Meeting Date: August 29, 2005
Action Agenda
Item No. a-~
SUBJECT: Water & Wastewater Improvements
DEPARTMENT: County Manager PUBLIC NEARING: (Y/N) No
ATTACHMENT(S):
Advantex filtration system brochure
Water treatment equipment building
brochure
INFORMATION CONTACT:
County Engineer, ext 2300
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To update the Board on the process and timeline far improving the water and
wastewater infrastructure serving the Northern Human Services Center (NHSC).
BACKGROUND: The expansion of the uses of the NHSC facility (existing building and
proposed Northern Park) requires that: 1) the existing well water (potable water supply) system
be replaced; and 2) the existing capacity of the wastewater treatment (on-site septic) system be
increased.
The NHSC facility's existing well, located in the boiler roam (and adjacent to the old coal
storage bin) beneath the building, has water quality issues associated with coal storage
byproducts and contaminants. The well may also eventually be impacted by contaminants
associated with a fuel oil spill a few years ago. Presently the well continues to supply water for
NHSC's non-potable uses while potable water is supplied as bottled water.
The facility's wastewater treatment is currently provided by an onsite pump conventional septic
system with the grease traps, septic tanks and pumping station located on the western (rear)
side of the building and the nitrification field occupying the entirety of the cleared grassy area
located on the east (front) side of the building between the building and NC 86. The treatment
capacity of the existing system is approximately 2500 gallons per day (gpd). That capacity has,
in the past, been exceeded for months at a time due to uncertain causes, but most likely
involving a combination of higher than normal building use, infiltration of ground water into the
plumbing system and malfunctioning plumbing fixtures. Plans to enhance the use of the NHSC
building itself have also included proposals for using the area occupied by the nitrification field
for an access drive, parking and landscaping in a manner inconsistent with continued use as a
nitrification field.
2
A new, relatively high-yield, well (located within the recently acquired Kennedy tract near the
common property line between the original NHSC and Kennedy tracts) was drilled in early 2004,
In accordance with the regulatory requirements of the Public Water Supply Section of the NC
Division of Environmental Health (PWS), water drawn from the well was subjected to a battery
of water quality tests to determine the level of treatment -other than the basic chlorination/
disinfection required of all public water supplies -that would be necessary for this water source.
Tests indicated that the water was both acidic (low pH) and high in iron content, The PWS
regulations accordingly required that the water be treated (buffered) to neutralize the pH and to
address precipitating iron, Furthermore, PWS regulations have required that a water storage
tank be integrated into the system to compensate for potential variations between maximum
potential demand on the system (water use) and well pumping rate.
County Engineering staff, in conjunction with Public Works staff, various equipment suppliers
and PWS staff have developed a design that will meet the requirements of PWS regulations as
well as the demands of the NHSC facilities. A 10' x 12' precast/prefabricated concrete panel
shed-type building/structure will be installed adjacent to the exterior western wall of the NHSG's
existing cafeteria. This shed will contain a 500 gallon buffering tank (4' diameter x 5' tall), a
1000 gallon fiberglass water storage tank (5' diameter x 8' tall), two existing 30" diameter
pressure tanks (relocated from the boiler room area), a polyphosphate metering pump with 20
gallon storage tank (iron sequesterization), achlorine metering pump with 200 gallon storage, a
finished water pressure pump and all associated piping and electrical controls, panels, etc.)
Raw -untreated -water from the well will be pumped into this building and treated. Treated
water will be pumped through the wall into the overhead portion of the cafeteria area and
connected to the facility's existing water heating and distribution network water, All existing
potable water equipment, with the exception of the hot water heaters (mounted high above the
finished floor), will be removed from the boiler room, The estimated cost of the new water
treatment equipment, building, etc,, is $35,000 out-of-packet, Public works staff will provide all
necessary installation services except plumbing and setting the prefabricated building (set by
building supplier on a gravel pad furnished by the County), The design of this facility has been
completed and should be through the permitting phase by November 2005. All
construction/installation is projected to be in February 2006,
Orange County investigated a number of wastewater system design and development
processes for the NHSC facility during the period of January through November 2004, At that
time, the Board determined that County engineering and Environmental Health staff would
develop and have permitted an innovative technology system that could provide a treatment
capacity of up to 6000 gallons per day (gpd). That system would utilize as much of the existing
infrastructure as possible, but would also include an advanced secondary treatment component
capable of providing a high level of treatment and tertiary treatment providing disinfection. The
new system would also provide an expanded nitrification field (the existing field would be
abandoned/removed) located on the Vincent tract (directly across NC 86 from the NHSC) which
had been acquired for that purpose,
To date staff, working with NC Division of Environmental Health regulators and a consulting soil
scientist, has concluded the extensive soil and hydraulic conductivity testing of the Vincent tract
nitrification field area, The design and the layout of the nitrification field have been finalized, A
secondary treatment technology (Advantex filtration systems, pre-approved by state
environmental health regulators) has been selected and a package that will be submitted for
final state approval nears completion, Final approval local/state environmental health approvals
are anticipated to be in hand in December 2005 with bidding and bid award by February 2006
and completion of system construction in June 2006, weather permitting.
Overall system design/development elements involving the existing NHSC tract include: 1)
converting one of the existing system's septic tanks to a grease trap; 2) installing a new 18,000
gallon septic tank adjacent to the existing grease traps and septic tanks; and 3) converting the
existing distribution pumping station to a transmission pumping station (conveying septic tank
system effluent to the Vincent tract). System design/development elements involving the
Vincent tract include installing: 1) three modular Advantex filtration units (approximately 8'w x
16'I x3.5'd) with re-circulation tanks, pumps, etc.; 2) a distribution pump station; 3) an ultra-violet
disinfection system; and 4) a three section nitrification field. A system of at least three ground
water monitoring wells will be installed on site: one up-slope of the system to establish
background readings and two down-slope to detect any movement of effluent toward properties
off~~site. The system will be capable of remote monitoring of operational parameters as well as
automated remote system malfunction/failure notification. The portions of the system located
on the Vincent tract will be essentially invisible off-site as the shallow filtration units will be
bermed/buried; pumping stations, valve vaults will be installed with the taps at or near ground
level; piping will be subsurface; and the nitrification field will similar to the existing grassy field in
front of the NHSC, etc. Only the electrical control panels will be mounted above ground and
visible. The entire installation will also be screened by retention of the existing tree buffer
around the property lines.
FINANCIAL IMPACT: The estimated additional cost for the well water system (approximately
$10,000 has already been expended on the well and pump) is $35,000. The estimated project
budget far the wastewater treatment system is $250,000 and capital project funds have been
previously allocated in that amount.
RECOMMENDATION(S): The Manager recommends that the Baard receive this report as
information and provide any comments to staff.
4
,,Nw,~ ,
grown to become an industry
:'leader, with more than 180
employees and with distributors
representing most of the United
'States, Canada, and parts of
.Europe,. South America,
Australia, and the South Pacific.
Our systems have been installed
all over the world.
Orenco maintains an environ-
mental lab and employs more
than a dozen civil, electrical,
mechanical, and manufacturing
engineers. Orenco's systems are
based on sound scientific princi-
ples of chemistry, biology,
mechanical structure, and
hydraulics. As a result, our
research appears in numerous
publications, and our engineers
are regularly asked to give work-
shops and conduct trainings
~i
~-?~
~.; ,
Orenco Systems'
Incorporated
Clanging r<r IXvy Jrr
I~.lJ Dnrs IMurruwrn•
814 Airway Avenue
Sulherlln, OR 97479
T • 547-059-0449
1.800-348-9843
F • 541-059-2884
www.arenco.com
ABR-ATX-AX700-7
Rev. i.t, m 07/03
Orenco Systems°, Inc.
Oregon Riverside Community
12 AX100s are providing advanced second-
ary wastewater treatment in Hebo, Oregon,
for a small community collection system that
discharges directly into Three Rivers, after
UV disinfection. The average annual design
Clow is 17,000 gpd with a peak daily design
flow of 80,000 gpd to account for I&I contri-
butions from the collection system. Effluent
BODS and TSS are averaging 3 1 and 5 8
mg/L, respectively
Malibu, California Restaurant
10 AX100s at the top of a Malibu bluff are treating high-strength waste from a large
(200+ seat) beachfront restaurant, 100 feet below. This high-visibility tourist destina-
tion requires reliable, odor-free operation Visual inspection after one month confirms
trouble-free start-up Another system for an adjacent mobile home park, consisting of
20 AX100s capable of treating up to 60,000 gpd peak flows, is slated for installation.
Canyonville, Oregon
Casino, Hotel, and
Convention Center
6 AX100s were added to an
existing recirculating sand fil-
ter to provide an additional
30,000 gpd of treatment
capacity for high periodic
flows. The modification also
allows the operator to rest
the RSF's zones, if neces-
sary This fast, "plug and
play" custom retrofit was accomplished without modifcations to pumps, controls, or
tankage. The system now accommodates the huge variance in recorded flows (as
much as 50°/n more than the design flow) generated by this 145-room hotel, resort,
and gaming center and produces effluent cBODs and TSS of Tess than 10 mg/L.
To order a complete. design/engineering package for Orenco's Commercial AdvanTex
Treatment Systems. contact your local Commercial AdvanTex Dealer or call Y-800-348-984.3
and ask for Systems Engineering
The Product
Orenco's AdvanTex° Treatment Systems utilizing the commercial-sized AX100 can
make raw wastewater up to 98°/n cleaner and meet the most stringent regulatory
requirements It can also reduce nitrogen significantly, depending on influent and
configuration.. And the AX100 offers all the benefits of Orenco's residential-sized
AdvanTex Treatment Systems:
• Consistent, reliable treatment, even under peak flows
• Compact package, small footprint, for small sites
• Premanufactured package, including textile medium, for quality control
• Low maintenance requirements; low life-cycle costs
• Production of clear, odorless effluent that's ideal for reuse
The Program
It takes more than a product, however, to solve onsite wastewater problems. It takes a
comprehensive program ..one that ensures a successful project every
time and provides support for the life of the system. That's what
Orenco Systems° has done.
We've engineered a program,
not just a product,
Orenco's commercial
Aslvae~Tex program includes ...
• Trained and authorized Dealers, Installers, and
Service Providers ~
• Training and plans review for Designers
• A comprehensive project checklist for successful system design,
installation, start-up, and follow-up
• Round-the-clock system supervision via Orenco's remote telemetry controls
• A commitment to ongoing O&M, signed by system owners
• Web-based tracking of site and performance data on Dealer extranet
• Ongoing manufacturer support through Orenco's Systems
Engineering Department
®ecades of Research,
Thousands of Installations
Orenco's patented` AdvanTex Treatment System is a recirculating flter that's
configured like a recirculating sand flter - a packed bed filter technology that
Orenco engineers have helped to perfect since the 1970's Like recirculating
sand filters, AdvanTex is reliable and low-maintenance. It is superior to other
packed bed filters, however, in its serviceability and longevity
It is also superior in its treatment media AdvanTex uses a highly efficient, light-
weight textile that has a large surface area, lots of void space, and a high
degree of water-holding capacity Consequently, AdvanTex Treatment Systems
can provide treatment equivalent to that of sand filters at loading rates as high
as 25-50 gpd/ft2 That means AdvanTex can treat high volume commercial
and multi-family flows in a very compact space
Our textile-based, multi-pass treatment technology has undergone third-party
testing and evaluation to ANSI Standards. More than 3,000 residential-sized
AdvanTex flters have been installed over the past several years And dozens of
our new, commercial-sized AX100 units are now in operation, including the
installations described on the back page.
AX100~ilterpods -~..., ;',
can be installed above ~ .~~~'
ground or partially bermed,
depending upon site conditions , " ~
"NOTE: Covered by U.S. patent numbers
6.540.920. 6,372.137; 5.980.748; 5.531.894; 5.492.635; 5.480.561; 5.360.556; 4,439.323
Addltlonai patents pending
Textile Media
The treatment medium is a unilorm,
engineered textile, which is easily service-
able and allows loading rates as high as
50 gpd/ltz,
Spray Nozzles
Efficient distribution is accomplished via
specially-designed spray nozzles.
Laterals and Lids
Isolation valves, /lushing valves, and
hinged lids with gas springs allow easy
access and servicing by a single operator.
Telemetry Controls
Orenco's telemetry-enabled control
panels use a dedicated phone line and
ensure round-the-clock system supervision
and real-time. remote control
~O
,~
3
c ~ x
~ ~ ~ ~ 1l'a
Buildings
Oldcastle Precast°
13i"P,C.%?SC T770~LTIc3f~ COI73'tl-i1Ct`7C1T7
Multi-family residential properties
Cluster systems, community systems
golf course developments
Schools, office buildings
,vivvnc u, iu „ iui iu,au,ui cu i ivn ~c ~.uu u i iui uuoa '~® Oreneo Systems'
Parks, RV Parks, rest areas ~°`°"'°"`°d
ce„~;,~m. my d„
Truck stops, restaurants, casinos ""'"~"'r""°'"