HomeMy WebLinkAboutAgenda - 12-01-2003-8hORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date:
December 1, 2003
Action Ager~a
Item No. ~ -~
SUBJECT: Roof and HVAC
DEPARTMENT: Budget/Public Works
ATTACHMENT (S):
Attachment 1. Roof Replacement Capital
Project Ordinance
Attachment 2, HVAC Replacement
for Fiscal Year 2003-04
PUBLIC HEARING: (Y/N)
INFORMATION CONTACT:
Wilbert McAdoo, 245-2727
Donna Dean, 245-2151
Capital Project Ordinance
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
No
Mebane 336-227-2031
PURPOSE: To consider approving capital project ordinances for roof and HVAC (heating,
ventilation, and air conditioning) replacements at County facilities for fiscal year 2003-04,
BACKGROUND: The County's recommended 2003-13 Capital Investment Plan (CIP) included
pay-as-you-go funding far roof replacements ($200,000) and HVAC replacements ($150,000) at
County-owned facilities,
Roof Replacement Projects
Orange County contracted with CTL Engineers for completion of a Roof Asset Management
Program (RAMP) in 1997, with assessments and data collection completed in 1998. The Board
of Commissioners received the report in spring 1999.
Staff has used the RAMP recommendations for roof replacements as a guideline each year in
prioritizing roof replacement projects to be included in the County's annual Capital Investment
Plan update. In accordance with the CTL contract, each year the firm re-assesses the County's
roofs and provides staff with an update of those that require repairs or replacements. With
capital investment funds approved by the Board of County Commissioners in recent years, the
following projects have been completed:
Recently Completed Roof Replacement Projects
Building Sector Year
Com leted
Animal Control Building All except metal (mansard) 2002/03
Dickson House All 2002/03
Purchasing & Central Services
Building All excluding front shingles replaced at time of
building renovation 2002/03
Skills Development Center Sector 3 replaced 2002/03
Government Services Annex Low slope areas only 1999/00
Jail All sectors on Old Jail (pre-1997) 1999/00
Law Office located at corner of
Margaret Lane and Court Street All 1999/00
Northside Building #1 Low slope area only 1999/00
Richard E. Whitted Human
Services Center All (excluding Central Recreation building) 1999/00
Offices located at 501 W, Franklin
St. All except barrel roof 1999/00
Skills Development Center Several low slope sectors 1999/00
County staff has reviewed the remaining RAMP recommendations for other County buildings
and identified the following as high priorities for replacement during the current 2003-04 fiscal
year.
Recommended Roof Replacement Projects for Fiscal Year 2003-04
BUILDING SECTOR(S) EST NEED/DEFICIENCIES
COST
Court St, All $57,000 The Roof Asset Management Plan (RAMP) prepared
Annex far the County in 2000 recommended replacement of
all roof sectors in 2002.
Courthcuse Shingle $15,000 The RAMP recommended replacement of the shingle
(New) portion of the New Courthouse (sloped roof on front
section of buildin in 2002.
Efland All $17,500 The RAMP recommended replacement of this roof (all
Comm. Ctr. shin le in 2003.
Northside $110,500 The RAMP recommended replacement during 2004.
Buildings 1,
2 and 3
TOTAL $200,000
3
HVAC Replacement Projects
Fiscal year 2003-04 marks the first year that the GIP has included funding for HVAC
replacements. Many of the existing HVAC systems are aged and in need of repairs and
replacement. County staff has reviewed the age, condition and potential impact of failure of
heating, ventilation and air conditioning equipment serving County buildings and have identified
the following as important priorities far replacement during the 2003-04 fiscal year.. While there
remain other outstanding projects that are in need of replacement, the chart below outlines the
ones that staff deems as the most critical at this time. As part of the scope of work for the
HVAC system design, the design engineer will be required to investigate and report on
environmentally sound and energy efficient options
Recommended HVAC Replacement Projects for Fiscal Year 2003-04
BUILDING COMPONENT EST NEED/DEFICIENCIES
COST
Courthouse Air handler $70,000 The air handler that serves the large first floor
(New) courtroom (Superior Court) is original to the building
(1954) and is well past its expected useful life..
Replacement is recommended before the need for a
more costly emergency replacement in the event of
equipment failure.
The existing equipment is located in the attic, and
was "built in" when the New Courthouse was
originally built. Removal of existing equipment will
require dismantling the unit for removal through attic
windows. Estimated replacement cost includes
installation of modular equipment, roof top units, or
"twinning" two small units to achieve the same
ca acit .
Jail Chiller $80,000 The chiller that serves the old .Jail (pre-1997) is
approximately 21 years old, and as such is past the
expected useful life of 15 to 20 years. Due to the
age of the unit, replacement parts far repair are
becoming increasingly difficult to obtain.
This equipment serves a critical building that is
occupied 24 hours per day, 7 days per week.
Replacement is recommended before the need for a
more costly emergency replacement in the event of
e ui ment failure.
TOTAL $150,000
4
FINANCIAL IMPACT: The County's CIP includes monies to complete the projects outlined
above for fiscal year 2003-04. Future County CIPs would include monies to continue the
replacement schedules for roofs and HVAC systems.
RECOMMENDATION(S): The Manager recommends that the Board of County Commissioners
approve the Roof Replacement and HVAC Replacement Capital Project Ordinances that
allocate funding to complete the projects outlined in this abstract for fiscal year 2003-04.
County Facilities Roofing Projects
Capital Project Ordinance
5
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section
13,2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is
hereby adopted.
Section 1.The project authorized provides funds to conduct a study on the maintenance and
replacement schedule including cost estimates on the roofs of all County Buildings,
The money appropriated will address high priority projects like Whiffed Human
Services, Animal Control Building, the Jail and New Courthouse. This project will be
financed by proceeds from the County's portion of the one-half cent sales taxes and
an appropriation from the County Capital Fund Balance.
Section 2.The officers of the County are hereby directed to proceed with the project within the
budget contained herein.
Section 3.The following revenue is anticipated to complete this project:
Through FY
2002-03
FY 2003-04 Through FY
2003-04
Sales Tax $583,000 $200,000 $783,000
Bond Funds $0 $0 $0
Private Placement $0 $0 $0
Dedicated Pro ert Tax $0 $0 $0
Transfer from Other Capital
Pro'ects
$100,000
$0
$100,000
County Capital Fund Appropriated
FundBafance
$100,100
0
$100,100
TotalFundin $783,100 $200,000 $983,100
Section 4.The following amount is appropriated for this project:
Through FY
2002-03
FY 2003-04 Through FY
2003-04
LandBuildin $0 0 $0
Desi n $68,000 $0 $68,000
Construction $0 $0 $0
Roofin Construction $715,100 $200,000 $915,100
Total Costs $783,100 $200,000 $983,100
Section 5.This ordinance supersedes all previous County Facilities Roofing Projects Capital
Project Ordinances.
Section 6.This ordinance shall remain in effect from .)uly 1, 1998 until June 30, 2004,
Adopted this first day of December 2003.
,Mr, G..
HVAC Project
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section
13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is
hereby adopted,.
Section 1.The project authorized provides funds for the replacement of heating, venting and
air conditioning (HVAC) systems at County facilities, Proceeds from the County's
dedicated portion of property taxes finance this project,
Section 2.The officers of the County are hereby directed to proceed with the project within the
budget contained herein,
Section 3.The following revenue is anticipated to complete this project:
Through FY
2002-03
FY 2003-04 Through FY
2003-04
Sales Tax $0 $150,000 $150,000
Bond Funds $0 $0 $0
Private Placement $0 $0 $0
Grant Funds $0 $0 $0
Dedicated Pro en Tax $0 $0 $0
TotalFundin $0 $150,000 $150,000
Section 4.The following amount is appropriated for this project:
Through FY
2002-03 FY 2003-04 Through FY
2003-04
LandBuildin $0 $0 $0
Desi n $0 $0 $0
Constmetion $0 $0 $0
HVAC Re lacements $0 $150,000 $150,000
Total Bud et $0 $150,000 $150,000
Section 5. This ordinance supersedes all previous HVAC Project Ordinances for Orange
County.
Section 6. This ordinance shall remain in effect until June 30, 2004,
~J
Adopted this first day of December 2003.