SUBJECT: Orange County Transportation Priority List for 2004 — 2010 TIP
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Draft Lefterto DCHC MPO Karen Lincoln, ext. 2GB3
2. Proposed Priority List for 2004 -2010 MTIP Craig Benedict md. 2592
3. Draft Lefterto NC Board of Transportation TELEPHONE NUMBERS:
4. Proposed Priority List for 2004 -2010 TIP Hillaborough 7324181
5. EDD Tranapodatlon Wortgroup Recommendations Chapel Hill 91
6. Project Request Fors Durham 688 -7331
Mebane (336)2274031
PURPOSE; To consider Orange County's Transportation Priority Projects for the 2004 — 2010
Transportation Improvement Program (TIP).
BACKGROUND: Biannually, the North Carolina Boats of Transportation (BOT) adopts a multi-
year State Transportation Improvement Program (STIP) that species needed transportation
improvements across the state. The process starts with local junst ictions drafting local
transportation priority lists. Federal and state regulations provide for public input into the process.
Orange County's transportation priority needs list has two sections. One section deals with
selected pmects within the Dunham Chapel Hill- Canboro Metmpolitan Planning Organisation
(DCHC MPO) planning boundary . The second section deals with projects in the remaining pointers
of Orange County which lie outside of the Durham - Chapel Hill- Canboro metropoltan planning area.
Orange County's transportation priority list for the projects within the Metropolitan Planning Ares
(MPA) must be submitted to the DCHC MPO in November. The Transportation Advisory
Committee (TAC) will then hold a public input meeting and the North Carolina Department of
Transportation (NCDOT) will meet with the MPO in January or February to discuss the MPO's
Prentiss.
NCOOT held a TIP Public Input Meeting on October 30. 2001 for areas in Division 7 that are not
represented in a Metropolitan Planning Organization; however, NGDOT and NCBOT will accept
written requests for Nose projects through December 2001.
FINANCIAL IMPACT: None at this time.
RECOMMENDATION: The Administration recommends that the Board approve the attached
Orange County Transportation Priority Lists for the 2004 -2010 TIP.
Decembar3,2001
Ms. Becky Heron, Chair
Transportation Advisory Committee
Durham - Chapel Hill- Cartlwro MPO
101 City Hell Plaza
Durham, NC 27701
Dear Me. Heron:
Enclosed! with this letter you will find the Orange County Transportation Priority
List for Consideration of Funding in The 2004 — 2010 Durham-0haoel Hi14Cartboro
Metmoolitan Transcortation Improvement Focus
Orange County vrould like to give priority to identified safety needs on existing
made and bridges, to other transportation projects that encourage altemattvet to
automobile travel and to those that foster economic development. The County also
endorses environmentally responsible construction of all transportation projects.
Finally, the County supports adequate maintenance for existing transportation faGlltles.
Thank you for your time and consideration of Orange County's transportation needs. If
you would like to discuss this matter in detall, please contact Bevedy Blythe, Clerk to
Me Board of County Commissioners at (919) 732-8181, extension 2130.
ORANGE COUNTY BOARD OF COMMISSIONERS
Sincerely,
Stephen H. Halluotis., Chair
Enclosure
ORANGE COUNTY TRANSPORTATION PRIORITY LIST
FOR CONSIDERATION OF FUNDING IN
THE 200.1 — 201 D D URHAM-0HAPEL HILL - CARRBORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM IMTIPI
As a member of the Durham - Chapel HilkCaribom, Metropolitan Planning
Organization, Orange County will continue to work with the Transportation
Advisory Committee (OCHC TAC) to develop a complete list of project priorities
for fire portion of Orange County that lies inside the urbanized area boundary.
However, there are selected projects in Orange County which we would like to
address now because they have been the subjects of discussions between the
TAC and the Department of Transporla0'en or because there are oMer special
concerns.
REQUESTED PROJECTS
1) 03808. Elizabeth Brady Road Extension Construct a facility, with bicycle
and pedestrian amenities, connecting US 70 Business and US 70 Bypass
on an alignment that has least impact on the Eno River, the natural
environment and cultural ekes. This project creates a parallel route ro the
highly congested Churton Street corridor (NC 86 8 US 70 Business). This
route will be used to m -mute heavy truck and through traffic out of the
downtownlhistoric district.
An Economic Development District (EDD) Transportation Workgroup
made up of Orange County and Town of Hillsborough elected officials,
planning staff, developers and community groups was established b
address transportation issues regarding the Hillsborough area EDD. That
group's recommendations and comments regarding this project are also
attached for consideration in planning and design of this project.
2) NC 88 Bicycle Lanes Construct bicycle lanes (4 -foot paved shoulders)
from Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). This
project will extend bicycle lanes on Airport Road (NC86) in Chapel Hill to
US 70 Business in Hillsborough. Bicycle lanes have recently been
completed along NC 88 from UNC to Whitfield Road (SR 1731 ) In Orange
County. NC 86 from Chapel Hill to Hillsborough is expenenung increasing
numbers of bicyclists using this route and there are also two schools along
this route. This route is listed as prody I of the primary bicycle routes
proposed in the Orange County Bicycle Tmnsporlafion Plan adopted April
6, 1999. This project is listed in the 2002 -2008 TIP as an incidental
bicycle need. Orange County requests that bicycle lanes be constructed
as an independent project, and, if necessary, programmed In phases.
3) R -2825. Improvements to South Chudon Street. Develop congestion
management, limited access, aesthetic and capacity improvements
between US 70 Business and Interstate 40. The portion between
Interstatas 40 and 85 will conform to the design criteria of the Economic
Development Distinct Design Manual (4-lane divided section with bike and
pedestrian improvements). The feasibility study should explore a variety
of improvements within the current right-of-way for the segment north of
Interstate 85. Improved capacity through widening is not the first choice
because of significant constraints between Interstate 85 and US 70
Business and the proximity of the historic district north of the project limits.
Orange County requests that, where conditions do not prevent the
addition of frontage reads the feasibility study Include the addition . of
frontage roads with limited access from the corridor.
4) US 70 Bypass Widening, Widen, from the OrangelDurbam County Line to
the US 70 — IA5 Connector east of Eeand, US 70 Bypass to a four -lane
divided section with bike and pedestrian improvements. This project
should be phased to address traffic counts and existing congestion.
Orange County requests that this project be identified as a need and
included in the 2004 -2010 STIR
5) NC 86 (North of Hillsborouohl Improvements: Widen, from US 70 Bypass
north of Hillsborough to SR 1332 (Coleman Loop), NC 86 to four lanes
with intersection improvements at US 70 Bypass. NC 86 is the major
north -south route Nrough Orange County. INC 57 converges into US 86
just north of US 70 Bypass. The segment of NC 86 between NC 57 and
US 70 is congested, rendering a high accident location al the intersection
of US 70 Bypass st NC 86. Development pressures In true area will
exacerbate traffic congestion and accident proliferation.
6) R -3438 Hllleborough Westam Bvpssa: Construct a two-lane facility
connecting US 70 with INC 86 Norn and Stroud's Creak Lane, using e
portion of SR 1332 (Coleman Loop) righlof-way. This project will create a
connection between NC 57 , NC 86 north of Hllleborough and US 70 west
of Hillsborough to create an alternate for traffic seeking 1401"5 from the
north of Hi115borough. By providing a direct connection to the interstate
corridor w4hout using NC 88 through Hillsborough, fire project will help
alleviate traffic congestion on Church Street through the historic
downtown area. A portion of 3tri Creek Lane accessing NC 57 has
been constructed with private funds. A 0.3 -mile (approx.) segment is
needed to complete the connection between NC 57 and NC N.
OTHER REQUESTS
1) Extension . Comments from the Economic
Development 0 strict (ED0) Tranaoortatlon Workortum
NGDOT should continue its study of seven options to reduce traffic
congestion and Improve the Level of Service in Hillsborough's central
business district and to improve safety along Chunon Street and NC 86. The
workgroup prioritized the seven options in order of preference:
1. Elizabeth Brady alignment 3, which does not cross the river, goes across
ridge (IF this is the least impact to the river)
2. Elizabeth Brady alignment 2 (averts racetrack, crosses river)
3. (original) Elizabeth Brady alignment 1
4. Lawrence Road (with 86 connector) — but different function from above
5. Western bypass
6. No build
Y. When Chumm St. from 70 business to 70 bypass
Elizabeth Brady Road Extension should be treated as a local road, not a
bypass. The location of Elaabetli Brady Road is not adequate for a bypass.
NCDOT should extend the study area for a bypass to include the Hillsborough
50 -Year Water and Sewer Boundary. One option for a bypass would follow
the study area boundary for project U -3808. using existing roads where
passible and with an interchange on 1.85 east of Lawrence Road. Rao,
please refer to to attached EDD Transportation Wcrkgroup
recommendations and comments.
2) 85 in Orange Courov [o
NC 147 (Buck Dean Freeway) in Durham County — Orange County requests
that 1-3306 Section A and 1 -3306 Section B be divided into two separate
projects and programmed separately in the TIP.
Project planning and design for this facility is in progress. Orange County
requests that the development of the Major Investment Study and
Environmental Impact Statement for this project include assurance that the
project will not have detrimental land use impacts to the Orange County
Comprehensive Plan. Orange County is opposed to any widening of 1 -00
through Orange County unless there Is a commitment by NCDOT ro provide
HOV andfor dedicated bus lanes.
COMMENTS ON OTHER TIP PROJECTS INITIATED BY NCDOT
1) 1305 widening of l -85t lanes and! reconnittingtion of insinithami from I-
4g at Hillshorouah 0 Durham County I ins: Orange County is opposed to any
widening of 1-95 through Orange County unless there is a commitment by
NCDOT to provide HOV andlor dedicated bus lanes.
Even though this project remains an 'UNFUNDED PROJECT", Orange
County requests that its staff be allowed to participate in Me planning of the
facility. The County is specifically interested in the following Infrastructure
impmvemaMa as May relate to the I -85fUS 70 Economic Development
District:
e) EMslon Control Measures - Orange County requests that permanent
erosion control measures be included in the project.
b) Pedestrian and Bicycle Facilities - Orange County requests that Rs
staff be allowed to participate in the determination of where and what
type of facilities are to be induced in this projecL Among the features
requested for inclusion are sidewalks and bike lanes (see the Regional
Bicycle Plan for Durham and Orange CrwMies) along roads where
interchange improvements are required and adequate guardrails on
overpasses.
c) NilMdfe Corddor Under 1 -85 - Orange County requests that Its staff he
allowed to participate during this part of the planning stage and that
this issue be brought to the attention of the NCDOT Staff Biologist.
Constructing this wildlife corridor is one of the recommendations
presented in the 'The New Hope Condor Open Space Master Plan:
Proposals for Linking Duke Forest and Eno Rlver Stale Park."
d) Intersecton of Pleasant Greem Road fSR 15671 & Mt Herman Church
Road (SR 17131 - NCOOT Division 7 Traffic Engineers have
recommended that this Interseaon be Included as a part of 1305
because of its proximity to the 14WS 70 interchange. The entire
Intersection should be maligned so that Pleasant Omen Road
intersects US 70 M a 90-degree angle.
a) US 70 from NC 751 to University Station Road (SR 17121- Due to the
needs of the Pleasant Omen Road1US 70 intersection, Orange County
requests that US 70, from NO 751 to University Station Road, he
upgraded b provide for a suitable transition bonvto I-85. An example
of the need far this project is the intersection of US 70 sigh Old No.10
(SR 1715) which is currently operating at twat of service "F".
f) Mt Herman Church Road (SR 17131 - Preliminary plans by the
Planning & Environmental Branch, Division of Highways of NCDOT
indica a that this road may be mlonsted as part of I -305. Orange
County requests that this road be designed with 12' wide travel lanes
and 4' wide bicycle lanes for a total paved width of 32'.
g) Old NO 10 (SR 1710) - Preliminary plans by the Planning is
Environmental Branch, Division of Highways of NCDOT indicate that
this road may also be relocated as pad of 1305. Orange County
requests that this mad be designed with 12' wide travel lane end 4'
wide bicycle lanes for a must paved width of 32'.
h) NO 86— NCDOT has expressed cancem that the width (24ane) of the
NO 80 overpass is inadequate for Increased traffic volumes that would
result from proposed development in the adjacent Economic
Development District. Orange County requests that the NC 88
overpass be widened.
2) E ) DM odulticiame mute
from 1 -85 In Oramg County to 1-85 In Durham County - Orange County is
strongly opposed to having this facility within Orange County and is also very
concerned about the environmental Impacts to the Eno River Stale Park.
Orange County requests that this facility be on a location outside of Orange
County.
December3,2001
Mr. J. Douglas Galyon
North Carolina Board of Transportation
Post Once Box 26969
Greensboro, Noah Camlina 27419
Dear Mr. Galyon:
Enclosed with this letter you will find the Orange County Transportation
Priority Ust for Conslderetlan of Funding in The 2004 2010 North Carolina
Transportation tmpmvement Pronoun.
Orange County's transportation needs list is divided into two sections.
The first section deals with selected projects within the Durham - Chapel Hill -
Canboro Metropolitan Planning Area. The second section deals with projects in
the remaining portions of Orange County which lie outside of the Durham- Chapel
Hill- Canboro metropolitan planning area.
We hope that you will be able to fund these highway, transit and bicycle
improvements.
Thank you for your time and consideration of Orange bounty's
transportation needs. If you would like to discuss this matter in detall, please
contact Beverly Blythe, Clerk to the Board of County Commissioners at (919)
732$181, extension 2130.
ORANGE COUNTY BOARD OF COMMISSIONERS
Sincerely:
Stephen H. HalMotls, Chair
Enclosure
Co: Mike Mills, Division Engineer, NCDOT Division 7
ORANGE COUNTY TRANSPORTATION PRIORITY LIST
FOR CONSIDERATION OF FUNDING IN
THE 2004 — 2010 TRANSPORTATION IMPROVEMENT PROGRAM
Orange County would like to give priority b identified safety needs on existing
roads and bridges and b other transportation projects which foster alternatives to
automobile travel. The County also andorees environmentally responsible
constmction of all transportation projects. Finally, the County supports adequate
maintenance for existing transportation facilities.
Our transportation needs list is divided into two sections. The first section deals
with selectetl projects within the Durham-Chapel Hill-Cambom metropolitan
planning area. The second section deals with pmjects In the remaining portions
of Orange County which lie outside of the DurhamChapel Hill- Carrbom
metropolitan planning area.
ORANGE COUNT' PROJECTS WITHIN
THE DURHAM- CHAPEL HILL- OARRBORO
METROPOLITAN PLANNING AREA
As a member of the Durham-Chapel Hill- Cantioro Metropolitan Planning
Organaetion, Orange County will continue to work with the Transportation
Advisory Committee (DCHC TAG) to develop a complete list of project priorities
for the portion of Orange County that lies inside the urbani area boundary.
However, there are selected projects in Orange County which we would like to
address now because they have been the subjects of discussions between the
TAC and the Department of Transportation or because there am other special
concerns.
REQUESTED PROJECTS
1) U-8608 Elizalfifilb Brady Road Fshqnslon Construct a m ity, with bicycle
and pedestrian amenities, connecting US 70 Business and US 70 Bypass
on an alignment that has least impact on the Eno River, the natural
environment and cultural saes. This project creates a parallel mule to the
highly congested Churton Street corridor (NC 86 & US 70 Business). This
route will be used to m mute heavy truck and through traffic out of the
downtowNhiffioric district.
An Economic Development District (EDD) Transportation Wodyroup
made up of Orange County and Town of Hillsborough elected officials,
planning staff, developers and community groups was established to
address transportation issues regarding the Hillsborough area EDD. That
gmup's recommendations and comments regarding this project are also
attached for consideration in planning and design of this project.
10
NC 86, Bicvcle Lanes: Construct bicycle lanes (4400t paved shoulders)
from Chapel Hill (Whitfield Read) to Hillsborough (US 70 Business). This
project will extend bicycle lanes on Airport Road (NC86) in Chapel Hill to
US 70 Business in Hillsborough. Bicycle lanes have recently been
completed along NC 86 from UNO to Whitfield Road (SR 1731) in Orange
County. INC 86 from Chapel HIII to Hlllaborough is experiencing Increasing
numbers of bicyclists using this mute and there are also two schools along
this route. This route is listed as priority I of the primary bicycle mutes
proposed in the Orange County Bicycle Transportation Plan adopted April
6, 1999. This project is listed in the 2002 -2008 TIP as an incidental
bicycle near. Orange County requests that bicycle lanes be constructed
as an Independent project, and, if necessary, programmed in phases.
3) R -2825 Improvements to South Churton Street Develop congestion
management, limited access, aesthetic and capacity improvements
between US 70 Business and Interstate 40. The portion between
Interstatos 40 and 85 will conform to the design criteria of the Economic
Development District Design Manual (4 -lane divided section with bike and
pedestrian improvements). The feasibility study should explore a variety
of improvements within the current rightoFway for the segment north of
Interstate 85. Improved capacity through widening is not the first choice
because of significant constraints between Interstate 85 and US 70
Business and the proximity of the historic district north of the pri limits.
Orange County requests that, where conditions do not prevent the
addition of frontage roads, the feasibility study include the addtion of
frontage leads with limited access from the condor.
4) US 70 Bvoaes Widening Witlen, from the OrangieDurham County Line to
the US 70 — 1.85 Connector east of Efland, US 70 Bypass to a four -lane
divided section with bike and pedestrian Improvements. This project
should be phased to address traffic counts and existing congestion.
Orange County requests that this project be identified as a need and
included in the 2004 -2010 STIP.
5) NC 86 (NOM of Hillsborough) Improvements. Widen, from US 70 Bypass
north of Hillsborough to SR 1332 (Coleman Loop), NG 86 to four lanes
with imersecon improvements at US 70 Bypass. NC 86 is the major
north -south mute through Orange County. NC 57 converges into US 86
just north of US 70 Bypass. The segment of NG 86 between NC 67 and
US 70 is congested, rendering a high accident location at the intersection
of US 70 Bypass at NC 86. Development pressures In this area will
exacerbate traffic congestion and accident proliferation.
6) R -3438 Hlllstal Weatem Bvoass: Construct a two -lane facility
connecting US 70 with NC 86 North and Stroud's Creek Lane, using a
portion of SR 1332 (Coleman Loop) right -of -way. This project will create a
11
connection between NC 57, NC 86 north of Hillsborough and US 70 west
of Hillsborough to create an connate for traffic seeking 1 >011 -85 from the
north of Hillsborough. By providing a direct connection to the interstate
corridor without using NC 66 through Hillsborough, the project will help
alleviate traffic congestion on Churton Street through the historic
downtown area. A portion of Stroud's Creek Lane accessing NC 57 has
been constricted with private funds. A 0. &mile (approx.) segment Is
needed to complete the connection between NC 57 and NC 86.
OTHER REQUESTS
1) U-3808. Eli ro the Economic
Development D'atf,(EDD1 Transportation W k
NCDOT should continue its study of seven options to reduce traffic
congestion and improve the Level of Service in Hillsborough's control
business district and to improve safety along Churton Street and NC 86. The
workgroup prioritized the seven options In order of preference:
1. Elizabeth Brady alignment 3, which does not cross the river, goes across
ridge (IF this is the least impact to the fiver)
2. Elizabeth Brady alignment 2 (averts racetrack, crosses river)
3. (original) Elizabeth Brady alignment 1
4. Lawrence Road wath 86 connector) — but different function from above
5. Western bypass
G. No build
7. Widen Church St. from 70 business to 70 bypass
Elizabeth Brady Road E#ension should be treated as a local road. not a
bypass. The location of Elizabeth Brady Road is not adequate for a bypass.
NCDOT should extend Me study area for a bypass to include the Hillsborough
5D-Year Water and Sewer Boundary. One option for a bypass would fallow
the study area boundary for project U -3808, using existing made where
Possible and with an interchange on Id5 east of Lawrence Road. Also,
please refer to the attached EDD Transportation Workgroup
recommendations and comments.
2) Section A. widening of 140 to six Ian
NC 147 (Buck Dean Freeway) 'n QuElbarn C — Orange County requests
that Id306 Section A and 1 -3306 Section B be divided into two separate
projects and programmed separately in the Tl P.
Project planning and design for this facility Is in progress. Orange County
requests that the development of the Major Investment Study and
Environmenfal Impact Statement for this project include assurance that the
project will not have detrimental land use impacts to the Orange County
Comprehensive Plan. Orange County is opposed to any widening of 140
through Orange County unless there is a commitment by NCDOT to provide
HOV end /ordedicated bus lanes.
COMMENTS ON OTHER TIP PROJECTS INITIATED BY NCDOT
1) on intrairchamman hom 1
60 at Hlllsborouah to Durham County Line: Orange County is opposed to any
Widening of 135 through Orange County unless there is a commitment by
NCDOT to provide HOV and /or dedicated bus lanes.
Even though I project remains an "UNFUNDED PROJECT', Orange
County requests that its staff be allowed to participate In the planning of the
facility. The County is specifically interestetl in the following inhesimclure
improvements as they relate to the 485I118 70 Economic Development
District
a) Erosion Control Measures - Orange County requests that permanent
erosion control measures be Included in the project.
b) Padestdan and Bicycle Fac'Id'es - Orange County requests that its
staff be allowed .0 participate in the determination of where and what
type of facilities are to be included in this project. Among Me features
requested for inclusion are sidewalks and bike lanes flee the RRege, nal
Bicycle Plan for Durham and Orence Count ies) along made where
interchange improvements are required and adequate guardrails on
overpasses.
c) Wildlife Corridor Under 1-85 - Orange County requests that its staff be
allowed b participate during this part of the planning stage and that
this issue be brought to the attention of the NCDOT Staff Biologist.
Constructing die wildlife corridor is one of Me recommendations
presented In the 'The New Hope Condor Open Space Master Plan:
Proposals for LinMrg Duke Forest and Eno River State Park.'
d) Intemeation of Pleasant Oman Road (SR 1567) & Mt Herman Church
Road SIR 1713) - NCDOT Division 7 Traffic Engineers have
recommended Mat Mis intersection be included as a part of 1305
bemuse of its proximity to the 1 -85NS 70 interchange. The entire
Intersection should be realigned so that Pleasant Green Road
intersects US 70 at a 90-0egree angle.
e) US 70 from NC 751 to University Station Road (SR 17121- Dee to Me
needs of the Pleasant Oman Roa:AUS 70 intersection, Orange County
requests that US 70, from NC 751 to University Station Road, be
upgraded to provide for a suitable transition fromrYo 135. An example
of the need for this project is the intersection of US 70 with Old No. 10
(SR 1715) which is currently operating at level of service "F•.
0 Mt Herman Church Road (SR 1]131 - Preliminary plans by the
Planning & Environmental Branch, Division of Highways of NCDOT
indicate that this mad may be relocatetl as part of 1305. Orange
County requests that this road be designed with 12' wide travel lanes
and 4' wide bicycle lanes for a total paved width of 32'.
g) Old NC 10 SR 1710) - Preliminary plans by the Planning &
Environmental Branch, Division of Highways of NCDOT indicate that
this read may also be relocated as part of 1305. Orange County
requests Mat Nis mad be designed with 12' wide brevel lanes and 4'
wide bicycle lanes for a total paved width of 32'.
h) NC 86 — NCDOT has expressed concem that the width (2 -lane) of Me
NG 86 overpass is inadequate for increased traffic volumes that would
result from proposed development in the adjacent Economic
Development District. Orange County requests Mat the NC 85
overpass be widened.
2) R-21MID DURHAM T DRIVE) . new mulfirtane ro e
from -86 in Came County to 1-85 In Durham Cou ty - Orange County Is
strongly opposed M having this facility within Orange County and is also vary
comemed about the environmental impacts to the Eno River State Park.
Orange County requests that this facility be on a location outside of Orange
County.
ORANGE COUNTY PROJECTS UO TSIDE
THE DURHAM- CHAPEL HILL- CARRSORO
METROPOLITAN PLANNING AREA
Orange County would like b give priority to Identified safety needs on existing
mads and bridges and to other transportation projects which foster alternatives to
automobile travel. The County also endorses environmentally responsible
construction of all transportation projects. Finally, the County supports adequate
maintenance for existing transportation facilities.
1) Pak and Race Lot in the BijckhQm Egrearric Development D'std
Orange County requests a park and title facility (from the adopted Orange
County Economic Development District Design Manual) be funded in the
Community Transportation morovernal P for Orange Public
Transportation. This project is clearly justified as it would provide an
opportunity for coordination of public transportation efforts between two
growing regions In North Carolina. the Tried and Triangle.
130
ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP
RECOMMENDATIONS
MEMORANDUM
To: Board of Orange County Commissioners
Hillsborough Town Board of Commissioners
From: EDD Transportation Work Group
Date: September 28,2001
RE: Final Report
Attached please find the notes provided by our facilitator for our final meeting on August 18, 2001.
This report serves as the translation of those notes into recommendations for action by bath boards.
Background
The EDD Transportation Commldas was an out -gromh of the EDD workgroup that suggested land
use changes in the EDD areas as well as the resignation of new EDD times. The Land Use Group
(2 commissioners from each board) had concerns that the transportation system was insufficient to
address the full implementation of the EDDS. The Land Use Group felt they greatly benefited from
the participation of the development community during the land use phase, and they wanted that to
continue in the transportation phase. To that end, they sought wide -range participation from the
public with known Interest in the topic. In addition to the 4 elected officials, 1 member from each
planning board, the Commission for the Environment, the Chamber of Commerce, the Alliance for
Historic Hillsborough, Economic Development Commission, and the Eno River Association were
Invited. An area property owner, a representative from Ayr Mount, a design professional, and
developer were also participants. Staff from Orange County Planning, the EDC and Hlllaborough
Planning supported the committees efforts.
Recommendations:
1. Both elected boards should forward the comments listed in the notes W NCDOT and their
consultants working on the evaluation of Elizabeth Brady Road Extension,
2. Both elected boards should choose treacle from me list of "other recommendations" to
crestaprioritylislstorthene #TIP. Submittals for the next round are due m the MPO this
fall. The boards should work together to select the same projects in the same relative
order to enhance the possibility of funding.
3. Implement the three policy suggestions:
• Encourage County to provide park & ride for employees
Consider policy about road widening similar to Carrboro''s —nothing greater than 3
lanes in town
• Set u p a standing joint town /county committee 0 address transportation issues.
14
ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP
RECOMMENDATIONS
Notes from Transpodatlon Work Group retreat
Hillsborough House Inn
August 18, 2001
Recommendations from the group
Comments to NCDOT reaardina Elizabeth Brady Road
(note, the group did not re -vote after additional alternatives were offered):
The seven options being studied in prionty order by what is preferred by the work group:
1. Elizabeth Brady alignment 3, which does not cross the river, goes across rings (IF this Is the
least impact to the river)
2. Elizabeth Brady alignment 2 (averts racetrack, crosses river)
3. ( original) Elizabeth Brady alignment)
4. Lawrence Road (with 86 connector) — but different function from above
5. Western bypass
6. No build
7. Widen Chunon St. from 70 business to 70 bypass
Additional comments:
➢ Expand the DOT study area to the entire 50 -year water and sewer boundary from the town plan
➢ Have DOT continue with Its existing list of options
Y Add the consultants current study area boundary as a 8" alternative, adjusted as needed and
using existing roads where possible
Y Design the Elizabeth Brady road extension to minimize the impact on the Eno River, even if it
reduces mobility
Y Treat Elizabeth Brady Rtl, as a local road, not a bypass
Y Treat Lawrence Rd. option as having a different function from Elizabeth Brady, to move through
traffic around, not through, downtown
Y Develop a new interchange of 1 -85 east of Lawrence Rd. to create possible bypass alternative
➢ Da other non -road fixes on Church Street to address congestion & safety, we
Other All include bike and Pedestrian feature
Amend cumma plena:
I . Amend Western Bypass to begin near US 70 connectorfrom 1 -85 and delete King Edward
Road extension from plan.
Extend existing made:
2. Extend Lawrence Rd. south and west to connect with NC86 at the Old /New 86 connector
3. Extend Painters Grove Church Road south to new interchange on 185 and continue south to
conned with New Hope Church Rd.
4. Extend NC 85 west at Crunch Street to con parallel whh railroad and connect to Eno Street at
Nash Street
5. Extend Orange Grove Road east to US 70 business
6. Extend JJ Freeland Memorial Drive east to Valley Forge Road
7. Realign and extend Old NC 10 to connect the access mad through Hampton Pointe & cress
railroad to provide access to Beckett 'a Ridge and through W Oakdale Drive
ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP
RECOMMENDATIONS
New mad alignments:
B. Connect NC86, South Churton & Oakdale through the Corbin Downs & Gateway Oaks
properties, extend east to New Hope Church Rd
9. Create north /south connector connecting the extension of Old 10 with the road above in the
Contain Downs Project
10. Connect Lafayette Drive with north/south Corbin Downs connector
11. Create a nom1south connector, through Collins property, connecting Orange Grove Road and
JJ Freeland extensions
Other improvements:
12.Align Eno Mountain Road & Mayo Street
13. Widen 70 bypass (in town plan but not in state TIP)
14.Add Win shows to existing signalized locations, especially downtown
15.Add right Win lane onto Mayo Street for south bound traffic
16.Add right turn lane onto Oakdale Drive for south bound tic
17. Provide longer turn lanes accessing Orange High School Road
18. Improve lane configuration at the 1- 85 /Chunon Street Interchange
19. Add turn lanes and pedestrian facilities at NC88/U570 Bypass intersection
20. Widen NC 86 between US 70 Bypass and NC57 and add bike and ped features
21. Straighten and make turn lane improvements along EBand Cedar Grove Rd., and make moo
direct connection to 1 -85
Policy recommendations:
Encourage County to provide perk & ride for employees
• Consider policy about mad widening similar to Carrboros— nothing greater than
lanes in town
• Be up a standing joint t own /county commldee to address transportation issues.
Issues for another day
Non -road improvements needed
DURHAM - CHAPEL HILL- CARRBORO
METROPOLITAN PLANNING ORGANI] TION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Prefect This
U-O80Q Elizabeth Bracy Road Extension
Estimated Cost
$15,082,000
Randal ing Agency
Orange Couny
Protest Dereard n
A new facility connecting US 70 Business and US 70 Bypass with bicycle &
412
pedestrian amenities. Special design coneld0mtti0n Is desired t0 miniml2e
Promotes Nafional Highway System
adverse environmental and cultural impacts.
Pmiect dus5fiwtlon:
This project creates a parallel route to Me hlghy, congested Chudon Street
No
corridor (NC 86 & US TO Business). Projections estimate this burster, with a
Provides for move mensrodation choices
capacity of 21,000 vpd, will remove approximately 5.000 vpd from Crunch
T.
Street. This route will be used to re -mute heavy truck and through traffic out
Yes
of the downtown /hlstonc distinct An Bronchi Development District exists
Has minimal impact on the natural environment
just south of Elizabeth Brady Road around the interchange at 1 -85. This
B.
project Is easeMlal to the viability of that EDD.
Pmiect Evaluation Cdteda:
1.
An element ofMe'2025 Current Trend Lung Range Transportation Plan"
Yes
2.
Ihgres of congestion (volumah apacityf (Chunon Bill LOS D, 2000 ADT = 20.000)
1.5
3.
Safety (ag., arJtlen/s/10o malion vehicle mass ofM1avelg(on Church St. - parallel route)
412
4,
Promotes Nafional Highway System
No
5,
Raduces use of angle occupant vessels,
No
B
Provides for move mensrodation choices
Yes
T.
Promotes energy conservation
Yes
B
Has minimal impact on the natural environment
No
B.
Encourage&pastur i; development consistent with adopted land use plans
Yes
10.
Adverse impacts DO not docamportbnately affect low income populations
Yes
11.
Transportation Improvement Program Status
Yes
J,n08 ELIZPBETH BRPOY EXTENSION
1
_ EWNIMIL DEELOPMENf ELV RB 6RAOY EM.
OISMW PREFERREDALI RNAnI
DURHAM - CHAPEL HILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Project Tttle: NC 66 Bicycle Lanes (Pal Shoulders)
Request is for an Independent Project
Estimated Cast $1,000,000
Roviesino Aaencv' Orange County
PmleH Des NMlnre Provide paved shoulders along NC 88 from US 70 A in Hillsborough to SR
1730 (Whitfeld Road) in Chapel Hill and may be programmed in phases.
Pjgiffs atldcatbrr This mad Is popular route for bicyclists to travel from Chapel HIII Mthe rural
roatls that Imemect wit NC W. Two schools are located along this route. This
project Is the number one primary route listed in A Bicycle Tranaoortafon Pan
for Orange County and is also a part of the DCHC Regional Birycte Plan. This
project would link bicycle lanes on Airport Road in Chapel Hill with bicycle
lanes along project U -381DS (Elizabeth Brady did). US 88 name several
sections of to Hillsborough Area EOD. An objective of tat EDD is t attract
mixed uses that make 0 s cools and feasible to u alternative faces of
transportation within the EDO. This project is lisatl� an incidental bicycle
project In the current TIP but no corresponding roadway project has been
programmed The Hillsborough Transporafion Plan Its% the ROW adequate
for ultimate roadway aimed 0 he four lanes divided with bicycle lanes.
coal Evaudistion cmana
1. An element of the '2025 Current Trend Long Range Transportation Plan'
2 Degree of congestion (volume r apaoity)
3. Solely (e.g., awldents,100 million vehicle miles of al (1997calculation)
4. Postal National Highway System
5 Reduces use ofaMgle occupant vediule
a Provides fo more hanspormion clroices
7 Promotes energy conservation
a Has minimal impact on the naluml environment
9. Encourages economic devebpmenf consistent with disaffect land use plans
10 Adverse dilated; do not dia/XWertionately afieat low mare as
11. Tmnspodati in Improvement Program Sal
Yes
0.63
47B
No
Yes
Yes
Yes
Yes
Yes
Yes
No
DURHAM- CHAPEL HILL- CARRBORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Protect T'Ne R- 2825, Improvements to South Churton Street
Estimated Cost Unknown
Requesting Agency: Orange County
Prmed DesoCOt'on Congestion management, limiter access, aesthetic and capacity improvements
between US 70 Business and Interstate 40. The portion between Intrrstates
40 and 85 will goofing to the design crlterla of the Economic Development
District Design Manual (4 -lane divided seciion with bike and pedestrian
Improvements). North of Intermide 85 a variety of Improvements within the
current right -of way need to be explored, Improved capacity through widening
is not the That choice due to significant constraints between Interstate 85 and
US 70 Business and the proximity of the historic district to the north of the
Project limits. Where conditions do not prevent the addition of frontage made,
access should be limited N spacing points that access frontage roads along
he control.
Protect,koxygoetiom This route incudes a developer commercial strip area, a developing mixed-
use common and traverses the 1 -0011 -65 Economic Development District.
TmfflG volumes along this mute exceed capacity of the roadway and turning
movements and multiple access points exacerbates congestion. The corridor
between the interstates is developing more quickly than original estimates and
is mowing additional tmRlc into and through the developed Nan core north of
Interstate 85. The viability of the Economic Oevelopment District will strongly
depend on the wuritys ability to limit auto access along this condition and
provitle feoldies for altamate transportation modes.
Project Evaluating Coming'
1. An element of the "2025 Cunegt Trend Long Rarge Tmgapwlstion Plar' Yes
2. Degree of congestion (volumehapacilyJ (2000 ADT = 20,000) 1.5
3. Safety (e.g., acrudendel 00 million vehicle miles of travel) (1997 figure) 490
4. Promotes National Highway System Yes
5 Reduces use ofaingle cocupant vehicle No
6 Provides Nrmore transportation chokes Yes
Promotes energy conservation Yes
B. Has minimal impact on the natual environment Yes
9. Encourages ecanamb development consistent wdh adopted land use plans Yes
10 Adverse impels do rml disproportionate )y, affect low income populamars No
if. Transportation Improvement Program Status Yes
R -2825 IMPROVEMENTS ALONG SOUTH CHURTON ST.
I ECONOMIC DE OPMENT DISTMCT
DURHAM - CHAPEL HILL CARRRORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Protect Title US 70 Bypass Widening
Estimated COST Unknown
Reauesfno Airencv' Orange County
Protect Descrtpfbn' Widen US 70 Bypass from the Durham County Ihre to the US 7(1
Connector east of Efland to a four -lane divided section with bicyGe and
pedestrian facilities.
Protect JUStifla iorc US 70 Bypass is a major fermagh(are projected to W over capacity during
the design p rood (2020). The intersection of US 70 Bypass at NC 85 is listed
as a high accident location (Hillsborough Transportation Plan) having an
average of 32 accidents per year for the period tram 092 to 4195 —the highest
accident intersection with the highest accident frequency within the
Hillsborough planning area. The 1997 Hillsborough Transportation Plan
(Table 1 Benefits Evaluation in section 111 Construction Priorities) ranks U5 70
Bypass Widening as the second phony of the major projects based on its
benefits, its estimated nghts-of-wey and construction mat, and Its probability
of stimulating the local economy. U3 70 Bypass also haverro s the County 's
I -aVUS 70 Economic Development District which expands almost Mro mlles
along those corridors into Orange County from the Durham County Line,
Protect Evaluation f'.rilMie'
1. An omen o7the 7025 Current Trand LOg Range Transportation Plan" Yes
2 Degree ofmngerson( volume /capaclN) 2D20 protection: 12,W0- 18,900 vpd(1.45 vfc) .85
3. Softly (a.g., eccidantd100 mNlicn vesicle miles of travel); ACC11 o0MVM Indudes
segment from 1-65 Connector to US 70 Business only. 291.06
4. Promotes National Hghway System No
5. Reduces use ofshigle occupant vehicle No
0. Provides funscre (ranspodalion choices Yes
7 Promotes enegy mnServaWll Yes
B Has minlmal Impact on the natural environment Yes
9. Encourages econs io development consistent with adopted land use plans Yes
10. Adverse impacts do not disproportionately effect low income populations No
11. Transportation Improvement Program Stalus No
23
24
DURHAM - CHAPEL HILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Pmeci Tire NO 36 (North of HillsCOrough) Improvements
Estimated Cost 9,200,000
Renaissance Agency' Orange County
PrgecfC scratirn.' Widen NO 86 from US 70 Bypass north of Hillsborough M SR 1332
(Coleman Loop) with intersection improvements at US 70 Bypass.
Projectjawri al'on NO 86 Is the major North -South mnidor through Orange County and NO
57, another major correct, converges wit NO 86 Iwo than a mile from US
70 Bypass. NCDOT 2000 ADT counts show that NO 86 just north of NO 57
carries 11.000 vpd'. INC 57 just north of it Intersection with NO 86 carries
4,500 vied. Therefore, to segment of NO 86 between NC 57 and US 70
may be carrying 15,500 vpb. The Intersection of US 70 Senate at NO 86 is
listed as a high accident location (Hillsborough Transportation Plan) having
an average of 32 accident per year for to period from 4192 to 4/95 — the
highest accident intersection with the highest account frequency within the
Hllsborough planning area.
Proiect Evaluation Greens:
1.
An element of the 2025 Current Trend Long Range Trznsportatuar Plan'
Yes
2
Degree afcongestlon(volumatimmi
1.2
3.
Safety reg., accidenls/f00 millionvehiGe miks oftmve) >311yr ®US 70 Bypass
and NC86.
4,
Promotes Nalwnal Highway System
No
5.
Reduces use ofeingle occupant vehicle
No
6.
Provides for more Mansportatim choices
No
Promotes energy conservation
Yee
B.
Has minimal impact on Me natural environment
Yes
9.
Enmumges economic development cansicrent with adopted hind use plans
No
10
Adverve impacts do not tli5 prype/ I (gndfely affect taw irwome populations
No
11.
Transportaflm Improvement Program Status
No
zs
NO 00 NORTH IMPROVEMENTS
\ o
MppP INO�OUN y
e
L7
(] 4
A
;o
26
DURHAM - CHAPEL HILL- CARRBORO
METROPOLITAN PLANNING ORGANIZATION
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST
Protect Titi R- 3438, Hillsborough Western Bypass
Estimated Clas $6,800,000
Reouestlac AOencr Orange County
Provi oescdpliop Construct a two-lane facility connecting US TO wit Stroud s Creek Lane
using a portion of SR 1332 (Coleman Loop Road) right -of -way.
Pored Justil ation, This project will create a connection between NC 57 and NC 86 north of
Hillsborough to US TO west of Hillsborough he create an alternate for
traffic seeking I4VI45 from the north of Hillaborough. By providing a
direct connection to the interstate comidor without using NC 86 through
Hillsborough, the project will reduce traffic on congested Croton Phrase
(2000 AOT = 20,000). A portion of Stroud's Creek Lane from NC 5T has
been completed wit private funds. A 0.3-mils (appfoxi) segment is
needed to complete the connection between NC 57 and NC 86.
Protect Evaluation Crtte er
1. An element of the" 2025 Current Trend Long Rarge Transportation Plan' Yea
2. Degree olcogestern(vofume/capai (for Crunch Street) 1.5
3. Satisfy (e.g., accidents /100 million vehicle miles of boost) WA
4. Promotes Natbnal Highway System Yes
5. Reduces use ofsngle occupant vehicle No
6. Provides formom transportation chokes No
7 Promotes enegyconservation Yes
8. Has nummalimpact on to natural environment No
9 Encourages economic development consistent wish adopted lend use plans No
10 Adverse impacts do not disproportionately affect low income populations Yes
11. Tonsportai Improvement Program Status Yes
2]
R -3438 Westem Bypass