Loading...
HomeMy WebLinkAboutAgenda - 06-21-2022; 8-l - Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill) 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 21, 2022 Action Agenda Item No. 8-1 SUBJECT: Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill) DEPARTMENT: Asset Management Services, County Attorney, & Environment, Agriculture, Parks & Recreation ATTACHMENT(S): INFORMATION CONTACT: Stormwater Operations and Maintenance Angel Barnes, Capital Projects Manager, Plan Agreement 919.245.2628 Steven Arndt, Asset Management Services Director, 919.245.2658 PURPOSE: To: 1) Approve a Stormwater Operations and Maintenance Plan Agreement with the Town of Chapel Hill for the Orange County Southern Campus Expansion Stormwater Control Measures; and 2) Authorize the Chair to sign the necessary paperwork upon final County Attorney review. BACKGROUND: The Town of Chapel Hill has requested a Stormwater Control Measure Operations and Maintenance Plan Agreement for the Orange County Southern Campus, Seymour Center facility located at 2501 Homestead Road, Chapel Hill. In 2021 the stormwater system was installed to meet the required standards. This agreement is the operations and maintenance plan agreement per the Town of Chapel Hill Section 5.4 Land Use Management Ordinance. FINANCIAL IMPACT: There is no financial impact associated with this Stormwater Operations and Maintenance Plan Agreement. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes, and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people 2 should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental, and commercial operations or policies. ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal impact is applicable to this item: • RESULTANT IMPACT ON NATURAL RESOURCES AND AIR QUALITY Assess and where possible mitigate adverse impacts created to the natural resources of the site and adjoining area. RECOMMENDATION(S): The Manager recommends that the Board: 1) Approve the Stormwater Operations and Maintenance Plan Agreement with the Town of Chapel Hill for the Orange County Southern Campus Expansion Stormwater Control Measures; and 2) Authorize the Chair to sign the necessary paperwork upon final County Attorney review. 3 Stormwater Operations and Maintenance Plan AGREEMENT This Operation and Maintenance Agreement ("Agreement") is established this day of 20 , by Orange County ("Owner"), who is the owner of the Property(hereinafter defined), on behalf of the Owner, the Association (if applicable), and all successor Owners of the Property and the Town of Chapel Hill ("Town"). Owner represents, warrants, and agrees that Owner is financially responsible for the maintenance, repair and replacement of all stormwater control structures, appurtenances and vegetation located on the Property. Owner agrees to perform the maintenance as outlined in the Stormwater Operations and Maintenance Plan for each Stormwater Control Measure and as may be applicable or required as part of the regulations set forth in Section 5.4 of the Town of Chapel Hill's Land Use Management Ordinance. A Homeowners Association or Property Owners Association shall not be the financially responsible party unless more than 50%of the lots or units on the Property have been sold and a resident of the Association has been named the president. Owner agrees that the Town has the right to access the Stormwater Control Measure(s) (hereinafter "SCM") on the Property, as deemed necessary in the Town's sole discretion, by way of the 'SCM Maintenance &Access Easement' as recorded on the final plat. Owner recognizes and agrees that Owner is responsible for the maintenance and upkeep of the SCM Maintenance &Access easement. 4 Owner acknowledges that Town's authorized access to the SCM(s) does not create any operation or maintenance responsibility or obligation on the part of the Town. Owner shall keep a maintenance record for routine maintenance performed related to SCMs on the Property("SCM Inspection and Maintenance Log"). The SCM Maintenance Log shall be kept updated by the Owner and be submitted to the Town each year as part of the required annual inspection report package. Any deficiencies noted during routine maintenance shall be corrected, repaired or replaced immediately by Owner.The Owner agrees to notify the Town of any problems with the system or prior to any changes to the SCM. The Owner must submit this executed Agreement with the Stormwater Operations and Maintenance Plan applicable to the SCMs located on the Property and a copy of the approved As-Built Plans to the Town. Once approved, the Owner shall submit these documents to Orange County Register of Deeds for recordation, and proof of submittal shall be provided to the Town prior to issuance of the Certificate of Occupancy. The Owner shall fulfill the requirements of this Agreement effective upon issuance of the Certificate of Occupancy. In case the ownership of the SCM transfers,the Owner shall, within thirty (30) days of transfer of ownership, notify the Town of such ownership transfer. Project Name: Orange County Southern Human Services Center Phase 1:Seymour Center Expansion Parcel Identifier Number: 9880008527 Identify the Stormwater Control Measures on site in the table below. Stormwater Control Measures Quantity ID Number(as noted on plan) Bioretention Cell 1 Dry Pond Grassed Swale Hydrodynamic Separator Level Spreader Other Type Permeable Pavement Sand Filter 1 StormFilter Stormwater Wetland Underground Detention 1 Wet Pond 1 5 Print Name of Owner: Renee Price Title &Organization: Board of County Commissioners,Chair/Orange County Street Address: 300 West Tryon Street City, State, Zip: Hillsborough, NC 27278 Phone Number(s): 919.245.2130 rprice@orangecountync.gov Email: IN WITNESS WHEREOF,the Owner has hereunto set its hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors,this the day and year first above written. Signature of Owner: STATE OF NORTH CAROLINA COUNTY OF [county in which acknowledgement taken] I, , a Notary Public of County, North Carolina, do hereby certify that personally appeared before me this day and acknowledge the due execution of the forgoing instrument. Witness my hand and official stamp or seal,this day of , 20 Seal Signature of Notary Public My Commission Expires 6 liStormwater Operations and Maintenance e Log Sheet Facility Name: Orange County Southern Human Services Center Phase 1:Seymour Center Expansion Permit Number: 201920166(FPZCP-SFRS) Address: 2501 Homestead Road,Chapel Hill,NC 27516 Owner: E-mail: Phone: Orange County abarnes@orangecountync.gov 919.245.2628 Qualified Professional: E-mail: Phone: Begin Date: End Date: Signature: Date BMP Type Inspected Cause for Inspection Conditions Requiring Correction Comments and and ID# By: Actions Taken 7 Date BMP Type Inspected Cause for Inspection Conditions Requiring Correction Comments and and ID# By: Actions Taken 8 Instructions: Record all inspections and maintenance activities for all SCMs at the facility on this form. Use additional log sheets and/or attach extended comments or documentation as necessary. Submit a copy of this completed Stormwater Operations and Maintenance Log Sheet in the Annual Inspection Report. Start a new log at the time of submission. More instructions about SCM inspection submittal guidelines can be found at this website. The following notes provide guidance for completing the Stormwater Operations and Maintenance Log Sheet. ■ BMP ID#— If applicable, use ID#from the approved site plan. ■ Inspected by— Note all inspections and maintenance activities on this form, including the required independent annual inspection. ■ Cause for inspection — Note if the inspection is routine, pre-rainy-season, post-storm, annual, or in response to a noted problem or complaint. ■ Conditions Requiring Correction — Note any condition that requires correction or indicates a need for maintenance. ■ Comments and Actions Taken — Describe any maintenance performed or will need to be performed in the future. 9 ' Stormwater Operation and Maintenance Plan BIORETENTION CELL Regular inspection and maintenance are necessary to preserve long-term functionality of Stormwater Control Measures "SCMs" per the original design intent. This Plan outlines the Town of Chapel Hill requirements for regular inspection and maintenance of Bioretention Cell SCMs. The Owner as defined in the Agreement shall keep a copy of this Stormwater Operations and Maintenance Plan,the SCM Inspection and Maintenance Log, and a copy of the approved As-Built Plans in a known set location and made available to the Town of Chapel Hill upon request. Annual inspections shall be performed by a qualified licensed Professional Engineer or Landscape Architect. Routine maintenance and inspection shall be performed by a qualified professional with NCSU Stormwater Inspection and Maintenance Certification or similar certification. The qualified professional shall maintain a SCM Inspection and Maintenance Log and make available to the Town of Chapel Hill upon request. All inspections shall be recorded in the log according to the frequency in the Inspection and Maintenance Table (Table 1 below) and within 24 hours after storm events that exceed 1.0 inch of rainfall. Any deficit SCM elements noted during inspection shall be recorded in the log and immediately corrected, repaired, or replaced. All routine and corrective/emergency maintenance activities shall be recorded in the log. The log template can be found at the Town of Chapel Hill Stormwater Control Measures website. An Annual Inspection and Maintenance Report shall be submitted to the Town of Chapel Hill Stormwater Department. The report shall detail the status of the SCM and maintenance performed as outlined in the SCM Inspection Report Guidelines. A copy of the annual report shall be submitted to the Town of Chapel Hill Stormwater Management Division beginning one year after issuance of the Certificate of Occupancy. REQUIRED INSPECTION AND MAINTENANCE TASKS FOR BIORETENTION CELL NOTE: The following inspection and maintenance table is not an exhaustive list of inspection and maintenance tasks. It is the responsibility of the professional inspecting the facility to perform comprehensive maintenance for the SCM to be operational. BIORETENTION PAGE OF • • • 10 Table 1: Inspection and Maintenance Provisions for Bioretention Cell INSPECTIONSFREQUENCY OF MAINTENANCE ACTIVITIES • Watering is needed twice a week until the plants become established (commonly Upon 6-8 weeks) and then as needed during first growing season (April-October), construction depending on rainfall. completion • Remove and replace dead plants. • Remove any tree stakes or wires six months after planting. • Mow any bioretention with turf cover to a height of approximately six to eight inches and remove grass clippings. • Check inlet, collection system and outlet device for clogging. Remove Once every accumulated grit, leaves, debris and any other obstructions and dispose off-site. quarter • Inspect for ponding and bare or eroding areas and make adjustments as necessary. • Remove trash and/or debris from the bioretention area. Twice during the growing • Pull out weeds and dead, diseased, or invasives plants preferably by hand. season • For bioretention areas without turf cover, supplement triple shredded hard wood mulch in devoid areas to maintain a maximum 3 inch layer. • Prune trees and shrubs to best professional practice. Thin vegetation so that Annually sunlight can penetrate the bioretention surface. • Inspect the observation/cleanout wells to ensure that the underdrain is functioning. If clogging has occurred, wash out the underdrain. • Inspect all structural elements. • Conduct a soil test for pH and heavy metals and determine the infiltration rate. • For bioretention areas without turf cover, remove and replace the mulch layer with triple shredded hard wood. The ideal time to reapply mulch is in the late Once every spring. 2-3 years •An extensive replanting is required if 50% minimum coverage throughout the basin is not achieved in the bioretention after the second growing season. Once every 5 • Perform facility"make-over'to maintain intended landscaping regime and to 7 years address any maintenance problems detected during routine inspections. After 5 growing seasons,the vegetation should achieve 75/o coverage. Vegetation • If the bioretention cell suffers from dead or diseased plants or overgrown with As Needed (Typical invasive species, evaluate the source of the problem: soils, hydrology, species, Problems) and/or type of disease to determine the cause of the plant failure. o Remediate the problem by selecting new species and/or implementing an eradication plan for invasives. BIORETENTION PAGE 2 OF • • • 11 o Ensure appropriate plant maintenance is occurring. o A one-time fertilizer application to establish ground cover is permissible if a soil test indicates it is necessary. No portion of the dry detention system shall be fertilized after the initial fertilization that is required to establish the vegetation. o Consult with the Town of Chapel Hill Stormwater Management Division before any aquatic herbicide is used and site specific approval is given. • If vegetation coverage is not achieved, add reinforcement planting to maintain desired vegetation density and/or split out perennials to increase plant cover. Desired vegetation coverage is 50%after 2 growing seasons and 75%after 5 growing seasons • Remediate bare soils or erosive gullies. o In perimeter areas, regrade the soil to remove the gully, plant a ground cover and water until it is established. If soil test shows that the pH has dropped, dolomitic lime shall be applied as recommended. o Within the pretreatment area, provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Filter Media Failure • If the bioretention area shows signs of clogging, identify source of sediment and work to remediate or eliminate it before proceeding with the following maintenance tasks. o Flush the underdrains and capture any sediment before it enters any downstream stream or storm drain system. o Conduct one or more test pits to determine the depth of soil contamination. o Before remediating the filter bed, remove and temporary store any plants. o Remove the accumulated sediment to the point where sediment is no longer observed in the soil media plus an additional 2 inches of soil. Either replace with new media or till 2 to 3 inches of sand into the upper 8 to 12 inches of soil. o Dispose of any removed soil in an appropriate off-site location. o Replant and mulch the area of disturbance. • If soil test shows that the pH has dropped, dolomitic lime shall be applied as recommended. • If the soil test shows that heavy metals have accumulated,the toxic soils shall be removed, disposed of properly, and replaced with new planting media. Structural Integrity • Replace or repair any cracked, separated or damaged inlet pipes, drop inlets, overflow structure, outfalls, impoundment walls or other structural elements. Functionality • If flow is bypassing the pretreatment area, regrade to route all flow to the pretreatment area. • Sediment Accumulation o Maintain stable ground cover in the drainage area. BIORETENTION PAGE 3 OF • • • 12 o Sweep or vacuum sediment on pavement in the contributing drainage area. o If sedimentation or clogging is occurring in the inlet, design modification may be needed to ensure adequate drop or slope between inlet and filter bed. o If sediment has accumulated in the forebay area or basin reducing its depth to 75%of the original design depth, remove the sediment, restabilize the area, and replace with clean rock. Search for the source of the sediment in the drainage area and remedy the problem if possible. • If greater than one feet of localized bed sinking and/or sediment is observed by the underdrain or overflow, conduct a test pit excavation by hand to examine subsurface conditions. Look for sediment across layers, discoloration,voids, loss of material. Cause of bed sinking may be breached material layers, poor connections, or damaged pipes. Repair the test pit to full functionality without cross contamination of the individual material layers. For additional information or if damage has occurred at the outlet which effects the receiving water, contact the Town at Chapel Hill Stormwater Management at 919- 969-7246 (RAIN). 13 • Stormwater Operations and Maintenance Plan SAND FILTER Regular inspection and maintenance are necessary to preserve long-term functionality of Stormwater Control Measures "SCMs" per the original design intent. This Plan outlines the Town of Chapel Hill requirements for regular inspection and maintenance of Sand Filter SCMs. The Owner as defined in the Agreement shall keep a copy of this Stormwater Operations and Maintenance Plan, the SCM Inspection and Maintenance Log, and a copy of the approved As-Built Plans in a known set location and made available to the Town of Chapel Hill upon request. Annual inspections shall be performed by a qualified licensed Professional Engineer or Landscape Architect. Routine maintenance and inspection shall be performed by a qualified professional with NCSU Stormwater Inspection and Maintenance Certification or similar certification. The qualified professional shall maintain a SCM Inspection and Maintenance Log and make available to the Town of Chapel Hill upon request. All inspections shall be recorded in the log according to the frequency in the Inspection and Maintenance Table (Table 1 below) and within 24 hours after storm events that exceed 1.0 inch of rainfall. Any deficit SCM elements noted during inspection shall be recorded in the log and immediately corrected, repaired, or replaced. All routine and corrective/emergency maintenance activities shall be recorded in the log. The log template can be found at the Town of Chapel Hill Stormwater Control Measures website. An Annual Inspection and Maintenance Report shall be submitted to the Town of Chapel Hill Stormwater Department. The report shall detail the status of the SCM and maintenance performed as outlined in the SCM Inspection Report Guidelines. A copy of the annual report shall be submitted to the Town of Chapel Hill Stormwater Management Division beginning one year after issuance of the Certificate of Occupancy. REQUIRED INSPECTION AND MAINTENANCE TASKS FOR SAND FILTERS NOTE: The following inspection and maintenance table is not an exhaustive list of inspection and maintenance tasks. It is the responsibility of the professional inspecting the facility to perform comprehensive maintenance for the SCM to be operational. SAND FILTER PAGE I OF 3 REVISED: • • • 14 Table 1: Inspection and Maintenance Provisions for Sand Filters INSPECTIONSFREQUENCY OF MAINTENANCE ACTIVITIES Upon • If a pretreatment grass filter strip has been built,water twice a week until the completion of construction grass become established (commonly 6-8 weeks), depending on rainfall. • Maintain any grass at the perimeter of the sand filter to a height of approximately six to eight inches. • Check inlet, outlet, and conveyance system for any obstructions or clogging. Once every Remove accumulated grit, leaves, and debris and dispose off-site. quarter • Remove any trash present on the sand filter surface. • Inspect for prolonged ponding and bare or eroding areas and make adjustments as necessary. Twice during • Remove any vegetation growing on the surface of the sand filter preferably by the growing hand. season • Skim the first inch of sand media. Annually • If a sedimentation chamber is present, pump out oil and grit. Structural Integrity • Replace or repair any cracked, separated or damaged inlet pipes, outfalls, or other structural elements. • Remediate bare soils or erosive gullies by regrading the soil to remove the gully, plant ground cover and water until it is established. • If erosion has occurred within the forebay or pretreatment area, provide additional erosion protection such as reinforced turf matting or riprap. Functionality • Sediment Accumulation As Needed o Maintain stable ground cover in the drainage area. (Typical o Sweep or vacuum sediment on pavement in the contributing drainage area. Problems) o If sediment has accumulated in the pre-treatment area to a depth greater than six inches, remove the top few inches of drainage media and dispose of it in a location where it will not cause impacts to the SCM or a stream. Search for the source of the sediment in the drainage area and remedy the problem. • Filter Media Failure o If water is ponding on the surface for more than 24 hours after a storm event, check to see if the underdrain collection system is clogged and flush if necessary. It water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, consult an appropriate professional. All the sand filter media may need to be replaced. 15 For additional information or if damage has occurred at the outlet which effects the receiving water, contact the Town at Chapel Hill Stormwater Management at 919- 969-7246 (RAIN). SAND FILTER PAGE 3 • • • 16 smith �,EWER C.0,H7RUCT1ON SHALL COMPLY WITH OWASA STANDARDS AND 1TO5HEF­1w 1RO, All SIEI REIATEI 1- AkCHITECTURE ovEreaow wue wnu Urvv<wn-�m�.z�� R.III NC2.1 NOiE$: 91I—L.14lI.), jH vivE w,aurvours lrvvl1111 e'Ircel ,x x v^ixDicnnue N m M1H �nMµ - ...A ALL N xnrcxED nreEnl AS AV2,LA — oveeaow wxx wnu — ssvwxrswxx DIPI-1 snvs ix,onu eRIED vv vie w,nueDu x,xe Exnree b ��' y vxovos®wwoow NHisl Dxux EI uovomi�rl PLAN VIEW jig H rc w r z w E oxsw nrt art m - N Z Dre�um�ry s[rs�`I<rc9e1� Dre�um�rvsmsl I �utn�x w O �oIrcel oD U DEeEa,rE 111`e,.xlrvelAT _ DEeE>sx...ox e,.x,rvel _ �LS IP"S_Ao�x�e,. _1 w a roe of reo.E,�Anox _ ,oe of wE�a Eavnox roo or w.�a E�Ev.�ox z p z 6 v�xm.rvexi w.rere ezEvnory _ veamAxexr wnrev erev.nox 11­waee eLev.nox z C1 DII reorcom o.reo, nxox orera�ro>AooinoxA we,.Mnoxl z o w > x SAND FILTER SEDIMENT CHAMBER SECTION VIEW SAND FILTER CHAMBER SECTION VIEW SPUTTER BOX SECTION VIEW(END) w ci r w � z � z a O U .A-AY ALIE­1 D (7 p o -LE VEw sirt crer.Dirvc vurvlmvl oaiurn iry srtvslml nn O N eonom.o�rew uEvn�oorv--❑ —¢Doom or eor zo�nory nox FE = = rov or weire eeevxnory ................................................. ................................................. KEY PLAN us¢zsxuz NO SCALE IS zus rxnrvz mu tlegl 3p R X 3.6 WINDOW W X 1.5'WINDOW SPUTTER BOX SECTION VIEW(SIDE) anw vme IIPIID $DESCR PT ON UNDERDRAIN BEDDING DETAIL DMM BY: SAD CHECKED BY: SAD STORMWATER MANAGEMENT DETAILS N17027 21 DEC 2018 C6-30 17 • Stormwater Operations and Maintenance Plan UNDERGROUND DETENTION Regular inspection and maintenance are necessary to preserve long-term functionality of Stormwater Control Measures "SCMs" per the original design intent. This Plan outlines the Town of Chapel Hill requirements for regular inspection and maintenance of Underground Detention SCMs. The Owner as defined in the Agreement shall keep a copy of this Stormwater Operations and Maintenance Plan, any applicable proprietary manufacturer's O&M Plan, the SCM Inspection and Maintenance Log, and a copy of the approved As-Built Plans in a known set location and made available to the Town of Chapel Hill upon request. Annual inspections shall be performed by a qualified licensed Professional Engineer or Landscape Architect. Routine maintenance and inspection shall be performed by a qualified professional with NCSU Stormwater Inspection and Maintenance Certification or similar certification. The qualified professional shall maintain a SCM Inspection and Maintenance Log and make available to the Town of Chapel Hill upon request. All inspections shall be recorded in the log according to the frequency in the Inspection and Maintenance Table (Table 1 below) and within 24 hours after storm events that exceed 1.0 inch of rainfall. Any deficit SCM elements noted during inspection shall be recorded in the log and immediately corrected, repaired, or replaced. All routine and corrective/emergency maintenance activities shall be recorded in the log. The log template can be found at the Town of Chapel Hill Stormwater Control Measures website. An Annual Inspection and Maintenance Report shall be submitted to the Town of Chapel Hill Stormwater Department. The report shall detail the status of the SCM and maintenance performed as outlined in the SCM Inspection Report Guidelines. A copy of the annual report shall be submitted to the Town of Chapel Hill Stormwater Management Division beginning one year after issuance of the Certificate of Occupancy. REQUIRED INSPECTION AND MAINTENANCE TASKS FOR UNDERGROUND DETENTION NOTE: The following inspection and maintenance table is not an exhaustive list of inspection and maintenance tasks. It is the responsibility of the professional inspecting the facility to perform comprehensive maintenance for the SCM to be operational. 18 Table 1: Inspection and Maintenance Provisions for Underground Detention OF MAINTENANCE ACTIVITIES 4 FREQUENCY -A • Check detention chambers and pipes for any obstructions, clogging, or damage. Remove accumulated grit, leaves, and debris and dispose off-site. Biannually • Remove any trash or debris present within the drainage area and outfall area. • Inspect the detention system for structural integrity and any accumulation of liquids or solids within the unit. • If the detention is in an area that is salted regularly during winter,the system Yearly should be rinsed during the springtime to prevent salting agents from accumulating inside the pipes. Structural Integrity • Repair any cracks, spalled areas, rusted areas within the detention chambers. • Replace any crushed or collapsed pipes under the supervision of a professional engineer. • Replace the detention structure if it has severely deteriorated. • Repair eroded outfall channels with additional riprap armoring or other permanent lining material. Functionality • Sediment Accumulation As Needed o Maintain stable ground cover in the drainage area. (Typical o Sweep or vacuum sediment on pavement in the contributing drainage area. Problems) o Any accumulated sediment in the detention unit must be disposed to a waste handling facility. • Other Pollutants o Identify and eliminate any sources of excessive oil loading. o If clogging becomes a persistent issue that prevents drawdown, a trashrack is required on the discharge orifice within the underground detention structure. For additional information or if damage has occurred at the outlet which effects the receiving water, contact the Town at Chapel Hill Stormwater Management at 919- 969-7246 (RAIN). 19 smith �,EWE,R C.0,HTRUCT1ON SHALL COMPLY WITH OWASA STANDARDS AND 11 TO3HEET C—FOR PRDLEC.AND SHED RELATED N— DEN 3 DATED�2/22/o RUCNFE;r END IL INCLUDED ON THIS SHEET FOR PROPOSED (AE_x R.AI NC'ORIFIC TO 2606 yyelpS MCCS 919 a,3rB`.'3b9a�o� EIESr-bleb Fr .YnH--.qU"yyL I"tlL111U1N1 -d f y x OIEF'ItE � Q (Re a/oo-az1 o .g aV. J f New .1r s uN_1 rova(xA € ax Barra D-atlas Ar vw PLAN VIEW Ncu u....- mR a Box L T Hill, * E a .awr a b"x att PBFnr,En umE� wnrtRr a� �Be x*or•fR RN. stu € max ' ' so��EB rporBy ED w _ — F l W FBI 1F w LBOnO�GF BTr U TO IL O 1.Ox N4.-511.�A F1EV N Z my �rLp V O t'oavnmw daxc F PROFILE A-A 1m•, 5i1 w C w a z p = O 2 Z = -_ w j = O r w � z � z a O U � eLEv-sT. WDR w E (7 p t r O N WITH�—m�ER.E STRI UNDERGROUND DETENTION VAULT NO SCALLEAN OUTLET STRUCTURE IMPROVEMENT DETAIL _ N S A"! DEESCRIPTION DRAWN BV: BAD CHECKED BY: SAD STORMWATER MANAGEMENT DETAILS N17027 21 DEC 2018 C6-20 20 • Stormwater Operation and Maintenance Plan WET POND Regular inspection and maintenance are necessary to preserve long-term functionality of Stormwater Control Measures "SCMs" per the original design intent. This Plan outlines the Town of Chapel Hill requirements for regular inspection and maintenance of Wet Pond SCMs. The Owner as defined in the Agreement shall keep a copy of this Stormwater Operations and Maintenance Plan, the SCM Inspection and Maintenance Log, and a copy of the approved As-Built Plans in a known set location and made available to the Town of Chapel Hill upon request. Annual inspections shall be performed by a qualified licensed Professional Engineer or Landscape Architect. Routine maintenance and inspection shall be performed by a qualified professional with NCSU Stormwater Inspection and Maintenance Certification or similar certification. The qualified professional shall maintain a SCM Inspection and Maintenance Log and make available to the Town of Chapel Hill upon request. All inspections shall be recorded in the log according to the frequency in the Inspection and Maintenance Table (Table 1 below) and within 24 hours after storm events that exceed 1.0 inch of rainfall. Any deficit SCM elements noted during inspection shall be recorded in the log and immediately corrected, repaired, or replaced. All routine and corrective/emergency maintenance activities shall be recorded in the log. The log template can be found at the Town of Chapel Hill Stormwater Control Measures website. An Annual Inspection and Maintenance Report shall be submitted to the Town of Chapel Hill Stormwater Department. The report shall detail the status of the SCM and maintenance performed as outlined in the SCM Inspection Report Guidelines. A copy of the annual report shall be submitted to the Town of Chapel Hill Stormwater Management Division beginning one year after issuance of the Certificate of Occupancy. REQUIRED INSPECTION AND MAINTENANCE TASKS FOR WET POND NOTE: The following inspection and maintenance table is not an exhaustive list of inspection and maintenance tasks. It is the responsibility of the professional inspecting the facility to perform comprehensive maintenance for the SCM to be operational. WETPOND PAGE I OF • • • 21 Table 1: Inspection and Maintenance Provisions for Wet Pond FREQUENCY OF MAINTENANCE ACTIVITIES INSPECTIONS IR Upon • Watering is needed twice a week until the plants on the vegetated shelf and completion of perimeter of the basin become established (commonly 6-8 weeks), depending construction on rainfall. • Mow grass surface areas to a height of approximately six to eight inches and remove grass clippings. • Check inlet system/forebay and outlet device for any obstructions or clogging. Once a quarter Remove accumulated grit, leaves, and debris and dispose off-site. • Remove any trash within the pond area. • Inspect for ponding and bare or eroding areas and make adjustments before the next rainfall as necessary. Twice during the growing • Pull out dead or diseased plants, weeds, or invasives preferably by hand. season • Have the embankment inspected by a dam safety expert. • Remove woody species on or near embankment area and maintenance access. Annually A dam safety specialist should be consulted to remove any trees. • Prune trees and shrubs to best professional practice. Thin vegetation so that sunlight can penetrate the pond surface. Vegetation • If the wet pond suffers from dead or diseased plants or overgrown with invasive species, evaluate the source of the problem: soils, hydrology, species, and/or type of disease to determine the cause of the plant failure. o Remediate the problem by selecting new species and/or implementing an eradication plan for invasives. o Ensure appropriate plant maintenance is occurring. o A one-time fertilizer application to establish ground cover is permissible As needed if a soil test indicates it is necessary. No portion of the wet pond system (Typical shall be fertilized after the initial fertilization that is required to establish Problems) the vegetation. o Consult with the Town of Chapel Hill Stormwater Management Division If algal growth covers 50%of the area, consult a professional to remove and control the algal growth. • If cattails, phragmites, or other invasive plants exceed 50%of the wet pond, remove invasives by physical removal or wiping them with a herbicide. Consult the Town of Chapel Hill before any aquatic herbicide is used. Site specific approval is required. Extended periods of dewatering may be a possible treatment approach for reducing invasives. 22 • Remediate bare soils or erosive gullies. o In perimeter areas, regrade the soil to remove the gully, plant a ground cover and water until it is established. If soil test shows that the pH has dropped, dolomitic lime shall be applied as recommended. o Within the pretreatment area, provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Structural integrity • Replace or repair any cracked, separated or damaged inlet pipes, outfalls, impoundment walls or other structural elements. • If dam embankment or emergency spillway needs maintenance, consult with a professional. Functionality • Sediment Accumulation o Maintain stable ground cover in the drainage area. o Sweep or vacuum sediment on pavement in the contributing drainage area. o If sedimentation or clogging is occurring in the inlet, design modification may be needed to ensure adequate drop or slope between inlet and filter bed. o If sediment has accumulated in the forebay area reducing its depth to 75%of the original design depth, remove the sediment off site, restabilize the area, and replace with clean rock. Search for the source of the sediment in the drainage area and remedy the problem if possible. • If there are visible disturbances to the forebay design, make the necessary repairs to ensure that the forebay is functioning as intended. • If evidence of a muskrat or beaver activity is observed, contact a professional to remove muskrat or beaver. • If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. For additional information or if damage has occurred at the outlet which effects the receiving water, contact the Town at Chapel Hill Stormwater Management at 919- 969-7246 (RAIN). WETPOND PAGE 3 OF • • 1 23 N SHALL COMPLY WITH OWASA STANDARDS AND ,TaNpgRDSgND=PE�IN�AD°N3 qLL�°N3TRD�TIDNIN=IDE°F,NE smithp HDMerEADR°gDPD4DDRI°Hr.DT_WAYSHALLDaMPLYWIrHN°DDT � / j / j--- �,-- �/ ,TaNpaRD5aNp5PE�IN�aTIaN3 ALLPR°PDSEDWATERAND=ANITARY °,o�=crl° — ___, ,� // eFati�3N[Ei CU01 FOa PkpJeCT nND SNeEi R[Lnr[p NprFS. sinnett _ AkCHITECTURE LEGEND r \\ \ EXIST,NG CONDIT,ONS LEGEND==17 arnL rreoros[o eorveze,[ p aaE WDgs Rootl i �,e, % I\ \ cxreeneuner G 9. .a lol Rr - u H: ` rreoronroScry a Y"ti w / � i' � \ Doan vwe _Pmcnu 44496t y F � /� +aereseev�rioeeuc \ ` \ \ \\ ■ raorosenovovirvur q. nox Ca` j m raorosco c"rcx a"sin a x�iu"%pnw:plE sews '' !7 / /� /� yO � � .4 I \ rreorosrosoreN mnrvnox c /// _ \ 'I \ xxx w¢nue corvroure r.woel � m Fxunrva noeMornwnce �I I / i/ are easaxrmie ` —— ------ , N.ralr I I , / � oren AGrr V ` A ,oc=mr orcuree �' me g Y ----- \ I -51 a rvcs,oeNornrvn, x t w Drz�N, a 11§e \\?ervo wn,E Ye"ie`rv�\ \`r OvCFI 91181N Y0LDME a. ELEV AREA AVERAGE VOLUME VOLUME w I.9 AREA {cR (eQ y z STORAGE 0V O SB3AG 6 D ❑ 1) S f so4.Do 2780 88 two T.38o 1. o rc � N \ 50B.o0 5,425 4,093 4,093 SA73 N Q 874 5,863 5,663 11 4 z 50T.00 7,]a a 7,062 7062 l8.4T$ai$ o0 0 0 `\ 507.50 8.485 B.134 4.067 22 485 z Li \ I \ \ ` �\ eErorve mEr« 0 0 p t` / '.iDB.❑0 R.taB BA98 4pte a8.9❑2 Z o ' TE 40Pi \ \ \ �\ \ o o°o° ° o 0 0\ I ` 500.23 G+445 11 2.L43 29.045 w > _ \ \ \ o.or °o 0 0 0°p \ `\ I / SOB.SO 8A88 4.555 2.sa7 st,6$2 Z o. o°° p oo Rsxez ` 509A0 1"46 10,206 5,103 38.755 = z i O w slo.00 11717 11132 11132 47886 p Lj \ GO, ° o00 0° oa. °o N 511A0 12,967 12,342 12,342 60,228 rc \ ` \ \\ ` �\ I 5tt.5o 738a7 tS 302 6.851 88a76 r r °o°L GO o° 'O t — it2.00 1a,315 t3,676 6,988 79.867 z zO °o O \ \ \ o o° O O O ® \ FMF@AY YIX.UYE CFLd1LATld1 W E 00 °pO ` \ \ 00 Goo Qp000 \ \ \\ \ °a00o 0 OOo x u / Ln ACC. F oop00Oo 000apO opO p \ \ \ CO0 0 0 0°oo° / ELEY AREA AVERAGE VOLUME VOLUME o pp0000OOo 00 00 \ ` \ \ o00 000 °o ox feR (.11) O H«eresFa 0 0-00 00 0 00 0 0 O°00 r \ o o p o 0 0 0° / d IM AREA o � I N — STORAGE S sear«rss ° oOpO° o�p °0°ap 728 0 o o ,SIC,Ervnxc. o 0 0 0 0 oa o° o SIC— a0°" ° °p °o o Op \ `\ o / 505.90 1A15 872 B72 872 000C °o oO° _ \ oo 506.7o 1 16 1a 1.188 2.008 °o 0 0 0°00 0 °°° O ° ° ° — \ 507.00 7 1.57i 1 571 3,609 Ma`a"E1' �,, 000OOp tsoO °pDO, — 510 moo KEY PLAN Ereryiihre I o CO° ° I NO SCALE urvose rear rend n so --___ w-gPPRoxIMA GROUND ELEvanON AT TOP OF • RCPCSED WgLL'E ------- \rreerexea'xicx _ --_--- OnOM OF PROPOSED WALL ELEVATION AT Knaw wM1aYs b20W. A—ATE sEaRRY *auex i_SUP+—a'""etllxk ___ Call b,,I dig. DHERCRUPnoN APPROXIMATE AND ARE INTENDED TO 3E FORDRAWN BY: BAD snW , CHECKED BY: SAD E,ERMWEDBr 'NATIONS 11ALL THE RCA INwO WALL DE:I°NER STORMWATER ——— _ —_—— —— --- -- / MANAGEMENT ---------- ———— ———— �Y NORTH PLAN _ — —_-- —-------------- —�—5� — \ \ GRAPHIC SCALE C6 _00 24 smith �,EWE,R C.0,DTIR'U.CTION SHALL COMPLY WITH OWASA STANDARDS AND EVER TO SHEET C—NOR PROJECT All SHEET REUTEO NOTESAFtCHITECTURE �E =r,, wA1 papaDE, aED N�a.°TxERs o,T�l °TVATIROHaILsallo "EDIRI foaCEo,TH�EWET-. °NME.a1fA CONTRA oR LEv-.,,o HnLLCooROINnTEwxH�EaTECHN��nLENGIrvEEa ami alAR,NC 2 1 EIEv=.W9sp Frm 9<0 HC38 Ce�• r w aN,ISEEP couare AN,rsE,:P cowre iN PooL� a, reEeAr� NVA OR RsC ourvow .PLAM NE C &Aeoro,Ns F E o3U6a w F C` ED Q CIT.11TON RT-41`N.W / CROSS SECTION OF WET POND N.,.S. � a g a g ' aTV �€€,nTV COMPAC,ED Ill .IIIII-I IIIII- WET DETENTION BASIN CONSTRUCTION SEQUEN°CEE IT SHALL RE" �'EITMorExao�ssJ € —IIIII I=N IR I'IIIII= III= HN Na�D�a,x ALANREDarePAN E �ncoMP�ncEwxHTR—ALANUTOTAUR, w EEo ND "CDz ;,'. TaenCN waH ON DE MN III ANxoLE NTED =GRATTESALL N Z sroreM DRAINAGEPIPE ANee roaTHewrs DC.TI NoasIN SHALL BE w -11IIII °H > -I, class a—CRETE ,racxeD = ., w a .I REcoMMENDAT�oNs N z o -IIIII III a°N°M °HREDer,xEENGINEERANDRED-IREvoNSsrEP � a i oTHIN o Z U E mv.o Arn+lcni� is Z —I IIIWET wcscR�TILE1. G--�_—; __ _ w u LENS Pusnc nEPs a—TEE coxs,auc,DH1aIRc Deunno vunTNcs TRYL NA oa NARLY wrrtea W ? _ =IIIII - ° mPiP° — Vc wro E. O ° —II_ IN ,RENcxsoTOM �s } ouLEDarLusrlooanwaovANCEL _ I12 O J IIIII IIIII IIII IIIII DRIED waH,HePaoJ�sPe IF'AT, T EaANDM N,An,NEPUNT TER ,NACCORDANCE � w -� -� wxxArE°RIHCE RARore,,,'A RowAo�NnreD�°NaFEreREw°aK c°MPLHED z = El A.DIDNALEureD*o WET DETENTION BASIN CONSTRUCTION NOTES c0,] uD.01 PIPE w oaM Pipe ALL ON LDNNHrHesaTeor NOM LCARouNA an°rowN ovSHADELL HILL.—AR.AND ENESI—ATIONE _ x ELEVATION TRENCH WALLS 1O Ne LT RTH,IND 11.11IT rPUN,S DTHE o ga r ows 0 N DISTILlEll H 11E EN VENG 11 --III TarNCH wnueP� `INV our sraueD DuawcT EMALI SEAsoN oeVnrsRonD =1 —III IIIII uueCONCa E EL N, KEY PLAN = sru re E TN' HA NO SCALE Mw. 1A -rwo�9BN¢5 _ -IIIII "III— TO O O O O O O O O O O O O O O OLEADS O O O O O O O O O O O O O O _ PIPE lReeER I.Saos�n O O O O O O O O O O O O O O sEc,ioN DETAIL NOR LounoN� PER TPEMEW Ki TVIIR111THTHeI DREVUST, UREE RE,VESCRIPTIONURI DRAWNBY BAD IIII IIIII eEIwEEN PiPEaxosrvucrureE CHECKED BY: SAD TH ��I>"oro>a EMEr°�,'oFEAN:>areM° STORM WATER PLAN VIEW 6DED—H.-NE ERIcifTHECDNRAlUL1SHAALLHAVETHE�R�"Ui1111I°wDEAs1RVEr°NTIEASRUILT E MANAGEMENT ceE IIMi%F,e• s.IN DETAILS "'�x�a OUTLET STRUCTURE DETAILCSSAL, xON Nx.s. oaaeer°aaDNc oe TH 201]02] 21 DEC 2018 ANTI-SEEP COLLAR DETAIL wE,Dr:,EM�oN oaS�nsHALL SETHEaESPons�sLEo'THE ConTSA,,oa. HIS C6-10