HomeMy WebLinkAboutAgenda - 06-02-2022; 5 - Presentation from GoTriangle – Durham-Orange Light Rail Transit Expenditure Report 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 2, 2022
Action Agenda
Item No. 5
SUBJECT: Presentation from GoTriangle — Durham-Orange Light Rail Transit Expenditure
Report
DEPARTMENT: Manager's Office, Planning & Inspections
ATTACHMENT(S): INFORMATION CONTACT:
A. PowerPoint Presentation Charles Lattuca, President and CEO,
GoTriangle, (919) 428-7345
Saundra Freeman, Chief Financial
Officer, GoTriangle, (919) 314-8746
PURPOSE: To receive a presentation from GoTriangle staff on the Durham-Orange Light Rail
Transit (D-O LRT) Project expenses.
BACKGROUND: The Durham-Orange Light Rail Transit project was an element of the Orange
County and Durham County Transit Plans from 2012 until the project was discontinued in 2019.
GoTriangle led the planning, design, and engineering effort. The presentation (Attachment A)
provides an overview of the history of the project, the Federal Transit Administration (FTA)funding
process, and a detailed report of the total project expenses and contracts.
The Durham County Board of County Commissioners received GoTriangle's expenditure report
at its May 2, 2022 meeting.
FINANCIAL IMPACT: There is no financial impact associated with the receipt of this presentation
from GoTriangle.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice goals are applicable to
this item:
• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND
INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or color;
religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic
background; age; military service; disability; and familial, residential or economic status.
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
Public Transportation provides opportunity for access to jobs and services and supports these
Goals.
2
ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal
impact is applicable to this item:
• CLEAN OR AVOIDED TRANSPORTATION
Implement programs that monitor and improve local and regional air quality by: 1)
promoting public transportation options; 2) decreasing dependence on single-occupancy
vehicles, and 3) otherwise minimizing the need for travel.
RECOMMENDATION(S): The Manager recommends that the Board receive the presentation as
information.
3
Durham -Orange
Light Rail Transit
Project Expenses
Federal Transit Administration
The Federal Transit Administration (FTA) provides financial and technical assistance to local public
transit systems, including buses, subways, light rail, commuter rail, trolleys, and ferries. FTA also
oversees safety measures and helps develop next-generation technology research. FTA administers
the Capital Investment Grants (CIG) program, which is a discretionary grant program that funds transit
capital investments, including heavy rail, commuter rail, light rail, streetcars, and bus rapid transit.
Learn more about the FTA on their website at: https://www.transit.dot.gov/about-fta.
Learn more about the CIG program on FTA's website at: https://www.transit.dot.gov/CIG.
4
Federal Funding Process
Development61
Full Funding
Project
Allay Agreement
Complete environmental review Gain
ommitments of
process incluineveloping all. . .
and reviewing alternatives, funding
selecting locally preferred . .
alternative(LPA),and . . . .. .
constrainedit into the fiscally
long range transportation . .
• The D-0 LRT project sought a federal grant of over$1 billion through the Capital Investment Grants(CIG)program
administered by the Federal Transit Administration.
• D-0 LRT completed the Project Development phase of the Capital Investment Grants program's New Starts process as
depicted in the diagram above.
• When the project was canceled, it was nearing the completion of the Engineering phase of the program,which was the final
phase before receiving the federal grant and beginning construction.
• A comprehensive presentation on the Capital Investment Grants program is available here: https://Voutu.be/*w2mgbEyWBQ.
Awl I���� liilh
=ter,
E _ 4ir
_ t
y�
.�WFr i
L RS
f '
�e3 i
40A r ..aa.iE�l� 1►
JJ
j; L�'
6
D-0 LRT Project Costs(FY14-FY21) YTD-June 30,2021
Management and Design
General Engineering Consultant(HDR) $ 86,775,632
Project Development Consultant(URS/AECOM) $ 26,722,828
Project Management Consultant(HNTB) $ 12,065,515
Construction Management Consultant(Gannett-Fleming/WSP) $ 3,278,526
Financial Advisor(PFM) $ 1,061,455
E-Builder Project Management Software $ 615,000
Design Review Reimbursements $ 403,176
Management and Design Total is 130,922,132
Administration and Staff
Staff/Admin Support is 14,936,603
Project Office 1$ 1,202,569
Administration and Staff Total Is 16,139,172
Real Estate
Property Acquisition and Maintenance $ 4,702,888
Legal Consultants $ 66,458
Other Real Estate Expenses $ 1,389,119
Real Estate Total $ 6,158,465
Other Professional Services and Operations
Professional Services $ 2,964,083
Operations $ 859,761
Other Professional services and Operations Total $ 3,823,844
Management and Design Total $ 130,922,132
Administration and Staff Total $ 16,139,172
Real Estate Total $ 6,158,465
Other Professional Services and Operations Total $ 3,823,844
Total Expenses $ 157,043,612
Totals reflect rounding to the nearest dollar.
7
Management and Design
$130,922,132 of total expenses was spent on project management,design, and other consulting services needed to prepare the
project for federal funding and construction.
The majority of these expenses was related to four major consulting contracts, as approved by the GoTriangle Board of Trustees:
URS/AECOM was the Project Development Consultant(PDC).PDC expenses totaled$26,722,828.
HDR was the General Engineering Consultant(GEC).GEC expenses totaled$86,775,632.
HNTB was the Program Management Consultant(PMC).PMC expenses totaled$12,065,515.
Gannett-Fleming/WSP joint venture was the Construction Management Consultant(CMC).CMC expenses totaled$3,278,526.
PFM was the Financial Advisor(www.pfm.com). Financial Advisor expenses totaled$1,061,455. Jill Jaworski was the contract
signatory for PFM.
Expenses for E-builder project management software totaled$615,000.
Engineering review reimbursements totaled$403,176.
URS Corporation (formerly United Research Services) was an engineering, design,
and construction firm. Headquartered in San Francisco, California, URS was a full-service, global
organization. URS was acquired by AECOM in 2014. At the time of the D-0 LRT project, Tim H.
Keener was the authorized representative and contract signatory for URS.
AECOM (formerly AECOM Technology Corporation) is a global infrastructure consulting firm,
delivering professional services related to planning, design and engineering, program
management, and construction management. AECOM has approximately 51,000 employees. Their
headquarters is located in Dallas, TX. In North Carolina, they have offices in Raleigh, Morrisville,
and Charlotte. At the time of the D-0 LRT project, Doug Tennant was the authorized
representative and contract signatory for AECOM.
Learn more about AECOM on their website at https://aecom.com/about-us/.
1
boutURS/AECOM
8
• URS/AECOM was contracted for services related to the project development phase of work.
• During project development, potential project impacts were assessed and required
environmental analysis was completed. Environmental analysis culminated in an
Environmental Impact Statement and a Supplemental Environmental Assessment
containing over 700 pages of documentation.
• URS/AECOM completed a 30 percent level of engineering drawings and plans that were
needed to design the project, as it was anticipated at that time.
ManagementDesign
Project Development
$26,.722.,828
HDR is an employee-owned global design firm specializing in engineering, architecture, environmental
and construction services. HDR has around 11,000 employees. Their headquarters is located in Omaha,
Nebraska. In North Carolina, they have offices in Charlotte, Raleigh, Wilmington, and Winston-Salem. At
the time of the D-O LRT project, Jonathan Henderson was the authorized representative and contract
signatory for HDR.
Learn more about HDR on their website at littps://www.hdrinc.com/about-us.
off IAbout 1 •
9
• HDR was contracted for final design services related to the engineering
phase of work.
• This work included:
o Field surveys and investigations, including exploration for subsurface
utility engineering, inspections for hydraulic/drainage design,
geotechnical borings, and seismic response tests.
o Engineering plans and specifications, including the design of
multiple bridges, aerial structures, and stations.
o Environmental management, including mitigation monitoring plans
and the evaluation of proposed changes to the design of the project.
o Value engineering, which was required to mitigate potential project
cost increases.
ManagementDesign
General Engineering Consultant
HDR
$86,.775.,632• • •
HNTB Corporation is an employee-owned infrastructure solutions firm. HNTB provides professional
services related to planning, design, program management, and construction management. HNTB has
around 5,000 employees. Their headquarters is located in Kansas City, MO. In North Carolina, they have
offices in Raleigh and Charlotte. At the time of the D-O LRT project, Henry V. Liles Jr. was HNTB's
authorized representative and contract signatory.
Learn more about HNTB on their website at https://www.hntb.com/about/.
MW
A • • i
10
• HNTB was contracted for program management services related to the
engineering phase of work.
• This work included:
• Preparation of materials required for federal evaluation
• Detailed plan review and management of light rail program
elements including:
o Cost and schedule
o Real estate
o Safety and security
o Quality assurance
o Rail operations
ManagementDesign
ProgramConsultant
$14065515 A.MIA
Gannett Fleming is a global infrastructure firm that provides planning, design, technology, and construction
management services for a diverse range of markets and disciplines. Gannett Fleming has around 2,500 employees.
Their headquarters is located in Camp Hill, PA right outside of Harrisburg. In North Carolina, they have offices in
Asheville, Charlotte, and Raleigh. At the time of the D-0 LRT project, Bryan P. Mulqueen was the authorized
representative and contract signatory for Gannett Fleming/WSP joint venture.
Learn more about Gannett Fleming on their website at https://www.gannettfleming.com/about/.
WSP is as global professional services consulting firm with technical experts and strategic advisors including
engineers, technicians, scientists, architects, planners, surveyors and environmental specialists, as well as other
design, program and construction management professionals. WSP has around 50,000 employees. Their
headquarters is located in Montreal, Quebec, Canada. In North Carolina, they have offices in Raleigh and
Mooresville.
Learn more about WSP on their website at ,ttps://www.wsp.com/en-US/who-we-are.
About '
•
About
11
• Ajoint venture between Gannett-Fleming and WSP was contracted for
construction management services related to construction preparation
during the engineering phase of work.
• This work included:
o Cost estimating
o Construction scheduling
o Constructability assessments
o Workforce development planning
ManagementDesign
Construction ManagementConsultant
•
17
• $1,061,455 was spent on financial consulting to conduct financial
modeling and assist with financial risk management.
• $615,000 was spent on E-builder project management software.
• $403,176 was spent on design review reimbursements.
Other Management D- • Expenses
12
Subcontractors and DBE Participation
Larger prime consultants partner with subcontractors to complete their work. GoTriangle sets goals for the
participation of disadvantaged business enterprises (DBE subcontractors) in work completed by
subcontractors.
DBEs are for-profit small businesses where socially and economically disadvantaged individuals own at least a
51% interest and also control management and daily business operations.
GoTriangle's DBE participation in capital projects has regularly exceeded federal guidelines.
The DBE participation goal for the GEC (HDR) was 14%.
The DBE participation goal for the PMC (HNTB) was 14%.
The DBE participation goal for the CMC (GF/WSP JV) was 15%.
The DBE participation goal for the PDC (URS/AECOM) was 8.8%.
Approved for
Team DBE Firm Name Paymentthrough Race/Ethnicity Gender Location
Final Invoice
GEC(HDR) Dovetail Consulting $ 4,215.60 Black Female Riverdale,GA
GEC(HDR) CH Engineering $ 20,607.45 White Female Raleigh,NC
GEC(HDR) New South Associates $ 31,992.35 White Female Greensboro,NC
GEC(HDR) Wetherill Engineering $ 66,634.05 White Female Raleigh,NC
GEC(HDR) EVOKE $ 121,516.48 Black Female Durham,NC
GEC(HDR) MI Eng $ 148,628.51 Other Male Raleigh,NC
GEC(HDR) Morton&Morton $ 179,417.24 White Female Raleigh,NC
DBE GEC(HDR) Cross Spectrum $ 232,646.08 Black Male Springfiled,MA
GEC(HDR) Cooper&Associates $ 271,833.37 White Female Cary,NC
GEC(HDR) Simpson Engineering $ 381,720.96 Black Male Cary,NC
Subcontractors
• . • GEC(HDR) Engineered Design $ 486,781.76 White Female Cary,NC
GEC(HDR) Susan Hatchell $ 922,695.14 White Female Raleigh,NC
GEC(HDR) Mid-Atlantic $ 952,996.10 White Female Wilmington,NC
EngineeringGeneral • GEC(HDR) CALYX Engineers $ 2,213,825.19 White Female Cary,NC
•• GEC(HDR) Davenport Engineering $ 3,289,600.49 Black Male Raleigh,NC
DBE Participation •
PMC(HNTB) CH Engineering $ - White Female Raleigh,NC
Program • PMC(HNTB) Neighboring Concepts $ 124,201.25 Black Male Charlotte,NC
PMC(HNTB) Al Consulting $ 273,697.23 Asian Male Morrisville,NC
PMC(HNTB) Keville Enterprises $ 469,127.56 White Female Herndon,VA
D' Participation PMC(HNTB) LKG-CMC $ 495,507.01 White Female Glendale,CA
Construction Management ConsultantCMC(GF/WSPJV) The Collaborative Firm $ - Black Male East Point,GA
g • • CMC(GF/WSP 1V) Cincar Consulting Group(C2G) $ 10,877.47 Black Male Atlanta,GA
DBE Participation CMC(GF/WSPJV) BBFoster $ 13,473.06 Black Female Durham,NC
CMC(GF/WSPJV) GREE&Associates $ 15,787.59 Black Male Durham,NC
Project Development • CMC(GF/WSPJV) CES Consulting $ 565,272.17 Asian Male Dulles,VA
PDC(URS/AECOM) LKG-CMC $ 50,806.80 White Female Glendale,CA
DB Participation PDC(URS/AECOM) BREE&Associates $ 120,244.56 Black Male Durham,NC
PDC(URS/AECOM) Planning Communities $ 176,829.05 White Female Raleigh,NC
PDC(URS/AECOM) Connetics Transportation Group $ 198,623.55 White Female Atlanta,GA
PDC(URS/AECOM) Neighboring Concepts $ 359,797.48 Black Male Charlotte,NC
PDC(URS/AECOM) Wetherill Engineering $ 735,904.05 White Female Raleigh,NC
PDC(URS/AECOM) CH Engineering $ 1,885,323.22 White Female Raleigh,NC
15
13
Team Firm Name Approved for Payent ""ad"
Finalm
Invoice
GEC HDR) Stantec Consulting(formerly RNL) $ 2,306.66 Arlington,VA
GEC(HDR) Tanner Consulting Group $ 3,451.00 Valley Springs,CA
GEC(HDR) Aston Carter $ 8,049.60 Raleigh,INC
GEC(HDR) Thomas E.Frawley Consulting $ 24,660.00 Berwyn,PA
GEC(HDR) West Ridge Construction $ 30,155.00 Matthews,NC
GEC(HDR) Billings Jackson $ 31,765.00 New York,NY
GEC(HDR) Fire&Risk Alliance,LLC $ 33,870.00 Derwoad,MD
GEC(HDR) Gilmore Consulting $ 34,872.50 West Chester,PA
GEC(HDR) Carl Walker(Wantman Group) $ 36,855.09 Charlotte,NC
on-DBE GEC(HDR) Aerotek $ 66,643.40 Raleigh,NC
GEC(HDR) James Carpenter Design $ 86,047.50 New Vork,NV
GEC(HDR) RMF Engineering $ 148,769.35 Raleigh,NC
GEC(HDR) DRMP $ 168,325.29 Cary,NC
Su
• • . • GEC(HDR) Clarion $ 190,157.68 Chapel Hill,NC
GEC(HDR) RNL $ 473,538.57 Arlington,VA
GEC(HDR) ECS Southeast $ 522,587.45 Raleigh,NC
Consultant GEC(HDR) Maintenance Design Group $ 769,878.70 Denver,CO
General Engineering GEC(HDR) McKim&Creed $ 1,827,241.91 Wilmington,NC
(HDR) GEC(HDR) LTK $ 6,415,624.33 Ambler,PA
GEC(HDR) Jacobs Engineeering $ 7,853,044.90 Arlington,VA
Program Management Consultant PMC(HNTB) McCracken $ - Chapel Hill,NC
PMC(HNTB) Rohadfox $ 53,781.01 Atlanta,GA
PMC(HNTB) SNCLavalin 5 119,782.32 Pittsburgh,PA
PMC(HNTB) Cambridge Systematics $ 190,320.40 Medford,MA
• • • PMC(HNTB) Dewberry 5 295,497.11 Raleigh,NC
e Joint PMC(HNTB) SRBTransit $ 304,255.78 Phoenix,AZ
PMC(HNTB) Atkins $ 592,147.52 Tampa,FL
PMC(HNTB) PPS $ 1,237,928.79 Kansas City,MO
Project Development C•
L • CMC(GF/WSP1V) SEPI $ 9,391.64 Raleigh,NC
DMC(GF/WSP JV) Holt Brothers $ 14,755.75 Raleigh,NC
CMC(GF/WSP1V) Summit $ 84,760.65 Hillsborough,NC
PDC(URS/AECOM] Martin/Alexiou/Bryson $ - Raleigh,NC
PDC(URS/AECOM) Bagile Baumann&Prost(BBP) $ - Washington,D.C.
PDC(URS/AECOM) Springboard Eydo $ - Cary,NC
PDC(URS/AECOM) Infremnsult $ - Scottsdale,AZ
PDC(URS/AECOM) Shook Kelley $ 25,411.17 Charlotte,NC
PDC(URS/AECOM) Russell Corrosion Consultants $ 41,923.01 Columbia,MD
PDC(URS/AECOM) Vantage Point Development Advisors $ 180,694.28 Baltimore,MD
PDC(URS/AECOM) VHB Engineering $ 659,818.18 Raleigh,NC
PDC(URS/AECOM] Cambridge5ystematics $ 1,142,432.49 Medford,MA
PDC(URS/AECOM) Mulkey Engineering $ 1,740,835.09 Columbia,SC
PDC(URS/AECOM) SN Inc $ 2,057,245.99 New York,NY 16
PDC(URS/AECOM) SN/Ralph Whitehead Associates $ 4,016,747.55 New York,NY
Administration and Staff
In accordance with Federal Transit Administration requirements for maintaining
adequate technical capacity and capability to manage the project, GoTriangle
employed a dedicated staff team responsible for overseeing the engineering and
management consultants.
14
Administration and Staff
$16,139,172 of total expenses for the Durham-Orange Light Rail Transit Project was spent on staff,administrative support,and
the project office.
Of this total,$14,936,603 was spent on staff and administrative support.
$1,202,569 was spent on a project office.
Work completed by GoTriangle staff included work related to:
The design and engineering plans for the project.
Compliance with the FTA's New Starts program requirements.
Project coordination with local government partners.
Project real estate acquisition activities.
Land use entitlement approvals and support for local planning efforts in station areas.
Property owner communications.
Public involvement and marketing.
Financial modeling, budgeting, procurement and administration.
Legal matters related to the project, including the development and execution of project-related agreements.
Other Professional Services and Operations
$3,823,844 of total expenses was spent on other project-related professional services and
operational costs. These expenses included:
Redesign of an impacted facility at the University of North Carolina in Chapel Hill.
T.J.F.Golf(www.faziodesign.com)-Brian Courcelle was the contract signatory.
Non-profit fundraising management.
Hartsook(www.hartsook.com)-Danny Kohns was the contract signatory.
Outside legal counsel.
Parker Poe Adams&Bernstein(www.parl<erpoe.com)-Jeff Bandini was the contract signatory.
Financial services during the project development phase of work.
15
Real Estate
$6,158,465 of total expenses was spent on real estate, legal consultants, and other
property-related costs.
$4,702,888 was spent to acquire and maintain 23.71 acres for the project's Rail Operations and
Maintenance Facility.
$1,389,119 was spent on other property-related expenses including:
Appraisals
Site review
Site preparation
Relocation payments
Outreach and communications to property owners
Rail Operations and Maintenance Facility
Properties (Durham County)
• 5003 Farrington Road
• 4919 Farrington Road
• 5009 Farrington Road
• 5013 Farrington Road
• 4925 Farrington Road {�
. t
• 5015 Farrington Road
• 5103 Farrington Road
• 5017 Farrington Road
• 4825 Farrington Road
• 4815 Farrington Road
• 4817 Farrington Road s
• 4809 Farrington Road
• 4901 Farrington Road %, Pi^ - iy
x ,
Total: 23.71 Acres «+
Discus's *ion
--.=mow
■ � � f
27