HomeMy WebLinkAboutAgenda - 03-19-2002 - 9a l ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 19, 2002 Action Ag7�_ Item No. SUBJECT: Approve Funding for the Design and Construction Phase of Chapel Hill- Carrboro City Schools (CHCCS) Elementary School #9 Located at Meadowmont DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No ATTACHMENT (S): INFORMATION CONTACT: Donna Dean 245-2151 Attachment 1. Chronology of Elementary TELEPHONE NUMBERS: School #9 Hillsborough 732-8181 Attachment 2. Comparison of Elementary#9 Chapel Hill 968-4501 Project Costs to Commissioner Adopted Durham 688-7331 Elementary School Construction Standards Mebane 336-227-2031 Attachment 3. February 7, 2002 Memo from Bill Mullin re: Elementary School #9 Construction Bids Attachment 4. Bid Tabulation for Construction of Elementary#9 Attachment 5. November 20, 2001 Site Plan for Schools and Town Use Agreement Attachment 6. CHCCS Elementary#9 Construction Capital Project Ordinance PURPOSE: To receive an update on CHCCS Elementary School #9 and allocate November 2001 bond funds for the Design and Construction Phase of the new school (including site work, construction and associated start-up costs), in accordance with Commissioner approved Policy on Planning and Funding School Capital Projects. BACKGROUND: On February 21, 2002, the CHCCS Board of Education approved a single prime contract bid award to Resolute Building Company to construct Elementary School #9 at Meadowmont. The base amount of the bid totaled $10,830,000. With the acceptance of twelve alternates, the total contract price is $10,921,250. This bid included costs for site work/grading and construction of the school. CHCCS has requested that the BOCC approve an amended capital project ordinance for Elementary #9 that will bring the anticipated final CHCCS/County cost for the project to $12,560,784. The November 2001 school bond referendum included $12.8 million for construction of Elementary #9. In November 2000, the Board of Commissioners approved a Policy on Planning and Funding School Capital Projects. That policy identifies two levels of school construction projects — Level 1 and Level 2. Level 1 projects are those projects that have a relatively 2 small scope of work and can be accomplished using a single prime contractor, in-house staff or entail purchasing equipment and vehicles. Level 2 projects are major projects that require several phases to complete. For these projects, the Commissioners approve project funding in four phases: • Concept/Pre-Planning Phase — includes preliminary programming and design work that would result in conceptual drawings and preliminary cost estimates. • Planning Phase — includes siting the facility, construction of infrastructure, and preparation of construction documents in preparation for bidding process. • Design and Construction Phase — includes final design, facility construction and purchase of equipment, furnishings, technology, and one-time start up items. • Final Accounting Phase — provides a reconciliation of actual project expenditures with approved budget. As defined in the policy outlined above, construction of Elementary School #9 in the CHCCS district is a Level 2 project and therefore requires that the Board of Commissioners approve the project at the various phases outlined above. Funding for the school, to be constructed at the Meadowmont subdivision in Chapel Hill, comes from a combination of pay-as-you-go monies and the voter approved November 2001 bond referendum. Attachment 1 of this abstract, Chronology of Elementary #9, outlines the project's activity to date. It is important to note that, per an agreement between CHCCS and the Town of Chapel Hill, the project bid includes upgrading the originally planned multi- purpose room to a community gymnasium. The Town of Chapel Hill has agreed to provide the District with a total of $750,000 to offset costs associated with the upgrade. In addition, the bid includes construction of playing fields associated with the Town's planned park at Meadowmont. Per an agreement between CHCCS, the Town and East West Partners (developers of Meadowmont), East West Partners plan to provide $824,052 to offset the cost of the playing fields. The table below outlines the components of the approved bid from Resolute: on ri u ion from Project Responsible Project Partner Partner Elementary School#9 in accordance with BOCC CHCCS $9,347,198 approved School Construction Standards Upgrade of multipurpose room to community Town of Chapel Hill $750,000 gymnasium Playing fields for Town park East West Partners $824,052 (developers of Meadowmont) Total Awarded Construction Bid $10,921,250 Attachment 2 of this abstract provides a comparison of Elementary #9 estimated project costs to Commissioner adopted Elementary School Construction Standards. 3 FINANCIAL IMPACT: Table 1 below outlines the estimated cost to construct Elementary #9, including the community gymnasium and additional playing fields. Table 1 Estimated Phase Cost Funding Source Concept/Pre-Planning Phase (Approved 12/06/00) Schematic Design $107,184 Town Approval Process $25,000 Project Savings at Smith Middle School Total Concept/Pre-Planning Phase $132,184 Planning Phase (Approved 03/03/01) Design Development $142,911 Project Savings at Smith Middle School and Town Approval Process $72,000 Appropriation of School Construction Documents $225,367 Capital Fund Balance Bidding (approved on 12/11/01) $36,000 Professional fees (examples include project November 2001 Bond scheduler, OWASA and Town Fees) (included in 3/19/02 request) $442,357 Total Planning Phase $918,635 Design and Construction Phase (Approved 12/11/01) Pre-grading $166,850 Contingency $32,150 November 2001 Bond Sub-Total Design and Construction Phase (approved 12/11/01) $199,000 Design and Construction Phase (Requested 3/19/02) Construction and Site Work Contract $10,921,250 Furniture and Equipment $477,645 November 2001 Bond (less Technology $750,585 $1,574,052 contributions One-time (Non-Personnel Start Up Costs) $400,000 fr m Town of Chapel Hill and Contingency $335,637 East West Developers) Sub-Total Design and Construction Phase (requested 3119102) $12,885,117 Total Estimated Cost of Elementar #9 $14,134,936 Less: Town of Chapel Hill Project Contribution ($750,000) For community gymnasium Less: East West Developers Contribution ($824,152) For playing fields Total CHCCS/County Cost of Elementary#9 $12,560,784 4 Table 2 below outlines total available funding for Elementary#9: Table 2. Funding Available for Elementary#9 Project Funding Savings from Smith Middle School $380,000 School Capital Fund Balance $192,462 Appropriation 2001 Bond Funds $12,800,000 Total CHCCS/County Funds Available for Elementary#9 $13,372,462 Town of Chapel Hill Contribution $750,000 East West Partners Contribution $824,052 Total Funds Available for Elementary#9 $14,946,514 Actual site and construction work have not started for Elementary #9, so it is difficult to accurately project any ultimate project savings. As with all new construction projects, there are many uncertainties. For example, there is a potential that as site work begins, contractors may encounter large rock beds that require a significant amount of work over and above the current contract price. As outlined in the School Facilities Planning and Funding Policy, the final phase of level 2 projects is the Final Accounting Phase. At the close of the project, this phase will reconcile actual project expenditures with the approved budget and provide the Board with a "final accounting" of the project. If a project balance exists at the completion of the Elementary#9 project, CHCCS has indicated that they would like the Commissioners to consider establishing a Future Projects Planning Fund. That mechanism would allow project balances remaining after the final accounting phase to be used for preliminary planning for other high priority approved Capital Investment Plan projects. It would also permit the District to proceed on schedule with the project prior to total project funding being identified and secured. RECOMMENDATION (S): The Manager recommends that the Board of County Commissioners receive the project update for CHCCS Elementary School #9 and adopt the attached Elementary School #9 Construction Capital Project Ordinance. . 5 THIS PAGE INTENTIONALLY LEFT BLANK. 03/14/02 6 Attachment 1. Chronology of CHCCS Elementary#9 Located at Meadowmont • Concept/Pre-Planning Phase December 2000 - The Commissioners appropriated $132,184 in funding for the initial phase, Concept/Pre-Planning, for this project. Funding for this phase came from savings in the Smith Middle School construction project. The appropriation provided funding for conceptual drawings (schematics) and preliminary permit fees (for the Town of Chapel Hill) for the school. • Planning Phase February 7, 2001 — Per the Commissioner approved policy, the Board of County Commissioners should appoint a representative to work directly with the Board of Education as it plans and constructs a new facility. The Board appointed Chair Halkiotis as its Commissioner.representative. March 6, 2001 - CHCCS staff presented preliminary plans to the Board of Commissioners for review. Those plans adhered to the County's Elementary School Construction Standards and included a multipurpose room instead of a gymnasium. At that time, the Commissioners appropriated an additional $440,462 for the Planning Phase of the project. Funding for this phase came from Smith Middle School construction project savings ($247,816) and an appropriation of$192,462 from the School Capital Project Fund Balance. Specifically, this phase entailed: • Refining the schematic plans; • Developing construction and site work details; • Producing project drawings that fix the building size and characteristics (including building elevations, exterior finishes, and mechanical, electrical and plumbing systems). During the Town of Chapel Hill approval process last spring, the Chapel Hill Town Council requested that the CHCCS Board of Education include a full-size community gymnasium instead of the multipurpose room. Estimated costs associated with this upgrade are $750,000. July 2001 - The CHCCS Board of Education approved the concept of including ,the gym in the design plans providing that the District and the Town could agree on how to compensate CHCCS for the additional construction costs. September 24, 2001 - During the joint meeting of the two school boards and the Commissioners, CHCCS staff presented revised plans for Elementary #9 that included the gymnasium. At that time, the Town and Board of Education had not agreed on the specifics of how Chapel Hill would compensate the district for the gymnasium cost. One proposal included the Town re-instating its financial 7 support of school resource officers and offering the district a joint-use agreement for the proposed Homestead Center aquatic center. Under that particular plan, the Town would have scheduled additional time for the district's high school swim teams. After reviewing the plans, the Commissioners asked the CHCCS Board of Education to request full funding of the gym construction cost from the Town of Chapel Hill in lieu of accepting the proposal of dedicated swim time. Since that time, the Town Council has agreed to reimburse the district in three annual installments of$238,000 beginning in fiscal year 2002-03 for a total of $714,000. In addition, the Town has agreed to credit the school system $36,000 for plan review fees. November 6, 2001 -Voters approved the November 2001 bond referendum that included $12.8 million to complete Elementary#9. November 26, 2001 The Town of Chapel Hill approved a Special Use Permit for Elementary#9. December 11, 2001 — County Commissioners appropriate $235,000 of recently approved bond funds to cover three project components — construction bidding, pre-grading of the site and project contingency. Hzzacnmenz z. %,omparmon of cieiiieiiiaiy ttV r-IVJVL;L t,.Vaw tV %..VrlunwawuGl P%UVNacu cICn119niaRy .a�.nvVi Construction Standards - Estimated Costs for Elementary#9 School(Including Gymnasium and Estimated Costs for Elementary#9 Approved School Construction Playing Fields per bid awarded by School(Excluding Gymnasium and Standards CHCCS BOE 2121102) Playing Fields) Student Capacity 600 600 • 600 Square Footage 95,225 94,234 11) 90,980 Square Feet per Student 158.7 157.1 151.6 Construction Cost $8,570,250 $10,168,810 $8,594,658 Cost Per Square Foot $ 90 $ 108 $ 94 including all acquisition related costs such as surveys and professional Site Acquisition fees. $400,000 $0 $0 Number of Acres: 16 22 22 Cost Per Acre: $25,000 $0 donated site $0 donated site Site Development $857,025 $955,290 $955,290 %of Construction Cost 10.0% 9.4% 11.1% Fees $942,728 $1,014,819 $1,014,819 %of Construction Costs and Site Development 10.0% 9.1% 10.6% Moveable Equipment $428,513 $477,645 $477,645 %of Construction Cost 5.0% 4.7% 5.6% (includes cabling and equipment for voice, video and data distribution Technolo systems) $785,606 $750,585 $750,585 Cost per square foot $8.25 $7.97 $8.25 Construction Contingency $471,364 $367,787 $367,787 Developmen 5.0% 3.6% 4.3% Start-Up Costs Jon Personnel One time start-up costs $330,000 $400,000 $400,000 %of Construction Cost 3.9% 4.7% Upgrade Multi-Purpose Room to a Community Gymnasium(4) Total $12,785,485 $14,134,936 $12,560,784 Total Cost Per Square Foot $ 134.27 $ 150.00 $ 138.06 Capital Cost per Student Capacity (capacity as set by school board) $ 21,309.14 $ 23,558.23 $ 20,934.64 Capital Cost per Student Capacity (capacity as set by construction standards report) $ 21,309.141 $ 23,558.23 $ 20,934.64 N . A44ach rnen+ 3 9 CHAPEL HILL - CARRBORO CITY SCHOOLS 750 Merritt Mill Road Chapel Hill, North Carolina 27516-2881 Telephone: (919) 967-8211 Fax: (919) 969-2474 Neil G. Pedersen Steve Scroggs, Assistant Superintendent Superintendent for Support Services William J. Mullin, Director of Facilities Management MEMORANDUM TO: Steve Scroggs FROM: Bill Mullin SUBJECT: Elementary School #9 Construction Bids DATE: February 15, 2002 On February 7, 2002, bids were opened for the construction of Elementary School #9. The project received excellent participation from contractors. Competitive bids were received from ten general contractors, six plumbing contractors, eight mechanical companies, eight electric companies, and five companies that bid on the fire protection sprinkler system. State law permits projects of this scope to be bid as a single and multi prime project and Elementary School #9 was bid in both formats. The bid documents were prepared with alternates. This structure offers flexibility in awarding contracts within the project budget and provides a mechanism for selecting desired upgrades. Additionally, alternates identify the cost associated with speck aspects of work. The attached Bid Tabulation prepared by the architects lists each contractor's submitted costs. The low single prime contractor bid submitted by The Resolute Building Co. in the amount of$10,830,000 is recommended. Accepting 12 of the 14 alternates is also recommended. Alternate #2, specifying a contractor to perform door and hardware work, is not recommended due to cost. Alternate#10, an ice storage system, does not meet the life cycle cost analysis criteria established prior to the bid and is not economically viable. The total cost of the recommended bid with 12 altemates is $10,921,250 and is within budget. 10 As stated, the project was also bid as a multi prime project. The comparative cost of the multi prime bids is $10,869,500. The single prime contract has a small premium of $51,750. This represents less than half a percent higher cost but is outweighed by the coordination and control benefits associated with a single prime project. The architects and Facilities Management believe that a single contractor will bring value to the process by simplifying decision-making and response time. As we work with the Town of Chapel Hill and the developers, East West Partners, these attributes will be very beneficial in controlling costs and maintaining schedule. The construction bid submitted by The Resolute Building Co. includes 11.5% minority participation. This represents a high minority participation rate compared to other major projects bid by the district in recent years. Additionally, the contractor is responsible to provide documentation regarding the efforts used to solicit minority contractors and the actual contractors who will participate in the work. The project bid includes upgrades and work that will be reimbursed by the Town of Chapel Hill and East West Partners. The Town will provide $750,000 to upgrade the multi purpose room to a community gymnasium and East West Partners is providing $824,052 to construct the Town play fields and associated amenities. This work is included in the recommended contract with The Resolute Building Co. The number of participating contractors produced a competitive bid. The base bid cost for Elementary School #9, adjusted to reflect the reimbursements, is $101.74 per square foot. This compares to other district projects as follows: School Year Cost Smith Middle School 1999 $ 94.99 per sf Scroggs Elementary School 1998 $ 95.50 per sf ECHHS Phase II 1997 $113.32 per sf McDougle Elementary School 1995 $ 90.64 per sf ECHHS Phase 1 1994 $ 95.18 per sf Elementary School #9 is designed to meet the district's High Performance Energy guidelines. The building is 35% more energy efficient than building code and includes features such as daylighting, solar domestic hot water, photovoltaic panels, and rainwater recovery system. Another of the school's features, that is not normally included in school construction, is the-fire safety sprinkler system. The project design team and Facilities Management recommend acceptance of the bid from The Resolute Building Co. with alternates totaling $10,921,250. After School Board review, funding will be requested from County Commissioners. i A 4 Mr.William J.Mullin February 13,2002 1 1 1 CORLEY REDFOOT ZACK D.0 RE: Elementary School#9 Bid Tabulation page 2 ARCHITECTS • ENGINEERS • P L A X d E R S Therefore,we recommend the following for your consideration under the Single Prime Contract February 13,2002 The apparent low bidder for the single prime contract was submitted as follows by: The Resolute Building Co.,200 Cloister Court Chapel Hill,NC 27514: William J.Mullin Director Base Bid: $10,830,000 Facilities Management AIL 411: 9,90D Chapel Hill-Caaboro City Schools AIL#3: 46600 750 South Merritt Mill Road AIL#4: 6,600 GLENN D.CORLEY.AIA Chapel Hill,North Carolina 27516 AIL#5: 0 Pnsidenl.CEO KENNETH E.REOFOOT,AIA RE: Elementary School#9 at Meadowmont AIL 06: 0 ✓irrp,e AIL 07: 550 e(de°t proms#0031. AIL#8: Q MARK xACK,AIA BID TABULATION ✓icePmideut AIL#9: W15W P UHAAEEL L .HAMMERSLEXPE Dear Mr.Mullin: AIL#12: 15= AIL#13: 11,500 AA oatCE W.SIrNCH,AIA In accordance with your request,I am sending you the certified bid tabulation Alt#14: t�0 AssoriRre for the above-referenced Bids for both S TOTAL:. $10,921,250 projert Ingle Prime and Multi-Prime ANDREW R.CROICKSHANK,ALA Contracts were opened and read aloud at 4:00 PM,February 7,2002. Associate Please note the following. The apparent low bid total for the single prime contract is$51,750 higher DAVID M.TAYLOR,AIA We recommend acceptance of the following alternates in conjunction with the than the total of the low multi-prime contract bids for the same package. Due to the tight HARRY Associate work required under the Base Bid: construction schedule for the School,and the need for it to open on time to alleviate the over- NARRY M IEHSEN crowding in the existing elementary schools,we recommend moving forward with the single prime Auu:.te AIL#1: Add porcelain the In lieu of vinyl the flooring in the Main Lobby, contract KENNETH L SMITH Reception area and corridor leading to the Media Center A cs,uiate Alt#3: Add irrigation to the Town Practice Field The single prime contract method of delivery offers the School Board a building onstruction project AIL#4: Add irrigation to the School Play Field with a single source responsibility,in contrast with the multi-prime contracts for separate AIL#5: Use of materials with recycled content i.e.,asphalt paving, plumbing;mechanical,electrical and fire protection disciplines. We believe that the single prime, acoustical ceiling the and vinyl the floorin& contract method,with The Resolute Building Company,is the best way to proceed with this project. AIL#6: Use low-water usage dishwasher AIL#7: Add waterless urinal to Men's toilet room adjacent to Minority business enterprise participations,according to the information provided by Resolute In Gymnasium their proposal,will be 11.5%of the Bow Bid amount Alt.#8: Use Siemens Automatic Temperature Controls PO sox 2368 AIL#9: Use Versa-Lok retaining wall system at Town Soccer Field Based on our knowledge that the total bid,Including the al Chapel Hill,NC 27515-23e8 Alt.#il: Use fiber-mesh-reinforced exterior concrete sidewalks at front g g Proper alternates,is within the Schools entrances system's budget,we propose proceeding as soon as possible with preparation of the Construction 222 Cloister coin► AIL#12 Use High-Efficiency Condensing Boilers Contract for Elementary School#9 at Meadowmont Chapel Hill,NC 27514-2212 AIL#13: Use Chillers that utilize R-134A Refrigerant Aicee d IIA AIL#14: Add potable water and a drinking fountain to Town Soccer Fieldt E.Red A[A Please note that we do not recommend accepting AIL#10,the ice storage de nt system. The cost is too high to justify,based on the life-cycle cost analysis presented to the School Board in late December,2001. Also,we do cot KER-esw/0031-bi&tnb recommend accepting Alternate#2,which stipulates the use of a specific vendor Endosm to supply the doors,door frames and hardware for the'project This alternate was designed to provide a single-source vendor to minimize coordination problems during the construction process,however,the cost is too high to (9l9)942-8586 Telephone justify, CDR[EY REDFOOT ZACKwr (919)929.4802 Fax r r r COR= BEDFOOT ZACK, ac. DID TABULATIOM HLEKERTAEY SCHOOL #9 AT MEADOWMOXT Chapel Hill-Carrboro City Schools Project #0031 3:00 PM, February 7, 2002 12 MULTI-PRIME 5% aid Add. MBE FIRE PROTECTIOM COMTEACTOR License Mo. Bond Board POEM RASE RID Allied Fire Protection, Inc. 16286 yes yes yes $165,500 Raleigh, MC Associated Fire Protection, Inc. 16333 yes yea yes $175,615 Clayton, MC Capital City Sprinkler, Inc. so bid Raleigh, MC Crawford Sprinkler Co. 09881 yes yes no $295,000 Raleigh, MC High Point Sprinkler, Inc. 24914 yea yp yes $176,535 Thomasville, MC JaD Sprinkler Company, Inc. 16269 yes 2 yes $176,665 Clayton. MC COBLEY $EDFOOT ZACK, ae. DID 2SNULATIOM ELODDATAR! SCHOOL #9 AT IDMZKR mMT Chapel Hill-Barrboro City Schools Project #0031 3:00 PM, February 7, 2002 Fz� I-PRTMB 5♦Hid Add. - MBE Alt. #4: RICAL COMTBACTOB License Mo. Bond Beard POBM BASE BID Irrigation of School Pield lectrical Construction 22348 yes yes' yes ¢ 953,000 $ 800 te, MC ss 213 you yes yes $1,121,900 $ 300 Burlington, MC Mayne J. Griffin Electric 16529 no yes yes Holliston, MA Morino Electrical a 20959 yes yes yes $1,098,000 $1,000 Mechanical Carrboro, MC Port City Electric Company 9590 yes yes yes $1,246,000 blank Mooresville, MC Quality Electric Co., Inc. 3495 yes 2 yes $1,497,800 $2,625 Durham, MC Triangle Electrical Services 19008 yea yes yes $1,060,000 no cost Chapel Hill, MC Vaughan Electric Co., Inc. 14 yes you yes $1,197,341 n/a Durham, MC Vick Brothers Electric 3003 yes yes yes $1,200,000 $2,275 Asheboro, MC CORLEY rEDFOOT ZACK, su. DID TAULATION ELRKENTARr SCHOOL #9 AT KEADOMM)UT Chapel Hill-rar±l.- City Schools Project #0031 3s00 PM, February 7, 2002 13 MULTI-PRIM 5% Bid Add. NBN MECRANZCAL CONTRACTOR License No. Bond Redd ]FORM BASS BID Baker Mechanical, Inc., Wilson, NC 04177 yes yes yes $1,486,000 CCI Systems, So. Boston, VA no bid Comfort Engineers, Durham, NC 9342 yes yes you $1,594,000 Cooper Mechanical Contractors 2580 yes;% yea yes blank •** Sanford, MC Meckworks, Inc., Beaufort, NC 11295 yes yes as $1,610,000 southern Piping Company, Raleigh, NC 7422 , you yes Yes $1,333,000 Superior Mechanical, Inc. 12051 yes yes yes $1,420,000 Randleman, NC WATCO Corporation, Garner, NC 2881 yes yes yes $1,439,860 Williams Mechanical Corporation 05820 yes yes yes $1,370,000 Lugoff, SC Nam-Pam Alt. #D Alt. #10 Alt. 12 Righ- Alt. 13 MRCHANICAL CONTRACTOR Bienaas ran storage Rff.COndeas Soil Chillers R-134A CamtsoL System Refrigerant Baker Mechanical, Inc. no change $164,000 $35,000 $100,000 CCI Systems no bid Comfort Snginsers no change $162,600 $26,200 $ 22,900 Cooper Mechanical Contractors - $1,399,000 $ 60,000 r $26,000 $ 21,000 Meckworks, Inc. no change $150,000 $30,000 no quote Southern Piping company no Change $151,000 $18,000 $ 10,000 Superior Mechanical Inc. no change $227,500 $55,800 $122,000 WATCO Corporation $10,000 $ 80,900 $26,350 $ 2,200 Williams Mechanical Corporation no Change $169,000 $10,500 $ 83,200 ran ri arm Was 161t Name BiLd Was supposed wr en. amount of $1,399,000 was incorrectly mitten on the bid form for Alternate #8. According to the School Board Attorney, the clerical error made does not render the bid unacceptable= therefore, Cooper Mechanical Contractors' Baas Bid is $1,399,000. " I CORLEY REDFOOT ZACK, me. DID TADULATION BLHISSTARY 8CBOOL #9 AT 1RIDOWNODT Chapel Hill-Carrboro City Schools Project 40031 300 PM, February 7, 2002 MULTI-PRIME 5%Did Add. MDR Alt. #7a Waterless PLUMING CONTRACTOR Licause No. bond Deed FORK DAM BID Urinals ABL a Associates, Plumbing LLC 19909 yea yes yea $747,000 $ S00 Raleigh, NC Acme Plumbing a Heating 1208 yes 2 yes $800,800 $ 675 Durham, NC Bradburn Plumbing Co., Inc. 5101 yes you yes $756,760 $ 400 Durham, NC Brown Brothers Plumbing 282 yes yes yes $968,800 $ 402 Durban, MC Morin& Electrical i Mechanical no bid Carrboro, NC 868 Machanical, Inc. 20196 yes you yes $673,800 no Change Raleigh, NC Tommy V. Strigo, Inc. no bid Burlington, NC Williams Mechanical Corp. 05820 yes yes yes $72,900 $2,500 Lugoff, SC Triangle Mechanical Contractor 4169 yea ran yes $862,416 $ 400 Garner, Inc •+ NOTE: According to Mr. Williams of Williams Mechanical Corp., the Baas Bid of $72,900 is incorrect, and they could not honor the price quoted. The Base Bid is therefore rejected. Elementary School Y9 at Meadormont, Multi-Prime General Bid, page 3 of 3 14 M LTI-PRXMZ Alt. 6 Alt. 9 Alt. 11 Alt. 14 GRNSRAL CONTRACTOR Low-rater Retaining Rainf. Ezt. Mater to Torn Dishwasher Well Concrete Soccer FLOW at Toro Slabs Field American South General no change $23,000 $ 700 $ 2,300 Contractors Barnhill Contracting Co. no change $ 6,800 $ S00 $ 5,500 Bordeauz Construction Co. no change $ 5,330 ($ 670) $ 7,000 Centurion Construction Co. no change $18,150 $ 1,450 $ 2,370 DeVere Construction Co. no bid McDonald-York, Inc. no change $ 8,888 no change $ 3,920 Miller Building Corp. no change $ 3,000 $ 500 $ 5,200 Pena-Co Construction Inc. no bid The Resolute Building Company -0- $20,500 $15,200 $ 2,400 R. N. Rouse 4 Co., Inc, no change $ 3,000 $ 600 $ 4,000 Sheloo, Inc. $ Soo $24,500 $ 5,000 $ 7,000 J. M. Thompson Company -0- $ 5,360 $ 4,200 $ 3,700 Elementary School 49 at Meadormont, Multi-Prime General Bid, page 2 of 3 MULTI-PRINZ Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 - GRNERAL CONTRACTOR Porcelain Door Skim Field School Field Recycled Tile supplier Irrigation Irrigation Materials American South General $18,000 $23,000 $ 8,500 $12,000 no change Contractors Barnhill Contracting Co. $10,300 $20,000 $ 4,600 $17,500 $10,600 Bordeaux Construction Co, $27,564 $46,861 $11,962 $13,200 $12,000 Centurion Construction Co. $ 6,375 $25,000 $ 6,120 $ 6,500 no change Devere Construction Co. no bid McDonald-York, Inc. $28,568 $23,740 $23,600 $20,744 no change Miller Building Corp. $11,200 $41,900 $ 5,700 $11,900 no change Pena-Co Construction Inc. no bid The Resolute Building C $ 9,900 $71,950 $ 4,600 $ 5,800 -0- R. N. Rouse i Co., Inc. $ 6,500 $41,700 $ 5,700 $ 5,700 $5,000 Shelco, Inc. $26,000 no change $15,000 $12,000 no change J. M. Thompson Company $11,485 -0- $10,200 $12,900 $13,000 CORLEY BEDFOOT ZAM, ..e. HID TABULATION • ELEWESTARY SCHOOL f9 AT uE&DOWMONT Chapel Bill-Carrbozo City Schools Project 40031 15 300 PM, February 7, 2002 MULTI-PRINE 5% aid add. MBR CEaEYAL CONTRACTOR License No. Bond Recd WORM BASE AID American South General Contractors 34536 yea yes yes $8,297,000 Sanford, NC Barnhill Contracting Co. 3194 yes yes yes $8,366,453 Raleigh, HC Sordeauz Construction Co. 9266 yes yes yes $6,372,100 Durham, NC centurion Construction CO. 12332 yes yes yes $7,890,000 Raleigh, Me DeVere Construction Co. no bid Alps", MI McDonald-York, Inc. 45371 Raleigh, NC yu yes yes ¢9,159,700 Miller Building Corp, 2078 yes yu YOU $8,147,000 Raleigh, NC Peace-CO Construction Inc. no bid Raleigh, NC The Resolute Suilding Company 14397 yes yes yes $7,563,300 Chapel Bill, NC R. N. Rouse s Co., Inc. 732 yes yes. yes $7,744,000 Raleigh, NC Shelco, Inc. 9515 yea yes yea $8,052,000 Raleigh, NC J. M. Thompson Company 474 yes yes yes $7,734,000 Raleigh, NC Multi-Pries General Bid page 1 of 3 Elementary School 49 at Meadommoat, Single Prime Bid, page 4 of 4 it SINGLE PRIMR Alt. 11 Alt. 12 Alt. 13 Alt. 14 GEBERAL CONTRACTOR Reint. Ext. Nigh-Effic. Chillers Water to Torn concrete Condensing with R-134A Soccer Field Slabs Boilers Refrigerant American South General $ 700 $40,000 $20,000 ¢2,300 Contractors Barnhill Contracting Co. $ 500 $19,000 $11,000 $5,500 Rordeauz Construction Co. ($670) $ 110 $ 75 $7,000 centurion Construction Co. $1,450 $37,000 $100,000 $2,320 DeVere Construction Co. no bid McDonald-York, Inc, no bid Miller Building Corp. $ 500 $111000 $87,000 $5,000 Penn-Cc Construction Inc. no bid The Resolute Building Company $15,200 $20,000 $11,500 $2,400 R. N. Rouse c Co., Inc. $ 600 $10,700 $10,500 $7,000 Shelco, Ina, $5,000 $20,000 $10,000 $7,000 J. M. Thompson Company $4,200 -0- -0- $3,700 Elementary School 19 at Meadowmont, Single Prime Bid, page 3 of 4 16 SINGLE PRINZ Alt. 6 Alt. 7 Alt. 8 Alt. 9 Alt. 10 - GRNERAL CONTRACTOR Low-rater Waterless Siessins Retaining Mall Ice Storage Dishwasher Drinals Controls at Town Field System American South General no change $ 500 $20,000 $25,000 $ 60,000 Contractors Barnhill Contracting Co. no change $ 500 no change $ 6,800 $160,000 Bordeaux Constructioa Co, no change $ 425 no change $ 5,330 $ 954 Centurion Construction Co. no change $1,000 no change $18,150 $166,000 DeVere Construction Co. no bid McDonald-York, Inc. no bid Miller Building Corp. no change $2,600 no change $ 3,000 ¢183,100 Penn-Cc Construction Inc. no bid The Resolute building any -0- $ 550 -0- $20,500 $155,000 R. N. Rouse 8 Co., Inc. no change no change no chaaga ¢ 3,000 $156,000 shelco, Inc. $500 $ 440 ao change $24,500 $115,000 J. M. Thompson Company -0- $ 600 -0- $ 5,360 $ 930 ■NOTES According to John Thompson, J. M. Thompson Company's bid of $930 for Alternate 810, ice storage, is incorrect and JMT could not honor the price quoted; therefore, the alternate bid is rejected. Elementary School 89 at Meadowmoat, Single Prima Bid, page 2 of 4 SINCLS PRINZ Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 - GEMZR&L CONTRACTOR Porcelain Door Tama Field School Held Recycled Tile Supplier irrigation Irrigation Materials American South General $18,000 $23,000 $ 8,500 $12,000 no change Contractors Barnhill Contracting Co. $10,300 $21,200 $ 4,700 $16,400 $10,600 Bordeaux Construction Co. $27,584 $46,861 $11,962 $15,600 $12,000 Centurion Construction Co. $ 8,375 $25,000 $ 6,120 $ 7,300 no change DeVere Construction Co. no bid McDonald-York, Inc. no bid Miller Building Corp. $11,200 $41,900 $ 5,700 $11,900 no change Pena-Cc Construction Inc. no bid The Resolute Building company $ 9,900 $71,950 $ 4,600 $ 6,600 -0- R. N. Rouse i Co., Inc. $ 8,500 $41,700 $ 5,700 $ 5,700 $ 5,000 8halco, Inc. $28,000 $23,000 $15,000 $12,000 no change J. M. Thompson Company $11,485 -0- J $13,000 $15,700 $13,000 CORLEY F.EWOOT ZACK, ,.�. DID TADMLDiION ELENEMTARY SCROOL 19 AT MBADONVAM 17 Chapel Will-Carrboro City Schools project $0031 4:00 PM, February 7, 2002 SINGLE PRIME 5%Bid Add. MBE GENERAL CONTRACTOR License no. Bond Recd FORM DUE DID American south General Contractors 34536 yes yes yes $11,564,000 Sanford, NC Barnhill Contracting Co. 3191 yes yes yea $11.586,025 Raleigh, NC Bordeaux Construction co. $266 yes yes yes $11,449,000 Durham, NC Centurion Construction Co. 12332 yam yes yes $11,133,000 Raleigh, NC DeVere r^astruction Co. no bid Alpena, MI McDonald-York, Inc. no bid Raleigh, NC Miller Building Corp. 2078 yes yes ys $11,396,000 Raleigh, NC Peas-Co Construction Inc. no bid Raleigh, Nc The Resolute Building Company 14397 yes yes yes $10,830,000 Chapel Rill, NC R. N. Rouse a Co., Inc. 732 yes yes yes $10,924,000 Raleigh. MC shelco, Inc. 9515 yes yes Ys $11,111,000 Raleigh, NC J. M. Thompson company 474 yes yes yes $10,989,000 Raleigh, NC Single Prime Did Page 1 of 4 II BID TABUIMION Elementary School #9 at Meadownont Chapel Hill-Carrboro City Schools Chapel Hill, NC Project #0031 Opened at 4300 PM, February 7, 2002 Bids as shown on the attached eleven (11) pages, opened at 4300 PM, February 7, 2002, have been checked and.validated and-are hereby certified as correct. eth E. edfoot, AIA, Vice President ��.•`. .....o f 6565 ++ CO / cu ma•a.u.n Q Parking Summary ParkingProvidtd j / ASPHALT 113 mg.car spaces / Gr Y� RSA'�r eASK erBALL ODU AT WITH GOALS AND O compact car Spa= 6 I S i7 accessible parking spae /:, • i'�4' , %STRIPING, Taal: 120 spaces provided on sire / �� /.•� ��„� ' ,r11 `'\�. Building Square Footago/ I� +� :+r' 1 0A PHASE ONE 95M SF-' i/ • • —• LsoQ6o _ \ Yarn* „:F\4p PHASETWO I2,000 S ?/ Mj etB AA DSCiiRGOL ' r-• �� �40 Total Square Footage: 107.000 S.F. f':/ ` W RECYCLING D f ruy T •� FrAaJG. ' ` GROUN 9Rm L✓rr�r�r ''.•.I-.•. I� i 2 ,p it \ i I it"_`-�,.r..—•� '\. t .1n�' v ONESTORY p WFINIPT ZW.73R ` ! 1 R�wOA7L�ANDD Amumricmmmwmi ELMAINTARY SCHOOL p 11 SPRIGGING IRRIGA-noKsPRIGGtNG, • - - 9YADD 6•TOPSO149FNCHE�S. - p ALTERNATE TRANI RECEPTACLES, F7INDID GOALS,SCOREBOARD, R, \ \ �.�•. '"f;- _� - d �� BY OIHERi SIGNAGSASPHALT /s'!�'r--.-.• -�"•�-�-_- -.E ::�;.=;: i I ATH,FENCING ETC. ` \\ /' r T °""•K"'W' -- -__ �__ 1 � �!•• s'PEDESTRIAN � 4:! �( I I i j 1a'GATE. GATE • , V/ '..-.._..--.-..-.--..-..-..L..-..-.-1..-..-..J..-..-.-I.-..-....I-. ' 1 l SITE PLAN FOR SCHOOLS AND CHAPEL FILL-CARRBORO ccrx ScHooLs CORLEY REDFOOT ZACx ' �- TOWN USE AGREEMENT ELEMENTARY SCHOOL#9 1 ' ' •» ••••• NOVEMBER 20,2001 CHAPEL HILL,NORTH CAROLINA 1�indieas -rown Melds Attachment 6 Elementary School #9 Construction 19 Chapel Hill-Carrboro City Schools Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds to construct Elementary School #9 for the Chapel Hill Carrboro City Schools. Funding for the project comes from savings from the Smith Middle School Construction Project, an appropriation from the School Capital Project Fund Balance, and proceeds from the November 2001 voter approved bond referenda. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Through Through 2000-01 FY 2001-02 2001-02 Sales Tax $0 $0 $0 Impact Fees $0 $0 $0 PSBF $0 $0 $0 Bond Funds $0 $11,988,322 $11,988,322 cans er from Smith Middle School Ca ital $380,000 $0 $380,000 Appropriate Appropriatea runa ance (School Capital Project Fund) $192,462 $0 $192,462 Total Project Funding $572,462 1 $11,988,322 $12,560,784 Section 4. The following is appropriated for this project: Through Through 2000-01 FY 2001-02 2000-01 Concept/Pre-Planning $132,184 $0 $132,184 Planning $440,278 $478,357 $918,635 Design and Construction $0 $9,513,948 $9,513,948 Equipment/Furnishings $0 $477,645 $477,645 Technolo $0 $750,585 $750,585 One-1115 e k.Non Personnel) Start Up Costs $0 $400,000 $400,000 Contin enc - $0 $367,787 $367,7871 Totall $572,462 $11,988,322 $12,560,784 Section 5. This Ordinance, originally adopted December 9, 2000, shall remain in effect until June 30, 2002. Adopted this nineteenth day of March 2002.