Loading...
HomeMy WebLinkAboutAgenda - 09-02-2021; 8-k - Northern Campus Water and Sewer – Transfer of Ownership to Town of Hillsborough 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 2, 2021 Action Agenda Item No. 8-k SUBJECT: Northern Campus Water and Sewer— Transfer of Ownership to Town of Hillsborough DEPARTMENT: Asset Management Services (AMS) ATTACHMENT(S): INFORMATION CONTACT: 1) Water/Sewer Utilities Map Steven Arndt, AMS Director, 919-245- 2) Utility Dedication Form 2658 PURPOSE: To approve transferring the ownership of the recently constructed water and sewer utility infrastructure associated with the construction of the Northern Campus Project to the Town of Hillsborough. BACKGROUND: In September 2019, the Board of Commissioners accepted a total Guaranteed Maximum Price (GMP) of $36,354,082, as presented by Bordeaux Construction, for the development of the Orange County Northern Campus. Work on the project commenced shortly afterwards and is now substantially completed. The utilities portion of the work included the construction of water and sewer lines to connect the construction site to existing water and sewer infrastructure owned and operated by the Town of Hillsborough. Specifically, the scope of work called for the installation of approximately 1,650 feet of 12-inch water main, 20 feet of 6-inch water main, fire hydrants, valves and associated appurtenances extending along US Highway 70 West from Holiday Park Road. These improvement provide domestic and fire service to three new buildings within the Orange County Northern Campus located at 1200 US Highway 70 West in Hillsborough. The new 12-inch water main connects to the existing 12-inch water main along Holiday Park Road at its intersection with US Highway 70 West and to the existing 6-inch water main at 1200 US Highway 70 West, owned by the Town of Hillsborough. The sewer scope of work called for the installation of approximately 630 feet of 8-inch PVC sewer main and three concrete manholes. The sewer line runs from the property boundary of Orange County Northern Campus to an existing sanitary sewer manhole located on property owned by Lisa Hall located at 500 Orange Heights Loop in Hillsborough. The sewer is located within an existing sewer easement previously dedicated to the Town and runs across two residential properties. Attachment 1 contains a map illustrating the location of the water and sewer utilities subject to this request. A three-part interlocal agreement stipulates that the public portion of the water and sewer infrastructure installed by the County shall be transferred to ownership of the Town of 2 Hillsborough upon completion of the work. This transfer of the property/assets needs approval by the BOCC. Attachment 2 provides the Utility Dedication Form to facilitate this transfer. FINANCIAL IMPACT: There is no financial impact associated with approving the transfer of utility infrastructure ownership to the Town of Hillsborough. SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated with approving the transfer of utility infrastructure ownership to the Town of Hillsborough. ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal impact associated with approving the transfer of utility infrastructure ownership to the Town of Hillsborough RECOMMENDATION(S): The Manager recommends that the Board: 1. Approve the transfer of ownership of the water and sewer infrastructure to the Town of Hillsborough and authorize the County Manager to sign the Dedication Form (Attachment 2); and 2. Authorize the County Manager and staff to pursue any further actions, as necessary, to complete the transfer of ownership to the Town of Hillsborough. 3 Attachment I— Maps of Water and Sewer Lines a H._LL:. HP�FI-T1n FW'KRKE9H 1 r / �• Y.- _.�\ !- TiE U- H4 P—1. Northern Campus e I'll rz TItt _L`(][o �� ~ ORANGE IEIC _ --d iia � �u epmic w a = I.Rl"M 116 PLAN SANITARY SEWER OUTFALL H-2. l _ _ US HWY 70 IFEST I rs r.�,,.7 �'T `''.. �...,,. � — - -- � U�,.,>✓ E�-u;al --�Via'. �'t,� � y Z_t PLAN WATERIAM EXTENSION scac $.-Wwxa - Wi ped. ;f In d: IM E U5 HWPp 70 VEST— M=STREET,Off 7>� a ■avirt�,rmm ramu s. � - :x PLAN WATERLINE EXTENSION — 1—a Haran 4 Attachment 2 ORANGE COUNTY NORTH CAROLINA September 2, 2021 Town of Hillsborough P.O. Box 429 Hillsborough, NC 27278 Re: Orange County, Northern Campus, Public Water and Sewer Dedication Orange County, North Carolina, the current owner/developer of a water extension project constructed along US 70 and a sanitary sewer extension built within a sewer easement, does herby dedicate and convey unto the Town of Hillsborough, its successors and assigns, all of its rights,title and interest in and to the offsite water main and sewer lines constructed in accordance with as-built plans entitled "Orange County Northern Campus Construction Documents" prepared by Civil Consultants, Inc., and sealed 7/19/2021, specifically the areas identified as public infrastructure. IN WITNESS WHEREOF, this letter is executed by the duly authorized officers of Orange County to be hereunto a fixed, all on the day and year first above written. (Name of General Contractor) (Name of OWNER) ATTEST: By: (Signature) (Signature) (Title) (Title) NORTH CAROLINA ORANGE COUNTY I, . A Notary Public, hereby certify that personally appeared before me this day and acknowledged that she is the Orange County Manager and that by authority duly given as the act of the Orange County Board of County Commissioners,the foregoing instrument was signed in its name by its County Manager. (Notary Public) My commission Expires: