Loading...
HomeMy WebLinkAboutAgenda - 12-11-2001-9cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM A85TRACT Meeting Dace: December 11, 2001 Ac[lon Ageptla Item No. -!` SUBJECT: Approve FUntling for Initial SRe Work at Chapel Hill-Camboro Chy Schools (CHCCS) Elementary School p9 Loca[etl at Meatlowmont DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): AHacM1ment 1. November 2], 2ogt Memo from Bill Mullln re: Elementary Bchocl N9 Initial Site Wodc Contract AttaehmeM 3. Bld Tabulation for Pre-grading Package for Elementary #9 Attachment 3. November 20, 2041 Site Plan for Schools antl Town Use Agreement AHacM1ment 4. CHCCB Elementary #9 ProjeM ScM1etlule AHachmeM 5. CHCCS EIemenWryp9 ConstruMion Capital ProjeM Ordinance INFORMATION CONTACT: Donne Dean 24521st TELEPHONE NUMBERS: Hillsborough ]32-8181 Chapel Hill 968-0501 Durham 688-]331 Mebane 338-22]-2031 PURPOSE: To receive an uptlate on CHCCS Elementary School #9 end allocate November 2001 bontl funtls [o cover costs of initial site work at the school site. BACKGROUND: In November 2000, the Boats of Commissioners approved a Policy on Planning antl Funding School Capital Projects. That policy kienfifies two levels of school construction protects-Level 1 and Level 2. Level 1 projects ere those projects that have a relalively small swpe Df work and can be armmplisM1etl using a single prime contreMOr, in-house stets or entail purchasing equipment and vehicles. Level 2 protects are malor protects that require several phases to wmplele. For these projects, the Commissioners apPmve projeM footling in four phases: • Concept/Pre-Planning Phase -inclutles preliminary programming and tlesign work that would result in conceptual drawings and preliminary wst estimates. • Planning Phase - inclutles siting the facility, construction of infrastructure, antl preparation of construction tlowments in preparetion for bitltling process. Design end Construction Phase - 'includes foal design, facility constmction antl purchase cf equipment, furnlahinge, technology, antl one-time startup items. • Final Accounting Phase - provides a reconciliation of actual project expenditures with approved budget, As defined In the policy outlined above, wnstmction of Elementary School M9 in the CHCCS diatdct is a Level 2 project antl therefore requires that the Board of Gcmmissicners approve the project a[ the vadcua phases outlined above. Footling for the schcol, to be constmctetl at the Meatlowmonl subdivision in Chapel Hill, comas from a combinatlon of pay-as-you-go monies antl the recent voter approved November 2001 bond referendum. To date, Me BoaN of Commissioners have approved the following phases pf the project: • GonceptlPre-Planning Phase December 2000 -The Commissioners appropriated $132,184 in funding for the initial phase, ConcepVPre-Planning, for this project. Funding for this phase came from savings Inthe Smith Mitltlle Schaal construction protect The appropriatwn provided footling far wnaeplual drewings (schematics) antl preliminary permit fees (far the Town of Chapel Hillj for the school Planning Phase. February 7, 2001 -Per the Ccmmissicner approved policy, the Boats of County Commissioners should appoint s representative to work directly with the Board of Education as if plans and constmcis a new facility. The Board appointed Chair Halkiotie ae its Commissioner representative. March 8, 2001 -CHCCS staff presented preliminary plans to the BoaN of Commissioners iorieview. Those plans adhered to the County's Elementary School Construction SfandaNS and included a multipurpose room instead of agymnaeium. Al that [line, the Commissioners appropdatetl an additional $440,4fi2 for the Planning Phase of the protect. Funding for this phase came frcm Smtth Middle School constmctloh project savings ($24],816) antl an apprcpdation of $192.462 from the School Capital Project Funtl Balance. Specifically, this phase enfalletl: • Refining the schemafm plans; • Developing wnslruceon antl site work tle+ails; • Producing protect drawings that fix the building size antl charectedsfiw (including building elevations, exfedor finishes. and mechanical, eleUrical antl plumbing systems). During the Town of Chapel Hill approval process last spring, the Chapel Hill Tpwn Council requested that the CHCCS Board of Eduration include a full-size community gymnasium insleatl of the multipuryose mom. Estimated costs associa[etl with this upgratle are S]50,000. July 2001 -The CHCCS Boats of Education approvetl the concept of includlnq the gym in the tlesign plans providing that the District and the Town mold agree on how to compensate CHCCB for the additional Cona[NCIIOn CnaI9. September 2A, 2001 -During the Joint meeting pf the Rvo school boards antl the Commissioners, CHGC$ staff presentetl revisetl plans for Elementary #9 that included the gymnasium. At that time, the Town end BoaN of Education had not agreed on the spedfcs of how Chapel Hill would compensate the dieMct for the gymnasium cos[. One proposal includetl the Town re-insisting its financial support of school resource offiwre and offering the disfdct a joint-use agreement for the proposed Npmes$atl Center aquatic center. antler that particular plan, the Town would have scheduled atltlitional time for the district's high school swim teams. After reviewing the plans, the Commissioners asketl the CHCCS BcaM of Etlumtlon to request full funding of the gym construction met from the Town of Chapel Hill in lieu of accepting the proposal of tletlicatetl swim time. Slnce that time, the Town Council has egreetl to reimburse the disMct In three annual installments of $250,000, November 6, 2001 -Voters approvetl the November 2001 band referendum that included funds for consimction of Elementary k9 November 26, 2001 -The Town of Chapel Hill approvetl a Special Use Permit for Elementary #g. Nezt Steps Attachments 3 antl 4 of [his abshacl offer a site plan antl a project schedule for the school, At this point, the tlis[nd requests that the Commissioners appropriate $235,000 of recently approvetl bond funds to rover three protect components -construction bitldinq, pre-gratling of the site antl project contingency (see Attachment 1). The final step of Oe Planning Phase of this protect is the bidtling process. The tlisMCt is in [he process of finalizing the builtling spechicetions antl protlucing construction documents required in the bitltling process. The finished plans and spacifceiions provide the level of apedcity required by contractors to develop mnsVUCtion bid estimates. They become part of the consWction conhact tlocuments that connectors use to build a facility, The tlistdct's goal Is to advertise entl solicit construction bids in February 2002. Projected vests of the bidding component of [he project are about $38,000. Following receipt and analysis of the constmction bitls, CHCCS staff would present recommentlation to the Board of Etluce[lon entl [he Boak cf Counfy Commissioners for approval. In oMer to keep the protect on schetlule, CHCCS recently solicitetl bids far clearing [he building patl area end providing necesaery erosion control measures. Twenty-one contmctom submlttetl bMS with SanfoN Contractors, Inc. of 98nfcN submitting the lowest bitl at $166,8511 (see Attachment 2 of this abstract for tletails). The project butlget compiled in Febmary 2001 by the CHCCS staff included $955,000 for site development. It Is important io note that the $188,850 requestetl by iha district now represents a Ilmltetl amount of site development work. Major site work will he part of [he final constmction bitls. The disbict also requests $32,150 for contingency funtls to cover unforeseen Items asscciated with grading end constmction, for example, rock betls. As outlinetl in the Policy on Planning and Funding School Capital Projects, schools have the latitude to shift funds between major components, provitling that the actual cost of theprojec[ tloas not exceed budget. These particular components are includetl in the Design entl Construction phase of the Level 2 project. Final Accounting Phase At ilia close of fhe pmlect, this phase will reconcile actual project expentlhures with the approved budget entl prcvitle the Boertl whh a'Yinal accounting" of the protect. FINANCIAL IMPACT: As statetl earlier, tootling for Oe first Iwo BOCC approval phases of this protect came from project savings at Smith Mitldle School ($380000) entl an appmpdafion from the School Capital Project Funtl Balance ($182,462). Funding far the next three protect components - wnstmclion bidding, pre- gratling of the site entl pmlect contingency woultl come from the recently approved November 2001 bontl refarehtlum. The following chart outlines [his information'. Phaee CNCCS Funtlinp Re uael Funtlin Source Lame Pre-Plannin Phase ¢vetl 1&0&00 Schematic Deai n 81 W,t e4 Town rvvalPmcess 525.000 Pro)ed Savings at Smith Middle School Tp(el Cpnce Wie-Plannin PM1es¢ 5132184 Plannin PM1ase rovetl 03/03101 Deal nDOVelo menr $tgP,g11 Project Savings 015miN Town oval Process $]3 WO Mitltlle Srliool an0 Approprlatlon MSCh¢¢i conavudion Dommenta 8225.36] caplet FUna aelance Bitltling (not approvetl on 3I03/01- nd utletl In l2/fl/m reguesl) $3fi,000 November 2001 Bontl Tdel Plannin P6ese 84Td 2]B Oesi n antl Consbuctlon Phau Re ue 51eU 12/11/01 Pr¢~ raGin $16fi 950 Conlin en $32,150 NOVBmb0r 20m Bontl Tofal Oesi nantl Conslvcflsn PM1ase 8188,000 Total CHCCS Footling Request Eap],463 As stated eadieq CHCCS staff will present constmc[ion bid results to the Boek of Education end the BoeN of Commiasionera for eppmval aker February 2002. RECOMMENDATION (S): The Manager rewmmentls that the Boartl of County Commissioners receive [he project uptla[e for CHCCS Elementary School fl9 antl adopt the attached Elementary School #9 ConsWCtion Capital Project Ordinance, qH L.,,,~,~{-~ 1 CHAPEL HILL -CARRBORO CITY SCHOOLS 750 Merritt Mill Roatl Chapel Hill, North Cardlna 27516-2881 Telephone: (918) 967-8211 Fax: (918)968-2474 NNI G. Petleraen 8Mw $mopga,Avb~em SUpeMlendenl Suparimendenl Far Suppm awvime WIIIYm J. Yullin, D'recbr W Fadlba Mtneae,nnt MEMORANDUM TO: Sbve Scroggs FROM: BiN Mullin SUBJECT: Elementary School pg In1Na1 Bh6 Wark Collect DATE: Now:mber 27, 2001 Elementary School pg le sdletlulatl ro open (or UrB 2005-g4 school year. Chapel HNI Town CouncN epplovetl the applbetbn for a Spedal Use Permit on November 25. A phasetl Zonllg Compliance Peantl will be requested allowing builtling site preparation [o begin ihfialtyfolbvretl by tlevelopment work ihroughoe Ma site. In preparation for Nb phased implemenbtbn a slte tldvdopmentactivity, wnsWeion Dlans arM spechkalions were advadieed entl bids were openetl on November 15, 20D1. Tha bkle represent tleamg of the buikigg pad area entl pnavitling necassaryeroslon mnwl mBeBarea. Contreecr padicipatbn was excelbnt wdh bentyane bbs submitted fo perform the work. The bw bitl of $186,650 waa eubmhbtl by Sanford Wntractore, Ino. of BenfoM, NC. the cert~ed bid bbulaSPn Is attachetl. It Y Impodarrt to nob Out thY bb repressors a limded amoGm of the ally tlevebpment work b ensure that consbuctlon of the builtling can acwr an achetlule. The majority of sde work wNl ba inclutletl In rho conatruGbn bide teal wIN ba openetl in February 20112. The Bgard of County CDmrtlissionen: prevldusy approved footling requests for the tleYgn of a si~a atwy, fulty tlaylight achod. On November 8, the vobre of Orenge County approvatl a bond refereMUm 1ha11nGudetl footle to construe Elemardary School pg. Aa a contlabn of the county's caPhal tmMing Polley, fhe BoeN of Courtly Commiuioners moat approval Me Sanford ContreGOre wnlree arM a prejee contlmlanq. A funding request for Iheaa hems has been reques[etl Far inGUabn at the December 11° County Commissbnere meming. If appmvetl, the mnbactwill maimain 8u project aclutlule and begin sae deadng b early January. A copy of the project schedule b abo attached FaGlhies Management entl the projad arohaeea reaxnmeM approval of Me SanfaN Contrail: ~ ~ ~ CORLEY 1~CDFOOT ZACK„>. .¢f X~i6('(5 ENCI e5 ~ r~nu H60.5 November 19, 31p1 CJ' ., nw Mr. WBBam l• MaBk9 Duecbr °`"~ ` " fACILITIfS c ~ Pa ~g ~ ~ c ,~;,.rao » ~ MgNpGcMEM A a ]BB b m o ltysr>maa eeawnxe a'araa+.w 7505oafh Memitr MJlRmd vls^,elaawe Cbapal Hill, Notbh Camltru 7751fi ' es m 'n' r ew i RE: Pregredmg Package fw ®mlenmry School R9 at MeadmvmoN ~ ~n.vmvesn Chapel HiPCanbwo City Setnols ~ PmpY Yd641 w.n yu. u ~ Bm TABULA]ION a wv N vuvaxu~c... o w Dm[ hL. Mullin N uiatr nm.,.w A[ 3:00 PM, November 15, 71101, bids were rereivM aM opeNed for ehe above aw.ou rdvmcad props , ie the ceNfitH pbule0on o(Ore 7] bide mbmiro name ~o- ]Te appmmt bw bidder were SaNoN Contracture, Irk., of SeNard, NC, wilh ~ Bax Bid of g166,B50. ra .a i m.~_._. _ _.._ _ - Wermm~mee3 a xep,~aq of 5anfmd'a Pr6poeel. P!n?e cnnpc[me with env qu®trona saamdy, Mie ! 1.. iey, PB ~aoe>~ [fiats NYI. NCM1S9m mu]zwlma]-aam 6rcl¢me ]S2CIwau,can CTapI XJ1. NCi1510.]]]3 - (919194]-0596 telephone Coa}.sx $ipHCOT ZaCit. v. [m ]mD>and 9QB[Ail¢ ICI®96 }O9 $]]®a 8C5YOL f9 AS MTiWIIDBT COeII. HILL-CO910090 ¢ST 0C®OOI9 0iojaet 900J1 a. 90 n, Hove oa u, aeea menactd Jacm.e w. 5e ma Hem Nia- mit} w.n am. ax•e ae[ Hm ACwll Cmvtivetim Ce. 45]a6 }u per J]86.306 BeinAill Cm ]194 a9],]53 AlyClle )MOlvmeuC ]6314 pe yea a69, 950 nuleevat Cmaei. M 40668 pm }ev al6r ]BJ N. H. 6arilam. 1039 ym ym J99, 8a5 C¢rt4 L. Jmey IOF. 45369 CIe aOI,]6B.50 Smea Bivv., Im. ]1]51 )ea ]gar 91]. ]e ASdOOO. Sm. J)301 le0 J49.950 Mem Banding m. 15)LL lea pea 3J9.)00 Nemt.L 6ia lm. YOBO pev 10L3]B CC Map9m Cmtiminia 6]\0] 9e ym a53,030 L. S..Mertl- v 9OOa Rn m Lfa Malntt Ti[ Im. .5654 ym )t6. ta5 Carl Aoiiie Covvt. Co. ve 61d 0D0 6iad1v9 a 6iaevetin9 99698 yu pm ym IIB.O]6 01£avholq COWYmeiim )tSBO yes y • ev R9.05) Hvberem cmt:a_et_L ~ m trid __ "' „ 0mfoxd Cmtraatare 6a91 ee m yae 166,050 HOnlt,. 9rotroore, xm. m tria xmm.m emti.e 4\sai ree r•a aae,9m 41ev93e Ciading a Mvq IAJa a]], 400 iPollme CmaWKlm IJIS) yes pev ym 418,300 8. T. NootN Ceip ]633 }ee yee ]fi]r6O' Boideam Cmataucttw Co. (vet a plm holder 9a66 ym ym pee a0).a50 JetrO Filem 6 eov (vot a plu AoLlail 7A99 pee ym pu H3,3]t [ida se stem .mve, imeivee rt I vo n, eo..amea aool, na.e xm ctreiAm am vallMtad and aze he if rect. ~~aya4 ..^SH CA~Oe el slay. ayt ~' P . t a' ~~ Qi~ z 3c~ ~m'~ fax n~ ~~o G alb ~~ s~ z~ ~o§ .. e~ Attachment 3 9 • "S ~6'g~~~b 1 ~'~t II1r ~0 g9d~H~~aF '~~ 1 Sa { ~~ §m g~i Ai`-~~6j~lii~g ~ ~g~ga~~~~~~ ~~~ 4I~~e&` ~II a 1 / A ~°~` ! ~`~ ~~~ ~'lj.- ` ~ iv` Attachment 4 in 9mn .$rx m m`m Am° ozr y-y~x ~j~ ybnyb CAA mom r O ~Q 0 w n x O O ~i @lemevtary 9ehool p9 Covstrnctivn Chapel hill-Currborv City Schools Capital Protect Ordinance Artechment$ Bc it ordawed by the OreuSC Cowry Board of Cowy Commissioners that pursuant to Section 1i.2 of Chapter 159 ofihe General StaNtes of NOM Cazolina, the fahawing capitalpmject is hereby adopted. Secdav 1. ITe projeo[ wlhodaed provides fuvde tv consnvct Elementary School N9 for tho Chapel Hill Cavbom City Schools. INV&ng fur the pr lxl comes fiom svviugs Gom the Smith Middle School Conswction PrOjecq vn appmpriation Gam the School Capital Project fund-alance, and proceeds from the November 2001 voter approved bond mfererWa. Seaton 2. The officers of the Cowty ace hucby dictated ro proceed with rtes project witldn me budget contaivi ltereiv. Section 3. The followingrevnnue is anticipazed to complete this projw[ nee xnuo-m Py soot-OZ sag zom-oz sale, Tax sc ao Eo lm aPxs sc so Eo PSRF Ec EO fi0 Rasa PUnar sa msonn sz3s.aoo wl M1Mlescno0lw fml 599a,ooa xo s39o coo (SOhoul Capful Pryeut Puvd 5142pfi2 Ra 5142,462 Tofzl Pro ec[NLntlln• 55R 44x 235,000 E80946R 8ecfi0n 4. 1]te frllowing E appropnaled frr Ibis project. oug xoon-m Ps aam-oa cog aooo-oa none, wro-Plannin 8132ISa so ffU2, 184 Planan S44g298 9166 850 $609, 1a8 nesi seed Wneuueliov 90 $69, 150 Efi0 1sn z a. maauramiehm Eo su sa Teennma ~EO $o sc Covoineenc 50 EO EO Tatyl 5592462 $235, 000 5909 <fi2 Seedon 5. Ibis Ordutawe, orighally adopted Decamfiv 9, 2000, shall remafv in effect wfil Jma 30,2W2. - Adopted Ibis eleventh day of Deecanba2001.