Loading...
HomeMy WebLinkAboutAgenda - 04-30-2002 - 1 t ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: Apd130, 2002 Action Agenda Item No. SUBJECT: Justice Facilities Development Expanded M t Plan Presentation DEPARTMENT: Purchasing and Central Services PUBLIC HEARING: IY/N) FNo— ATTACHMENTIS): INFORMATION CONTACT: 9A-01 agenda abstract and minutes Pam Jones (919)245-2852 11-7-01 agenda abstract 1-28-112 power Point slides applicaGemthis TELEPHONE NUMBERS: topic. Hillsborough 7324181 Expanded master plan (under separate Chapel Hill 9684501 cover) Durham 000-7331 Mebane 338227-2031 PURPOSE: To receive information regarding design options for court and parking facilities on the downtown Hillsborough county campus. BACKGROUND: The Board has previously received information on various design options for the Hillsborough court facilities and the associated parking. The more recent discussions are as follows: • September 4, 2001, the Board approved the planning process for the Justice Facilities Expansion and requested that the site's master plan be expanded to conaider relocating the parking facilities to an area with less visual impact, i e. in closer proximity to the Government Services Center. (abstract and minutes attached) • November 7, 2001, the Board approved a contract with Freeman White Architects for the completion of the Expanded Master Plan for court facilities; (abstract attached. Minutes reflect that the contract was approved.) • January 28,2002: Justice Facilities, with a brief ovarview of the Expanded Master Plan findings, were included in a presentation about overall county space responsibilities; (See attached Power Point handouts from presentation) The presentation at this work session is intended to include the following: • Full presentation of the Expanded Master Plan by representatives from Freeman- White Architects (The report is provided under separate cover.) • Brief elaboration regarding how the Implementation of the expanded plan might impact the expansion of the Government Services Center as proposed in the 2000 Space Study. 2 The Board has previously approved the composition of the archRect selection committee, the two planning committees (interior and exterior) and the development process proposed for the Justice Faci diss Expansion. However, determination of a design preference, particularly as it respects the parking facilities will be required at such time the Board is prepared to proceed further with the expansion initiatives. As a reminder, parking options identifed at this time include'. 1. Parking facilities integrated into each phase of courthouse expansion, beginning with the Phase II (Phase I includes only underground secured parking for judicial officials and was referenced as Option 8 in the original master plan report). 2. Separate parking deck situated in the approximate location of the existing Sheriffs office. (Referenced as Option A in the original master plan report. Commissioners have previously supported leaving the Sheriffs building intact and not placing a free-standing deck on this site.) 3. Separate parking deck situated in the approximate location of the existing Government Services Center Annex parking lot. (Included in the expanded master plan.) FINANCIAL IMPACT: The Board may recall that funds for planning the project are available in the 2001-2011 Capital Investment Plan. The proposed 2002-2012 CIP includes funding via alternative financing for Phase I construction as it was originally proposed. RECOMMENDATION(S): The Manager recommends that the Board receive the information and provide direction to staff as maybe appropriate. 3 ORANGE COUNTY BOARD OF COMMISSIONERS ACTON AGENDA REM ABSTMCT Meeling Dale: SolNeml or 4,2001 Achilles Agenals ffem No. SUBJECT: ISItsLCrouoh Judicial F F' E:mardiori Planning Poorest DEPARIUINI: Punctual and Central Berucas PUBLIC HEARING: (YA4) No ATTACHMENT(S); NFORMADON CONTACT: Pam Jonas(919)24$2652 TELEPHONENUMBERS: Hillsborough 1 Ifrl Ch" Hill 95&4581 Durlam SWk=1 Neberre 356221 WKH PURPOSE:To consider approving a planning pmoess to be used in the OesgrthonmMdbn of the Justin Facilities Expansion Project. BACKGROUND: Onamal Jutice Facilities Study In 1994 me Orange County Board d Ccmmissimvrs appoinR]a group to study Me long tsar needs d justice facilkles in Orange County. All judicial functions wi1Mn the County rare repre¢emetl in Me Jumive Fmi4ties SNdy Croup. The resutisdMeir eSons xere reflected lnerepmt publBhetl in JUty 1945. Efforts to Address Mm Orifical Needs no Smile d Me long-term real as icartlisd by Me Group area aaterAw. Tlv Countya ab911yM undertake expansion of this magnitude was limited To Met end,components m:hlblllrg Me greatest most were mnvdered aeperetdy and two projects specific m those needs inflated. my Jail Evanston proect completed in East 1998 added 598etls M Me existing 11,thereby hosing the Mlelwpactyln Majailb129. Mhl hrsp of Ms Jelllelnad uatefor Mebrlg1arm. mopeation behseen Me Shod Department and jucpes has served to Mlnknlze overcrowding. The Fetlerel Marshal continues to use Me Orange Couny Jail m e major deput for prkmers. • The adtlman of the Oorclon BEING Counrmm in early 1998 allowed the heavier wum9 dinMd Court reutilize MV Mrgemuun En Memain ItemeallaprmmycN, IoBy Aggamfmibilfye ME)p u ing v f all c muArooma was eBreatl ro among Mejudges,Hereby MhAinp a more e8cimrt ME)laemn d NI murtrmma A esmnd group of Judicial Officials and Gcuny seen ware mrsei ed later In 1995 to evaluate the impact of these two E%p9nsiOns. AMOUgh users changes may haw negated ME need for further exp9llagn for up M e tlemds,the group Agreed Mat Me longterm need still wrote end that a proactive approach to developmemwee cdtim. Exoanded Maafer Plan Wnrk spesinn nn d-Rn.n9 ma. 4 Hllebddten Juetlre FatllNe¢Cenmw McMx PW In read,Me Cmnly Omhnlselonera commlealwtetl 9Bemer.WhHe Anomalous,Character te Produce e As plan Mat affected Me total buipqut cepedliry of Ore site.The rosult¢of this rai preeMetl In Apf 2000,ouuithd two optons.one of which would allow approMmeany 95,000 add'Nmel square feet W building(Optgn A),theotherepprotlmetelY 105,800 aquewofM(OPtlon EN. HisimportaMtonote Met the study defined Me seethe of the Po er plan who s be only Me area Mrawn Me Govemmom Servbm Comer to Me east,Me Courthouse M the wart, Margaret Lane b Me reRh and tie"a of Me eaistlng perking let to Me south. Each option defirwo building Ponmudim In four phases. Option A. Incorporagn Me Perking deck Imo Me courth¢u¢e wn truth whit Option B developed a S oval New. at ital parking amenure in Me approzini location 0 Me ground Bhei Department. At Me requaw 0 Me C Nhdy Cdnmissomm,Me Master Plan was elm presented to Me Town of Hlisbmcugh COmmissbnarc In June 2000. CmwM$mmle bybothB MBMMNmiMr,ar lmd whim include Me rolwNng: • Parking¢uMblerey and bmtlm; • Concern about losing Me Hale lrom Margaret lane into Rlvar Perk;mtl • Scale df ash propcaM bulldirgaM reletm MMe Mtloting aVlkdure;aM • Femsr's Marratlocepon. In an eon tefoMer defy two challenges a5sodetetl with development of a couR Malay on Margaret Lana,two Cemmisdoner5.two Judges and Ccuny staff met earn reprmmt ms from Me Town of Hillsbomugh,Me lSstoM Alliance,the Tourism flood and bcel dtlunfy. Whibthrebgeraml consensus Not dstrebpmem can error on Me Bite,Mere 19 elgnlflcert ooncem Met H M dome in a Mer Mat embraces a strong sensilMy te Mtoreal co al0 Me community as wall as MB resulting endranmental manacle.Them ancems will be mra led In Me oMerla used in the selection of a design firm. Proposal Egoemsion of Me Master Patn BMW Me mmplefion of sea Master Plan,Me Beam M1ea wool reawnBM mregarding future dwelopmem of Coumy Gwemment bulbings in Me immadate Nary. Bareml swum were reisetl during Mae discussions.aduding Me potential Mat a parking deck Cl be hooked closer te the GpyammM G¢Moss Center RMerdwn being sniff aspen W Me C ffflh Y8a P1010M. 889011liki whether Matshould leer eseas,reiseforgma MnMom. Mat example: angpmd Mr OGh tedlitm will be more otlectiva if Over needs are oonsklewodinMMem. For example: • TM1e ladtitlm will hew smiler perking reeds; • Petlsskten end VehN:ulsr drouletbn from one ate tets orner eM1OVM the arretleretl; • 0 tooth o MaBmrdchmaeteaXae Fermels MaMatm MlB site XahouM be ailed with andtlemtbm M 18cillliss In MM. Bece sse"a done mteresson of gre two parembra ekpareabn an Me Dvxrnown Marlborough ate,it is reoomm nded Met Me sated of work for arms tectural sonvoes for Me CaMCUse design be expanded to i"mor all Caurty land that lies: • South of Margate lens • FaetMChutonSion • West of Cameron nSree • NMhottte Ens Rlvm. Upon BOertl 00W"atlen,Me WHOWng assumptions regarding Me use of the IoM would lea caw to Me uGMSCC • Tha area Mat is presently giver Perk lend mi women dadicated te pertlopen specs,with Mremey minimal,If any ereroaMneni by asking. a The arm Mat Is presently River Park could be Walked for part or an 0 a Forman's Markel Fadlity,it Me flml design Indbated Met to be the optimal location. 5 • The building in which Me Small Depekrcm is locatetl should W left Intact X aall pcside.(The COUIt(fempus fiddler Plan recanmends as remcrel.) • The Osaneechl Indian Village remain us la. • mass�meaGrpMn wW/d C011eldNMtl"M MNtt IM ncamrvMerbn M and pobntlN erpenvlOn M and GSL entl gSCA as proposed by rho Bpaaa AYbe Teak FCraw In March Ebda. • A rtmXFlewl perking deck remena an axeptede seWdpn to proAdrg adequate paMJm to me area. The nvitol master plan would be presented!do the EceN to epyrwel bdmry N Me panel design prccace for the Ccurtnousa. Sndtltl Me Bashi so direct,Me firm who produmtl the Count Cembie!Miter Plan could be cohered regm N ewllabllity farhie expended plan and a,mmrem for such presented to hie goattl for cerebratlon In the near future. Prooased Plannlno Produce FORAT"the approval nt Me propceed espeMed the mender plan,lire Justice FndXXea Expansion Paged,M worriment by the County Commi ssionere should moms formal The somas•fated have is recommumed in order to incorporate the IIXero91B t whims atekeholtlere 9 M appropriates mce sharedwl Me Raring anneal TM1er ammoca involvement been Interest,apedllc area of !offeng anchor sites: Sinwlvenam in the propece.The decoded has been mrryaMtemlasionvlmbregr offering estimates: • &BlectlpnntDeeign Rrm; • Programming: ImeMr • programming: Exterior(indudce River PBrkerec) BelaolOn dtM Duran Rand Bmpent Wok: App0lnrecem this group wadtl bd rwpOanlde for the folbving; • AppricAng the crimrie MCrepy Me films Wll be pardelad; • Reviewing the contests for Prospect submhred by the wrioue firms and creating a shortJind o firma that appear to beat meet Na patent rieede; • InmMeMng the firms placed an Me Mort list(generally no more than and); • Recommending Me preferred design firm for Board of Commissioner consideretbn. Rsoannandud eppainal • Mark Sheridan,Town of Hillabcmugh Commissioner and Tourism Board member • Susan Frankenbuq,Nlience for Hbmrk HEabapugh • Cattlean Turner.Murder for Histanic HXlaborough • Todd Dickinson,Historic Praervedcn AroM1 2 Doumy COmanleeiaem • grand Uncy Pendergrass • John Unk,DCuMy Nanagar • Wade Banker, Superior D ft Judge • Joe BUdlher,Chief DiNM COW Judge • Jamie Surd ask O COUrt • Peru Janes,Orange County Dmcor M Purchasing and Genital Servi can • Mind Steno,Orange County Director of Environment and Resource Caiaerrwian Department ProanmNYnb: E is ek Scope oe wank: This meld groupwill be resparapparance twindhipdeaddth tDser's concerns•bulldog Net mopes NB cammudyamcema eaoNMe aoi demo the blildied and Me tcer'a rk and the the xwce,peMUnhp,etc. Tlris group cell mw pronde design dreclkn aeperdn9 Rival Park and hie 6 Nroticnel melding d Vrs Wilding MM the Perk The We group's rowmrwrrnadpna will ba brought forward for County Commoseloner conaberoaon. Reaornmerdetl Appointees: • Merk Sherklen,Town Commiesioner and Tourism Swrd member • Margaret Haunt,Town of Nldaborough Planning Director • Susan FmnWMurg,allows fs lgstore Hillsborough • Todd Diokinson,H l Preservation Amhileot • Cornices Tumor,Allsm for Hisbdo Hlllmomugh Nomm Wh'ne, ma ape Amidmd • Coast Suomi,or dommuse 2 County ComMWaners • Judge Wade former • Judge Joe SucNner • Jamie Stanford,Clark of Court SharlN Undy PeMarerew • Cad Fos,DlaMd Afarwy • John Unk,Cmmry Manager • Pam Joan$ Further,In order to ensure the Involvement of ell stakeholder¢.Input will be sdidmd at Me appropriate time In Von eevAor design Procaea More groups representing Ma moment o Me Consco hi Indlan Vlkago and me Farmers funded,amdq phase. Pmomnmlm:bran Hor 5wpe of walk: The scope of Me project originally defined In the rmswr plan inducted epprotlmately W,000 square fset d sperse so wmmxl9re at laws Me following funMbm: • Newenberlraslorpumllcwd"ff i thapubycenberlredesgnWwbeaseoume nw: • Cif Sfar Me 6medlfa DepertrmM; 011bes MMe perk d Cmdb Mowle Vom leased spew; Frpeusiom f in Iumdal fgnMbne PrewrMy knMed In to m to en. Appointees Mmin mis wtwory wlll work met.Me design reup'm ensure met rtes well be b needs d Ms proposed ocwpaommissdmer p we red.The m k group's rewtnmendetbne MII be brought farvmrd for County Commissioner wreltloation. Redanmenned Apportions: • Judge Wade Berber • Judge Jw BUCMar • Jamie Stanford,risk M Court • Cad Fox, District Attorney • short UWy Pendergmu • 2 County COmmisebrlere • John Unk,County Manager Pam Jones Input from after building unions,such w Me Public Darantlar,probetlpryPerela,Me 158 Bar AseoclaVCn, ft.will he bobbled at epproPrlatatlmw dumg Me design PrdcaSS as waV. Upon Board approval ol Vte propose,the Request far Proposal for erolMed selection MII Ee Prepared! and Proceed Wring Me fell.Mlh a recommendation ham Me wlectlpn wmrdVw anfidpMed by Me and of January 2002. T rr,11iI Will The Inelrsd dodo of apprmrel w Mie maps Is ad funnies: • c Of pansMtkn bar bulking Wry Is estimated at$B mlilon.This cost would be funded through abemawe funding maohenams,such as C+atblmfes of ParNolpation(OAPst ore private pleoerreM loan. • although design consdpfagons for River Park will W included in Me scope W the work,aly Catlmendanans ma ang the actual devalopmem walla be considered as a senerats vas item. d design mr the talking only Is a&imeted N 1 o-12%of mmnual vaster aPPM m l $BW,WDEIOD,ogo. Thessfunds have been eppfophated over the peM Mw yeas in Me Cii Invzalments Plen(CIP). happroved,metforthe expanded but member pan would aso be oharged epalw these funds. Specdc beat impkcelichm for each d Made ImMiifies will be Misstated for Bead apparel,as they become khan. RMIMMEeIBAMelft The Manager recommaks that Vs Board • Appove the expanded mercer plan more and alMove the Cbemor M Purchasing and Cenvel SBMM to negotiate a cossi for Bond approval with FraaremWhhe Archheos;and • Enctrat Me propmed planning praceae;eM • Make appammens m the Mree ask groups as manbal above,Moluding the designation of Nw Cauchy Commiaaonim who will serve;and • Authorities Me OireMCra Pumluvng and CMuah fImmoes to sblist proposes for detlgn wrvfnss for she Juafea Feelings Expan ion Prop t,Phase I. 8 Mamba: Sesebandbel ZDDI BOCC nwd,M g NI Judi dd Plamine Becomes The MM wn4aered Widening a plennmg ethanol bB used in Me daeigNCM u m d Ne jueaS hclAtiee emparmon diesel. John Link wild hat he Bsmang County ComI1madi BR l spent the note phase A Me jumrn gelfty exp rman. A jai expenelon and Smw mumrom WA's added In 1988. Meador,Mere ere addiXonel nsetls M Indeed fmll9les. Pam Jones;saw Met a MN force"a"Posted N IOut to c wdhp a made oseomeMfa Me coed node. Ad en imerhn meeeure betls were etltledm2 . T m pop lace edmcly,uPto118. In July else average tldty pop. A tiv VAS 125. ea Wide planwa dewslo'o !bymadladues Mum Wassail ebu but O.amedd plan was tleuebpetl by an pe dsfotl for MOIwo much could Project bout on Mut19dB1 fedeaw arts. Tray bd anry hhpwwcdsMhg dR. . Cho0croup be but himar ettekvd and!cased parking anddi,which would be in Me bmaumea Me 9treMf goRide. The odder opibn had the Perking inmRweteO In Me building and would be but in phase two. The dope at the metier Plan Is Mllm use creekw Mergamit 10115 CNIMM games to Me edge d to couMwo Palling lot A Mg-term study d Count'spew nods we; cmdudedrecentlyNmughthe Spam NestleleekW . OW4M Redmmenddions b w add to Me Government Services Carter an Cemaren Baed. It aeemB Widen at County Cohm[dthr EMIRBiwanaeede Theeba M1sirean. S would Bmkd Feemen While M epprovaeneayate d the m,ton mail Sheard Wpmpoeew ask Freemeness. rgtbto ads titillate seeder plan,Men move bnvdk With Me planning Process. Pam Jmesthen smkegh,M stadia pncmod, pompon Met tam will is be the dosed on tlpamavn Xiptend d Me stadium ebhas three and nRWr Park. Thelmais Inaoledionti me up Met twtltles9Me oardld'r to Will Perk. The second Is e @nWR rp group MetvwudnHH ebsaorht aceminJigtPmekeaufa MOT h tlmB rod orerPaBerthe dambwn HRbbdouph eHRO 1111IM tl h e Prhgremmlrg gwpP MdxPUbfoldan thyComedareem Met Theoere leMU wludlM oPrdele, County dell, oubCounty a spot. ioneretlMtwmltl be hpereang wMlnMe mamlw. OMO uoremudelse Oda inpuw. Commd down Grey sated about needed d impPr otllo antl Pan Jones caw Mara mutl be fom down to make rmmid nestled Ddwnp. TMre eR enter ap1kA1B. but the Is the bast n. Commissioner Oe Braved mrMnnetl Md to firm pause would be a bulMlrg atljeednlw o misio eaurteduw. Commissioner JattOC edudb R9ad Ncue6 for Me dazanaqowent vrTan Information lanteeemed. Cammd be jor Jemtif made Rkreemidare 0 wasnibe Wt and Bed gtd delineated Me De lea im a if possible. He Belsugge it ads nice w oeoro the me worst Mat we Ids ma wtw we M1ava. He wegadedkMan9 Freemen When l MewoM wooden Id an wa m patio. Amdbn was made by Cm babod an Muse adding Cam mood Commissioner Jemols Cdey w outlaw the assumptions o Ikted m Page woke shod being PNdeM tithe SM1edPa deplane recpaNn9 to space needs study PprWAmereetl bare Imed Me rdummerweeo far potential mounted doter Plan vend • 9 Govamment Services CenNr and Govemmmk iiiVok c Cedar Annekm propowd by the Spew Nwtla TCek Ircince ar Mrdm2o01.° Cri nmdaeioner Jnwbc meneorled flat ke and Chair Helkiodo met WM sci peoplelrem HIIbWdi gh and me of Meir wnwme wee tkettlpy beebbte we the Hivar Perk Rom Margaret Lane. VOTE: UNANIMOUS 10 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSIMICT MMltg tuts: November],2001 AotlON AgeMe Xart Na. SUBJECT: Justice promise S8s Fxpmtlnd Motor Plan DEPARTMENT: Puohedn9 antl CeMMl Services PUBLIC NEARING: (YBOFN—o–7 ATTACXMEM(8): INFORMATION CONTACT'. Penn Jones(B1g)2A5-2952 FreemertWhite Preposel TELEPHONE NUMBERS: Hill sill h 752411 81 Ch"Hill 98&1501 memo& BBB-T08t Meeena 8361 PURPOSE To pontMer tamlMng Free -WhM AraRoole W W;Za an surrounded mender plan of me downtown Courti campus. BACKGROUND: County CaMllamonera Wpa daprocees WomnbgaMdesignWQM o wam Jumme Families Fxparroon during the meeting on 8eptam0ar J 2001. The Boats directed the Purchasing Mremor to seek a proposal fw expansion a the ema0ng Master Plan for Me Coun Campus In odor to consider Me peasi inpohe 0 the reopmmematona in Me pMiminnry G rsi Space I1eevb Body and inmwltmrate Man as might be appropriate.The Justin Faallty Member Plan proposed the Publication N Me prellminaw County Space Eftudy,which proposes expansion of the Government GeMass CeMOr(GSC)and"Mal ra mldtMQO ment Devices Ceder Mnex(GSCAI. The GB SCA pmject pNOMhelly opine newappodunNea ImeyngMWime y pmvidng M Mng for bah die GSCJGSCA and Me Justice f4dlhtes proses. Model Information is required however.Wensure that our planning basis for bcth the Wilding mWension and Me perking structures u reallNlo and makes Ma mom added use of Me ammis lam. 9moe of Wert The proposed expanded masher plan wind expand Me anginal muter plan prepared forthe coon eem0ue M include the GSCIGS(i area. Former.It wit aim consider the Impact a Me proposed!Were Pmjaw on Me RMa Park arse. Neither prolem being considered,hawadf,Wh monsoon open the River Park area. The pmpoom expended toaster plan sill proods in-depth MvesOgesion of the mM and Wit apm8icely determine Me feasibility of a poking mtupi on Me GSG'GSCA all The a¢anded plan will include Me fallowing majors seemed; • bLbautace lnumlgetan to determine Me romay of Me mil m support Me structures proposed; • Toni ani fatlmermine moment for moving Mr shimflusent number M vehicles Met a pai structure could generate; • Ronew Me preliminary findings of to Spero Nerds fi�and d ermunee a inwMe SGha) impassion plan for Me courthouse and wormy Omsem op g Department. no proposal is a0eched to mare fly di ire the scope of ink. Cod EI.m.Me Coeta 0 me e W tly incll Me tallmting: • 812,001): AaoNtect • 17,500: TraMb Pnalycls • M2.2W: Sub-Sucew testing 1:2t,'rop Total 0 aWandec away nines Tire report will be compislad In appmtlmately 3g aaya from me date Mine emenru WhOWICA. Presuming Me agreerrem Is approved on Now rd er 7.20(11.me eppmaimate date of mmpleYwn should W Deoembn 10,2001. FINANCMIMPACT: Fum Wwp"nrt mNoitlrea+pentletlm MwplenamavallaMingle Jusel Paollity Planning CaMat Pmlcot In the cuneM GP. HEWMMENOAMR11):TTe Manager recommence met me Booty rotnin Freemen-Wmte Arehileots to cmrpiata ma nyandsd runt er plan fore wpm not to arwae 821.100 as auMrree in me etia0bed proposal:and aullKKke the Pumhashg Director to aeeNretlw appralwals pawhea M. 12 Justice Facilities ]ustice Facilities Expansion • Master Plan presented to BOCC April 2000 • Called for four phases of development of appmArnately 24,000 square feet each • Phase I facility to Include: - Shenfrs Deparnnant - apansion tor functions currently located In courthouse 13 7 stice Facilities Expansion: D ign Options a Two design options: —Option A—parking deck wnsWcted as part of building beginning phase 2 —Option B—Free-standing multi-level parking structure located where Sheriffs Office now stands, constructed during Phase 2 Justice Facility Expansion • Board did not select a design approach —Expressed preference for Option A • Board approved facility planning process September 4, 2001 —Autlgrized expanded master plan 14 J stice Facilities Expansion: panded Master Plan a Desired Plan Outcomes were to determine: • How people muld easily access River Park • How the vista from Margaret Lane muld be preserve • How the mass of the buildings proposed along Margaret Lane muld be minimized ] stice Facilities Expansion panded Master Plan oerrea uw•em wo ono,wmmu�l: • what opaans a Iom to mlomte the panung smxwre ham the main muahouse campus W an area of less visual Impact • A um firerenwalofthe Gw nment SWm Center Anw • Msunuz that me Sheriffs Building remains Intact 15 J stice Facilities Expansion E panded Master Plan Prellnlnary nndirgs a eya Wn: • Revises number of development phases from four to three - n,OM s.f.lncmKnla - TO I Wldar 91,000 sf.vs.aa,010 cf. • All chases induced 8,000 s.f. under-building parking • Creates a pedestrian Walkway from Margaret lane to River Park ] stice Facilities Expansion E panded Master Plan Preliminary Findings of Expanded Plan: • Five level deck mule be lom c!mubi of CaSC- Annex slle • 500+vehkle rapacity • Needed by Phase 2 of courthouse expansion s LI o I =- ]ustice Facilities Expansion Expanded Master Plan . Traffic is Primary Challenge —Margaret lane and Churton Street —Cameron Street and Margaret Lane n Justice Facilities Expansion Expanded Master Plan m Suggestions by Traffic Consultant: —Optimize traffic signal nming .w Iffy E3Kld6 m asw slgiul NJm operauan m mspaa m weals S — Remove parking along Fast Margaret lace — Remove parking along Churton Street from during peak twel hours * lam b 9 am •9pm In 6 Pm