Loading...
HomeMy WebLinkAbout2.16.22 OUTBoard Agenda Packet AGENDA ORANGE UNIFIED TRANSPORTATION BOARD Wednesday, February 16, 2022 OUTBoard Meeting — 6:30 pm REGISTER ON ZOOM TO GET ACCESS TO THE MEETING 72.1. Call to Order 3 —4 Approval of Minutes November 17, 2021 OUTBoard Meeting 3. Election of Chair and Vice Chair 4. Consideration of Additions or Changes to Agenda 5. Regular OUTBoard Agenda 6. Staff Report/Updates Durham-Chapel Hill-Carrboro 2050 Metropolitan Transportation Plan and Air 6.a. 5 — 14 Quality Conformity Determination Report (Nish Trivedi) Action: Receive the Update. Burlington-Graham Metropolitan Planning Organization Safety Plan and Program 6.b. 15 — 42 (Nish Trivedi) Action: Receive the Update. Orange County US-70 Multimodal Corridor Study (Nish Trivedi) 6.c. 43 — 46 Action: Receive the Update. MPO/RPO and NCDOT (Nish Trivedi) 6.d. 47 — 49 Action: Receive the Update. 7. Information Items The next OUTBoard meeting date is To Be Determined Charge of the OUTBoard (Excerpt from Section I, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. Meetings (Excerpt from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings 1. Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Public Comments / Participation Instructions There are two methods for public comment: • Written submittals by email or drop-off • Speaking during the virtual meeting Written Public Comments Members of the public are encouraged to provide written public comments by emailing comments to ntrivedi orangecountync.gov no later than 3:00 p.m. on the afternoon of the meeting. Please include in the Subject line of the email the title of the agenda item your comment. Written comments can also be dropped off at the Planning Department's offices at 131 W. Margaret Lane, 2nd floor, Hillsborough, NC during normal business hours (8:00 a.m. to 5:00 p.m. Monday through Friday). Please leave your comments in the drop-off box near the front counter and call (919) 245-2575 to notify staff that there has been a drop-off. Written comments will be scanned emailed to the OUTBoard members and staff. Verbal Public Comments Members of the public must contact Planning Department staff via email at tlove orangecountync.gov no later than 3:00 p.m. on the afternoon of the meeting and indicate they wish to speak during the meeting. When submitting the request to speak, please include the following: • The date of the meeting • The title of the agenda item you wish to speak on • Your name, address, email and phone number o The phone number must be the number you will call in from if participating by phone During the meeting, speakers will be called upon in the order in which requests to speak were received. Each speaker may speak once per agenda item and has 3 minutes to address the board. Ceding time to another speaker is not permitted. Written comments continue to be encouraged and can be sent to ntrivedi orangecountync.gov Zoom Meeting Registration Both members of the public who wish to speak at the meeting and those who wish to only view the meeting must register to receive a link to the meeting. Persons wishing to speak must register with the same name provided in the email that notified staff you wish to speak. The link to sign up for the meeting is: https://orangecountync.zoom.us/webinar/register/WN 5DiUkLQBT005k4Wj-Iso1Q If you do not have internet access, you may participate in the meeting via phone. Please call (919) 245- 2575 during regular business hours to receive information on the number to call-in to, the meeting ID, and a password. DRAFT 3 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 NOVEMBER 17,2021 4 REGULAR MEETING 5 (Due to current public health concerns, this meeting was held virtually. 6 Members of the OUTBoard, staff and public participated remotely) 7 8 MEMBERS PRESENT: : Eric Broo (Chair), At-Large Representative; Amy Cole (Vice-Chair),At-Large Representative; David 9 Laudicina, Cheeks Township Representative; Randy Marshall, Bingham Township Representative; Tony Blake, At-Large 10 Representative; Jamie Crandell, Eno Township Representative; Joshua Mayo, At-Large Representative; Tom Gray, 11 Hillsborough Township Representative;Heather McAndrew,At-Large Representative;Roy Schonberg,Chapel Hill Township 12 Representative; Michael Hughes,At-Large Representative; 13 114 5 MEMBERS ABSENT: Todd Jones,At-Large Representative; 16 STAFF PRESENT: Nish Trivedi, Transportation Planner; Tom Ten Eyck, Transportation/Land Use Planner; Tina Love, 17 Administrative Support 18 19 20 AGENDA ITEM 1: CALL TO ORDER AND DETERMINATION OF QUORUM 21 Erik Broo called the meeting to order and quorum was established 22 23 24 AGENDA ITEM 2: APPROVAL OF MINUTES 25 MOTION by Randy Marshall to approve the September 15, 2021, OUTBoard Minutes. Seconded by Tony Blake. 26 27 Dave Laudicina Yes 28 Michael Hughes Yes 29 Tony Blake Yes 30 Roy Schonberg Yes 31 Randy Marshall: Yes 32 Joshua Mayo: Yes 33 Jamie Crandell: Yes 34 Heather McAndrew Yes 35 Amy Cole: Yes 36 Erik Broo: Yes 37 VOTE: UNANIMOUS 38 (Tom Gray arrived after vote) 39 40 41 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 42 Tom Ten Eyck let the members know that Chair/Vice would be on the next meeting agenda 43 44 45 AGENDA ITEM 4: REGULAR OUTBOARD AGENDA 46 47 AGENDA ITEM 4.A: ANNUAL REPORT AND WORK PLAN 48 PRESENTER: NISH TRIVEDI 49 Nish Trivedi reviewed the report of OUTBoard activity for 2021 and work plan for 2022 50 51 Amy Cole would like to see coordination/inclusion of Rails to Trails and collaboration with power companies in creating 52 greenways added to utilize other resources. 53 54 Amy Cole would like to see the NCDOT 1-40 widening project include a pedestrian overpass as a safety solution. 55 56 Erik Broo would like to see the County find means for local match and other requirements ready when projects come. 57 1 DRAFT 4 58 Joshua Mayo would like to see the County check into the State budget for trails, including Mountains to Sea. 59 60 MOTION by Randy Marshall to approve the 2021 Annual Report and 2022 Work Plan as discussed and amended. Seconded 61 by Erik Broo. 62 63 Tony Blake Yes 64 Dave Laudicina Yes 65 Michael Hughes Yes 66 Roy Schonberg Yes 67 Randy Marshall: Yes 68 Joshua Mayo: Yes 69 Jamie Crandell: Yes 70 Heather McAndrew Yes 71 Amy Cole: Yes 72 Tom Gray Yes 73 Erik Broo: Yes 74 VOTE: UNANIMOUS 75 76 77 AGENDA ITEM 5: STAFF REPORTS/UPDATES 78 79 AGENDA ITEM 5A: MPO/RPO AND NCDOT UPDATES(NISH TRIVEDI)— 880 Nish Trivedi shared the updates in the agenda packet 82 83 AGENDA ITEM 513: TRANSIT PLAN UPDATE(TOM TEN EYCK)— 84 Tom Ten Eyck shared updates for the Transit Plan Update project. He indicated that information is available on the project 85 website, htWs://octransit2020.com/. 86 87 88 AGENDA ITEM 6: INFORMATION ITEMS 89 90 91 AGENDA ITEM 7:ADJOURNMENT 92 OUTBoard meeting was adjourned by consensus 93 94 95 Erik Broo, Chair 2 5 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Orange County Transportation Planner CC: Craig Benedict, Orange County Planning Director Tom Altieri, Comprehensive Planning Supervisor DATE: February 16, 2022 SUBJECT: Durham-Chapel Hill-Carrboro 2050 Metropolitan Transportation Plan and Air Quality Conformity Determination Report Attachment: DCHC MPO Board Highlights This memorandum is to provide an update to the Orange Unified Transportation Board (OUTBoard) on the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) 2050 Metropolitan Transportation Plan (MTP) and Air Quality Conformity Determination Report (AQ CDR). On February 9, 2022, the DCHC MPO approved the 2050 MTP and AQ CDR. This plan and report contains the roadway and transit projects, financial plan which ensuring the MTP is fiscally constrained, and policies for the MPO. All Bike/Ped projects in the MTP are included by reference to locally-adopted plan. It also includes an updated Triangle Regional Model (TRM) and the Goals, Objectives and Performance Measures for the DCHC MPO. The AQ CDR uses the highway and major transit projects from the 2050 MTP and identifies air quality regulations and planning assumptions. The version that the DCHC MPO is required to use, called the "short form," which is much simpler than previous AQ CDRs because there are no emissions modeling and threshold comparisons. The report also contains the analysis on the extent to which the plan and process meet other standards like Critical Factors and Emphasis Areas in the Planning Process. This includes Environmental Justice (EJ), Safety, Security, and Climate Change. Attached are highlights from the DCHC MPO Board presentations when the MTP and AQ CDR was released for public review, during the public hearing and subsequent final adoption. This concludes the current MTP and AQ cycle. Feel free to contact staff with any questions. ORANGE COUNTY NORTH CAROLINA DCHC MPO 2050 MTP and AQ CDR February 16 , 2021 OUTBoard 7 Highlight M PO Board 1 /12/21 Released 2050 MTP report for public comment, includes Goals/Objectives, SE Data, and TRM MPO Board 12/8 Approved 2050 MTP (i .e. , projects and financial plan) Release Air Quality Conformity Determination Report (AQ CDR) for public comment M PO Board 2/9 Adopted 2050 MTP by resolution , includes Goals/Objectives, SE Data, TRM and AQ CDR ORANGE COUNTY NORTH CAROLINA 8 Highlight Assumptions: • Add additional '/2 cent sales tax equivalent to match CAMPO's full 1 cent. Use on transit, bike/pedestrian and other non-roadway investments. • Mathematical assumption made on the financial element of the plan • Requires significant local political and legal process (e.g.. Referendum) Transit Projects (revenue equivalent to 1/2 cent sales tax) • All Durham Transit Plan Projects (funded + unfunded) • CRT extension to Hillsborough and service increase (12-8-12-8) • Add 15-minute Service to 6 additional GoDurham routes • 4 BRTs (North-South, US 15-501 , NC 147, NC 54) • Top unfunded priorities in Capel Hill Transit and Orange County • Public Transportation short range plans by 2040 ORANGE COUNTY NORTH CAROLINA 9 r Dl P-MA CHApELHILL CARREORO Transit — 2050 MTP DCHC] METROPOLITAN PLANIMOR5111.pN Transit Projects (new revenue equivalent to full 1 cent All Durham Transit Plan Projects (funded + unfunded) Changes., CRT extension to Hillsborough and service increase (12-8-12-8) [5 years earlier] Add 15-minute Service to all GoDurham routes [10 additional routes] 4 BRTs (North-South, US 15-501 , NC 147, NC 54) [$30M l mile instead of $20M l mile] All unfunded projects in Chapel Hill Transit and Orange County Public Transportation short range plans $15Mlyear for transit priority and access projects [2-3 miles / year] $15Mlyearfor additional routes, vehicles and demand-responsive service [Services identified in Preferred Option, starts in 2031 instead of 2050] [increases to $50M I year in 2041] ORANGE COUNTY NORTH CAROLINA 10 DURHAM CHAPELHILL CAIMORO Bicycle and Pedestrian IDCHC- HIMP"AN PU NJNGORGMW!AJON The level of bicycle and pedestrian ' Y p BikelPed Costs to complete local plans facility investment is based on a Length review of the MPO's local { :unit Cost TotalCast government plans. (mi) :(ft) ($millions) Sidewalk 525 $ 250 $ 693 175 miles of sidewalk per decade Shared Use 70 miles of shared use paths per decade Path/Sidepath 210 $ 500 $ 554 80 miles of protected bike lanes per decade Protected bike lane (bath sides) 240 ; $ 1,200 $ 1,521 20 miles of bicycle boulevards per decade .. ..... .. ..... ......... ... .......... .................... ................... Bicycle Boulevard 60 $ 10 $ Note: Total $ 2,771 Bicycle and pedestrian projects are usually not listed or mapped in the MTP Costs to complete local plans Report appendix will list regional routes. (because SPOT awards regional points) $292m in costs in 2045 MTP Roadwa s&Alternative Trans r-tatian I 2030 2040 2050 Total Bic cle and Pedestrian 15 140 1291 1340 5 2 771 Roadways and Alt.Transportation Balance) 101 0 s 1 102 Balance for the non-transit section of the financial plan will essentially be zero for 2040 and 2050 decade. ORANGE COUNTY NORTH CAROLINA 11 DURMAM CHAPEL HILL CF.RR60R0 Budget (Financial Plan DC H C � I ME7ROPOLITAN PLANNiNGOPGANaAJON Transit 2050 MTP 2030 2040 2050 Total Exist ingTransit(Priorto FY2013) Costs(miIlions$) Operations and Capital $ 562 $ 562 $ 562 $ 1,686 evenue(millions$) Existing Revenues(non-transit plan) $ 562 $ 562 $ 562 $ 1,686 New Transit(after FY2013) osts(m i Mons$) Operations $ 223 $ 791 $ 846 $ 1,860 Capital $ 449 $ 1,538 $ 773 $ 2,760 Total $ 672 $ 2,329 $ 1,619 $ 4,620 Budget Summary evenue(miII ions$) Total MTP in urrent and Proposed Tax $ 550 $ 1,569 $ 1,890 $ 4,009 Investment ; billions %of Total Federal (CIG) $ 166 $ 775 $ 172 $ 1,113 _Bike/Ped/TDM _ _ _ I 2.8 _._17% otal $ 716 $ 2,344 $ 2,062 $ 5,122 ---+--_.._.... Roadway I rovement m ' 2.1 12% Balance $ 44 $ 15 $ 443 $ 502 __I._� Roadway Mtce. & 5.6 330/a Transit 6.3 38% Total I 16.8 �100% ORANGE COUNTY NORTH CAROLINA 12 Air Quality Conformity Determination Report (AQ CDR) • The Air Quality Conformity Determination Report (AQ CDR) basically demonstrates that the expected pollutants from the transportation sector will not exceed established thresholds. • Our area is in attainment for all pollutants, e.g. , CO and ozone, however, a 2018 EPA court case extended the horizon year for ozone conformity requirements. • The resulting EPA guidance allows areas to demonstrate conformity without an updated regional emission analysis, using a "short form." • The AQ CDR report presents the: — Regulations and guidelines that require the report — Responsibilities of the different agencies — 2050 MTP process, socioeconomic data and travel demand modeling — Planning assumptions, e.g., fiscally-constrained MTP — Interagency consultation requirements ORANGE COUNTY Project lists from draft 2050 MTP NORTH CAROLINA 13 Air Quality Conformity Determination Report (AQ CDR) • The Air Quality Conformity Determination Report (AQ CDR) basically demonstrates that the expected pollutants from the transportation sector will not exceed established thresholds. • Our area is in attainment for all pollutants, e.g. , CO and ozone, however, a 2018 EPA court case extended the horizon year for ozone conformity requirements. • The resulting EPA guidance allows areas to demonstrate conformity without an updated regional emission analysis, using a "short form." • The AQ CDR report presents the: — Regulations and guidelines that require the report — Responsibilities of the different agencies — 2050 MTP process, socioeconomic data and travel demand modeling — Planning assumptions, e.g., fiscally-constrained MTP — Interagency consultation requirements ORANGE COUNTY Project lists from draft 2050 MTP NORTH CAROLINA 14 LFi INN .: [DICHICWHO WE ARE WHAT WE DO RESOURCES WORK WITH US =.-_ TRANSLATE What We 6o»P cq*ams&Plans-Trar.sgortccior Pans- 2050 Metropolitan Transportation 2050 Metropolitan Transportation Plan Plan Fart Size: 0 0 0 share&Bookmark IF Feedback $ Print 2045 Metropalrtan Transportatro Plan + 2040 Metropalrtan Transportation The federal government requires the DCHC MPO to update their Metropolitan Transportation Plan [MTP]at lease Plan every four years.The 2050 MTP will identify the highway,public transportation,bicycle,pedestrian and other transportation projects that the region plans to implement over the next thirty years to meet the ll goals.The MTP has to he based on the future land use plans and policies of the jurisdictions and counties in the MPO's planning area,and must be fiscally-can strained,which meads that the project costs have to be covered by the expected available revenues.As a practical matter,the MTP is important because the MPO requires that projects that are submitted to the NCDOT prioritization process for possible state or federal funding must come from the MTP, and regulations require that all federally-funded projects must he in the MTP. In addition, local governments may use the MTP to reserve or dedicate right-of-way for future highway and rail transit projects. The series of tabs on this Web page will present the process,documents and maps used to develop the 2050 MTP. The tabsJprocess will be in chronological order,starting with the goals and ending with the adopted plan. A review of the adopted 2045 MTP and the various development steps will provide a clearer understanding of the MTP. DEFICIENCIESENGAGEMENT + OPTIONALTERNATIVES + PREFERRED DCHC MPO MTPs ORANGE COUNTY NORTH CAROLINA 15 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Orange County Transportation Planner CC: Craig Benedict, Orange County Planning Director Tom Altieri, Comprehensive Planning Supervisor DATE: February 16, 2022 SUBJECT: Burlington-Graham Metropolitan Planning Organization Safety Plan Attachment: BG MPO Safety Plan Presentation by VHB Presentation This memorandum is to provide an update to the Orange Unified Transportation Board (OUTBoard) on the Burlington-Graham Metropolitan Planning Organization (BG MPO) Safety Plan. Background Effective April 14, 2016, the Federal Highway Administration (FHWA) established five highway safety performance measures in accord with regulations set forth in the Federal MAP-21 and FAST Act transportation funding bills. Each state is required to establish and meet their safety performance measures based on: 1. Number of fatalities and serious injuries 2. Rate of fatalities and serious injuries, per 100 million vehicle miles traveled (VMT); 3. Number of combined non-motorized fatalities and non-motorized serious injuries. These targets are established annually based on the calendar year and are comprised of 5- year rolling average data sets. North Carolina state targets are set in in the state's 2019 Strategic Highway Safety Plan (SHSP) (https://spatial.vhb.com/ncdotshsp/). The SHSP was developed through collaborative efforts of a diverse group of stakeholders including state, regional, and local partners (including MPOs). The state's plan is to reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050. Per federal regulations, states must approve the unique processes of any MPO if the MPO seeks to craft its own safety performance measures. The North Carolina Department of Transportation (NCDOT) has funded BG MPO's Safety Plan, and the MPO has contracted VHB consulting to craft it. This will be the first MPO Safety Plan in the State, and attached is the latest presentation given by VHB of their unique planning process. Schedule • Public Meetings in 2022 - February, May, and September • Existing Conditions Summary — February 2022 • Strategies — May 2022 • Draft Plan — August 2022 16 • Plan Completion October 2022 Please visit the website link (https://bgmpotransportationsafetyplan.com/) for more information and details of the BG MPO Safety Plan. Transportation planning staff will continue to keep OUTBoard updated on the plan's progress. Feel free to contact staff with any questions. 2 000000 BURLINGTON - GRAHAM MPO Transportation Safety Plan TCC Update December 14 , 2021 Presented by VHB A TRANSPORTATION December 2021 SAFETY PLAN 18 FAST ACT and Transportation Performance Measures Requirements What is Transportations Performance Management (TPM) • MAP-21 (2012) established the Federal framework A strategic approach that for TPM and the FAST Act (2015) codified the uses system information and t an in vestment nvesmen process and requirements for USDOT, State DOTS, to ma - policy decisions to , , , transit agencies and MPOs g achieve transportationTranspar system performance goals • MPOs TPM Rules for USDOT: — Coordinate with state DOT, transit providers in the region ❑ Establish measures; identify data sources; — Establish targets define metrics — Support national goals and consider measures and targets ❑ Report to Congress in long range plans (MTPs) ❑ Stewardship and oversight TPM Rules for States & MPOs: — Report progress to USDOT (States) ❑ Interagency coordination ❑ Establish targets ❑ Support national goals and consider measures and targets in long range plans ❑ Report progress to USDOT (States) I/,1I/lBURIINGTON-GRAHAMI•.I .i, 19 TPMSpecific Areas of FocusTPM-Related Rules Regulatory Chapter Statewide and Non-Metropolitan 23 CFR 450 & 771, Establishes goals and TPM • MAP-21 (2012) established the Federal framework Planning; Metropolitan Planning 49 CFR 613 framework ... .. .... . . .. . . for TPM and the FAST Act (2015) codified the Safety Performance Measures 23 CFR 490 Highway Safety: (PM1) (Subpart A& B) Data collection, reporting, process and requirements for USDOT, State DOTS, HighwaySafetyFmpravement' target setting and transit agencies and M POs Program 23 CFR 921 programming approach Highway As Management Plans 23 CFR 515 & 667 Highway Assets: for NHS Data collection, reporting, • M POs Pavement and Bridge Condition 23 CFR 490 target setting and — Coordinate with state DOT, transit providers in the region Measures (PM2) (Subpart A, C & D) programming approach System Performance: Establish targets Performance of the NHS, Freight, 23 CFR 490 Reporting and target setting — Support national goals and consider measures and targets and CMAQ Measures (PM3) = _(sub. A, E ,'c, H) for highway mobility, freight, in long range plans (MTPS) and emissions Transit Assets: — Report progress to USDOT (States) Transit Asset Management Rule ... ........ 9CFR:625;:630.. 1, Data collection, reporting, target setting and programming for FTA recipients BURIINGTON I/,1I/l I I•. TRANSP.i. 20 Transit Safety Performance Measures Targets • Not part of the current BGMPO Transportation Safety Plan scope FTA's Four Safety Performance Measures p Y p • Transit Agencies coordinate with FTA establishes four safety M POs performance measures in the EIA • Additional info at National Public Transportation : https://www.transit.dot.gov/PTASP-. Safety Plan TAC I . Fatalities National Public Transportation 2. Injuries Safety Plan xnuary 2uIT 3. Safety Events 4. System Reliability TRANSPORTAVON SAFETY PLAN .i, J f r Crashes Section — Safety <�- BGMPO Fatal & Serious Injury Trends (All vehicle types) Score f L 80 11 ossipee s� �„ � i sz 119 60 49 I Serious Injury .. Gr in Level 40 �_. Gibsanvi EJrto n \� ` Burlington Rik ti 7a ' 20 I 3 I Me bans Whitsett ,AFatalit Graham Y J 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Alamance Swepsonvlk � t� Green c� Level :J O L1 8oa�� � U �- � � 87 (fibs linville 0 �Haw Me6ar Elfin ti 0 0 C czkRiver 7p co" 0 0 Burlington �� p 9 C o l C Whitsett 0 0J Graham 0 000L —i � G 0 0 • c 0 00 n r •• s7 c0 �� Crash 9 0 p BGMPl7 Boundary rJ 0 0 O 0 0 Section Safety Score Frequency by �A�j C7 OTO 33 Alaman�e _— $� Swepsonville 33 TO 66 n t e rs a et i o n * Section Safely Score:this score is calculated based on crash 66 TO 100 frequencyand severity along sections of a particular roadway. Crash frequency Is compared with similar-type roadways -Less than 60%Milepasted acc..the state 22 10 Critical Intersections in MTP (2014-2018) -IN Total Crashes Fatal & Type A LIntersection 1 42018) Injury Crashes JA AL M 1 42018) 140 at University Dr (SR 1226) 180 0 US 70 S Church St at University Dr (SR 1226) 142 2 University Dr (SR 1226) at Boone Station Dr (SR 1301) 122 1 140 at NC 87 S Main St 112 1 Huffman Mill Rd (SR 1158) at Garden Rd (SR 1308) 105 0 US 70 N Church St at N/S Graham Hopedale Rd (SR 1716) 104 2 US 70 N/S Church St at NC 87 E/W Webb Ave 103 3 140 at Mebane Oaks Rd (SR 1007) 101 1 Huffman Mill Rd (SR 1158) at Forestdale Dr 94 0 US 70 S Church St at S Williamson Ave/St. Marks Church Rd 88 1 (SR 1301) Safety Performance Measures Data- BGMPO 23 • Safety targets set every FatalTiffies FatalM Serious Non (5 Year (5 Year Average) Injuries Injury Motorized year Average)• NCDOT calculates the data Average) Serious for each MPO region in NC Injuries _ Average)ar • BGMPO can sign on to 2012- 18.2 0.977 34.6 1.858 5.2 statewide targets or adopt 2016 a separate set of targets 2013- 20 1.045 44.6 2.307 7.6 • Can adopt a more 2017 aggressive schedule for 2014- 19.8 1.005 57.0 2.869 7.2 2018 crash reduction 2015- 21 1.051 74.6 3.694 9.0 • Currently not meeting the 2019 existing crash reduction 2016- 23.4 1.205 94.2 4.828 12.2 to rg ets 2020 2022 18.8 0.935 69.1 3.415 7.7 ��l��l� -- • • • Ta rget 24 Statewide Targets ICY 2021 by December 31, 2021 ) or_t,- ,'r - Catego__�% Reduce by Numbers ry Percenta • - . Fatalities -4.20%/year 1,427.2 (2015-2019 avg.) to 1,309.9 (2017-2021 avg.) � 1 Fatality Rate -4.35%/yea r .208 (2015-2019 avg.) to 1.105 (2017-2021 avg.) Serious Injuries -3.24%/year 3,905.0 (2015-2019 avg.) to 3,656.1 (2017-2021 avg.) Serious Injury Rate -3.35%/year 3.281 (2015-2019 avg.) to 3.065 (2017-2021 avg.) Non-Motorized Fatalities & -3.65%/year 543.4 (2015-2019 avg.) to 504.4 (2017-2021 avg.) Serious InjuriesSAFETY PLAN • • • .i. 25 Safety Performance Measures Data- BGMPO BGMPO Fatal & Serious Injury BGMPO Fatal & Serious Injury Rate 100 Trends Trends 5 90 4.5 80 Serious 4 70 Injury 3.5 Serious 60 3 Injury 50 2.5 40 Fatality 2 30 1.5 20 Fatalit Non-Motorized 1 10 0.5 0 0 2012-2016 2013-2017 2014-2018 2015-2019 2016-2020 2022 Target 2012-2016 2013-2017 2014-2018 2015-2019 2016-2020 2022 Target BURIINGTON I1,1I/1 I I•. TRANSP.i. 26 BGMPO Safety Targets Adoption • Usually in late fall, every year • CY 2021 targets adoption example below NOW THEREFORE, BE IT RESOLVED, that the BGMPO agrees to plan and program projects that contribute toward the accompIishment of the State's targets as noted below for each of the aforementioned performance measures: North Carolina Calendar Year 2021 Safety Performance Targets Performance Measures CY2021 Number of Fatalities 1,309.9 Rate of Fatalities 1.105 Number of Serious Injuries 3,656.1 Rate of Serious Injuries 3.065 Number of Non-Motorized Fatalities & Serious Injuries 504.4 Now therefore, be it further resoled, that by approval of this resolution, an amendment is hereby made to the 2045 MTP adopted on June 16, 2020 by the Burlington — Graham MPO. Date: By: TAC Chair I/,1I/lBURIINGTONI I•. TRANSP.i. 27 How are Safety Improvements Funded ? • Programming in the STIP through the SPOT (STI) Prioritization w • HSIP Safety funding category • Locally-funded transportation improvements • Routine maintenance for small improvements (restriping) • High Impact Low-Cost projects (Division- led selection) Image courtesy of the Times- News.com • Intersection/modernization improvements and pedestrian improvements can lead to crash reductions I/,1I/lBURIINGTON-GRAHAMI•.I .i. 0 OO BGMPO Transportation 0 Safety Plan Process ono and Key Tasks 0 29 Transportation Safety Planning and Vision Zero Eval�at� krtin! THE ■ P DEVELOPMENT �rlarl��e and PROCESS Durham Greenshora naorporate Raleigh Chapel Hiil Slat les aPe% Greenville � Mooresville YYY"`��� I #� EstablishGharlatte #ra# iesLeadership Robeson Ca. Wilmington EmphasisSafety Areas BURLINGTON-GRAHAM MPO /l�OrO TRANSPORTATION SAFETY PLAN 30 Safe System Approach ,,RIoUs INJURY IS UN,gCCFprq@ G�P� tiG Safe Road Safe Users Vehicles THE SAFESYSTEM 2U CSAPPROACH Post-Crash Safe • 1 W Care Speeds • Death/serious injury Humans make Humans are °9�� -Roads is unacceptable mistakes vulnerable RFSJ'oNSIBILITY IS S"ARSQ /000� r"",+* 0-00 Responsibility is Safety is proactive Redundancy shared is crucial Source: FHWA I/,1I/lBURIINGTONI I•. TRANSP.i. 31 BGMPO Transportation Safety Plan • Data - Driven Safety Planning Process — Identify Stakeholders and Public Outreach _ THE LRSP — Collect and Analyze Data DEVELOPMENT y PROCESS — Select Goals ' " - - Identify Focus Areas 0 — Determine Strategies Identify Establish rategies A Leadership — Develop Plan Document C 0 Determine Analyze Emphasis Safety Data Areas TRANSPORTAVON SAFETY PLAN .i, Project 2021 2022 Project Initiation CompletUn Kick-off and Initial Data •�• Gathering — Website Aawf Launch BURLINGTON - GRAHAM MPO Develop vision, _ •••• TRANSPORTATION and • ,•., • objectiveso � SAFETY PLAN Existing Milos Conditions Summary �`� • List of Crash Strategies, Reduction Projects Strategyand Legend Programs ---- ------ ------ -- --- ----- -- --- --- ------ -- -- ----- • • TCC and TAC Meeting Q r wi- �•7 jTransportation �1 Safety Subcommittee Meeting raft TSP 000 • Safety Plan � r� Public Engagement Meetings FinTransportation ` Online Survey =� Safety Plan Presentation Final TSP _ 46. 33 Schedule • Website - December 17, 2021 • Safety Subcommittee Meetings in 2022 - January, March, May, July, September • Public Meetings in 2022 - February, May, September • Existing Conditions Summary — February 2022 • Strategies — May 2022 • Draft Plan — August 2022 • Plan Completion October 2022 TRANSPORTAVON SAFETY PLAN .i, 34 TCC and TAC Expectations • Help share public engagement materials and links through your local lists/municipal websites and social media • Provide feedback regarding transportation safety concerns and opportunities • Review and adopt the Transportation Safety Plan 0 0 Publ Eggicnaement CIS O Recommendations n and Opportunities oo 0 36 Public Engagement Opportunities Discussion • Development of Public Engagement Approach — Pop-up outreach at festivals and public events — Key stakeholder groups — Equity-focused groups — Website (BGMPOTransportationSafetyPlan.com) • Press Release Development and Distribution — December 17, 2021 , along with website — New media groups — Active news sources • Three Public Meetings TRANSPORTAVON SAFETY PLAN .i, 0 0 Transportation O Safety Plan Vision n and Goals oo 0 �� ✓, , 38 MTP Vision Example - Vision _ Vim:, "`. L ' '`� � � Getting There 2045 will support � �� investment in a multimodal transportation ' I network for a vibrant and prosperous _ Burlington-Graham region, where: _ - - Residents of all ages have access to opportunities and a good quality of L life - - - Businesses can grow and thrive F — Natural and cultural resources of the region are protected = -- 39 Safety Plan Vision and Goals-Greensboro Example • The goal of Vision Zero Greensboro is to make transportation safety a top priority. Stakeholder collaboration and community engagement will be key to moving towards zero fatal and serious injury crashes by 2040 • Greensboro objectives — Prevent crashes resulting in fatalities and serious injuries — Promote a safety systems approach to transportation in Greensboro — Engage partners and the public to foster a culture of safety TRANSPORTAVON SAFETY PLAN .i, 40 Brainstorming: Vision and Goals • What is an appropriate goal for the BGMPO plan? • Aspirational and interim goals? • How should the region balance future development with safety goals? 41 Next Steps • Collect relevant background documentation / crash data • Develop list of stakeholders • Schedule Meeting #2 with Safety Subcommittee and TCC/TAC meetings in January • Finalize Public Engagement Plan • Website to go live and press release December 17, 2021 TRANSPORTAVON SAFETY PLAN .i, 42 Any Additional Questions or Comments? Wannetta Mallette BGMPO Administrator (336) 513-5418 wmallette@burlingtonnc.gov • Eric Tang Lyuba Zuyeva VHB Consultant team VHB Consultant team etana@vhb.com (704) 960-8991 Izuyeva@vhb.com 43 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Orange County Transportation Planner CC: Craig Benedict, Orange County Planning Director Tom Altieri, Comprehensive Planning Supervisor DATE: February 16, 2022 SUBJECT: Orange County US-70 Multimodal Corridor Study Attachment: Orange County US-70 West Multimodal Corridor Map This memorandum is to provide information to the Orange Unified Transportation Board (OUTBoard) on the upcoming US-70 Multimodal Corridor Study in Alamance and Orange County. Background The US-70 regional corridor continues to experience significant residential and employment growth; the population of Mebane has doubled in the last decade, and Mebane, Orange County and Hillsborough have already approved several thousand new residential units— scheduled for completion in the next few years—that will have an impact on the corridor. In addition, low-income and minority populations are concentrated along various segments of the corridor, particularly between Hillsborough and Mebane. The US 70 Multimodal Corridor Study will create a much-needed transportation plan for a fast growth corridor, and will ensure a unified, coherent process for the two counties, two municipalities and two MPOs that have planning authority in the area. Study Area: NC 119 By-Pass in Alamance County to US 751 in eastern Orange County (see attached map). Scope Elements • Coordination with Core Technical Team (CTT) o One staff member each from Mebane, Hillsborough, Orange County, DCHC MPO, BG MPO, and NCDOT Division 7. o Meets monthly throughout the duration of the study. • Existing Conditions Analysis o Land use, Triangle Regional Model (TRM), local priorities, environmental, all modes, current and future trends, etc. o Alternatives evaluation (no build, context sensitive solution, ultimate vision) o All currently adopted local and regional plan, program, studies, etc. o Including those during the study (e.g. Orange County Transit Plan) • Public Engagement and Environmental Justice (EJ) o Public Engagement Plan with comprehensive list of stakeholders o Reaching out to EJ communities of concern along the corridor 44 o 2 round of public workshops in Mebane, Hillsborough and Orange County • Performance Standards and Implementation Strategies o The performance standards will serve as benchmarks against which requests for development and transportation improvements can be measured. o The strategies will consist of recommendations along the various segments of the corridor. o Identify short-term (non-STIP), mid-term and long-term projects with cross- sections, lighting and landscaping • Draft and Final Plan o Incorporate into CTP, MTP, SPOT, STIP o Local and regional implementation responsibilities. o Consultant will present final plan to local boards and MPOs for their consideration, with assistance from local staff Schedule: • Start— February/March 2022 • End — Fall/Winter 2023 VHB has been selected as the consultant for the US-70 Multimodal Corridor Study. Orange County Transportation planning staff will continue to keep the OUTBoard apprised of these processes. Feel free to contact staff with any questions. 2 45 Attachment 1 US-70 West Multimodal Corridor Alamance ` County f J o ge { C un _ NC-8S I4 i I Durham NC-119 Bypass '', r County Intersection Location M p Mebane US-70 ...r is ,a4Hoa, - �6 - _r ^� H17 oro.ugIn r 1-85 — Durham 1-40 NC fT51 Intersection Crashes # Fatal 11 Legend Serious Injury 15 I♦US TC Crashes M25 Highway ' Regional Freight Plan severity -M35 Highway Minor Injury 165 Route C i N 1 inch-1.1 miles lass - Fatal 2096 Highway g 0315 055 ,., i+ Total All Types 1772 -S4rtegic FreightCaniEor . Serious Injury-2025 Transd -Truck R.O.s -2135Transd Orange County Planning andlnspedions _ Source:NCDOT and DMV Minar Injury 2046 Transd Nishith Tdyera(11/21 2 02 0) Dates:1/1/2009-17131/21 46 Technical Committee 1/26/2022 Item 14 47 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2022 FY2024 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough 46395.3.1 SS-6007V Intersection improvements(all-way stop)on SR 1567 7/14/2021 6/30/2022 $90,000 All routes completed 11/17/21. Pending Dawn McPherson 49706.3.1 (Pleasant Green Road)at SR 1569 (Cole Mill Road);on SR final inspection by Regional Traffic 1548(Schley Road)at SR 1538(New Sharon Church Road); Engineer. on SR 1507(Wilkerson Road)at SR 1545(Sawmill Road); and on SR 1114 (Buckhorn Road)at SR 1120(Mt. Willing Road). SS-6007R Traffic signal revisions and high visibility crosswalk Dec. 2022 11/18/2022 $12,600 Pavement markings completed by NCDOT Dawn McPherson 49557.1.1 installation on SR 1010 (East Franklin Street)at Henderson Apr. 2023 on 11/18/21. Town of Chapel Hill 49557.3.1 Street. Outside WB through lanes on Franklin Street at implemented timing changes. Pending Henderson Street will be modified for temporary Covid final inspection by Regional Traffic accommodations, and will be restored to existing multi-lane Engineer. pattern by May 2022 to coincide with adjacent resurfacing project. SS-6007AD Convert intersection from two way stop to all way stop at the Apr. 2022 Sep. 2022 $28,000 Planning and design activities underway Dawn McPherson 49823.1.1 intersection of SR 1710(Old NC 10)and SR 1712 (University 49823.3.1 Station Road)west of Durham SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of 47936.2.1 Hillsborough. Improvements consist of wedging pavement 47936.3.1 and grading shoulders. 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski 45910.1.1 (Buckhorn Road)to West of SR 1006 (Orange Grove Road) 45910.3.1 1-5967 Interchange improvements at 1-85 and SR 1009(South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton 45917.1.1 Churton Street)in Hillsborough Design activities underway, Coordinate 45917.2.1 with 1-0305 and U-5845 45917.3.1 Page 1 DCHCMPO Dec.2021 Technical Committee 1/26/2022 Item 14 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 FY2029 $11,156,000 PE funding approved 10/10/17, Coordinate Chad Reimakoski 45911.1.1 (Orange Grove Road)to Durham County line with 1-5967, 1-5984 and 1-0305 45911.3.1 R-5821A Construct operational improvements including 6/20/2028 FY2031 $7,000,000 PE funding approved 10/10/17, design Rob Weisz 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor 47093.3.2 Road). Study U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 7/18/2028 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton 50235.1.1 40 to Eno River in Hillsborough and Design activities underway, 50235.2.1 Coordinate with 1-5967 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton 47530.1.1 Hillsborough and Design activities underway, 47530.2.1 Coordinate with 1-0305 and 1-5959 47530.3.1 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton 34142.1.2 in Orange Co. to west of SR 1400 (Sparger Road)in Orange design activities underway, Project 34142.2.2 Co. reinstated per 2020-2029 STIP (funded 34142.3.2 project)and delete project 1-5983 Page 2 DCHCMPO Dec.2021 Technical Committee 112612022 It—14 49 North Carolina Department of Transportation 12/7/2021 Active Projects Under Construction -Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE S T WOOTEN Nordan,PE, $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 6/12/2022 100 73.12 COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 CORPORATION James M C204078 B-4962 REPLACE BRIDGE#46 OVER ENO RIVER ON US-70 BYPASS. CONTI ENTERPRISES, Howell,Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 84.31 98 INC C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Cvijetic,PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 9/1/2025 3.89 3.89 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Bojan US-15/501. CORPORATION DG00462 REHAB.BRIDGES 264,288,260,5431N GUILFORD COUNTY AND ELITE INDUSTRIAL Snell,PE,William $967,383.15 8/1/2019 1/1/2020 9/13/2021 2/14/2022 61.1 43.07 BRIDGE 031 IN ORANGE COUNTY PAINTING INC H DG00483 RESURFACE SR 1010(MAIN STREET/FRANKLIN STREET)FROM SR CAROLINA SUNROCK Howell,Bobby J $845,631.59 5/18/2019 8/7/2020 1005(JONES FERRY ROAD)TO NC 86(COLUMBIA STREET) LLC DG00484 AST RETREATMENT OF 3 SECONDARY ROADS IN DURHAM WHITEHURST PAVING Howell,Bobby J $339,150.43 4/1/2021 10/30/2021 9/7/2021 12/31/2021 100 99.98 COUNTY AND VARIOUS ROUTES IN ORANGE COUNTY CO.,INC DG00485 U-5846 SR 1772(GREENSBORO STREET)AT SR 1780(ESTES DRIVE), FSC II LLC DBA FRED Howell,Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 96 99.96 CONSTRUCT ROUNDABOUT SMITH COMPANY DG00504 RESURFACING OF 1 SECTION OF SECONDARY ROAD IN DURHAM FSC 11 LLC DBA FRED Howell,Bobby J $2,203,659.65 7/1/2021 11/1/2021 7/22/2021 12/31/2021 99.99 99.95 COUNTY AND 24 SECTIONS OF SECONDARY ROADS IN ORANGE SMITH COMPANY COUNTY DG00510 AST RETREATMENT ON 26 SECONDARY ROADS IN ORANGE WHITEHURST PAVING Howell,Bobby J $900,585.16 7/1/2021 6/30/2022 7/29/2021 12/31/2021 99 99.5 COUNTY CO.,INC DG00527 HS-2007C PLACEMENT OF THERMOPLASTIC PAVEMENT MARKING LINES ON TMI SERVICES INC. Cvijetic,PE, $1,358,289.72 8/16/2021 12/31/2022 VARIOUS SECONDARY ROADS THROUGHOUT THE DIVISION Bojan Page 1 of 1