ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 25, 2002
Action Agenda
Item No. 4
SUBJECT: County/OCS/CHCCS Informational Reports
DEPARTMENT: Budget/Planning/Purchasing PUBLIC HEARING: (Y/N) No
Finance
ATTACHMENT(S): INFORMATION CONTACT:
As listed in "Background" Donna Dean, ext 2151
Craig Benedict, ext 2592
Pam Jones, ext 2652
Ken Chavious, ext 2453
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To receive reports from staff regarding several school related issues.
BACKGROUND: This portion of the meeting provides an opportunity for the three elected
boards to receive updates on the topics noted below. As time permits, the Boards may wish to
discuss some or all of these topics, and to identify any points that staffs may need to research
and bring back as the subject of subsequent reports.
a. Minority Student Achievement
Oral reports will be provided by school system representatives.
No Attachments
b. 3rd Month School Capacity/Student Membership Updates
Staff can review, as the Boards may desire, information transmitted by County staff to the
BOCC in early March that was based on updated membership and school capacity information
submitted by the Superintendents and their staffs. A summary of student capacity by school
district that was discussed at the most recent Schools and Land Use Council meeting is also
provided for reference.
Attachment 4b— 1 316102 Table— Student Capacity by School District
Attachment 4b— 2 316102 Table— School Districts Use of Mobile Units
Attachment 4b— 3 316102 Table — Elementary School Capacity
2
Attachment 4b— 4 316102 Table — Middle School Capacity
Attachment 4b— 5 316102 Table— High School Capacity
Attachment 4b— 6 Table— Student Capacity by School District
c. Status of Durham Tech Satellite Campus Project
At a January 28, 2002 work session, staff provided the BOCC with an overview of County
supported facility space needs. This included presentation of the development process for an
Orange County satellite campus of Durham Technical Community College. The BOCC's
requested public hearing for that project is tentatively slated for April 16. Pertinent PowerPoint
slides from the January 28 meeting are provided for reference.
Attachment 4c Durham Tech Satellite Campus Presentation Slides
d. Status of Schools Adequate Public Facilities Ordinance Consideration
Orange County's Planning Director has prepared the attached report on progress with the
Schools APFO and elements which will need further discussion and agreement.
Attachment 4d 3121102 County Planning Director Memo Re: School APFO
e. FY 2001-02 School Audit Results
The County's Finance Director has carried out his annual review of the two school systems
audits and resulting fund balance, and has provided a few observations in the accompanying
memo.
Attachment 4e 3119102 County Finance Director Memo Re: School System Fund
Balance
FINANCIAL IMPACT: There is no financial impact tied directly to the review/discussion at this
meeting of these reports. However, any discussion is likely to influence future school operating
and capital budgets.
RECOMMENDATION(S): The Manager recommends that the boards receive the reports for
information only.
updated March 6, 2002
Figure 5. Student Capacity by School District
Permanent Structures Only, No Mobile Units(Including Projects Under Construction)
CHCCS OCS
Square Members Square Members
Elementary Feet Capacity hip(1) Elementary Feet Capacity hip(1)
Carrboro 60,832 563 492 Cameron Park 70,812 598 456
Ephesus 66,952 472 550 Central 52,492 463 293
Estes Hills 56,299 549 555 Efland Cheeks 64,316 509 411
Glenwood 50,764 445 371 Grady Brown 74,016 575 459
FP Graham 63,541 570 587 Hillsborough 51,106 414 393
McDougle 98,000 596 669 New Hope 100,164 601 457
Scroggs(2) 90,980 609 572 Pathways 85,282 560 427
Seawell 52,869 498 676
Total CHCCS Total OCS
Elementary 540,237 4,302 4,472 Elementary 498,188 3,720 2,896
Middle Middle
Culbreth 104,798 670 644 A.L. Stanback 136,000 740 744
McDougle 136,221 732 634 C.W. Stanford 107,620 726 789
Phillips 109,498 706 749
Smith ' 128,764 732 521
Total CHCCS Total OCS
Middle School 479,281 2,840 2,548 Middle School 243,620 1,466 1,533
High High
Chapel Hill 241,111 1,520 1,560 Orange 213,509 1,518 1,723
East Chapel Hill 258,985 1,515 1,395 Cedar Ridge* 206,500 1,000 (3)
Total CHCCS Total OCS High
High School 500,096 3,035 2,955 School 420,009 2,518 1,723
Total All Levels 1,519,614 10,177 9,975 Total All Levels 1,161,817 7,704 6,152
3rd Month Membership
(2)Capacity as approved by CHCCS Board of Education in January 2001
(3)Currently being constructed
Changes from 2000-01 figures reflected in shaded background
Small increases from 2000-01 in CHCCS HS square footage because of construction of concession areas
Decreases in individual 2001-02 OCS elementary school membership reflects opening of Pathways-Dec 2000
Reductions in OCS elementary capacities reflect new pre-K classes-20 seats per class
Figure 7. School Districts Use of Mobile Units
Usage for 2001-02 School Year
CHCCS OCS
Assigned Assigned
Elementary #Units Usage Elementary #Units Usage
Carrboro 1 Classroom Cameron Park 1 Resource Room,
Supply Storage
Classrooms and
Ephesus 7 Small Group Central 0 No Units
Instruction
BEH Self Occupational
Estes Hills 1 Contained Room Efland Cheeks 1 Therapy and
After School
Classrooms, Classrooms and
Glenwood 4 Resource Room, Grady Brown 3 Resource
Family Specialist Rooms
Room
FP Graham 2 Classrooms Hillsborough 0 No Units
McDougle 2 New Hope 0 No Units
Scroggs 0 No Units Pathways 0 No Units
Seawell 6 Classrooms
Total CHCCS 23 Total OCS 5
Elementary Elementary
Middle Middle
Culbreth 0 No Units A.L. Stanback 1 Classroom
Classrooms,
McDougle 2 Classrooms C.W. Stanford 6 Resource
Rooms
Phillips 0 No Units
Smith 0 No Units
Total CHCCS 2 Total OCS 7
Middle School Middle School
High High
Chapel Hill 6 Classrooms Orange 2* Classrooms
East Chapel Hill 0 No Units Cedar Ridge 0
Phoenix
Academy/Lincol 3 Classrooms
n Center
Total CHCCS 9 Total OCS High 2
High School School
Total All Levels 34 Total All Levels 14
* to be returned upon opening of Cedar Ridge in Aug 2002
���Currently being constructed
All-
G� -..
updated March 6,2002
Figure 8. Elementary School Capacity
Permanent Structures Only, No Mobile Units
CHCCS OCS
Capa Member %of Capa Member %of
School city ship(1) Capacity School city ship(1) Capacity
Carrboro 563 492 87.4% Cameron Park 598 456 76.3%
Ephesus 472 550 116.5% Central 463 293 63.3%
Estes Hills 549 555 101.1% Efland Cheeks 509 411 80.7%
Glenwood 445 371 83.4% Grady Brown 575 459 79.8%
FP Graham 570 587 103.0% Hillsborough 414 393 94.9%
McDougle 596 669 112.2% New Hope 601 457 76.0%
Scroggs 609 572 93.9% Pathways 560 427
Seawell 498 676 135.7%
Total CHCCS Total OCS
Elementary Elementary'
School 4,302 4,472 104.0% School 3,720 2,896 77.8%
CHCCS
Elementary OCS Elementary
Capacity at 105% Capacity at 105%
Level of Service 4,517 4,472 99.0% Level of Service 3,906 2,896 74.1%
(1)3rd Month Membership
F
updated March 6,2002
Figure 9. Middle School Capacity
Permanent Structures Only, No Mobile Units
CHCCS OCS
Capa Member %of Capac Member %of
School city ship(1) Capacity School ity ship(1) Capacity
Culbreth 670 644 96.1% A.L. Stanback 740 744 100.5%
McDougle 732 634 86.6% C.W. Stanford 726 789 108.7%
Phillips 706 749 106.1%
Smith 732 521 71.2%
Total CHCCS Total OCS Middle
Middle School 2,840 2,548 89.7% School 1,466 1,533 104.6%
CHCCS Middle OCS Middle
School Capacity School Capacity
at 107% Level of at 107% Level of
Service 3,039 2,548 83.8%1 Service 1,569 1,533 97.7%
��� 3rd Month Membership
updated March 6,2002
Figure 10. High School Capacity
Permanent Structures Only, No Mobile Units
CHCCS OCS
Capa Member %of- Capa Member %of
School city ship(1) Capacity School city ship(1) Capacity
Chapel Hill 1,520 1,560 102.6% Orange 1,518 1,723 113.5%
East Chapel Hill 1,515 1,395 92.1% Cedar Ridge 1,000
Total CHCCS Total OCS High
High School 3,035 2,955 97.4% School 2,518 1,723 68.4%
CHCCS High
School Capacity OCS High School
at 110% Level of Capacity at 110%
Service 3,339 2,955 88.5% Level of Service 2,770 1,723 62.2%
(1J 3rd Month Membership
(2) Opening Fall 2002
STUDENT CAPACITY BY SCHOOL DISTRICT
Summary Comparison of 2002 and 2001 Reports—March 2002
Chapel Dill—Carrboro City Schools (CHCCS) Orange County Schools(OCS)
Level Year Capacity Membership %of Year Capacity Membership %of
Capacity Capacity
Total 2002 4302 4472 104.0 2002 3720 2896 77.8
Elem 2001 4444 103.3 2001 3820 3078 80.6
Diff 0 28 Diff Loss (100) Loss (182)
Total. 2002 2840 2548 89.7 2002 1466 1533 104.6
Middle 2001 At 2326 81.9 2001 " 1504 102.6
Diff 0 222 0 29
Total 2002 3035 2955 97.4 2002 2518 1723 68.4
High 2001 44 2815 92.8 2001 " 1672 66.4
Diff 0 140 Diff 0 51
Total 2002 10177 9975 98.0 2002 7704 6152 79.8**
All 2001 " 9585 94.2 2001 7804 6254 80.1
Levels
Diff 0 390 Diff ' Loss(100) Loss(102)
KEY
Diff=Difference between the * Based on OCS 2002 capacity which is 100 students
2002 and 2001 reports fewer than 2001 capacity at the elementary level
** Based on OCS 2002 capacity which is 100 students
fewer than 2001 capacity for all levels combined
NUMBER OF STUDENT SEATS AVAILABLE (OR NEEDED)— 2002 REPORT
CHCCS OCS
Elementary (170) 824
Middle 292 _ (67)
High 80 795
All Levels 202 1552**
LI C
Durham Tech Satellite Campus
■ Board endorsed the development of an
Orange County campus in April 2001
■ BOCC and Durham Tech officials joint
meeting on October 11, 2001
■ BOCC received proposed timetable for
development via Manager's Memo in
December 2001
Durham Tech Satellite Campus
■ Action items required within the next
few months include:
—Adoption of Resolution to Pursue
Establishment of a Satellite Campus of
Durham Technical Community College
(February--March 2002)
— Public Hearing (March--April 2002)
22
f
Durham Tech Satellite Campus
— County officially notifies Durham Tech
Board of Trustees of Intent to Match
State Bond Funds for the Development of
a Satellite Campus (March--April 2002)
— County adopts site selection process
(March -- April 2002)
Durham Tech Satellite Campus
— Durham Tech Trustees notify State Board
of Community Colleges of Intent to
Establish a Satellite Campus in Orange
County (April--May 2002)
23
Durham Tech Satellite, Campus
Site Selection
■ BOCC responsible for selection of site
■ Recommended that County establish
site criteria for evaluation of:
— Sites sought out by County; and/or
— Sites offered to the County through other
means
Durham Tech Satellite Campus
■ Suggested criteria:
— 20-acre minimum to accommodate
on-site parking and future expansion
(Durham Tech recommendation)
—Centrally located within the County
—Close to public transportation and/or
major roadways
24
f
Durham Tech Satellite Campus
— Cost of land to County
— Site development costs
■ Does site present development challenges
that would drive construction costs up?
— Environmentally"clean" site
— Compatible with surrounding uses of land
Durham Tech Satellite Campus
Proposed Site Selection Process:
■ Establish work group to include at least the
following:
■ County Commissioners(2)
■ County Manager
■ Director of Purchasing and Central services
■ County Engineer
■ Planning Director
■ EDC Director
■ Durham Tech Representative(s)
■ Chambers of Commerce Representatives
25
Durham Tech Satellite,Campus
Proposed Site Selection Process, continued
■ Tasks for work group:
— Recommend final criteria
— Establish a criteria matrix that weights criteria
according to criticality
— Determine"minimum" number required for site
acceptability
— Bring forward for BOCC approval
Durham Tech Satellite Campus
■ Timeline for site selection
• Board appoints selection committee
February—March 2002
• Site selection committee completes
criteria, scoring matrix, etc.
March 2002
26
Durham Tech Satellite Campus
(Timeline for site selection, continued)
■ BOCC endorses selection process
by April 2002
■ Site selected and acquisition underway
no later than Spring 2003
27
Orange County • and
Inspections Department
Memo
To: Rod Visser,Assistant County Manager
From: Craig N.Benedict,A1CP,Planning Director
Date: March 21,2002
Re: School APFO
The School Adequate Public Facilities Ordinance (School APFO) is being proposed in a three step
process:
1) Memorandum of Understanding_(MOU
This document sets forth the general understanding of how a School APFO functions. The
document also includes, as an exhibit, a Model School APFO which is an example of the regulatory
code framework. Each local government in Step 3 will adapt the Model School APFO to the specific
Section of the land development regulations that comports.
2) The Memorandum of Understanding (MOU) also includes certain elements of the School
APFO of which the parties shall reach agreement prior to the adoption of the Step 3 ordinance.
Those elements are elaborated further on the attached page,but are listed briefly as follows:
■ Student Generation Rate
■ Student Membership
■ School Capacity
■ Student Projection Methodology
■ Student Projection Rate
■ School Capital Investment Plan
These elements set the technical basis of the APFO system. The Memorandum of
Understanding(MOU)suggests that each year a technical team of planning directors and
school district representatives evaluate and update the initial elements and report to all parties
prior to formal updating of the APFO system. These elements are prerequisite steps that are
collected at different times of the year depending on the item.
G JCassie/SLUCa"032202-M-RV
3) School APFO Implementation Process
After Steps 1 and 2 are complete,the local governments will incorporate,through a public
hearing process,the specific ordinance into the development review process. This step also sets forth
an effective date which anticipates agreement and collection of the technical data noted in Step 2.
A status report of the actions of the various parties is also attached.
The Orange County Planning Director will be available to explain any questions regarding
these items.
Attachments(2)
2
STATUS OF MEMORANDUM OF UNDERSTANDING AND
ADEQUATE PUBLIC FACILITIES ORDINANCE
Memorandum of Understandin ** Adequate Public Facilities Ordinance
Jurisdiction Review Public Adoption Review Public Hearing Adoption
Hearin
Carrboro 6-12-01
3-26-02
Chapel Hill 2-13-01 2-19-01 4-8-02*
Hillsborough 3-25-01
3-11-02
Orange County 9-25-00 4/16/02 ?
10-02-00 5-28-02 ?
Chapel Hill-Carrboro City Schools 1-17-01 ***
Orange County Schools 12-11-00 ***
Schedule updated on 3-18-02
* Scheduled for vote by town council
** Includes model APFO
*** May reapprove to note late 2001 changes
3
SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE
MEMORANDUM OF UNDERSTANDING(MOU)
INCLUDES MODEL ORDINANCE
(SCHOOL APFO) ,./
1. THE SCHOOL APFO FORMULA WITH VARIABLES
AC=SC—(M+ND)
AC=Available Capacity is the result of the equation
VARIABLES:
SC= School Capacity is determined by joint action of county commission and school districts and
includes schools built and future Capital Investment Plan (CIP)funded capacity.
M= Membership is recorded by school districts on an annual basis as of November 15.
ND=New Developments and the school level membership they generate are based upon local
governments approved residential development and the Student Generation Rate(SGR)
associated with the two housing types..
The Memorandum Of Understanding(MOU)notes the intent to agree on
the description of the variable source.
Items for Discussion Possible Choice
suggested by SLUC
A. Student Generation Rates(SGR) Tischler&Associates Study,2001
(Section 1.c.(M) (Two housing categories for each school district)
B. Membership Date(NI) As of November 15 by School District and Level
(Section La.) (i.e.2°d month)
C. School Capacity(SC) As of November 15
(Section I.b.) 1. Criteria of class size or programming agreed
to by School Facilities Task Force
2. New capacity determined by School CIP
adoption by BOCC
CAPITAL INVESTMENT PLAN (CIP) PROCESS
Items for Discussion Possible Choice
A. 1. Student Membership Average of five(5)projection models to start
Projection Methodology School APFO 2003 System(two linear and
(Section 1.c.(iii)) three cohort methods).
2. Projected Growth Rate 6/2001 t projected growth rates ranged
(Section 1.c.(ii)) between and
+ V 52
trri G,.�•
Orange County
Finance Department
208 South Cameron Street Tel: 919 732-8181
Post Office Box 8181 919 968-4501
Hillsborough, NC 27278 919 688-7331
919 227-2031
Fax: 919 644-3324
MEMORANDUM
TO: John Link, County Manager
Rod Visser,Assistant County Manager
FROM: Ken Chavious, Finance Director
DATE: March 19, 2002
SUBJECT: School System Fund Balance
I have reviewed the Annual Financial Reports for both schools systems for the fiscal year ended
June 30, 2001. My review included an analysis of fund balance in the school system's general fund,
as you requested. My observations are as follows.
Orange County Schools
• Expenditures exceeded revenues by approximately$46,000 thus reducing total fund balance.
• After required reservations ($825,000) and an appropriation of $2,000,000 for the 2001-02
budget, undesignated Fund Balance at year-end was $928,000.
• Undesignated fund balance represented 5.5% of general fund expenditures at year-end.
Chapel Hill-Carrboro City Schools
• Expenditures exceeded revenues by approximately$305,000 reducing total fund balance.
• Total fund balance was further reduced by a$64,000 auditor adjustment related to the previous
fiscal year and an operating transfer of$12,000 to the food service fund.
• After required reservations ($1,800,000)and an appropriation of$1,500,000 for the 2001-2002
budget, undesignated fund balance at year-end was$817,000.
• Undesignated fund balance represented 2.25% of expenditures at year-end.
Please call me if you have any questions.