HomeMy WebLinkAboutAgenda 05-24-22; 7-a - Orange County Facilities Master Planning Presentation 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 24, 2022 Action Agenda Item No. 7-a SUBJECT: Orange County Facilities Master Planning Presentation DEPARTMENT: Asset Management Services ATTACHMENT(S): INFORMATION CONTACT: 1. O'Brien Atkins Associates Proposal Travis Myren, Deputy County Manager, for Master Planning Services 919-245-2308 2. PowerPoint Presentation Steven Arndt, Asset Management Services Director, 919-245-2658 PURPOSE: To receive a presentation on the scope of services to be performed by O'Brien Atkins Associates for the development of the Orange County Facilities Master Plan, and to provide an opportunity for the Board to provide feedback regarding plan development. BACKGROUND: Orange County issued a request for qualifications (RFQ) and has selected O'Brien Atkins Associates of Durham, NC to help develop a Facilities Master Plan to guide the development of County properties and programs over the next twenty year time frame. The work will include a review of background information, related plans and programs, an inventory and condition analysis of selected facilities, a population growth assessment and program demand analysis, a related gap analysis and action plan, development of program options and recommendations, and preparation and presentation of the final Master Plan Report. FINANCIAL IMPACT: There is no financial impact associated with the presentation of the Facilities Master Plan scope of services. The O'Brien Atkins contract totaling $298,216 was previously approved by the Board at the May 3, 2022 Business meeting. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is associated with this item: • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal impacts are associated with this item: 2 • ENERGY EFFICIENCY AND WASTE REDUCTION Initiate policies and programs that: 1) conserve energy; 2) reduce resource consumption; 3) increase the use of recycled and renewable resources; and 4) minimize waste stream. • CLEAN OR AVOIDED TRANSPORTATION Implement programs that monitor and improve local and regional air quality by: 1) promoting public transportation options; 2) decreasing dependence on single-occupancy vehicles, and 3) otherwise minimizing the need for travel. • RESULTANT IMPACT ON NATURAL RESOURCES AND AIR QUALITY Assess and where possible mitigate adverse impacts created to the natural resources of the site and adjoining area. Minimize production of greenhouse gases. RECOMMENDATION(S): The Manager recommends that the Board receive the presentation on the scope of services to be provided by O'Brien Atkins in the development of the Orange County Facilities Master Plan. Attachment #1 — O'Brian Atkins Proposal OBIA UBRIEN ATKINS, April 14,ZD22 Steven A.Arndt,MBA,CFM Asset Management Services Director Orange County Government Re:Orange County Facilities Master Plan Dear Steve: #I O'Brien Atkins Associates is pleased to present this fee proposal for providing professional planning and design services for the Orange County Government Facilities Master Plan. Our proposal has been organized into the following sections: 1. Scope of Project 2, Proposed Scope of Services 3. Deliverables 4, Proposed Schedule 5. Proposed Team 6, Clarifications 7. Proposed Fees 8. Invoicing&Payments 1. Scope of Project Base Services:This Facilities Master Plan will evaluate existing Orange County buildings and property and project space needs for a 20-year planning horizon,We will Interview the Counties 38 departments and determine their space needs and use that Information to develop options for both the utilization of existing facilities and new facilities as well.We will prepare phasing plans and cost estimates. 2.Proposed Scope of Services O'Brien Atkins proposes the following scope of services to meet the intent of this project assignment. Task 1-Visioning o Facilitate a kickoff visioning session with the oversight committee and the County's leadership • Describe the County's aspirations for their growth and delivering services to the citizens of Orange County • Set goals and direction for work place strategies in County facilities Define strategic goals the Facilities Master Plan should address • Review placemaking precedents and identify development opportunities • Prioritize the County's goals and aspirations OBIA O'BRIEN ATKINS o Summary report the Counties goals for their growth Task 2 - Investigation o Tour the existing County facilities o Review existing 2021 Facilities Report o Compile list of current County leases o Prepare a base map illustrating all facility locations and summary table o Prepare a physical land analysis of the Counties properties in the Hillsborough area ■ Natural features analysis including terrain, hydrology-flood plains streams and wetlands ■ Buildable area study Task 3 -Space Needs Analysis o Department Inventory-The consultant will prepare a department survey instrument for distribution by the County's Project Manager to the department contacts. Data to be requested will include: ■ Departmental mission and function ■ Identification of space driver—staff or equipment ■ Identification of key workload/service demand indicators (i.e., population type served; number of permits,files, calls, requests for services, or other; response time;judicial case filings and detention population) j ■ Historic staff counts and workload indicators since 2012 ■ Identification of any current staff working remotely and description of in-office space needs ■ Functional space relationships and adjacencies both internally and to other departments ■ Current space allocations and unmet space needs ■ Equipment with significant impact on space needs ■ Use of automation and special communication systems ■ Data/record storage practices ■ Relationship to general public access and visitation ■ Parking needs to include public/visitor, staff, and county/state vehicle totals ■ Staff opinions on any safety, security, or health concerns ■ Staff opinions about functional space problems and deficiencies ■ Staff preference for approach to the department reception area (in- person or remote) Po!,i oiii(;r, mx 110 9 J k scorch 1'riainj le !'arl<, NC: I TAY.) 919.9/i I.`)000 I Niw�nv.ohiiewnkii1s.corn P 2 5 OBIA O'BRIEN ATKINS o Department Interviews- Following receipt and review of the survey information,the consultant will conduct in-person and/or virtual interviews with each of the 38 departments.This additional level of information will allow the consultant to: ■ Understand any planned organizational or operational changes ■ Understand the impact of COVID-19 and remote working on existing and future operations ■ Study departmental efficiencies ■ Assess existing operations in terms of function, operational mandates, related service requirements and individual facility and internal unit adjacencies to determine efficiencies via consolidation of functions, improvement of or sharing of space or the use of technology o Upon completion of all surveys and interviews,the consultant will create a department profile for each physical location.The department profiles will provide a consolidated location for each department's existing conditions,functional characteristics, issues, and any data relevant to developing Personnel and Space Needs Projections.These profiles will be used as tool throughout the master plan to identify: ■ Location or co-location issues ■ Critical adjacencies for optimum efficiency of space,consolidation and technology implementation ■ Historic growth trends and key growth factors ■ How customers access and receive services (in-person versus virtual) ■ How staff provides customer services (in-person versus virtual) o Space Standards & Benchmarking ■ Applicable industry, state, and/or local space standards will be reviewed and used as a benchmark to assess current space utilization. Attention will be given to the potential space impact of current operational and/or technological trends.The space standards will serve as a benchmark to assess current office, equipment,and parking space utilization for each department. ■ Based on public and private practice and the consultant's professional planning experience, recommended space standards for administrative office, support space, public areas and circulation, equipment and storage unit sizes,and parking will be provided. ■ For a master plan,the size of an individual office or area is not as important as the space-per-person or space-per-equipment standard. Based on the recommended net square foot space standards and the type of department (staff versus equipment driven),the consultant will recommend a space-per- unit (staff or equipment) allocation standard, expressed as department gross square foot(DGSF) per staff,for each department. 11o"i Olfice l wl 00`37 I Rwnrjrrai 11irmf,,le 11ark, IM( ( 17/09 91IMAH,90OO P13 6 OBIA O'BRIEN ATKINS o Projections Database ■ Using data obtained from the completed survey instruments and detailed interviews,the consultant will develop a projections database for the County. ■ The first database component will be to prepare a projection of future personnel requirements for each staff-driven department.The projections will quantify changes in personnel in five-year increments up to 20 years,The personnel projections will consider official County population forecasts, historic trends, and agency-specific workload factors indicative of the functions performed. For departments that are not staff-driven,the consultant will identify the impacting growth factor and project the unit need in five year increments for 20 years. ■ Using the unit projection (staff or other) and recommended department space standard (DGSF/unit),the consultant will calculate total DGSF required for each department in five-year increments for 20 years.Space projections will be at a department gross level to develop block space needs for options development. o Gap Analysis ■ The consultant will identify the gaps between existing facilities and the overall ability to meet current and future space projections.The analysis of the current state to future needs will identify the facility gaps and the opportunities for future development. Task 4-Conceptual Planning& Design o Prepare 3 planning concepts that accommodate the space needs identified ■ Phasing plans for short, mid and long-range plans ■ Refine plans in work sessions with County and select a preferred option o Real estate broker overview of existing County owned facilities ■ Broker opinion of values for the following County owned facilities identified in the RFP that have been relocated to new facilities or temporarily vacated due to unsafe building conditions(i.e., mold). o Dept of Environment&Agricultural Services o Detention Facilities o Public Defender Building o John Link Government Services Center ■ Identification of relocations sites for potential future construction and/or lease. ■ Review status of current leases o Cost analysis Pro's&Cons of owned versus leased scenarios o Potential remote work strategies ■ Conceptual design of a new County Administration facility Oi`ri(,e mx "I)w 1 I ch "I riaul;Io Perk, IMC: ( 77709 91'MM 1,9 00 w�n�w.ul��l; n�iki�irs,<,orn P14 7 OBIA O'BRIEN ATKINS o Basic programming of uses and departments o Blocking diagram of floor plans o 3D elevations Task 5 -Communications& Presentations o Work sessions with the owner's oversight committee ■ 9 work sessions-Once a month over the course of the project o Monthly reports of the teams completed work, next steps and schedule 0 3 County Commissioners meeting presentations ■ 2 progress updates ■ 1 Final presentation Task 6- Documentation o We will prepare a detailed outline of the master plan report for the team to review o We will prepare a draft of the master plan report for the County's review and comment o Executive summary o Space needs analysis o Action plan of prioritized list or recommendations o Conceptual plans o Phasing plans o Order of magnitude cost estimates o We will prepare a final digital master plan report o We will prepare 3 color renderings that highlight key facilities in the County's growth 3. Deliverables 1. Summary of visioning session 2. Summary of facilities Investigation 3. Space needs analysis 4. Conceptual design plans 5. Phasing and relocation strategies 6. Master plan document 4. Proposed Schedule We anticipate beginning the project on May 1, 2022 and completing by January 31, 2023. Once we are under contract,we will prepare a detailed schedule of milestones and task. 5. Proposed Team 11wJ 01ler, ISox 170';7 kese<)i ch I risinjj,lF Park, INC /09 919.9 ±"I_,9000 w�niw.ol,Lir;n�Iikin°a.COM � P 1 5 8 OBIA O'BRIEN ATKINS O'Brien/Atkins proposes the following team for this project: Base Services: O'Brien Atkins will provide the following Master plan services: Project Management, Space Needs, Benchmarking, Space Projections, Leasing and Disposition of Real Estate, Land Planning, Architectural Concept Design and Order of Magnitude Cost Estimating. • OBA—project lead, Land Planner and Architectural designer • CGL—Space Planner • CBRE—Real Estate Lease Evaluations • Palacio Collaborative—Order of Magnitude Cost Estimating Supplemental Team members if needed: • Terracon—Environmental/Mold,Asbestos and Indoor Air Quality 6. Clarifications • Site surveys are not included • Site and Building Environmental studies are not included • Geothermal well evaluation is not included • Traffic or Transportation analysis and planning is not included • Detailed design plans or permitting plans are not included I 7. Proposed Fees O'Brien Atkins proposes to provide the Scope of Design Services outlined in this proposal. A summary of the fee by phase is as follows: Base Services Task 1 -Visioning $19,490 Task 2-Investigation $21,450 Task 3-Space Needs Analysis $72,805 Task 4-Conceptual Planning and Design $98,170 Task 5-Communication&Presentations $39,720 Task 6-Documentation $46,580 Total Fee$298,215 The total fee is Two Hundred Ninety-Eight Thousand Two Hundred Fifteen Dollars($298,215). Direct reimbursable expenses are included in the fee named above. PwA 011 ice 13ox 110;7 I kes(:rlf d I I IianPlc Park, IOW 709 P6 9 OBIA O'BRIEN ATKINS S. Invoicing and Payments O'Brien Atkins will invoice Orange County on a monthly percent complete basis for services performed. Payments are due within thirty(30) days of receipt of invoices, Closing O'Brien Atkins appreciates the opportunity to work with Orange County and looks forward to successfully delivering this project. If the contents and terms are acceptable, please sign below and return a copy for my records—this will serve as our notice to proceed. Sincerely, OBRIENATI<INS ASSOCIATES, PA Jay .Smith, PLA,ASLA, LEED AP P xin ipaI Director of Landscape Architecture and Planning cc; I<evin G. Montgomery, FAIA, LEED AP BD+C John L.Atkins III, FAIA, LEED AP Accepted Date Prr"P t 11k,e 13o)( '1)03 ch friainvlc Park, NC 9 M.,)/11,0000 �nnni�ni.ohrir:nail<i�;i>.corn. P 7 10 ORANGE COUNTY Facilities Master Plan OBB NORTH CAROLINA BoCC Meeting 5-24-22 O'BRIENATK9NS 11 Agenda Introductions , Mme , Overview igh Managing for Success Kevin G. Montgomery Jay W. Smith FAIA,LEED AP BD+C PLA,ASLA,LEED AP Principal in Charge Project Manager Process and Approach `" a ,. Representative Projects = UA I Discussion Chloe S.Jaco Timothy Hillhouse AICP,LEED AP BD+C AIA,LEED AP OBM + CGL Principal Planner Senior Archifect t'YBRIEN ATKINS 12 OBB PM,Architecture, Site Analysis, Land Planning,Workplace Strategies CGL Projections, Demand Analysis, Benchmarking, Needs Assessment CBRE Real Estate Lease Evaluations, Property Disposition Evaluation PALACIO COLLABORATIVE Cost Estimating lFrerracon Explore with us Environmental, Indoor Air Quality, Asbestos, Mold 13 Managing 1 Solutions that meet your objectives and needs On time and in budget Maximizing communication to minimize problems Leveraging technology for efficiencies Master Plan that serves as working tool 14 Approach Overview Phase I Phase 2 Phase 3 Phase 4 Understand Define Analyze Plan Visioning Your Aspirations •f 13 ,; Q Space Drivers & Gap Analysis sis Tools & Strategic Plan Data Forms & Benchmark Scenario Workshops Interactive Roadmap Interactive Variables Process Format & Implementation Database Schedule Templates 15 Visioning Phase 1 : Understand ASPIRATIONS GUIDING PRIORITIES r. see liiii.i•..iii• -- _---_ - � � — - ' i•iii iiiiiiii - �� �c.�. _ i•i•ii ii•.i•i•ii•••i C0.EJ _ iii i•ii/i••ii• � •n a�c+a w� l ■••ii•i•• t iiia• A. - '�ile��il��s IIIIIIIIIIIM AIIIIIIIIIIIIIIIII - - kJRAL NDJ��'-S +i-�ANSPAI? wyusrylg ^; . OP.ERATIOMAL. EFFICIENCY Nceu NEW S7UDEINT_CEAfT1E Stakeholder PPhase 1 . Understand WHAT WE LEARN Identifying policy drivers Community* Understanding the stakeholders x 7w AM 0 Incorporating holistic approach • r • - -♦ 17 Information 1 Phase 1 : Understand O {'�,�'•�'y fL.�f,�8-�lE9 HE1*��f'�"A"9"4��N� �, 'E, z� Wz z ��nes � �. WHAT WE LEARN 0 7ACOCi7N .ELCOUNMfhCE84N6RPW FEErur+�sv+.ceaeouneuer+rasw�,•.srnuuo.r � `w'r..n"A'bs, 1—1 Flf\t1A��� Mw^"�Y�• � l I�WI�[I�A.Q A:IICIP�iEQ cSacE IfliMR b����ar�. Proven data gathering ` tools ~— - Understanding local c�eY+ 5 CIIRREh S A4E.QCEVPANI3 E ___- "��eyy'"�,w environment Building project database V El ------------ "� p"�' �"�' irt.cncMMar.Aub"eEtYc nc�MlfwMMwm..-- rel. iv�.v^d ~~ �+yyge pr"w we Nrr we+x�fx�+w4mcl..aW.we�+ e>.� �[]ii9Winpmtll6.� Abp psx.i of 18 Trends Phase 1 : Understand Housing Change acro-2020 w IIGm n Population Change 2010--2020 WHAT WE LEARN Incorporating projected CeW r Craw Two teas Crvr�Two UalnaoracreMd lTd%I w �. Un+ncarywr 1o.61y f } demographics k� 61wMwTw H&d%1 �T�(ILT%, • Understanding areas of UnlncorparoXd[S9k! '�I �r..'uryvab,a KM IMn.a.1�9%f XINs hTwulli•SSI uw Mwarw(1l.YAi m❑. = growth rov.ml rnuaaxT Xwf m anfu ex,f ,,,arnbr i:.s Identifying centers of I j population cn.wc XIn rTs%1 I c►p Xr ta..v� rrwl j e-U@Uwarw Wnu r u5 C.+xe nurw 19 Space Drivers Phase 2: Define ( WHAT WE LEARN COVID • Understanding driver by department L/iNc" 9 Gathering relevant data * Thinking about future Population Change Staff Space Suitability Accessibility impacts Workload Technology Equipment 1 n i n Environment a g g W roPhase 2. Define WHAT WE LEARN Understanding space trends Aligning standards to function } - Impact of • • �11111111111112008 2013 -- -� piiiiiijj 00 ` Me "Any Space" 21 Facility Conditions A Define LEGEND exiSVINGSUILDINGS ACuNwlaMw.n 7yfaror�daixPmmme NEWPR61ECT5 WHAT WE LEARN WfNOVATKKI 1.Neil A.furrkaCdnbnu gfd Cefnn Z51.1crdlamrr 13.Na[e Annee A:Re�o'rate eonMulig Ed lebr f.He rFscanies @WWinq 7_Ikeltlta Wcvter Bwldng &`Ilpnpson LWrrp fe.Early{nad E&Censav &New Wahh a Sdence eulW+np GEaRaM arvd Renerneler HVAC lees NEW @t1110e1C 3-laatrcr$�N fwaday g.INtual idfege Cerner ,,S.G{v.erd Cleu—buidleg C.Renovate Ew WeMEngd Gunsmhhing Ft Cwdererxx Eemn.Paiking 65tomweter a.ShImou&flet }d.Adraneetl seen fsraet. 16.@ufotenlndustry P.Gyml .ulen&A ftien I.Gerwrai Clacsrrurn BWhpngemaanon `STOWWATER S.Ialeyene slNl 1,,A¢ndnytAi,wt@uldrg l].ieltanand%PEd.Ceruet E.Wdisudum Rtrgvrtlpuy Addi- f.Re.wrateMxeusmess incubator Si-, e , - Condition of space Facility condition index 15 ,6 _ Build upon completed work H lr.t 40 7 a Maim Nolects , P1 Heath Technology Canter 42,500 0P7 I Horace Sisk Lynn Ft—tion and Addidpn 26,000 sf EXISTING BU1IDING P2 Renolate General Classroom Building 14,900 sf PS Facilities and Warehouse Bu.ildi ng 141,250 sf RENOVATIONS P3 I Lafayette Renoyadan&Addition 1 26,000 sf P9 Conference Center 152.000 sf F - P5 ATC Renovation 116,275 0Pi0 Cumberland HallAuddorium ger hon& "NEW BUILDING P6 I CDI Renovation 3,00D Addition 1 14,100 sf P111 C£C Renovation 13,750 s1f-'Lr M OR PROJECTS 1 1 9 S �f BUILDING ARRIVAL POINTS jJ 'r i PROPERTY UNE 'fir I 4 BUILDING PROJECTS �t "'' 4"' � - y�Afi 1 41 22 Research = ormed . Define WHAT WE LEARN` process • Creating interactive 355 - P . staff - -- . database —-- Mee S, As ease Collected s�mm� yAligning standards to Space function WNW— 410 105,1711 59,'ys 6 .5T° projected �- _ Impact on capital and i7 511 563` 5 6 075 • E�,roc��<�� General Govertment 11 34,511, 338 13.�� 1 .. ser.i«5 z '°°46° operational plan ty�nity 116,430 5 ws�R�yor°"5 Coram rnentSQtvices 16 89,496 � 125,805 .a. -. . vevelo9 68;168 ' 26,990 " ,.s`+Krxa yudicia4 10 988 21,050 54895 ro� 9, rd publitSalety 5 27.7p3 42.595 553 ' n � w tilities 4 q,553 1 Pub4ic'� ik,049 . projected pov Warks ♦ s 61.E - 3 at -Rev d' t}titerz -•t r =r ,dsrcrs a r' erAa+ Unassigneds 51 6 _ Pro sheets for each naWe space'lar a depa aron Rd. a55og 4, courthouse Aenex,and Sh - s ASF�neludes the sum s and CAS use, p,pd areas�^Co>artha x�t�r urcludesvartous starage sites tJnass,6ned includesunaccu 23 Operations iciency Phase 3: Analyze • • ' WHAT WE LEARN • Aligning facilities to function & future land use % LiAddressing =.' central/decentralized service Addressing public access A & employee health n t u �L 24 Concept Options Phase 3: Analyze DURHAM COUNTY SPACE NEEDS ANALYSIS WHAT WE LEARN Scenario One-Downtown DURHAM COUNTY SPACE NEEDS ANALYSIS Scenario Two-Downtown Space Requirements Derail DURHAM COUNTY SPACE NEEDS ANALYSIS • Identifying qualitative Scenario Three-Downtown IL� , 1 ,�DURHAM COUNTY SPACE NEEDS ANALYSIS _ and quantitative Scenario Four-Downtown - �* ti 'DURHAM COUNTY SPACE NEEDS ANALYSIS factors L as qt ME; arl�ooFive-Downtown oa�la�•+en� REN 11A �' Comparing pros and _.� cons of each TION' . 61fa Skill — aWMM6 py IONS 4 jS — • Developing cost wZ:ri J estimate ranges lacl.l a.rwr c..p�.x ,�.acmawa.y Ir"� sm,.. ca .. r�CcmlRhr _ 9 e.a.,a.,.k.. •�'•"�,4`. `ars° � .,,w„ r..�r.�a.u„n.rraam.wn,c ua wam..w+ c..u. eon IIS • f � . �.d7+1ET-.t 25 Cost Measurement Phase 4: Plan WHAT WE LEARN Facility Major Repairs& Energy&Water 29✓ Maintenance • Understanding facility Replacement (Preventative) 3.1% 2.6% life-cycle & real estate Building/ether value Protect . Operational erational Expenses fl•1% • Incorporating operational cost impacts Staff • Factoring County funding sources & opportunities 26 A Living Document Deliverable Phase 4: Plan -= WHAT WE LEARN Creating versatile master plan AKE COUNTY JUSTICE SYSTEM Detention • - Delivering interactive •a tools ` PASCO COUNTY • Providing dynamic GOVERNMENT FACILITIES MASTER PLAN roadmap to inform OBdenAtkins CHATHAnt Coin ,t { s ;G decisions Chatham County Government Complex&Park Mase Pia—ing 01Y",4ls 5=1 Ni4m 9rGh%Ld. Pan+�SIC 27TD7 ...., iscussion . ......... -A 0 -jai I f: I 7 1: � ,yy f ,- � ..�-, �. .1 ., ar v 1, y6:4✓` � k. f r�.