BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Dale: December 3, 2001
Action Agentla
Item NO. ~-p
SUBJECT Rogers Rcatl Man Waterline Project Change Orders
DEPARTMENT: County Manager PUBLIC HEARING (YIN) No
ATTACHMENT (S): INFORMATION CONTACT:
Paul Thames, 245-2303
17/29/01 County Engineer Memo Rotl Visser, 2452308
TELEPHONE NUMBERS:
Hillsborough ]32.8161
Lhepel HIII 966A501
- Durham 686-]331
Mebane 336-22]-2031
PURPOSE: To consider approval of three change oMers to the Rogers Road main waterline
protect the[ have been identified by Orange Water entl Sewer Authority (OWASA) staff.
BACKGROUND: The Rogers Road main waterline construdicn protect ie naedng complefion.
OWASA is managing this project under an agreement with the County, and has itlentifetl the
need for three change orders to the original project, as ou6ined in the aavmpenying staff
memo from the County Engineer. An eppropriatbn of $40,000 from reserves in [he Landfll
Enterprise Fund will be needed to cover the cost of these change orders and tc enable
OWAGA's mnstrumicn contractor to wmplete the project wdhin the next few weeks.
FINANCIAL IMPACT: The estimated cost of [he three change ooers is $40,000.
RECOMMENDATION(S): The Manager recommends that the Board: 1)authorize OWASA to
undertake the change orders{ entl 2) approve [he appropriation of $40,000 in reserves tram the
Solid Waste Operations/Landgll Enterprise Fund ro cover the mst of the change oNam.
MulMOxnNnuM
To: cowry commiaaionara
COP1E5: John Livk, Counry Manager
Rod Vilifier, Assistant Counry Mwagm
Oayle Wdeoq Solid W as[a Dvutm
PA Kerwin, Bxecufive Dlecemc, OWASA
FROM: Paul Tremeq P$COwty HVeivem
DATE: Novmaher29.2001
SUB.fEOT: Mgers Road WatarlinnPmjt
I have been ulvisedby OWASA e[eR[het [lace ehevge oders for the Rogers Road waterline construction
project mus[be executed. The mtal mstoflhese chmge orders, while not yc[fmlized, is expwted to
approach 540,000. Asthe cwnactm is only expected to be ov site fm tM veer twe weeks or so, [he
change orders chonldbe axewtedmthe ve[y veer term. Each chwge ortler, its purpose wdils
approximate wsl is oullincd bdow.
Chanec Order l~ Tanker Truck FtiB 6ts[lov-The lwdfill staffhave roquest~thela fill slaHevfor
watec trucks he insldlsl ev the portiov ofthe watmlwe that bas bcen extended across dte fiouthem
bowdary of We lwdfill propetrymservethe landfill cells wwopemting Thefill emtiov will consi6t
essenliaHyo(a [ell efwdin5 Poe with a valvdat the base avd hose on the top and that can be utilized to
5ll the landfill's water tanker minks Hmv er at the top Ne rook. These tmcks wa usadto spraywaler on
the Iwdfill's dvVgmval roadways to hold dowv dust cxatedby pursing wake wd heavy eanhmowrg
xl,dpmmt during drypenods. Carrmdy the taker mrcks mint exit nc~lwdfilt vte and be driven seveml
miles to be filled at a [ire hydrant vcar the NC 86/EUbavks Road ivtersecfion. This is atime covsm^=^e
and inconvenient operation waz most be performed several timce px day during drypaiod6. The fill
eretiov will ebmivam the off-airs opesation of the tad:er trvaks ehd will provide amwh aeeim maws of
fillin6 the tanks. The cost of lhia evhancemmthepprovme[e1y 59,000.
Chan eOrder 3' BarricatlNe necesa to waterline mmis-Thcpmccse ofimtWling waterlines
thconghout the Roger Rovd commwityhas mewt that ihouemWs of het o[wa[erline have hem inetaved
iv uhffiYaesmvmis that run °anss-wwtry+' duw5h large wdewloped vaNS within the commu~dN. The
turns of the easemcnla limit the use ofthe easemmts to OWASA (to ivspcn err repair wvterlinesj err the
property ovmcre (whose use maynot cpufiim with OWASA'6 use, essmtiallyrestnnirrg the ptacemmt of
f us mpmnanmtstructuree). Aesidmts pfthe mmmurdly have expressed conccme [het these open
(cleared wd grades eaeemmta may provide wcees m hwtme or oNm wwelmme wd nnemhmized
individuals such as Urose who might wish to nee the aesemmes w droop cu/truckleede ofhashbeyond The
observation and conlml ofthe commwip~'s sesidmts or law enforcement officiate.'The commwityhas
suggested that the mtrwoes to these easements bebw9caded m some (esWw m msMd velHcvler access
(other Ihav OWASA service vehicles). OWASA has proposed tp comply with lhcse reque6t6 by ins+zlling
locking pipe bollard (fabrieetcl by vertically mttelting wvereta 1-led sacdone ofbmken or surplus water
pipe segmevte)wd cable barricades across [he access to ewhofthe eaaavencs. fhe cost of these
barricades is eefvvatetl ro total appwximatekp SG,500.
CM1av¢e Order J: Avlvmatic Nlvbhive Valves -One ofthc chWlrnges of We RoKen Road project awes
its ivccpOan ie the regtiremem Nat the project's weer mains he sized barge sough m provide &m
p%tatiov (lows mtd pressures throughom the ncighberhood mrd aaotnmodating the projected tlemsd of
forme develepmrnr in adjacent areas (such as Ore Grerne TrecQ, while simultaneouslyprovidmgteigh
quality drNldng water toerelatively £ew existing cmlomers. This requirsevt poses something ofe
oontrndmm iv W¢t pomble warm ie treated with WsWfeotst clremjoak (usually chlodve or s ohlodne
ompovvd) that dissipate from No vcated watu within a shovperiod oRime (%sazallY a week or lass).
AcwNivgly, forwatar m remtiv potable (bY law, retaining a memmablecWonvc reaidus9, it must be
reKWarly mplsished(or "mmed ovet')in Ne water mains. This repladsWnaH is accomplished ei[her
when the waur is wvsumW by local mars or when the uLGty routinely flushes wvur from aportiov ofthe
system Naz would experience wsufficient water mmovtt otherwise.
Thtte is little quesfion thaz the limited vumbcr o(pmwtial existing water customers W Ne Rogvs Aoad
vwty a¢d We speed, m lack Nmeef, at which they will wnnsl w Ne systvn will mandate drat We
system be flashed regularly. OWASApraposes [e accomplish the dushNgproccee by wstallwg
automated flushing valve appamWS at Wree locationsNNe togas Road syniw. A[eacb locadon,a
banay powered tinter and hmh valve syamm will openly Iv upev a Rusbin8 valve at predo[ormirred times
end for prederemsmed lvtavals that havebean calcvlaled to sure Nat the water available to eonsumas
retnaitu properly disinfected. TM1e tirml cost for We purchase and insmlladon of[hese valves and
associnted equipmm[has vol yet been delemlivcd. Howmer, the total eva[has been aalimnfed by
OWASA ataRlo fall in [he $38000 to 525,000 range.
Tlrerc love been several questions as fo We cf&cacp of[he evtometed flush vulva installation m opDOSed
m moms sort ofmmtual dusWUg Process that would continue motif demand generated flow is sufficicm [e
provide the necessary mmnvm ofwmer. While Were is little question that suc6aprocess mould be
implemented for this particular subsystmv of OWASA's wale[ disvibution network, itwouldbe a fime
uming mdstaff intensive opaadovf OWASA. OWASA will alreadyhe called upon to bear We
costa of Ore water Wat is lost tM1muKM1 fhe ^usltin8 oPerazion, regarWess ofwheOser Wat opaafiov is
automated ormanual. The quesfion of the cxtcut o[ Wose emote hashes very recemly posed to OWA$A
sluff', bul Na answer is not yet avaiable.
OI may proa9de ulditioral iWbnvalicn at tlus time, please advise.