SUBJECT: Justice Facilities Development Expanded M t Plan Presentation
DEPARTMENT: Purchasing and Central Services PUBLIC HEARING: IY/N) FNo—
ATTACHMENTIS): INFORMATION CONTACT:
9A-01 agenda abstract and minutes Pam Jones (919)245-2852
11-7-01 agenda abstract
1-28-112 power Point slides applicaGemthis TELEPHONE NUMBERS:
topic. Hillsborough 7324181
Expanded master plan (under separate Chapel Hill 9684501
cover) Durham 000-7331
Mebane 338227-2031
PURPOSE: To receive information regarding design options for court and parking facilities on
the downtown Hillsborough county campus.
BACKGROUND: The Board has previously received information on various design options for
the Hillsborough court facilities and the associated parking. The more recent discussions are
as follows:
• September 4, 2001, the Board approved the planning process for the Justice
Facilities Expansion and requested that the site's master plan be expanded to
conaider relocating the parking facilities to an area with less visual impact, i e. in
closer proximity to the Government Services Center. (abstract and minutes attached)
• November 7, 2001, the Board approved a contract with Freeman White Architects for
the completion of the Expanded Master Plan for court facilities; (abstract attached.
Minutes reflect that the contract was approved.)
• January 28,2002: Justice Facilities, with a brief ovarview of the Expanded Master
Plan findings, were included in a presentation about overall county space
responsibilities; (See attached Power Point handouts from presentation)
The presentation at this work session is intended to include the following:
• Full presentation of the Expanded Master Plan by representatives from Freeman-
White Architects (The report is provided under separate cover.)
• Brief elaboration regarding how the Implementation of the expanded plan might
impact the expansion of the Government Services Center as proposed in the 2000
Space Study.
2
The Board has previously approved the composition of the archRect selection committee, the
two planning committees (interior and exterior) and the development process proposed for the
Justice Faci diss Expansion. However, determination of a design preference, particularly as it
respects the parking facilities will be required at such time the Board is prepared to proceed
further with the expansion initiatives. As a reminder, parking options identifed at this time
include'.
1. Parking facilities integrated into each phase of courthouse expansion, beginning
with the Phase II (Phase I includes only underground secured parking for judicial
officials and was referenced as Option 8 in the original master plan report).
2. Separate parking deck situated in the approximate location of the existing Sheriffs
office. (Referenced as Option A in the original master plan report. Commissioners
have previously supported leaving the Sheriffs building intact and not placing a
free-standing deck on this site.)
3. Separate parking deck situated in the approximate location of the existing
Government Services Center Annex parking lot. (Included in the expanded master
plan.)
FINANCIAL IMPACT: The Board may recall that funds for planning the project are available in
the 2001-2011 Capital Investment Plan. The proposed 2002-2012 CIP includes funding via
alternative financing for Phase I construction as it was originally proposed.
RECOMMENDATION(S): The Manager recommends that the Board receive the information
and provide direction to staff as maybe appropriate.
3
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTON AGENDA REM ABSTMCT
Meeling Dale: SolNeml or 4,2001
Achilles Agenals
ffem No.
SUBJECT: ISItsLCrouoh Judicial F F' E:mardiori Planning Poorest
DEPARIUINI: Punctual and Central Berucas PUBLIC HEARING: (YA4) No
ATTACHMENT(S); NFORMADON CONTACT:
Pam Jonas(919)24$2652
TELEPHONENUMBERS:
Hillsborough 1 Ifrl
Ch" Hill 95&4581
Durlam SWk=1
Neberre 356221 WKH
PURPOSE:To consider approving a planning pmoess to be used in the OesgrthonmMdbn of the
Justin Facilities Expansion Project.
BACKGROUND:
Onamal Jutice Facilities Study
In 1994 me Orange County Board d Ccmmissimvrs appoinR]a group to study Me long tsar needs d
justice facilkles in Orange County. All judicial functions wi1Mn the County rare repre¢emetl in Me
Jumive Fmi4ties SNdy Croup. The resutisdMeir eSons xere reflected lnerepmt publBhetl in JUty
1945.
Efforts to Address Mm Orifical Needs
no Smile d Me long-term real as icartlisd by Me Group area aaterAw. Tlv Countya ab911yM
undertake expansion of this magnitude was limited To Met end,components m:hlblllrg Me greatest
most were mnvdered aeperetdy and two projects specific m those needs inflated.
my Jail Evanston proect completed in East 1998 added 598etls M Me existing 11,thereby hosing
the Mlelwpactyln Majailb129. Mhl hrsp of Ms Jelllelnad uatefor Mebrlg1arm.
mopeation behseen Me Shod Department and jucpes has served to Mlnknlze overcrowding.
The Fetlerel Marshal continues to use Me Orange Couny Jail m e major deput for prkmers.
• The adtlman of the Oorclon BEING Counrmm in early 1998 allowed the heavier wum9 dinMd Court
reutilize MV Mrgemuun En Memain ItemeallaprmmycN, IoBy Aggamfmibilfye
ME)p u ing v f all c muArooma was eBreatl ro among Mejudges,Hereby MhAinp a more e8cimrt
ME)laemn d NI murtrmma
A esmnd group of Judicial Officials and Gcuny seen ware mrsei ed later In 1995 to evaluate the impact
of these two E%p9nsiOns. AMOUgh users changes may haw negated ME need for further exp9llagn for
up M e tlemds,the group Agreed Mat Me longterm need still wrote end that a proactive approach to
developmemwee cdtim.
Exoanded Maafer Plan Wnrk spesinn nn d-Rn.n9 ma.
4
Hllebddten Juetlre FatllNe¢Cenmw McMx PW
In read,Me Cmnly Omhnlselonera commlealwtetl 9Bemer.WhHe Anomalous,Character te Produce e
As plan Mat affected Me total buipqut cepedliry of Ore site.The rosult¢of this rai preeMetl In
Apf 2000,ouuithd two optons.one of which would allow approMmeany 95,000 add'Nmel square feet W
building(Optgn A),theotherepprotlmetelY 105,800 aquewofM(OPtlon EN. HisimportaMtonote Met
the study defined Me seethe of the Po er plan who s be only Me area Mrawn Me Govemmom
Servbm Comer to Me east,Me Courthouse M the wart, Margaret Lane b Me reRh and tie"a of Me
eaistlng perking let to Me south. Each option defirwo building Ponmudim In four phases. Option A.
Incorporagn Me Perking deck Imo Me courth¢u¢e wn truth whit Option B developed a S oval New.
at ital parking amenure in Me approzini location 0 Me ground Bhei Department.
At Me requaw 0 Me C Nhdy Cdnmissomm,Me Master Plan was elm presented to Me Town of
Hlisbmcugh COmmissbnarc In June 2000. CmwM$mmle bybothB MBMMNmiMr,ar lmd
whim include Me rolwNng:
• Parking¢uMblerey and bmtlm;
• Concern about losing Me Hale lrom Margaret lane into Rlvar Perk;mtl
• Scale df ash propcaM bulldirgaM reletm MMe Mtloting aVlkdure;aM
• Femsr's Marratlocepon.
In an eon tefoMer defy two challenges a5sodetetl with development of a couR Malay on Margaret
Lana,two Cemmisdoner5.two Judges and Ccuny staff met earn reprmmt ms from Me Town of
Hillsbomugh,Me lSstoM Alliance,the Tourism flood and bcel dtlunfy. Whibthrebgeraml
consensus Not dstrebpmem can error on Me Bite,Mere 19 elgnlflcert ooncem Met H M dome in a
Mer Mat embraces a strong sensilMy te Mtoreal co al0 Me community as wall as MB resulting
endranmental manacle.Them ancems will be mra led In Me oMerla used in the selection of a design
firm.
Proposal Egoemsion of Me Master Patn
BMW Me mmplefion of sea Master Plan,Me Beam M1ea wool reawnBM mregarding future
dwelopmem of Coumy Gwemment bulbings in Me immadate Nary. Bareml swum were reisetl
during Mae discussions.aduding Me potential Mat a parking deck Cl be hooked closer te the
GpyammM G¢Moss Center RMerdwn being sniff aspen W Me C ffflh Y8a P1010M. 889011liki
whether Matshould leer eseas,reiseforgma MnMom. Mat example: angpmd Mr OGh tedlitm will
be more otlectiva if Over needs are oonsklewodinMMem. For example:
• TM1e ladtitlm will hew smiler perking reeds;
• Petlsskten end VehN:ulsr drouletbn from one ate tets orner eM1OVM the arretleretl;
•
0 tooth o MaBmrdchmaeteaXae Fermels MaMatm MlB site XahouM be ailed with andtlemtbm
M 18cillliss In MM.
Bece sse"a done mteresson of gre two parembra ekpareabn an Me Dvxrnown Marlborough ate,it is
reoomm nded Met Me sated of work for arms tectural sonvoes for Me CaMCUse design be expanded
to i"mor all Caurty land that lies:
• South of Margate lens
• FaetMChutonSion
• West of Cameron nSree
• NMhottte Ens Rlvm.
Upon BOertl 00W"atlen,Me WHOWng assumptions regarding Me use of the IoM would lea caw to Me
uGMSCC
• Tha area Mat is presently giver Perk lend mi women dadicated te pertlopen specs,with Mremey
minimal,If any ereroaMneni by asking.
a The arm Mat Is presently River Park could be Walked for part or an 0 a Forman's Markel Fadlity,it
Me flml design Indbated Met to be the optimal location.
5
• The building in which Me Small Depekrcm is locatetl should W left Intact X aall pcside.(The
COUIt(fempus fiddler Plan recanmends as remcrel.)
• The Osaneechl Indian Village remain us la.
• mass�meaGrpMn wW/d C011eldNMtl"M MNtt IM ncamrvMerbn M and
pobntlN erpenvlOn M and GSL entl gSCA as proposed by rho Bpaaa AYbe Teak FCraw In
March Ebda.
• A rtmXFlewl perking deck remena an axeptede seWdpn to proAdrg adequate paMJm to me area.
The nvitol master plan would be presented!do the EceN to epyrwel bdmry N Me
panel design prccace for the Ccurtnousa.
Sndtltl Me Bashi so direct,Me firm who produmtl the Count Cembie!Miter Plan could be cohered
regm N ewllabllity farhie expended plan and a,mmrem for such presented to hie goattl for
cerebratlon In the near future.
Prooased Plannlno Produce
FORAT"the approval nt Me propceed espeMed the mender plan,lire Justice FndXXea Expansion
Paged,M worriment by the County Commi ssionere should moms formal The somas•fated have is
recommumed in order to incorporate the IIXero91B t whims atekeholtlere 9 M appropriates mce
sharedwl Me Raring anneal TM1er ammoca involvement been
Interest,apedllc area of
!offeng anchor sites: Sinwlvenam in the propece.The decoded has been
mrryaMtemlasionvlmbregr offering estimates:
• &BlectlpnntDeeign Rrm;
• Programming: ImeMr
• programming: Exterior(indudce River PBrkerec)
BelaolOn dtM Duran Rand
Bmpent Wok: App0lnrecem this group wadtl bd rwpOanlde for the folbving;
• AppricAng the crimrie MCrepy Me films Wll be pardelad;
• Reviewing the contests for Prospect submhred by the wrioue firms and creating a shortJind
o firma that appear to beat meet Na patent rieede;
• InmMeMng the firms placed an Me Mort list(generally no more than and);
• Recommending Me preferred design firm for Board of Commissioner consideretbn.
Rsoannandud eppainal
• Mark Sheridan,Town of Hillabcmugh Commissioner and Tourism Board member
• Susan Frankenbuq,Nlience for Hbmrk HEabapugh
• Cattlean Turner.Murder for Histanic HXlaborough
• Todd Dickinson,Historic Praervedcn AroM1
2 Doumy COmanleeiaem
• grand Uncy Pendergrass
• John Unk,DCuMy Nanagar
• Wade Banker, Superior D ft Judge
• Joe BUdlher,Chief DiNM COW Judge
• Jamie Surd ask O COUrt
• Peru Janes,Orange County Dmcor M Purchasing and Genital Servi can
• Mind Steno,Orange County Director of Environment and Resource Caiaerrwian
Department
ProanmNYnb: E is ek
Scope oe wank:
This meld groupwill be resparapparance twindhipdeaddth tDser's concerns•bulldog
Net mopes NB cammudyamcema eaoNMe aoi demo the blildied and Me tcer'a rk and the
the xwce,peMUnhp,etc. Tlris group cell mw pronde design dreclkn aeperdn9 Rival Park and hie
6
Nroticnel melding d Vrs Wilding MM the Perk The We group's rowmrwrrnadpna will ba brought
forward for County Commoseloner conaberoaon.
Reaornmerdetl Appointees:
• Merk Sherklen,Town Commiesioner and Tourism Swrd member
• Margaret Haunt,Town of Nldaborough Planning Director
• Susan FmnWMurg,allows fs lgstore Hillsborough
• Todd Diokinson,H l Preservation Amhileot
•
Cornices Tumor,Allsm for Hisbdo Hlllmomugh
Nomm Wh'ne, ma ape Amidmd
• Coast Suomi,or dommuse
2 County ComMWaners
• Judge Wade former
• Judge Joe SucNner
• Jamie Stanford,Clark of Court
SharlN Undy PeMarerew
• Cad Fos,DlaMd Afarwy
• John Unk,Cmmry Manager
• Pam Joan$
Further,In order to ensure the Involvement of ell stakeholder¢.Input will be sdidmd at Me appropriate
time In Von eevAor design Procaea More groups representing Ma moment o Me Consco hi Indlan
Vlkago and me Farmers funded,amdq phase.
Pmomnmlm:bran Hor
5wpe of walk: The scope of Me project originally defined In the rmswr plan inducted epprotlmately
W,000 square fset d sperse so wmmxl9re at laws Me following funMbm:
• Newenberlraslorpumllcwd"ff i thapubycenberlredesgnWwbeaseoume nw:
• Cif Sfar Me 6medlfa DepertrmM;
011bes MMe perk d Cmdb Mowle Vom leased spew;
Frpeusiom f in Iumdal fgnMbne PrewrMy knMed In to m to en.
Appointees Mmin mis wtwory wlll work met.Me design reup'm ensure met rtes well be b needs d
Ms proposed ocwpaommissdmer p we red.The m k group's rewtnmendetbne MII be brought
farvmrd for County Commissioner wreltloation.
Redanmenned Apportions:
• Judge Wade Berber
• Judge Jw BUCMar
• Jamie Stanford,risk M Court
• Cad Fox, District Attorney
• short UWy Pendergmu
• 2 County COmmisebrlere
• John Unk,County Manager
Pam Jones
Input from after building unions,such w Me Public Darantlar,probetlpryPerela,Me 158 Bar AseoclaVCn,
ft.will he bobbled at epproPrlatatlmw dumg Me design PrdcaSS as waV.
Upon Board approval ol Vte propose,the Request far Proposal for erolMed selection MII Ee Prepared!
and Proceed Wring Me fell.Mlh a recommendation ham Me wlectlpn wmrdVw anfidpMed by Me and
of January 2002.
T
rr,11iI Will The Inelrsd dodo of apprmrel w Mie maps Is ad funnies:
• c Of pansMtkn bar bulking Wry Is estimated at$B mlilon.This cost would be funded through
abemawe funding maohenams,such as C+atblmfes of ParNolpation(OAPst ore private pleoerreM
loan.
•
although design consdpfagons for River Park will W included in Me scope W the work,aly
Catlmendanans ma ang the actual devalopmem walla be considered as a senerats vas item.
d design mr the talking only Is a&imeted N 1 o-12%of mmnual vaster aPPM m l
$BW,WDEIOD,ogo. Thessfunds have been eppfophated over the peM Mw yeas in Me Cii
Invzalments Plen(CIP). happroved,metforthe expanded but member pan would aso be oharged
epalw these funds.
Specdc beat impkcelichm for each d Made ImMiifies will be Misstated for Bead apparel,as they
become khan.
RMIMMEeIBAMelft The Manager recommaks that Vs Board
• Appove the expanded mercer plan more and alMove the Cbemor M Purchasing and Cenvel
SBMM to negotiate a cossi for Bond approval with FraaremWhhe Archheos;and
• Enctrat Me propmed planning praceae;eM
• Make appammens m the Mree ask groups as manbal above,Moluding the designation of Nw
Cauchy Commiaaonim who will serve;and
• Authorities Me OireMCra Pumluvng and CMuah fImmoes to sblist proposes for detlgn wrvfnss for
she Juafea Feelings Expan ion Prop t,Phase I.
8
Mamba: Sesebandbel ZDDI BOCC nwd,M
g NI Judi dd Plamine Becomes The MM wn4aered Widening a plennmg ethanol bB used in Me
daeigNCM u m d Ne jueaS hclAtiee emparmon diesel.
John Link wild hat he Bsmang County ComI1madi BR l spent the note
phase A Me jumrn gelfty exp rman. A jai expenelon and Smw mumrom WA's
added In 1988. Meador,Mere ere addiXonel nsetls M Indeed fmll9les.
Pam Jones;saw Met a MN force"a"Posted N IOut to c wdhp a made
oseomeMfa Me coed node. Ad en imerhn meeeure betls were etltledm2 . T m
pop lace edmcly,uPto118. In July else average tldty pop. A tiv VAS 125. ea Wide planwa dewslo'o !bymadladues Mum Wassail ebu but O.amedd
plan was tleuebpetl by an pe dsfotl for MOIwo much could Project bout on Mut19dB1
fedeaw arts. Tray bd anry hhpwwcdsMhg dR. . Cho0croup be but himar
ettekvd and!cased parking anddi,which would be in Me bmaumea Me 9treMf goRide. The odder
opibn had the Perking inmRweteO In Me building and would be but in phase two. The
dope at the metier Plan Is Mllm use creekw Mergamit 10115 CNIMM games to Me
edge d to couMwo Palling lot A Mg-term study d Count'spew nods we;
cmdudedrecentlyNmughthe Spam NestleleekW . OW4M Redmmenddions
b w add to Me Government Services Carter an Cemaren Baed. It aeemB Widen at
County Cohm[dthr EMIRBiwanaeede Theeba M1sirean. S would Bmkd
Feemen While M epprovaeneayate d the m,ton mail Sheard Wpmpoeew
ask Freemeness. rgtbto ads titillate seeder plan,Men move bnvdk With Me
planning Process.
Pam Jmesthen smkegh,M stadia pncmod, pompon Met tam will is be
the dosed on tlpamavn Xiptend d Me stadium ebhas three and nRWr Park. Thelmais
Inaoledionti me up Met twtltles9Me oardld'r to Will Perk. The second Is
e @nWR rp group MetvwudnHH ebsaorht aceminJigtPmekeaufa MOT h
tlmB rod orerPaBerthe dambwn HRbbdouph eHRO 1111IM tl h e Prhgremmlrg gwpP
MdxPUbfoldan thyComedareem Met Theoere leMU wludlM oPrdele,
County dell, oubCounty a spot. ioneretlMtwmltl be hpereang wMlnMe mamlw.
OMO uoremudelse Oda inpuw.
Commd down Grey sated about needed d impPr otllo antl Pan Jones caw
Mara mutl be fom down to make rmmid nestled Ddwnp. TMre eR enter ap1kA1B.
but the Is the bast n.
Commissioner Oe Braved mrMnnetl Md to firm pause would be a bulMlrg
atljeednlw o misio eaurteduw.
Commissioner JattOC edudb R9ad Ncue6 for Me dazanaqowent vrTan
Information lanteeemed.
Cammd be jor Jemtif made Rkreemidare 0 wasnibe Wt and Bed gtd
delineated Me De lea im a if possible. He Belsugge it ads nice w oeoro
the me worst Mat we Ids ma wtw we M1ava. He wegadedkMan9 Freemen When l
MewoM wooden Id an wa m patio.
Amdbn was made by Cm babod an Muse adding Cam mood Commissioner
Jemols
Cdey w outlaw the assumptions o Ikted m Page
woke shod being PNdeM tithe SM1edPa deplane recpaNn9 to space needs study
PprWAmereetl bare Imed Me rdummerweeo far potential mounted doter Plan vend
• 9
Govamment Services CenNr and Govemmmk iiiVok c Cedar Annekm propowd by
the Spew Nwtla TCek Ircince ar Mrdm2o01.°
Cri nmdaeioner Jnwbc meneorled flat ke and Chair Helkiodo met WM sci
peoplelrem HIIbWdi gh and me of Meir wnwme wee tkettlpy beebbte we the
Hivar Perk Rom Margaret Lane.
VOTE: UNANIMOUS
10
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSIMICT
MMltg tuts: November],2001
AotlON AgeMe
Xart Na.
SUBJECT: Justice promise S8s Fxpmtlnd Motor Plan
DEPARTMENT: Puohedn9 antl CeMMl Services PUBLIC NEARING: (YBOFN—o–7
ATTACXMEM(8): INFORMATION CONTACT'.
Penn Jones(B1g)2A5-2952
FreemertWhite Preposel
TELEPHONE NUMBERS:
Hill
sill h 752411 81
Ch"Hill 98&1501
memo& BBB-T08t
Meeena 8361
PURPOSE To pontMer tamlMng Free -WhM AraRoole W W;Za an surrounded mender plan of me
downtown Courti campus.
BACKGROUND: County CaMllamonera Wpa daprocees WomnbgaMdesignWQM o wam
Jumme Families Fxparroon during the meeting on 8eptam0ar J 2001. The Boats directed the
Purchasing Mremor to seek a proposal fw expansion a the ema0ng Master Plan for Me Coun Campus
In odor to consider Me peasi inpohe 0 the reopmmematona in Me pMiminnry G rsi Space
I1eevb Body and inmwltmrate Man as might be appropriate.The Justin Faallty Member Plan proposed
the Publication N Me prellminaw County Space Eftudy,which proposes expansion of the Government
GeMass CeMOr(GSC)and"Mal ra mldtMQO ment Devices Ceder Mnex(GSCAI. The
GB SCA pmject pNOMhelly opine newappodunNea ImeyngMWime y pmvidng M Mng for bah die
GSCJGSCA and Me Justice f4dlhtes proses. Model Information is required however.Wensure
that our planning basis for bcth the Wilding mWension and Me perking structures u reallNlo and makes
Ma mom added use of Me ammis lam.
9moe of Wert
The proposed expanded masher plan wind expand Me anginal muter plan prepared forthe coon eem0ue
M include the GSCIGS(i area. Former.It wit aim consider the Impact a Me proposed!Were Pmjaw
on Me RMa Park arse. Neither prolem being considered,hawadf,Wh monsoon open the River Park
area.
The pmpoom expended toaster plan sill proods in-depth MvesOgesion of the mM and Wit apm8icely
determine Me feasibility of a poking mtupi on Me GSG'GSCA all The a¢anded plan will include
Me fallowing majors seemed;
• bLbautace lnumlgetan to determine Me romay of Me mil m support Me structures proposed;
• Toni ani fatlmermine moment for moving Mr shimflusent number M vehicles Met a pai
structure could generate;
• Ronew Me preliminary findings of to Spero Nerds fi�and d ermunee a inwMe SGha)
impassion plan for Me courthouse and wormy Omsem op g
Department.
no proposal is a0eched to mare fly di ire the scope of ink.
Cod EI.m.Me
Coeta 0 me e W tly incll Me tallmting:
• 812,001): AaoNtect
•
17,500: TraMb Pnalycls
• M2.2W: Sub-Sucew testing
1:2t,'rop Total 0 aWandec away
nines
Tire report will be compislad In appmtlmately 3g aaya from me date Mine emenru WhOWICA.
Presuming Me agreerrem Is approved on Now rd er 7.20(11.me eppmaimate date of mmpleYwn should
W Deoembn 10,2001.
FINANCMIMPACT: Fum Wwp"nrt mNoitlrea+pentletlm MwplenamavallaMingle
Jusel Paollity Planning CaMat Pmlcot In the cuneM GP.
HEWMMENOAMR11):TTe Manager recommence met me Booty rotnin Freemen-Wmte Arehileots to
cmrpiata ma nyandsd runt er plan fore wpm not to arwae 821.100 as auMrree in me etia0bed
proposal:and aullKKke the Pumhashg Director to aeeNretlw appralwals pawhea M.
12
Justice Facilities
]ustice Facilities Expansion
• Master Plan presented to BOCC April 2000
• Called for four phases of development of
appmArnately 24,000 square feet each
• Phase I facility to Include:
- Shenfrs Deparnnant
- apansion tor functions currently located In
courthouse
13
7 stice Facilities Expansion:
D ign Options
a Two design options:
—Option A—parking deck wnsWcted as
part of building beginning phase 2
—Option B—Free-standing multi-level
parking structure located where Sheriffs
Office now stands, constructed during
Phase 2
Justice Facility Expansion
• Board did not select a design approach
—Expressed preference for Option A
• Board approved facility planning
process September 4, 2001
—Autlgrized expanded master plan
14
J stice Facilities Expansion:
panded Master Plan
a Desired Plan Outcomes were to
determine:
• How people muld easily access River Park
• How the vista from Margaret Lane muld
be preserve
• How the mass of the buildings proposed
along Margaret Lane muld be minimized
] stice Facilities Expansion
panded Master Plan
oerrea uw•em wo ono,wmmu�l:
• what opaans a Iom to mlomte the panung
smxwre ham the main muahouse campus W
an area of less visual Impact
• A um firerenwalofthe Gw nment
SWm Center Anw
• Msunuz that me Sheriffs Building remains
Intact
15
J stice Facilities Expansion
E panded Master Plan
Prellnlnary nndirgs a eya Wn:
• Revises number of development phases
from four to three
- n,OM s.f.lncmKnla
- TO I Wldar 91,000 sf.vs.aa,010 cf.
• All chases induced 8,000 s.f. under-building
parking
• Creates a pedestrian Walkway from
Margaret lane to River Park
] stice Facilities Expansion
E panded Master Plan
Preliminary Findings of Expanded Plan:
• Five level deck mule be lom c!mubi of CaSC-
Annex slle
• 500+vehkle rapacity
• Needed by Phase 2 of courthouse expansion
s
LI
o I
=-
]ustice Facilities Expansion
Expanded Master Plan
. Traffic is Primary Challenge
—Margaret lane and Churton Street
—Cameron Street and Margaret Lane
n
Justice Facilities Expansion
Expanded Master Plan
m Suggestions by Traffic Consultant:
—Optimize traffic signal nming
.w Iffy E3Kld6 m asw slgiul NJm operauan m
mspaa m weals S
— Remove parking along Fast Margaret lace
— Remove parking along Churton Street from
during peak twel hours
* lam b 9 am
•9pm In 6 Pm