 ,240.40 5/10/2021 4/14/2023 1/25/2022 4/14/2023 21 .57 21 .76 ROUTES INC DG00527 HS-2007C PLACEMENT OF THERMOPLASTIC PAVEMENT MARKING LINES ON TMI SERVICES INC. Cvijetic, PE, $1 ,358,289.72 8/16/2021 12/31/2022 8/18/2022 12/31/2022 1 .35 1 .35 VARIOUS SECONDARY ROADS THROUGHOUT THE DIVISION Bojan DG00534 REPLACE BRIDGE #99 OVER NEW HOPE CREEK ON SR 1723 (NEW CONTI ENTERPRISES, Howell, Bobby J $1 ,108,442.00 1/3/2022 11/30/2022 5/9/2022 11/30/2022 81 .51 31 .68 HOPE CHURCH ROAD) INC D000547 RESURFACE A SECTION OF NC 49 & 6 SECONDARY ROADS IN FSC II LLC DBA FRED Howell, Bobby J $4,299,745.38 4/1/2022 10/31/2022 4/1/2022 10/31/2022 57 84.28 ORANGE COUNTY SMITH COMPANY D000550 AST TREATMENT OF 32 SECONDARY ROUTES IN ORANGE WHITEHURST PAVING Howell, Bobby J $1 ,840,813.26 4/1/2022 10/31/2022 COUNTY CO. INC. DG00554 RESURFACE A SECTION OF NC 54 & 14 SECONDARY ROADS IN FSC II LLC DBA FRED Howell, Bobby J $3,755,101 .19 4/1/2022 10/31/2022 4/28/2022 10/31/2022 42 41 .52 ORANGE COUNTY SMITH COMPANY Page 1 of 1