HomeMy WebLinkAboutAgenda - 04-03-2002 - 5 1 ORANGE COUNTY BOARD OF COMMISSIONERS WORK SESSION AGENDA ABSTRACT M_ eeting Date: April 3, 2002 Action Agenda Item No. � SUBJECT: Efland/Buckhorn EDD/Cheeks Small Area Planning Study DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: a. Orange Alamance Water System Service Area Craig N. Benedict, ext. 2592 b. Sewer Master Plan Phases (Partially approved) Paul Thames, ext. 2303 c. Efland/Buckhorn/Cheeks EDD Study Area Dianne Reid, ext. 2326 d. Key Definitions e. Outline of Issues to be Addressed Regarding TELEPHONE NUMBERS: Efland Area Sewer System Extensions Hillsborough 732-8181 into Undeveloped Land Chapel Hill 968-4501 f. Efland/Buckhorn EDD/Cheeks Planning Area Durham 688-7331 Study Goal Outline Mebane (336)227-2031 PURPOSE: To hear a report on the Efland/Buckhorn EDD/Cheeks small area planning area issues with special emphasis on instituting the process to complete 1997 bond aspects of public sewer commitment in the Efland area. BACKGROUND: A list of planning initiatives in the Efland/Buckhorn EDD/Cheeks is noted below: 1. Resolution Establishing Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area of Orange County (adopted November 19, 1985) with amendments thereafter 2. Water and Sewer Policy, Orange County, North Carolina (adopted April 3, 1989) (However, this policy is not part of Comprehensive Plan which would couple land use policy decisions with water and sewer policies.) 3. Efland Small Area Planning Study (adopted in 1991) 4. Buckhorn Economic Development Districts (EDD) (adopted 1994) 5. Reaffirmation of Overall System Plan of the Adopted Efland Area Sewer System (element of aforementioned Item 1) (reaffirmed April 17, 2001) 6. Resolution Outline Efland Sewer System Issues Related to Extensions to Undeveloped Properties (approved May 15, 2001) [Attachment e] 2 The overall system plan of the adopted Efland Area Sewer System was reaffirmed at the April 17, 2001 meeting to include Phase I West and East and Phase II and other minor amendments. Due to the county's strong commitment to comprehensively plan for growth, an overall review of land use and zoning and its public service impacts depending on the density or intensity of a project was evaluated by staff and now is to be discussed by the BOCC and the community. Complementary public services of public potable water, public sewer, and fire suppression are guiding elements of appropriate growth planning. Therefore, there is need for coordination between all public service providers such as Orange County on behalf of the Efland Area Sewer System, Orange Alamance Water System (OAWS), City of Mebane, Town of Hillsborough and county and local fire districts. The next step is to evaluate issues regarding the Efland Sewer operation. The rules were originally adopted in the mid 1980's with several amendments thereafter. What conditions have changed that may warrant further amendment to the resolution? The Outline of Issues attached (Attachment e) identifies those issues that reflect changing policy considerations. In summary, the focus'of this meeting report is to elaborate on the need to proceed on the design of the 1997 Bond Efland Sewer Area and discuss related matters in pursuit of that initiative. PRELIMINARY STAFF RECOMMENDATION(S): 1. Determine Urban Service Line in and around Phases 1A (red, existing), 1 B (peach), 2 (yellow), 3 (green) and 4 (blue). 2. Bid final design of 1997 Bond Area with urban service area noted above in mind for potential future expansion. 3. Examine Urban Service Line in Buckhorn EDD/Cheeks Area. 4. Continue more formal discussions with City of Mebane in Study Map areas 1, 2, 3 (not related to any aforementioned phasing). 5. Consider changes to land use designation in all study areas as part of Comprehensive Plan to be consistent with Village Growth Boundary. FINANCIAL IMPACT: None at this time related to planning studies, but eventually bond expenditures to pursue Efland sewer expansion will be necessary. RECOMMENDATION(S): The Manager recommends that the Board consider the report and offer direction for further staff research, committee creation, RFP design services and/or agenda item preparation. . Ab AID Ab law- WE pnu- mi it �'� ��:"� ;. � ter■ „'-��1 � �■■■ �� -_ �• ' 1 } r_ INS I pill v �' `�.•-1•'� sac., Male An ■ ■ • • • • NO • �f 3 .� . xd '..W-e .0 v, U) a R t ~ a Q V- N CO d (D �N d W W y W O 1 5 \ t a-c LL - � I 'f LL - �.CfDpp GtsO'Ve MHMOND l ,,- r- FRpaER y lk } L a aoHhona - r q V a • - ���hme�-� C 5 ca a� Q y 0 � � � �NUU � UUUUU m mmmm LD L 00cn00000 F— F- F- , _ ? a� a) a) QQ � QQQQQ m mmmm � mm003: 00000 F— F— F— F— F- o (D U) o Cl) CL > cc c� E coo o » ❑ z � o ❑ ❑ ❑ ❑ ❑ � � � Q ❑ F- F- F- F- F- U- wwww w 0 co w a X c C C � "j L .C: C U E a� � a � � � iZOOO o � � � zz cc 0 cn a v0www wQQavv Q wwC� Ix � U ° � 3 M E o 0 L y O °° .n Q CD o E -� � CD o w Q CO 0 z cu c� A77ACkMrNT Key Definitions 2/28/02 Code Definition 10YT 10 Year Transition OYT 20 Year Transition R Agricultural Residential C Critical Area CIN Commercial/Iriuu-Strial Node Cons Conservation EDD Existing Development District EDD1 Primary Economic Development District EDD2 Secondary Economic Development District EDDSC Economic Development District Small Commerc HDR High Density Residential LDR Low Denisty Residential MDR Medium Density Residential MEBANE Mebane Jurisdiction NR Non-Residential PW Protected Watershed RES Residential RES/NRT Residential/Non-ResidentialTransition RR Rural Residential RT Residential Transition RVILLAGE Rural Village UT jUrban Transition �J Page 1 Outline of Issues to be Addressed Regarding Efland Area Sewer System Extensions into Undeveloped Land I. The Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area of Orange County make a clear distinction between connecting to the System and extensions of the System to serve undeveloped land. A. Connections of existing lots to the System do not implicate policy and -are generally accomplished with payment of necessary fees, an application for sewer service and an acknowledged Efland Sewer System Sewer Easement and Agreement. B. Extensions of the System into undeveloped land do implicate policy and are controlled by Section IX of the Rules and require that the extensions: 1. be consistent with the Overall System. Plan; 2 . be consistent with: (1) goal 9.3 of the Orange County Land Use Plan which goal prohibits the establishment of public water and sewer services in the areas designated water quality critical areas, except to address emergency situations and (2) any water and sewer policy the County has adopted as part of its• Comprehensive Plan; 3 . be approved .by the County'wEngineer if 1. and 2. are accomplished and if all zoning, subdivision, land use plan and comprehensive plan regulations . of Orange County.-or the Town of Hillsborough, if applicable, are met. Before the County Engineer can approve, an extension of the System to serve undeveloped land, a subdivision preliminary plan must be approved by the County which preliminary plan includes approved preliminary plans for the System extensions. I2 . Temporarily ceasing extensions of the System to serve undeveloped land will provide the Board of Commissioners with an opportunity to address the following. issues: A. whether and to what extent to allow extensions of the System where the homes in the development to which the System is extended will be served by private wells; $. whether and to what extent to allow extensions of the System where the homes in the development to which the System is extended will- be served by private water systems; C. whether and to what extent to allow extensions of the System where the homes in the development to which the System is extended will be served by a public water system; III. Issues to be addressed related to public water systems providing public water. to homes served by a System extension include: A. consistency with State law regarding interbasin transfers; - B. Eno River Capacity Use Agreement review; C. the -extent and the impact of augmenting surface water supply with large capacity wells; D. the existence of a State approved water supply plan for the public water supply system; E. to the extent it can reasonably be determined, the impact on ground water resources including recharge capabilities of ground water resources in the area of public water supply system wells augmenting surface water supply; F, the following issues with respect to the Orange Alamance Water System: 1. Land Use and Zoning: OAWS plans to coordinate its efforts with Orange County Land Use Plan, Zoning Regulations and Efland Area Sewer System Rules. 2. Master Plan - Long Range System Plan and Design a. Status of State action on Water Supply Plan. b. OAWS participation with Orange County/ Hillsborough/Mebane in combined efforts to serve the Efland-Cheeks Area and in the Efland area small area planning process with other stakeholders. 3 . ' Capital improvement Plan a. New system improvements anticipated. b. - Existing system upgrades and/or replacement scheduled. 4 . Connection Policy for existing lines and existing lots. 5. Extension Policy for undeveloped properties, residential subdivisions and non-residential projects. 6. Sale/Absorption of system by other utility providers. 7. Fire Suppression for new development that could include fire hydrants and pressure for required fire sprinkler systems. 8. Identify members of Board of Directors., meeting schedule for 2001 and -future meetings and notice practice for the- meetings. 9. . Water Resources and Wells: OAWS working with . Orange County to evaluate the impact of high i capacity wells on the water resources of the County. IV. Consideration of updating the Efland Area Small Area Plan to include or' not the Buckhorn Road Economic Development District; V. Consideration of public utility (water and sewer) service to the Buckhorn Road Economic Development District . EFLAND/BUCKHORN EDD/CHEEKS PLANNING AREA STUDY FY 2002-2003 GOAL OUTLINE Conduct a comprehensive study and recommendation for the development of the Efland/Buckhorn EDD/Cheeks to examine all facets of growth including environmental impact, water, sewer, traffic, urban/rural growth patterns. (Target Date - November 2002 Quarterly Public Hearing) OBJECTIVE 1 Analyze existing conditions and area growth potential and determine urban/village growth boundaries (VGB) including urban service lines, that demarcate the village higher residential density and non-residential intensity patterns from rural non-public water and sewer development. a) Create urban service line b) Develop village core areas and associated uses c) Develop village support areas and associated uses d) Develop growth pattern for areas outside of urban service line to highlight rural lifestyle and discourage urban sprawl OBJECTIVE 2 Evaluate, report, and initiate activities and processes to examine the potential of the Orange-Alamance water system. a) Present status and potential b) Coordination with sewer system placement c) Governmental coordination and cooperation regarding expansion policy - d) What roles can Mebane and Hillsborough play? 1 13 OBJECTIVE 3 Evaluate, report, and initiate activities and processes to expand the county's Efland sewer system. a) Define a sewer area b) Proceed with bond area responsibilities c) Prioritize further expansion d) Develop sewer expansion policy OBJECTIVE 4 Evaluate transportation system in the Efland/Buckhorn area OBJECTIVE 5 Evaluate existing and future land uses and land development standards and propose new development patterns in the area that reflect the availability of public services and the preservation of nearby environmental preservation and rural character. a) Coordinate and re-evaluate Efland Small Area 1991 OBJECTIVE 6 Integrate other goal areas such as TDR, NEOTRAD ETJ, watershed preservation, water resource analysis and economic development districts, and i nte rgovem mental coordination into Efland/Buckhorn Small Area Plan. 2