Loading...
HomeMy WebLinkAboutAgenda - 08-22-2005-33. Transfer of Development Rights (TDR) Update The Board has requested that staff provide an update on the progress of the TDR Feasibility Study. Since the contract with the study consultant, The Louis Berger Group and the UNC -Charlotte Urban Institute, was signed in April, the consultants have set to the tasks outlined in the Scope of Services. To date these tasks have included the following items: 1, Expert Interviews: Most of the readily available interviewees have been completed. 2, Legal Analysis: Some additional work may be desirable, depending on the specific areas of concern, A legal decision tree and additional legal review are ongoing. 3, Case Studies: A slide presentation is being prepared with some additional formatting required. 4. Economic Review. and 5. Decision Matrix: This will incorporate the legal decision tree and will include graphic and detailed text. In May, the Board appointed ten citizens to the TDR Task Force. The citizens include the following: Betty Cross, Marge Limbert, Hervey McIver, Scott Radway, Martin Rody, Jason Jolley, Monica Evans, Pamela Paul, Robert Dowling, and Martha Hoylman. Attachment 1, a two-page memorandum from the consultant, summarizes the five items listed above.. t~.. uu~~!nc~n,i ~I i ~.;~I^. `7 +~~a:I a~ II• i;. ~I ~.,~.cd ;1 Lqt III i'IP. Jo.. Attachment 1 THE LOUIS BERGER GROUP, INC. 1513 Walnut Street, Suite 250, Cary, North Carolina 27511 Tel (919) 467-3885 Fax (919) 467-9458 www louisberger com To: Glenn Bowles, AICP, Planner II, Orange County From; J, Scott Lane, Director of Planning, The Louis Berger Group, Inc. Date: August 12, 2005 Subject: Orange County TDR Feasibility Study: Status Report No. 2 CC: Vicki Bott, UNC-Charlotte t.)rban Institute Glenn, The following is our second status report for the Orange County TDR Feasibility Study project, The schedule for our deliverables has slipped considerably, by at least 10 weeks, in large part due to delays in assembling and convening the Task Force. Along wi#h this transmittal is our first major technical report that covers items such as legal considerations, program decision tree, economic assessment, and summaries of case studies and stakeholder interviews, The contents of these were prepared without the benefit of a Task Force meeting, which, as I understand, has not been scheduled as yet, As a result, I think that we have actually progressed to a considerable degree into Phase II with some of our work.. However, I did not feel that it was appropriate to continue to wait for a Task Force meeting before we submitted our first, draft deliverables on these items.. Please let me know if you have questions. attachments G:\JA Sharetl files\Proects\Ownge County iDR\Slalus Repels\Stalus P.epa128~12D5) tloc THE LOUIS BERGER GROUP, INC. 1513 Walnut Street, Suite 250, Cary, North Carolina 27511 Tel (919) 467.3685 Fax (919) 467-9458 ww~v louisbergercom Phase I -Background Research ~ Status Data Gathering _ A. Meet with County Planning Staff (2) Three meetings with staff have been completed to date. Additional meetings have not been scheduled. B. Collect & Review Documents and Data 95% Completed. Tracking down water/sewer GIS Files data (other than OWASA) has been a significant challenge; the staff has been passed to different eo le Burin a series of contacts. C. Conduct Key Person Interviews 90% Completed and submitted in draft form (8.12.2005). Some interviews remain, especially private development interests, who are not returning numerous phone calls. We will not be able to complete interviews with County Commissioners besides Barry Jacobs, according to information rovided b the Count Clerk. D. Analyze Property Values & Market Trends Completed in draft form submitted (8.12.2005). E/I. Summarize preliminary issues and Completed in draff form submitted (8.12.2005). decision flow chart/Review Results with Planning Staff F. Develop a Public Engagement Process Completed (June, 2005). Plan G. Research & Analyze NC case law 90% Completed and submitted in draft form (8.12.2005).. Finalizing this item depends on having a second meeting with the County aitorne . H. Research & Analyze relevant TDR case Completed and submitted in final form studies (8.12.2005). J. Meet with Task Force to Review Planning No scheduled meeting date for Task Force. Process (t) Upcoming Events 1. We should set a target date for (a) the next staff-level meeting and (b) the first Task Force meeting. 2, Review by County staff of the draft report, submitted by Consultant on 8.12.2005. Schedule Adherence (8,12.2005) By mutual agreement of County and Consultant staff, the original schedule is no longer valid, and must be updated prior to providing a comparison to existing progress.