Loading...
HomeMy WebLinkAboutAgenda - 02-17-2004-9aORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 17, 2004 Action Agen a Item No. -Gt SUBJECT: Site Plan -Efland Cheeks Park (Phase II) DEPARTMENT: ERCD,R&P PUBLIC HEARING: (YIN) No ATTACHMENT INFORMATION CONTACT: 1) Draft Site Plan Map David Stancil, 245-2590 Lori Taft, 245-2660 Paul Thames, 245-2303 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To approve the submittal of a site plan for Phase II of Efland Cheeks Park. BACKGROUND: On December 9, 2003, the Board received the report of the Efland Cheeks Park Concept Plan Review Committee, and authorized staff to develop a proposed site plan for the construction of Phase II of this park, co-located with Efland-Cheeks Elementary School in western Orange County. The attached site plan has been developed based on the report and Board feedback on December 9. The primary features of Phase II of the park are a new picnic shelter, lighting around the existing playing field and walking track, and trails (bath a smaller ADA-accessible trail from the Community Center and a longer natural surface loop trail that would connect to adjacent Richmond Hills subdivision). The existing playground equipment would also be relocated. As instructed on December 9, a separate possible add-on to the project pending discussion with the Orange County Schools, is the grading and seeding of the "northern field" located above the school, would be included in the construction bid materials for pricing and later consideration of addition. Staff would also develop a plan for addressing the former sedimentation basin on the property. After review and approval of the site plan, construction bid documents and construction drawings will be developed. These activities would not occur until after the County has hired a Construction Manager, A timetable for park construction will be presented at that time. Generally, it is estimated that construction bids/drawing preparation, the award of the bid and actual construction could be accomplished in approximately 8-10 months after the site plan is approved. 2 Staff would propose to hold two community open house meetings, one prior to and one during construction to keep the community aware of progress toward completion, FINANCIAL IMPACT: There are no costs associated with submittal of the site plan. Approval of a contract for construction would be brought back in June, The facilities to be built would be constructed with $250,000 in 2001 Parks and Open Space band funds for Phase 2 of the park, Of the amount for this project, $125,000 was appropriated in FY 2002- 03 and the remaining $125,000 is in the current fiscal year as part of the next bond sale, The estimated cost of the proposed facilities is projected to range from $231,000 - $297,000, If costs exceed the available amount, or the Board decides to include the add-on project, staff would identify a source of additional funds that may include an appropriation from the School/Park Reserve Fund, RECOMMENDATION(S): The Manager recommends that the Board review the site plan, providing feedback as desired, and authorize staff to submit the site plan for approval, with the construction bid process to follow once the County has hired a Constnaction Manager. ~\ '\ \ \, . \ Ir T- 2Lb~ , ^ \ x a ~ I,~G \ ro :~-> p ~\ \ I c ~. i i ~~IrttiS s \\\ \\ ~"y's:e nr~ \\ \~ ~1 \ ~ \ v i ~) ~ A \ ` \ `o \ \ \l` . \\ ~l. ~\ ~~ jF \ , ~ 1 \ p .,.---~i ,~~I ~ , \i~`~ \, ( E ~:_ 1 I~~ \ ' ~ ~~~i 1 ,,,((( -.. I I ! , `` ... ti ,~/ _ ~ N~ •i 'r Al. ~~~:; ~, a a _~I •'; o~ ~ , ', a E 1 C. ~__{ll ., A ' ~.. 1 ~;~1\ ~ ~ ~ - 1 ~ (, ~ I ~„r,-,P, ~i.• r~. I;i _ 1 m~ . ,~ to°~ ~`. it ~ ,, ( .. ._I . ' ~ 1 ~ L..>h m:o, m.rtn v~o F i I i J00 P/nI 1 ( 1 ~ I i i 1 c +;ornnu sue/a¢couxec 'reearin suecr~.iit --------------_ .~1. u^wn nvs, ~"CJr~C'!Ltf SIN! .+.m cv wenwaic x,e l~vcrus swvuv: i l i 240 V'S ~(v~ 70 .. _ _ '.r Orange Coun Environment and Resource Conservation Department 30G Rwere P.caC PO Box 81 B 1 Nilisbomugh. NC 27278 P-(919) 2d5-2590 F.(9197 614.3331 ,~ L z ~ N Q~ ~ ~ cn ~> U -~ °' ~ O c~ 4- W SLPI$ LA-2 eneel2 el 3