WORK SESSION AGENDA ABSTRACT
Me®ling Date: Apri130, 2002
Item Agenda
N
Item No. $
SUBJECT: Efland/Buckhom EDD/Cheeks Small Area Planning Study
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No
ATTACHMENT(S): INFORMATION CONTACT:
a. Orange Alamance Water System Service Area Craig N. Benedict, act. 2592
b. Sewer Master Plan Phases (Partially approved) Paul Thames, ext. 2303
c. EflandlB cdoormCheeks EDD Study Area Dianne Reid, ext. 2326
J. Key Definitions
a. Outline of Issues to be Addressed Regarding TELEPHONE NUMBERS:
Efland Area Sewer System Extensions Hillsborough 732-8181
into Undeveloped Land Chapel Hill 9684501
E EflandBUCkhom EDD/Cheeks Planning Area Durham 683-7331
Study Goal Outline Mebane (336)2274031
PURPOSE: To hear a report on Me Eftand/Buckhom EDD/Cheeks small area planning area Issues
with special emphasis on instituting the process to complete 1997 bond aspects of public sewer
commitment in the Efland area.
BACKGROUND: A list of planning initiatives in the Efland/Buckhom EDD/Cheeks is noted below:
1. Resolution Establishing Rules and Regulations for Me Operation of a Sewer Collection
Treatment System to Serve the Efland Area of Orange County(adopted November 19, 1985)
with amendments thereafter
2. Water and Sewer Policy, Orange County, North Carolina(adopted April 3, 1989)
(However,this policy is not part of Comprehensive Plan which would couple land use policy
decisions with water and sewer polidea.I
3. Efland Small Area Planning Study(adopted in 199 1)
4. Buckhon Economic Development Districts (EDD)(adopted 1994)
5. Reaffirmation of Overall System Plan of the Adopted Efland Area Sewer System (element of
aforementioned Item 1) (reaffirmed April 17, 2001)
6. Resolution Outline Efland Sewer System Issues Related to Extensions to Undeveloped
Properties (approved May 15,200 1)[Attachment of
2
The overall system plan of the adopted Efland Area Sewer System was reaffirmed at the April 17,
2001 meeting to include Phase I West and East and Phase II and other minor amendments. Due
to the county's strong commitment to comprehensively plan for growth, an overall review of land
use and zoning and its public service impacts depending on the density or intensity of a project was
evaluated by such and now is to be discussed by the BOCC and the community. Complementary
public services of public potable water, public sewer, and fire suppression are guiding elements of
appropriate growth planning. Therefore,there is need for coordination between all public service
providers such as Orange County on behalf of the Efland Area Sewer System, Orange Alemence
Weer System (OAWS), City of Mebane, Town of Hillsborough and county and local fire districts.
The next step is to evaluate issues regarding the Efland Sewer operation. The Mies were originally
adopted in the mid 1980's with several amendments thereafter. What conditions have changed
that may warrant further amendment to the resolution? The Outline of Issues attached (Attachment
a) Identifies those Issues that reflect changing policy conaideiaticns.
In summary, the focus of this meeting report is to elaborate on the need to proceed on the design
of the 1997 Bond Efland Sewer Area and discuss related matters in pursuit of that initiative.
PRELIMINARY STAFF RECOMMENDATION(S):
1. Determine Urban Service Line in and around Phases 1A mad,existing), 1B (peach). 2
(yellow), 3 (green) and 4 (blue).
2. Bid final design of 1997 Band Area with urban service area noted above in mind for potential
future expansion.
3. Examine Urban Service Line in Buckthorn EDD/Cheeks Area.
4. Continue more formal discussions with City of Mebane In Study Map areas 1, 2, 3 (not related
to any aforementioned phasing).
5. Consider changes to land use designation in all study areas as part of Comprehensive Plan to
be consistent with Village Growth Boundary.
FINANCIAL IMPACT: None at this time related m planning studies, but eventually bond
expenditures to Pursue Efland sewer expansion will be necessary.
RECOMMENDATION(B): The Manager recommends that the Board consider the report and offer
direction for further staff research, committee creation, RFP design services and/or agenda Item
preparation.
NHgrhmentA
'Orange Alamance Water System, Inc. Service Are
H 11
High Rwk Village
AS LNS J/ V
ml cr¢ k11 High Fan
1 ]B LO 0U
Sm. V High nlege �^ e P) f y*t' V
�L M1� iV Cis
IIiE' bnu ry 58 LOk
__
A
r e
Water Pipes Rlwm Proposed Public Water I Sewer Boundaries
2•• 0 Lakes oOWASA Long-Term interest Area -
2.5" 13 Mebane ETJ ❑ Orange Co LonliTerm Interest Area
3" ❑Orange Co Primary Service Area
N q•' ❑ Customers
Transition Arras
6„ ■ Mebane 1, 1 10 year transiiio wA ,
Upper Eno- Protected Area �\/ 20 year transition YY
N 72•' r Upper Eno. CriOcal Area '
" Preliminary Plan Approved
n r mo-. crsr�?ia-w?eevu+�a�eN.aoe:-
f �jCl 1r'aOYeer TmrcAOn
CIF '..ive '_I °i°
.EOD
pha
m pel
P F�� Paa¢e 1P
L mom tB
fayl� 8:'Pneae
MPb 6
I IL 1 . Pmpo ea nmF�wngrnsderer
l ` I i � f ewo�an Aaaemam
i = 30x0
P TIJL r<
I, 9 _ _ a
� .., . _ ..
/r
Efland/Buckhorn/Cheeks Economic Development District Study Area
(Possible Amendments)
Utility Provision
Area Acreage Current Land Use Future Land Use Water Sewer
1 CIAN EDD7 Mebane Mebane
2 j JEDDl EDD-PW Mebane Mebane
3 EDD-PW EDD-PW Mebane Mebane
4 EDD-PW EDD1 OAWS? OC?
OAWS/ OCf
5 EDD-PW EDD-PW-2 Well Septic
Sa AR-C VMU OAWS OC
Sb AR-C VMU OAWS OC
7 AR-PW VMU-Business OAWS OC
8 CIAN CIAN OAWS OC
9 CIAN HDR OAWS OC
lo- RT TBD TBD
11 , IRR RT TBD TBD
12 IRR RT TBD TBD >
13 RR RT TBD TBD
14 IRR RT TBD TBD s
3
'Conswer anentlmanno Water and Sever Mawpement Plan and Sol Map to be Consistent wil a"led u"D sel line. �
Note-NeFlmtlons of abbreviatuns are noletl on netl page. n
Olaaroa efan0101dNew Uses As
A77ACta rrv7 6.
Key Carl =W02
' Cede Wnmon
FW +o Year Twsilwn
YW 20 ear Transition
Pprcuuural Resmemlal
Critical Hrea
IN Commemlaltlndustnal Node
Cons Conservation
E00 Existing Development 0istrld
EDDt Primary Economk Development District
002 . Secontla Ewnomlc Development DistniS
EDDSC Ecommle Development DoIrct_Small CDmmerc
HOR High Density Reeidential
LDR Low Danlsty Reeide Uall
M) M0 u Density Residential
MERANE Mebane Jurisdiction
NR Non-Reaidemlal
PW erotenad WaterahW
RES Residontoi
RESINRT ResidentiaiNc -Resitlantia transition
RR Rural Residental __
RT Reaidentiel Transition
RVILL GE Rural Village
UT UNan Transil
gi'(AEHMfNr E —�
Outline of Issues to be
Addressed Regarding
Efland Area Sewer System
E6Rensions into Undeveloped Land
I. The Rules and Regulations for the Operation of a Sewer
Collection Treatment System to Serve the Efland Area of
Orange County make a clear distinction between connecting -
to the System and exten81on9 Of the System to sera
undeveloped land. _
A. Cennactions Of existing lots to the System do not
implicate policy and are generally accomplished with
Payment Of necessary fees, an application for sewer
service end an acknowledged Efland sewer System sewer
Easement and Agreement.
E. Retenaiona of the System into undeveloped land do
implicate policy and are controlled by Section IX of
the Rules and require that the extensions:
1. be consistent with the Overall system. Plan;
2 . be consistent with
(1) goal 9.3 of the Orange County Land Use Plan
which goal prohibits the establishment of
public water and sewer services in the areas
designated water quality critical areas, _
cept to address emergency situations and
8 �
(2). any water end sewer policy the County has
adopted as part of its Comprehensive Plan;
3. be approved by the County.engineer if 1. and 2.
are accomplished and if all zoning, subdivision,
land use plan and comprehensive plan regulations
of orange county or the Town of Hillsborough, if
applicable, .are met. Before the County. engineer
can approve,an extension of the system to serve
undeveloped land, a subdivision preliminary plan -
must be approved by the County which preliminary
plan includes approved preliminary plane for the
system extensions.
II. Temporarily Ceasing artersions of the System to serve
undeveloped land will provide the Beard of conmiiacionere
With of opportunity to address the following. issues:
A. whether end to what extent to allow extensidm of the
System where the homes in the development to which the
System is extended will be served by private wells;
B. whether and to what extent to allow extension& of the
system where the homes in the development to which the
System is extended will be Served by private water
systems;
C. whether and to what extent to allow extensions of the
System where the homes in the development to which the
. 9
system is extended will he served by a public water
System)
III. Issues to be addressed related to public water Systems
providing public water to homes served by a System
extension include:
A. COOSieoency with State law regarding interbaein
transfers; -
B. Pon River Capacity Use Agreement revisor;
C. the .extent and the impact of augmenting Surface water
Supply with large capacity wells;
D. the existence of a State approved water supply plan
for the public water supply System;
S. to the extent it can reasonably he determined, the
impact on ground water resources including recharge
Capabilities of ground water resources in the area of
public water supply system wells augmenting surface
water supply;
F. the following issues with respect to the Orange
Alamance Water System:
1. Land Use and Zoning: uses plans to Coordinate its
efforts with Orange County Land Use plan, Zoning
Regulations and Efland Area Sewer System Rules.
2. Neater Plan - long Range System Plan and Design
a. Status of State action on Water Supply Plan.
10,
b. OAWS participation with orange County/
Hillsborough/Nebene in combined efforts to
r the Efland-Cheeks Area and in the
Mend area small area planning process with
other stakeholders..
3. Capital IO@rovement Plan
a. New system improvements anticipated.
b. , WNisting system upgrades and/or replacement
scheduled. -
a. connection Policy for existing lines and existing
Iota.
5. Nxtension policy for undeveloped properties,
residential aubdivieione and non-residential
pmcjecta. —
6. sale/Absorption of system by other utility
providers.
7. Fire Suppression for new development that could
include fire hydrants and presents for required
fire sprinkler systems.
a. Identify membexa of Heard of Directors, meeting
schedule for 1001 and future meetings and =tics
practice for the meetings.
e. . water Resources and Wells: o WS working with
Orange County to evaluate the impact of high
capacity Wells on the water resources of the
County.
IV. Consideration Of updating the Efland Area Small Area Plan
to include or not the Buckhorn Road economic Development
District]
V. consideration of public utility (water and asset) service
to the Buckhorn Road Econoeic Development District.
EFLAND/BUCKHORN EDD/CHEEKS
PLANNING AREA STUDY
FY 2002-2003
GOAL OUTLINE
Conduct a comprehensive study and recommendation for the
development of Me EflandlBuckhorn EDDICheeks to examine all facets of
growth including environmental impact,water, sewer,traffic, urban/rural
growth patterns. (Target Date- November 2002 Quarterly Public Hearing)
OBJECTIVE 1
Analyze existing conditions and area growth potential and determine
urbanNillege growth boundaries(VGB)including urban service lines,Mat
demarcate the village higher residential density and non-residential
intensity patterns from rural nonpublic water and sewer developmenL
a) Create urban service line
b) Develop village cons areas and associated uses
C) Develop village support areas and associated uses
d) Develop growth pattern for areas outside of urban service line to
highlight rural lifestyle and discourage urban sprawl
OBJECTIVE 2
Evaluate, report, and initiate activities and processes to examine Me
potential of the Orange-Alamance water system.
a) Present status and potential
b) Coordination with sewer system placement
c) Governmental coordination and cooperation regarding expansion
policy I -
d) What roles can Mebane and Hillsborough play.+
i
OBJECTIVE 3
Evaluate, report, and initiate activees and processes to expand the
county's Efland sewer system.
a) Define a sewer area
b) Proceed with bond area responsibilities
C) Prioritize further expansion
d) Develop sewer expansion policy
OBJECTIVE4
Evaluate transportation system in the Efland/Buckhom area
OBJECTIVE 5
Evaluate existing and future land uses and land development standards
and propose new development patterns in the area that reflect the
availability of public services and the preservation of nearby environmental
Preservation and rural character.
a) Coordinate and re-evaluate Hand Small Area 1991
OBJECTIVE 6
Integrate other goal areas such as TDR, NEOTRAD ETJ,watershed
preservation,water resource analysis and economic development
districts, and mtergovammentel coordination into Efland/Buckhom Small
Area Plan.