ORANGE COUNTY
NORTH CAROLINA
MEMORANDUM
TO: Board of County Commissioners
Bonnie Hammersley, Orange County Manager
Travis Myren, Orange County Deputy Manager
FROM: Christopher J. Sandt, P.E., Staff Engineer
Craig N. Benedict, Planning Director
DATE: August 30, 2021
SUBJECT: BOCC Information Item —Administrative Updates to the Eno River
Voluntary Water Management Operations Plan (WMOP)
This purpose of this Information Item is to inform the BOCC of proposed administrative
updates to the Eno River Voluntary Water Management Operations Plan (WMOP).
Background
In 1988, Orange County became party to the Eno River Voluntary Water Management
Operations Plan (WMOP). The WMOP was/is intended to preserve a minimum flow in
the Eno River, even during times of drought, by restricting the amount of raw water that
major water users (i.e. users who withdraw 100,000 gallons of raw water per day or more)
can withdraw from the Eno River. The three major water users who are parties to the
WMOP are the Town of Hillsborough (Town), Orange-Alamance Water System (OAWS)
and Resco Products (formerly Piedmont Minerals). Orange County is party to the
WMOP because at the time of the original development of the WMOP, Lake Orange
(owned and operated by Orange County) was the only public water supply reservoir
located within Orange County that was capable of controlling raw water releases from
the dam. In the year 2000, the WMOP was revised/modified to incorporate the West
Fork Eno Reservoir (WFER) into the WMOP. The WFER (owned and operated by the
Town) is a public water supply reservoir located on the West Fork of the Eno River.
The WMOP sets forth a minimum release schedule from both the Lake Orange dam
(County-operated) and the West Fork Eno Reservoir dam (Town-operated) to provide
the major water users with raw water based on allocations as specified within the
WMOP. In addition, the WMOP mandates minimum in-stream flow within the Eno River
during dry weather periods to help sustain aquatic ecosystem health. The North
Carolina Department of Environmental Quality, Division of Water Resources (DWR)
currently administers the WMOP. The Orange County Staff Engineer is responsible for
monitoring daily Eno River flows and initiating/rescinding raw water withdrawal
restrictions during low-flow (dry weather) periods. The Orange County Staff Engineer
reviews raw water release data from Lake Orange, Lake Ben Johnston (a run-of-river
dam owned and operated by the Town), Corporation Lake (a run-of-river dam owned
and operated by OAWS), and the WFER to monitor established river flow and raw water
withdrawal targets as specified in the WMOP. Allocated water withdrawers are
responsible for monitoring and reporting their raw water withdrawals to DWR and the
Page 1 of 2
2
Orange County Staff Engineer. Additional background information on the Eno River
and the WMOP is located at the following DWR website links:
http://www.ncwater.org/Eno River Management/
http://www.ncwater.org/Eno River Management/plan.phi)
Purpose of Information Item
The last revision to the WMOP (the addition of the WFER) was made in 2000, over 20
years ago, and involved regulatory changes that required review and approval by the
Environmental Management Commission (EMC) prior to execution. The existing
WMOP (i.e. the 2000 version) is in typewritten font and needs to transition to the 21st
Century. The existing WMOP does not contain a table of contents or page numbers for
reference by the reader, and Resco Products (one of the major water users) is noted
erroneously as Piedmont Minerals. In addition, the existing WMOP contains some
administrative ambiguities that require minor clarifications and/or refinements.
See Attachment 1 for a copy of the existing WMOP.
The Orange County Staff Engineer originally initiated the proposed administrative
updates with the WMOP partners in early 2020. Since that time, Orange County has
received formal consent and input from all WMOP partners, including DWR. The
WMOP partners have collectively agreed that it is time to update the formatting of the
WMOP and provide more background and explanation of the existing WMOP terms.
DWR has confirmed, in writing, that the proposed WMOP updates as contained within
this Information Item will not require EMC review or approval due to the
administrative/cosmetic nature of the proposed updates. The proposed updates involve
converting the late-1980's WMOP document to electronic format, providing a table of
contents and page numbers, adding an introductory section, making grammar and
editorial updates, and providing a better explanation of the allowable raw water
withdrawal allocations (i.e. revisions to Table 1 within the WMOP). The proposed
revisions also update the names of the current partners and current state agencies.
See Attachment 2 for a copy of the proposed WMOP, inclusive of proposed updates.
DWR staff has accepted and integrated all of the requested administrative WMOP
updates as such. The Hillsborough Board of Commissioners was made aware of the
proposed WMOP updates through a Town staff-initiated information item on consent
agenda at their August 9, 2021 meeting; see Agenda/Minutes at the link below:
http://archive.hillsboroughnc.gov/WebLink/l/doc/3424/Pagel.aspx. There were no
Town Commissioner comments and/or exceptions received. There are no Orange
County financial impacts associated with the proposed WMOP updates.
NOTE: Any future proposed regulatory/material changes to the WMOP (e.g. changing
allocated raw water withdrawals, changing minimum water releases, etc.) would require
formal presentation to the WMOP partner government leaders and the EMC for review
and approval prior to execution.
Please communicate any questions or concerns to Christopher J. Sandt, P.E., Staff
Engineer (csandt@orangecountync.gov or 919-245-2583).
Page 2 of 2
3
Department of Natural Resources and Community Development
Division of Water Resources
ENO RIVER CAPACITY USE INVESTIGATION
------------------------------------
G11ATER Y,,ANAGERjENT OPERATIONS PLA14
--------------------------------
August 19 , 1988
Endorsed by Environmental Management Commission
September 8 , 1988
Modified March 1989
Revised July 1990
4
WATER MANAGEMENT PLAN
All water users in the Eno River Basin who withdraw more
than 100 , 000 gallons of water per day from surface water or
groundwater sources are subject to the management controls of
this plan. Both water withdrawals and reservoir releases are
subject to controls. Water users affected by controls under the
plan are listed below.
1 . Town of Hillsborough -- Lake Ben Johnston withdrawal
and reservoir release.
2 . Orange-Alamance -- Corporation Lake withdrawal
and reservoir release.
3 . Piedmont Minerals -- Eno Fiver withdrawal.
4 . City of Durham -- Eno River withdrawal.
5 . West Point Grist Mill -- Eno River.
6 . Irrigators whose monthly average withdrawal
exceeds 100 , 000 gallons per day.
7. Orange County -- Releases from Lake Orange,
Corporation Lake, and
Lake Ben Johnston.
5
The limited capacity of the basin requires these users to
be subject to the following controls.
Hillsborough Water System
The Hillsborough Water System will be allowed to withdraw a
maximum of 1 ,510 ,000 gallons of water per day from their intake
at Lake Ben Johnston. Maximum allowable withdrawals will change
as the lake levels at Lake Orange change . Table 1 indicates the
maximum allowable withdrawal at successive storage levels.
The Orange-Alamance Water System
The Orange-Alamance Water System will be allowed to withdraw
a maximum of 820 ,000 gallons of water per day from its intake at
Corporation Lake. Allowed withdrawals will be reduced as storage
at Lake Orange is reduced. Table 1 indicates the maximum
allowable withdrawal for given storage levels at Lake Orange.
Piedmont Minerals
Piedmont Minerals will be allowed to withdraw a maximum of
900 ,000 gallons of water per day from their intake in the Eno
River below Lake Ben Johnston when flows at the Eno Gage are 14
cfs and above. This will be reduced to 430 ,000 gallons per day
when flows are between 14 cfs and 4 cfs. Below 4 cfs, the
maximum allowable withdrawal will depend on the storage and lake
levels in Lake Orange, as shown in Table 1 .
6
Durham Water System
The Durham Water System will be allowed to withdraw water
from the Eno River below the U.S. 501 Bridge in amounts up to
5 , 000 , 000 gallons of water per day when the flows , as measured at
the USGS Eno River gage at Durham, are above 30 cfs from March
through May and 10 cfs during other times of the year.
Withdrawals will cease when flows fall below these levels.
West Point Grist Mill.
The West Point Grist Idill is a run-of-river operation. The
Mill will be permitted to use water from the Eno for mill power
and return it to the river immediately downstream.
Irrigators With Average Use Exceeding 100, 000 Gallons/Day
Irrigators will be allowed to withdraw up to their maximum
monthly use, based on water use figures collected by the Division
of Water Resources in 1987 for the severe drought year of 1986 .
Current (1986) water use would not be restricted, but increases
in existing water use and large new users may be restricted. The
short-range objective is to limit the expansion of irrigation
acreage and facilities until downstream water supply sources can
be improved.
Users Withdrawing In Excess of 100 ,000 Gallons Per Day
Any users, not previously mentioned, which withdraw more than
100, 000 gallons per day from either ground or surface water
sources in the Eno River Basin, upstream of the confluence with
the Little River, will be required to agree to limits, but are
not now included in this plan.
7
Instream Flow
In addition to maximum withdrawal limits set for offstream
uses in the Eno River Basin, minimum instream flow requirements
are established at the Hillsborough streamflow gage (USGS
Streamflow Gage # 02085000) . A minimum of 1 . 7 cfs (1 , 100, 000
gallons per day) is to be maintained at the gage when Lake Orange
is greater than 80 percent total storage. This value is reduced
as the storage level decreases at Lake Orange. Table 1 lists
the minimum instream flow requirements. Orange County will be
responsible for coordinating releases and maintaining minimum
flows at the gage. The three major withdrawers will provide
withdrawal schedules to the County at least one week in advance
and will notify the County immediately regarding emergencies and
other necessary changes in the withdrawal schedule.
Additional Storage
The withdrawal allocation can be revised whenever additional
storage facilities are completed in the capacity use area or when
additional water supplies are made available from sources outside
the area. New storage facilities will be reviewed to ensure that
there are no adverse effects upon the permit holders or on
streamflow as measured at the Hillsborough gage.
8
Outside Sources
Water obtained from sources outside of the area designated
as capacity use will not be limited under the Eno Capacity Use
regulations. During periods of higher flows (over 10 cfs or
6 .452 MGD) , public water supply systems may take additional water
from the Eno, provided that they have long-term contracts for
obtaining an equal amount of water from outside the basin when
the flow in the Eno drops. This type of adjustment will be
evaluated on a case-by-case basis by the N.C. Division of Water
Resources.
Plan Administration
Orange County will be responsible for notifying affected
water users of levels at Lake Orange and of the reductions of
water withdrawals as required by the Plan.
Periodic Review and Changes
Withdrawal allowances will be subject to review every 5 years
or when changes have been made to current systems, storage, or
supply sources.
Plan Support
Technical support, plan clarification, and approval of minor
interim adjustments and modifications will be provided by the
N.C. Division of Water Resources.
9
Reporting
Average daily withdrawal in million gallons per day (MGD) for
Orange-Alamance, Hillsborough, and Piedmont Minerals will be
reported monthly to the Division of Water Resources. Average
daily withdrawals in MGD for agricultural users will be reported
annually in March.
10
Revised July 1990
Table 1
Maximum Allowable Surface Water Withdrawals
-------------------------------------------
Based_on_Lake-Orange-Level
Drawdown Allowable Surface Water Withdrawal
Percent of in feet --------gallons per day-----------
Storage from top
Remaining at of 1-ft . Town of Orange- Piedmont Instream Flow
Lake-Orange-__-flashboard-_Hillsborough--Alamance--MineralsRequirement
> 100 spilling * * ** 1 , 100, 000
100 - 80 0 . 0 1 , 510,000 820, 000 430, 000 1 , 100, 000
80 - 60 2 . 0 1 , 360, 000 740, 000 380, 000 650, 000
60 - 50 4 . 3 1 , 280 , 000 700, 000 360, 000 450, 000
50 - 40 5 . 8 1 , 280, 000 700, 000 320, 000 450, 000
40 - 30 7 . 4 1 , 130,000 620, 000 190, 000 0
< = 30 9 . 3 680, 000 370, 000 0 0
------------------------------------------------------------------------
notes:
*- Adjusted to reflect outside source agreement for Hillsborough and Orange-Alamance.
- Excess withdrawals from Eno River based on outside source agreement may be made when flows
at the Eno River at Hillsborough Gage are 10 cubic feet per second (cfs) and above,
regardless of water level in Lake Orange. Maximum withdrawals will be limited to the
total of the contract amount and the allocated amount.
- A low flow period will begin on the 7th consecutive day of the average daily flow at the
Hillsborough Gage dropping below 10 cfs. On the 4th day, the Orange County Engineer will
request that affected parties prepare for a low flow period.
- When flows are between 10 cfs and 3 cfs at the Hillsborough Gage during a low flow period,
withdrawals from the Eno River shall be limited to the 100-80 percent of storage remaining
amount shown above, regardless of water level in Lake Orange.
- When flows are below 3 cfs at the Hillsborough Gage, during a low flow period, withdrawals
will be limited to amounts shown above for percent of storage remaining at Lake Orange.
- A low flow period will be terminated when average daily flow at the Hillsborough Gage
registers 10 cfs or greater for a period of 7 consecutive days. The Orange County
Engineer will notify affected parties when the low flow period is terminated.
**- For Piedmont Minerals Inc: When flows at the Hillsborough gage are 14 cfs and above,
withdrawals from the Eno River will be limited to 9001,000 gallons per day (gpd) . Between
14 cfs and and 4 cfs, withdrawals will be limited to 430,000 gpd, regardless of water
level in Lake Orange. Below 4 cfs, withdrawals will be limited to amounts shown above for
percent of storage remaining.
11
June 1991
ADDENDUM
To the Eno River Voluntary Water Use Agreement
When Lake Orange is above 100 percent full and is spilling,
Hillsborough will be allowed partial credit for water purchased from
an outside source and discharged into the Eno River west of county
road 1009 during the monitoring week that the discharge occurs, at a
credit rate of 60 percent of the total discharge, when the discharge
is made over a 24-hour period or greater. The credit volume will be
divided by 7 days and added to the withdrawal limit listed in Table
1, to determine the allowed average daily withdrawal for that week.
In the event that the flushing discharge straddles two monitoring
weeks, the credit volume will be applied equally between the two
weeks. The Orange County Engineer, or DWR staff in his absence,
must be notified of the volume and the duration upon completion of
the flushing. A written report of the flushing, detailing exact
dates, times, and volumes, shall be included in the monthly report
to DWR. If notification is not received with that months water use
report, no credit will be granted and any excess water use will be
labeled as a violation of this agreement . The Division of Water
retains the right to revoke permission for Hillsborough to receive
credit for flushed flows if at any time , in the opinion of the
Division, the ability of Ben Johnston Dam to meet downstream flows
may be compromised. Said revocation will be in effect until there
is notice by DWR that the problem has been corrected to its
satisfaction. If Lake Orange is not spilling, no credit will be
allowed.
- In the event that flow at the Eno River at Hillsborough streamflow
gage is over 10 cfs, Corporation Lake and Lake Ben Johnston are both
spilling water over the dams, purchases of water are being made from
outside of the Eno River Basin, and the low flow period has not yet
ended, users may cease their outside purchase of water and withdraw
the amount of water allowed in the absence of a low flow period, as
long as the ability to resume purchase of water for immediate
customer delivery remains. This time period has been determined to
be three days for the OWASA line. Water purchases will be made as
often as necessary to flush the lines and keep them from stagnating.
If flows drop below 10 cfs before the low flow period is over, Eno
River withdrawals must immediately be reduced to Table 1 levels.
- Transfer of water allocation between users is permissible under
the following conditions: 1) Lake Orange is greater than 80 percent
full; 2) notification of the duration and specific volume of the
transfer will be given by the surrendering party to the Orange
County Engineer, or the DWR in his absence, a minimum of one day
before the transfer is to take place; 3) the total allocation will
be adjusted if necessary by the averaging period of the surrendering
party, and 4) written notification of the duration and volume of the
transfer will be provided by both involved parties in their monthly
water use reports to DWR. If prior notification is not received,
DWR will not recognize the allocation transfer.
12
Eno River Water Management Plan Table 1 Revised March 2000
Maximum Allowable Surface Water Withdrawals Based on Lake Orange Water Level
Allowable Surface Water Withdrawal Instream Flow Requirement at Hillsborough Gage
Percent of (gallons per day) (gallons per day)
Storage Drawdown
Remaining in feet from From Total Flow at
at Lake top of 1-ft. Town of Orange- Piedmont From West Fork Eno Hillsborough
Orange flashboard Hillsborough+ Alamance Minerals Lake Orange Reservoir Gage
> 100 spilling *t * "* 1,100,000 650,000 1,750,000
Stage 1 100 - 80 0.0 1,510,000t 820,000 430,000 1,100,000 650,000 1,750,000
Stage 2 80 -60 2.0 1,360,000t 740,000 380,000 650,000 650,000 1,300,000
Stage 3 60 - 50 4.3 1,280,000t 700,000 360,000 450,000 650,000 1,100,000
Stage 4 50 -40 5.8 1,280,000t 700,000 320,000 450,000 650,000 1,100,000
Stage 5 40 - 30 7.4 1,130,000t 620,000 190,000 0 650,000 650,000
Stage 6 �= 30 9.3 680,000' 370,000 0 0 650,000 650,000
Notes:
+ Allowable withdrawals for Hillsborough shown above do not include withdrawals of water supply releases from West Fork Eno Reservoir.
* - Adjusted to reflect outside source agreement for Hillsborough and Orange-Alamance.
- Excess withdrawals from Eno River based on outside source agreement may be made when flows at the Eno River at Hillsborough Gage are 10
cubic feet per second(cfs) and above,regardless of water level in Lake Orange. Maximum withdrawals shall be limited to the total of the contract
amount and the allocated amount.
- A low flow period will begin on the 7`'consecutive day of the average daily flow at the Hillsborough Gage dropping below 10 cfs. On the 4`i'day,
the Orange County Engineer will request that affected parties prepare for a low flow period.
- When flows are between 10 cfs and 3 cfs at the Hillsborough Gage during a low flow period,withdrawals from the Eno River shall be limited to the
Stage 1 amount shown above (100-80 percent of storage remaining), regardless of water level in Lake Orange.
- When flows are below 3 cfs at the Hillsborough Gage during a low flow period, withdrawals shall be limited to amounts shown above for percent of
storage remaining at Lake Orange.
- A low flow period will be terminated when average daily flow at the Hillsborough Gage registers 10 cfs or greater for a period of 7 consecutive
days. The Orange County Engineer will notify affected parties when the low flow period is terminated.
"For Piedmont Minerals: When flows at the Hillsborough Gage are 14 cfs and above,withdrawals from the Eno River will be limited to 900,000
gallons per day(gpd). Between 14 cfs and 4 cfs, withdrawals will be limited to 430,000 gpd,regardless of water level in Lake Orange. Below 4 cfs,
withdrawals will be limited to amounts shown above for percent of storage remaining.
13
RESOLUTION NO. 88--13
ENVIRONMENTAL MANAGEMENT COMMISSION
WHEREAS, at the direction of the Environmental Management
Commission (EMC) , the Department of Natural Resources and
Community Development has completed a capacity use investigation
of the Eno River portion of the Neuse River Basin, pursuant to
the provisions of the N.C. Water Use Act ❑f 1967 (G.S. 143-215. 11
et.seq. ) .
WHEREAS, the Department found that:
1 . The aggregate use of surface water from the Eno River
has grown to the point where coordination is required to
prevent conflicts and t❑ protect the interests and rights
of riparian owners.
2. During low flow periods the demand for water exceeds the
amount of water available from the En❑ River.
3. Limited regulation of water users appears to be an
equitable short-term alternative until new water supply
sources are developed.
4 . A means is needed to encourage cooperation and
conservation among all water users in order that greater
efficiencies in water use are promptly implemented.
5. The rapid present and projected growth of water use in
the En❑ Basin requires action soon to avoid the risk ❑f
even more severe water supply problems.
WHEREAS, the Department recommended that the estimated 150
square miles of the Eno River watershed area upstream from the
confluence with the Little River be designated as a capacity use
area.
WHEREAS, the Department developed a proposed water management
plan for the Eno Basin to illustrate the types of regulations and
permits that would be proposed under the capacity use
designation.
WHEREAS, the water users in the Eno Basin have committed
themselves to follow the proposed water management plan.
WHEREAS, the voluntary water management plan includes the
essential elements of a declared capacity use area with the
exception of the provisions for enforcement.
WHEREAS, the General Statute directs the Department to
present "actions which might preclude the need for additional
regulation. "
14
WHEREAS, the voluntary plan, if adhered to by those involved,
satisfactorily addresses the capacity use-related problems in the
Eno River area.
NOW THEREFORE, BE IT RESOLVED that the EMC accepts the Eno
River Capacity Use Investigation Hearing Officer ' s Report and
endorses the voluntary Water Management Operations Plan and
directs the staff of the Division -of Water Resources to monitor
compliance with the plan and make periodic reports to the EMC.
BE IT FURTHER RESOLVED, that should the plan not be adhered
to by those involved, that the EMC intends to proceed with a
designation of capacity use for the Eno River area, as outlined
in the Department' s report.
This the 8th day of September 1988 .
r
Charles L. BzfIer
Chairman,
Environmental Management Commission
15
Department of Environmental Quality
(formerly, Department of Natural Resources and Community Development)
Division of Water Resources
ENO RIVER CAPACITY USE INVESTIGATION
WATER MANAGEMENT OPERATIONS PLAN
August 19, 1988
Endorsed by Environmental Management Commission
September 8, 1988
Modified or Revised: March 1989,
July 1990, March 2000, and July 2021
2
16
Table of Contents
INTRODUCTION................................................................................................................. 4
Background ................................................................................................................................4
HillsboroughWater System ........................................................................................................6
Orange-Alamance Water System ................................................................................................6
Resco Products (formerly, Piedmont Minerals)...........................................................................6
Cityof Durham Water System.....................................................................................................6
WestPoint Grist Mill...................................................................................................................6
Irrigators with Average Use Exceeding 100,000 Gallons/Day.......................................................6
Users Withdrawing in Excess of 100,000 Gallons Per Day............................................................6
FLOW AND STORAGE REQUIREMENTS............................................................................... 7
InstreamFlow.............................................................................................................................7
AdditionalStorage......................................................................................................................7
OutsideSources..........................................................................................................................7
PLAN ADMINISTRATION.................................................................................................... 7
Periodic Review and Changes......................................................................................................7
PlanSupport...............................................................................................................................7
Reporting....................................................................................................................................8
Addendum 1 —Hillsborough Water Purchases (June 1991).................................................. 9
Table 1 —Eno River Water Management and Operations Conditions(revised October 2020)
........................................................................................................................................ 10
Appendix A: EMC Resolution............................................................................................ 12
Appendix 8: Original Table 1 (July 1990).......................................................................... 14
3
17
INTRODUCTION
The Water Management Operations Plan (WMOP) was the result of a Capacity Use
Investigation (CUI) by the Department of Environmental Quality(DEQ) (formerly, Department
of Natural Resources and Community Development)—Division of Water Resources (DWR) and
a subsequent cooperative effort by the DWR and primary water users at the time to avoid a
formal Capacity Use designation and regulations. The WMOP, instead, established voluntary
water use restrictions that provide for equitable use of the water resources, while providing
for minimum flows in the Eno River. The requirements in the WMOP are managed and
administered by the water users and Orange County, with oversight and coordination by
DWR. The DWR is responsible for production of the quarterly and annual reports based on
available information and organization of an annual meeting of the water users group. Based
upon the EMC Resolution (attached), the intent of the WMOP is to institute a "voluntary
water management plan [that] includes the essential elements of a declared capacity use area
with the exception of the provisions for enforcement, ... [to] satisfactorily address the capacity
use-related problems in the Eno River area."
The specific changes or additions made for each of the previous modifications or revisions
listed on the cover page (March 1989, July 1990, March 2000) are not entirely known.
However, the changes made in July 1990 and March 2000 included revisions to Table 1. Both
versions of Table 1 are included in this current version of the WMOP.The March 2000 revision
of Table 1 was specifically concerned with integrating the minimum release requirements for
the newly constructed West Fork Eno River Reservoir (WFER). These minimum release
requirements were from federal and state permits (Clean Water Act - Sections 401/404, and
NCDEMLR Dam Safety Permit) for the dam construction and established outside of
requirements by the EMC related to the Eno River WMOP. This revision is limited to editorial
changes for clarifications, background information, intent statement based on the EMC
Resolution, and to create a modern digital version. This revision in no way implies any
management or operational changes to the WMOP.
Issues with using the Eno River as a dependable water supply had been documented for many
years, dating back to the 1950's, especially during times of drought. As a result, the Orange
County Board of Commissioners formed a water resource task force in the early 1980's to
study potential options available to improve the situation, who issued a report of their
findings in May 1981. According to the Capacity Use Investigation (CUI), issued December
1988, by the DEQ, "The [task force] report discussed possible designation of the Upper Neuse
Basin as a Capacity Use Area; concerns over maintaining instream flow needs; water supply
limitations; water conservation; potential reservoir sites; and other related items.The County
has worked closely with the State in attempting to achieve their water resource objectives."
The CUI continues describing the findings from the task force report, "The State has worked
closely with the local governments in the Eno River Area in attempting to provide for
adequate water supplies and minimum instream flow needs. The State has assisted local
water supply interests in determining storage volumes available in the three reservoirs [i.e,
4
18
Lake Ben Johnson, Corporation Lake and Lake Orange], developing and improving system
operating rules, and assisting the County in preparing a draft water conservation ordinance."
Several years later, as documented in the CUI, "at the request of the [Orange] County
Manager, a simulation was conducted reflecting water demands for Hillsborough and Orange-
Alamance as they existed in June of 1986." The results of this modeling concluded that "with
the projected water demands in the early 1990's the Eno River would cease to flow at the
water intakes ten times and the systems would be in crisis mandatory rationing thirty-two
times (a total of 1,830 days). The CUI goes on to say, that "even under existing water supply
demands, the potential for a water supply disaster is imminent."
Orange County is not one of the six water users, listed below, directly affected by controls
under the WMOP, because Orange County does not withdrawal water from the Eno River, as
it does not operate a water system or other water withdrawal purpose. However, as the
owner of Lake Orange, the County is responsible for the management and operations of Lake
Orange to meet specified flow targets in the Eno River through the release of water from Lake
Orange. This WMOP establishes the three existing reservoirs as the means by which required
minimum flows in the Eno River are controlled; however, with Lake Orange the largest and
most upstream, at the time of the issuance of the WMOP, it serves as the primary controlled
water source (i.e., reservoir) to meet flow targets in the Eno River downstream during low
flows.
All water users in the Eno River Basin who withdraw more than 100,000 gallons of water per
day from surface water or groundwater sources are subject to the management controls of
this plan. Both water withdrawals and reservoir releases are subject to controls. Water users
affected by controls under the plan are listed below.
1. Town of Hillsborough -- Lake Ben Johnston and West Fork Eno River Reservoir
withdrawal and reservoir releases.
2. Orange-Alamance -- Corporation Lake withdrawal and reservoir releases.
3. Resco Products (formerly, Piedmont Minerals) -- Eno River withdrawal.
4. City of Durham -- Eno River withdrawal.
5. West Point Grist Mill -- Eno River.
6. Irrigators whose monthly average withdrawal exceeds 100,000 gallons per day.
The limited capacity of the basin requires these users to be subject to the following controls.
5
19
Hillsborough Water System
The Hillsborough Water System will be allowed to withdraw a maximum of 1,510,000 gallons
of water per day from their intake at Lake Ben Johnston. Maximum allowable withdrawals
will change as the lake levels at Lake Orange change.Table 1 indicates the maximum allowable
withdrawal at successive storage levels.
Orange-Alamance Water System
The Orange-Alamance Water System will be allowed to withdraw a maximum of 820,000
gallons of water per day from its intake at Corporation Lake. Allowed withdrawals will be
reduced as storage at Lake Orange is reduced. Table 1 indicates the maximum allowable
withdrawal for given storage levels at Lake Orange.
Resco Products (formerly, Piedmont Minerals
Resco Products will be allowed to withdraw a maximum of 900,000 gallons of water per day
from their intake in the Eno River below Lake Ben Johnston when flows at the Eno gage are
14 cfs and above. This will be reduced to 430,000 gallons per day when flows are between
14 cfs and 4 cfs. Below 4 cfs, the maximum allowable withdrawal will depend on the storage
and lake levels in Lake Orange, as shown in Table 1.
City of Durham Water System
The City of Durham Water System will be allowed to withdraw water from the Eno River below
the U.S. 501 Bridge in amounts up to 5,000,000 gallons of water per day when the flows, as
measured at the USGS Eno River gage at Durham, are above 30 cfs from March through May
and 10 cfs during other times of the year. Withdrawals will cease when flows fall below these
levels.
West Point Grist Mill
The West Point Grist Mill is a run-of-river operation. The Mill will be permitted to use water
from the Eno for mill power and return it to the river immediately downstream.
Irrigators with Average Use Exceeding 100,000 Gallons/Day
Irrigators will be allowed to withdraw up to their maximum monthly use, based on water use
figures collected by the Division of Water Resources in 1987 for the severe drought year of
1986. Current (1986) water use would not be restricted, but increases in existing water use
and large new users may be restricted. The short-range objective is to limit the expansion of
irrigation acreage and facilities until downstream water supply sources can be improved.
Users Withdrawing in Excess of 100,000 Gallons Per Day
Any users, not previously mentioned, which withdraw more than 100,000 gallons per day
from either ground or surface water sources in the Eno River Basin, upstream of the
confluence with the Little River, will be required to agree to limits, but are not now included
in this plan.
6
20
FLOW AND STORAGE REQUIREMENTS
Instream Flow
In addition to maximum withdrawal limits set for offstream uses in the Eno River Basin, minimum
instream flow requirements are established at the Hillsborough streamflow gage (USGS
Streamflow Gage #02085000). A minimum of 1.7 cfs (1,100,000 gallons per day) is to be
maintained at the gage when Lake Orange is greater than 80 percent total storage. This value is
reduced as the storage level decreases at Lake Orange. Table 1 lists the minimum instream flow
requirements. Orange County will be responsible for coordinating releases to maintain
minimum flows at the gage. The three major withdrawers will provide withdrawal schedules to
the County at least one week in advance and will notify the County immediately regarding
emergencies and other necessary changes in the withdrawal schedule.
Additional Storage
The withdrawal allocation can be revised whenever additional storage facilities are completed
in the capacity use area or when additional water supplies are made available from sources
outside the area. New storage facilities will be reviewed to ensure that there are no adverse
effects upon the permit holders or on streamflow as measured at the Hillsborough gage.
Outside Sources
Water obtained from sources outside of the area designated as capacity use will not be limited
under the Eno Capacity Use regulations. During periods of higher flows (over 10 cfs or 6.452
MGD), public water supply systems may take additional water from the Eno, provided that
they have long-term contracts for obtaining an equal amount of water from outside the basin
when the flow in the Eno drops. This type of adjustment will be evaluated on a case-by-case
basis by the N.C. Division of Water Resources.
PLAN ADMINISTRATION
Orange County will be responsible for notifying affected water users of levels at Lake Orange
and the West Fork Eno Reservoir and of the reductions of water withdrawals as required by
the Plan.
Periodic Review and Changes
Withdrawal allowances will be subject to review when changes have been made to current
systems, storage, or supply sources.
Plan Support
Technical support, plan clarification, and approval of minor interim adjustments and
modifications will be provided by the N.C. Division of Water Resources.
7
21
Reporting
Average daily withdrawal in million gallons per day (MGD) for Orange-Alamance,
Hillsborough, and Piedmont Minerals will be reported monthly to the Division of Water
Resources. Average daily withdrawals in MGD for agricultural users will be reported annually
in March.
Additional detailed information regarding the management of water releases and
withdrawals, including contact information for membership of the water users group is
available at, http://www.ncwater.org/Eno River Management/
8
22
Addendum 1 -Hillsborough Water Purchases (June 1991)
To the Eno River Voluntary Water Use Agreement
When Lake Orange is above 100 percent full and is spilling, Hillsborough will be allowed partial credit for
water purchased from an outside source and discharged into the Eno River west of county road 1009 during the
monitoring week that the discharge occurs, at a credit rate of 60 percent of the total discharge,when the discharge
is made over a 24-hour period or greater.The credit volume will be divided by 7 days and added to the withdrawal
limit listed in Table 1,to determine the allowed average daily withdrawal for that week. In the event that the
flushing discharge straddles two monitoring weeks,the credit volume will be applied equally between the two
weeks. The Orange County Engineer, or DWR staff in his absence, must be notified of the volume and the duration
upon completion of the flushing. A written report of the flushing, detailing exact dates,times, and volumes, shall
be included in the monthly report to DWR. If notification is not received with that month's water use report, no
credit will be granted, and any excess water use will be labeled as a violation of this agreement. The Division of
Water retains the right to revoke permission for Hillsborough to receive credit for flushed flows if at any time, in
the opinion of the Division,the ability of Ben Johnston Dam to meet downstream flows may be compromised. Said
revocation will be in effect until there is notice by DWR that the problem has been corrected to its satisfaction. If
Lake Orange is not spilling, no credit will be allowed.
-In the event that flow at the Eno River at Hillsborough streamflow gage is over 10 cfs, Corporation Lake and Lake
Ben Johnston are both spilling water over the dams, purchases of water are being made from outside of the Eno
River Basin, and the low flow period has not yet ended, users may cease their outside purchase of water and
withdraw the amount of water allowed in the absence of a low flow period, as long as the ability to resume
purchase of water for immediate customer delivery remains. This time period has been determined to be three
days for the OWASA line. Water purchases will be made as often as necessary to flush the lines and keep them
from stagnating. If flows drop below 10 cfs before the low flow period is over, Eno River withdrawals must
immediately be reduced to Table 1 levels.
-Transfer of water allocation between users is permissible under the following conditions: 1) Lake Orange is greater
than 80 percent full; 2) notification of the duration and specific volume of the transfer will be given by the
surrendering party to the Orange County Engineer, or the DWR in his absence, a minimum of one day before the
transfer is to take place; 3)the total allocation will be adjusted if necessary by the averaging period of the
surrendering party, and 4)written notification of the duration and volume of the transfer will be provided by both
involved parties in their monthly water use reports to DWR. If prior notification is not received, DWR will not
recognize the allocation transfer.
9
23
Eno River Water Management Plan
Table 1 - Eno River Water Management and Operations Conditions (revised October 2020)
Triggers Allowable Surface Water Withdrawal Minimum Releases
West Fork Instantaneous
Percent of Drawdown in Eno Instream Flow
Storage Lake Orange Town of Orange- Resco Reservoir Requirement at
Remaining in from top of Hillsborough Alamance Products Lake Orange (WFER)(mgd Hillsborough
Stage Lake Orange flashboard (ft) (mgd [cfs]) (mgd [cfs]) (mgd [cfs]) (mgd [cfs]) [cfs]) Gage(mgd [cfs])
no stage >100 spilling * * 0.9 [1.4] 1.1 [1.7] 0.65 [1.01]
Stage 1 100-80 0 1.51 [2.34] 0.82 [1.27] 0.43 [0.67] 1.1 [1.7] 0.65 [1.01] 1.75 [2.71]
Stage 2 80-60 2.0 1.36 [2.10] 0.74[1.15] 0.38 [0.59] 0.65 [1.01] 0.65 [1.01] 1.3 [2.01]
Stage 3 60-50 4.3 1.28 [1.98] 0.7 [1.08] 0.36 [0.56] 0.45 [0.7] 0.65 [1.01] 1.1 [1.7]
Stage 4 50-40 5.8 1.28 [1.98] 0.7 [1.08] 0.32 [0.5] 0.45 [0.7] 0.65 [1.01] 1.1 [1.7]
Stage 5 40-30 7.4 1.13 [1.75] 0.62 [0.96] 0.19 [0.29] 0 0.65 [1.01] j 0.65 [1.01]
Stage 6 <30 9.3 ir 0.68 [1.05] 0.19 [0.29] 0 0 0.65 [1.01] 0.65 [1.01]
million gallons per day(mgd);cubic feet per second(cfs);feet(ft)
*When flows are greater than 10 cfs as measured at the Hillsborough gage,additional withdraws beyond those allowed in Table 1 can commence
at rates less than or equal to that of contracts held by the Town of Hillsborough &Orange-Alamance for water supply sources outside the basin.
Low Flow Stage Conditions:
-A low flow period will begin at the end of the 7th consecutive day when the average daily flow at the Hillsborough gage has been below 10 cfs.At
the end of the 4th day,the Orange County Engineer will request that affected parties prepare for a low flow period.
-When flows are between 10 cfs and 3 cfs at the Hillsborough gage during a low flow period,withdrawals from the Eno River shall be limited to the
Stage 1 amount shown above(100-80 percent of storage remaining), regardless of water level in Lake Orange.
-When flows are below 3 cfs at the Hillsborough gage during a low flow period,withdrawals shall be limited to amounts shown above for percent of
storage remaining at Lake Orange.
-A low flow period will be terminated when average daily flow at the Hillsborough gage registers 10 cfs or greater for a period of 7 consecutive days.
The Orange County Engineer will notify affected parties when the low flow period is terminated.
10
24
-The Orange County Engineer will notify the affected parties when moving between Low Flow Stages.
Conditions for All Water Users:
-Allowable withdrawal values are based on natural flow estimates and releases from Lake Orange.
-Excess withdrawals from the Eno River based on an outside source agreement may be made when flows at the Hillsborough gage are 10 cfs and
above, regardless of water level in Lake Orange. Maximum withdrawals shall be limited to the total of the contract amount and the allocated
amount.
Conditions for the Town of Hillsborough:
-Allowable withdrawals for the Town of Hillsborough shown above do not include withdrawals of water supply releases from the WFER.
-Minimum releases from the WFER are based on Army Corps of Engineers Permit Condition, not the Eno River Water Management and Operations
Plan.
-Releases from Lake Orange and/or the WFER may need to exceed the minimum releases shown in Table 1 to meet the minimum instream flow
requirements as shown in Table 1 due to natural conditions.
Conditions for Orange County:
-Releases from Lake Orange and/or the WFER may need to exceed the minimum releases shown in Table 1 to meet the minimum instream flow
requirements as shown in Table 1 due to natural conditions.
Conditions for Resco Products:
When flows at the Hillsborough gage are 14 cfs and above,withdrawals from the Eno River will be limited to 0.9 mgd. Between 14 cfs and 4 cfs,
withdrawals will be limited to 0.43 mgd, regardless of water level in Lake Orange. Below 4 cfs,withdrawals will be limited to amounts shown above
for percent of storage remaining.
11
25
Appendix A: EMC Resolution
RESOLUTION NO. 88-13
ENVIRONMENTAL MANAGEMENT COMMISSION
WHEREAS, at the direction of the Environmental Management
Commission (EMC) , the Department of Natural Resources and
Community Development has completed a capacity use investigation
of the Eno River portion of the Neuse River Basin, pursuant to
the provisions of the N.C. Water Use Act of 1967 (G.S. 143-215. 11
et. seq. ) .
WHEREAS, the Department found that:
1 . The aggregate use of surface water from the Eno River
has grown to the point where coordination is required to
prevent conflicts and to protect the interests and rights
of riparian owners .
2 . During low flow periods the demand for water exceeds the
amount of water available from the Eno River.
3. Limited regulation of water users appears to be an
equitable short-term alternative until new water supply
sources are developed.
4 . A means is needed to encourage cooperation and
conservation among all water users in order that greater
efficiencies in water use are promptly implemented.
5. The rapid present and projected growth of water use in the
Eno Basin requires action soon to avoid the risk of even
more severe water supply problems.
WHEREAS, the Department recommended that the estimated 150
square miles of the Eno River watershed area upstream from the
confluence with the Little River be designated as a capacity use
area.
WHEREAS, the Department developed a proposed water management
plan for the Eno Basin to illustrate the types of regulations and
permits that would be proposed under the capacity use
designation.
WHEREAS, the water users in the Eno Basin have committed
themselves to follow the proposed water management plan.
WHEREAS, the voluntary water management plan includes the
essential elements of a declared capacity use area with the
exception of the provisions for enforcement.
12
26
WHEREAS, the General Statute directs the Department to
present "actions which might preclude the need for additional
regulation. "
WHEREAS, the voluntary plan, if adhered to by those involved,
satisfactorily addresses the capacity use-related problems in the Eno
River area.
NOW THEREFORE, BE IT RESOLVED that the EMC accepts the Eno
River Capacity Use Investigation Hearing Officer' s Report and
endorses the voluntary Water Management Operations Plan and
directs the staff of the Division of Water Resources to monitor
compliance with the plan and make periodic reports to the EMC.
BE IT FURTHER RESOLVED, that should the plan not be adhered
to by those involved, that the EMC intends to proceed with a
designation of capacity use for the Eno River area, as outlined
in the Department' s report.
This the 8th day of September 1988 .
Charles L. Baker
Chairman,
Environmental Management Commission
13
27
Appendix B: Original Table 1 (July 1990)
14
28
Eno River Water Management Plan Table 1 Revised March 2000
Maximum Allowable Surface Water Withdrawals Based on Lake Orange Water Level
Allowable Surface Water Withdrawal Instream Flow Requirement at Hillsborough Gage
Percent of (gallons per day) (gallons per day)
Storage Drawdown
Remaining in feet from From Total Flow at
at Lake top of 1-ft. Town of Orange- Piedmont From West Fork Eno Hillsborough
Orange flashboard Hillsborought Alamance Minerals Lake Orange Reservoir Gage
> 100 spilling *t * ** 1,100,000 650,000 1,750,000
Stage 1 100 - 80 0.0 1,510,000t 820,000 430,000 1,100,000 650,000 1,750,000
Stage 2 80 -60 2.0 1,360,000t 740,000 380,000 650,000 650,000 1,300,000
Stage 3 60 - 50 4.3 1,280,000' 700,000 360,000 450,000 650,000 1,100,000
Stage 4 50 -40 5.8 1,280,000' 700,000 320,000 450,000 650,000 1,100,000
Stage 5 40 - 30 7.4 1,130,000t 620,000 190,000 0 650,000 650,000
Stage 6 <=30 9.3 680,000t 370,000 0 0 650,000 650,000
Notes:
t Allowable withdrawals for Hillsborough shown above do not include withdrawals of water supply releases from West Fork Eno Reservoir.
* - Adjusted to reflect outside source agreement for Hillsborough and Orange-Alamance.
- Excess withdrawals from Eno River based on outside source agreement may be made when flows at the Eno River at Hillsborough Gage are 10
cubic feet per second(cfs)and above,regardless of water level in Lake Orange. Maximum withdrawals shall be limited to the total of the contract
amount and the allocated amount.
- A low flow period will begin on the 7"'consecutive day of the average daily flow at the Hillsborough Gage dropping below 10 cfs. On the 4"'day,
the Orange County Engineer will request that affected parties prepare for a low flow period.
- When flows are between 10 cfs and 3 cfs at the Hillsborough Gage during a low flow period,withdrawals from the Eno River shall be limited to the
Stage 1 amount shown above (100-80 percent of storage remaining),regardless of water level in Lake Orange.
- When flows are below 3 cfs at the Hillsborough Gage during a low flow period,withdrawals shall be limited to amounts shown above for percent of
storage remaining at Lake Orange.
- A low flow period will be terminated when average daily flow at the Hillsborough Gage registers 10 cfs or greater for a period of 7 consecutive
days. The Orange County Engineer will notify affected parties when the low flow period is terminated.
**For Piedmont Minerals: When flows at the Hillsborough Gage are 14 cfs and above,withdrawals from the Eno River will be limited to 900,000
gallons per day(gpd). Between 14 cfs and 4 cfs, withdrawals will be limited to 430,000 gpd,regardless of water level in Lake Orange. Below 4 cfs,
withdrawals will be limited to amounts shown above for percent of storage remaining.