TO: Board of County Commissioners
FROM: Nishith Trivedi, Orange County Transportation Planner
CC: Craig Benedict, Orange County Planning Director
Tom Altieri, Comprehensive Planning Supervisor
DATE: January 18, 2022
SUBJECT: SPOT 6.0/STIP 2024-2033
Attachment: SPOT 6 Project Scores in Orange County
This memo is to provide an update to the Board of County Commissioners (BOCC) on the
Strategic Prioritization of Transportation (SPOT) cancellation, project scores in Orange
County, and the status of the State Transportation Improvement Program (STIP).
Background:
Biennially, the North Carolina Board of Transportation (BOT) adopts a ten-year STIP that
funds and schedules transportation projects throughout the state for all modes of
transportation. The STIP implements the adopted Comprehensive Transportation Plans
(CTP) and Metropolitan Transportation Plans (MTP) of Metropolitan and Rural Planning
Organizations (MPO/RPO). The CTPs and MTPs are used by MPO/RPOs to determine
which projects are submitted for consideration in the STIP using the SPOT process.
In November, NCDOT's SPOT Office released the quantitative scores for projects that had
been submitted for scoring in the most recent cycle Prioritization 6.0 (P6.0). These scores
were released for informational purposes only, and will not be used in the prioritization
or selection of projects. The P6.0 process has been halted, and a different process will
be used to develop the next STIP for Fiscal year 2024-2033. However, the scores can still
provide us with insight to help our decision making when it is time to submit projects in
Prioritization 7.0 a few years from now.
Orange County and local towns' project scores are included in the attachment for reference.
Key highlights for Orange County-sponsored projects are summarized below:
Highway Projects:
• Old NC-86 (SR-1009) Modernization — Eubanks Road to 1-40 — highest scoring Division
Needs fundable project.
o Future SPOT — rural roads should focus on being brought to modern standards
o Division Needs projects are limited to Secondary Routes (SR) and individual
jurisdictions
• NC 54 Improvements — Mebane Oaks Road to Old Fayetteville Road — highest scoring
Regional Impact
o Future SPOT regional corridors (US and NC) should focus on capacity
improvements.
2
Transit, Rail and Bike/Pedestrian Projects:
• Chapel Hill Transit's North-South Bus Rapid Transit (BRT) will not be in the Draft STIP
2024-2033
o Transit projects compete against all other non-highway projects per SPOT
normalization process.
• Dimmocks Mill Road — highest scoring rail project in Orange County — Hillsborough
o Rail projects typically do well in Regional and Statewide funding categories
• Buckhorn Road — submitted by NCDOT Rail Division — 2nd highest scoring rail project
o Future SPOT project should focus on the portion south of 1-85/1-40
• Orange County may need to address local match and local administration prior to
submitting bike/pedestrian projects.
The Draft STIP 2024-2033 will be released in spring 2022 for public comment. It will include
revised cost estimates for all projects brought on by increasing project expenses. NCDOT
does anticipate some revenue from the new Federal transportation authorization bill called
Infrastructure Investment and Jobs Act (IIJA). However, NCDOT has been presenting their
financial outlook to local and regional agencies across the state, expressing the following key
points as they prepare drafting the 2024-2033 STIP:
• Cost projections may exceed $11 billion, IIJA funding to NC may provide about $8 billion.
o Draft STIP was initially estimated at $7 billion in October 2021
o Current and previous STIPs were limited to $2 — 3 Billion
• Some committed STIP 2020-2029 projects will be removed to ensure a financially
constrained Transportation Improvement Program (TIP).
o NCDOT will work with MPO and RPO to coordinate on project schedule
This concludes the current SPOT cycle. Transportation planning staff will continue to keep
the BOCC apprised of the state's STIP process. Feel free to contact staff with any questions.
2
SPOT 6 Project Scores in Orange County 3
Highway Projects
Funding •• •- •-•
SPOT ID Project From To Description Cost to NCDOT
Category • �� • •
Division SR 1005 (Old NC 87 in Alamance SR 1942(Jones
H111162* Modernize roadway $ 42,500,000 �
Needs Greensboro Road) County Ferry Road
Modernize roadway including
Division SR 1006(Orange SR 1102 (Dodsons wider lanes and paved
H185154* Needs Grove Road) Crossroads)1-85 shoulders. Includes addition of $ 9,500,000
turn lanes at multiple
intersections.
Modernize roadway including
Division SR 1102 (Dodson SR 1006(Orange wider lanes and paved
H185157* Needs Crossroads) Grove Road) NC 54 shoulders. Improve multiple $ 15,000,000
intersections by adding turn
lanes.
Modernize roadway including
Division SR 1007(Mebane SR 2126/2128(Old wider lanes and paved
H185158* Needs Oaks Road) NC 54 Hillsborough Road) shoulders. Improve multiple $ 15,300,000
intersections by adding turn
lanes.
Modernize roadway including
Division SR 1727(Eubanks wider lanes and paved
H185159* Needs SR 1009(Old NC 86) 1-40 Road) shoulders. Improve multiple $ 10,700,000
intersections in corridor by
adding turn lanes.
Rex Road/Kousa Widen to four lanes with
Division SR 1727(Eubanks SR 1725 (Millhouse
H190432 Needs Road) Trail-end of four Road) pedestrian, bicycle,and transit $ 5,800,000
lane cross-section facilities.
Create two roundabouts along
Division SR 1006(Orange SR 1148(Eno SR 1192(Mayo Orange Grove Road one at Eno
H192437* $ 5,800,000
Needs Grove Road) Mountain Road) Street) Mountain Road and one at
Mayo Street.
Division SR 1731(Whitfield Construct a one-lane
H192689 SR 1734(Erwin Road) $ 3,200,000
Needs Road) roundabout.
SPOT 6 Project Scores in Orange County 4
Highway Projects
Funding •• •- •-•
SPOT ID Project From To Description Cost to NCDOT
Category • �� • •
Improve the intersections with
the following roads with turn
lanes:
Division SR 1306(Lebanon SR 1345(Mill Creek SR 1004(Efland- -SR 1412(Daniel Farm Road)
H190523* Needs Road) Road) Cedar Grove Road) -SR 1343 (Doe Run Road) $ 5,100,000
-SR 1352(North Frazier Road)
-SR 1340(High Rock Road)
Install a roundabout at SR 1004
(Efland-Cedar Grove Road)
Construct a road on a new
Division
H192878 Needs New Route-NC 57 US 70 NC 57 location to connect US 70 to NC $ 28,700,000
57, northwest of Hillsborough.
Widen to four lanes with a
Regional median and Improve
H111036* NC 86 US 70 Bypass North of NC 57 $ 21,300,000
Impact intersections at US 70 Bypass
and NC 57.
RCI corridor improvements
along NC 54 from the vicinity of
Old Fayetteville Rd through the
Regional SR 1107/1937(Old intersection of W Main St and
H140374-E NC 54 West Main Street $ 8,100,000
Impact Fayetteville Road) east towards James St in
Carrboro with full use of
updated Complete Streets policy
components.
H170804* Regional US 70 US 70 Connector Reconstruct interchange to an at $ 18,200,000
Impact grade intersection.
Regional SR 1007(Mebane SR 1107(Old
H185160* NC 54 Widen to multilanes $ 125,500,000 �
Impact Oaks Road) Fayetteville Road)
SPOT 6 Project Scores in Orange County 5
Highway Projects
Funding •• •- •-•
SPOT ID Project From To Description Cost to NCDOT
Category • �� • •
H190035 Regional US 70 SR 1004(Efland- Add left turn lanes on all four $ 3,000,000
Impact Cedar Grove Road) approaches of the intersections.
Access management of
driveways,sidewalks and shared
Regional use path facilities,four lane curb
H191598 NC 54 NC 119 Mebane Oaks Road $ 106,000,000
Impact and gutter cross section,
intersection and roundabout
improvements
Statewide NC 54(Raleigh Road)
H149000-A US 15/501 Improve Interchange $ 21,500,000
Mobility (TIP U-5774A)
H149001-A Statewide US 15, US 501 (TIP U- NC 54/86(South Improve interchange $ 38,100,000
Mobility 5304A) Columbia Street)
Statewide US 501, US 15 (TIP U- Intersection Improvement for an
H149001-B Mobility 530413) Sage Road standalone superstreet $ 28,286,000
intersection concept
Statewide US 15, US 501 (TIP U
H149001-C Manning Drive Construct Interchange $ 37,446,000 •• • �
Mobility 5304E)
US 15/501, NC 54 Construct operational
i
Statewide US 15, US 501 (TIP U- SR 1742(Ephesus improvements and add
H149001-D interchange(Raleigh $ 35,343,000
Mobility 5304D) Road) Church Road) sidewalks,sidepaths, and transit
accommodations.
Construct capacity and
Statewide US 15, US 501 (TIP U- SR 1742(Ephesus operational improvements and
H149001-E I-40 $ 38,000,000
Mobility 5304F) Church Road) add sidewalks,sidepaths,and
transit accommodations.
* Orange County Priorities
SPOT 6 Project Scores in Orange County 6
Bike/Ped Projects
SPOT ID Project From To Description Cost to NCDOT
Construct sidepath along north
B192919 East Franklin Street Booker Creek Greenway Bolin Creek Greenway side of Franklin Street to connect $ 2,030,000
Sidepath Trail Trail Bolin and Booker Creek
Greenway Trails
NC 86(Martin Luther
SR 1777(Homestead Construct multi-use sidepaths
B193089 King,Jr. Parkway) SR SR 1770(Estes Drive) Road) along NC 86 $ 4,836,700
1777(Homestead Road)
Construct bicycle lanes on both
B192899 Estes Drive Caswell Rd East Franklin Street sides of the street and a sidewalk $ 423,800
on the south side of the street.
SR 1843(Seawell School SR 1780(Estes Drive SR 1777(Homestead Construct a sidepath along the
B171175 Road) Extension) Road) entire corridor from Estes Drive $ 3,289,000
to Homestead Road.
Tanyard Branch- Village Drive&Tanyard
Construct an off-road multi-use
B150258 Carrboro Connector Branch Greenway Broad Street path providing bicycle and $ 1,273,000
pedestrian safety.
Bolin Creek Greenway Extend Bolin Creek Greenway
B193180 Extension Estes Drive Umstead Park Estes Drive from Umstead Park to Estes Drive $ 1,850,000
to connect bike-ped facilities
Construct a multi-use sidepath
B170403 Church rch Road)oCarmel US 15/501 SR 1913 (Bennett Road) on one side of Mt.Carmel Church $ 808,000
Chad
Road.
Ephesus Church Road Construct bicycle lanes and
6193177 Pinehurst Drive Pope Road $ 756,000
Pope Road sidewalks.
6190579 US 70 MUP N Construct a 10' multiuse path on Ninth Street Ashbury Boulevard $ 1,108,000
the north side of US 70.
SPOT 6 Project Scores in Orange County 7
Transit Projects
SPOT ID Funding Category Project Description Cost to NICDOT
Final location to be determined but
T190598 Division Needs Mebane Park and Ride Lot generally in the vicinity between 1-40 and $ 4,342,800
Mebane Oaks Road
BRT service from the Chapel Hill Transit
T192636 Division Needs Chapel Hill-RTP BRT Center at UNC Hospital to the new $ 55,768,100 '
Regional Transit Center in RTP
Eubanks park-and-ride to Southern Village.
T192652 Division Needs North-South BRT Entire route is within the limits of the Town $ 9,444,380
of Chapel Hill.
North-South BRT from Eubanks park-and-
T192656 Division Needs North-South BRT w/Hillsborough ride to Southern Village; includes express $ 13,589,406
service to Hillsborough.
CT Express Route runs between Pitts oro
and Chapel Hill (with some runs also
serving Siler City). In long-term,vehicle
T193079 Division Needs Expansion vehicle for CT Express Route may also be used for future possible $ 450,000
connecting service to Sanford,or future
fixed route services related to Chatham
T193096 Division Needs Hybrid Vans for Shared Ride Service Specified zones within the Orange County $ 345,600
Public Transportation service area
Service begins at North Carolina Central
University and terminates in Carrboro.
T193141 Regional Impact Durham-Carrboro BRT Serves downtown Durham, Duke $ 14,154,480
University,South Square, Patterson Place,
Easttowne,downtown Chapel Hill, UNC
Campus, UNC hospitals,and Carrboro.
UNC Hospital in Chapel Hill to the Regional
T192949 Regional Impact GoTriangle Route 800 Headway Reduction Transit Center in RTP/Durham.Serves UNC $ 205,215
campus and Southpoint.
SPOT 6 Project Scores in Orange County 8
Transit Projects
SPOT ID Funding Category Project Description Cost to NCDOT
Begins in Carrboro,serving downtown
T192852 Regional Impact Carrboro-RTP BRT Carrboro,downtown Chapel Hill, UNC $ 55,815,340
campus, UNC hospital,Southpoint,and
RTP.
BRT service from North Carolina Central
T192845 Regional Impact Durham-Chapel Hill BRT University in Durham to UNC Hospital in $ 44,226,075
Chapel Hill. Using primarily the 15/501
corridor.
Durham Station in downtown Durham to
UNC Hospital in Chapel Hill.Serves Duke
T192955 Regional Impact GoTriangle Route 400 Headway Reduction University,South Square, Patterson Place, $ 136,810
Easttowne,downtown Chapel Hill and the
UNC campus.
T192947 Regional Impact North-South BRT w/Pittsboro From Eubanks park-and-ride in Chapel Hill $ 16,717,048
to Chatham Park in Pittsboro.
BRT service along NC 54,Western Blvd, and
T192908 Regional Impact Chapel Hill to North Hills BRT Wake Forest Rd serving Chapel Hill, RTP, $ 100,000,000
Morrisville,Cary,and Raleigh.
UNC Hospital in Chapel Hill to Durham
T192957 Regional Impact GoTriangle Route 405 Headway Reduction Station in Downtown Durham. Express $ 273,620
service serving UNC campus,downtown
Chapel Hill,and Duke Universtiy.
Durham Station in Downtown Durham to
Efland-Cheeks Community Center in
T171722 Regional Impact ODX Route Headway Reduction Orange County.Serves Duke University, $ 68,405
Durham Tech Orange Campus, downtown
Hillsborough, and Mebane in Alamance
County.
SPOT 6 Project Scores in Orange County 9
Rail Projects
Funding •• •.
SPOT ID Project Location Description Cost to NCDOT
Category • •• • -
Close the existing the at-grade crossing of SR 1402
(Crossing#735 4745)which connects East
NCRR/NS H SR 1146(Mattress Factory Washington Street and US 70. Replace with a new
R190451 Division Needs Line Road) northward across East at-grade crossing by extending Mattress Factory $ 30,000,000
Washington Street to US 70 Road (SR 1146) northward across East Washington
Street and the NCRR/NS H Line right-of-way to
intersect US 70.
Construction of grade separation at Dimmocks
NS/NCRR H Line crossing of Mill Road (Crossing#735 1545)and closure of
Statewide NCRR/NS H Bellvue Street existing at-grade crossing(Crossing
R150318 Dimmocks Mill Road in $ 23,711,440
Mobility Line Hillsborough. #735 152D)and West Hill Avenue existing at-
grade crossing(Crossing#735 151W). Project
includes a pedestrian tunnel at Hill Avenue.
This project would realign Mt.Willing Road to line
up with Efland Cedar Grove Road at US 70 and
Statewide NCRR/NS H would remove the at-grade crossing(735 145T)of
R191321 Mobility Line Mt.Willing Rd the Norfolk Southern Rail Line at mile post H- $ 31,000,000
37.31 and would construct a bridge over this line.
This line serves as a connect from Greensboro to
Durham.
Construction of new railroad bridge or other
Statewide NCRR/NS H Exchange Park Lane(Crossing railroad approved method over Exchange Park
R170029 $ 19,900,000
Mobility Line #735 158U) Lane(Crossing#735 158U)to accommodate
pedestrian traffic within the structure.
Statewide NCRR/NS H Control Point Funston (MP Construction of second main track from Control
R150319 Mobility Line 49.8)to East Durham Yard Point Funston (MP 49.8)to East Durham Yard (MP $ 50,800,000
(MP 56) in Durham 56) in Durham.
SPOT 6 Project Scores in Orange County 10
Rail Projects
Funding •• •.
SPOT ID Project Location Description Cost to NCDOT
Category • •• • •
R170033 Statewide NCRR/NS H MP H 38 to MP H 40.4 near Construction of curve radius improvements from $ 4,000,000
Mobility Line Efland MP H 38 to MP H 40.4 near Efland.
Statewide NCRR/NS H MP H 44.5 to MP H 48 east of Construction of curve radius improvements from
R170032 $ 4,000,000 •�
Mobility Line Hillsborough MP H 44.5 to MP H 48 east of Hillsborough.
Construction of curve radius improvements near
Collins Ridge in Hillsborough from approximately
R192631 Statewide NCRR/NS H NCRR H Line from MP 41.7 to MP 41.7 to MP 42.2.According to local officials, $ 5,900,000 a' f
Mobility Line MP 42.2. property for realignment of track was previously
obtained.
Construction of grade separation east of Frazier
Road of a realigned SR 1114(Buckhorn Road) in
The intersection of Buckhorn
Mebane, NC. Project also includes closure of
Statewide NCRR/NS H Road and the railway. existing at-grade crossing of Buckhorn Road
R190351* Mobility Line Between E Washington (Crossing#735 141R).This is part of a larger $ 23,600,000
Street and S Frazier Road. project that involves realigning the widened SR
1114(Buckhorn Road) north of the 1-40
interchange with US 70 to a 4-lane divided
highway as per Design Alternative 2.
* Submitted by NCDOT Rail Division