Loading...
HomeMy WebLinkAboutAgenda - 10-18-2022; 8-c - Amendment to the 2020 Eno Haw Regional Hazard Mitigation Plan 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 18, 2022 Action Agenda Item No. 8-c SUBJECT: Amendment to the 2020 Eno Haw Regional Hazard Mitigation Plan DEPARTMENT: Emergency Services ATTACHMENT(S): INFORMATION CONTACT: 1. Amendment Resolution Sarah Pickhardt, (919) 245-6135 2. Amendment One - Attachment A - Christopher Sandt, (919) 245-2583 Amended Plan PURPOSE: To approve a resolution amending the 2020 Eno Haw Regional Hazard Mitigation Plan. BACKGROUND: In 2020, the Orange County Board of Commissioners formally adopted the 2020 Eno Haw Regional Hazard Mitigation Plan. This plan identifies natural and man-made threats and hazards to the community and identifies solutions to lessen the impacts of these disasters. The Federal Emergency Management Agency has allocated over $2.3 billion to the Building Resilient Infrastructure in Communities (BRIC) and $800 million to the Flood Mitigation Assistance (FMA) programs. The Orange County Planning and Inspections Department and the Emergency Services Department— Emergency Management Division have identified point repairs to the Lake Orange Spillway as a potential project for these grant programs. As such, this initiative will need to be incorporated into the 2020 Eno Haw Regional Hazard Mitigation Plan. FINANCIAL IMPACT: There is no financial impact associated with amending the 2020 Eno Haw Regional Hazard Mitigation Plan. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: CREATE A SAFE COMMUNITY The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang activity, substance abuse and domestic violence. ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal impact associated with this item. RECOMMENDATION(S): The Manager recommends that the Board approve and authorize the Chair to sign the resolution approving the amendment to the 2020 Eno Haw Regional Hazard Mitigation Plan. 2 RES-2022-055 Attachment 1 ORANGE COUNTY BOARD OF COMMISSIONERS RESOLUTION 2020 Eno Haw Regional Hazard Mitigation Plan Amendment WHEREAS, Orange County is vulnerable to an array of natural hazards that can cause loss of life and damage to public and private property; and WHEREAS, Orange County desires to seek ways to mitigation situations that may aggravate such circumstances; and WHEREAS, Orange County has identified point repairs to the Lake Orange spillway as additional infrastructure to limit the impacts of natural hazards to our community; and WHEREAS, we, the Orange County Board of Commissioners, formally adopted the Eno Haw Regional Hazard Mitigation Plan in 2020; NOW, THEREFORE, BE IT RESOLVED, that the Orange County Board of Commissioners: 1. Adopts Amendment One, Attachment A, to the Eno Haw Regional Hazard Mitigation Plan; 2. Agrees to take such other official action as may be reasonably required to carry out the proposed project to the extent that such are eligible under the Federal Emergency Management Agency's Flood Mitigation Assistance Grant program; and 3. Agrees to incorporate the salient points of this amendment into the next update of the Orange County Annex M to the Eno Haw Regional Hazard Mitigation Plan. BE IT FURTHER RESOLVED, by the Orange County Board of Commissioners that this resolution shall take effect immediately upon its adoption. Approved this 18th Day of October, 2022. Renee Price, Chair Orange County Board of Commissioners 3 SECTION 7: MITIGATION ACTION PLANS Table 7.12—Mitigation Action Plan,Orange County Goal& Action Hazard(s) Objective Potential Funding ImplementationA # Action Description Addressed Addressed Priority Lead Agency/Department Source Timeline 2020 Status 2020 implementation Status Comments Prevention P-1 Continue implementation ofthe Orange All Hazards 1.1 Moderate Orange County Planning General Fund(existing 2020-2025 Carried This action is in progress and Orange County Planning staff County 2030 Comprehensive Plan and Inspections staffsalaries) Forward continues to implement the 2030 Comprehensive Plan.Updates Department to the Comprehensive Plan may take place within the next 5 years or may result from the 2020 Census,however,at this time staff is not positive if/when that may actually occur. P-2 Continue participation in the Community Flood, 1.1 High Orange County Planning General Fund(existing 2020-2025 Carried For 2015 the Orange County CRS rating was an 8.Since 2016 the Rating System(CRS)and annual recertification Hurricane and and Inspections staffsalaries) Forward CRS rating for Orange County has been a 6.Last recertification in order to increase public safety,reduce Tropical Storm Department date was September 16,2019. property damage,avoid economic loss,and allow for a decrease in flood insurance premiums for Orange County residents. P-3 Continue to enforce floodplain regulations Flood, 1.2 High Orange County Planning General Fund(existing 2020-2025 Carried Orange county continues to enforce floodplain regulations through the county's Special Flood Hazard Hurricane and and Inspections staffsalaries) Forward through the County's Special Flood hazard Area Overlay District Area(SFHA)Overlay District contained within Tropical Storm Department contained within the Orange county Unified Development the Orange County Unified Development ordinance.Michael Harvey is the Orange County Floodplain Ordinance and continue training efforts for Manager and he is credentialed as a Certified Floodplain the Certified Floodplain Manager(CFM). Manager(CFM)as of 2009. P-4 Continue to collaborate and support All Hazards 3.2 Moderate Orange County Emergency General Fund(existing 2020-2025 New municipal mitigation strategies Services staffsalaries) P-5 Engage in assessments of local supply chain Drought 3.1 Moderate Orange County Emergency General Fund(existing 2020-2025 New resiliency for critical commodities Services;Orange County staffsalaries) Sustainability P-6 Continue to develop,review,update,and All Hazards 3.1 Moderate OWASA,Orange County CIP and Operating 2020-2025 New implement recommendations in local and Planning and Inspections Budgets regional plans to improve the reliability, Department redundancy,and resiliency ofwater resources (water,wastewater,reclaimed water). Property Protection PP-1 Continue enforcement ofthe North Carolina All Hazards 1.2 High Orange County Planning General Fund(existing 2020-2025 Carried Currently operating under the 2018 edition ofthe NC State State Building Code. and Inspections staffsalaries) Forward Building Codes and 2017 edition ofthe National Electrical Code. Department Updated every 6 years and next scheduled update is January 2025. PP-2 Continue participation in the National Flood Flood, 1.2 High Orange County Planning General Fund(existing 2020-2025 Carried Orange County has expanded its mapping and public outreach Insurance Program(NFIP)to reduce the Hurricane and and Inspections staffsalaries) Forward program.We will prohibit development in thefloodway/special impact of a future flood event,mitigate Tropical Storm Department flood hazard area and require buffers(Per Section 6.13 of the effects of flooding,and allow citizens to be UDO)from the 1%annual area of inundation(buffers range eligible for affordable flood insurance. from 65ft to 80ft based on slope.No setbacks have been noted. PP-3 Identify potential flood hazards of critical Flood, 4.2 High OWASA CIP and Operating 2020-2025 New infrastructure and mitigation measures to Hurricane, Budgets address. Tropical Storm PP-4 Explore expanding situational awareness tools All Hazards 2.2 Moderate Emergency Services, General Fund(existing 2020-2025 New and strategies for increased monitoring of OWASA staffsalaries) local hazards such as installation of additional stream gauges Eno-Haw Regional Hazard Mitigation Plan 2020 4 SECTION 7: MITIGATION ACTION PLANS Goal 8, Action Hazard(s) Objective Potential Funding Implementation # Action Description Addressed Addressed Priority Lead Agency/Department Source Timeline 2020Status 2020 Implementation Status Comments Natural Resource Protection NRP-1 Strive to ensure future development occurs in Flood, 1.1 High Orange County Planning General Fund(existing 2020-2025 Carried The County enforces floodplain development regulations and a manner that protects floodplains,streams, Hurricaneand and Inspections staff salaries) Forward riparian/floodplain buffers standards exceeding minimum FEMA wetlands,and other natural features which Tropical Storm Department model ordinance and State riparian buffer requirements. work to reduce flood hazard susceptibility and The County prevents development activities(i.e.grading, continue to enforce existing regulations placement offill material,etc.)within SFHAs and requires pertaining to stormwater management and preservation of a floodplain buffer,measured from the edge of erosion control standards contained within the 1%-annual area of inundation.This'floodplain buffer is the Orange county Unified Development required to be preserved in its natural state to assist with the Ordinance. natural infiltration of storm water runoff and serve as an overall flood control measure.The size of the buffer,which is based on the slope of the subject property,can range anywhere from 65 ft.to 80 ft. With respect to the County's storm water and erosion control programs,the County pushes development projects to adhere to low impact storm water design principles where practical and design erosion control basins in key critical watershed areas to the 25 year storm event. Structural Projects SP-1 Explore the possibility of retrofitting critical All Hazards 4.2 Moderate Emergency Services,Asset Unified hazard 2020-2025 Carried Asset Management(AMS)staff worked with an architect(Jim facilities to harden against high winds and Management Mitigation Assistance Forward Stumbo)in the Spring of 2018 and before to explore hardening lightening. (UHMA) the ES center.This produced drawings and specs which formed the basis for a grant application to the NC 9-1-1 Board for funding to create a hardened,updated,and more secure "Orange County Resilient PSAP"built to withstand wind speeds of up to 150 MPH.This was submitted on June 15th,2018 but was not funded.AMS staff is currently exploring the possibility of hardening a new Emergency Services Substation in Efland. SP-2 Conduct a cost-benefit review during the All Hazards 4.2 Moderate Emergency Services,Asset Unified hazard 2020-2025 Carried This is being completed on a case-by-case basis with each new planning and design phase of construction of Management Mitigation Assistance Forward facility and major retrofit. new government owned facilities or critical (UHMA) facilities to determine the feasibility of equipping the facility with back-up generators,lightening protection,high wind protection,and/or 361 compliant tornado shelters. SP-3 Continue to identify and explore possibility of All Hazards 4.2 Moderate Emergency Services,Asset Unified hazard 2020-2025 New improving or retrofitting existing critical Management,OWASA Mitigation Assistance facilities with on site energy generation. (UHMA) SP-4 Conduct spillway stabilization to Lake Orange Flooding,Severe 4.2 Moderate Emergency Services, Flood Mitigation 2022-2025 New Dam through point repairs. Weather, Planning and Inspections Assistance(FMA) Hurricane and Emergency Services Eno-Haw Regional Hazard Mitigation Plan 2020 5 SECTION 7: MITIGATION ACTION PLANS ES-1 Identify and implement strategies to increase Flooding, 2.2 Moderate Emergency Services Emergency 2020-2025 New swift water rescue capacity. Severe Management Weather, Performance Grant Hurricane and (EMPG) Tropical Storm Eno-Haw Regional Hazard Mitigation Plan 2020 AA 6 SECTION 7: MITIGATION ACTION PLANS Goal& Action Hazard(s) Objective Potential Funding Implementation 9 Action Description Addressed Addressed Priority Lead Agency/Department Source Timeline 2020 Status 2020 Implementation Status Comments ES-2 Engage with regional stakeholders in All Hazards 3.2 Moderate Emergency Services General Fund(existing 2020-2025 New comprehensive emergency response planning staff salaries) including Complex Coordinated Terror Attack response and Mass Casualty Incident response planning. Public Education&Awareness PEA-1 Provide education and outreach to Orange All Hazards 2.1 Moderate Orange County Planning General Fund(existing 2020-2025 Carried Revised to pursue outreach in multiple languages.Orange County residents in multiple languages in and Inspections staffsalaries) Forward County continues to host and sponsor the Community orderto increase awareness of natural hazard Department;Emergency Emergency Response Team(CERT)training.Since 2015,Orange potential in the county and maintain a link to Services County has hosted 8 CERT Basic Training Courses.In 2018, the Eno-Haw Regional Hazard Mitigation Plan Orange County hosted a FEMA Community Mitigation Workshop on Orange County's Website. to educate residents about mitigation options.In 2018-2019, Emergency Services staff worked with both Chamber of Commerces to develop and host 6 business emergency preparedness workshops.Also in 2018,the Orange County Health and Emergency Services Departments partnered to deliver 4 preparedness workshops to the limited English proficiency community.These workshops included take home preparedness kits for participants.Orange County EM continues to utilize social media and other platforms to inform and educate residents of natural hazards. PEA-2 Engage in regional events,activities,and All Hazards 3.2 Moderate Emergency Services General Fund(existing 2020-2025 Carried Orange County participated in the Triangle Regional Resilience training opportunities related to natural staffsalaries) Forward Assessment-2018 hazards in order to improve communication, enhance,partnerships,and improve planning efforts with other local jurisdictions. PEA-3 Strive to improve communication and All Hazards 2.1 Moderate Emergency Services General Fund(existing 2020-2025 Carried Revised to pursue outreach in multiple languages.Orange outreach in multiple languages to Orange staffsalaries) Forward County upgraded the website hosting and design vendor in County residents before,during,and after August of 2018 from Revive to CivicPlus.Distribution of press hazard weather event with the county's releases was also changed from IContactto CivicSend in August website,press releases,social media 2018.Participating in Nextdoor,text 911,implemented citizen accounts,and the OC Alerts system in order self reporting,hosted a FEMA Community Mitigation Workshop, to keep residents informed and improve Continually holding CERT classes and assisting in facilitating their public safety in and around the county. success. PEA-4 Provide staff support and information on Flood, 2.1 Moderate Orange County Planning General Fund(existing 2020-2025 Carried Updated information was posted at Orange County's website to provide Hurricane and and Inspections staffsalaries) Forward http://www.orangecountync.goy/1309/Floodplain-Information education and assistance to residents Tropical Storm Department;Emergency experiencing floodplain,stormwater,and Services erosion control issues. Eno-Haw Regional Hazard Mitigation Plan 2020