HomeMy WebLinkAboutAgenda - 12-09-2003-9fORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: December 9, 2003
Action Agenda
Item No.
SUBJECT: Emergency Power Sources for County Buildings
DEPARTMENT: Manager/Public Works/
Emergency Management/Purchasing
ATTACHMENT(S):
12/01/03 Public Works Director Memo re:
Existing Emergency Power Generators
12/03/03 EM Staff Memo re: Primary
Emergency Shelter Generator Capability
11/25/03 EM Staff Memo re: Alternative
Energy Source Grants Status
Emergency Power Capital Project
Ordinance
PUBLIC HEARING: (Y/N) No
INFORMATION CONTACT:
Rod Visser, 245-2300
Wilbert McAdco, 235-2625
Nick Waters, 644-3030
Pam Jones, 245-2350
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To discuss the need for and authorize staff to take certain steps towards
providing backup power capabilities at key County facilities during electrical power outages.
BACKGROUND: In recent years, Orange County has experienced a significant number of
widespread electrical power outages, generally as the result of adverse weather. Certain key
County facilities, particularly the Emergency Operations Center and related Emergency
Management Department offices, have backup generators installed that provide for a seamless
transfer of the power load and continuous operations in the event of electrical power failures..
Others can receive generator power through manual transfer switches. However, recent
experience has been that because not all Cotanty buildings have backup power sources, many
important County services came to a virtual halt under adverse weather conditions and their
immediate aftermath. In early 2003, the BOCC encouraged the Manager and staff to consider
including funding for some emergency generators in the 2003-2013 Capital Investment Plan..
The recommended CIP includes $152,000 in County pay-as-you-go (PAYG) funding to begin
the expansion of existing backup power capabilities at County facilities. Staff have prepared a
table of existing County facilities with generators in place and the degree to which those
generators are capable of powering the facilities they support. Staff have also prepared a
summary of the wiring in place at the County's two main "generator ready" shelters at Stanford
and Smith Middle Schools.
There was inadequate time during June 2003 budget work sessions to discuss all proposed
County capital projects for 2003-04, Accordingly, discussion of the need for backup generators
was scheduled far a BOCG work session on October 27, 2003, As a result of that discussion,
the Board asked the Manager to report back on his recommended priorities for providing
generators at County facilities, In order to enhance the County's ability to continue some basic
County services during power outages, the Manager recommends that at this time, the County
pursue backup power at two priority facilities: 1) the Southern Human Services Center in Chapel
Hill, and 2) the Government Services Center in Hillsborough,
Staff suggests earmarking the $152,000 in 2003-04 PAYG funds to retain the services of an
electrical engineer to design and implement wiring at these two facilities to make them
"generator ready". If needed due to adverse weather or for other prolonged electrical power
outages, generators would be leased until such time as the County accumulates sufficient
funding for outright purchases, where appropriate.
Commissioners also have asked staff to look at the possibilities of having some County facilities
taken "off the grid", so that primary (or perhaps backup) power would not be dependent on the
electrical utilities' power distribution systems. In addition to proceeding with the design and
installation of the wiring for the two priority buildings, staff recommends a parallel course of
action over the next several months of investigating the feasibility and cost of using other "off
the grid" systems to provide backup power, As noted in the accompanying memo, staff have
been investigating grant opportunities for alternative energy sources, as well as grants through
the Homeland Security program. Staff have submitted applications for some Homeland
Security grant funds, with receipt of some funds for direct Emergency Management facility
generators likely. However, formal decisions by the grantors regarding the County's
applications are probably several months off.
FINANCIAL IMPACT: As noted above, there are $152,000 in pay-as-you-go funds available for
appropriation in FY 2003-04 that would address the wiring design and installation activities for
the two priority County buildings and further investigation of "off the grid" backup power sources
far other County facilities. The accompanying Emergency Power Capital Project Ordinance
would authorize expenditure of these funds for these purposes. It is possible that additional
finds may became available later this fiscal year through federal/state grant sources. If so,
staff would bring an amended capital project ordinance back to the BOCC for consideration of
additional appropriations to further enhance the County's backup power situation,
RECOMMENDATION(S): The Manager recommends that the Board:
1. Authorize staff to retain the services of an electrical engineer to design the wiring
schematic for both the Southern Human Services Center and the Government Services
Center, so that bath buildings will be "generator ready"; and
2, Authorize staff to proceed with bidding both projects for Board award as expeditiously as
practicable; and
3. Instruct staff to conduct a process to identify a consultant(s) for the Board to consider
who would be retained to investigate the feasibility and cost of using other "off the grid"
systems to provide backup power in other County buildings; and
4. Adopt the accompanying Emergency Power Capital Project Ordinance..
DATE:
TO: John Link, Cotanty Manager
FROM: Wilbert McAdoo, Public Works Director
RE:
Generators
Orange County currently has a number of emergency power generators in place at County
buildings and facilities. Table 1 below presents a summary of each, including the capacity and
a general description of the areas and equipment served by each,
Preventive maintenance, including routine "exercising" of generators is, provided by the Motor
Pool Division of Public Works. Motor Pool staff provide additional service inspections and fuel
top-ups based on forecasts of severe weather,
Table 1
Existing Orange County Emergency Power Generators
Location .Size/Capacity Areas/Equipment Served'
Stationa Generators
Cedar Grove Fire Station 1.5 KVA Various lights and
rece tacles
Communications Tower 30 KVA All communications
equipment; small electric
heater
Efland Sewer Station 125 KVA Sewa e um s
EMS 911 Center 73,7 KVA Communication center, EOC,
various li hts throu hout
Fuel Station 30 KVA All operations
Jail 80 KVA Fire alarm, exit lights,
basement lights, telephone
equip, various outlets
throu h-out
Motor Pool Old 11 KVA Entire buildin - no HVAC
Motor Pool (New) (includes Public Works 80 KVA All operations excluding
Admin buildin coolin
Purchasing & Central Services Building 60 KVA Entire building including
HVAC, telephone equip and
PC servers
Location Size/Capacity Areas/Equipment Served:
Richard E. Whitted Numan Services Center 110 KVA Fire alarm, telephone equip,
elevator (lights & controls
only), receptacles throughout
A & B basement
Sheriff's Office 75 KVA Eve hin but NVAC
Portable Generators
Stored at Public Works 5,000 watt/ea Available for use throughout
the Count as needed
eea` .
D`
~" ',.
r,.
$~ w
t~'tG ¢a^~~`~
ORANGE COUNTY
EMEPGENCY MANAGEMENT
PO Box 8181
Hillsborough, NC 27278
F.utergency Medical Services
Firc Mursltal
Hazardous Materials'ieam
Disttster Response
9-I-1 Conuuunications
Nor'rnnl DuSirrass Hours.
919-9GS-20>0
919-644-3030
29 flour I-0~mning Foint:
919-933-2600
919-732-Si GI
l7usfuess Fned~faehine.
919-9GS-4066
24-flour' F,a,c rYfncGina.
919-967-9026
DIRECTOR
Nicl: Waters
nwatexs@co,orange.nc. us
DEPCI'll' DIRECTOR/EMS/ADMINISTRA'IION
C. ICeut McKenzie
kmckenzie@co. orange.nc. us
DEPUTY DIRECTOR/FIRE MAFSHAL
Mike 'Papp
mtapp@co. orange.nc.us
DIPU'T1' DIRECTOR/COMMUNICATIONS
GWCIl S110Wde11
gsnowden@co.orange, nc. us
EMERGENCI' MANAGEMEIVF SPECIALIST"
Epic Griffin
egriffin@co.orange.nc.us
ADM[NIS`iRATIVF. ASSIS'fAN'i
Tauuuy Comar
tcomar@co. orange, nc.us
MEMORANDUM
To: Nick Waters
Prom: Elie Griffin, Mike Tapp
Date: December 3, 200
Subject: Primary Emergency Shelter Generator Capabilities
Smith Middle School has a permanently mounted diesel powered
generator that provides power to the gymnasium, locker rooms,
auditorium, and kitchen as well as the emergency exits and egress lights..
The generator does not provide power to the chiller units for air
conditioning, however it will facilitate heating by powering one boiler
and all of the blower fans. The generator is diesel powered, 350 I{W/480
volt, three phase.. Generator power is supplied to the facility tlu`ough a
manual transfer switch.
C.W. Stanford Middle School uses a rental diesel powered generator
supplied by Gregory Poole Power Systems in Raleigh which connects to
a permanently mounted manual transfer switch. The generator powers
the manual transfer switch through a set of cables, which is part of the
generator system supplied by the rental company,. The rental generator
must provide 225 K.W/480 volt, tlnee phase power. The generator has a
small fuel tank, which requires the unit to be refueled on a daily basis
when the shelter is in operation. The generator supplies power to the
chiller units for air conditioning and the boiler for heat to the
gymnasium, locker rooms, cafeteria, the special needs area,
emergency/egress lighting.
.,,a~ ,
~~ `°° ,a
a ~ ,y r'
,.
'.~ z.,~o~~~°
ORANGE COUNTY
EMERGL•NCY MANAGEMENT
PO Box 8181
Hillsborough, NC 27278
Emergency Medics] Services
Fire Marshal
Hazardous Materials 1-e~mt
Disaster Response
9-I-1 Conununicatious
Nur~trn/Dusiuess Hounsr
919-9GS-zoso
9t9-Gd4-3030
24 Hour INnrrtirrg Point
919-933-2G00
919-732-SIGI
lSUSiness Fn.~c Mnc/tine
919-9GS-40GG
?-t -Hour £n.e ddnclune~
919-9Gi-902G
DIRECTOR
Nick Waters
nwaters@co. orange.nc, us
DEPUTI' DIRECTOR/EMS/ADMINI51-RAT[(
C. Kent McKenzie
kmckenzie@co. or ange.ne.us
DEPU7"1' DIRECT"OR/FIRE MARSFIAI
Milce Tapp
mtapp@co. orange.nc.us
DEPUTY DIRECTOR/COMMUNICA'IIONG
Gwen Snowden
gsnowden@co orange nc.us
EMERGENCI' MANAGF,MENT SPECIALIST
Eric Griffin
egriffm@co .orange .nc.us
ADMINISI-RATIVE ASSISTANT
Tanury Comar
tcomar@co . or ange. nc. u s
MEMORANDUM
To: Nick Waters
From: Eric Griffin
Date: November 25, 20.3
Subject: Alternative Energy Source Grants Status
~~
As you know, I actively research grants thl°ough public and private sources in
performance of my job duties. To date, I have found very few that fiord
altenlative energy sources.
The North Carolina State Energy Office, a division of state govenunent, is
the holding agency for federal energy grants, and is our best chance of
building alternative power source capacity. I have monitored this office for
grant announcements, and have been unable to capitalize on their Request
For Proposals to date. I plan to continue attempts to tap this funding stream
to acquire photovoltaic systems to supplement our° facilities' power needs.
Alternative energy needs have so far been unacceptable to federal Homeland
Security grant mairagers, even for generators to allow us to take our facilities
"off the grid". The existing grants which Orange County is eligible for are
limited to specific funding criteria skewed toward "f rst responder"
equipment only.. Currently, this grant constitutes the only Homeland Security
funding available to Emergency Management for capital equipment
purchases and is spread out through all the first responder agencies in the
County. I will latow of other opporttmities in the coming months as Congress
approves more deparhnental budgets.
There are a limited irumber of private grants that will find govermnental
prgjects. As you recall, most of the large grant fenders such as the Ford
Foundation and the Pew Charitable Trusts only fiord agencies with a national
scope, like the Northeast Energy Efficiency Partnerships. The grantors for
local agencies favor those which are 501 (c) 3 organizations, which is a
private non-profit designation. Govermnent is less favored since it is seen as
having "dedicated" finding streams. I have, and will, continue to research
and apply to these private grant progl-ams.
The Hazard Mitigation Grant Program funded tlu-ough the Stafford Act after
federally declared disasters will continue to be a source of grant funds.
However, they are limited to public safety uses only, Currently, the
stipulations are that only primary Emergency Operation Centers; EMS
stations, Fire Departments, and 9-1-1 cotnrnunication facilities are eligible
for permanent generators. Other facilities are eligible for "quick corrects",
which consist of limited writing and the electrical panel to connect a leased
generator to the facility.
Emergency Power
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to
Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following
capital project is hereby adopted.
Section 1.The project authorized provides funds for backup power capabilities at key
County facilities during electrical power outages. Proceeds from the
County's dedicated property tax finance this project.
Section 2.The officers of the County are hereby directed to proceed with the project
within the budget contained herein.
Section 3.The following revenue is anticipated to complete this project
'Through FY
2002-03
FY 2003-04 Through FY
2003-04
Sales Tax $0 $0
Bond Funds $0 $0
Private Placement $0 $0
Fees $0
T $0
Dedicated Pro ert Tax $0 $152,000 $152,000
TotalFundin $0 $152,000 $152,000
Section 4.The following amount is appropriated for this project:
Through FY
2002-03
FY 2003-04 Through FY
2003-04
LandBuildin $0 $0
Desi n $0 $0
Construction $0 $0
Emer enc Power Sources $0 $152,000 $152,000
Total Costs $0 $152,000 $152,000
Section 5.This ordinance supersedes all previous Emergency Generators Capital
Project Ordinances for Orange County.
Section 6.This ordinance shall be in effect until June 30, 2004.
7
Adopted this 9th day of December 2003.