HomeMy WebLinkAboutAgenda - 04-30-2002 - 5 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 30, 2002 Action Again Item No. a SUBJECT: Draft County Park Facility Planning (PFP) Process DEPARTMENT: Environment and Resource PUBLIC HEARING: (TIN) No Conservation ATTACHMENT(S); INFORMATION CONTACT: Draft Process and Project Summary Sheets David Stencil, 245-2590 TELEPHONE NUMBERS: Hillsborough 7324181 Chapel HIII 968J.4581 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To review a draft process and status report for park prefects in the Manager's recommended CIP. BACKGROUND: In recent months, staff has worked,through the CIP process,In identify me potential timetable for the parka and open space projects approved as part of the 2001 bond. The funding distribution for all projects is addressed in the Managers Recommended CIP, and includes projected timetables for the different phases of the projects. Sond projects that are joint projects with the towns are being procedurally addressed through the "Proposed Joint Planning Process for Joint County/fOWo Pats and Open Specs Projects", which is currently being Considered by the Intergovernmental Pats Work Group (with a tentative date of transmittal to the Board of Commissioners of June 4). The attached Park Facility Planning (PFP)document would serve to address pat projects w8hln the County's jurisdiction that are not joint Town/County presets. hisprovidedaea starting point far Seem discussion on the status and phasing of County parks projects. The attached draft begins with thoughts on a set of"basic operating Principles"for the conshu ton of each facility,followed by iwo-page summary sheets for each project. The summary sheets review the status of planning and design for each project, followed by a proposed process for each of two phases of the projects: 1)the concept plan, and 2)bids andconstructlon. A possible approach for public participation,cost estimates and other resource needs is identified for these phases. The summary sheets conclude with three key points: 2 •. Abest-case scenario for the beginning of construction (assuming the project begins July 2002 and there are no unforeseen delays) • A projected park opening date (again assuming no unforeseen delays), and • The actions that would be needed at this time far the Board to pursue the perk project It is important to note that the bealcase sconado for construction and park opening assumes each project begins between May and July 1 of this year. This was done to allow the based to see and compare the relative nature of each, on an equivalent basis. The reality is that staff and financial resource limitations will likely make it impossible for each of the projects to run simultaneously beginning July 1, so some staggering of activities and projects will be needed. However, each project Is already st different stages of planning,which lands itself well W a staggered approach. Because the Chapel Hill Township Park is pad of a much-larger Master Plan concept for a park and educational campus, a separate document has been prepared to outline In greater detail the proposed approach to this design. For purposes of this document, It is assumed Mat the Chapel Hill Township Park will be a County park, although substantial involvement from the Chapel Hill-Canboro City Schools and the Town of Carrboro has also been proposed in the separate 'Chapel Hill Township Park and Educational Campus.' The process outlined in the summary sheet far this poject Is consistent with that considered by the Board this evening. The document concludes with a brief summary of other joint projects—projects that would be covered by the Intergovernmental Park Work Group's"Proposed Joint Planning Process for Joint CountyROwn Parks and Open Space Projects." Finally,a brief summary of other County projects not pad of the 2801 bond(McGowan Creek Preserve, Little River Regional Park)is also provided FINANCIAL IMPACT: There Is no financial impact related to discussion of the PFP process, although decisions on the order of projects undertaken does have financial implications. RECOMMENDATION(S): The Manager recommends that the Board review and discuss the PFP draft, providing feedback as desired, and that this item be brought back for Boats action as a part of the setting of phonies during future CIP discussions. • 3 Park Facility Plan (PFP) Process DRAFT-April 22, 2002 Basic Operating Principles Ea<L project recoives¢oval footine in terms of initial appropriation and planning and design potential • While there is equal footing, some staggering of activities may be necessary due to finite amount of human and financial resources • Opportunities for economies of scale and cost savings should be explored as projects continue and are developed • Each concept plan committee would have a scope of duties and a set of guiding principles set by the Board of Commissioners at the time of appointment • An"Olmsteadian": view of pinks, (natural and ecologically-aemvtive design for al parts of parks not designated far ether specific uses) should M adhered to The following Perk Facility Plan(PFP)"summary sheets"provide basic information about each park project, the resources needed to acwmplish the task, the current status of the project, the other partners or"players°in the project, and a potential timeline of activities IF EACH PROJECT WERE BEGUN ON JULY 1, 2002.` '-Nate: "its staff mould explore economies of scale m mulllpieproject in the areas of purchasing and cmattructlon, all projects mill not be able to track simukanew ely from July l due to human and financial resource limitation b As Ruch, thepoiential timetable offered an the foilomiag pages is an example of `beet ease structures.' 4 Project Name: Cedar Grove Park Project Cost: $1200000 Pre-Concept Plan Completed? Yes fib iewea but not adootedl Project Status: Land acquired and poeconcept plan reviewed by BOCC in June 2001. Funds from 2001 bond, appropriated accordingly in 2002-2012 CIP. Scope of Work: Take pre-concocalplan and use with opemtingprinaiples, To BE adopted ar part of the charge by the Board ofC nusioxrs, to dengn thepark. $10,000 for detailed suNe None Commissioner Commissioner 1 Recreation and Parks Advisory Council member 1 Commission for the Environment member 2 Area Citizens 1 citizen design professional/other expertise Primary: Open Space Design Specialist. ERC Director, Recreation and Parks Management Director Other: Land Conservation Manager, County Engineer, Planning Director, Purchasing Director. Public Wodcs Director, others as needed Projected Concept Plan Timetable: ne-September. 2002 Target Date for BOCC Consideration?'. October. 2002 5 Develop conetruciinn drawings and bids, gain County or Town siteplan approve( award bid to cantractor(a)and construct thepark faciNtles according to the adopted plan as per BOCC approval. W { Cctso.DDo Commissioner Commissioner Recreation and Packs Management Director Pumhasin9 Direcor Open Specs Deagn Specialist County Engineer .RC Director Planning Director Park Services Director 'Best-Case"Consbuction Begins: April,2003 �fe� �✓.�6p�m(ul[fin lbw: If the Board Is ready to proceed with planning for this park: t. Adopt preconcept plan previously reviewed 2. Discuss timing/coordination Issues regarding upgrades to Northern Human Services Center 3. Appoint Cedar Grove Park Concept Plan Committee, with charge and scope of work (based on preconcept plan) and arty operating principles the Board wishes to apply. 6 Project Name: Chapel Hill Township Park and Educational Campus Project Cost: $1.200 000 (Park - phase 1) Pre,COno¢pt Plan Completed? Yes,appmand by Bond on 10122/01 Prcl Status: Land acquired and pre-concept plan reviewed and approved by by BOCC in CctobetlNovember, 2001. Funds from 2001 bond appropriated in 2002-2012 CIP(consistent with fimetabler below). This is part of larger park and educational campus pm)acq to be comprehensive planned as a master site plan. Sropa of Work: Take pre-concept plan and we with operating prLmiPler and other guidance adopted as part of the charge by the Board ofCommusioners, to design the nrkandedacatWnatmm as. t i $10,000(for detailed survey) Chapel Hill-Carrbpre City schools Commissioner Commissioner — 1 Camporo Alderman 1 CHCCS scowl Member 1 Chapel Hill Town Courxdl member 1 Orange County School Boats member 2 Aree clUzens 1 Recreation and Parks Advisory Chapel member 1 Commission For the Encouragement member 2 Intergovernmental Parka Work Group members Duke Forest Resource Manager 1 Carrhoro Nor tom Transition Area Committee member 1 Carrboro Parks and Recreation Commission member 1 Chapel Hill Perks and Recreation Commission member 1 Chapel Hill Greenways Commission member t Canbam Describes Commission member Ptlmay Counts Manager(or designee),Open Space Design Spedallar,ERC Director Announced and Parks Management Director:CHCCS superintendent(w designee) Other:Land Consarvatim Manager,County Engineer,Planning } Director,Pumhas tip D'recror,Public Worke D'rector,others as yy .; needed Carrbom and Grade Hill Parks and Planting staHS'neited to W'^" Pandang ii so v Projected Concept Plan Trig May 2002—February 2993 Target Date for BOCC Consideration?: March 2003 D velrp cunetruction drawings and bldg, gain Town acts plan (Conditional Use Permit)approval, award bid to comractor(a)and construct the park (acidities according to the➢OCC-adopted plan. $1,'go,000 Commissioner Commissioner Recreation and Packs Management Director Purchasing Direcbr Open Space Design Specialist ERG Director County Engineer Planning Director Park Services Director "Best-Case' Construction Begins: February,2004 * - Planning far this project will use a special Master Plan Process, adopted by the Board, to jointly plan the schools campus and park(to the degree possible). If the Boartl is ready to proposal with Master Plan for this park: 1. Adopt Master Plan Process (with operating guidelines, etc) 2. Appoint Chapel Hill Township Park and Educational Campus Master Plan Work Group, with charge and mission (scope of work), based on pre-ooncept plan and operating principles in the adopted process. $ Project Name: Efland-Cheeks Park Phase 11 Project Cost: $250.00 Pre4oncept Plan Completed? 7€ Project Status: Concept plan exists, as does Phase 1 of park. Funds Rom 2001 bond, appropriated accordingly in 2002-2012 CIP, originally to develop nature tmNs, teaching platform and Install held lighting. Scare of Work:reviex exining conceprpianfor adequacy and determine best use of bond nds or ark Amend mrw. t Plan as needed. $2,000 Orange County Schools Commissioner Commissioner 1 Orange County School Board member I Recreation and Parks Advisory Council member 1 Commission for the Environment member 2 Area Citizens Primary: Open Space Design Specialist, ERC Director, Recreation and Perke Management Director Other: Land Conservation Manager, County Is Engineer, Plan ill ng Director, Purchasing Director, Public Works Director, others as needed projected Review Timetable: Review existing Plan October,2002— Febmary 2003 Target Date for BOCC Consideration?: March. 2003 9 Develop construction dmwings and bids, gain site plan improved, award bid to contractor(s)and construct the park facilities according to the BOCC- advptedplan. _ $27SeNiws Cooner Cooner Ren end Parks Management Director Pug Director Opce Design Specialist Cogineer ERtor Plairector Paices Director "Best-Case' Construction Begins: October,2003 If the Board is ready to proceed with planning for this park: 1. Create Efland-Cheeks Park Work Group to review the existing concept plan for the park for adequacy and changed conditions, and amend as needed. 2. Adopt operating principles for Work Group, as needed 10 Project Name: Fairview Park Project Cost: $850.000 Prtn Concept Plan Completed? No PrI Statue: Existing playground and playing field Decisions needed on whether park will include both County and Town of Hillsborough portions or County only, whether a joint CountyROWn park or a County park, and whether perk plan will include master plan for other pudic facilities. Funds from 2001 bond, appropriated accordingly in 2002-2012 CIP, consistent with following timetable. There is no pre+.nncapt plan or concept plan. Srope of Work discuss ouxmrWing issues with town ofhilleborough.DevelogI concept plan. Form concept plan committee to design park, aintipre-concepiplan and operriongprinciples adopredospart of the chl by the Board ofCOmmissioners. $ 00 for detelled curve of Hlllsborou h? missioner missioner sborough Town Commissioner Recreation and Parks Advisory Council member mmission for the Environment member a Citizens osn desi n rofessional/other ex amiss ry: Open Space Design Specialist, ERG tor, Recreation antl Parks Management Director r: Land Conservation Manager, County neer, Planning Director(County antl Town), hasing Director, Public Works Director, others as ed Projected Concept Plan Timetable': Januarv-Mav2003 Tamer Date for BOCC Conskleretlon?: Jupa.204$ ` -after outstanding Issues resolved by BOCC work group 11 Develop construction drawings and baba, gain neon site plan approval, award bid to contmrlor(s)and construct the park facilities occurding In the BOCC adopted plan. W$8 4 0 ,00 0 Commissioner Commissioner Recreation and Parks Management Director Pumhasing Director Open Space Design Specialist County Engineer ERC Director Planning Director Park Services Director Projecled Continuation Begins: February,2004 At . n,Id t,pa„,d of hLo tom: If the Board is ready to proposal with planning for this park: 1. Create a BOCC workgroup to meet with like contingent from H lllsborough to discuss joint Park opportunities and scope of project 2. Once key decisions made, develop and adopt pre-concept plan 3. Appoint. the Falrvlear Park Concept Plan Committee, with charge and mission (scope of work), based on preconcept plan and any operating principles the Board wishes to apply. 1R Addressed through IPWG's draft'Proposed Process for Joint County'TOwn Parks and Open Space Projects' Southern Park 1. Complete discussions with Chatham County about participation 2. Complete CIP deliberations to determine funding stream 3. Review Conceptual Plan with Chapel Hill Town Council at October 30 Assembly of Governments 4. Create Park Planning Group (or like mechanism after roviawing IP Work Group recommendation and Town of Chapel Hill comments on Joint Parks pmcass)with Town of Chapel Hill to make key decisions about park 5. Review and adopt Park Planning Group recommendations 8. Construct park accordingly Homestead Aauat'cs Center 1. Complete Cl P deliberations to determine funding stream 2 Review design and construction plans with Town of Chapel Hill at October 30 Assembly of Governments 3. Create Facility Planning Group to make key decisions about facility 4. Review and adopt Facility Planning Group recommendations 5. Release funds—facility constructed accordingly Smith Middle Park t. County/Caro doro/CRCOS meeting needed to decide lead entity to take project through Canboro Conditional Use Permit modification 2. Lighting plan will need to be developed by fighting professional before Canbom will consider CUP modRmation. 3. Once lighting plan developed, CUP modification goes to Carrhoro public hearing Sl application fee)and Board! of Aldermen approve modification 4. Review site plan and authorize release of funds for bleachers and lighting at the playing fields Jo at Townit ounty Open Space 1. Receive a report from the InteiGovernmental Parks Work Group regarding status of greenways projects in Chapel Hill and Cariboro and potential use of funds 2. Create Project Plan Group to review report and make recommendations on key decisions and projects to be funded— report sent to each elected board 3. Upon receipt of Town actions on Project Plan Group recommendations, consider and adopt greenways project plan. 4. Review plans at October 30 Assembly of Governments? 13 Little River Regional Park(Grant-funded) 1. Approve hiring on concept plan consultant(covered by gram) 2. Existing Little River Park Advisory Committee reviews concept plan at interim stage and final draft. recommending adoption to the .Boards of Commissicnars In Durham and Orange Counties 3. Bids solicited for construction of park, approved by Board of Commissioners 4. Volunteers and non-profits work to develop and finalize trails at park 5. Park construction begins fall 2002, and opens to public in late-spdng 2003. McGowan Creek Preserve 11997 narks bo l l I. Approve site plan under development 2. Approve construction of turn lane, parking area, basic amenities (picnic tables and trash receptides, emergency phone), and trail development using volunteers 3. Construction begins Fall 2002, McGowan Creek Preserve opens for use spring 2003 Makleview Soccer Field(199] Parks Bond) 1. Survey and lease completed 2. Field design and site plan needed — awaiting Open Space Design Specialist hiring 3. Bids for field construction, and construction of field 4. Field available for play spring 2003