ACTION AGENDA ITEM ABSTRACT
Meeting Date: April 30, 2002
Action Again
Item No. a
SUBJECT: Draft County Park Facility Planning (PFP) Process
DEPARTMENT: Environment and Resource PUBLIC HEARING: (TIN) No
Conservation
ATTACHMENT(S); INFORMATION CONTACT:
Draft Process and Project Summary Sheets David Stencil, 245-2590
TELEPHONE NUMBERS:
Hillsborough 7324181
Chapel HIII 968J.4581
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To review a draft process and status report for park prefects in the Manager's
recommended CIP.
BACKGROUND: In recent months, staff has worked,through the CIP process,In identify
me potential timetable for the parka and open space projects approved as part of the 2001
bond. The funding distribution for all projects is addressed in the Managers Recommended
CIP, and includes projected timetables for the different phases of the projects. Sond projects
that are joint projects with the towns are being procedurally addressed through the
"Proposed Joint Planning Process for Joint County/fOWo Pats and Open Specs Projects",
which is currently being Considered by the Intergovernmental Pats Work Group (with a
tentative date of transmittal to the Board of Commissioners of June 4).
The attached Park Facility Planning (PFP)document would serve to address pat projects
w8hln the County's jurisdiction that are not joint Town/County presets. hisprovidedaea
starting point far Seem discussion on the status and phasing of County parks projects.
The attached draft begins with thoughts on a set of"basic operating Principles"for the
conshu ton of each facility,followed by iwo-page summary sheets for each project.
The summary sheets review the status of planning and design for each project, followed by a
proposed process for each of two phases of the projects: 1)the concept plan, and 2)bids
andconstructlon. A possible approach for public participation,cost estimates and other
resource needs is identified for these phases. The summary sheets conclude with three key
points:
2
•. Abest-case scenario for the beginning of construction (assuming the project begins July
2002 and there are no unforeseen delays)
• A projected park opening date (again assuming no unforeseen delays), and
• The actions that would be needed at this time far the Board to pursue the perk project
It is important to note that the bealcase sconado for construction and park opening
assumes each project begins between May and July 1 of this year. This was done to
allow the based to see and compare the relative nature of each, on an equivalent
basis. The reality is that staff and financial resource limitations will likely make it
impossible for each of the projects to run simultaneously beginning July 1, so some
staggering of activities and projects will be needed. However, each project Is already
st different stages of planning,which lands itself well W a staggered approach.
Because the Chapel Hill Township Park is pad of a much-larger Master Plan concept for a
park and educational campus, a separate document has been prepared to outline In greater
detail the proposed approach to this design. For purposes of this document, It is assumed
Mat the Chapel Hill Township Park will be a County park, although substantial involvement
from the Chapel Hill-Canboro City Schools and the Town of Carrboro has also been
proposed in the separate 'Chapel Hill Township Park and Educational Campus.' The
process outlined in the summary sheet far this poject Is consistent with that considered by
the Board this evening.
The document concludes with a brief summary of other joint projects—projects that would be
covered by the Intergovernmental Park Work Group's"Proposed Joint Planning Process for
Joint CountyROwn Parks and Open Space Projects." Finally,a brief summary of other
County projects not pad of the 2801 bond(McGowan Creek Preserve, Little River Regional
Park)is also provided
FINANCIAL IMPACT: There Is no financial impact related to discussion of the PFP process,
although decisions on the order of projects undertaken does have financial implications.
RECOMMENDATION(S): The Manager recommends that the Board review and discuss the
PFP draft, providing feedback as desired, and that this item be brought back for Boats action
as a part of the setting of phonies during future CIP discussions.
• 3
Park Facility Plan (PFP) Process
DRAFT-April 22, 2002
Basic Operating Principles
Ea<L project recoives¢oval footine in terms of initial appropriation and
planning and design potential
• While there is equal footing, some staggering of activities may be
necessary due to finite amount of human and financial resources
• Opportunities for economies of scale and cost savings should be explored
as projects continue and are developed
• Each concept plan committee would have a scope of duties and a set of
guiding principles set by the Board of Commissioners at the time of
appointment
• An"Olmsteadian": view of pinks, (natural and ecologically-aemvtive
design for al parts of parks not designated far ether specific uses) should
M adhered to
The following Perk Facility Plan(PFP)"summary sheets"provide basic
information about each park project, the resources needed to acwmplish the
task, the current status of the project, the other partners or"players°in the
project, and a potential timeline of activities IF EACH PROJECT WERE
BEGUN ON JULY 1, 2002.`
'-Nate: "its staff mould explore economies of scale m mulllpieproject in the
areas of purchasing and cmattructlon, all projects mill not be able to track
simukanew ely from July l due to human and financial resource limitation b
As Ruch, thepoiential timetable offered an the foilomiag pages is an example of
`beet ease structures.'
4
Project Name: Cedar Grove Park
Project Cost: $1200000
Pre-Concept Plan Completed? Yes fib iewea but not adootedl
Project Status: Land acquired and poeconcept plan reviewed by BOCC in June
2001. Funds from 2001 bond, appropriated accordingly in 2002-2012 CIP.
Scope of Work: Take pre-concocalplan and use with opemtingprinaiples, To BE adopted
ar part of the charge by the Board ofC nusioxrs, to dengn thepark.
$10,000 for detailed suNe
None
Commissioner
Commissioner
1 Recreation and Parks Advisory Council member
1 Commission for the Environment member
2 Area Citizens
1 citizen design professional/other expertise
Primary: Open Space Design Specialist. ERC
Director, Recreation and Parks Management Director
Other: Land Conservation Manager, County
Engineer, Planning Director, Purchasing Director.
Public Wodcs Director, others as needed
Projected Concept Plan Timetable: ne-September. 2002
Target Date for BOCC Consideration?'. October. 2002
5
Develop conetruciinn drawings and bids, gain County or Town siteplan
approve( award bid to cantractor(a)and construct thepark faciNtles
according to the adopted plan as per BOCC approval.
W
{
Cctso.DDo
Commissioner
Commissioner
Recreation and Packs Management Director
Pumhasin9 Direcor
Open Specs Deagn Specialist
County Engineer
.RC Director
Planning Director
Park Services Director
'Best-Case"Consbuction Begins: April,2003
�fe� �✓.�6p�m(ul[fin lbw:
If the Board Is ready to proceed with planning for this park:
t. Adopt preconcept plan previously reviewed
2. Discuss timing/coordination Issues regarding upgrades to Northern
Human Services Center
3. Appoint Cedar Grove Park Concept Plan Committee, with charge and
scope of work (based on preconcept plan) and arty operating principles
the Board wishes to apply.
6
Project Name: Chapel Hill Township Park and
Educational Campus
Project Cost: $1.200 000 (Park - phase 1)
Pre,COno¢pt Plan Completed? Yes,appmand by Bond on 10122/01
Prcl Status: Land acquired and pre-concept plan reviewed and approved by
by BOCC in CctobetlNovember, 2001. Funds from 2001 bond appropriated in
2002-2012 CIP(consistent with fimetabler below). This is part of larger park and
educational campus pm)acq to be comprehensive planned as a master site plan.
Sropa of Work: Take pre-concept plan and we with operating prLmiPler and other
guidance adopted as part of the charge by the Board ofCommusioners, to design the
nrkandedacatWnatmm as.
t i $10,000(for detailed survey)
Chapel Hill-Carrbpre City schools
Commissioner
Commissioner
—
1 Camporo Alderman
1 CHCCS scowl Member
1 Chapel Hill Town Courxdl member
1 Orange County School Boats member
2 Aree clUzens
1 Recreation and Parks Advisory Chapel member
1 Commission For the Encouragement member
2 Intergovernmental Parka Work Group members
Duke Forest Resource Manager
1 Carrhoro Nor tom Transition Area Committee member
1 Carrboro Parks and Recreation Commission member
1 Chapel Hill Perks and Recreation Commission member
1 Chapel Hill Greenways Commission member
t Canbam Describes Commission member
Ptlmay Counts Manager(or designee),Open Space Design
Spedallar,ERC Director Announced and Parks Management
Director:CHCCS superintendent(w designee)
Other:Land Consarvatim Manager,County Engineer,Planning
}
Director,Pumhas tip D'recror,Public Worke D'rector,others as
yy .; needed
Carrbom and Grade Hill Parks and Planting staHS'neited to
W'^"
Pandang ii so
v
Projected Concept Plan Trig May 2002—February 2993
Target Date for BOCC Consideration?: March 2003
D velrp cunetruction drawings and bldg, gain Town acts plan (Conditional
Use Permit)approval, award bid to comractor(a)and construct the park
(acidities according to the➢OCC-adopted plan.
$1,'go,000
Commissioner
Commissioner
Recreation and Packs Management Director
Purchasing Direcbr
Open Space Design Specialist
ERG Director
County Engineer
Planning Director
Park Services Director
"Best-Case' Construction Begins: February,2004
* - Planning far this project will use a special Master Plan Process, adopted by
the Board, to jointly plan the schools campus and park(to the degree possible).
If the Boartl is ready to proposal with Master Plan for this park:
1. Adopt Master Plan Process (with operating guidelines, etc)
2. Appoint Chapel Hill Township Park and Educational Campus Master
Plan Work Group, with charge and mission (scope of work), based on
pre-ooncept plan and operating principles in the adopted process.
$
Project Name: Efland-Cheeks Park Phase 11
Project Cost: $250.00
Pre4oncept Plan Completed? 7€
Project Status: Concept plan exists, as does Phase 1 of park. Funds Rom 2001
bond, appropriated accordingly in 2002-2012 CIP, originally to develop nature
tmNs, teaching platform and Install held lighting.
Scare of Work:reviex exining conceprpianfor adequacy and determine best use of
bond nds or ark Amend mrw. t Plan as needed.
$2,000
Orange County Schools
Commissioner
Commissioner
1 Orange County School Board member
I Recreation and Parks Advisory Council member
1 Commission for the Environment member
2 Area Citizens
Primary: Open Space Design Specialist, ERC
Director, Recreation and Perke Management Director
Other: Land Conservation Manager, County
Is Engineer, Plan ill
ng Director, Purchasing Director,
Public Works Director, others as needed
projected Review Timetable: Review existing Plan
October,2002— Febmary 2003
Target Date for BOCC Consideration?: March. 2003
9
Develop construction dmwings and bids, gain site plan improved, award bid
to contractor(s)and construct the park facilities according to the BOCC-
advptedplan.
_ $27SeNiws
Cooner
Cooner
Ren end Parks Management Director
Pug Director
Opce Design Specialist
Cogineer
ERtor
Plairector
Paices Director
"Best-Case' Construction Begins: October,2003
If the Board is ready to proceed with planning for this park:
1. Create Efland-Cheeks Park Work Group to review the existing concept
plan for the park for adequacy and changed conditions, and amend as
needed.
2. Adopt operating principles for Work Group, as needed
10
Project Name: Fairview Park
Project Cost: $850.000
Prtn Concept Plan Completed? No
PrI Statue: Existing playground and playing field Decisions needed on
whether park will include both County and Town of Hillsborough portions or
County only, whether a joint CountyROWn park or a County park, and whether
perk plan will include master plan for other pudic facilities. Funds from 2001
bond, appropriated accordingly in 2002-2012 CIP, consistent with following
timetable. There is no pre+.nncapt plan or concept plan.
Srope of Work discuss ouxmrWing issues with town ofhilleborough.DevelogI
concept plan. Form concept plan committee to design park, aintipre-concepiplan and
operriongprinciples adopredospart of the chl by the Board ofCOmmissioners.
$ 00 for detelled curve
of Hlllsborou h?
missioner
missioner
sborough Town Commissioner
Recreation and Parks Advisory Council member
mmission for the Environment member
a Citizens
osn desi n rofessional/other ex amiss
ry: Open Space Design Specialist, ERG
tor, Recreation antl Parks Management Director
r: Land Conservation Manager, County
neer, Planning Director(County antl Town),
hasing Director, Public Works Director, others as
ed
Projected Concept Plan Timetable': Januarv-Mav2003
Tamer Date for BOCC Conskleretlon?: Jupa.204$
` -after outstanding Issues resolved by BOCC work group
11
Develop construction drawings and baba, gain neon site plan approval,
award bid to contmrlor(s)and construct the park facilities occurding In the
BOCC adopted plan.
W$8
4
0
,00
0
Commissioner
Commissioner
Recreation and Parks Management Director
Pumhasing Director
Open Space Design Specialist
County Engineer
ERC Director
Planning Director
Park Services Director
Projecled Continuation Begins: February,2004
At . n,Id t,pa„,d of hLo tom:
If the Board is ready to proposal with planning for this park:
1. Create a BOCC workgroup to meet with like contingent from
H lllsborough to discuss joint Park opportunities and scope of project
2. Once key decisions made, develop and adopt pre-concept plan
3. Appoint. the Falrvlear Park Concept Plan Committee, with charge and
mission (scope of work), based on preconcept plan and any operating
principles the Board wishes to apply.
1R
Addressed through IPWG's draft'Proposed Process for Joint County'TOwn Parks
and Open Space Projects'
Southern Park
1. Complete discussions with Chatham County about participation
2. Complete CIP deliberations to determine funding stream
3. Review Conceptual Plan with Chapel Hill Town Council at October 30
Assembly of Governments
4. Create Park Planning Group (or like mechanism after roviawing IP Work
Group recommendation and Town of Chapel Hill comments on Joint Parks
pmcass)with Town of Chapel Hill to make key decisions about park
5. Review and adopt Park Planning Group recommendations
8. Construct park accordingly
Homestead Aauat'cs Center
1. Complete Cl P deliberations to determine funding stream
2 Review design and construction plans with Town of Chapel Hill at October 30
Assembly of Governments
3. Create Facility Planning Group to make key decisions about facility
4. Review and adopt Facility Planning Group recommendations
5. Release funds—facility constructed accordingly
Smith Middle Park
t. County/Caro doro/CRCOS meeting needed to decide lead entity to take project
through Canboro Conditional Use Permit modification
2. Lighting plan will need to be developed by fighting professional before
Canbom will consider CUP modRmation.
3. Once lighting plan developed, CUP modification goes to Carrhoro public
hearing Sl application fee)and Board! of Aldermen approve modification
4. Review site plan and authorize release of funds for bleachers and lighting at
the playing fields
Jo at Townit ounty Open Space
1. Receive a report from the InteiGovernmental Parks Work Group regarding
status of greenways projects in Chapel Hill and Cariboro and potential use of
funds
2. Create Project Plan Group to review report and make recommendations on
key decisions and projects to be funded— report sent to each elected board
3. Upon receipt of Town actions on Project Plan Group recommendations,
consider and adopt greenways project plan.
4. Review plans at October 30 Assembly of Governments?
13
Little River Regional Park(Grant-funded)
1. Approve hiring on concept plan consultant(covered by gram)
2. Existing Little River Park Advisory Committee reviews concept plan at interim
stage and final draft. recommending adoption to the .Boards of
Commissicnars In Durham and Orange Counties
3. Bids solicited for construction of park, approved by Board of Commissioners
4. Volunteers and non-profits work to develop and finalize trails at park
5. Park construction begins fall 2002, and opens to public in late-spdng 2003.
McGowan Creek Preserve 11997 narks bo l l
I. Approve site plan under development
2. Approve construction of turn lane, parking area, basic amenities (picnic tables
and trash receptides, emergency phone), and trail development using
volunteers
3. Construction begins Fall 2002, McGowan Creek Preserve opens for use
spring 2003
Makleview Soccer Field(199] Parks Bond)
1. Survey and lease completed
2. Field design and site plan needed — awaiting Open Space Design Specialist
hiring
3. Bids for field construction, and construction of field
4. Field available for play spring 2003