HomeMy WebLinkAboutAgenda - 04-30-2002 - 3 ORANGE COUNTY BOARD COMMISSIONERS WORK SESSION AGENDA ABSTRACT Me®ling Date: Apri130, 2002 Item Agenda N Item No. $ SUBJECT: Efland/Buckhom EDD/Cheeks Small Area Planning Study DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No ATTACHMENT(S): INFORMATION CONTACT: a. Orange Alamance Water System Service Area Craig N. Benedict, act. 2592 b. Sewer Master Plan Phases (Partially approved) Paul Thames, ext. 2303 c. EflandlB cdoormCheeks EDD Study Area Dianne Reid, ext. 2326 J. Key Definitions a. Outline of Issues to be Addressed Regarding TELEPHONE NUMBERS: Efland Area Sewer System Extensions Hillsborough 732-8181 into Undeveloped Land Chapel Hill 9684501 E EflandBUCkhom EDD/Cheeks Planning Area Durham 683-7331 Study Goal Outline Mebane (336)2274031 PURPOSE: To hear a report on Me Eftand/Buckhom EDD/Cheeks small area planning area Issues with special emphasis on instituting the process to complete 1997 bond aspects of public sewer commitment in the Efland area. BACKGROUND: A list of planning initiatives in the Efland/Buckhom EDD/Cheeks is noted below: 1. Resolution Establishing Rules and Regulations for Me Operation of a Sewer Collection Treatment System to Serve the Efland Area of Orange County(adopted November 19, 1985) with amendments thereafter 2. Water and Sewer Policy, Orange County, North Carolina(adopted April 3, 1989) (However,this policy is not part of Comprehensive Plan which would couple land use policy decisions with water and sewer polidea.I 3. Efland Small Area Planning Study(adopted in 199 1) 4. Buckhon Economic Development Districts (EDD)(adopted 1994) 5. Reaffirmation of Overall System Plan of the Adopted Efland Area Sewer System (element of aforementioned Item 1) (reaffirmed April 17, 2001) 6. Resolution Outline Efland Sewer System Issues Related to Extensions to Undeveloped Properties (approved May 15,200 1)[Attachment of 2 The overall system plan of the adopted Efland Area Sewer System was reaffirmed at the April 17, 2001 meeting to include Phase I West and East and Phase II and other minor amendments. Due to the county's strong commitment to comprehensively plan for growth, an overall review of land use and zoning and its public service impacts depending on the density or intensity of a project was evaluated by such and now is to be discussed by the BOCC and the community. Complementary public services of public potable water, public sewer, and fire suppression are guiding elements of appropriate growth planning. Therefore,there is need for coordination between all public service providers such as Orange County on behalf of the Efland Area Sewer System, Orange Alemence Weer System (OAWS), City of Mebane, Town of Hillsborough and county and local fire districts. The next step is to evaluate issues regarding the Efland Sewer operation. The Mies were originally adopted in the mid 1980's with several amendments thereafter. What conditions have changed that may warrant further amendment to the resolution? The Outline of Issues attached (Attachment a) Identifies those Issues that reflect changing policy conaideiaticns. In summary, the focus of this meeting report is to elaborate on the need to proceed on the design of the 1997 Bond Efland Sewer Area and discuss related matters in pursuit of that initiative. PRELIMINARY STAFF RECOMMENDATION(S): 1. Determine Urban Service Line in and around Phases 1A mad,existing), 1B (peach). 2 (yellow), 3 (green) and 4 (blue). 2. Bid final design of 1997 Band Area with urban service area noted above in mind for potential future expansion. 3. Examine Urban Service Line in Buckthorn EDD/Cheeks Area. 4. Continue more formal discussions with City of Mebane In Study Map areas 1, 2, 3 (not related to any aforementioned phasing). 5. Consider changes to land use designation in all study areas as part of Comprehensive Plan to be consistent with Village Growth Boundary. FINANCIAL IMPACT: None at this time related m planning studies, but eventually bond expenditures to Pursue Efland sewer expansion will be necessary. RECOMMENDATION(B): The Manager recommends that the Board consider the report and offer direction for further staff research, committee creation, RFP design services and/or agenda Item preparation. NHgrhmentA 'Orange Alamance Water System, Inc. Service Are H 11 High Rwk Village AS LNS J/ V ml cr¢ k11 High Fan 1 ]B LO 0U Sm. V High nlege �^ e P) f y*t' V �L M1� iV Cis IIiE' bnu ry 58 LOk __ A r e Water Pipes Rlwm Proposed Public Water I Sewer Boundaries 2•• 0 Lakes oOWASA Long-Term interest Area - 2.5" 13 Mebane ETJ ❑ Orange Co LonliTerm Interest Area 3" ❑Orange Co Primary Service Area N q•' ❑ Customers Transition Arras 6„ ■ Mebane 1, 1 10 year transiiio wA , Upper Eno- Protected Area �\/ 20 year transition YY N 72•' r Upper Eno. CriOcal Area ' " Preliminary Plan Approved n r mo-. crsr�?ia-w?eevu+�a�eN.aoe:- f �jCl 1r'aOYeer TmrcAOn CIF '..ive '_I °i° .EOD pha m pel P F�� Paa¢e 1P L mom tB fayl� 8:'Pneae MPb 6 I IL 1 . Pmpo ea nmF�wngrnsderer l ` I i � f ewo�an Aaaemam i = 30x0 P TIJL r< I, 9 _ _ a � .., . _ .. /r Efland/Buckhorn/Cheeks Economic Development District Study Area (Possible Amendments) Utility Provision Area Acreage Current Land Use Future Land Use Water Sewer 1 CIAN EDD7 Mebane Mebane 2 j JEDDl EDD-PW Mebane Mebane 3 EDD-PW EDD-PW Mebane Mebane 4 EDD-PW EDD1 OAWS? OC? OAWS/ OCf 5 EDD-PW EDD-PW-2 Well Septic Sa AR-C VMU OAWS OC Sb AR-C VMU OAWS OC 7 AR-PW VMU-Business OAWS OC 8 CIAN CIAN OAWS OC 9 CIAN HDR OAWS OC lo- RT TBD TBD 11 , IRR RT TBD TBD 12 IRR RT TBD TBD > 13 RR RT TBD TBD 14 IRR RT TBD TBD s 3 'Conswer anentlmanno Water and Sever Mawpement Plan and Sol Map to be Consistent wil a"led u"D sel line. � Note-NeFlmtlons of abbreviatuns are noletl on netl page. n Olaaroa efan0101dNew Uses As A77ACta rrv7 6. Key Carl =W02 ' Cede Wnmon FW +o Year Twsilwn YW 20 ear Transition Pprcuuural Resmemlal Critical Hrea IN Commemlaltlndustnal Node Cons Conservation E00 Existing Development 0istrld EDDt Primary Economk Development District 002 . Secontla Ewnomlc Development DistniS EDDSC Ecommle Development DoIrct_Small CDmmerc HOR High Density Reeidential LDR Low Danlsty Reeide Uall M) M0 u Density Residential MERANE Mebane Jurisdiction NR Non-Reaidemlal PW erotenad WaterahW RES Residontoi RESINRT ResidentiaiNc -Resitlantia transition RR Rural Residental __ RT Reaidentiel Transition RVILL GE Rural Village UT UNan Transil gi'(AEHMfNr E —� Outline of Issues to be Addressed Regarding Efland Area Sewer System E6Rensions into Undeveloped Land I. The Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area of Orange County make a clear distinction between connecting - to the System and exten81on9 Of the System to sera undeveloped land. _ A. Cennactions Of existing lots to the System do not implicate policy and are generally accomplished with Payment Of necessary fees, an application for sewer service end an acknowledged Efland sewer System sewer Easement and Agreement. E. Retenaiona of the System into undeveloped land do implicate policy and are controlled by Section IX of the Rules and require that the extensions: 1. be consistent with the Overall system. Plan; 2 . be consistent with (1) goal 9.3 of the Orange County Land Use Plan which goal prohibits the establishment of public water and sewer services in the areas designated water quality critical areas, _ cept to address emergency situations and 8 � (2). any water end sewer policy the County has adopted as part of its Comprehensive Plan; 3. be approved by the County.engineer if 1. and 2. are accomplished and if all zoning, subdivision, land use plan and comprehensive plan regulations of orange county or the Town of Hillsborough, if applicable, .are met. Before the County. engineer can approve,an extension of the system to serve undeveloped land, a subdivision preliminary plan - must be approved by the County which preliminary plan includes approved preliminary plane for the system extensions. II. Temporarily Ceasing artersions of the System to serve undeveloped land will provide the Beard of conmiiacionere With of opportunity to address the following. issues: A. whether end to what extent to allow extensidm of the System where the homes in the development to which the System is extended will be served by private wells; B. whether and to what extent to allow extension& of the system where the homes in the development to which the System is extended will be Served by private water systems; C. whether and to what extent to allow extensions of the System where the homes in the development to which the . 9 system is extended will he served by a public water System) III. Issues to be addressed related to public water Systems providing public water to homes served by a System extension include: A. COOSieoency with State law regarding interbaein transfers; - B. Pon River Capacity Use Agreement revisor; C. the .extent and the impact of augmenting Surface water Supply with large capacity wells; D. the existence of a State approved water supply plan for the public water supply System; S. to the extent it can reasonably he determined, the impact on ground water resources including recharge Capabilities of ground water resources in the area of public water supply system wells augmenting surface water supply; F. the following issues with respect to the Orange Alamance Water System: 1. Land Use and Zoning: uses plans to Coordinate its efforts with Orange County Land Use plan, Zoning Regulations and Efland Area Sewer System Rules. 2. Neater Plan - long Range System Plan and Design a. Status of State action on Water Supply Plan. 10, b. OAWS participation with orange County/ Hillsborough/Nebene in combined efforts to r the Efland-Cheeks Area and in the Mend area small area planning process with other stakeholders.. 3. Capital IO@rovement Plan a. New system improvements anticipated. b. , WNisting system upgrades and/or replacement scheduled. - a. connection Policy for existing lines and existing Iota. 5. Nxtension policy for undeveloped properties, residential aubdivieione and non-residential pmcjecta. — 6. sale/Absorption of system by other utility providers. 7. Fire Suppression for new development that could include fire hydrants and presents for required fire sprinkler systems. a. Identify membexa of Heard of Directors, meeting schedule for 1001 and future meetings and =tics practice for the meetings. e. . water Resources and Wells: o WS working with Orange County to evaluate the impact of high capacity Wells on the water resources of the County. IV. Consideration Of updating the Efland Area Small Area Plan to include or not the Buckhorn Road economic Development District] V. consideration of public utility (water and asset) service to the Buckhorn Road Econoeic Development District. EFLAND/BUCKHORN EDD/CHEEKS PLANNING AREA STUDY FY 2002-2003 GOAL OUTLINE Conduct a comprehensive study and recommendation for the development of Me EflandlBuckhorn EDDICheeks to examine all facets of growth including environmental impact,water, sewer,traffic, urban/rural growth patterns. (Target Date- November 2002 Quarterly Public Hearing) OBJECTIVE 1 Analyze existing conditions and area growth potential and determine urbanNillege growth boundaries(VGB)including urban service lines,Mat demarcate the village higher residential density and non-residential intensity patterns from rural nonpublic water and sewer developmenL a) Create urban service line b) Develop village cons areas and associated uses C) Develop village support areas and associated uses d) Develop growth pattern for areas outside of urban service line to highlight rural lifestyle and discourage urban sprawl OBJECTIVE 2 Evaluate, report, and initiate activities and processes to examine Me potential of the Orange-Alamance water system. a) Present status and potential b) Coordination with sewer system placement c) Governmental coordination and cooperation regarding expansion policy I - d) What roles can Mebane and Hillsborough play.+ i OBJECTIVE 3 Evaluate, report, and initiate activees and processes to expand the county's Efland sewer system. a) Define a sewer area b) Proceed with bond area responsibilities C) Prioritize further expansion d) Develop sewer expansion policy OBJECTIVE4 Evaluate transportation system in the Efland/Buckhom area OBJECTIVE 5 Evaluate existing and future land uses and land development standards and propose new development patterns in the area that reflect the availability of public services and the preservation of nearby environmental Preservation and rural character. a) Coordinate and re-evaluate Hand Small Area 1991 OBJECTIVE 6 Integrate other goal areas such as TDR, NEOTRAD ETJ,watershed preservation,water resource analysis and economic development districts, and mtergovammentel coordination into Efland/Buckhom Small Area Plan.