Loading...
HomeMy WebLinkAboutAgenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 18, 2023 Action Agenda Item No. 6-a SUBJECT: Orange County Transportation Priority List for SPOT 7.0 / FY 2026-2035 STIP DEPARTMENT: Orange County Transportation Services (OCTS) ATTACHMENT(S): INFORMATION CONTACT: 1. Acronym List Nishith Trivedi, Transportation Director, 2. Projects in TARPO 919-245-2007 3. Projects in BG MPO 4. Hillsborough Resolution 5. Projects in DCHC MPO 6. Orange County Resolution PURPOSE: To consider a resolution approving Orange County's transportation priorities for the State's Strategic Prioritization of Transportation (SPOT)/Strategic Transportation Improvement Program (STIP). BACKGROUND: Biennially, the North Carolina Board of Transportation (BOT) adopts a ten year Statewide Transportation Improvement Program (STIP) that funds and schedules transportation projects throughout the state for all modes. The STIP implements Metropolitan and Rural Planning Organizations (MPO/RPO) adopted Comprehensive Transportation Plan (CTP) and Metropolitan Transportation Plan (MTP). The CTP and MTP are used by the MPO/RPO to determine which projects are submitted for consideration in the STIP using the Strategic Prioritization of Transportation (SPOT) process. The Board initially discussed this item at its March 7, 2023 Business meeting. SPOT P7.0 Schedule and Process Between spring and fall 2023, MPO/RPOs across the state will submit their limited number of projects — based on their population and total centerline miles — to North Carolina Department of Transportation (NCDOT) for inclusion in SPOT 7.0. These projects must be approved by their respective Boards prior to submission to the MPO/RPO for their consideration. Orange County's process requires the BOCC approve the list of County transportation priorities prior to submission to respective MPO/RPO. Each MPO/RPO has its own unique process for determining which limited number of projects to submit to NCDOT. • DCHC MPO will only submit projects listed in the adopted MTP • TARPO uses a subcommittee for SPOT 7 project selection • BG MPO uses a multi-criteria process to determine which projects to submit Before the MPO/RPO Boards approve projects for submission, they will conduct a 30 day public comment period and public hearing. 2 SPOT P7.0 Project List OCTS staff is recommending Orange County transportation priorities be updated so that projects may compete better. A list of acronyms is provided (Attachment 1) to go along with the recommended County Transportation Priority projects noted in Attachments 2, 3, and 5. • Due to cancellation of SPOT 6, staff recommends the same priorities as SPOT 6. • Staff is recommending removal of independent bike/ped projects per State Transportation Investment law — North Carolina General Statutes § 136-189.11 (d).(3).c.— o "The Department shall not provide financial support for independent bicycle and pedestrian improvement projects." • Staff recommends adding NC 10 modernization and Orange Grove Road Extension as County Priorities for SPOT and other funding opportunities. TRANPORTATION ADVISORY SERVICE (TAS): The TAS met on Thursday, January 26, 2023 and unanimously recommended approval. ORANGE UNIFIED TRANSPORTATION BOARD (OUTBOARD) ACTION: The OUTBoard met on Thursday, January 26, 2023 and unanimously recommended approval. HILLSBOROUGH: The Hillsborough Board of Commissioners adopted a resolution on March 27, 2023 endorsing Orange County priorities with additions (Attachment 4). CHAPEL HILL AND CARRBORO: The towns took no formal action, and are pursuing local projects at DCHC MPO Technical Commmittee and MPO Board. OCTS UPDATE: County priorities in DCHC MPO (Attachment 5) are updated based on local action and public comment. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. Independent bike/ped projects still require a 20 percent local match and local administration, through separate resolutions, and will be choreographed with the County's budget process. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is applicable to this item: 3 • CLEAN OR AVOIDED TRANSPORTATION Implement programs that monitor and improve local and regional air quality by: 1) promoting public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3) otherwise minimizing the need for travel. RECOMMENDATION(S): The Manager recommends that the Board approve the resolution (Attachment 6) to submit transportation projects for the SPOT 7.0/STIP 2026-2035. Attachment 1 4 AcronymDescription BG MPO Burlington Graham Metropolitan Planning Organization BOT Board of Transportation CMAQ Congestion Management and Air Quality UP Comprehensive Transportation Plan DCHC MPO Durham Chapel Hill Carrboro Metropolitan Planning Organization MTP Metropolitan Transportation Plan NCDOT North Carolina Department of Transportation OUTBoard Orange Unified Transportation Board ROW Right-of-Way SDBGDA Surface Transportation Block Grant Direct Allocation SPOT Strategic Prioritization of Transportation SR Secondary Road STI State Transportation Investment STIP State Transportation Improvement Program TARPO Triangle Area Rural Planning Organization TAS Transportation Advisory Service TIP Transportation Improvement Program 5 Attachment 2:Draft Triangle Area Rural Planning Organization(TARPO)Project List MPO/ AADT 2010- Crashes 2006- 2018 Results Recommendations # RPO Project Description/Need 2016 2016 (SPOT 5.0) Staff OUTBoard Description:Modernize Old Greensboro Road(SR-1005)from Jones Ferry Road(SR-1942)to Alamance County with NCDOT standard street cross-section 2B(60'row,1 T travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at Jones Ferry Road(SR-1942),Hatch Road(SR-1944),Neville Road(SR- west 2800-3000 Total 339 1945),Carl Durham Road(SR-1950),White Cross Road(SR-1951),Wildcat Creek Road(SR-1953),and 5 fatal TARPO Old Greensboro Orange Chapel Clover Garden Road(SR-1956). 6 serious injury County Priority 1 /DCHC (SR-1005)Road 45 minor injury Approval Approval Improvement** Need:This project would provide a continuous paved bikeway segment from Carrboro through the 51 possible injury 22.36 Division southwestern portion of Orange County to connect with other bikeway segments that comprise the state's 232 property Mountain to Sea bicycle route.The project is not likely to score very high using either the State's highway or east 4600-4800 damage bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description:Widen Efland-Cedar Grove Road(SR 1004)from Highland Farm Road(SR 1332)to Carr Store Road(SR-1352)with NCDOT standard street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at Carr Street(SR-1357)and highland Farm Road(SR- north 1400-1800 Total 56 14.63 Division Efland-Cedar Grove 1332). 1 serious injury 2 TARPO Road(SR-1004) 6 minor injury No local points Approval Approval Improvements** Need:The project improves travel time by increased design speed and improves safety with travel lane 11 possible injury recommended straightening and increased pavement width.This segment of Efland-Cedar Grove Road is a travel alternative 38 property to NC 86 for traffic from northwestern Orange County to access 1-40/85,and as such,traffic is projected to south 2100-2200 damage Not funded continue to increase in future years. Description:Modernize Orange Grove Road(SR-1106)from 1-85 to Dodson Crossroad(SR-1007)with NCDOT County Priority standard street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety Total 102 improvements at Ode Turner Road(SR-1130),Dimmocks Mill Road(SR-1134),Crossroad Church Cemetery north 4700-4600 1 fatal Not submit to Road(SR-1131),Davis Drive(SR-1129),Kimbro Road(SR-1128)and Dodson Crossroads(SR-1102) TARPO Orange Grove Road 1 serious injury NCDOT for 3 (SR-1006) 7 minor injury P5.0 Approval Approval /DCHC Need:This project would provide one segment of a bikeway connection through western Orange County from Improvement** Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both 13 possible injury o local d match bicyclists and motorized vehicular travel.The project is not likely to score very high using the State's south 2400-3100 80 property No 20 o bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. damage administration local ration Description:Modernize Dairyland Road(SR-1177)from Orange Grove Road(SR-1006)to Old NC-86(SR- 1009)with NCDOT standard street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add County Priority turn lanes and safety improvements at Orange Grove Road(SR-1006),Dodson Crossroads(SR-1102),Rocky Total 121 Ridge Road(SR-1113), Bethel Hickory Grove Church Road(SR-1104)and convert intersection at Old NC-86 west 940-970 2 fatal Not submit to TARPO Dairyland Road (SR-1009)to Roundabout. 2 serious injury NCDOT for 4 /DCHC (SR-1177) 15 minor injury P5.0 Approval Approval Improvement** Need:This project would provide one segment of a bikeway connection through western Orange County from 16 possible injury Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for 86 property No 20%local motorized vehicular travel.The project is not likely to score very high using the State's bile/pedestrian scoring east 5400-5200 damage match or local factors because of its rural context and is only eligible for funding at the division tier. administration Description:Modernize Dodson Crossroad(SR-1102)from Orange Grove Road(SR-1006)to NC-54 with NCDOT standard street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and County Priority safety improvements at Orange Grove Road(SR-1106),Borland Road(SR-1126),Arthur Minnis Road(SR- north 830-1000 Total 62 1115),and Dairyland Road(SR-1177) Not submit to 2 serious injury Dodson Crossroad NCDOT for TARPO 8 minor injury 5 (SR-1102) Need:This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge P5.0 Approval Approval /DCHC 10 possible injury Improvement** High School from the area south of the schools and connect to a proposed bikeway facility on Orange Grove 42 property Road northward into Hillsborough.The project would also improve safety for motorized vehicular travel on this south 1800-1800 damage No 20%local segment of Orange Grove Road.The project is not likely to score very high using the State's bike/pedestrian match or local scoring factors because of its rural context and is only eligible for funding in the division tier. administration 6 Attachment 2:Draft Triangle Area Rural Planning Organization(TARPO)Project List Recommendations MPO/ AADT 2010- Crashes 2006- Map RPO Project Description/Need 2016 2016 2018 Results Staff OUTBoard Description:Modernize Mebane Oaks Road(SR 1007)from NC 54 to 1-85 with NCDOT standard street cross- section 2B(60'row,11'travel lanes,with 5'paved shoulder),add turn lanes and safety improvements at Old Hillsborough Road Road(SR-2126),Hebron Church Road(SR-1139),Yarborough Road(SR-1138),Oak Grove north 4400-3400 Total 161 Church Road(SR-1117),Jones Road(SR-1123),S Jim Minor Road(SR-2135),Nicks Road(SR-1119), 2 fatal Mebane Oaks Road Bradshaw Quarry Road(SR-1100),and NC-54 4 serious injury 6 TARPO (SR-1007) 19 minor injury N/A Approval Approval Improvement** Need:This project would provide multimodal and safety improvements along a north-south corridor that 31 possible injury connects Orange and Alamance County.This corridor is growing more unsafe with increasing accidents,two of 105 property south 2400-2400 damage them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes at Davis Road(SR- north 5500-6300 Total 208 1129),and New Hope Church Road(SR-1723) 3 fatal Old NC-86 3 serious injury TARPO Need:This project would provide multimodal and safety improvements along a north-south corridor for 7 (SR-1009) 15 minor injury N/A Approval Approval /DCHC commuters travel between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing Improvement** accidents,three of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce 24 possible injury south 4500- crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will sou 5000 163 property continue increasing making the area more hazardous and will eventually exceed the capacity of the existing damage road. Description:Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the Total 609 corridor and safety improvements at each intersection. north 4700-5700 g fatal Need:This project would provide multimodal and safety improvements along a north-south corridor for 6 serious injury 8 TARPO NC-86 Improvement** commuters travel between Orange and Caswell County.This corridor is growing more unsafe with increasing 46 minor injury N/A Approval Approval accidents,nine of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce south 11000- 111 possible crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will 11000 injury 437 property continue increasing making the area more hazardous and will eventually exceed the capacity of the existing damage road. Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)and from Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/ East 12000- Total 340 Inside DCHC with additional lanes and multimodal facilities along the corridor and safety improvements at each 15000 3 fatal TARPO intersection. 8 serious injury 61.80 Region 9 NC-54 Improvement** 35 minor injury Approval Approval /DCHC Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 61 possible injury 26.58 Division substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 9300- 233 property widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 10000 damage and crashes along corridor. Description:Widen from Mebane Oaks Road(SR-1007)to Orange Grove Rd(SR 1006)with additional lanes East 9300-10000 and multimodal facilities along the corridor and safety improvements at each intersection. Total 163 1 fatal Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 4 serious injury 10 TARPO NC-54 Improvement** 19 minor injury N/A Approval Approval substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 5800-6000 20 possible injury widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 119 property and crashes along corridor damage Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for 1'`5 feet of sidewalk and 100%Orange County for any additional sidewalk. Attachment 2: Draft Triangle Area Rural Planning Organization(TARPO)Project List 7 TARPO SPOT 6 - Projects Caswell Co. Person C o. 6A Doa 4 F'FS. R, �2 4 l �T ,g g o rc S sar_ vo y RRD ^Ok` �sA 'r0 ee� a 7 �AYY STOR E R RO 49 Q Tl 2 HA;WIN5 RD 4EF RD JSP 15� a uTTLE RNEq CH[1RCk q I,p�`;t r•F, rI �,p1sU RO STORPR(1 w O PEAR.¢,_ N U Y YNO O o 1fGFR RO Goy w � s r ❑ 4 '.'f KENION q0 ��.As� Gayy to f w �ako waustniuRa v ak �FIN Afl �N L4&wloN NO EE �. p o �[ f•ti Do 5J o J P4 yo a� - Mebanera L 0 �GSOR -gam Od 70 ��a wesr 1 '° E rRvoN 5f D, z q° ' "IENR° p ,� Hillsborough' 1s i`£ zpv R� t '� 70A WOK" 4❑ .� �C',�[E uR ? •yc 70 ti ts 1- y�RP RO .t u�S �9,`uS�R 5 80Rf.Rv1V Rp � & A6 K� A1 t2 . y Durham Co. v RRTNvx rw o �y d145 Q' 2 PA qF 4W od[ A OKSRD fu p D AV p or s EAVE K' $I TEER a� S� 1 rFAD Rb Rn Z o Chapel'Hlll'i s n 5 y� +ica J' �.z� F� ,J �gV � C4� � N,AD v��S,•rhk: n• Ra�E vk A:i RgFf�5f1nRO ••1 a �p1C• �pv OL_G v� o y y'•r Project Locations �--- - —.--�'S�'G�—-� ; Municipal Boundaries DCHC MPO Boundary , to 1 in-3 miles ORANGE 110111[=Miles TARPO Boundary COUNTY 0 2 B-G MP?Boundary orange CoAnty CPlan g and inspection 8 Attachment 3:Draft Burlington-Graham Metropolitan Planning Organization(BGMPO)Project List MPO/ Recommendation # RPO Project Description/Need AADT 2010-2016 Crashes 2006-2016 2018 Results (SPOT 5.0) Staff OUTBoard lbke ription:Widen US-70 and improve intersections from Buckhorn Road(SR-1114)to Durham Total 1148 ty with NCDOT standard street cross-section 4G(110'row,17.5'median,11'travel lanes,5' West 6400-6200 10 fatal ane,c&g,and sidewalk),add turn lanes and safety improvements at NC-86,St.Mary's Road1 DCHC/BG US-70 002),Efland Cedar Grove Road(SR-1004),Frazier Road(SR-1310),Richmond Road(SR- 12 serious injury N/A Approval Approval Improvements— 1312),Brookhollow Road(SR-1324),Faucette Mill Road(SR-1328),Miller Road(SR-1555), 100 minor injury Lawrence Road(SR-1561),Palmers Grove Church Road(SR-1562),Pleasant Green Road(SR- East 12000-14000 220 possible injury 1567),Orange High School Road SR-1588,and N Scotswood Boulevard SR-2300. 706 property damage County Priority 2 BG Mattress Factory Description:Construct a new interchange at the existing grade-separated crossing of Mattress N/A Approval Approval Road Interchange Factory Road and 1-85/1-40 Not submit to NCDOT for P5.0 Description:Extend Mattress Factory Road northward across East Washington Street and the North 2200-2000 Total 18 County Priority Mattress Factory 3 BG Road Extension to NCRR/Nort 1 serious injury olk Southern railroad right-of-way to intersect U.S.70 and close the existing railroad 3 minor injury Not submit to Approval Approval U.S.70 crossover road connecting East Washington Street and U.S.70 approximately 240 feet to the east 1 possible injury NCDOT for P5.0 of the intersection of Mattress Factory Road and East Washington Street. South 1300-1800 13 property damage Total 124 County Priority Buckhorn Road North 6800-6600 2 serious injury 4 BG (SR 1114) Description:Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to multiple lanes with 14 minor injury Not submit to Approval Approval Widening— bicycle and pedestrian facilities with grade separation over railroad to US-70. 18 possible injury NCDOT for P5.0 South 2500-3000 90 property damage Total 100 Lebanon Road East 2600—3000 2 serious injury 5 DCHC/BG (SR-1306) Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek 12 minor injury N/A Approval Approval Improvements" Road(SR-1345)to Efland-Cedar Grove Road(SR-1004) 11 possible injury West 2100-2300 75 property damage Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for 1"5'of sidewalk,100%Orange County for any additional sidewalk. Attachment 3:Draft Burlington-Graham Metropolitan Planning Organization(BGMPO)Project List 9 BGMPQ SPOT 6 - Projects 5 1 i II 1� li � s 7 y +-FURCH Rp I �4L t IRA F76 I 11 I 'I i 1 I ,A ir y `�.�-�� LicBANO1V RO OL_r r r l 1 I i I Mebane I I o 7 � 1 n � t � o T ti WE57 TEN RO -- -- _ o I O 4G U HEgRprl Project Locations ' Municipal Boundary pooK¢ B-G MPO Boundary �z� x i in=a.00n reel � oliarv�E �FeA, DCHC MPO Boundary s,aoo TARPO Boundary Orange counEIC V �2S 209 a Inspection 10 �SbOR0 s RESOLUTION Supporting the Town's Priority Transportation Projects for Inclusion in o 17 ' +54��Q The SPOT 7 Ranking Process ITN C)NI WHEREAS,the town board previously reviewed and discussed priority transportation projects in September 2021 for inclusion in the SPOT 6 ranking process; and WHEREAS, no SPOT 6 projects were funded due to NCDOT budgetary challenges; and WHEREAS,the board has reviewed the town's list of priority transportation projects and the draft Orange County SPOT 7 list; and WHEREAS,the board requests that the Orange Grove Road/86 Connector project be added to the Orange County SPOT 7 project list; and WHEREAS,the board reaffirms its support for the following projects included in the draft SPOT 7 list: 1-85/Old NC 86 Interchange • 1-85/NC 86 Interchange • 1-85 Widening • 1-40 Widening • South Churton Street Improvements(including Lafayette/Cates Creek Intersection Improvements) • Eno Mountain/Mayo/Orange Grove Road Roundabouts • 1-85 Pedestrian Bridge • US-70 Corridor Projects; and WHEREAS, in addition to the projects listed above, the board also affirms its support for the Ridgewalk Greenway as a priority transportation project; NOW, THEREFORE, be it resolved by the Hillsborough Board of Commissioners that the above listed projects are the town's priority transportation projects for inclusion in the SPOT 7 ranking process. Approved this 2711 day of March of the year 2023. 000 � Jenn Weaver, Mayor Town of Hillsborough 0�17 5�`�� c Ago Attestation: Sarah Kimrey,Town C erk 11 Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List MPO/ AADT 2010- Crashes 2006- 2018 Results Recommendations # RPO Project Description/Need 2016 2016 (SPOT 5.0) Staff OUTBoard Description:Widen US-70 and improve intersections from Buckhorn Road(SR-1114)to Durham County with NCDOT standard street cross-section 4G(110'row,17.5'median,11'travel lanes,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at NC-86,St.Mary's Road(SR-1002),Efland Cedar Grove Road(SR-1004),Frazier Road(SR- West 6400-6200 Total 1148 1310),Richmond Road(SR-1312),Brookhollow Road(SR-1324),Faucette Mill Road(SR-1328),Miller Road(SR-1555), 10 fatal Lawrence Road(SR-1561),Palmers Grove Church Road(SR-1562),Pleasant Green Road(SR-1567),Orange High School 12 serious injury 1 DCHC US-70 Road(SR-1588),and N Scotswood Boulevard(SR-2300). 100 minor injury N/A Approval Approval /BG Improvements 220 possible injury Need: This is a major east-west corridor linking Mebane,Hillsborough and Durham through Orange County.Traffic continues 706 property Ea increasing with more commuters traveling from Mebane and Hillsborough into Durham.Many use this corridor to avoid 1-85.It st 12000- damage is also designated at a Strategic Freight Corridor in the DCHC MPO adopted Freight Plan. 14000 Description:Reconstruct interchange at 1-85 and NC 86 1-85/NC 86 Funded Need:This project would relieve existing and/or future expected congestion on the under-capacity existing interchange to 2 DCHC Interchange N/A Statewide Funded Funded accommodate future capacity improvements to I-85 and increase operational efficiency at the on-ramp/off-ramp intersections Improvements with NC 86.The new interchange would also be an opportunity to provide pedestrian and biking facilities across 1-85;these TIP I-5984 facilities do not currently exist along the corridor. Description:Widen NC 86 from U.S.70 Bypass to north of NC 57 to four(4)lanes with intersection improvements at U.S.70 Bypass and NC 57 Total 114 NC 86 Need:The segment of NC 86 between NC 57 and U.S.70 is highly congested.Traffic counts indicate that this segment of NC 1 serious injury County Priority 3 DCHC Improvements 86 is over capacity for average annual daily counts.Capacity improvements would ease congestion and improve travel time 17,000-18,000 5 minor injury Approval Approval North of along this primary north-south corridor connecting the Town of Hillsborough to NC 57 and northern Orange County. 26 possible injury 51.02 Regional Hillsborough Additionally,this area is identified in the Orange County Safe Routes to School Plan and the Town of Hillsborough 82 property 27.42 Division Connectivity Plan as an area in need of improvements for pedestrians,particularly for school age residents of the Fairview damage neighborhood that walk to Orange High School and Stanford Middle School.The Town of Hillsborough Connectivity Plan also calls for bike lanes in this area as well. Eno Mountain Description:Realign the intersection of Eno Mountain Road(SR 1148)and Mayo Street(SR 1192)with Orange Grove Road Eno 3800-4500 Total 38 Road/Mayo Street (SR 1006)and make safety improvements. 4 minor injury County Priority 4 DCHC 4 possible injury Approval Approval at Orange Grove Need:The project would improve safety,reduce travel time,and improve traffic flow between residential and commercial Mayo 5300- 30 property 14.36 Division Rd. areas in the Town of Hillsborough. 5200 damage Description:Modify the 1-85/1-40 Connector(SR 1239)interchange at U.S.70 to provide access from all directions. Total 54 t/14Need:The project would enable traffic from northwestern Orange County to access 1-85 more easily without risking the many 1 fatal County Priority 5 DCHC U.S.70 Ea Connector 5/I- points of traffic conflict through Efland. Traffic has increased on Efland-Cedar Grove Road as an alternative to NC 86.Much 4100-4900 5 minor injury Approval Approval 40 Connector of that traffic currently"dog-legs'through Efland via Forrest Avenue to Mt.Willing Road to access 1-85/1-40.Traffic counts 4 possible injury 18.43 Regional reveal that traffic has increased approximately 40%over the past 10 years on Mt.Willing Road just south of Forrest Avenue, 44 property 13.0.03 Division while traffic on U.S.70 east of Efland-Cedar Grove Road has increased only 2%.The project would dramatically improve damage travel time for traffic from northwestern Orange County to 1-85/1-40 and would dramatically ease congestion during peak periods in Efland. Description:Modernize Old Greensboro Road(SR-1005)from Jones Ferry Road(SR-1942)to Alamance County with NCDOT standard street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety Total 339 improvements at Jones Ferry Road(SR-1942),Hatch Road(SR-1944),Neville Road(SR-1945),Carl Durham Road(SR- west 2800-3000 5 fatal DCHC Old Greensboro 1950),White Cross Road(SR-1951),Wildcat Creek Road(SR-1953),and Orange Chapel Clover Garden Road(SR-1956). 6 serious injury County Priority 6 /TARP (SR-1005)Road 45 minor injury Approval Approval O Improvement— Need:This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of 51 possible injury 22.36 Division Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route.The project east 4600—4800 232 property is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context damage and is only eligible for funding at the division tier. 12 Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Recommendations MPO/ AADT 2010- Crashes 2006- Map RPO Project Description/Need 2016 2016 2018 Results Staff OUTBoard Description:Modernize Dairyland Road(SR-1177)from Orange Grove Road(SR-1006)to Old NC-86(SR-1009)with NCDOT standard street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety Total 121 County Priority improvements at Orange Grove Road(SR-1006),Dodson Crossroads(SR-1102),Rocky Ridge Road(SR-1113), Bethel west 940-970 2 fatal DCHC Dairyland Road Hickory Grove Church Road(SR-1104)and convert intersection at Old NC-86(SR-1009)to Roundabout. 2 serious injury Not submit to NCDOT for P5.0 7 /TARP (SR-1177) 15 minor injury Approval Approval O Improvement" Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 16 possible injury ° Bkhom Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized No 20/local uc south 2400 property vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its sou - 86 match or local rural context and is only eligible for funding in the division tier. 3100 damage administration Description:Modernize Dodson Crossroad(SR-1102)from Orange Grove Road(SR-1006)to NC-54 with NCDOT standard County Priority street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at north 830-1000 Total 62 Orange Grove Road(SR-1106),Borland Road(SR-1126),Arthur Minnis Road(SR-1115),and Dairyland Road(SR-1177) 2 serious injury Not submit to DCHC Dodson Crossroad 8 minor injury NCDOT for P5.0 8 /TARP (SR-1102) Need:This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from Approval Approval 10 possible injury O Improvement the area south of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. south 1800- 42 property No 20%local The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road.The project is 1800 damage match or local not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible administration for funding in the division tier. Description:Modernize Orange Grove Road(SR-1106)from 1-85 to Dodson Crossroad(SR-1007)with NCDOT standard street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at north 4700- Total 102 County Priority Ode Turner Road(SR-1130),Dimmocks Mill Road(SR-1134),Crossroad Church Cemetery Road(SR-1131),Davis Drive DCHC Orange Grove (SR-1129),Kimbro Road(SR-1128)and Dodson Crossroads(SR-1102) 4600 1 seriousalnjury NCDOT for P5.0 Not submit to 9 /TARP Road(SR-1006) 7 minor injury Approval Approval O Improvement— Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 13 possible injury ° B uckhom 80r rt Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized No 20/o local vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its south 2400- popey match or local rural context and is only eligible for funding in the division tier. 3100 damage administration Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)and from East 12000- Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/Inside DCHC with additional lanes 15000 and multimodal facilities along the corridor and safety improvements at each intersection. Total 340 Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially 3 fatal exceed the existing roadway capacity by 2035,warranting an increase in capacity through widening.NCDOT traffic figures DCHC 8 serious injury 61.80 Region NC-54 already indicate that traffic along the segment of NC 54 from Butler Road/Dodsons Cross Road to Neville Road is at capacity 10 !TARP y 9 9 p y 35 minor injury Approval Approval O Improvement— and will only continue to substantially exceed capacity in future years.It is likely that traffic along the segment of NC 54 from 61 possible injury 26.58 Division Neville Road to Old Fayetteville Road is also at or over capacity.Specific user input on the subject corridor reveals the lack of West 9300- 233 property usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. 10000 damage User input also reveals the presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right turns at some intersecting streets and entrances to businesses along the corridor. Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek Road(SR-1345)to East 2600—3000 Total 100 Efland-Cedar Grove Road(SR-1004) 2 serious injury 11 DCHC Lebanon Road 12 minor injury N/A Approval Approval /BG 11 possible injury Need:Road continues experiencing increasing traffic and crashes,intersection and safety improvements along the corridor West 21002300 75 property will help provide safe travel for all users. - damage 13 Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List MPO/ AADT 2010- Crashes 2006- Recommendations Map RPO Project Description/Need 2016 2016 2018 Results Staff OUTBoard Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard street cross- section 2E(60'row,11'travel lane,5'bike lane,c&g,and sidewalk),add turn lanes at Davis Road(SR-1129),and New Hope north 5500- Total 208 Church Road(SR-1723) 6300 3 fatal DCHC Old NC-86(SR- 3 serious injury Need:This project would provide multimodal and safety improvements along a north-south corridor for commuters travel 12 /TARP 1009) 15 minor injury N/A Approval Approval O Improvement"* between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing accidents,three of them being fatal. 24 possible injury Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key south 4500- 163 property locations along the corridor.Traffic along this corridor will continue increasing making the area more hazardous and will 5000 damage eventually exceed the capacity of the existing road. Description:Improve current Dimmocks Mill Rd(#735154S)grade separation and close Bellvue St(#735152D)rail crossing County Priority Dimmocks Mill Need:The NCRR trestle on Dimmock's Mill currently does not allow trucks or pedestrians to safely cross underneath the 13 DCHC Trestle N/A 52.84 Statewide Approval Approval railroad.By restructuring this trestle and reconfiguring the intersection,this area will provide a safe crossing between Improvements Hillsborough and destinations south for all users.Additionally,improving this trestle will allow large trucks to avoid using 8 Regional 22. Churton Street and will helpereate a back entrance to West Hillsborough. 2.86 Division Description:Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. County Priority Exchange Park Need:Currently,the NCRR trestle on Exchange Park Lane only accommodates one vehicle at a time and provides no safe 14 DCHC Lane Rail Trestle accommodations for pedestrians.Once the Hillsborough Train Station is constructed,Exchange Park Lane will be the only N/A 2 16.56 Statewide Approval Approval Improvements safe pedestrian route from the Train Station to Downtown Hillsborough.With substantial pedestrian demand forecast between Regional the Train Station and Downtown Hillsborough,creating a safe pedestrian environment is a crucial need in this area. 12.4.46 Division Description:Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road(SR 1221)to Orange Grove Rd include both pedestrian and bicycle improvements along the roadway.The 1-40 bridge would be widened to accommodate Total 43 Not submit to Widening with both pedestrian and bicycle amenities and one additional travel lane. 1 serious injury NCDOT for P5.0 15 DCHC Bicycle and 4700-4600 5 minor injury o Approval Approval Pedestrian Need:There are significant safety issues along this stretch of roadway for motorists,but also for pedestrians and bicyclists. 6 possible injury No 20/o local Improvements— Increased traffic along Orange Grove Road has led to a significant safety risks for all users of the roadway. 31 property match or local damage administration Orange County Description:Provide one(1)bus to serve a new route for Orange Public Transportation providing service to major trip generators in Hillsborough Public Removed from Need:This project would provide a fixed route for underserved areas of Orange County(not being covered by the 16 DCHC Transportation Hillsborough Circulator)to major points of interest such as medical,employment,retail,municipal and social services.The N/A SPOT in favor of Approval Approval Circulator II is current) in the unfunded category of the Orange Count Bus and Rail Investment Ian, et remains a priorityfor our DO LRT Vehicles project y 9 ry 9 y p y County Board of commissioners.It is only eligible for funding at the Division Needs tier. Description:Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S.70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road,install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road,and construct a sidewalk along entrance roads to CW Stanford Middle School. Orange High Not submit to School Need:Orange High School Road serves two schools north of U.S.70,Orange High School and CW Stanford Middle School. NCDOT for P5.0 17 DCHC Road/Harold Latta There are currently no dedicated pedestrian facilities along Orange High School Road to accommodate students accessing N/A Approval Approval Road Sidewalk the schools from residential areas to the north and east.The project would provide safe and comfortable pedestrian No 20%local Improvements— connections from these areas to the schools.The Orange County Safe Routes to School Action Plan identifies these sidewalk match or local and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. administration. 14 Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Recommendations MPO/ AADT 2010- Crashes 2006- Map RPO Project Description/Need 2016 2016 2018 Results Staff OUTBoard Description:Construct a pedestrian bridge over 140 alongside Orange Grove Road(SR 1006),construct a sidewalk along the north side of Orange Grove Road(SR 1006)from the pedestrian bridge to Timbers Drive,construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing,and construct a sidewalk along one side of Oakdale Drive Not submit to from Cheshire Drive to Orange Grove Road. NCDOT for to Orange Grove Prohibited by Prohibited by 18 DCHC Road/1-40 Need:1-40 separates two schools,Grady Brown Elementary and Cedar Ridge High School,from residential areas north of I- N/A No 20%local STI STI Pedestrian Bridge* 40.The schools are within walking distance of residential areas,but bicyclists and pedestrians must share the roadway with match or local §136-189.11 §136-189.11 motor vehicles crossing the existing narrow two(2)-lane bridge that carries Orange Grove Road over 1-40.The bridge is too administration narrow to accommodate a pedestrian walkway.Lack of an adequate pedestrian crossing presents an unsafe environment for students to walk to the schools.The Orange County Safe Routes to School Action Plan identifies the pedestrian bridge and supporting sidewalk improvements as central elements in the plan for Grady Brown Elementary School. Description:Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village,and Downtown Hillsborough. Not carried forward by MPO Prohibited by Prohibited by I-85 Pedestrian Need:Neighborhoods to the south of 1-85,such as those along Cates Creek Parkway and Beckett's Ridge Drive,lack 19 DCHC Bridge* g g y g NIA STI STI g pedestrian and bicycle connections to commercial amenities and neighborhoods north of the highway.Constructing a bridge No 20%local §136-189.11 §136-189.11 across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to match or local Downtown Hillsborough and commercial amenities along Churton Street.Receiving sidewalks will be present on both sides of administration the proposed pedestrian bridge. Description:Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. Not submit to Trail Connection Need:Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan.An existing NCDOT for P5.0 Prohibited by Prohibited by from English Hill barrier to pedestrians toward Orange High School and CW Stanford Middle School exists between residential areas along 20 DCHC Lane to and east of Buttonwood Drive and residential areas along and west of English Hill Lane.The improvement would provide a N/A No 20%local STI STI Buttonwood Dr.* direct pedestrian connection from highly populated residential areas further west from the schools and make walking match or local §136-189.11 §136-189.11 distances safer and more manageable. administration. Description:Construct a multi-use path connecting the southwest comer of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. Not submit to Trail Connection NCDOT for P5.0 Prohibited by Prohibited by from Patriot's Need:Project is recommended as an improvement in the Orange Count Safe Routes to School Action Plan.An existing 21 DCHC Pointe to Timbers barrier to pedestrians exists between Patriots Point Apartments and Timbers Drive such that long walking distances are N/A No 20%local STI STI Dr.* required for pedestrians from Patriots Pointe to access the New Grady Brown Elementary School and Cedar Ridge High match or local §136-189.11 §136-189.11 School along Orange Grove Road with no designated pedestrian facilities.The improvement would provide a direct administration. pedestrian connection from Patriots Point to Timbers Drive and Orange Grove Road in the direction of the schools that make walking distances more manageable. 15 Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Recommendations Map MPO/ Project Description/Need AADT 2010- Crashes 2006- 2018 Results RPO 2016 2016 staff OUTBoard Description:Extend Orange grove road from Old NC 86(S.Churton Street)to NC 86 with multimodal accommodations and Orange Grove Road taking into consideration the new Hillsborough Train Station. Previously 22 DCHC Extension/NC 86 N/A committed STIP Approval Approval Connector Need:Previously committed STIP project,connection to Hillsborough Train station,provide alternative route for congested project US 70 Business.Increased traffic in and around Hillsborough. Description:Modernize NC 10 from NC 86 to US 70 Business with NCDOT standard street cross-section 2B(60'row,11' travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at Lawrence Road(SR-1561)New Hope 23 DCHC NC 10 Church Road(SR-1723),University Station Road(SR-1712),Mt.Harmon Church Road(SR-1339)and US 70 Business. N/A Public Requested Approval Approval Improvements Need:Public requested Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for V 5'of sidewalk,100%Orange County for any additional sidewalk. Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List 16 DCHC SPOT 6 - Projects Caswell Co, j Person Co. na n _ a_---..J..---- c�reEr7 Rne:. M1 v o • ` '�a A❑� FU� v.W:STaRE Ra 0 H 4 4 `� kowaousRny�5� oaam 0 111 ~�y❑ ?n C L1TiLE RIVFJr�-IVRGfR gy.A1JLL Ro O Qkk"o m Y 6 PFAR3.., y g ISO o KKaER Ra £ eiOUF I a �A is �v 7 r� w fi KINWN RD As Ra r�,p.�' ❑".!�j 3y� tlQ n `]"R q `qY fl ,Q yfgt��q �ti� Nf 5 R HAuS faLi RL $ � o `- 117SI s+ARrsan 5 N LE&4R°N R(7 ❑ 1 ¢Rd 1 ar!.J v �r L •, 4 f'yssr Ru,�F r-T q Mebane]-,1 a 70 1` f�s = _ ®�— Hillsborough, w �a �' l-rl'�;'-�] I i C`psx�� ••"'sr:sNRd r t � colt l r y MA L p9 5[ � 8' RaMn,pa"' 4p E �• JrJe� � 70 p0 ❑ eA o :n !S 5 eu � �s � °iv,s¢9 o ti1°r��,y burtlalls i:o. �• 6oRLaNP Rf] �}• � '° mq0 Ml SxNf Rp } 2 ARIHUR �� NhTy to, ♦4 ygrglN$RU R❑ 'Ar.M'kri0 ey 1EER� O v Ch a el,IIIIIRYd D $ O �Wo I �Carrb;vrn fr.r Is '�'❑aRct+' 0� S 1 1 ep wi n A. �l , 501 f ••,� � a >: 9�� s❑u.f.titi9r�"L��rRc i OLU GkFCN5AUR0 nA Sp °F 01'�� L 4 yJ� J r � J Project Locations or- �__; Municipal Boundaries B-G MPO Boundary 1 in=Smiles 1111111=1 Miles COLiNi" 0 DCHC MPO Boundary Z TARPO Boundary Chatham Co. V Orange County Planning and Inspection ry sc VIV201e RES-2023-014 Attachment 6 17 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION APPROVING ORANGE COUNTY TRANSPORTATION PROJECTS FOR THE BURLINGTON-GRAHAM AND DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATIONS (BGMPO AND DCHC MPO) AND THE TRIANGLE AREA RURAL PLANNING ORGANIZATION (TARPO) FOR CONSIDERATION IN THE STATE PRIORITIZATION OF TRANSPORTATION PROCESS AND STATE TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next ten years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the STIP; and WHEREAS, the DCHC MPO, BGMPO and TARPO Boards are charged with the development of their respective Transportation Improvement Program (TIP); and WHEREAS, Orange County is a member jurisdiction of the BGMPO, TARPO and DCHC MPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, on October 18, 2022, Orange County Board of County Commissioners adopted a resolutions the County's Complete Street Policy and Vision Zero Policy; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County encourages the NCDOT to design all roads, bridges, and right-of-way so as to protect ecosystems and non-renewable resources; and WHEREAS, Orange County has outlined its transportation needs within the BGMPO, TARPO and DCHC MPO planning areas in attachments to this resolution; and NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following list of transportation projects to be submitted for scoring by the State and to ultimately be considered for inclusion in the STIP. 18 Burlington-Graham MPO: 1) US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR- 1114) to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11' travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR- 1588), and N Scotswood Boulevard (SR-2300). 2) Mattress Factory Road Interchange: Construct a new interchange at the existing grade- separated crossing of Mattress Factory Road and 1-85/1-40. 3) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. 4) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities with grade separation connection at US-70. 5) Lebanon Road Improvements: Intersection and safety improvements along Lebanon Road (SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004). 6) Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to 1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Old Hillsborough Road Road (SR- 2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR- 1119), Bradshaw Quarry Road (SR-1100), and NC-54. Triangle Area RPO: 1) Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) from Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR-1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). 2) Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to Carr Store Road (SR 1352) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Carr Street (SR-1357) and highland Farm Road (SR-1332) 3) Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to Dodson Crossroad (SR-1007) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR- 1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102) 19 4) Dairyland Road Improvements: Modernize Dairyland Road (SR-1177) from Orange Grove Road (SR-1006) to Old NC-86 (SR-1009) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR- 1113), Bethel Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009) to Roundabout. 5) Dodsons Crossroads Improvements: Modernize Dodson Crossroad (SR-1102) from Orange Grove Road (SR-1006) to NC-54 with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177). 6) Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to 1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Old Hillsborough Road Road (SR- 2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR- 1119), Bradshaw Quarry Road (SR-1100), and NC-54. 7) Old NC-86 Improvements: Modernize Old NC-86 (SR-1009) from 1-40 to Eubanks Road (SR- 1727) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723). 8) NC 86 Improvements - Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection 9) NC-54 Improvements: Widen NC-54 from Mebane Oaks Road (SR-1007) to Orange Grove Road (SR-1006) and Orange Grove Rd (SR 1006) to Butler Rd (SR 1951)/ Dodsons Cross Rd (SR 1102) and from Butler Rd (SR 1951) / Dodsons Cross Rd (SR 1102) to Old Fayetteville Road (SR-1107) / Inside DCHC with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. Durham-Chapel Hill-Carrboro MPO: 1) US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR- 1114) to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11' travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR- 1588), and N Scotswood Boulevard (SR-2300). 2) 1-85/NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and NC 86. 3) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. 4) Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. 5) U.S. 70 East/1-85/1-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. 20 6) Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) from Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR-1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). 7) Dairyland Road Improvements: Modernize Dairyland Road (SR-1177) from Orange Grove Road (SR-1006) to Old NC-86 (SR-1009) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR- 1113), Bethel Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009) to Roundabout. 8) Dodson Crossroad Improvements: Modernize Dodson Crossroad (SR-1102) from Orange Grove Road (SR-1006) to NC-54 with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177). 9) Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to Dodson Crossroad (SR-1007) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR- 1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102). 10)NC-54 Improvements: Widen NC-54 from Orange Grove Rd (SR 1006) to Butler Rd (SR 1951) / Dodsons Cross Rd (SR 1102) and from Butler Rd (SR 1951) / Dodsons Cross Rd (SR 1102) to Old Fayetteville Road (SR-1107) / Inside DCHC with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. 11)Lebanon Road Improvements: Intersection and safety improvements along Lebanon Road (SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004). 12)Old NC-86 Improvements: Modernize Old NC-86 (SR-1009) from 1-40 to Eubanks Road (SR- 1727) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723). 13)Dimmocks Mill Trestle Improvements: Improve current Dimmocks Mill Rd (#735154S) grade separation and close Bellvue St (#735152D) rail crossing. 14)Exchange Park Lane Rail Trestle Improvements: Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. 15)Orange Grove Rd. Widening with Bicycle and Pedestrian Improvements: Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road (SR 1221) to include both pedestrian and bicycle improvements along the roadway. The 1-40 bridge would be widened to accommodate both pedestrian and bicycle amenities and one additional travel lane. 16)Orange County Public Transportation Circulator 11 Vehicles: Provide one (1) bus to serve a new route for Orange Public Transportation providing service to major trip generators in Hillsborough 21 17)Orange High School Road/Harold Latta Road Sidewalk Improvements: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle School. 18)Orange Grove Road/1-40 Pedestrian Bridge: Construct a pedestrian bridge over 1-40 alongside Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road 19) 1-85 Pedestrian Bridge: Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village, and Downtown Hillsborough. 20)Trail Connection from English Hill Lane to Buttonwood Dr: Construct a multi-use path connecting English Hill Lane to Buttonwood Drive 21)Trail Connection from Patriot's Pointe to Timbers Dr: Construct a multi-use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. 22)Orange Grove Road Extension/NC 86 Connector: Extend Orange grove road from Old NC 86 (S. Churton Street) to NC 86 with multimodal accommodations and taking into consideration the new Hillsborough Train Station. 23)NC 10 Improvements - Modernize NC 10 from NC 86 to US 70 Business with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Lawrence Road (SR-1561) New Hope Church Road (SR- 1723), University Station Road (SR-1712), Mt. Harmon Church Road (SR-1339) and US 70 Business. Upon motion of Commissioner , seconded by Commissioner the foregoing resolution was adopted this the day of April, 2023. 1, Laura Jensen, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on April 18, 2023, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of 2023. Clerk to the Board of Commissioners