Loading...
HomeMy WebLinkAbout2022-075-E-Solid Waste-Draper Aden-Drainage Issues at Eubanks Road Landfill and Walnut Grove Recycling Center February 3, 2022 Robert Williams Solid Waste Director Orange County PO Box 17177 Chapel Hill, NC 27516 RE: Drainage Issues at Eubanks Road Landfill and Walnut Grove Recycling Center Orange County, NC Draper Aden Associates Proposal No.: P2200365 Mr. Williams: At your request we offer this proposal for engineering services for the mitigation of drainage issues located at the Walnut Grove Recycling Center and the Orange County Regional Landfill Facility on Eubanks Road in Chapel Hill, NC. This proposal outlines our understanding of the project scope, tasks to be completed, assumptions underlying our fee proposal, and fees for various project tasks. I. PROJECT DESCRIPTION The project consists of preparation of engineered drawings and specifications to resolve drainage issues at the two locations listed above. The purpose of this project is to determine of the most economical and practical way to alleviate ponding of water and its associated issues to prevent damage to existing structures, establish firm ground to prevent slipping while walking or driving in these areas. II. SCOPE OF SERVICES Draper Aden Associates will survey the areas for topography, provide a design to establish proper drainage, aid the County in selecting an appropriate contractor for each site, review shop drawings and submittals for soil fabric, fill material and any required appurtenances, oversee the work after completion and provide certification that the work has been completed as designed and agreed upon. III. FEES A. Survey of two sites and incorporation into site plans……………….. $5,200 B. Basic Design Services for repair design of drainage system…………………… $7,000 SUBTOTAL, DESIGN: ............................. $7,000 C. Review of Shop drawings and submittals …………………………….......... ....... $300 D. Construction Administration (RFI’s, Field Questions) ............................... $1,500 DocuSign Envelope ID: A3EA85FF-D162-47E7-9D24-6416E7F6B6CE Task Order Request Drainage Repair – 2200365 February 3, 2022 Page 2 of 3 E. Site visits with written reports………………………………………………………… ... $1,700 SUBTOTAL, CONSTRUCTION PHASE: ............................... $3,500 TOTAL ………..……………………………………………………………………. $15,700 (Note: allowances for reimbursable costs (mileage, printing) are included) IV. DELIVERABLES Our deliverable documents to you will be in the form of electronic or plotted versions of AUTOCAD drawings and specifications in Word format. We assume that we will provide one such set of documents per design team review or submittal to owner, and one final such set of documents for use as project construction documents. A final certification of the designed work will be provided after the work is completed to satisfaction of the Engineer. V. ASSUMPTIONS  Our service includes reasonable and appropriate response to review comments made by the Owner.  County will solicit for contractor pricing through an informal bid process and not formally bid these projects.  No permits will be required to be obtained or modified for this work.  Cost estimating and special inspections are excluded from this proposal. If this proposal is acceptable, please let us know by signing where indicated below and returning a copy to us. Please let us know if our scope and fee statements do not align with your expectations or project budget. We look forward to working with you again. If you have any questions, please feel free to call me at 919 455 5804. Sincerely, DRAPER ADEN ASSOCIATES Tyrus C. Clayton, Jr. Principal/ Vice President DocuSign Envelope ID: A3EA85FF-D162-47E7-9D24-6416E7F6B6CE Task Order Request Drainage Repair – 2200365 February 3, 2022 Page 3 of 3 Drainage Issues at Eubanks Road Landfill and Walnut Grove Recycling CenterOrange County, NC Draper Aden Associates Proposal No.: 2200365 AUTHORIZATION TO PROCEED ______________________________________ ________________ Orange County Solid Waste Management date THIS INSTRUMENT HAS BEEN PRE-AUDITED IN THE MANNER REQUIRED BY THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT: ______________________________________ ________________ Office of the Chief Financial Officer date THIS SCOPE OF WORK IS SUBMITTED PURSUANT TO THE TERMS OF THE AGREEMENT DATED FEBRUARY 22, 2017, AS AMMENDED EFFECTIVE FEBRUARY 22, 2022, BETWEEN DRAPER ADEN ASSOCIATES AND ORANGE COUNTY. __________________________________ __ _ Draper Aden Associates date DocuSign Envelope ID: A3EA85FF-D162-47E7-9D24-6416E7F6B6CE 2/22/2022 2/22/2022 2/23/2022