HomeMy WebLinkAboutIPWG Agenda 10122022 Intergovernmental Parks Work Group
Agenda
October 12', 2022
5:30 p.m.
Location - Zoom
5:30 1. Welcome / Call to Order
5:35 2. Introductions / Review of Meeting Notes (Attached)
5:45 3. Orange County Bicycle, Pedestrian and Trails
Plan - Scope of Work/Collaboration Ideas
6:15 4. Blackwood Farm Park Phase II Construction
Update
6:30 5. What's on the Horizon? / Park Plans and Local
Updates (10 mins max)
a. City of Mebane
b. Town of Chapel Hill
c. Town of Carrboro
d. Town of Hillsborough
e. Orange County
f. Others
7:00 5. Adjournment - Next meeting April 12, 2023
Intergovernmental Parks Work Group
Meeting Notes of April 13th, 2022
Commissioner Anna Richards: Called the meeting to order and welcomed everyone. She noted that this
was her first Intergovernmental Parks Work Group meeting and was looking forward to hearing from
everyone. She asked everyone to introduce themselves.
Beth Young: Communications Manager for the Orange County Department of Environment, Agriculture
and Parks & Recreation
Robb English: Hillsborough Board of Commissioners.
Myra Austin: Orange County Department on Aging.
Kalani Allen: Admin Support for the Department of Environment,Agriculture and Parks & Recreation
Kim Piracci: Orange County Commission for the Environment.
Stephanie Trueblood: Public Space and Sustainability Manager for the town of Hillsborough
Anita Jones-McNair: Recreation Parks and Cultural Resources Director for the town of Carrboro and also
the Race and Equity Officer
Phil Fleischmann -The Parks and Recreation Director for the town of Chapel Hill
Adam Searing: Chapel Hill Town Council
Trish McGuire: Director of Planning, Zoning and Inspections for the town of Carrboro
Wendell Rogers: Facilities Administrator for the town of Carrboro
Dave Stancil: Director of the Orange County Department of Environment,Agriculture and Parks&
Recreation
Kim Livingston: Director of Conservation and Stewardship at the Eno River Association
Chris Colvin: Orange County Parks and Recreation Council
Aaron Davis: Recreation and Parks Director, with the city of Mebane
Ashley Ownbey: Planner for the City of Mebane
Tyler Steelman: Chapel Hill Chair of the Parks, Greenway and Recreation Commission
Atuya Cornwell:Town of Chapel Hill Parks and Recreation
Marabeth Carr: Landscape Architect with the Orange County Department of Environment, Agriculture
and Parks & Recreation
Tina Moon: Carrboro Planning Department
Jesse Mowles: Hillsborough Parks and Recreation Board.
Commissioner Anna Richards-opened the meeting and asked if everyone had had a chance to review
the meeting minutes from the last meeting and if anyone had anything that they wanted to add or
subtract. After hearing none she accepted them.
Dave Stancil stated that tonight's PowerPoint presentation was given at the January 25 Assembly of
Governments meeting and noted that there was so much information he thought it would be useful to
share again.
• Each of the jurisdictions present spoke about what had been going on in their towns related to
parks and trails especially focusing on collaboration efforts between the jurisdictions.
Parks and Trails-
Connectivity � Collaboration
Anita Jones-McNair-Town of Carrboro Recreation,Parks and Cultural Resources Director/Race and Equity Officer
Phil Fleixhmann-Town of Chapel Hill Parks and Recreation Director
David stanch-Orange County Environment,Agriculture,Packs and Recreation Director
Stephanie Trueblood-Town of Hillsborough Public Space and sustainability Manager
Aaron Davis-Ci[y of Mebane Recreation and Parks Director
Trish McGuire-Town of Carrboro Planning Director
Ashley Ownbey-City of Mebane Planner
• It was noted that one of the things that has been one of the biggest successes of the
jurisdictions collectively and of the Intergovernmental Parks Work Group was the creation of the
Interactive Parks Locator Map and the Interactive Trails and Greenways Map.
• A description on how the map works was demonstrated.
Orange County Interactive Parks, Trails and Greenway
or
Maps
11
3i
19
31
I S�
� v
b
ti
-norm
n ecount nc. ov/TrailsAn ecount nc
Status of Current or Planned Comprehensive Planning
Efforts
Plan—s adopted
I to update or 0 -The ed January 6, November 18,
space Ln recommendations Z I rian Trait Plan and
u rvation _j and Plans for < Transportation route adopt-
is, _j future pedestrian 1:10 Plan-JanI 'inll
t.
pLa vitt Link 0 update both Plans. assessment MIL le
n undertaken in
tin,plans of < 2022.
an"other r cx�
ictions to 0 -Pote rat for Traits
is,parks,
lhowing areas
and adjacent
Trish McGuire, Carrboro Planning
• Carrboro has a new greenway project that is part of the Bolin Creek greenway system and will
be a connection between the end of Lake Hogan Farms Road and Lake Hogan Farm. The existing
trail that goes through Twin Creek Park and connects up to Morris Grove elementary. It's 90%
complete and will provide a safe routes to schools for students and Lake Hogan Farms who
attend Morris grove elementary as well as just general recreation.
TopicsHot . of . • •
Jones --k GreenwaV Project
{p Morr6Grove Eubanks Road
1 Ekmentary
• - :• - 2
• a 9
0
s
Connects Lake Hogan Farm Rd to existing
Orange County -- Pod
I
• • - - • ••• - • Future
LHF • • Twin CreeksGrove Elementary School ParkD- e •0 •- •- •-review
Lake Hogan Farms
eighborhood
Funded SId.-1k/G—n..,
• Morgan Creek Greenway Project- Phase One of the design process was completed and went out
to bid. The route is shown in gold on the slide below. It runs west from Smith level road you can
see there's a green dotted line running to the East to Chapel Hill who will speak on this segment.
• There are project phases to the to the west that will ultimately connect to University lake
• Safety study that Chapel Hill Transit; Chapel Hill and Carrboro worked on together to evaluate
the safety of this Hwy 54 corridor as a result three signalized pedestrian crossings are planned.
(See red stars on map below)
• Future sidewalk projects-South Greensboro (to connect near the 54 intersection up to Pittsboro
Road) and Jones Ferry and Barnes Streets
as
ME
'• -1 1 • -1 . 1 • � N
g o
c
- 1 • W �
l7 /
N
• _ 1 �a N�ywys4 /.�1
• • •••- - - - y � To Chapel Hill
1- 1 1 - 1 - -- • - To University Lake ,F
•1 • 1-1 Exirting SidewalWGree V ------> FutureG—myConnet`"
Funtletl SidewalWGreen_Y y Planned 5ignalimtl
l Pedertrian Crossing
Phil Fleischmann -Town of Chapel Hill:
• East Section will extend the Morgan Creek Greenway eastward and connect several
neighborhoods south of Fordham Blvd.
• West section will extend from the existing trail 3,700 to the Carrboro town line at Smith Level
Road connecting neighborhoods south of Highway 54.
• Funding received is roughly 1.2 million and from a Trails and Greenway Bond. From the MPO
they received funding towards the Fordham side path, which is a multimodal path.
Updates from Chapel Hill include:
• Completed the planning and design for the reconstruction of the six tennis courts of Cedar Falls
Park
• Resurfacing and improving the three tennis courts at Hargraves Park
• Looking to execute a splash pad feasibility study On Earth Day they will be releasing, a new
parkland an open space map which will complement the maps that David mentioned earlier in the
presentation.
s-
New greenway pedestrian project
The greenway will connect downtown Hillsborough to the train
station,Collins Ridge,across 1-85 with a pedestrian bridge and to
Cates Creek Park in Waterstone.
mw.a nni.n«000n we.nmo n.romm.omno.
Stephanie Trueblood—Town of Hillsborough
• The slide shows the pedestrian recommendations from the Community connectivity plan and
that plan is being incorporated into our comprehensive sustainability plan it is currently in a
draft form and ready for public review and input this summer.The parks and recs board has
participated in the development of that plan.
• Last year the town board set transportation priorities to feed into the plan and directed staff of
what projects were prioritize so that we could start looking for planning and design and
construction funding through the MPO and federal sources.
• The town board prioritized a greenway connection shown on the map below in light aqua, it
runs north-south from downtown Hillsborough and Riverwalk to our future train station
property and then on through Collins Ridge, which is very large development just behind the
Daniel Boone Antique Mall the way to the Waterstone development and Cate Creek Park there
will be a pedestrian bridge across it five into Beckett's Ridge and Waterstone which are both
residential neighborhoods so this this greenway is a is a really important piece of the towns
overall network. It's roughly a mile long it involves two pedestrian bridges and possibly one
pedestrian tunnel. Parts of it will be looked at in Fiscal Year 23.
• The town board has also prioritized several roadway projects that include pedestrian amenities,
such as the 86 connector,which is a new road connecting old 86 to new past the train station
property on South Churton street.
• The town recently updated their Typical Standards for roadway sections to include a shared use
path on one side, so in the past roadway projects, usually had sidewalks on both sides, but now
our new cross section for the town allows roadway projects to have a traditional sidewalk on
one side and then a shared use path which, which is separate a little further from the road
surface and is generally wider and provides that full multimodal access for bicycles and
pedestrians outside of the vehicle travel wings.All of the priorities are being wrapped into the
comprehensive sustainability plan.They are going to have a very strong effort for public input
over the summer and hope to have a draft in front of the town board to look at in September.
Hot Topics- •
North Mebane Connections
Me -
Mebane
Connects Corregidor St.to 3�St.
` _ m
MebaneConstruction wiU begin once tast easement is N.
North
Map to right shows planned and proposed connections
in North Mebane.
Pro sed net rk would provide conk—tions from
L.r.M Mwao to Cates Farm Pa an Downtown
Network contingent upon—ing cases.
or
h
_-
Aaron Davis and Ashley Ownbey- City of Mebane
• Trail connectors and a full update on Lake Michael.
• The Lake Michael connector will connect the new subdivisions, going in around like Michael.
They are trying to complete a full loop 3.1 miles around Lake Michael. A large project is the
spillway at like Michael is going through some design work right now for a complete renovation
of the spillway estimated cost is between the four and $6 million.The boathouse has been
deemed unsafe due to the foundation block being in the water for so long and deteriorating.
Hoping to lower the lake level for both repairs. As a result there won't be any boat rentals this
summer.
• Completed two miles of trails at Cates Farm Park and are finalizing design the of an inclusive
playground an entry way and a parking shelter
• A major goal Bicycle and Pedestrian Advisory Commission and The Recreation and Parks Advisor
Commission is to have like Michael connected to Cates Farm Park, by way of multiuse paths and
greenways.
• The city has received for rezoning requests for most of the properties that you're seeing on the
map. As part of their conditional rezoning they are required to construct multi use paths along
Lebanon Road which will make a connection similar to the one that showed them the map. The
black line indicates that network and there is some floodplain that would have to be crossed,
and so there are proposed locations for bridges in boardwalks and crosswalks.This will be a very
good way to connect people who are visiting Lake Michael Park to connect to either Cate's Farm
Park or downtown Mebane.
• There is also a greenway that is being considered in our budget process right now to be funded
and the upcoming year in.This would connect Corregidor Street with Third Street. Currently
waiting to secure one last easement.
Hot Topics- Orange County
Mountains to Sea Trail Blackwood Farm Park
y
�A
Dave Stancil—Orange County:
• Mountain-To-Sea Trail—The MST is part of the State Parks system that connects Clingmans
Dome on the North Carolina/Tennessee border to Jockeys Ridge State Park on the Outer Banks.
Some sections of the trail have been built in urban areas, in the Appalachian Mountains and
along the coast, but a lot of the areas (especially in the eastern Piedmont between Greensboro
and Durham/Raleigh) have not yet been built, and those are the areas of focus over the last
decade.Around 2014 Orange County engaged in a multi-year effort to meet with the public and
talk about how to connect the 17 mile section in Orange County that was identified connecting
from Saxapahaw and the Alamance County line in the southwestern corner of Orange into
Orange County and connecting to the Hillsborough Riverwalk.These towns have become
"trailtowns," destination points along the MST route. But a challenge Orange has is the area
between the two towns does not have a natural feature such as a river to follow—such as east
of Raleigh where the trail follows the Neuse River. County staff are trying to utilizing the road
network and the OWASA-owned lands around Cane Creek Reservoir, and Orange County's Seven
Mile Creek Natural Area to forge a connection to Hillsborough and Riverwalk. It's this section in
the middle,that requires going up and over the ridge between the Neuse River basin and the
Cape Fear River basin that has no natural features to follow that was a challenge time in terms
of identifying a route. However in January of 2018 a route was adopted as shown on the map in
yellow. We are focusing on that section now. We are working closely with the Friends of the
Mountains-to-Sea Trail.
• Blackwood Farm Park- Is a 152 acre park located midway between Chapel Hill and Hillsborough.
It's also very close to interstate 40 and fronts on NC 86.There is currently a $3 million
construction project underway for Phase 2 of the park, expected to be complete late summer. It
will have an amphitheater; a large picnic shelter a park office and renovations to the historic
farmhouse. Eventually the park will also have a disc golf course trails and agricultural
demonstration areas. During the pandemic,the park saw triple the number of visitors, so it is
expected to become quite a destination. With the amphitheater and a picnic shelter that can
also double as a stage the County is expecting that there will be future many concert
pp
Current and Future Collaboration
• Collaboration with the different jurisdictions is paramount.
• Providing countywide park information to the public via the locator maps.
• Forming partnerships for joint ventures of parks projects, not only with the towns in the county
but also with our nonprofit partners, many of whom are here tonight.
► COVID-19 Operations and Long Term Recovery - Significant
increase in communication and sharing of information
I Projects: Community Egg Hunt, joint park projects
I Communication: Intergovernmental Parks Work Group
(Next Meeting Date April 13, 2022), Partnerships with
towns. County and non-profit partners
Connectivity - Morgan Creek and Bolin Creek Trails, MST,
Hollow Rock/New Hope Preserve, Bikeways and sidewalks
Visit the following websites for more information.
Orange County Department of Environment,Agriculture,Parks and Recreation-hops://www.co.oran4e.nc.us/459/Dept-of-Environment-
Aericul[ure-Parks-Re
Town of Carrboro Recreation,Parks and Cultural Resources-httu:i%carrbororec.or4/275/Recrea[ion-Parks-Cultural-Resources
Town of Chapel Hill Parks and Recreation-https://www.townofchapelhill.or4/4overnmen[/departmenu-services/parks-and-recreation
Town of Hillsborough Public Space and Sustainability-h[t s://www.hillsborou hnc. ov/overnment/divisions-and-offices/ ublic-s ace-and
sustainability/
Town of Carrboro Planning Department-iittps://www.townofcarrboro.or4/133/Plannin4-Zonin4-Inspections
City of Mebane Recreation and Parks-ht[ps://citvofinebanenc.4ov/departments/recreation-Darks/
City of Mebane Planning and Zoning-ht[ps://ci[vofinebanenc.4ov/departments/plannin4-and-zonin4/
Commissioner Anna Richards-asked if anyone have any other comments or questions about the
presentation, hearing none the next item on the agenda is to brainstorm a bit about ideas for future
agendas.
• Dave Stancil -At the request of our County Manager Bonnie Hammersley;the County would like
the IPWG to consider and discuss developing a comprehensive countywide bicycle, pedestrian
and trails plan. The scope of work could be discussed at future meetings, and there are several
different forms this idea could take. It could be a fully integrated effort, or since the some of the
towns have already done a lot of work it could be something where the County takes on the
initiative and we just incorporate the work of the towns. Stancil noted that it's a big topic to
introduce, but this seemed to a logical place for the topic to be tossed out there for
consideration. Anna Richards asked for comments.Adam Searing stated he thought it was a
great idea; as well as Stephanie Trueblood; she asked if staff would be coordinating. Stancil said
in terms of developing the scope of planning for the plan,yes, but the ultimate plan would be to
hire a consultant in fiscal year 23-24 to develop the plan.There was agreement in incorporate
some transportation planners and sustainability folks.
• Deon Temne—Would like to add revisiting the MOU on Community Use of Schools. He's on the
Chapel Hill School Board and sees an issue with security and the challenge to provide the proper
security for the schools and the shared spaces; specifically playground equipment. Stancil
mentioned that this topic actually came up through this group about 12-14 years ago and an
MOU that was created was eventually sent forward and adopted by all the jurisdictions and
both school boards. Stancil noted that he would forward a copy of the MOU. Phil Fleischmann
said the Town of Chapel Hill has had staff level conversations about the joint use agreement
between the school district, and the town and are looking at ways that we can collaborate to
increase access.They are looking to update that agreement. He thought they could bring
security into our discussion. Carrie Doyle with the Orange County School Board was unaware of
a similar situation at the Orange County Schools. Stephanie Trueblood said she thought that
outside groups often contacted the principal directly. David Stancil mentioned that at Gravely
Hill Middle School and the Soccer Center that there was a separate agreement between the
county and the schools for that site. Myra Austin with the Orange County Department on Aging
mentioned that Efland Cheeks School has had a long standing agreement with Orange County
parks.
What's on the Horizon
Chapel Hill - Phil Fleischmann
• They are looking to host to join advisory board meeting that would involve the town of Chapel
Hill and the parks and recreation advisory boards from Carrboro, Hillsborough, Orange County
and Chapel Hill. We're planning that collaboratively and we're looking at a date in the fall and
topics.
Carrboro-Anita Jones-McNair
• Recreation -all of our activities and programs have reopened
• freight train blue series
• Replaced the fence at the Community Garden at Dr. Martin Luther King JR Park and we also
reconfigured it from where it was previously so that the gardeners could have more usable
space for gardening.Also looking at improving our storm water treatment with our public works
department.
• Resurfacing two tennis courts at Wilson Park
• The new Orange County Southern Branch Library went out for bid.The facility will also provide a
permanent home for the Orange County Skills Development Center; Carrboro Recreation, Parks
and Cultural Resources Department; WCOM Radio,the Virtual Justice Center; and
performance/multipurpose uses.
• Working a Comprehensive Plan called Carrboro Connects
Eno River Association-Kim Livingston
• Facilitating the sale of the classical American homes preservation trust land on mostly on the
south side of the Eno River in Hillsborough. 206 of the total 226 acres are proposed to go to Eno
River State Park and then there's a 20 acre in what's known as the Oxbow Bend that will
hopefully be going to the archaeological conservancy. It is not a done deal.They are currently
fund raising and working on a federal grant they have privately raised $100,000 of the needed
$2 million.
• Confluence Natural Area has expanded by 70 acres; for a total of 270 acres.
• Next year they are opening Panthers Branch Natural Area which is on the end of Lebanon Road
it is 56 and will have three miles of trails.The opening will be in 2023.
Hillsborough -Stephanie Trueblood
• They have installed a floating wetland called a Bio Dock in Kings Highway Park along with a
kayak launch.
• Adding wildflower and native seed mixes in parks to increasing wildlife and pollinator habitat
• Sustainability initiatives in general, including prioritization of projects such as electrical electric
vehicle infrastructure plans
• Working on an Accessibility Plan;that will include inclusive play
• Reclaimed wood sculpture project in River Park; worked jointly with the County;the Arts Council
and the Arts Commission
• REC board has been working primarily on the connectivity updates and possibly developing a
skate park
• The Handmade Puppet Parade will be held on April 301h
• On April 23rd there will be dedication ceremony for the Occoneechee village replica.The
reproduction is based off the archaeological evidence of the original site. It took volunteers five
to recreate.
Orange County- David Stancil
• Spoke about coming out for the Occoneechee Village replica ceremony, and that the
Occoneechee tribal council would be in attendance.
• Earth Evening will be held on April 29t" along with the town of Hillsborough's Last Friday Event.
• Staff is working on a floating wetlands project that can become part of park and nature preserve
water quality protection and environmental education.
• The Orange County Board of Commissioners declared this month as native plant month. Staff is
working to make sure that parka are being designed and maintained to be pollinator friendly.
• Summer camps plans are in the works, although scaled back because of the pandemic.
• Movies in the Park are also returning
• Doing some upgrades to playground and basketball surfaces at Efland Cheeks and Cedar Grove
Parks.
• Fairview Park is getting resurfaced and will include pickle ball lines.
Mebane-Aaron Davis:
• Accepting bids for our Recommend Parks Master Plan and Bike and Pedestrian Plan on April
18tn.
• Started a Movies in the Park series at our Farmers Market.
• Now have five summer sports camps.
• Just finished our Extravaganza Program downtown this past Saturday
• Will be partnering with some local Churches for Juneteenth event
• Dogwood festival will be April 22 and 23rd
• June 18,we will have our Sports Hall of Fame
• Construction on their first public outdoor basketball court will start soon
Commissioner Anna Richards:Thanks everyone for attending and adjourned the meeting at 7pm.