HomeMy WebLinkAboutAgenda - 01-28-2002 - 3ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 28, 2002
Action Agenda
Item No. 3
SUBJECT: County Supported Facilty Needs
DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N)
N
Services
ATTACHMENT(S):
#1 9-4-01 agenda abstract establishing
planning process for the Justice
Facility Expansion
#2 Minutes for 94-01 meeting INFORMATION CONTACT:
#3 County Space Needs Report Pam Jones (919) 245-2652
Executive Summary
#4 Northern Human Services Center TELEPHONE NUMBERS:
Task Farce Report Hillsborough 7324181
#5 Community College Task Forces Chapel Hill 968-4501
Report Durham 688-7331
#610-11-01 Joint meeting w/Durham Mebane 336-227.2031
Tech meeting notes
PURPOSE: To receive information and provide feedback for the following facility related
issues'.
• Justice Facility Expansion (See attachments #1 and #2)
• Projects included in the Preliminary County Space Needs Task Force Report (See
attachment 43)
including Senior Centers
• Including Northern Human Services Center (sea attachmerH#4)
Durham Technical Community College Satellite Campus Development (saa
attachments #5 and #8) ; and
• Homestead Road Campus at the Southern Human Services Center
BACKGROUND: The January 28, 2002 discussion regarding Gounty facility needs will provide
the opportunity to view all of the aforementioned projects in the context of overall County needs
and obligations for the next several years and will hopefully provide the Scam with relevant
information by which to make facility related decisions.
With the exception of the Homestead Road Campus, the Board has at one time or another
during the past several months receivetl information and/or discussed each of these facility
development needs. The brief presentations that will be provided by staff during the work
session are designed to accomplish the fallowing.
• Provide a brief synopsis of the projects;
• Cite where the previous discussions left off;
Identity any decisionslmodifications that have been mad
discussion;
• Explore options that may exist to satisfy the need
Identify funding options that may be available for the pro
• Cite imminent decision points and the preferred timetabh
Background information from previous presentations has be
abstract M enhance Boakleteff collective recollections in or
It may be helpful for the Board to be aware of imminent bad
order to move some of the more time sensitive projects to tf
the extent practicable, these have been listed below It is in
points are listed for the Boom s information, rather than as e
outcome.
Justice Facilities Expansion
• Select desired design approach. Note that an overview
Master Plan based on preliminary information from Free
provided to the Board during this work session. Howeve
presented by the architect during an upcoming Comm itz
Board may choose to select the preferred design appros
Space Study Projects
• Confirm space study pnonlization of projects, or modify I
that staff may incorporate them into the upcoming CIP it
Board wishes,
Community Satellite campus in Orange County
• Establish and begin process to site the facility
• Determine preferred funding method for the State match
FINANCIAL IMPACT'. There are significant capital (and in me
impacts associated with the projects to b r discussed during th
will be addressed through an overall bond and alternative fii
the Boards information at the December 11, 2001 BOCC r
financing these projects will be laid out in detail in the 2002
CIP, to be presented, reviewed modified, and ultimately ap
period March - June 2002.
RECOMMENDATION: The Manager recommends that the
provide appropriate feedback and direction to staff.
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
'Meeting OW: 8aptembsr4.2001
Aclan Aga
Natn Na. 4-h
SUBJECT. Hlg Judldal FadNas nalon Mann' Proceae
DEPARTMENT: PumhaWq snot Central
Services PUBICHEARING: (YIN)
ATTACHMENT(S): MFORMATION CONTACT:
Pan Jones (919) 246-2862
TELEPHONE NUMBERS:
HRbbmou6h 731-0181
ChepN HIS was isi i
DuNwn 888.7381
NeWne 3861172831
PURPOSE: To mnalder approving a planning prooeM to be wed In Sea DeelgNmrebudbnof
the Juetlce FaPRees E1Panlen Project.
BACKGROUND:
(hg3a l Justice Peclhke Study
In 19%, SN Orange County mad dCOmnYasbrwrs appobtlad a gawp W aWdy the lonpbmi
needs djusdee bduee. br OMrgs S Z ouip bid rumuons vdhb tywere
repneerrbtl h the Juetloe FadNce Burry OmuP. The results results of bear eRwft ane wale refMdsd in a
sport puMNhetl In July 19Be.
The voope dtn.lmp4enn nestle ae lEadRe0 by the Group was adendva. The COUdys
abl ty b undeNalm expansion of this magnibds was Intletl. To UW and. mmponenb
eadlbDnp the penitent a ax!"IN mneiderad separately am Na PrMede emu b Mess
needs in8NN6.
• The Jell Espardon pr*d DOmdetetl N arrly l9BS added 56 We to ft totaling 71.
ONreby taking the Wad capacity in 8aje8 to 128. Although capacity of ft Jail v;
InWpuab bT Iha lor1ti4enn. o0ope edon batmen Sa Sheriffs Deparbnenl oral lNces hav
saved to m6wnhe cverorowdug. The Faderal Marshal mnenues b use tlN Drags COaNy
Jal as a maps depot M pdsonem.
• The adtlieon of is Gordon Berne Courhoom In satly 1988 efbwed the heaWa volume
dehld Cwrt b uSOe 61a lags mumaan on me mefn IlpOfae Xs DrimTry muN locallon. A
9N fladbely Ne ulbRvabuewu mowasagmedbem ngeMjud9r,baeby
Rua" a more efficient use pamm deb mudroomc.
A second 01000 of Judidd Moats aM County staff wam wrwenad Idvin 1808 to evalusb
me breed d8rew W eapenebns. Although dam; rAerpes may nevi rageW be need Tp
further expansion her up to • doted., ins 91011) apmed that the kegamm need adB edsb and
theta ga•ctlw approach m dwveldpnant me ar*W.
Hpaomwh hieing FaeeMae •m v14etw Pmn
in 1g9B, pe Couny cmmmWNMre mmmhabnetl FneMnso-whae Ardd[ecl•, Chadodato
produces sheplandrtraflectad SrotoWbukkWw bigyof theafe. Therwultsof Bde
report presented In April 2000, outlined two options, am of which wad allow appmdmalay
96,000 additional square feat of balding (Option A), the other a0Woximately 705.800 mutes
head (Option S). It Is Important to ran Bud Be study donned Me smba of Mar master Plan sae to
be only Me arse bowmen the Govern ment Services Cant•rb the east ma Courthouse b the
wwt,Maq•ret Lane to the wth and Be edge arms adding pmdng lot title south. Each
option
gause ba construction, while Option B dsvMOp•d 0 8 bvN Irmenardirg paramq smw0un
e aaup
M the mimrtlmde location of to existing Sher $13mmmeM.
Atths requM of eCcunty Commlaeiaem.tie Meader Pan wee elm prsuentetl mtie Town
of HBmorough Commissioners M June 2000. Concerns retied by both Boards were ekrtlhr,
examples of which Include the hollowing:
• Pw"summrwywowadmm:
• Conamaboutbse pdevloa Bpm Mmparad LeMMb River Park;wd
• Scale of the proposed batidingi; In Motion to de existing mucters; and
• Famers Me"lotatlen.
In an enat b MMar Clardy the challenges associated with dimbprMnf of a must facility on
Margaret Lens, aka Commhebrers, M Judges and Comedy sWf met with mpresentapvea hom
the Town of HAlsbarough, as HbroBCAIIdMe, VmTwdamBUW and local citizenry. Me
drone to paMrat aneensuelMt tlanbpmsM can moron dma ell., den b egNficaat aMarn
dot a un does
community as w rW a as rennerthat the mauling amracae •ehog•I Impacts. Three hi?ncel concerns concerns s will will t be released selection eM
the orders used In the eeimeclbn of fd design n Mr Imim.
Pl
Proeved Emgneorr tith Maeiar Ran
SMce tM mmpletbn mf robeMasnf Plan, pia Bomtl nee mown d reeommendetlons regarding
hours devabpmmil of County Oovemment butldlrgs In the Immediate vidniy. Sewhal lawn
wars rebetl dung thoes dlumesluns. including the Potential that a p•mnp deck amid be
Grated closer so the Gowmmmit Ssnhm Lamm rather duct being bunt as pad of Me
CoudMuse Project. RepaMbes of Whether Mad should be the crosv It is a forgone conlcANlmm
that the design Morro for both nagess will M none effective Bthe rneeds me considered N
tandem For example:
• Thebdlhbewillfi eelmilargerkignowle;
• Pedestrian and Vehicular r9mllatlon from one site u the rarer should M anadered;
• Shod Me Board chooser to site a Facers Market on this ens, m olelld be abed whir
coneldersmns of batlr facllltlw In mind.
Bensuea of the dose Interaction of the two potential e•imnsions In the Oowntowd Htibbaough
sea, it to recommended that the amps of work for architectural services for the Courthouse
design be amended b lmagreh all County land that Iles:
• Smshof MagaWLens
• EwtorChumbn Stead
• Weal afCartrmn Street
• NeM alias Erro Wirer
upon Dow confirmation, the "owing assumptions ragcodkg the use of the and would be
rJtetl to be architect:
• The area dad w presently; Over Park Irk wood ram" dedicated m pawopart slow, each
wo mnely minbw, zany anomsohmend by pacdnp.
• The coed that b presently liym Park cook he utRlvd far part or all of a Famreys MaMwt
Facility, Mthe final design indicated that to W the optimal kcddbn.
• The Waking N Which me Shams oapsrmsnt Is located should be teB intact a et ed Possible.
(Thou court Campus madder Plan racemmrlda as removed)
s The Dccenaechi Indian WINDS remains es Is.
• A muldlevet prldpg cook remains W acceptable $Wft W providing edadueae peddrg m
the am.
The revised madder plan would be presented to th Board for approval batons comrsnoresm
of to actual deslpn process; fay the CourlhOob.
Should this Board so direct, the firm dare pmACad the Court Camps Metier Plan could be
wnteped regarding"abddy for the rgtanded plan and a comma for won presented to She
Board for ransldnratim in the nor future.
proposed Parmlim
Following ds assumed of dr pmposed expanded aa• master plan, the Juadw FaoBies
Fgrsbn P44 as endorsed by the Carry commissioners should nave farwW. The
process Hod below Is recommended In order to Imamreid be kdereate of van"
askehcWmatcoappmpn Wi thmughoAd ptannbgpm . Thekddhvldusls Austad
am ranOl;lrrlerdded besad on S scass; dAereeL spedfiCam ofexrycotlceantis;prw.bue
srvnNarrrrnt k the pmcese. Thhe e pmcesa hes b0M compartmoMelkad hdothe fdilpwkp
aapmente:
• SNarr dOeddte Flan
• Programming: Interior
• Programming: Ekerbr CnrJUdes RNer Prkam)
Sol wMe daMn Flan
Soucopepsofoak App6 m whgapfi hemponddb folow'vg:
• Appavinp thaeoi atWiawhr•bY Proposal moflmrwiAbeavebluthe oW: • shvftlod o Rriuesbfer submitted by various
flms and reetlrpe
In the that am bass ft meat the Project wm lade;
m*
• Room wftlnp the finespWlaoWced mtlnshort Get (pcowaly nomomtlnarn alah
Recpnrcending du pradsnad desyhn firmmr BOaN of Cammisabncooonlderatlm.
Remmmerdetl appointees:
• Marls Sheridan. Town of Hstebaeugh Commbskn•rand Tourism Board member
• Susan FraMrrtaag. A pane; fr Houck HDsbrough
• Cahoon Tumco, Audience W Htetrk HSebomugh
• Todd DWnsom Historic Preservation Achitact
• 2 County Crnmlasionera
• 3henR Lilly Pendergrass
• Join Link, Count' Mamga
• watl• Barber, Supator COUrt Judge .
• Jae Burknen Chan Dleaet Own Judge
• Jambmulkrd,Gerkdaw" -
• Pam Janel, Orange County Director or Purchasing and Central SeIVIONS
Devi Shod, Orange County Diksom aEmikonment and Resource Comervebcn
Deparhnem
prowaramminm
Suape oFtrort This task group "I W POSPOM ING Wwaking will Use aesignerm design a
buudhg get macro gut cemrnunhy nomeme about the aplearancD of the bugdirg wed the
nearcencemaaa accessional mela?inThb WldkG he Pe& rk Thea Innsloaokkpmgron
raga101Dg Rim Pont and tlw functional melding atlie bultlYgwfth M the Pup's
raminmmaegana real be bmupM fanvero fw COUny Commbabmr caneltleretla?.
Recommended Appointees:
• Maur Sheridan, Town Commissioner and Tourism Roam member
• Margaret Haum, Town of Hllebomough Planning Diiremor
• Susan Frankenburg, Alllenm for Historic Hiabomugh
• Todd Dlcitlmao, Historic Preservation Aadfted
• Cahlaln Turner, ANance fa Meant Hibborough
• Ndmanwhks,Laaecepe Arohnea
• David Stencil, or designees
2 Courts Commleebnen _
Judge wade Berber
• Judge Joe Suaanar
• Jamb&entord, Clerk of Court
• ShadB Lindy Pendergrass
• Cad Fox, OMd Agormy
• Jam Link, County Manager
• Penn Jones
Further, in orderb ensure ans Involvement of all aakahohNn, b artWe be salefted athe
eiprpplese are In its aaarordecgn Proms nom soups rapraasntlnp tlut intaeea ands
OoosnaeohllndMn Wbgeend gw Fanutre Matket,emorng alron.
ringwrining.
Soopea a"gmjacdongu" deRae In the masterplan Imuded
eWMftatey 30,000sbuaefeetaepx maoemmnedaeaM.etgrefollowingfundlom:
• Nett entrances for pudlo and stepwM, but pudic entrance designee to be a secure
entrance;
• Omceetorme ShMRs Departrma;
• OIIlcea forme Clark aCounto rabcela from bleed spesa
Expansion forluaciel Mnetbns presently located N the building.
Appoinkles wahin fhh category WHO work with the design team to amount g1a Ue mnClona
needsolme pmpwedocoupent departmn s are met. The task gmuD'a wcaanendatbnswill
Commlwbnw rnwderetbn.
be brought beam for County
Rscommsrded Appdnlses:
• Judge Weds Surber
• Judge Jos Bunions
• Jamfe Shinano, CMk of COUd
• Col Foy DM* Abw&y
• Shako Liddy Pandergress
• 2 Cwnty CommMabrem
• John Llnk County Manager
• Pmn JOnw
Input hmn oUw Musing usam, such no the Publa Defender, Pmba lonFaMe, to 155 Bar
Aeacc aEon, ale WAN M engaged at sppropdda does dwelt sn design process es and.
Upon Board approval of to prooes%the Rapine[ for Proposal 0-r soothed sebdbn Will be
inspmdand sd[dW enuary F? a remnmmdetion got gas WI mm*m
of
anflolinabod by to and FHANCIALgdPACT: The lndkalegadof eppmalofClM msWrbw falows:
Codofn cdmforbulMing yMeeMnsMda$Omlllm. TMacodWduldbsfadad
through dMmaNro funding mochnMma such as Cekfleeles of PMgelindan (CCPs) or a
private placomeM Idea.
• Algnugh design mnddersdom fir Rim Park Will to Included In she scope of this work. my
reommondefone refunding the scud dswbpmsm%wM be considered an a sapeMhi
andli m.
• Cod of design for the WOM only In wWnsled of 10-12% of consbudon cook or
yeemln thCepbllnvadnanb Plm Theme
(CClPP). gs apgowd,mdforihoespardeddMmnMr
pMn woulddw h charged agslndgow turfs.
Speelbmet hVici dons (w sect of tame wWMaswR be plesenfed sw Bond opitm al se
goy become known.
RECCMMENDATICK13): T0- Mpnsper redommenM tlldga Besrd:
• Approve to expsntled resoles On wok ant suglmMe gm Oversaw of Purchasong and
Costal Services fi negddate s conbm tw Sound approval wish Fosrtorl-Whgs AMWMCM:
and
Encase she proposed *nning moww: and
• Make appeNgnanes a ft Mme basis groups an micdsd above, irdutlip ma dwgnalMof
0-o Ccunly CommMolm ms who WS servo; arni
• A oft she Dlnechir Of Purohsing and Cwtral SeMws M slick pmpwds for design
services firth Junks FacNRes Emiu nsidn Paiscl, Raw I.
914101 Mielvo-S
bb l 6a aJ tat F lift E bn% promme
The Smd wnsidered approving a planning process to be used in Me deatgNwnwuction of
Mejuatke facilities expansion project.
John Link said that he of Making County Commimioners to approve the next phew Gthe
justice facility expansion. A jail expansion and a new wudmom were added in 1898. However, there
are additional nests forjustirA fawow.
Pam Janes sakl that a task force wee appolntad In 1994 he develop a needs assessment for
the court needs. As an Interim measure beds were added to the jail to bring the wwGry up to 128. In
July 2001 the awrow dent populabwr was 125. The Federal Matahal's Once stills uses ourjaila for
federal ptsorere. A year ago, a master plan was developed by archilech to determine how much could
tie Wilt on the judicial faclllem she. They laid out roue options for that site. Each project would W bulk in
fur phases and each would have specific parting options. One G the oxides ie to have a six?hevel
paring deck, which weld m in Me location of the Sherffe or=, The other option had the parking
incorporated in Me building anti coal to bush In phase bro. The scope of dim master plan is Stillhouse
Creek to Margaret Lana to Churon Street he Me edge of Me courthouse parking lat. Alorg-tens study
of County spew needs was conducted recently through the Spam Needs task form. One G the
recommendations Is to add to the Gowmment gerviws Center on Cameron Street It seems prudent at
this point W look at the more who as a whole. The ebff has requested Mat Me gook of County
Commissioners approve an expansion of the master plan. She wouM propose to ask Freemen White to
update the previous master plan, then move forward with Me planning process.
Pam Janes then spoke b Me phoning process. Knowing that them will be an impact on
dovrtmlovm Hillsborough, the procam ham Mrwwmpomnte. The fiM is the selection of he architect
and designer of Me building ant River Perk. The second is a programming group that woud look at the
assets GMe bussing o make sure that it does net averpouer Me slowdown Hillsborough area. The
Mkd of a programming group that would fewa on Ma tntedor of he building. These art limited tojudicial
officials, County staff, and County Commissioners that would be operating within the building. Other
users could also line Input.
Commissioner Carey same about the Sheeffe price and Pam Jones said that it could be
tom down to make mom for needed parding. There are other options, but this is M as bear plan.
Commissioner grown confirmed Mal the that phase would be a skiing adjacent to to
present cau itrouw.
Commimlner Jambe asked to haw visuals for the chizens present when Information is
presented.
Commissioner Jacobs made reference to the Sheriffs bur ding and said tlrot the Molding
should be left intact if posmibb. He sand that it was nice to have to presupposition that we Wit use what
we have. He suggested Imrting Freeman Whre to to work session on spew studies.
A motion was made by Commissioner Coition, sewnded by Cummsmonet Carey to endorse
the assumptions as listed an page Mree adding Commissioner Jacoha' woks about being prudent br
the Sheriffs office and reepecting Me spew needs study recommeMaAOn as atatad by Pam Janes as
follows: 'The expended master plan would consider and haw Intact the recommendation to potential
expansion of tie Government Services Center and Government Services Calder Annex as prowled by
the Spew Needs Task Forty M March 2001'
Commissioner Jacobs mekuned that he and Chair HalMeds met with some people from
HiMborogh and one otjiheir benwros was tat toy be able to ace the Rber Park from Margaret Lane.
VOTE: UNANIMOUS
Orange County Spam Needs Study
Preliminary Report
March 29, 2001
Executive Summary
0. Purpose
The purpose of this study was to produce a multi-faceted space needs
analysis that is intended, at a minimum, to meet the following goals:
1. To inventory existing space used by County Departments.
2. To document projected space requirements through 2010 for use in
planning future County Capital Investment Plans with respect to the
development of new facilities, expanded facilities and/or renovated
facilities.
3. To identify Issues that affect the quality of how the existing facilities
are used and, when appropriate, to offer recommendations as to how
facilities might be upgraded to provide a higher level of service,
4. To identify special departmental needs that might impact the ultimate
development of a facility.
6. To review departmental data and to explore specific areas that have
impacted growth in a department, therefore impacting facility
expansion needs. This is an effort to identify growth trends and be
able to better predict future space requirements.
6. To take into consideration the place technology in County
government and the space needs that result.
7. To present recommended options for addressing County space
needs.
B. Principles
The principles observed in the preparation of options and
recommendations for future development of County facilities included:
1. Co-location. Co-locating departments with similar functions and/or
those that serve the same customer base.
2. Consolidation. Consolidating County operations to as few aims as
may be practicable in an attempt to gain operational efficiency and
enhance the ease with which citizens may access County services.
While consolidation opportunities may be more limited in the
Hillsborough area where the County has several facilities scattered
throughout the community, the Southern Human Services Center site
on Homestead Road offers extraordinary opportunities to mate a
campus for County services offered in southern Orange County. The
County should preserve this location for public use.
3. Ownership. Owning facilities in which county operations are located,
as opposed to leasing, except where there exists a compelling
business reason to do so.
C. The Questionnalre
The information that fors the basis of the study was derived from a
questionnaire completed by all County Departments. The 83 questions are
intended to provide a complete picture of County space needs in the
following areas:
t. Identification of current space
2. Assessment of current space deficiencies or inadequacies
3. Future space needs based on projected and historical program
growth
4. Special considerations of future space (reception areas, specialized
services areas, etc)
5. Storage needs, including plans for reducing need through use of
technology
5. Meeting Room needs
7. Parking
8. Security concerns
g. Adjacency requirements to other County functions that would yield
the expected level of customer service.
Results were incorporated into a database by Freeman White Architects. A
copy was provided to the County and it includes the data upon which this
report is based.
D. Scope of Study
The study encompasses all County functions whose space needs require
solution by 2010, with several exceptions as noted in the report.
Recommendations were withheld for a limited number of projects, pending
the outwme of work by groups other than the Space Needs Task Force.
Those projects will be Incorporated into the Final Space Needs Task Force
Report, scheduled for publication in Fall 2001.
E. Options and Recommendations - Overvlaw
Departments were grouped into functional classifications according to their
primary service delivery, and the data for each functional classification
were assessed for both current adequacy and long-term need. Various
options were developed for meeting the stated needs through expansion of
existing County buildings or construction of new ones. Through Task Force
deliberation, a recommended option was selected for each function using
the criteria below.
1. Criteria for Selection of Recommended Option.
a. Overcrowded facility. The present facility is significantly overcrowded.
b. Growth and no recent new space . The Department has been allocated
no additional space over the past decade although significant employee
growth or increases in service demands have occurred.
c. Improved service and/or collaboration. Carrying out the Task Force
recommendation will provide significant opportunities for Improved
service delivery and/or collaboration among like function departments
within County government.
d. Reduced rental costs. Carrying out the Task Force recommendation will
provide the opportunity to significantly reduce the cost of, or eliminate
the need for, existing property for which the County currently pays rent.
e. Long-standing need. The initiative is a long-standing need with
considerable public support.
2. Rationale for Construction of County facilities
Less than $10 million of County money has been used to construct county
facilities since 1990, although the County has grown considerably during
that same time period. In some respects, this report reflects the significant
apace deficit under which County operations exist. As a point of
comparison, it should be noted that during the 1990's the County spent
$140 million on school construction to provide the excellent schools of
which we are so proud.
3. Levels of Need
The needs have been categorized into three levels, in an attempt to
address them in a priority order as well as to group the resulting projects
into segments that are realistic in term of the size of the undertaking.
Funding and commencement of the design and construction process would
be anticipated as indicated below.
10
a. Level 1 projects are proposed for funding in fiscal years 2001-2003.
Funding could come through the bond proposed for November 2001 or
through alternative funding mechanisms such as Certificates of
Participation (COPs) or other private placement mechanisms,
b. Level 2 projects are, in general, proposed for funding in fiscal years
2003-2007. It is not required that all Level 2 projects would be funded in
a single fiscal year, but rather may be spaced out during the 2003-2007
fime period, contingent upon the timing need for building occupancy.
c. Level 3 projects are proposed for funding in fiscal years 2007-2010.
F. Leval 1 and Justice Facilities-Recommended Projects
Level 1 projects are those that should be addressed in fiscal years 2001-
2003 and they include:
1. Government Services Center (GSC) Expansion
2. Planning and Ag Building Renovations/Farmem Market
These two projects were selected because of the pressing need for
relieving overcrowding both at the GSC and Planning and Ag Building, and
the desirable co-location of facilities at the Government Services Center.
Also, the resulting availability of space at the Planning and Ag Building
provides an excellent location for addressing the long-standing desire to
have a farmers market, as well as to provide additional space for related
functions.
In addition, it is recommended that the following project be pursued in the
same time frame as Level 1 projects:
3. Justice Facilities Expansion-Phase 1
A Master Plan for the Justice Facilities campus segments the expansion
into four Phases. Phase I is considered in this report as a Level 1 project.
Information regarding expansion of Justice Facilities Is Included in a 1995
Report and subsequent County Commissioner action. The County is
mandated to serve the Court needs.
11
G. Level ?-Recommended Projects
1. Animal Shaker/Animal Control
2. Emergency Management Expansion
3. Public Workerrransportation Expansion
4. 112 N. Churton Street Minor Renovation
5. Court Street Annex Minor Renovation
H. Level 3-4tecommended Projects
1. Whltted Human Services Center Expansion
2. Southern Human Services Center Expansion
a. Expansion of Center building
b. Renovation of the residence for use as a conference center
(meeting space for Center)
1. Uncategorized Projects
1. Senior Centers
2. Solid Waste and Recycling Center, and Master Plan
J. No Action Recommended.
Three facilities are briefly discussed in the report, however, no action is
recommended during the study period through 2010. The facilities include.
1. Purchasing and Central Services Building, 129 East King Street,
Hillsborough
2. Northside Community Center, Caldwell Street Extension, Chapel
Hill
3. Skills Development Center, 503 West Franklin Street, Chapel Hill
K. Cost Estimates, Conclusions and Recommended Actions
1. Cost Estimates
The cost estimates put forth in the report area based on current knowledge
and markets present in 2001. Construction estimates should be revised at
the time of funding to reflect the then-current market.
12
The recommended projects reflect an estimated expenditure of the
following amounts:
a. $14 million of Level 1 plus Justice Facility Projects (2001-2003)
b. $3 million for Level 2 projects, unadjusted for inflation, (2003-
2007)
c. $10 million for Level 3 projects, unadjusted for inflation, (2007-
2010)
d. Unspecified construction coats for uncetegorized projects
2. Conclusions
Based on information submitted by County Departments, the Space Needs
Task Force believes that the projects cited in this report reflect a fair
assessment of space needs through the year 2010 for the functions
evaluated. With the exception of Justice Facility development particularly
in Chapel Hill/Carrboro, the projects evaluated in this report would appear
to address County department space needs for signlflcently beyond the
period covered by the study.
However, as noted in this preliminary report, there were projects that were
not evaluated due to outstanding issues that precluded definitive
recommendation. Therefore, in the Fall of 2001 after further information is
available, the Task Force will prepare a final report.
3. Recommended Action
The Space Needs Task Force recommends that the Board of County
Commissioners:
a. discuss the Preliminary Report and provide comments
b. approve the Executive Summary of the report, and forward it to the
Capital Needs Task Form
c. receive the rest of the report pending completion of the Final
Report in Fall 2001
L. Space Needs Task Force Members
Questions regarding the substance of this study may be addressed to any
of the Task Force members:
Margaret Brown, County Commissioner
Alice Gordon, County Commissioner
John Link, County Manager
Pam Jones, Director or Purchasing and Central Services
13
Northern Human Sarvlcas Center Task Fame
Future Use Plan
Report to the Board of County Commleslonere
June 2001
Chame
In November 1999, the Orange County Board of Commissioners coated the
Northam Human Services Center Task Force. The charge of the teak force is to
iden* Me needs and develop a longaange plan for the Northam Human
Services Center and the adjacent property ownetl by the County.
Lono4kan is Plan
The long-range plan for the Northern Human Services Center shall include, but
net be limited to, the following:
1. Review past Capital Investments Plana and reports requesting improvements
for the Northern Human Services Center.
2. Identity the specific needs of agencies occupying the building.
1 Priaitze the CIP needs for Me building and adjacent property.
4. Assess the current and potential uses of the building to determine the
possible Impacts of those uses on the existing waste treatment system.
5. Evaluate the location of the park and nds lot and possible impacts on client
parking for the building and future park.
6. Review the statue of all easements an the property.
7. Review recreational programs at the Center to ensure the future park design
will include existing programs and possibly expand actIve and low-Impact
recreational activities for the area.
Backoexam
Since 1999, the task force chaired by Commissioners Stephen Halkioes and
Margaret Brown, and staff has met In assess the facility, adjacent property and
available programming. Because many of the discussion to data have focused
on Possible land acquisitions, atizens from the community have riot been
involved in this phase of the planning process.
The Northern Human Services Center is the only county building located in the
Cedar Grove Township and Is an Integral resource for the community. It It a vital
link M the citizens making In this area. Citizens receive a variety w service.
throughout the week and use the tacitly to Most community and/or family
gatherings during the evenings and on weekends.
At present, there arc f ve agency occupants at the Nodham Human Seonoss
Canter (NHSC). These agencies Include: Orange County Recreation and Parks
DePenment, Joint Orange.Chatham Community Action (JOCCA), Cedar Grove
Day Care Carner. Head Stan, and the Northern Family Resource Center
(operated by Chapel Hill Training-Outreach Project). The Department on Aging/
Orange Public Transportation also provides services to center partidpame
An overview of current program operations, proposed program service
expansions, facilty issues and proposed enhancements, and a list of options to
pursue are Provided In Mls report for BOCC consideration
Current Program Operations
Orange County leases space to the non.prof t agencies providing services at the
Northern Human Services Center. Space is leased at minimal or no charge to
the occupants. A map outlining the exiting space allocations Is Included as
Attachment 1.
Orange County Recreation and Pans Deparmsnt- provides a variety of
recreational programs throughout the year. These programs Induce Youth Gids
Softball, Yount Soccer, Youth basketball, Youth Wrestling, Youth Connections,
and Summer Camp Acevitiea. A detailed description of program adivities is
provided as Attachment II.
Joint Orange-Chatham Community Action (JOCCA)-provides year-round
services for senior drizens. The agency operates daily, with a daily attendance
averaging 33 clients. The seniors are primarily Involved in various types of
mamwork and mceve catered lunches daily
The Cedar Grow Day Caro Canter has been operational since September
1981. The purpose of the Center ls to provide a high quality educational program
in a day care setting M families in the Northern Orange Community. W8h an AA
license, the Center meets and exceeds the programmatic standards set by the
state. The Center collaborates with three agencies M assist families with
affordable day care. These agencies, Child Care Services Association, Orange
County Department of Social Services, and Chapel Hill Outreach Early Head
Start Program provide subsidy dollars to help families who cannot afford the full
price of day care. The Center also implements a sliding fee scale to make Mition
15
more affordable. The Confer operates daily; serving infants and toddlers ages
N5 years. The average dally attendance is 30 children, with 13 staff.
Hnd Start provides services to children from August through May of each year.
Administrative staff be omits throughout the year. With an average enrollment of
IW children and 15 staff, the program provides sawfoss to children was 3, 4 and
5 years. In atltlttbn, volunteers contribute an average of 20 hours par week.
Transportation Is provided though Orange Public Transportation (OPT).
The Head Start program was fomrerly opeatetl by Wake Opportunities, Inc. of
Ralsigh, N.C. However, the US Department of Health and Human Services is
scheduled to announce a new administrear of the program by the and of June
2001. it is our understanding that tyro local agencies have applied to operate the
Head Start Program, JOCCA and Chapel Hill Training-Outreach Project
(CHTOP). tithe program is awarded W CHTOP, a large portion of the Head
Start Program may move out of the facility. It lathe intent of the CHTOP, with the
permission of the Orange County Schools, to move all of the four year old
children to four elementary schools and to place the three year olds and younger
Into various daycare programs in northern Orange County, including Cedar
Grove Day Care. If JOCCA is designated as administrator, a is their intent to
continua full service delivery at the NHSC.
The Northam Orenga Family Resource Center, which opened In 1995, serves
the Cedar Grove, Efland-Cheeks and Perry Hill communities. The Family
Resource Center provides family support programs and services mat are
designed to address the needs of children and families In these communises. It
Is operated by the Chapel Hill Training-Outreach Pmjim, and receives ha funding
from the Orange County Partnership for Young Children and the Department of
Human Resources, Othi lion of Family Support. The Family Resource Center
provides daily services to youth and adults, With some evening anWor Saturday
programs. Programs include life skills oxxia hops, computer lab, afterechool
tutoring, preschool activities, literacy, and special eve" and outings.
Propoeed Program Service Expansions
In January 2001, staff from the Family Resource Center conducted a survey to
assess community meads. (Sae Attachment Ilg. The survey mount suggest that
there Is an Interest in increased programming eotlvises. Ninetyeight
respondents (14 Hispanic) Inolcated a desire for computer classes, employment i
job readiness training, GED, Spanish classes, English classes, literacy doses,
tutoring, wealth care, Souial services I family support, housing assistance and
"Pac support. There were also requests for transportation services and space
to host family or community gatherings.
The results of the community survey were shared with representatives from
Durham Technical Community College. This information, combined with data
obtained from a September 2000 survey given to employees at Flynt Fabrics In
Hillsbomugh, by the NC Department of Commerce, Division of Employment and
Training, supports the need for Increased service delivery far this area. (See
A
ahmg interests in wng ski ng high school or obtaining a DED;e, training or earning
a new skill; Lob seeking akHls o and community college, education or
training opporWnhiea. In addition, , many merry of them expressed a desire know
more about health cam , drlltlcere, housing assistance nce nca and nd flnencial planning.
Discussions with representatives from Dumam Technical Community College
(DTCC) have been very pwkve. Apartnership, similar "at ofthe Skills
Development Center, could also be established for this area blithe county. With
the strong community interest m computer training, DTCC is prepared to offer at
least ono computer does, with the possibility of a second class, as early as the
fall 2001 semester. Additionally, they win determine the feasibility of offering
ether a Spanish or an Employment/Job Seeking Skills class as well.
DTCC representatives have met with County staff to assess the proposed
classrooms and identify design needs.. The County IS Department has reserved
18 computers (scheduled for replacement) for the computer lab, Thesurplus
PCs are being configured now by Orange High School students who am working
as temporary county empoyees this summer. These students will also assist in
conflluration of Me network in the room and setup of the computer systems and
printed.
In addition, Redi Softwere, located! In RTP, will donate technical support time
cram M NHSC to help set up the Linux server. A free server well be provided by
Gateway Computers as part of the Countys purchase of replacement PCs under
the IT Plan this year. A network switch will be donated by Orem Systems in
RTP, the IS Department network technical support contractor that Orange
County has been working with for the past We years.
The IS Department N also investigating two other possible donations. The
Hillsborough/Orange County Chamber of Commerce has been olmeoted fo
determine t any member companies would be able to donate a computer
protector. Arid, Time Warner Cable has been asked to donate Internet
connection installation and services.
The Public Works Department Is currently developing an implementation plan for
facility modifications necessary to meet the needs identified by DTCC for the
computer lab aM classroom.
The task force has also received a request from El Centro Latino for space fo
provide sarvicas to Me Latin l-Hispanic families in rural Orange County. Many of
gees families are migrant or working in agriculture. Programming possibilities
include assistance with translation, information and referrals, and transportation;
support groups and wuroeling; chikirsn's programming; cultural programming; a
legal clink; and a leadership development project to promote leadership from
within the Hispanlo-latino community.
Since the Family Resource Center currently employs both a full-time and part-
bme Hispanic outreach worker, the presence of El Centro Latino would help to
enhance the Service delivery. By being co-located at the NHSC, these agencies
could more effectively coMborate and coordinate programming efforts to this
target population.
In addition to developing a computer lab for DTCC, the task force has reviewed
the overall space allocations for wrtera facility occupants and anticipated
program service expansions. Based upon the information obtained from the
community Surveys, a stronger human services presence is also requested at the
NHSC. This would include, but is not limited to, health and dental screenings,
nutrition and ft rless classes, and other health education classes (e.g. prombal,
child safety, STD, basest cancer awareness, etc.). Also in an of ort to ensure a
balance of library services throughout the County, a cybrary, similar to that
identified for Carrboro, is proposed for the NHSC.
In order to accommodate the requestetl services and new agencies, a
realignment of some of the Space is suggested to provide a more efficient
utilization of the building. A map illustrating the proposed apace assignments for
service providers Is included as Attachment V.
With an expansion of services offered at the NHSC, H is anticipated that the
facility usage will increase Substantially. A chart describing the percentage of
facility usage (wren and proposed) is included as Attachment VI.
Facility Issues and Proposed Enhancements
Wastewater Treatment System
Built in 1951 to Sarre as a School and acquired by the County in 1977, the NHSC
is in need of stmctural renovators and enhancements. The most pressing need
is to replace he wastewater treatment system.
According to the Heats Department, the design fiow for the current use of the
building, based upon the estimated number of participants, is lust over 3500
gallons per day. nis Septic system is sized for 2,400 gallons par day. It is
therefore, overloaded by approximately 46% with the existing use. Although it is
working properly by all aaounts, overuse b his degree will have long-term
18
impacts on the functionality and life of the system. A breakdown of the existing
use is included as Attachment VII.
WIM the presumed potential design low a 6,000 gallons per day in a new
system and with the current use taken into account, Me remaining available low
wouW be approximately 2,500 gallons per day. Baser! upon the Information
obtained from Me community surveys, Environmental Health staff has prepared a
sample scenario of pdermal use for the remainder of Me flow. A than illustrating
the Expansion Wastewater Design Flow is Included as Attachment VII I.
In March 2000, has Kennedy had portion of ft NHSC property complex was
evaluated by Orange County Environmental Health staff to determine the
specifics of its utility for oiwm wastewa@r treatment nitrification (ground
absorption) fields. The Sol preliminary finding was that the Kennedy tract
contained an area (approximately 0 acres in a more or less contiguous area
generally described as being from its southern and southeastern boundaries
[award the center of the cad) of Solis suitable for conventional ground absorption
technology wastewater disposal at a rate of approximately 5000 to 6000 gallons
par day (god) with 100 percent repair am. Environmental Health staff have
indicated that more extensive site evalual and system layout/design work
(involving site topography survey and soft test pit excavation) must be completed
before an exact system treatment capacity can be determined.
Unfortunately, the portion of the Kennedy bad containing soils suitable for use as
nitrification fleld is also that which contains the large hardwood trees. Many, if
not most, of the hardwood trees located in has active nitrification fields would
new to be removed during the construction of the nitrification fields.
Funhemmre, recreational activities In the hardwood tree area that would be set
Sell for Martial field repair area would be saverey restricted. Activity In this
area would be limited to low impact trails and me like.
In November 200, the County made a preliminary offer to purchase additional
land (26 acres) adjacent to the Kennedy Rai The landowners expressed
interest in selling the land but as of this date the terms for a purchase agreement
he" not been worked W. An appraisal of the property will be completed by the
end of June 2001. The appraisal will be used in further negdistiom for land
acquisition. An evaluation of the property by the Division of Environmental
Heath revealed that only one very small portion of the property has soils that
appear suitable for waste treatment purposes (500 gals./day).
Options to address the wastewater treatment system, as Identified by the County
Engineer are included as Attachments IX and X.
Fadlity Improvemenb
19
The task force considers the improvements b Me Northern Human Services
Center as an opportunity for it to as" as a model demonstration project for odor
aM energy efficiency. There am oeveral pcesibilitles b pursue with respect to
Me HVAC system and water heating system. Stan is planning b comad Me
Soler Center, at North Carolina Stale University, to discuss possible options.
In addition to replacement d Me wastewater treatment system, Me Public Work;
Department has aesesced the facility and Identified a list d pouilbfe
improvements. The maldiq of Me;e adivales have been identified as needs In
Past Capital Investment Plana. Attachment XI Is a list Of Mase proposed
improvements. However, the five mast critical improvements are to:
1. Relocate or expand the existing wastewater treatment system
it. Replace Ma HVAC system (research agerrus ve/energy efficient systems)
III. Replace the windows and exterior doors and locks (mvesilgam solar
possibilities)
N. Replace the mot (after ft 10.year warranty expires in 2004, included in
the C/P Roofing Reserve Account)
V. Secure a new well, water distribution system, holding tanks, ate. (research
feasibilly a Solar water heating system design)
Staff will research HVAC allamative / energy efficient systems which may W
suitable for Me NHSC. A recommendation will be brought to the Board as soon
as available. The rod replacement Is Included in Me CIP. The above-referenced
items are considered essential in order to make the building habitable, suitable
for expanded use and functional. The remaining needs described in Attachment
XI may be phased in aver, time,
Proposed Recreation Aimed and Park Amenltiea
Another key component b this property assessment is Me potential far increased
recreational actNdes. Several amenities have been proposed -contingent upon
surreys, soli analysis, sib plans and publidcommunity input through park design
meetings. The following Ilat htghlighh Me possible recreational activities. For a
more deblled desoriptbn, see Attachment XII, Proposed Recreational Facilities,
which outlines three park scenarios, based on different designs and different size
parks.
Low ImPeet/Passive Recreation
• Nature trail (natural surface) through woodlands to take (with interpretive
signage)
• Picnic arse WM cables
• Benches overlooking the lake
• Rustic toilet facility (nmor picnic area)
20
Avdi Recreation
• Two additional softball fields (lighted, Irrigated, fenced with bleachers and
dugous)
• Two wells fingadon and drinking water)
• Twowatertountims
• R•stroom facility (near sotivityareas)
• Expanded playground! (with new equipment for &12 year olds)
• Large picnic shelter (with tables and grills)
• Horseshoe pile and volleyball court (near picnic shelter)
• Concession stand
• Maintenance shed
Conturpent Upon Future LavMAOgWalHOn
• Two mutt-purpose somenfoothall fields (lighted, irrigated and forced)
• Walking / Filters; track (herd surface)
• Second driveway enhance and parking area
Other Sianificant Findings
• The Kitchen functions primarily as a warming kitchen for JOCCA and Head
Stan. However, the Cedar Grow Day Care Center uses a m prepare meals.
• The wnent playground is designed for toddlers. If older children visit me
facility on the weekends, there are no factlkles for them to use.
• Bapproved by the BOCC this fiscal year, the proposed Clinical Nutritionist will
be able to provide a hearth dapartment presence at the NHSC for
appronmately 20 hours per week.
• With the purchase of the Kennedy tract, the issue regarding easements has
been resolved.
• The NO Department of Transportation grant to pave the southern lot "a not
approved. Once we determiner the outside design (i.e. circular drive, speck
parking mMgurations, em.) Me County can resubmit in January 2002 for
funding to pave the Park and Ride area. (Please note that !M rolocaaon of
the waste treatment system wi0 affect Me ability In demlop Me circular dn'va)
? If adminishefion of the Head Sled Program is awarded to Chapel Hill
Tralnin$OUheach Project and the program subsequently relocates to the
elementary school p and delicate centers in northern Orange County, the
Orange Count' Schools Superintendem has requested fo use this space as
an allamative wheal. However, the task force has not had an opportunity to
assess this most recant request.
RECOMMENDATIONS
Feel/iry:
I. Pumuellwtoptlneefec111tyimprevemeMaasprlodhredbelow:
Activi Estimated Cost
Per" or expand Me exfstln
tewatertreabnent system (main $300,000
I
lace WindowsrExterwor
rehocks(inveatigate solar $250,000
ibilitief
E
ure a New Well, Water
ibMlon System, Holding Tanks, $50,000
(research feasibility of solar
r h ddin stem des n
Sub-Twal SS00 000
(a) SUIT will provide a
reecmmendadon regarding the
HVAC Options at a later data. (b)
The roof replacement Is Included in
the CIP.
2. Reallocate the existing program spaceas identified in the proposed
expansions, pursuant to Attachment V.
3. Finalize arrangements with Durham Technical Community College to develop
computer lob, classroom space and appropriate course offerings beginning in
Fall 2001.
a. Develop a NHSC Management Team, The management team, similar to that
at the Skills Development Center, will be composed of agency heads
occupying Me building (Recreation S Parks, Head Start, Family Resource
Carder, JOCCA, Cedar Grove Day Care, DTCC, FJ Centro Latino, and
Orange County Public Library). The management teem will oversee the day.
today aPsrabons and will meet as often as necessary, but not ass Man
weekly to discuss coodln ri and Center activities.
The team leader will be designated by the County Manager from his office.
The learn leader is responsible for convening regular meetings of the
management team, oversight of the physical facility and coordination with
other county departments for services.
22
5. Relocate the sports and crafts equipment, currently stored in the facility to a
climate-controlled environment.
0. Contact both Orengs County Schools and Chapel HillfCanboro City Schools
for the possible use of surplus Mldhen equipment and furniti for the
computer lab.
]. Irrvse community repre wntabves fo participate in Phase II of the task force
planning process, to include design of the park and programming initiatives
for the facility.
9. Investigate Me feasibiltyy of establishing a Farmers Market.
9. Develop marketing matedels, to Include but not limited fo, sgnage fo advise
the community of new services and events.
10. Assume responsibility for providing custodial and cleaning services for the
entire building. Note: The County currently provides cleaning services for
common areas 2P1.
11. Assess the feasibility of housing the Orange County Albiur a Schad. A
recant request "a made from the Superintendent to use space Mat may be
made available from the possible relocation of Head Stan. Note: This request
was received following the last task force meeting and Me members have not
had an opportunity for review and discussion.
12. Extend current lease agreements to December 2001 contingent upon the
status of the Head Sued program.
13. Develop a plan for establishing library andlor cybrary eervicas at NHSC
similar to those recommended for the Carrbom Century Center. (See
Attachment %III - Excerpt from Library Task Force 2001 Report - Library
Services at the Century Center).
Park.
1. Develop recreational facllltlei for the Kennedy trap, as identified In the
Master Recreation & Parka Plan, and contmi upon the location of the
sewer system.
2. Acouine additional property for recreational activities.
3. Pursue the septic system and external remroom faeliftes fo serve the playing
fields and park.
23
I$Wldtng
Potential Facility Improvements and Associated Coate
Activity Estimated Coat
1) Rebcale or Eapand Wastewater
Treafinerd S stem main building) 30,000
2) Replace WmdowslE erior
DooBllocks (inveatigale solar $250,000
bltiles
3) New Wei, Water Distribution
Systam, Folding Tanks, W. $50,000
(research fea tbility of solar water
heading system des' n
Su>Totef M01000
• Replace WAG (research
Surna"en -aficbrd s tem $600,000
• Replace Roof (after 2004) Onduded 8500,000
In the ravolubg fund or roof
rearlactrverM
• ParkinglAaaes:
Q Pave Emsting Lots $150,000
o Greets Circle Ort"Mave It $ 50,000
• Restrbome/Addltbns iii Renovators
o Retrofit ealstn realrooms $127,000
• D rode El cal Wldn $30,000
• Palm lntedar/EHerior $25,000
Enclose the Bresaewe $15,000
• R law Fbod $143,000
• Alarm Systems:
c Fire 530,000
o Burglar $15,000
Complete Renc ration of Kkchenl
Includes Re lawment E u' ment $100,000
Sub-TOY( $1766,000
TOTAL R36S000
Park
Rest can Face's to Serve
Pia do Fblda and Park $70,000
Septa SystemoServe Sawifte
Restroan Facil $25,000
TOTAL $$6 000
GRAND TOTAL hclll and ark $14800W
ORANGE COUNTY
BOARD OF COMMISSIONERS
24
ACTION ASENDAnwMSTRACT
MMIrpDW: Nowmber27, 2000
Ac"M A!rQ`
Nam No. ,?
SUBJECT: Community Cdlepa Task Forces
DEPARTMENT: County Oommlsslonem PUBLIC HEARING: )YRO C
County Manager
ATTACHMENT(S): INFORMATION CONTACT:
Matching Requirement; Table Moea CArey jr Chess
Task Force Report _ John Linh. 2162900
TELEPHONE NUMBERS:
HUlabpmugh.732-8181
Chapel Hill 9684501
Durham 11811-7921
Mahan 588.227,2091
PURPOSE: Tome"the mobil of set Community College Task Forms.
BACKGROUND: The Caneonsy College Talk Fords halt matfourdmea shoe March 2000,
Report fmm eediertek doss and haormelbn nom ems oonmunRy oollega hove been
reviewed. Focus group sessions have been had to determine the Interest of the GUZea of
Orange Coumy in establishing a satellite campus of Durham Technical Community College.
Aga several months of research, the Tact Force recommends tu4he Orange County Bard of
Commlabners to a saWlha campus of Durham Technical Community College be eatbeshe
In Drones County. A satellite campus would:
O area the more then 6500. residents who Mks one or mom ceesee m a community
college each year, and
O offer a gateway to the future for residents by proyMing a mom camprehenave,
canuatad location for adult training and education services In the.County,
FINANCIAL BWACT: Staff's understendtglrcm the AdmInkfason at DUrhem Tech Is Ma
the Stetnlds borne for hghereducallon recently approved by North Cologne voters Included
remarking of S4.4100,000 form Orange Canty Sm ll Cempuaa Durham Technical
CormendyCollege. AltnotodIntheaaohadtableamatchingmquftmnm.OmngaC my
must provide a 50 peroerd mach of Stab bond funds, which mans that each State dollar me
be reached, dollar-fixEdler, with local funds. The State legislation authorizing the higher
atution bond referendum provided that counties nave through June 2005 to complw to
matching regmremeo Them on be an -In-klnd' compose d to the match. For example,
Orange County would get some matching credit by providing the lend br my saell6e campus.
The Coundys share of to funding could come hcm any combination of muloes, which might
Include, but am not necessarily limited bx.
25
e gen" obigmdon bands
o Inommodpurdosehnrldng
o mmmOft of addOmW dedkoW POY nYoago Hueneme
e oa"Mtlom ham ffgngc e0lm a Mw lanai gove MWM pWedlctlons
? p mep mndrer burl buWMM COm&Aons
0 mW n krfun wreb oug spedeA nl g WMW M the 6snmW Mumbly fH much s bW
shotdd
RICDL DATIOM(S):? The Menegut meMSmmtd»Bosh meWetM nM and
WM* dedlan toWAgm teMe $Wpt lnaddmedng iMMtlbgs Wthe sport.
26
Repmtbfdw
CommomT CoPep Tack Fame
Noemdtw2l.20M
1bCc==MpOoUep TNkPwaebumalbwdU ob=Mamh2O0. Repabbm
Falbpo burema?mmdm mm am ootlga Yhew4eevmiewd.
Pam pn4estlmhaw hem heldm dalmmaetbo WO whdc ofWaeititml of Orange
Camylpr ftoawtmtet epwcFDudtee7edddChe Outage CNkM&
p
dlCoodmoolha
After ofspsa6theTWPometeoemomdamlhsOamp Comy
CaUtpbthmmstensa p CovaeaePte omMaTedmiol Commamy
CLReaeembFtladmOmvtmde Cpmy. Aermiteempswmm:
O aswbemo 0roaWmtaarhoaba mastmaaarrm•
ee memdry alWpl1M someh ywy sad
• omre`swq atla fmwfeaaaddma bypweid'manmsa
ccum w¢aliaedlaeaem [a Woktrtlda{am sdvuew aervaa
InurindoCaamy
TOCOMily Talk PaamommmMlhmlWmu?beamWa Mlwaadin
du emhd pctof to Carry io mda b save all amdmY. 71asidell she 1Q a solYi e
owWwamaldbr.
? Cbma mamMaa?wry
O 20amarcmma btememvsdadbmue pawW
O Nasbmares mebmaspma
O IaaemaalaidbtY.
? f<a.w aeama,a p Afted ma.
? wmdBeaCol0lds)
O NWampodmde
• PeraymrFWdlateayortmm
e Aearmbmdbsopen time
nbCWAW*CeWpTe F"MieaadbvlirmpwaadaNoadof0m*
Co mdothvmbemmmcuutkL iml
Cana
e>mmoy Ca WyCoBo dsmd and oaw ommmiy mFas m emodiectftoaaatlea•
pewapmpaaimavmaheklammmrapaeoaeosdmdewlopiegdWUpac The
Poeapmpeaduclok
O Sks7la Dawbpmem Cats Cep
? 7blkmomielavalapmmtCaaamlmm
O Cm MOOREad bmCmmmmCttgalHN aiyn adma
? BadN s Cltlamap MAHMIdfMlbhaeoo
? MtmbmoftbaWTlehsnuy40aao{eComyChmbsofCemmmm
?
O Cb Qwpol Carry Nigh City Schools $WdmVA sad
O ChapI NiRCmb*dM%Cu ftmse Srhaa7'mhm em Btgpal&aS
27
'tan.1¢119 Vdmkdb BmdofCo®ycamMiWmmhmaaviembfavim e
trmu mm®d, Thsdmmm
?
41dMalFe i7 Derde9mm ffd ms9u7mCmmf pmmltWdOmlepYpdm m9mFNe9 me
t h meptl 13{11,
? n.tlgsvpAmotb.F.wmmml7eWOymmt3]®ism19trm9bt7m,
ma
• Tbdmmtmb9uedeeedbaw Mthe?•Pm9 DtmP Cameye Ptlmv Tedc
Faees
Hre6 of thmr te9u31e udAerred tlm mad &e meem'h4 and u?tdul3b etibe{ rW
admriarlemetesmredmm mlhsromlS. MmumammhaaweF meeFAdyaf.
mmtyteddmbbMdMepjoh'a 75hFk8blkvamimmteom7Ym uepmbd
memimhe Firmbe*Lbhr mtly ntllmmptlMtgoppwYmNimm
mrhlslhmmoppW tmr9x mthtl9gWlmm
hmdm mmmmilI oogwrmmbdh
cufoperyulmay
• aoeuptlomlemtmdam
• a9mmdry9mY9e. and
' •'wdmdmd hemiey heDOdmtl mdmAmhy
? AtMof2327@m{eCamryndd@OM&KodhrdmtlDudm
Todm3ml Ommmiq cmw h dm Fdl d 1999 .
? 311maat 9fbhmFep'epe91999mm9mtlraddedinomp Cemq
? I.MIQm myntlidm reOWmdtlmihWade{ammemD'eelia{a
hme Nlafl f 1999
1 90310dMed tl Abmma C==Wm Cramp
? ditlsadtl CsmtlCmlheCammlyCe9ge, md.
Mn
? IU rplmedtl9p Comoro MCmmb t
? D3Y7CoAtemtmtmiy wl m9kmehmmdw ml0 Wad= In
Oeop Camq
? 9
gM9w?m dm mPPm hroutaom eahmi COW emmryidow
ffOR? m MWIY ?
? 9l oft D1'ino mhrmo®mdhOmFStkmy®ee 1994.
er 1C9m19191999
Qmpp5Ofm mmdt ow
? TCC3cwotkidhp ywimpft rormnhmoCSly &L
Dr1 W e Camqs&" 9mmm9'pamee tlmmo6rpeOm? 9r lug rdm
rmdmh, b C9h 6YOnehm Wrmhbmdkeehn, dbdaEee tlbty9m e[
28
O
wN.Gwmeola* to W new awd ad wditmtampi eowomiaWem mad bdmeIMaHami
.. , amodradpddgmty
N.C OOmmid wiiwpwa e®a w lRardab3e ahemm?w for pau aewmdaq
.
vanims
? Camimhove aurm mtmyn>vm&%rbd d+w devabft mdmabdeap
Bd
• &tlabee b d awm own mW be anWbm wetpu.mb mworry
l? dol ihctbctalty db efabollNe{a+L
kswmbmtlohad tbpanmt-0apmbyPoeaomd
? D= tbCmpCwm/YpabaK wdtbmapdBMCm mo CRY
pdM%bw WMSpataclmpaihdbmtwdbdm:
• Npkaahom amdmbepdopwlmpwmwwlhwa?lY[CC
•
mPml?wmMwpmwbawmNpp
school mdD= Conic" and
wlL and
? bmlboamrbilb ypatdwp?epmjabmadiamakilb
anam 1@hipharbwdtmdmb andtabor
' O Ooapeotln and wpabonmmpoVm'>mmyblwampnpublm aohmla and
D7CC waWd pvw wim aelYps ataQmwed m amac ptmt®iry m atmwla
ma®d
Adhmmptwpefmtidmb matmdxmOep mmm{Poaa®rmdaadylldl. A
wmbmWpmCaemmityCQW71okFu bdhwWo bVo*Ammtofl4
teaidN®adawgoetdmemvt aeNmpadbippad mwavaoWomdmmptlr Ptaama
mtlshol mmdamdms dmhemclodR'gm,emaaq'amWWa®miry w9ep
mm, w216a ndpim, bmama awm and amplayma. mbol ayab patmmd
mdamtmdpwaahwadmvkabdpaWmtmto bUa*f
DwlumTd WdC;oimwthamabL Wape®mewKaampueamemWwW
pm
Ilm?7'mkdmiCwmmiryCdlep
AVeadtheildwtJlingdo I Andea®wb WwwwmaVwppetldpmmiu
mdwWio AppmmaA Wmtw mwM1 Aaemmcy Wdp'umapmmam •gmd®dm
wmpmmd by n pattleonat L ord W tl below:
O 'lbw lag mtpmdmb mdadad92 Bmdu and 3f o "vftmyW iaapw
poor U mammdm d! (pw iemviduab dWmtaooplammagowdiwabom
withlO pkrt8mlmwo?dmpapamdmdwmemohdeddwp
O
wph idtatbdmdividuwm
? pisCt-ibmwaa®pm„dNp->ims,l0waeeegbgdpuWmmdri?
nor tamwd m Y ttaaadm abwd Imtpm3'wmt mar (Elba mdiwtlad waY
? b'm4 l
pn bow4aw mm6tlpmbn tadmDwmmtymuAlammWGo76dm 7,
Cambbodm4lsemin ComGWIftAndby
wtminAt adollNCat,tlm
• tAap+e,mdd9f4 WPoatagmdwm mtSemdiheYwmelo-dYmomY
UEwwmb
ffzodmm6lmdwCOmy AembmNrAyWwommeid33aedmem
odata.wyy od?tnnd&WbW advimwP W
mmmwiryoelbge obOiEeaampoa. '
29
? bo??mbOm??
? tlmemetlrybapptle "k fbrjoh (112)
? mmemddaZb heprowbrblBbnnN4y,m.m.odwtlimi(13)
e
• d s hs add mdeg oon em
dmieBabeW®mranm)oft (96)
• ammtlw8 m(tlk? d PmP(^l?
+ OGM(17m(s3j 39x ed
6mddsm'.amdbl wmxe a.em.m.murampa. ore..ae IY
moms sameldlWiA?Ymmmaemmmepormuid.'(5sr beumeebdbr
? uomaemamr.,wab.amyma..mio?an.mm.om,ma
? ray.bmram.rm,.uee.mb?bmnaumab
WOMOdlY 110a WMM Aimm*ovhmdw, 0 whh IRwuN dPummoron
a % um8nteamq,mampdimee 8r.mo0sotmmywlulmm.
'.memy sbm tlromWua
ftap ho p.? pwbrapsmdinsaRnPoe&WwiWb'Pml wyoeampmr.
?P mh oe?tlBeMimmenl, WmN?r. bnY7.li'mmr
bod o sd &P41ub dsLmmps'+mtvad.?mY.tlo4 mleb{$',
brier.aetly, W'• mmodh spyndmoni
i ..? IeuLa ?.n?^Y. ae W n weak, nmmr Iql f bam.
?Amiim m8a4 mr81oi . .884 hmtlwnn,Omt.W i
mmW ao, D?9)4' d m Vt ? np4.
9rodwm.?WC ?mmmndw wvlar
'.De.4olbmdW Com ammmdWCo88eF mmdtlb mmq pm4m.QoWywOlpwWo Am
iOa br.
• as vN
• masmd.etlmkoowmtln/
MI&Mb =vim
? mmpplmmtlacM
Wm`
• n?eWmBmt; ad
' ? 8m?ymbmoS ab.;nC .
? tlNtlmdnaomtYam®IbmBYmmms'?a9wtlbmm7
.ma.mmmnbrominlmpowo{mm.(.a '
30
?.a R R R S F R = A A R R R C ¦
S
a _ S A C A C
I
N I
1
"
r- A
8
A _ S . A - . .. S S A n . - S IN C 3
l k - S _ - L 1 3 2 i
R O v a .
R A l 1 I f
. all = R . .. . a ll
,
x n ., s a A . R A y . y +
A
S I
N
S
F
S
A
S
'
'
'
.
i
? ]
A a f f
A -
??l
1
? !
t , ? la
J, A9 !e
Jim
a
?
#
R
??}7 ?? I? !i
31
32
Meeting Notes
Joint Meeting of the Durham Technical Community College
And
Orange County Commissioners
October 11, 2001
Skills Development Center, Chapel Hill North Carolina
County Representatives Present
All Commissioners
John Link, County Manager
Rod Vsseu Assistant County Manager
Donna Dean, Budget Director
Ken Chavious, Finance Director
Pam Jones, Director of Purchasing and Central Services
Community College Representatives'.
Trustee Jesse Anglin
Trustee Dr. Mary Ann Peter
Trustee Ann Barnes
Dr. Pheil Dr. Wynn, President, Durham Technical Community College
Barbara Baker, Vice-President Administrative and Support Services
Chair Halkiotis called the dinner meeting to order and requested that those
present take a moment of silence in honor of all Jim Gibson, one of Orange
County's most active volunteers, who died on Thursday, October 11, 2001.
Dinner was served by Hobgoods, Hillsborough North Carolina. It was noted that
Sam Hobeccd was a Community College graduate
Overview by Dr Phu I Dr. Wynn
Dc Wynn spoke briefly about the following topics'.
• The historically good and cooperative relationship that Durham Tech has
.
had with schools in Orange County
Noted that Orange and Durham County residents held Community College
in high regard as evidenced by their high rate of approval of the bonds for
Community Colleges passed in 1997 (83%),
Noted that 22% of the students in credit courses at Durham Tech are
Orange County residents.
Dr. Wynn distributed a booklet entitled "Community College Laws of North
Carolina" to County Commissioners. His comments for the next several minutes
referred to various sections of the book in an effort to clarify the following'.
Board of Trustee membership. Dr. Wynn indicated that pursuant to G.S.
115D-12 (a) -Group Two, two (2) members may be elected to the goad
of Trustees from those counties in which a satellite facility is located. This
32
Durham TeclnOrange County Commissioners Joint Meeting
October 11, 2001
33
would raise the current Board of Trustee membership from 12 to 14.
Commissioner Halklons noted that only one of the two Trustees from
Orange County could be a Commissioner.
Prooertv Ownership. Pursuant to G5115D-14, Dr. Wynn pointed out the
relationship between the County and the Community College system as it
respects the ownership of property. This section indicates that the Boards
of Trustees for Community Colleges will hold title to all real and personal
property that is purchased with funds provided by the tax-levying
authorities of the respective institutions. The title to equipment furnished
by the State shall remain the property of the Community College system,
however, should the satellite facility cease to operate, the real and/or
personal property purchased with Orange County funds would revert back
to County ownership.
States fnan6ial support responsibilities.
Dr. Wynn referred the group to GS 1150-31, which outlines the State's
responsibility for financial support of the community college. Heinlicated
that there was hope for additional operational funding in support of
satellite or off-campus centers, however, the State's budget maladies
were likely to preclude such action this year.
Orange County's financial support responsibilities,
Dr. Wynn briefly discussed the local financial support responsibilities for a
satellite campus. He indicated that there could be limited opportunities to
share staff between the Durham and Orange campuses, citing pro-rating
costs for salaries, benefits etc. of building maintenance personnel as an
example. Afull iteration of local responsibilities is depicted in
G. S. 115D-32.
Site selection.
Durham Tech Trustees believe that this is County Commissioner
responsibility and will look to them to develop a process whereby the
selection is made. Dr. Wynn referred to sites of no less than 20 acres and
accessible to major highways as favorable.
Each of the Trustees indicated a willingness to work with the Orange
County Commissioners to develop the satellite campus. Jesse Anglin
indicated that the Trustees were there in a supportive role not one to
dictate what is presented at the facility. Phail Or. Wynn commented that
the Community College has much autonomy in its offerings contingent
upon community demands. He indicated that a needs assessment would
be conducted to determine what programming should be offered at the
satellite campus. Further, he intlicated that he envisioned the possibility
that the Orange and Durham campuses could work together jointly in
offering degree programs. thereby allowing Orange students to school in
county for much of their program. He offered as examples the Law
Enforcement and Fire Protection programs, where Orange students could
receive basic courses the fret year in Orange and then make the short
33
Durham Tech/Orange County Commissioners Joint Meeting
October 11, 2001
34
commute to the Northern Durham Center where the specialty classes are
held to finish their degree.
Capital Expenditure Requirements
With the overview by Durham Tech concluded the discussion migrated
toward the capital expenditures, specifically the $4 million in State bond
money that is available for new construction of the Orange Campus. The
County would be expected to match with $4 million in capital funding or in-
kind contrbutions.
Commissioner Carey asked for clarification of the time frame in which
bond funds must be spent and the process for claiming it. Dr. Wynn said
that bonds are sold over a six-year period with 65% sold during the last
three years. He told them that a resolution announcing the
Commissioners intent to match the State funds for construction of a
satellite campus must be forwarded to the State. The State would then
issue a number for the project, which allows funds to be drawn against the
project account on a reimbursement basis.
Commissioners queried the basis of matching the State funds. Or. Wynn
indicated that in addition to construction costa and equipment that is the
local responsibility, the value of land could be used against the match.
The question regarding the use of the Skills Development Canter as a
partial match was raised since it's primary function is for Durham Tech
classes. Although Una new campus cost will likely exceed the $4 million
match required of the County, the Skills Center could potentially be held
as an over match and applied against future match requirements as they
may arise. Dr. Wynn will check to determine the passibility of the Skills
Center being considered for match purposes.
Steve Halkiotis remarked that a satellite campus could be compared to
having a third school district in the County. Operating expenses will
become part of the budget. Further, he stated that regardless of how the
match was determined, the County should support the effort and
produce a qualhy, facility for the community college function. He
encouraged the group to have a broad vision of the project.
Or. Wynn indicated that while he does not advocate the approach, the fact
is that some communities have gone to their legislators to have the match
appropriated for them. Representative (and Trustee) Ann Barnes
indicated that while that was true, it was primarily so for some of the
poorer Counties where the match would have been impossible without the
intervention of the legislators. She gave dim hope of Orange County's
chances to receive funds in that manner.
34
Durham Tech/Orange County Commissioner; Joint Meeting
October 11, 2001
35
Or. Wynn clarified that the County's full match obligations must be fulfilled
by the and of the project, which must fall prior to November 2006.
In answer to a question by Commissioner Gordon, Dc Wynn indicated that
the County would only be required to match funds in the instance of State
bond funds. There is no match requ loomed for special appropriations by
the State. Hefurther noted, however, that Durham Tech would make
annual capital requests to the Board of Commissioners, which Is an issue
separate from the match. Barbara Baker noted that State participation in
capital funds for construction was begun in 1993. Prior to that time the
responsibility lay entirely with the taxing authority
.
Environments Issues
Both Commissioners Brown and Jacobs strongly encouraged the use of
environmentally sensitive and energy efficient construction methods when
constructing the satellite campus. Durham Tech representatives indicated
that it was entirely within the discretion of the taxing authority to make this
type of decision.
High School Students at Durham Tech
Commissioner Carey asked about the status of legislation regarding high
school students enrolled in Durham Tech classes. Dr. Wynn indicated
that the Board of Trustees would consider procedures during their meeting
on October23,2001. Barbara Baker pointed out that some high school
students are already pad of Durham Tech classes and noted relevant
updated numbers provided in the handout distribute! at the mewing.
Durham Tech 'a Involvement at Northern Human Services Center
Commissioner Brown noted that Durham Tech is contributing to the
program at the Northam Human Services Center through the
implementation of computer classes this fall. Class offerings will be
expanded at the site to meet other needs, among them ESL (English as a
Second Language). Barham Baker noted that approximately 31000 hours
of ESL were offered in Chapel Hill last year and believes the Northern
Human Services Center offerings should be well received.
Next Steps
The Boartl requested that the County Manager and the President draft a
process for review by the County Commissioners and the Board of
Trustees to
• Outline a process and criteria for siting the facility
• Establish a suggested timetable by which the project should
move toward. including the timing for funding;
• Outline a process by which to conduct the feasibility
study/needs assessment for the facility.
35
Durham Tech/Orange County Commissioners Joint Maeting
October 11, 2001
36
The Board requested that this information be developed in a fairly short
time frame.
Commissioner Jacobs requested that the process also Culture how far the
plan may proceed without the selection of a specific site.
Draft minutes of the April 25, 2001 meeting reflect that the Board
"endorsed the siting and future development of the Orange County
Satellite Campus of Durham Technical Community College! The Board
discussed the merits of having a public hearing immediately before
adopting the formal Intent to Proceed with the satellite campus
development resolution as required by the State to begin the process.
Following closing comments by members of the Board and the Boat of
Trustees, the meeting was adjournetl at approximately 8:30 p.m.
36
Durham Tech/Orange County Commissioners Joint Meeting
October 11, 2001