HomeMy WebLinkAboutAgenda - 03-07-2023; 8-h - Designation of Applicant’s Agent Update for Orange County Application for FEMA’s Hazard Mitigation Grant Program - Hurricane Florence 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 7, 2023
Action Agenda
Item No. 8-h
SUBJECT: Designation of Applicant's Agent Update for Orange County Application for
FEMA's Hazard Mitigation Grant Program — Hurricane Florence
DEPARTMENT: Emergency Services
ATTACHMENT(S): INFORMATION CONTACT:
UNC-Chapel Hill Letter of Request Sarah Pickhardt, 919-245-6135
Resolution - Designation of Applicant's Patrick Mallett, 919-245-2577
Agent Kirby Saunders, 919-245-6123
Cy Stober, 919-245-2592
Christopher Sandt, 919-245-2583
PURPOSE: To update the designation of an agent for Orange County's application for Federal
Emergency Management Agency's (FEMA) Hazard Mitigation Grants Program for repetitive loss
property acquisition for property most recently suffering damage on September 14-17, 2018
during Hurricane Florence.
BACKGROUND: On September 14-17, 2018, Orange County was significantly impacted by
torrential rain and winds due to Hurricane Florence. As a result, significant flooding occurred over
the course of several days. Orange County was included in the list of counties that received a
major disaster declaration from FEMA on October 22, 2018. (Disaster number: 4393-DR-NC).
Orange County has been awarded a grant for the two projects outlined below.
Project #1
Despite emergency protective measures that were taken by the County, several residences were
flooded due to the heavy and cumulative rainfall. Included in the properties that sustained damage
from Hurricane Florence is 503 Brandywine Road, Chapel Hill, NC 27514. Flood waters
surrounded the home while the family of five was inside. The flood waters then filled the lower
level of the home and garage with an estimated one and a half feet of water. The entirety of the
first level of the home and garage was destroyed along with the contents. A damage assessment
of the home was completed, and it was concluded that there was approximately $87,000 in
damage to the home and property caused by flooding during Hurricane Florence. This
home/property at 503 Brandywine Road has flooded numerous times, causing damage resulting
in costly repairs, which deems the property a severe repetitive loss.
Project #2
Orange County has received a request from the University of North Carolina-Chapel Hill to serve
as the sub-applicant on its behalf. UNC Chapel Hill is seeking grant funding to install an
emergency powered generator to support its environmental health and safety efforts on Estes
2
Drive extension in Chapel Hill. This facility serves as its Emergency Operations Center. The total
of this grant request is approximately $414,000. The request from UNC Chapel Hill is attached.
The Board of County Commissioners approved these projects and approved the previous
Designation of Applicant's Agent on October 15, 2019. Since then, personnel changes have
occurred with Orange County which affect the currently designated primary and secondary agents
for the project. As a part of the process, the County must adopt a resolution which updates the
designated agent to receive project assistance from FEMA's Hazard Mitigation Grants Program
and work to complete the two projects.
FINANCIAL IMPACT: FEMA provides Hazard Mitigation Grants Program funding up to 75% of
total project costs, with the remaining 25% coming from the applicant. Historically, North Carolina
Emergency Management (NCEM) has provided the 25% share for counties. There is no indication
that NCEM will be changing policy on these projects. FEMA policy stipulates that total project
funding cannot exceed $276,000 per project. There should be no direct financial impact to the
County with these projects. However, in time financial assistance may be needed to stay within
federal funding limits. The full financial impact will not be known until the grant is approved and
an appraisal is completed. Any additional funding needs will be presented for approval as
appropriate.
Project #1
The current estimated cost of the property acquisition project is $322,150 with $242,612.50 being
paid by FEMA, and the remaining $80,537.50 being paid by the State of North Carolina.
Project #2
Because this is a FEMA grant-funded project, there will be no financial impact to the County and
all costs will be paid by FEMA (75%) and the State of North Carolina (25%).
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to
this item:
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
• GOAL: CREATE A SAFE COMMUNITY
The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang
activity, substance abuse and domestic violence.
Project #1 has a positive social justice impact by relocating a family of five including three small
children (a vulnerable population) from a hazard prone area. The FEMA Hazard Mitigation Grants
Program process does provide temporary assistance to those displaced by such a process by
this mitigation action. The owners of this property are voluntarily committing to the acquisition
process, as required by federal law.
Project #2 will help to ensure continuity of UNC Chapel Hill's ability to maintain emergency
coordination and support of the campus community (including students, staff, and visitors).
ENVIRONMENTAL IMPACT: The following Orange County Environmental Goal impact is
applicable to this item:
• RESULTANT IMPACT ON NATURAL RESOURCES AND AIR QUALITY
3
Assess and where possible mitigate adverse impacts created to the natural resources of
the site and adjoining area. Minimize production of greenhouse gases.
The Project#1 property will be demolished and then returned to green/natural space under a 100
year deed. All aspects of both projects; including but not limited to debris removal, will follow all
federal, state, and local environmental and historic regulations.
RECOMMENDATION(S): The Manager recommends that the Board approve the attached
resolution with the designation of Sarah Pickhardt (Primary Agent) and Patrick Mallett (Secondary
Agent) for this Hazard Mitigation Grants Program application, and direct the Clerk to the Board of
County Commissioners to sign as the Certifying Official.
4
0ANLE AND uPERATi0N5 1'11(: Unncrm) of Noah l.arouna a.l.hal d I hll
I1120 IssLCs Urns PALension-1tr11.2329,(_o# 165u
1 Chapel 11d1,NC 27599-1650
I
tmergMy Manayeme�t and Planniny Telel,nonc: 919-Az-37s9 • rax.919-962-uzz'
W. Kirby Saunders
Emergency Plaiiage...ent Coordinator
Orange County Emergency Services
Hillsborough, NC
Mr.Saunders.
In reference to FEMA's Hazard Mitigation Grant Program "Generator Procurement"funding opportunity
through the North Carolina Division of Emergency Management for Disaster Number 4393-DR,The
University of North Carolina at Chapel Hill's (UNC) Office of Emergency Management and Planning is
requesting Orange County, NC serve as Sub-applicant for said grant for the purchase and installation of a
new generator at the Emergency Operations Center on our Main Campus in Chapel Hill (1120 Estes
Drive Extension). This tacility has and continues to serve as a critical coordination venue for campus,
local, and county level incidents and events. Therefore, it is essential that emergency power is
preserved during an outage.
Attached are reterence documents that detail the project's scope.
I hank you for conzidering thi-, requezt, and I look forward to your reply.
Sincerely,
r
Darre'U Fl.jeter
Director of Emergency Management& Planning
cc. Derek Kemp, AVL for Campu.3 safety & Risk Management
5
THE UNIVERSITY
Of NORTH CAROLINA GREGORY A.DRt-,'FR,1_'E
1
at CHAPEL HILL Eeecutive Director-1 University FnRineer
Enioneenng a Co-struction,Facilities Services
1111 A,,p.n nave 1:919.813.0156
t',,,,p,,,Ru.-1821 ..ww.F—lmes.unc.edu
Chanel Hill,NC 2751)1) =gdnvedn)fac.unceriu
June 10, 2019
James Barker
Hazard Mitigation Specialist
binrth Carolina Department of Public Safety
Division of Emergency Management, Recovery Section, Hazard Mitigation Rranch
Mailing Address:4238 Mail Service Center, Raleigh, NC 27699-4238
Physical Address: 41% Reedy Creek Road, Raleigh, NC 27607-6410
office: 919-KS-2355
Fax: 919-71S-9191
bnh.barker@ncdps.gnv
Dear Mr. Barker:
After careful consideration of the input from the University's Director of Emergency Managpment&
Planning, our Spnnr Electrical Engineer(Licensed Profpssinnal Engineer),our Executive Director of
Environment Health &Safety, our Generator Shop Supervisnr, our Facilities Conditions Assessment
Program,and our Energy Services group, I confirm the 3onKW size is the appropriate generator size to
support the critical Inads at UNC-CH's Fmergency Operations Center_ These nperations include
utilization of the entire building for the university's emergency personnel and potentially sheltering of
these personnel during a campus emergency event.
The authority having jurisdiction for this location is the State of North Carnlina.This system will be
designed by a Professional Engineer licensed in the state of North Carolina and will meet nr exceed the
current North Carolina Building Cndp, National Electric Code, and University and State Construction
office standards. Final inspection will be conducted by the University and State Constructinn Office.
sinter ly,
egory A. Driver
6
FINANCE AND OPERATIONS The University of North Carolina at Chapel Hill
1120pEstes Drive Extension,Rm.2328,CB#1650
Emer enc Mana ement and Plannin Cha el Hill,NC 27599-1650
9 y 9 9 Telephone: 919-962-5729 • Fax:919-962-0227
June 14, 2019
James Barker
Hazard Mitigation Specialist
North Carolina Division of Emergency Management
4105 Reedy Creek Road, Raleigh,NC 27607-6410
Dear Mr. Barker:
The following specs and quote were provided by the UNC Facilities Services Engineering and
Construction for a 300kW generator:
277/480v- 3 Phase
ATS NOT Included
2 Year Std. Warranty(Covers parts, labor, & travel)
600A Mainline LS/I Breaker, or...
660 Gal Fuel Tank; 5 gal spill Containment; 24 Hr. run-time @100% Load
Level 1 Sound Attenuated Enclosure
External E-Stop
Alternator Strip Heater
Coolant Heater
Shipped to your door(but not off-loaded)
Official CAT Start-Up Service
18-22 Week lead time after approval of submittals
$66,100.00+Taxes
This is being included in our grant request as supporting documentation. Feel free to contact me
with any questions.
Sincerely,
Z�)a4l���/ 94_:�_
Darrell Jeter, Director
Emergency Management and Planning
7
Cost Estimate for Generation Install at EHS building
System Description Quantity Unit Cost Total
Generator set, diesel, 3 phase 4 wire,
277/480 V, 300 kW, incl battery,
Generator 1 Ea $ 60,700 $ 60,700
charger, muffler, &day tank, excl
conduit,wiring, &concrete footing
Automatic transfer switches, enclosed,
ATS 1 Ea $ 13,400 $ 13,400
3 pole,480 volt,800 amp
Move 1,000 gal tank, pour concrete
Move Tank and Footing 1 Ea $ 10,000 $ 10,000
footing
Feeder installation less than 600 V,
Control Wiring including RGS conduit and XHHW wire 250 LF $ 15 $ 3,750
up to60A
Underground service installation,
includes excavation, backfill, and
4 wire
3 phase
4' depth, , ,
Feeder 400 Amp Install With Concrete Trough Installation compaction, 250 LF $ 525 $ 131,250
277/480 volts, 600 A, Bus duct,
copper, 3 pole 4 wire,weatherproof,
feeder, 600 amp
Exhaust Stack Exhaust Stack 1 Ea $ 3,000 $ 3,000
Sub Total $ 222,100
General Contractor Overhead 0.3 $ 66,630
Construction Contingency 0.1 $ 22,210
Professional Fees 0.2 $ 44,420
Owner Reserves 0.15 $ 33,315
Commissioning 0.015 $ 3,332
General Conditions 0.1 $ 22,210
Total I $ 414,217
8
UNC at Chapel Hill
Proposed Emergency Generator
W itYsms
Airport
460 n
ESTES DR
O�
FACILITtES DR
Hazardous
Materials
Warehouse
Hazardous
Airport Block Materials
Sto 9 Facility
Facrlity Waste Storage
co+ Fac Orly
3JJ0/r
EHS
Horace Williams
Airport O ffce
T
508 R OQ
Fac it i ty
Co n st me tion
a r
Shop
je
General
Storeroom
Giles F.
Horney
Annex
Service
Station
NOB
Art Studio
Sources:Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO,USGS,
FAO, NPS,NRCAN,GeoBase, IGN, Kadaster NL,Ordnance Survey, Esri Japan,
METI,Esri China(Hong Kong),(c)OpenStreetMap contributors,and the GIS
User Community
POINT_X POINTY
GEN
-79.058808 35.934133
UNC at Chapel Hill
Proposed Emergency Generator
Q
CD-
0-
at �
io m
N }
Cl
Frh:U�niiversity of North Carolina
59.233
Airport Dr
U
a�
r
--------------
POINT-X POINT-Y
GEN
-79.058808 35.934133
10
RESOLUTION
DESIGNATION OF APPLICANT'S AGENT
North Carolina Division of Emergency Management
Organization Name(hereafter named Organization) Disaster Number:
Orange County FEMA-4393DR-NC
Applicant's State Cognizant Agency for Single Audit purposes(If Cognizant Agency is not assigned,please indicate):
Applicant's Fiscal Year(FY)Start
Month: July Day: 01
Applicant's Federal Employer's Identification Number
56 - 6000327
Applicant's Federal Information Processing Standards(FIDS)Number
037 - 135 -
PRIMARY AGENT SECONDARY AGENT
Agent's Name Sarah Pickhardt Agent's Name Patrick Mallett
Organization Organization
Orange County Emergency Services Orange County Planning&Inspections Department
Official Position Division Chief of Emergency Management Official Position Deputy Director Development Services
Mailing Address 510 Meadowlands Dr. Mailing Address 131 W.Margaret Lane,suite 201,PO Box 8181
p
City,State,Zip Hillsborough, NC 27278 City,State,zip Hillsborough, NC 27278
Daytime Telephone (919) 245-6135 Daytime Telephone (919) 245-2577
Facsimile Number Facsimile Number
Pager or Cellular Number Pager or Cellular Number
BE IT RESOLVED BY the governing body of the Organization (a public entity duly organized under the laws of the State of North Carolina)
that the above-named Primary and Secondary Agents are hereby authorized to execute and file applications for federal and/or state assistance on
behalf of the Organization for the purpose of obtaining certain state and federal financial assistance under the Robert T.Stafford Disaster Relief
&Emergency Assistance Act,(Public Law 93-288 as amended)or as otherwise available.BE IT FURTHER RESOLVED that the above-named
agents are authorized to represent and act for the Organization in all dealings with the State of North Carolina and the Federal Emergency
Management Agency for all matters pertaining to such disaster assistance required by the grant agreements and the assurances printed on the
reverse side hereof. BE IT FINALLY RESOLVED THAT the above-named agents are authorized to act severally. PASSED AND
APPROVED this day of 20
GOVERNING BODY CERTIFYING OFFICIAL
Name and Title Name
Name and Title Official Position
Name and Title Daytime Telephone
CERTIFICATION
(Name)duly appointed and (Title)
of the Governing Body,do hereby certify that the above is a true and correct copy of a resolution passed and
approved by the Governing Body of (Organization)on the day of
,20 .
Date: Signature:
Rev.06/02
11
APPLICANTASSURANCES
The applicant hereby assures and certifies that it will comply with the FEMA regulations,policies,guidelines and requirements including OMB's Circulars No.A-95 and A-102,and FMC
74-4,as they relate to the application,acceptance and use of Federal funds for this Federally assisted project. Also,the Applicant gives assurance and certifies with respect to and as a
condition for the grant that:
15.It will comply with the provisions of the Hatch Act which limit the political
1.It possesses legal authority to apply for the grant,and to finance and construct the activity of employees.
proposed facilities;that a resolution,motion or similar action has been duly adopted or
passed as an official act of the applicant's governing body,authorizing the filing of the 16.It will comply with the minimum wage and maximum hours provisions of the
application,including all understandings and assurances contained therein,and directing Federal Fair Labor Standards Act,as they apply to hospital and educational
and authorizing the person identified as the official representative of the applicant to act in institution employees of State and local governments.
connection with the application and to provide such additional information as may be required.
17.(To the best of his/her knowledge and belief)the disaster relief work described on
2.It will comply with the provisions of:Executive Order 11988,relating to Floodplain each Federal Emergency Management Agency(FEMA)Project Application for which
Management and Executive Order 11990,relating to Protection of Wetlands. Federal Financial assistance is requested is eligible in accordance with the criteria
contained in 44 Code of Federal Regulations,Part 206,and applicable FEMA
3.It will have sufficient funds available to meet the non-Federal share of the cost for Handbooks.
construction projects. Sufficient funds will be available when construction is completed to
assure effective operation and maintenance of the facility for the purpose constructed. 18.The emergency or disaster relief work therein described for which Federal
Assistance is requested hereunder does not or will not duplicate benefits
4.It will not enter into a construction contract(s)for the project or undertake received for the same loss from another source.
other activities until the conditions of the grant program(s)have been met.
19.It will(1)provide without cost to the United States all lands,easements and
5.It will provide and maintain competent and adequate architectural engineering rights-of-way necessary for accomplishments of the approved work;(2)hold and
supervision and inspection at the construction site to insure that the completed save the United States free from damages due to the approved work or Federal funding.
work conforms with the approved plans and specifications;that it will furnish
progress reports and such other information as the Federal grantor agency may need. 20.This assurance is given in consideration of and for the purpose of obtaining
any and all Federal grants,loans,reimbursements,advances,contracts,property,
6.It will operate and maintain the facility in accordance with the minimum discounts of other Federal financial assistance extended after the date hereof to the
standards as may be required or prescribed by the applicable Federal,State Applicant by FEMA,that such Federal Financial assistance will be extended in reliance
and local agencies for the maintenance and operation of such facilities. on the representations and agreements made in this assurance and that the United
States shall have the right to seek judicial enforcement of this assurance. This
7.It will give the grantor agency and the Comptroller General,through any assurance is binding on the applicant,its successors,transferees,and assignees,
authorized representative,access to and the right to examine all records, and the person or persons whose signatures appear on the reverse as authorized to
books,papers,or documents related to the grant. sign this assurance on behalf of the applicant.
8.It will require the facility to be designed to comply with the"American 21.It will comply with the flood insurance purchase requirements of Section 102(a)of
Standard Specifications for Making Buildings and Facilities Accessible to, the Flood Disaster Protection Act of 1973,Public Law 93-234,87 Stat.975,approved
and Usable by the Physically Handicapped,"Number A117.1-1961,as modified December 31,1973. Section 102(a)requires,on and after March 2,1975,the purchase
(41 CFR 101-17-7031). The applicant will be responsible for conducting of flood insurance in communities where such insurance is available as a condition for
inspections to insure compliance with these specifications by the contractor. the receipt of any Federal financial assistance for construction or acquisition purposes
for use in any area that has been identified by the Director,Federal Emergency
9.It will cause work on the project to be commenced within a reasonable time Management Agency as an area having special flood hazards. The phrase"Federal
after receipt of notification from the approving Federal agency that funds financial assistance"includes any form of loan,grant,guaranty,insurance payment,
have been approved and will see that work on the project will be prosecuted rebate,subsidy,disaster assistance loan or grant,or any other form of direct or indirect
to completion with reasonable diligence. Federal assistance,
10.It will not dispose of or encumber its title or other interests in the site and 22.It will comply with the insurance requirements of Section 314,PL 93-288,to
facilities during the period of Federal interest or while the Government holds obtain and maintain any other insurance as may be reasonable,adequate,
bonds,whichever is the longer. and necessary to protect against further loss to any property which was
replaced,restored,repaired,or constructed with this assistance.
11.It agrees to comply with Section 311,P.L.93-288 and with Title VI of the
Civil Rights Act of 1964(P.L.83-352)and in accordance with Title VI of the Act, 23.It will defer funding of any projects involving flexible funding until FEMA
no person in the United States shall,on the ground of race,color,or national makes a favorable environmental clearance,if this is required.
origin,be excluded from participation in,be denied the benefits of,or be
otherwise subjected to discrimination under any program or activity for which the 24.It will assist the Federal grantor agency in its compliance with Section 106 of
applicant receives Federal financial assistance and will immediately take any the National Historic Preservation Act of 1966,as amended,(16 U.S.C.470),
measures necessary to effectuate this agreement. If any real property or structure Executive Order 11593,and the Archeological and Historic Preservation Act of
is provided or improved with the aid of Federal financial assistance extended to the 1966(16 U.S.C.469a-1 at seq.)by(a)consulting with the State Historic
Applicant,this assurance shall obligate the Applicant,or in the case of any transfer Preservation Officer on the conduct of investigations,as necessary,to identify
of such property,any transferee,for the period during which the real property or properties listed in or eligible for inclusion in the National Register of Historic
structure is used for a purpose for which the Federal financial assistance is extended places that are subject to adverse effects(see 36 CFR Part 800.8)by the activity,
or for another purpose involving the provision of similar services or benefits. and notifying the Federal grantor agency of the existence of any such properties,
and by(b)complying with all requirements established by the Federal grantor agency
12.It will establish safeguards to prohibit employees from using their positions to avoid or mitigate adverse effects upon such properties.
for a purpose that is or gives the appearance of being motivated by a desire
for private gain for themselves or others,particularly those with whom they have 25.It will,for any repairs or construction financed herewith,comply with
family,business,or other ties. applicable standards of safety,decency and sanitation and in conformity
with applicable codes,specifications and standards;and,will evaluate the
13.It will comply with the requirements of Title II and Title III of the Uniform natural hazards in areas in which the proceeds of the grant or loan are to be
Relocation Assistance and Real Property Acquisitions Act of 1970(P.L.91-646) used and take appropriate action to mitigate such hazards,including safe
which provides for fair and equitable treatment of persons displaced as a result of land use and construction practices.
Federal and Federally assisted programs.
STATE ASSURANCES
14.It will comply with all requirements imposed by the Federal grantor agency
concerning special requirements of law,program requirements,and other The State agrees to take any necessary action within State capabilities to require
administrative requirements approved in accordance with OMB Circular A-102, compliance with these assurances and agreements by the applicant or to assume
P.L.93-288 as amended,and applicable Federal Regulations. responsibility to the Federal government for any deficiencies not resolved to the
satisfaction of the Regional Director.