Loading...
HomeMy WebLinkAboutAgenda - 04-04-2023; 12-5 - Information Item - Memorandum - US 70 Multimodal Corridor Study 1 E ORANGE COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT 0 COUNTY ,,�, MEMORANDUM TO: Board of County Commissioners (BOCC) FROM: Nishith Trivedi, Transportation Director DATE: April 4, 2023 SUBJECT: US 70 Multimodal Corridor Study The following memo summarizes the US 70 Multimodal Corridor Study currently in process by VHB, including the first round of public workshop. In 2019, Board of County Commissioners (BOCC) approved US 70 as a County Priority for possible consideration in the state's Strategic Prioritization of Transportation (SPOT) process. It was done so with the understanding the corridor posed significant safety and mobility issues for all uses. The Comprehensive Transportation Plan (CTP) in Durham- Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) identified this corridor for potential widening with multimodal accommodations. The CTP in Burlington- Graham Metropolitan Planning Organization as a corridor needing multimodal improvements. Both CTP were amended in 2022 incorporating the state's new Complete Street Policy. Following County's approval as a priority and coordinating with in the CTP amendments, Orange County started working with VHB to analyze the corridor in partnership with local jurisdictions and regional agencies. DCHC MPO provided the funding while Orange County managed the project. A Core Technical Team (CTT) was created composed of Hillsborough, Mebane, Orange County, North Carolina Department of Transportation (NCDOT), DCHC MPO and BG MPO staff with the state's Integrated Mobility Division (IMD) and Rail Road Division invited as critical stakeholders. The CTT meets monthly with VHB. VHB recently concluded the first round of public workshops, continue encouraging input throughout the planning process and will present their findings to all the respective boards along the corridor, at the end of the year. OCTS staff presents the summary of Draft Existing Conditions Report, outcomes from the public workshops, next steps and welcome any comments the Board and general public may offer. The following are highlights from the Existing Conditions Report and first round of public workshops: Existing Conditions highlights: • Focus on Safety, multi-modal (access & connectivity), environmental and economic. • 19 miles major arterial and 3 miles other arterial (US 70 Business), NC 119 to NC 751. • Six segments (A-F), 120' NCDOT ROW, 2-lane undivided with 4' paved shoulder. • 3 fixed transit routes, micro transit and demand response area for 2 transit agencies. • No bicycle facilities, limited pedestrian, Safety#1 issue for all users, including animals. 0 Website (link), 3 public workshops for 1St round, 2nd round tentatively June/July. 2 • Vehicular traffic volumes back to pre-covid levels. o Low - 4,800 Average Annual Daily Traffic (AADT) between Efland Cedar Grove Road and 1-85 Connector. o High - 9,500 to 15,500 AADT throughout, greatest concentration near 1-85 at Pleasant Green Road. • Truck traffic accounts from 3 to 8% of total vehicular traffic with greatest concentration east of Buckhorn Road. o 2 to 4% of total truck traffic is heavy vehicles (e.g. freight, amazon, others). • Crash data indicates key areas (segments and intersections) experiencing heavy crashes, mainly from 1-85 connector east to NC 751. o Primary factors contributing to high crashes is speed, volume is pre-covid but increased speed is post-covid. • Level of Service (LOS) deterioration is mainly due to long queuing problems, not volume, primarily east of NC 86 (S. Churton Street) to Pleasant Green Road. o Pleasant Green Road and Lawrence Road intersections LOS D. o Road segment between Palmer Grove Church Road and Pleasant Green LOS F. • Future Grown (2020 to 2050) concentrated in rural Economic Development Areas, not urbanized town areas. • If 10% of traffic from 1-85 detours onto US 70 for any reason (accident or congestion), US 70 becomes more problematic, unsafe and equally congested. Next Step: • VHB will publish Existing Conditions report for more public comments, compile all comments and incorporate them into the plan. • Evaluate each intersection and segment using multiple alternatives and present all options during second round of public workshops. • 2nd public workshops will also focus on implementation strategies, costs, and schedule through short, mid and long term projects. • Draft the plan and present it to local governing bodies for their consideration. o Hillsborough and Mebane will take action on their town limit portion, not ETJ or MPO portion, while supporting others. o Orange County will take action with information collected from local jurisdictions. o VHB and OCTS staff will present to DCHC and BG MPO following local action. Please forward any questions, comments or concerns to Orange County Transportation Director Nishith Trivedi at ntrivedi(a_orangecountync.gov.