Loading...
HomeMy WebLinkAboutAgenda 01-18-22; 12-5 - Information Item - Memorandum Regarding SPOT 6.0 STIP 2024-2033 1 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Board of County Commissioners FROM: Nishith Trivedi, Orange County Transportation Planner CC: Craig Benedict, Orange County Planning Director Tom Altieri, Comprehensive Planning Supervisor DATE: January 18, 2022 SUBJECT: SPOT 6.0/STIP 2024-2033 Attachment: SPOT 6 Project Scores in Orange County This memo is to provide an update to the Board of County Commissioners (BOCC) on the Strategic Prioritization of Transportation (SPOT) cancellation, project scores in Orange County, and the status of the State Transportation Improvement Program (STIP). Background: Biennially, the North Carolina Board of Transportation (BOT) adopts a ten-year STIP that funds and schedules transportation projects throughout the state for all modes of transportation. The STIP implements the adopted Comprehensive Transportation Plans (CTP) and Metropolitan Transportation Plans (MTP) of Metropolitan and Rural Planning Organizations (MPO/RPO). The CTPs and MTPs are used by MPO/RPOs to determine which projects are submitted for consideration in the STIP using the SPOT process. In November, NCDOT's SPOT Office released the quantitative scores for projects that had been submitted for scoring in the most recent cycle Prioritization 6.0 (P6.0). These scores were released for informational purposes only, and will not be used in the prioritization or selection of projects. The P6.0 process has been halted, and a different process will be used to develop the next STIP for Fiscal year 2024-2033. However, the scores can still provide us with insight to help our decision making when it is time to submit projects in Prioritization 7.0 a few years from now. Orange County and local towns' project scores are included in the attachment for reference. Key highlights for Orange County-sponsored projects are summarized below: Highway Projects: • Old NC-86 (SR-1009) Modernization — Eubanks Road to 1-40 — highest scoring Division Needs fundable project. o Future SPOT — rural roads should focus on being brought to modern standards o Division Needs projects are limited to Secondary Routes (SR) and individual jurisdictions • NC 54 Improvements — Mebane Oaks Road to Old Fayetteville Road — highest scoring Regional Impact o Future SPOT regional corridors (US and NC) should focus on capacity improvements. 2 Transit, Rail and Bike/Pedestrian Projects: • Chapel Hill Transit's North-South Bus Rapid Transit (BRT) will not be in the Draft STIP 2024-2033 o Transit projects compete against all other non-highway projects per SPOT normalization process. • Dimmocks Mill Road — highest scoring rail project in Orange County — Hillsborough o Rail projects typically do well in Regional and Statewide funding categories • Buckhorn Road — submitted by NCDOT Rail Division — 2nd highest scoring rail project o Future SPOT project should focus on the portion south of 1-85/1-40 • Orange County may need to address local match and local administration prior to submitting bike/pedestrian projects. The Draft STIP 2024-2033 will be released in spring 2022 for public comment. It will include revised cost estimates for all projects brought on by increasing project expenses. NCDOT does anticipate some revenue from the new Federal transportation authorization bill called Infrastructure Investment and Jobs Act (IIJA). However, NCDOT has been presenting their financial outlook to local and regional agencies across the state, expressing the following key points as they prepare drafting the 2024-2033 STIP: • Cost projections may exceed $11 billion, IIJA funding to NC may provide about $8 billion. o Draft STIP was initially estimated at $7 billion in October 2021 o Current and previous STIPs were limited to $2 — 3 Billion • Some committed STIP 2020-2029 projects will be removed to ensure a financially constrained Transportation Improvement Program (TIP). o NCDOT will work with MPO and RPO to coordinate on project schedule This concludes the current SPOT cycle. Transportation planning staff will continue to keep the BOCC apprised of the state's STIP process. Feel free to contact staff with any questions. 2 SPOT 6 Project Scores in Orange County 3 Highway Projects Funding •• •- •-• SPOT ID Project From To Description Cost to NCDOT Category • �� • • Division SR 1005 (Old NC 87 in Alamance SR 1942(Jones H111162* Modernize roadway $ 42,500,000 � Needs Greensboro Road) County Ferry Road Modernize roadway including Division SR 1006(Orange SR 1102 (Dodsons wider lanes and paved H185154* Needs Grove Road) Crossroads)1-85 shoulders. Includes addition of $ 9,500,000 turn lanes at multiple intersections. Modernize roadway including Division SR 1102 (Dodson SR 1006(Orange wider lanes and paved H185157* Needs Crossroads) Grove Road) NC 54 shoulders. Improve multiple $ 15,000,000 intersections by adding turn lanes. Modernize roadway including Division SR 1007(Mebane SR 2126/2128(Old wider lanes and paved H185158* Needs Oaks Road) NC 54 Hillsborough Road) shoulders. Improve multiple $ 15,300,000 intersections by adding turn lanes. Modernize roadway including Division SR 1727(Eubanks wider lanes and paved H185159* Needs SR 1009(Old NC 86) 1-40 Road) shoulders. Improve multiple $ 10,700,000 intersections in corridor by adding turn lanes. Rex Road/Kousa Widen to four lanes with Division SR 1727(Eubanks SR 1725 (Millhouse H190432 Needs Road) Trail-end of four Road) pedestrian, bicycle,and transit $ 5,800,000 lane cross-section facilities. Create two roundabouts along Division SR 1006(Orange SR 1148(Eno SR 1192(Mayo Orange Grove Road one at Eno H192437* $ 5,800,000 Needs Grove Road) Mountain Road) Street) Mountain Road and one at Mayo Street. Division SR 1731(Whitfield Construct a one-lane H192689 SR 1734(Erwin Road) $ 3,200,000 Needs Road) roundabout. SPOT 6 Project Scores in Orange County 4 Highway Projects Funding •• •- •-• SPOT ID Project From To Description Cost to NCDOT Category • �� • • Improve the intersections with the following roads with turn lanes: Division SR 1306(Lebanon SR 1345(Mill Creek SR 1004(Efland- -SR 1412(Daniel Farm Road) H190523* Needs Road) Road) Cedar Grove Road) -SR 1343 (Doe Run Road) $ 5,100,000 -SR 1352(North Frazier Road) -SR 1340(High Rock Road) Install a roundabout at SR 1004 (Efland-Cedar Grove Road) Construct a road on a new Division H192878 Needs New Route-NC 57 US 70 NC 57 location to connect US 70 to NC $ 28,700,000 57, northwest of Hillsborough. Widen to four lanes with a Regional median and Improve H111036* NC 86 US 70 Bypass North of NC 57 $ 21,300,000 Impact intersections at US 70 Bypass and NC 57. RCI corridor improvements along NC 54 from the vicinity of Old Fayetteville Rd through the Regional SR 1107/1937(Old intersection of W Main St and H140374-E NC 54 West Main Street $ 8,100,000 Impact Fayetteville Road) east towards James St in Carrboro with full use of updated Complete Streets policy components. H170804* Regional US 70 US 70 Connector Reconstruct interchange to an at $ 18,200,000 Impact grade intersection. Regional SR 1007(Mebane SR 1107(Old H185160* NC 54 Widen to multilanes $ 125,500,000 � Impact Oaks Road) Fayetteville Road) SPOT 6 Project Scores in Orange County 5 Highway Projects Funding •• •- •-• SPOT ID Project From To Description Cost to NCDOT Category • �� • • H190035 Regional US 70 SR 1004(Efland- Add left turn lanes on all four $ 3,000,000 Impact Cedar Grove Road) approaches of the intersections. Access management of driveways,sidewalks and shared Regional use path facilities,four lane curb H191598 NC 54 NC 119 Mebane Oaks Road $ 106,000,000 Impact and gutter cross section, intersection and roundabout improvements Statewide NC 54(Raleigh Road) H149000-A US 15/501 Improve Interchange $ 21,500,000 Mobility (TIP U-5774A) H149001-A Statewide US 15, US 501 (TIP U- NC 54/86(South Improve interchange $ 38,100,000 Mobility 5304A) Columbia Street) Statewide US 501, US 15 (TIP U- Intersection Improvement for an H149001-B Mobility 530413) Sage Road standalone superstreet $ 28,286,000 intersection concept Statewide US 15, US 501 (TIP U H149001-C Manning Drive Construct Interchange $ 37,446,000 •• • � Mobility 5304E) US 15/501, NC 54 Construct operational i Statewide US 15, US 501 (TIP U- SR 1742(Ephesus improvements and add H149001-D interchange(Raleigh $ 35,343,000 Mobility 5304D) Road) Church Road) sidewalks,sidepaths, and transit accommodations. Construct capacity and Statewide US 15, US 501 (TIP U- SR 1742(Ephesus operational improvements and H149001-E I-40 $ 38,000,000 Mobility 5304F) Church Road) add sidewalks,sidepaths,and transit accommodations. * Orange County Priorities SPOT 6 Project Scores in Orange County 6 Bike/Ped Projects SPOT ID Project From To Description Cost to NCDOT Construct sidepath along north B192919 East Franklin Street Booker Creek Greenway Bolin Creek Greenway side of Franklin Street to connect $ 2,030,000 Sidepath Trail Trail Bolin and Booker Creek Greenway Trails NC 86(Martin Luther SR 1777(Homestead Construct multi-use sidepaths B193089 King,Jr. Parkway) SR SR 1770(Estes Drive) Road) along NC 86 $ 4,836,700 1777(Homestead Road) Construct bicycle lanes on both B192899 Estes Drive Caswell Rd East Franklin Street sides of the street and a sidewalk $ 423,800 on the south side of the street. SR 1843(Seawell School SR 1780(Estes Drive SR 1777(Homestead Construct a sidepath along the B171175 Road) Extension) Road) entire corridor from Estes Drive $ 3,289,000 to Homestead Road. Tanyard Branch- Village Drive&Tanyard Construct an off-road multi-use B150258 Carrboro Connector Branch Greenway Broad Street path providing bicycle and $ 1,273,000 pedestrian safety. Bolin Creek Greenway Extend Bolin Creek Greenway B193180 Extension Estes Drive Umstead Park Estes Drive from Umstead Park to Estes Drive $ 1,850,000 to connect bike-ped facilities Construct a multi-use sidepath B170403 Church rch Road)oCarmel US 15/501 SR 1913 (Bennett Road) on one side of Mt.Carmel Church $ 808,000 Chad Road. Ephesus Church Road Construct bicycle lanes and 6193177 Pinehurst Drive Pope Road $ 756,000 Pope Road sidewalks. 6190579 US 70 MUP N Construct a 10' multiuse path on Ninth Street Ashbury Boulevard $ 1,108,000 the north side of US 70. SPOT 6 Project Scores in Orange County 7 Transit Projects SPOT ID Funding Category Project Description Cost to NICDOT Final location to be determined but T190598 Division Needs Mebane Park and Ride Lot generally in the vicinity between 1-40 and $ 4,342,800 Mebane Oaks Road BRT service from the Chapel Hill Transit T192636 Division Needs Chapel Hill-RTP BRT Center at UNC Hospital to the new $ 55,768,100 ' Regional Transit Center in RTP Eubanks park-and-ride to Southern Village. T192652 Division Needs North-South BRT Entire route is within the limits of the Town $ 9,444,380 of Chapel Hill. North-South BRT from Eubanks park-and- T192656 Division Needs North-South BRT w/Hillsborough ride to Southern Village; includes express $ 13,589,406 service to Hillsborough. CT Express Route runs between Pitts oro and Chapel Hill (with some runs also serving Siler City). In long-term,vehicle T193079 Division Needs Expansion vehicle for CT Express Route may also be used for future possible $ 450,000 connecting service to Sanford,or future fixed route services related to Chatham T193096 Division Needs Hybrid Vans for Shared Ride Service Specified zones within the Orange County $ 345,600 Public Transportation service area Service begins at North Carolina Central University and terminates in Carrboro. T193141 Regional Impact Durham-Carrboro BRT Serves downtown Durham, Duke $ 14,154,480 University,South Square, Patterson Place, Easttowne,downtown Chapel Hill, UNC Campus, UNC hospitals,and Carrboro. UNC Hospital in Chapel Hill to the Regional T192949 Regional Impact GoTriangle Route 800 Headway Reduction Transit Center in RTP/Durham.Serves UNC $ 205,215 campus and Southpoint. SPOT 6 Project Scores in Orange County 8 Transit Projects SPOT ID Funding Category Project Description Cost to NCDOT Begins in Carrboro,serving downtown T192852 Regional Impact Carrboro-RTP BRT Carrboro,downtown Chapel Hill, UNC $ 55,815,340 campus, UNC hospital,Southpoint,and RTP. BRT service from North Carolina Central T192845 Regional Impact Durham-Chapel Hill BRT University in Durham to UNC Hospital in $ 44,226,075 Chapel Hill. Using primarily the 15/501 corridor. Durham Station in downtown Durham to UNC Hospital in Chapel Hill.Serves Duke T192955 Regional Impact GoTriangle Route 400 Headway Reduction University,South Square, Patterson Place, $ 136,810 Easttowne,downtown Chapel Hill and the UNC campus. T192947 Regional Impact North-South BRT w/Pittsboro From Eubanks park-and-ride in Chapel Hill $ 16,717,048 to Chatham Park in Pittsboro. BRT service along NC 54,Western Blvd, and T192908 Regional Impact Chapel Hill to North Hills BRT Wake Forest Rd serving Chapel Hill, RTP, $ 100,000,000 Morrisville,Cary,and Raleigh. UNC Hospital in Chapel Hill to Durham T192957 Regional Impact GoTriangle Route 405 Headway Reduction Station in Downtown Durham. Express $ 273,620 service serving UNC campus,downtown Chapel Hill,and Duke Universtiy. Durham Station in Downtown Durham to Efland-Cheeks Community Center in T171722 Regional Impact ODX Route Headway Reduction Orange County.Serves Duke University, $ 68,405 Durham Tech Orange Campus, downtown Hillsborough, and Mebane in Alamance County. SPOT 6 Project Scores in Orange County 9 Rail Projects Funding •• •. SPOT ID Project Location Description Cost to NCDOT Category • •• • - Close the existing the at-grade crossing of SR 1402 (Crossing#735 4745)which connects East NCRR/NS H SR 1146(Mattress Factory Washington Street and US 70. Replace with a new R190451 Division Needs Line Road) northward across East at-grade crossing by extending Mattress Factory $ 30,000,000 Washington Street to US 70 Road (SR 1146) northward across East Washington Street and the NCRR/NS H Line right-of-way to intersect US 70. Construction of grade separation at Dimmocks NS/NCRR H Line crossing of Mill Road (Crossing#735 1545)and closure of Statewide NCRR/NS H Bellvue Street existing at-grade crossing(Crossing R150318 Dimmocks Mill Road in $ 23,711,440 Mobility Line Hillsborough. #735 152D)and West Hill Avenue existing at- grade crossing(Crossing#735 151W). Project includes a pedestrian tunnel at Hill Avenue. This project would realign Mt.Willing Road to line up with Efland Cedar Grove Road at US 70 and Statewide NCRR/NS H would remove the at-grade crossing(735 145T)of R191321 Mobility Line Mt.Willing Rd the Norfolk Southern Rail Line at mile post H- $ 31,000,000 37.31 and would construct a bridge over this line. This line serves as a connect from Greensboro to Durham. Construction of new railroad bridge or other Statewide NCRR/NS H Exchange Park Lane(Crossing railroad approved method over Exchange Park R170029 $ 19,900,000 Mobility Line #735 158U) Lane(Crossing#735 158U)to accommodate pedestrian traffic within the structure. Statewide NCRR/NS H Control Point Funston (MP Construction of second main track from Control R150319 Mobility Line 49.8)to East Durham Yard Point Funston (MP 49.8)to East Durham Yard (MP $ 50,800,000 (MP 56) in Durham 56) in Durham. SPOT 6 Project Scores in Orange County 10 Rail Projects Funding •• •. SPOT ID Project Location Description Cost to NCDOT Category • •• • • R170033 Statewide NCRR/NS H MP H 38 to MP H 40.4 near Construction of curve radius improvements from $ 4,000,000 Mobility Line Efland MP H 38 to MP H 40.4 near Efland. Statewide NCRR/NS H MP H 44.5 to MP H 48 east of Construction of curve radius improvements from R170032 $ 4,000,000 •� Mobility Line Hillsborough MP H 44.5 to MP H 48 east of Hillsborough. Construction of curve radius improvements near Collins Ridge in Hillsborough from approximately R192631 Statewide NCRR/NS H NCRR H Line from MP 41.7 to MP 41.7 to MP 42.2.According to local officials, $ 5,900,000 a' f Mobility Line MP 42.2. property for realignment of track was previously obtained. Construction of grade separation east of Frazier Road of a realigned SR 1114(Buckhorn Road) in The intersection of Buckhorn Mebane, NC. Project also includes closure of Statewide NCRR/NS H Road and the railway. existing at-grade crossing of Buckhorn Road R190351* Mobility Line Between E Washington (Crossing#735 141R).This is part of a larger $ 23,600,000 Street and S Frazier Road. project that involves realigning the widened SR 1114(Buckhorn Road) north of the 1-40 interchange with US 70 to a 4-lane divided highway as per Design Alternative 2. * Submitted by NCDOT Rail Division