Loading...
HomeMy WebLinkAboutAgenda - 12-03-2001-9bORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 3, 2001 Action Age d Item NO. ]�_ SUBJECT: Orange County Transportation Priority List for 2004 — 2010 TIP DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No ATTACHMENT(S): INFORMATION CONTACT: 1. Draft Lefterto DCHC MPO Karen Lincoln, ext. 2GB3 2. Proposed Priority List for 2004 -2010 MTIP Craig Benedict md. 2592 3. Draft Lefterto NC Board of Transportation TELEPHONE NUMBERS: 4. Proposed Priority List for 2004 -2010 TIP Hillaborough 7324181 5. EDD Tranapodatlon Wortgroup Recommendations Chapel Hill 91 6. Project Request Fors Durham 688 -7331 Mebane (336)2274031 PURPOSE; To consider Orange County's Transportation Priority Projects for the 2004 — 2010 Transportation Improvement Program (TIP). BACKGROUND: Biannually, the North Carolina Boats of Transportation (BOT) adopts a multi- year State Transportation Improvement Program (STIP) that species needed transportation improvements across the state. The process starts with local junst ictions drafting local transportation priority lists. Federal and state regulations provide for public input into the process. Orange County's transportation priority needs list has two sections. One section deals with selected pmects within the Dunham Chapel Hill- Canboro Metmpolitan Planning Organisation (DCHC MPO) planning boundary . The second section deals with projects in the remaining pointers of Orange County which lie outside of the Durham - Chapel Hill- Canboro metropoltan planning area. Orange County's transportation priority list for the projects within the Metropolitan Planning Ares (MPA) must be submitted to the DCHC MPO in November. The Transportation Advisory Committee (TAC) will then hold a public input meeting and the North Carolina Department of Transportation (NCDOT) will meet with the MPO in January or February to discuss the MPO's Prentiss. NCOOT held a TIP Public Input Meeting on October 30. 2001 for areas in Division 7 that are not represented in a Metropolitan Planning Organization; however, NGDOT and NCBOT will accept written requests for Nose projects through December 2001. FINANCIAL IMPACT: None at this time. RECOMMENDATION: The Administration recommends that the Board approve the attached Orange County Transportation Priority Lists for the 2004 -2010 TIP. Decembar3,2001 Ms. Becky Heron, Chair Transportation Advisory Committee Durham - Chapel Hill- Cartlwro MPO 101 City Hell Plaza Durham, NC 27701 Dear Me. Heron: Enclosed! with this letter you will find the Orange County Transportation Priority List for Consideration of Funding in The 2004 — 2010 Durham-0haoel Hi14Cartboro Metmoolitan Transcortation Improvement Focus Orange County vrould like to give priority to identified safety needs on existing made and bridges, to other transportation projects that encourage altemattvet to automobile travel and to those that foster economic development. The County also endorses environmentally responsible construction of all transportation projects. Finally, the County supports adequate maintenance for existing transportation faGlltles. Thank you for your time and consideration of Orange County's transportation needs. If you would like to discuss this matter in detall, please contact Bevedy Blythe, Clerk to Me Board of County Commissioners at (919) 732-8181, extension 2130. ORANGE COUNTY BOARD OF COMMISSIONERS Sincerely, Stephen H. Halluotis., Chair Enclosure ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR CONSIDERATION OF FUNDING IN THE 200.1 — 201 D D URHAM-0HAPEL HILL - CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM IMTIPI As a member of the Durham - Chapel HilkCaribom, Metropolitan Planning Organization, Orange County will continue to work with the Transportation Advisory Committee (OCHC TAC) to develop a complete list of project priorities for fire portion of Orange County that lies inside the urbanized area boundary. However, there are selected projects in Orange County which we would like to address now because they have been the subjects of discussions between the TAC and the Department of Transporla0'en or because there are oMer special concerns. REQUESTED PROJECTS 1) 03808. Elizabeth Brady Road Extension Construct a facility, with bicycle and pedestrian amenities, connecting US 70 Business and US 70 Bypass on an alignment that has least impact on the Eno River, the natural environment and cultural ekes. This project creates a parallel route ro the highly congested Churton Street corridor (NC 86 8 US 70 Business). This route will be used to m -mute heavy truck and through traffic out of the downtownlhistoric district. An Economic Development District (EDD) Transportation Workgroup made up of Orange County and Town of Hillsborough elected officials, planning staff, developers and community groups was established b address transportation issues regarding the Hillsborough area EDD. That group's recommendations and comments regarding this project are also attached for consideration in planning and design of this project. 2) NC 88 Bicycle Lanes Construct bicycle lanes (4 -foot paved shoulders) from Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). This project will extend bicycle lanes on Airport Road (NC86) in Chapel Hill to US 70 Business in Hillsborough. Bicycle lanes have recently been completed along NC 88 from UNC to Whitfield Road (SR 1731 ) In Orange County. NC 86 from Chapel Hill to Hillsborough is expenenung increasing numbers of bicyclists using this route and there are also two schools along this route. This route is listed as prody I of the primary bicycle routes proposed in the Orange County Bicycle Tmnsporlafion Plan adopted April 6, 1999. This project is listed in the 2002 -2008 TIP as an incidental bicycle need. Orange County requests that bicycle lanes be constructed as an independent project, and, if necessary, programmed In phases. 3) R -2825. Improvements to South Chudon Street. Develop congestion management, limited access, aesthetic and capacity improvements between US 70 Business and Interstate 40. The portion between Interstatas 40 and 85 will conform to the design criteria of the Economic Development Distinct Design Manual (4-lane divided section with bike and pedestrian improvements). The feasibility study should explore a variety of improvements within the current right-of-way for the segment north of Interstate 85. Improved capacity through widening is not the first choice because of significant constraints between Interstate 85 and US 70 Business and the proximity of the historic district north of the project limits. Orange County requests that, where conditions do not prevent the addition of frontage reads the feasibility study Include the addition . of frontage roads with limited access from the corridor. 4) US 70 Bypass Widening, Widen, from the OrangelDurbam County Line to the US 70 — IA5 Connector east of Eeand, US 70 Bypass to a four -lane divided section with bike and pedestrian improvements. This project should be phased to address traffic counts and existing congestion. Orange County requests that this project be identified as a need and included in the 2004 -2010 STIR 5) NC 86 (North of Hillsborouohl Improvements: Widen, from US 70 Bypass north of Hillsborough to SR 1332 (Coleman Loop), NC 86 to four lanes with intersection improvements at US 70 Bypass. NC 86 is the major north -south route Nrough Orange County. INC 57 converges into US 86 just north of US 70 Bypass. The segment of NC 86 between NC 57 and US 70 is congested, rendering a high accident location al the intersection of US 70 Bypass st NC 86. Development pressures In true area will exacerbate traffic congestion and accident proliferation. 6) R -3438 Hllleborough Westam Bvpssa: Construct a two-lane facility connecting US 70 with INC 86 Norn and Stroud's Creak Lane, using e portion of SR 1332 (Coleman Loop) righlof-way. This project will create a connection between NC 57 , NC 86 north of Hllleborough and US 70 west of Hillsborough to create an alternate for traffic seeking 1401"5 from the north of Hi115borough. By providing a direct connection to the interstate corridor w4hout using NC 88 through Hillsborough, fire project will help alleviate traffic congestion on Church Street through the historic downtown area. A portion of 3tri Creek Lane accessing NC 57 has been constructed with private funds. A 0.3 -mile (approx.) segment is needed to complete the connection between NC 57 and NC N. OTHER REQUESTS 1) Extension . Comments from the Economic Development 0 strict (ED0) Tranaoortatlon Workortum NGDOT should continue its study of seven options to reduce traffic congestion and Improve the Level of Service in Hillsborough's central business district and to improve safety along Chunon Street and NC 86. The workgroup prioritized the seven options in order of preference: 1. Elizabeth Brady alignment 3, which does not cross the river, goes across ridge (IF this is the least impact to the river) 2. Elizabeth Brady alignment 2 (averts racetrack, crosses river) 3. (original) Elizabeth Brady alignment 1 4. Lawrence Road (with 86 connector) — but different function from above 5. Western bypass 6. No build Y. When Chumm St. from 70 business to 70 bypass Elizabeth Brady Road Extension should be treated as a local road, not a bypass. The location of Elaabetli Brady Road is not adequate for a bypass. NCDOT should extend the study area for a bypass to include the Hillsborough 50 -Year Water and Sewer Boundary. One option for a bypass would follow the study area boundary for project U -3808. using existing roads where passible and with an interchange on 1.85 east of Lawrence Road. Rao, please refer to to attached EDD Transportation Wcrkgroup recommendations and comments. 2) 85 in Orange Courov [o NC 147 (Buck Dean Freeway) in Durham County — Orange County requests that 1-3306 Section A and 1 -3306 Section B be divided into two separate projects and programmed separately in the TIP. Project planning and design for this facility is in progress. Orange County requests that the development of the Major Investment Study and Environmental Impact Statement for this project include assurance that the project will not have detrimental land use impacts to the Orange County Comprehensive Plan. Orange County is opposed to any widening of 1 -00 through Orange County unless there Is a commitment by NCDOT ro provide HOV andfor dedicated bus lanes. COMMENTS ON OTHER TIP PROJECTS INITIATED BY NCDOT 1) 1305 widening of l -85t lanes and! reconnittingtion of insinithami from I- 4g at Hillshorouah 0 Durham County I ins: Orange County is opposed to any widening of 1-95 through Orange County unless there is a commitment by NCDOT to provide HOV andlor dedicated bus lanes. Even though this project remains an 'UNFUNDED PROJECT", Orange County requests that its staff be allowed to participate in Me planning of the facility. The County is specifically interested in the following Infrastructure impmvemaMa as May relate to the I -85fUS 70 Economic Development District: e) EMslon Control Measures - Orange County requests that permanent erosion control measures be included in the project. b) Pedestrian and Bicycle Facilities - Orange County requests that Rs staff be allowed to participate in the determination of where and what type of facilities are to be induced in this projecL Among the features requested for inclusion are sidewalks and bike lanes (see the Regional Bicycle Plan for Durham and Orange CrwMies) along roads where interchange improvements are required and adequate guardrails on overpasses. c) NilMdfe Corddor Under 1 -85 - Orange County requests that Its staff he allowed to participate during this part of the planning stage and that this issue be brought to the attention of the NCDOT Staff Biologist. Constructing this wildlife corridor is one of the recommendations presented in the 'The New Hope Condor Open Space Master Plan: Proposals for Linking Duke Forest and Eno Rlver Stale Park." d) Intersecton of Pleasant Greem Road fSR 15671 & Mt Herman Church Road (SR 17131 - NCOOT Division 7 Traffic Engineers have recommended that this Interseaon be Included as a part of 1305 because of its proximity to the 14WS 70 interchange. The entire Intersection should be maligned so that Pleasant Omen Road intersects US 70 M a 90-degree angle. a) US 70 from NC 751 to University Station Road (SR 17121- Due to the needs of the Pleasant Omen Road1US 70 intersection, Orange County requests that US 70, from NO 751 to University Station Road, he upgraded b provide for a suitable transition bonvto I-85. An example of the need far this project is the intersection of US 70 sigh Old No.10 (SR 1715) which is currently operating at twat of service "F". f) Mt Herman Church Road (SR 17131 - Preliminary plans by the Planning & Environmental Branch, Division of Highways of NCDOT indica a that this road may be mlonsted as part of I -305. Orange County requests that this road be designed with 12' wide travel lanes and 4' wide bicycle lanes for a total paved width of 32'. g) Old NO 10 (SR 1710) - Preliminary plans by the Planning is Environmental Branch, Division of Highways of NCDOT indicate that this road may also be relocated as pad of 1305. Orange County requests that this mad be designed with 12' wide travel lane end 4' wide bicycle lanes for a must paved width of 32'. h) NO 86— NCDOT has expressed cancem that the width (24ane) of the NO 80 overpass is inadequate for Increased traffic volumes that would result from proposed development in the adjacent Economic Development District. Orange County requests that the NC 88 overpass be widened. 2) E ) DM odulticiame mute from 1 -85 In Oramg County to 1-85 In Durham County - Orange County is strongly opposed to having this facility within Orange County and is also very concerned about the environmental Impacts to the Eno River Stale Park. Orange County requests that this facility be on a location outside of Orange County. December3,2001 Mr. J. Douglas Galyon North Carolina Board of Transportation Post Once Box 26969 Greensboro, Noah Camlina 27419 Dear Mr. Galyon: Enclosed with this letter you will find the Orange County Transportation Priority Ust for Conslderetlan of Funding in The 2004 2010 North Carolina Transportation tmpmvement Pronoun. Orange County's transportation needs list is divided into two sections. The first section deals with selected projects within the Durham - Chapel Hill - Canboro Metropolitan Planning Area. The second section deals with projects in the remaining portions of Orange County which lie outside of the Durham- Chapel Hill- Canboro metropolitan planning area. We hope that you will be able to fund these highway, transit and bicycle improvements. Thank you for your time and consideration of Orange bounty's transportation needs. If you would like to discuss this matter in detall, please contact Beverly Blythe, Clerk to the Board of County Commissioners at (919) 732$181, extension 2130. ORANGE COUNTY BOARD OF COMMISSIONERS Sincerely: Stephen H. HalMotls, Chair Enclosure Co: Mike Mills, Division Engineer, NCDOT Division 7 ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR CONSIDERATION OF FUNDING IN THE 2004 — 2010 TRANSPORTATION IMPROVEMENT PROGRAM Orange County would like to give priority b identified safety needs on existing roads and bridges and b other transportation projects which foster alternatives to automobile travel. The County also andorees environmentally responsible constmction of all transportation projects. Finally, the County supports adequate maintenance for existing transportation facilities. Our transportation needs list is divided into two sections. The first section deals with selectetl projects within the Durham-Chapel Hill-Cambom metropolitan planning area. The second section deals with pmjects In the remaining portions of Orange County which lie outside of the DurhamChapel Hill- Carrbom metropolitan planning area. ORANGE COUNT' PROJECTS WITHIN THE DURHAM- CHAPEL HILL- OARRBORO METROPOLITAN PLANNING AREA As a member of the Durham-Chapel Hill- Cantioro Metropolitan Planning Organaetion, Orange County will continue to work with the Transportation Advisory Committee (DCHC TAG) to develop a complete list of project priorities for the portion of Orange County that lies inside the urbani area boundary. However, there are selected projects in Orange County which we would like to address now because they have been the subjects of discussions between the TAC and the Department of Transportation or because there am other special concerns. REQUESTED PROJECTS 1) U-8608 Elizalfifilb Brady Road Fshqnslon Construct a m ity, with bicycle and pedestrian amenities, connecting US 70 Business and US 70 Bypass on an alignment that has least impact on the Eno River, the natural environment and cultural saes. This project creates a parallel mule to the highly congested Churton Street corridor (NC 86 & US 70 Business). This route will be used to m mute heavy truck and through traffic out of the downtowNhiffioric district. An Economic Development District (EDD) Transportation Wodyroup made up of Orange County and Town of Hillsborough elected officials, planning staff, developers and community groups was established to address transportation issues regarding the Hillsborough area EDD. That gmup's recommendations and comments regarding this project are also attached for consideration in planning and design of this project. 10 NC 86, Bicvcle Lanes: Construct bicycle lanes (4400t paved shoulders) from Chapel Hill (Whitfield Read) to Hillsborough (US 70 Business). This project will extend bicycle lanes on Airport Road (NC86) in Chapel Hill to US 70 Business in Hillsborough. Bicycle lanes have recently been completed along NC 86 from UNO to Whitfield Road (SR 1731) in Orange County. INC 86 from Chapel HIII to Hlllaborough is experiencing Increasing numbers of bicyclists using this mute and there are also two schools along this route. This route is listed as priority I of the primary bicycle mutes proposed in the Orange County Bicycle Transportation Plan adopted April 6, 1999. This project is listed in the 2002 -2008 TIP as an incidental bicycle near. Orange County requests that bicycle lanes be constructed as an Independent project, and, if necessary, programmed in phases. 3) R -2825 Improvements to South Churton Street Develop congestion management, limited access, aesthetic and capacity improvements between US 70 Business and Interstate 40. The portion between Interstatos 40 and 85 will conform to the design criteria of the Economic Development District Design Manual (4 -lane divided section with bike and pedestrian improvements). The feasibility study should explore a variety of improvements within the current rightoFway for the segment north of Interstate 85. Improved capacity through widening is not the first choice because of significant constraints between Interstate 85 and US 70 Business and the proximity of the historic district north of the pri limits. Orange County requests that, where conditions do not prevent the addition of frontage roads, the feasibility study include the addtion of frontage leads with limited access from the condor. 4) US 70 Bvoaes Widening Witlen, from the OrangieDurham County Line to the US 70 — 1.85 Connector east of Efland, US 70 Bypass to a four -lane divided section with bike and pedestrian Improvements. This project should be phased to address traffic counts and existing congestion. Orange County requests that this project be identified as a need and included in the 2004 -2010 STIP. 5) NC 86 (NOM of Hillsborough) Improvements. Widen, from US 70 Bypass north of Hillsborough to SR 1332 (Coleman Loop), NG 86 to four lanes with imersecon improvements at US 70 Bypass. NC 86 is the major north -south mute through Orange County. NC 57 converges into US 86 just north of US 70 Bypass. The segment of NG 86 between NC 67 and US 70 is congested, rendering a high accident location at the intersection of US 70 Bypass at NC 86. Development pressures In this area will exacerbate traffic congestion and accident proliferation. 6) R -3438 Hlllstal Weatem Bvoass: Construct a two -lane facility connecting US 70 with NC 86 North and Stroud's Creek Lane, using a portion of SR 1332 (Coleman Loop) right -of -way. This project will create a 11 connection between NC 57, NC 86 north of Hillsborough and US 70 west of Hillsborough to create an connate for traffic seeking 1 >011 -85 from the north of Hillsborough. By providing a direct connection to the interstate corridor without using NC 66 through Hillsborough, the project will help alleviate traffic congestion on Churton Street through the historic downtown area. A portion of Stroud's Creek Lane accessing NC 57 has been constricted with private funds. A 0. &mile (approx.) segment Is needed to complete the connection between NC 57 and NC 86. OTHER REQUESTS 1) U-3808. Eli ro the Economic Development D'atf,(EDD1 Transportation W k NCDOT should continue its study of seven options to reduce traffic congestion and improve the Level of Service in Hillsborough's control business district and to improve safety along Churton Street and NC 86. The workgroup prioritized the seven options In order of preference: 1. Elizabeth Brady alignment 3, which does not cross the river, goes across ridge (IF this is the least impact to the fiver) 2. Elizabeth Brady alignment 2 (averts racetrack, crosses river) 3. (original) Elizabeth Brady alignment 1 4. Lawrence Road wath 86 connector) — but different function from above 5. Western bypass G. No build 7. Widen Church St. from 70 business to 70 bypass Elizabeth Brady Road E#ension should be treated as a local road. not a bypass. The location of Elizabeth Brady Road is not adequate for a bypass. NCDOT should extend Me study area for a bypass to include the Hillsborough 5D-Year Water and Sewer Boundary. One option for a bypass would fallow the study area boundary for project U -3808, using existing made where Possible and with an interchange on Id5 east of Lawrence Road. Also, please refer to the attached EDD Transportation Workgroup recommendations and comments. 2) Section A. widening of 140 to six Ian NC 147 (Buck Dean Freeway) 'n QuElbarn C — Orange County requests that Id306 Section A and 1 -3306 Section B be divided into two separate projects and programmed separately in the Tl P. Project planning and design for this facility Is in progress. Orange County requests that the development of the Major Investment Study and Environmenfal Impact Statement for this project include assurance that the project will not have detrimental land use impacts to the Orange County Comprehensive Plan. Orange County is opposed to any widening of 140 through Orange County unless there is a commitment by NCDOT to provide HOV end /ordedicated bus lanes. COMMENTS ON OTHER TIP PROJECTS INITIATED BY NCDOT 1) on intrairchamman hom 1 60 at Hlllsborouah to Durham County Line: Orange County is opposed to any Widening of 135 through Orange County unless there is a commitment by NCDOT to provide HOV and /or dedicated bus lanes. Even though I project remains an "UNFUNDED PROJECT', Orange County requests that its staff be allowed to participate In the planning of the facility. The County is specifically interestetl in the following inhesimclure improvements as they relate to the 485I118 70 Economic Development District a) Erosion Control Measures - Orange County requests that permanent erosion control measures be Included in the project. b) Padestdan and Bicycle Fac'Id'es - Orange County requests that its staff be allowed .0 participate in the determination of where and what type of facilities are to be included in this project. Among Me features requested for inclusion are sidewalks and bike lanes flee the RRege, nal Bicycle Plan for Durham and Orence Count ies) along made where interchange improvements are required and adequate guardrails on overpasses. c) Wildlife Corridor Under 1-85 - Orange County requests that its staff be allowed b participate during this part of the planning stage and that this issue be brought to the attention of the NCDOT Staff Biologist. Constructing die wildlife corridor is one of Me recommendations presented In the 'The New Hope Condor Open Space Master Plan: Proposals for LinMrg Duke Forest and Eno River State Park.' d) Intemeation of Pleasant Oman Road (SR 1567) & Mt Herman Church Road SIR 1713) - NCDOT Division 7 Traffic Engineers have recommended Mat Mis intersection be included as a part of 1305 bemuse of its proximity to the 1 -85NS 70 interchange. The entire Intersection should be realigned so that Pleasant Green Road intersects US 70 at a 90-0egree angle. e) US 70 from NC 751 to University Station Road (SR 17121- Dee to Me needs of the Pleasant Oman Roa:AUS 70 intersection, Orange County requests that US 70, from NC 751 to University Station Road, be upgraded to provide for a suitable transition fromrYo 135. An example of the need for this project is the intersection of US 70 with Old No. 10 (SR 1715) which is currently operating at level of service "F•. 0 Mt Herman Church Road (SR 1]131 - Preliminary plans by the Planning & Environmental Branch, Division of Highways of NCDOT indicate that this mad may be relocatetl as part of 1305. Orange County requests that this road be designed with 12' wide travel lanes and 4' wide bicycle lanes for a total paved width of 32'. g) Old NC 10 SR 1710) - Preliminary plans by the Planning & Environmental Branch, Division of Highways of NCDOT indicate that this read may also be relocated as part of 1305. Orange County requests Mat Nis mad be designed with 12' wide brevel lanes and 4' wide bicycle lanes for a total paved width of 32'. h) NC 86 — NCDOT has expressed concem that the width (2 -lane) of Me NG 86 overpass is inadequate for increased traffic volumes that would result from proposed development in the adjacent Economic Development District. Orange County requests Mat the NC 85 overpass be widened. 2) R-21MID DURHAM T DRIVE) . new mulfirtane ro e from -86 in Came County to 1-85 In Durham Cou ty - Orange County Is strongly opposed M having this facility within Orange County and is also vary comemed about the environmental impacts to the Eno River State Park. Orange County requests that this facility be on a location outside of Orange County. ORANGE COUNTY PROJECTS UO TSIDE THE DURHAM- CHAPEL HILL- CARRSORO METROPOLITAN PLANNING AREA Orange County would like b give priority to Identified safety needs on existing mads and bridges and to other transportation projects which foster alternatives to automobile travel. The County also endorses environmentally responsible construction of all transportation projects. Finally, the County supports adequate maintenance for existing transportation facilities. 1) Pak and Race Lot in the BijckhQm Egrearric Development D'std Orange County requests a park and title facility (from the adopted Orange County Economic Development District Design Manual) be funded in the Community Transportation morovernal P for Orange Public Transportation. This project is clearly justified as it would provide an opportunity for coordination of public transportation efforts between two growing regions In North Carolina. the Tried and Triangle. 130 ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP RECOMMENDATIONS MEMORANDUM To: Board of Orange County Commissioners Hillsborough Town Board of Commissioners From: EDD Transportation Work Group Date: September 28,2001 RE: Final Report Attached please find the notes provided by our facilitator for our final meeting on August 18, 2001. This report serves as the translation of those notes into recommendations for action by bath boards. Background The EDD Transportation Commldas was an out -gromh of the EDD workgroup that suggested land use changes in the EDD areas as well as the resignation of new EDD times. The Land Use Group (2 commissioners from each board) had concerns that the transportation system was insufficient to address the full implementation of the EDDS. The Land Use Group felt they greatly benefited from the participation of the development community during the land use phase, and they wanted that to continue in the transportation phase. To that end, they sought wide -range participation from the public with known Interest in the topic. In addition to the 4 elected officials, 1 member from each planning board, the Commission for the Environment, the Chamber of Commerce, the Alliance for Historic Hillsborough, Economic Development Commission, and the Eno River Association were Invited. An area property owner, a representative from Ayr Mount, a design professional, and developer were also participants. Staff from Orange County Planning, the EDC and Hlllaborough Planning supported the committees efforts. Recommendations: 1. Both elected boards should forward the comments listed in the notes W NCDOT and their consultants working on the evaluation of Elizabeth Brady Road Extension, 2. Both elected boards should choose treacle from me list of "other recommendations" to crestaprioritylislstorthene #TIP. Submittals for the next round are due m the MPO this fall. The boards should work together to select the same projects in the same relative order to enhance the possibility of funding. 3. Implement the three policy suggestions: • Encourage County to provide park & ride for employees Consider policy about road widening similar to Carrboro''s —nothing greater than 3 lanes in town • Set u p a standing joint town /county committee 0 address transportation issues. 14 ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP RECOMMENDATIONS Notes from Transpodatlon Work Group retreat Hillsborough House Inn August 18, 2001 Recommendations from the group Comments to NCDOT reaardina Elizabeth Brady Road (note, the group did not re -vote after additional alternatives were offered): The seven options being studied in prionty order by what is preferred by the work group: 1. Elizabeth Brady alignment 3, which does not cross the river, goes across rings (IF this Is the least impact to the river) 2. Elizabeth Brady alignment 2 (averts racetrack, crosses river) 3. ( original) Elizabeth Brady alignment) 4. Lawrence Road (with 86 connector) — but different function from above 5. Western bypass 6. No build 7. Widen Chunon St. from 70 business to 70 bypass Additional comments: ➢ Expand the DOT study area to the entire 50 -year water and sewer boundary from the town plan ➢ Have DOT continue with Its existing list of options Y Add the consultants current study area boundary as a 8" alternative, adjusted as needed and using existing roads where possible Y Design the Elizabeth Brady road extension to minimize the impact on the Eno River, even if it reduces mobility Y Treat Elizabeth Brady Rtl, as a local road, not a bypass Y Treat Lawrence Rd. option as having a different function from Elizabeth Brady, to move through traffic around, not through, downtown Y Develop a new interchange of 1 -85 east of Lawrence Rd. to create possible bypass alternative ➢ Da other non -road fixes on Church Street to address congestion & safety, we Other All include bike and Pedestrian feature Amend cumma plena: I . Amend Western Bypass to begin near US 70 connectorfrom 1 -85 and delete King Edward Road extension from plan. Extend existing made: 2. Extend Lawrence Rd. south and west to connect with NC86 at the Old /New 86 connector 3. Extend Painters Grove Church Road south to new interchange on 185 and continue south to conned with New Hope Church Rd. 4. Extend NC 85 west at Crunch Street to con parallel whh railroad and connect to Eno Street at Nash Street 5. Extend Orange Grove Road east to US 70 business 6. Extend JJ Freeland Memorial Drive east to Valley Forge Road 7. Realign and extend Old NC 10 to connect the access mad through Hampton Pointe & cress railroad to provide access to Beckett 'a Ridge and through W Oakdale Drive ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP RECOMMENDATIONS New mad alignments: B. Connect NC86, South Churton & Oakdale through the Corbin Downs & Gateway Oaks properties, extend east to New Hope Church Rd 9. Create north /south connector connecting the extension of Old 10 with the road above in the Contain Downs Project 10. Connect Lafayette Drive with north/south Corbin Downs connector 11. Create a nom1south connector, through Collins property, connecting Orange Grove Road and JJ Freeland extensions Other improvements: 12.Align Eno Mountain Road & Mayo Street 13. Widen 70 bypass (in town plan but not in state TIP) 14.Add Win shows to existing signalized locations, especially downtown 15.Add right Win lane onto Mayo Street for south bound traffic 16.Add right turn lane onto Oakdale Drive for south bound tic 17. Provide longer turn lanes accessing Orange High School Road 18. Improve lane configuration at the 1- 85 /Chunon Street Interchange 19. Add turn lanes and pedestrian facilities at NC88/U570 Bypass intersection 20. Widen NC 86 between US 70 Bypass and NC57 and add bike and ped features 21. Straighten and make turn lane improvements along EBand Cedar Grove Rd., and make moo direct connection to 1 -85 Policy recommendations: Encourage County to provide perk & ride for employees • Consider policy about mad widening similar to Carrboros— nothing greater than lanes in town • Be up a standing joint t own /county commldee to address transportation issues. Issues for another day Non -road improvements needed DURHAM - CHAPEL HILL- CARRBORO METROPOLITAN PLANNING ORGANI] TION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Prefect This U-O80Q Elizabeth Bracy Road Extension Estimated Cost $15,082,000 Randal ing Agency Orange Couny Protest Dereard n A new facility connecting US 70 Business and US 70 Bypass with bicycle & 412 pedestrian amenities. Special design coneld0mtti0n Is desired t0 miniml2e Promotes Nafional Highway System adverse environmental and cultural impacts. Pmiect dus5fiwtlon: This project creates a parallel route to Me hlghy, congested Chudon Street No corridor (NC 86 & US TO Business). Projections estimate this burster, with a Provides for move mensrodation choices capacity of 21,000 vpd, will remove approximately 5.000 vpd from Crunch T. Street. This route will be used to re -mute heavy truck and through traffic out Yes of the downtown /hlstonc distinct An Bronchi Development District exists Has minimal impact on the natural environment just south of Elizabeth Brady Road around the interchange at 1 -85. This B. project Is easeMlal to the viability of that EDD. Pmiect Evaluation Cdteda: 1. An element ofMe'2025 Current Trend Lung Range Transportation Plan" Yes 2. Ihgres of congestion (volumah apacityf (Chunon Bill LOS D, 2000 ADT = 20.000) 1.5 3. Safety (ag., arJtlen/s/10o malion vehicle mass ofM1avelg(on Church St. - parallel route) 412 4, Promotes Nafional Highway System No 5, Raduces use of angle occupant vessels, No B Provides for move mensrodation choices Yes T. Promotes energy conservation Yes B Has minimal impact on the natural environment No B. Encourage&pastur i; development consistent with adopted land use plans Yes 10. Adverse impacts DO not docamportbnately affect low income populations Yes 11. Transportation Improvement Program Status Yes J,n08 ELIZPBETH BRPOY EXTENSION 1 _ EWNIMIL DEELOPMENf ELV RB 6RAOY EM. OISMW PREFERREDALI RNAnI DURHAM - CHAPEL HILL CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Project Tttle: NC 66 Bicycle Lanes (Pal Shoulders) Request is for an Independent Project Estimated Cast $1,000,000 Roviesino Aaencv' Orange County PmleH Des NMlnre Provide paved shoulders along NC 88 from US 70 A in Hillsborough to SR 1730 (Whitfeld Road) in Chapel Hill and may be programmed in phases. Pjgiffs atldcatbrr This mad Is popular route for bicyclists to travel from Chapel HIII Mthe rural roatls that Imemect wit NC W. Two schools are located along this route. This project Is the number one primary route listed in A Bicycle Tranaoortafon Pan for Orange County and is also a part of the DCHC Regional Birycte Plan. This project would link bicycle lanes on Airport Road in Chapel Hill with bicycle lanes along project U -381DS (Elizabeth Brady did). US 88 name several sections of to Hillsborough Area EOD. An objective of tat EDD is t attract mixed uses that make 0 s cools and feasible to u alternative faces of transportation within the EDO. This project is lisatl� an incidental bicycle project In the current TIP but no corresponding roadway project has been programmed The Hillsborough Transporafion Plan Its% the ROW adequate for ultimate roadway aimed 0 he four lanes divided with bicycle lanes. coal Evaudistion cmana 1. An element of the '2025 Current Trend Long Range Transportation Plan' 2 Degree of congestion (volume r apaoity) 3. Solely (e.g., awldents,100 million vehicle miles of al (1997calculation) 4. Postal National Highway System 5 Reduces use ofaMgle occupant vediule a Provides fo more hanspormion clroices 7 Promotes energy conservation a Has minimal impact on the naluml environment 9. Encourages economic devebpmenf consistent with disaffect land use plans 10 Adverse dilated; do not dia/XWertionately afieat low mare as 11. Tmnspodati in Improvement Program Sal Yes 0.63 47B No Yes Yes Yes Yes Yes Yes No DURHAM- CHAPEL HILL- CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Protect T'Ne R- 2825, Improvements to South Churton Street Estimated Cost Unknown Requesting Agency: Orange County Prmed DesoCOt'on Congestion management, limiter access, aesthetic and capacity improvements between US 70 Business and Interstate 40. The portion between Intrrstates 40 and 85 will goofing to the design crlterla of the Economic Development District Design Manual (4 -lane divided seciion with bike and pedestrian Improvements). North of Intermide 85 a variety of Improvements within the current right -of way need to be explored, Improved capacity through widening is not the That choice due to significant constraints between Interstate 85 and US 70 Business and the proximity of the historic district to the north of the Project limits. Where conditions do not prevent the addition of frontage made, access should be limited N spacing points that access frontage roads along he control. Protect,koxygoetiom This route incudes a developer commercial strip area, a developing mixed- use common and traverses the 1 -0011 -65 Economic Development District. TmfflG volumes along this mute exceed capacity of the roadway and turning movements and multiple access points exacerbates congestion. The corridor between the interstates is developing more quickly than original estimates and is mowing additional tmRlc into and through the developed Nan core north of Interstate 85. The viability of the Economic Oevelopment District will strongly depend on the wuritys ability to limit auto access along this condition and provitle feoldies for altamate transportation modes. Project Evaluating Coming' 1. An element of the "2025 Cunegt Trend Long Rarge Tmgapwlstion Plar' Yes 2. Degree of congestion (volumehapacilyJ (2000 ADT = 20,000) 1.5 3. Safety (e.g., acrudendel 00 million vehicle miles of travel) (1997 figure) 490 4. Promotes National Highway System Yes 5 Reduces use ofaingle cocupant vehicle No 6 Provides Nrmore transportation chokes Yes Promotes energy conservation Yes B. Has minimal impact on the natual environment Yes 9. Encourages ecanamb development consistent wdh adopted land use plans Yes 10 Adverse impels do rml disproportionate )y, affect low income populamars No if. Transportation Improvement Program Status Yes R -2825 IMPROVEMENTS ALONG SOUTH CHURTON ST. I ECONOMIC DE OPMENT DISTMCT DURHAM - CHAPEL HILL CARRRORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Protect Title US 70 Bypass Widening Estimated COST Unknown Reauesfno Airencv' Orange County Protect Descrtpfbn' Widen US 70 Bypass from the Durham County Ihre to the US 7(1 Connector east of Efland to a four -lane divided section with bicyGe and pedestrian facilities. Protect JUStifla iorc US 70 Bypass is a major fermagh(are projected to W over capacity during the design p rood (2020). The intersection of US 70 Bypass at NC 85 is listed as a high accident location (Hillsborough Transportation Plan) having an average of 32 accidents per year for the period tram 092 to 4195 —the highest accident intersection with the highest accident frequency within the Hillsborough planning area. The 1997 Hillsborough Transportation Plan (Table 1 Benefits Evaluation in section 111 Construction Priorities) ranks U5 70 Bypass Widening as the second phony of the major projects based on its benefits, its estimated nghts-of-wey and construction mat, and Its probability of stimulating the local economy. U3 70 Bypass also haverro s the County 's I -aVUS 70 Economic Development District which expands almost Mro mlles along those corridors into Orange County from the Durham County Line, Protect Evaluation f'.rilMie' 1. An omen o7the 7025 Current Trand LOg Range Transportation Plan" Yes 2 Degree ofmngerson( volume /capaclN) 2D20 protection: 12,W0- 18,900 vpd(1.45 vfc) .85 3. Softly (a.g., eccidantd100 mNlicn vesicle miles of travel); ACC11 o0MVM Indudes segment from 1-65 Connector to US 70 Business only. 291.06 4. Promotes National Hghway System No 5. Reduces use ofshigle occupant vehicle No 0. Provides funscre (ranspodalion choices Yes 7 Promotes enegy mnServaWll Yes B Has minlmal Impact on the natural environment Yes 9. Encourages econs io development consistent with adopted land use plans Yes 10. Adverse impacts do not disproportionately effect low income populations No 11. Transportation Improvement Program Stalus No 23 24 DURHAM - CHAPEL HILL CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Pmeci Tire NO 36 (North of HillsCOrough) Improvements Estimated Cost 9,200,000 Renaissance Agency' Orange County PrgecfC scratirn.' Widen NO 86 from US 70 Bypass north of Hillsborough M SR 1332 (Coleman Loop) with intersection improvements at US 70 Bypass. Projectjawri al'on NO 86 Is the major North -South mnidor through Orange County and NO 57, another major correct, converges wit NO 86 Iwo than a mile from US 70 Bypass. NCDOT 2000 ADT counts show that NO 86 just north of NO 57 carries 11.000 vpd'. INC 57 just north of it Intersection with NO 86 carries 4,500 vied. Therefore, to segment of NO 86 between NC 57 and US 70 may be carrying 15,500 vpb. The Intersection of US 70 Senate at NO 86 is listed as a high accident location (Hillsborough Transportation Plan) having an average of 32 accident per year for to period from 4192 to 4/95 — the highest accident intersection with the highest account frequency within the Hllsborough planning area. Proiect Evaluation Greens: 1. An element of the 2025 Current Trend Long Range Trznsportatuar Plan' Yes 2 Degree afcongestlon(volumatimmi 1.2 3. Safety reg., accidenls/f00 millionvehiGe miks oftmve) >311yr ®US 70 Bypass and NC86. 4, Promotes Nalwnal Highway System No 5. Reduces use ofeingle occupant vehicle No 6. Provides for more Mansportatim choices No Promotes energy conservation Yee B. Has minimal impact on Me natural environment Yes 9. Enmumges economic development cansicrent with adopted hind use plans No 10 Adverve impacts do not tli5 prype/ I (gndfely affect taw irwome populations No 11. Transportaflm Improvement Program Status No zs NO 00 NORTH IMPROVEMENTS \ o MppP INO�OUN y e L7 (] 4 A ;o 26 DURHAM - CHAPEL HILL- CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Protect Titi R- 3438, Hillsborough Western Bypass Estimated Clas $6,800,000 Reouestlac AOencr Orange County Provi oescdpliop Construct a two-lane facility connecting US TO wit Stroud s Creek Lane using a portion of SR 1332 (Coleman Loop Road) right -of -way. Pored Justil ation, This project will create a connection between NC 57 and NC 86 north of Hillsborough to US TO west of Hillsborough he create an alternate for traffic seeking I4VI45 from the north of Hillaborough. By providing a direct connection to the interstate comidor without using NC 86 through Hillsborough, the project will reduce traffic on congested Croton Phrase (2000 AOT = 20,000). A portion of Stroud's Creek Lane from NC 5T has been completed wit private funds. A 0.3-mils (appfoxi) segment is needed to complete the connection between NC 57 and NC 86. Protect Evaluation Crtte er 1. An element of the" 2025 Current Trend Long Rarge Transportation Plan' Yea 2. Degree olcogestern(vofume/capai (for Crunch Street) 1.5 3. Satisfy (e.g., accidents /100 million vehicle miles of boost) WA 4. Promotes Natbnal Highway System Yes 5. Reduces use ofsngle occupant vehicle No 6. Provides formom transportation chokes No 7 Promotes enegyconservation Yes 8. Has nummalimpact on to natural environment No 9 Encourages economic development consistent wish adopted lend use plans No 10 Adverse impacts do not disproportionately affect low income populations Yes 11. Tonsportai Improvement Program Status Yes 2] R -3438 Westem Bypass