HomeMy WebLinkAbout2021-425-E-AMS-Carolina Contracting & Investments-Hillsborough Commons skylights credit for flashing add general conditionsRevised 07/20 NORTH CAROLINA CONTRACT AMENDMENT ORANGE COUNTY THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 30th day of July 2021 by and between ORANGE COUNTY (hereinafter referred to as “County”) and Carolina Contracting & Investments, Inc., (hereinafter referred to as “Provider”). WITNESSETH: THAT WHEREAS, the County and Provider entered into a contract dated October 27, 2020, (hereinafter the “Original Agreement”), for the provision of services to replace the existing skylights at the Orange County Department of Social Services; and WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: 1. In order to ensure the completion of the Services identified in the term of the Original Agreement is amended to reflect an end date by which all Services shall be completed of June 30, 2021. 2. Exhibit A to the Original Agreement is amended by adding the following tasks and services to the Services to be provided by the Contractor: Provide credit to Orange County for flashing removed from the scope of work and add for general conditions for extension for contract for owner coordination per Contractor Proposal for Contract Modification dated June 4, 2021 . 3. Article 5 Payment & Taxes, Section “A” is amended to reflect a maximum payable not-to-exceed amount of One Hundred Sixty Seven Thousand, One Hundred Forty-Eight Dollars and Twenty-Eight Cents ($167,148.28) 4. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event there is a conflict between the terms of the Original Agreement and the terms of this Amendment, this Amendment shall control. IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above written. ORANGE COUNTY PROVIDER ______________________________ __________________________________ Bonnie Hammersley Glenn Wise, President County Manager Carolina Contracting & Vestments, Inc. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 8/3/20218/4/2021 Revised 07/20 ORANGE COUNTY—DEPARTMENT USE ONLY ______________________________________________________________________________ Party/Vendor Name: Carolina Contracting & Investments, Inc. Party/Vendor Contact Person: Glenn Wise (President) Contact Phone: 704.499.4501 Party/Vendor Address: 1632 Village Harbor Dr. 2nd Floor City: Lake Wylie State: NC Zip: 29710 Department: AMS Amount: Increase contract from $163,952 to $167,148.28 by adding $3,196.28 to existing contract Purpose: Hillsborough Commons Skylights – Credit for flashing/Add for General Conditions Budget Code(s): 61370035-882000-30002 Vendor # 66717 (N/A if new vendor) Vendor is a BOCC consultant? Yes No Contract Type: (Check one) New Renewal Amendment Effective Date 7/30/2021 Approved by Board Yes No Agenda Date: This agreement is approved as to technical form and content and I as Department Director affirmatively state work on this pro ject has not been initiated prior to execution of the agreement: Department Director’s Signature ________________________________________ Date: ________ Agreements for emergency services or repair are not subject to the above affirmation. If services related to this agreement have already begun or been completed please briefly describe the nature of the emergency condition that was addressed: NA Information Technologies (Applicable only to hardware/software purchases or related services) This agreement has been reviewed and is approved as to information technology content and specifications: Office of the Chief Information Officer___________________________________ Date: ________ Risk Management This agreement is approved for sufficiency of insurance standards, specifications, and requirements: Office of the Risk Management Officer ___________________________________ Date: _________ Financial Services This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act: Office of the Chief Financial Officer ____________________________________ Date: _________ Legal Services This agreement is approved as to legal form and sufficiency: Office of the County Attorney __________________________________________Date: ________ Clerk to the Board Received for record retention: All DocuSign contracts must be copied to the Clerk upon completion: occlerkdocs@orangecountync.gov The following signature block is for hard copies only and is not required for DocuSign contracts: Office of the Clerk to the Board __________________________________________Date:_________ DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 8/3/2021 8/3/2021 8/4/2021 8/4/2021 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 CONTRACTOR PROPOSAL FOR CONTRACT MODIFICATION DATE:4-Jun-21 Change Proposal No. 5 - Add-Deduct for Project Closeout CONTRACT NO.: N/A Hillsborough Skylight DESCRIPTION:Credit for Flashing-Add for General Conditions PRIME CONTRACTOR'S WORK Revisions 1. Direct Materials 393.16 2. Sales Tax on materials 0.00% of line 1 0.00%0.00 3. Direct Labor 0.00 4. Insurance, Taxes, & Fringe Benefits 0.00% of line 3 0.00%0.00 5. Rental Equipment 2,287.45 6. Sales Tax on Rental Equipment 7.35% of line 5 7.35%168.13 7. Equipment Ownership/Operating Expenses 0.00 8. SUBTOTAL (Add Lines 1-7)2,848.74 9. Field Overhead 0.00% of line 8 0.00%0.00 10. SUBTOTAL (Add Lines 8 & 9)2,848.74 SUMMARY 11. Prime Contractor's Work (From Line 10)2,848.74 12. Total of All Subcontractor's Work (See Backup)0.00 13. SUBTOTAL (Add Lines 11 and 12)2,848.74 14. Prime Overhead on Subcontractor's Work 5.00% of line 12 5.00%0.00 15. Prime's Home Office Overhead 0.00% of line 11 0.00%0.00 16. Other (City/State Charges, etc.)0.00 17. Prime's Profit 10.00% of line 13 10.00%284.87 18. SUBTOTAL (Add Lines 13-17)3,133.61 19. Prime Contractor's Bond Premium 2.00% of line 18 2.00%62.67 20. Other (Travel, etc.)0.00 21. TOTAL COST (Add Lines 18-20)3,196.28 Estimated Time Extension and Justification:N/A days Prime Contractor's Comments: Prime Contractor's Name:Carolina Contracting & Investments, Inc Signature:Date:6/4/2021 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE BREAKDOWN OF DIRECT COSTS Contract No.: N/A Date:04-Jun-21 PC #: ITEMS OF WORK QTY UNIT MATERIAL LABOR R EQUIPMENT Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total Cost Delete Counter Flashing -472 lf 2.97 $(1,401.84)0.00 0.00 Additional Fork Lift Rental 1 ls 0.00 $-$-0.00 2,287.45 2,287.45 Additonal Site Services-Portable Toilet 1 ls 195.00 $195.00 0.00 Additonal Site Services-Dumpster 1 ls 540.00 $540.00 0.00 Additional Room/Board 10 days 106.00 $1,060.00 $-0.00 ls $-$-0.00 ls $-$-0.00 $-$-0.00 $-$-0.00 $-$-0.00 $-$-0.00 R $-$-0.00 R $-$-0.00 $-$-0.00 R $-$-0.00 R $-$-0.00 $-$-0.00 NONE DIRECT Prime Contractor's Totals 393.16 0.00 R Total (Rental)2,287.45 FOR: O Total (Owned) DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE X 20007HS Hillsborough 074014 Invoice Approval Project No. _______________ Project Name:______________ Cost Code:__________________ Approved By: ______________________ DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Paxton Whitmore <pwhitmore@garlandind.com> on behalf of Paxton Whitmore Sent:Monday, March 1, 2021 3:37 PM To:Drew Wilgus Cc:rbanks@garlandind.com; Curtis.lee@cushwake.com; Calvin Barber; Ashley Taylor; Debi Hunter/USA; Scott Mcconnell Subject:Re: Hillsborough Commons Skylights - Curb Detail Drew, The contractor should be able to install the new skylight without disturbing our existing flashings, We just need to make sure we have a good seal above the existing termination bar, and then run an ice and water shield membrane over the termination bar and up and over the top of the curb. Then the metal should be installed as shown in the detail that was provided by Garland and on the Architect details, and then new skylight installed. Please let me know if you have any additional questions. Paxton Whitmore Territory Manager - Richmond, VA The Garland Company, Inc. C: 804-334-6713 pwhitmore@garlandind.com www.garlandco.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Preview YouTube video Garland Building Envelope Overview To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Garland Building Envelope Overview On Mon, Mar 1, 2021 at 1:11 PM Drew Wilgus <dwilgus@smithsinnett.com> wrote: Rob, Paxton and Curtis, Reporting on our call this morning: Garland and Cushman & Wakefield will need to advise on the curb flashing approach. Our intent is obviously to maintain the new roof’s warranty. As you are now aware, the skylight flashing assembly as submitted (second attached) is minimal. I agree with Calvin that simplicity is generally a good thing…. provided the flashing is accomplishing what it needs to. Referring to the detail as designed(first attached A1-01, detail 6), we would typically use a removeable counterflashing at this location for easier replacement or repair of the roof/base flashing at any time DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 2 before the skylights are ready for replacement. However, if that flexibility is not a concern and the proposed alternative detail meets the warranty requirements for: 1) The roof system, 2) the skylights, and 3) the installer’s workmanship warranty; the tenant and architect are acceptive of that. Please respond to this group with your thoughts and direction and let us know if we need to discuss as a group later today. Note that neither Wayne Roofing nor the Contractors subcontractors are included in this correspondence and it is assumed any necessary information is disseminated to those parties. Thanks, Drew Wilgus, AIA, LEED AP Associate | Architect smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram M: 919.455.4227 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Calvin Barber Sent:Tuesday, March 2, 2021 9:22 AM To:'Drew Wilgus'; 'abarnes@orangecountync.gov' Cc:Ashley Taylor; Glenn Wise Subject:FW: Hillsborough Commons Skylights - Curb Detail Drew, This email from Cushman Wakefield provides direction for the project to proceed in accordance with directions from the roofing manufacturer and not according to the contract documents. Unfortunately, the roofing manufacturer and the roof warranty that appears to be the driving element in this decision- making process, but was not disclosed in the bid documents and therefore not considered by CCI. The issue of the roof warranty only surfaced a little over a week ago when we started to receive phone calls from a roofing installer. Of course, the skylight manufacturer will not let a roofing manufacturer dictate the details of the fabrication and installation of their product and still provide the warranty required by specification. We spoke with the skylight installer this morning regarding the roofer’s detail and his response was that he would ask the skylight manufacturer if they would refabricate some of the skylight, but likely, it will not be entertained. As initially indicated, it appears that this project being asked to sacrifice the skylight guarantee in exchange for the roofing guarantee, which again was not disclosed to us. We have directed the not installer not to proceed with any further work until you have resolved the competing interest between Cushman Wakefield, Garland and the design documents. Hopefully, these issues can be resolved, and clear direction provided not later than March 8, 2021. From: Debi Hunter/USA <debi.hunter@cushwake.com> Sent: Tuesday, March 2, 2021 8:06 AM To: Paxton Whitmore <pwhitmore@garlandind.com>; Calvin Barber <cbarber@carolinaci.com> Cc: Drew Wilgus <dwilgus@smithsinnett.com>; Rob Banks <rbanks@garlandind.com>; Curtis Lee/USA <curtis.lee@cushwake.com>; Ashley Taylor <ataylor@carolinaci.com>; Scott Mcconnell <smcconnell@smithsinnett.com>; Glenn Wise <gwise@carolinaci.com> Subject: RE: Hillsborough Commons Skylights - Curb Detail Good morning – please confirm that the skylights will be installed per the directions from Garland. There are no alternatives on this issue, anything else will void our warranty. Thanks - Debi Hunter, LEED Green Associate Director of Operations DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 2 Cell: +1 919 358 0010 debi.hunter@cushwake.com 3015 Carrington Mill Blvd, Suite 410 Morrisville, NC 27560 | USA cushmanwakefield.com LinkedIn | Facebook | Twitter | YouTube | Instagram From: Paxton Whitmore <pwhitmore@garlandind.com> Sent: Tuesday, March 2, 2021 7:45 AM To: Calvin Barber <cbarber@carolinaci.com> Cc: Drew Wilgus <dwilgus@smithsinnett.com>; Rob Banks <rbanks@garlandind.com>; Curtis Lee/USA <curtis.lee@cushwake.com>; Ashley Taylor <ataylor@carolinaci.com>; Debi Hunter/USA <debi.hunter@cushwake.com>; Scott Mcconnell <smcconnell@smithsinnett.com>; Glenn Wise <gwise@carolinaci.com> Subject: Re: Hillsborough Commons Skylights - Curb Detail Calvin, We need to follow the detail provided in the original drawings for our skylight detail at the transition. Paxton Whitmore Territory Manager - Richmond, VA The Garland Company, Inc. C: 804-334-6713 pwhitmore@garlandind.com www.garlandco.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Preview YouTube video Garland Building Envelope Overview Garland Building Envelope Overview On Mon, Mar 1, 2021 at 5:38 PM Calvin Barber <cbarber@carolinaci.com> wrote: Drew, DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 3 Unfortunately, that puts us back where we started. It also modifies the detail beyond what was originally drawn and outside of the skylight manufacturers recommended installation for guarantees. If the existing base flashing is installed according to the Garand details on their website, in all likelihood we will be penetrating the flashing in several places. It looks like we should follow the details of the skylight manufactures and install the supplementary flashing as shown on the contract drawings. We will proceed in the above fashion. From: Drew Wilgus <dwilgus@smithsinnett.com> Sent: Monday, March 1, 2021 5:22 PM To: Paxton Whitmore <pwhitmore@garlandind.com> Cc: rbanks@garlandind.com; Curtis.lee@cushwake.com; Calvin Barber <cbarber@carolinaci.com>; Ashley Taylor <ataylor@carolinaci.com>; Debi Hunter/USA <debi.hunter@cushwake.com>; Scott Mcconnell <smcconnell@smithsinnett.com> Subject: RE: Hillsborough Commons Skylights - Curb Detail Thanks Paxton. For others’ clarification, the first attached is the approved Garland detail which was used as a basis for the designed detail. Calvin, per Paxton’s direction below and referring to the second detail attached with revised membrane routing, let’s proceed as such: 1. Remove existing skylights and existing metal flashing. 2. Examine the curb and base flashing. The existing term bar is new and should not need to be replaced. 3. Install approved fully adhered transition membrane over top of curb, overlapping term bar by 1”. Refer to third attached for sample of approved membrane. 4. Install metal flashing/counterflashing as shown in the original detail 5. Install skylight metal flashing 6. Review sample section on-site 7. Install skylight DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 4 If any one objects to this course, please advise. Drew Wilgus, AIA, LEED AP Associate smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram From: Paxton Whitmore <pwhitmore@garlandind.com> Sent: Monday, March 1, 2021 3:37 PM To: Drew Wilgus <dwilgus@smithsinnett.com> Cc: rbanks@garlandind.com; Curtis.lee@cushwake.com; Calvin Barber <cbarber@carolinaci.com>; Ashley Taylor <ataylor@carolinaci.com>; Debi Hunter/USA <debi.hunter@cushwake.com>; Scott Mcconnell <smcconnell@smithsinnett.com> Subject: Re: Hillsborough Commons Skylights - Curb Detail Drew, The contractor should be able to install the new skylight without disturbing our existing flashings, We just need to make sure we have a good seal above the existing termination bar, and then run an ice and water shield membrane over the termination bar and up and over the top of the curb. Then the metal should be installed as shown in the detail that was provided by Garland and on the Architect details, and then new skylight installed. Please let me know if you have any additional questions. Paxton Whitmore Territory Manager - Richmond, VA The Garland Company, Inc. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 5 C: 804-334-6713 pwhitmore@garlandind.com www.garlandco.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Preview YouTube video Garland Building Envelope Overview Garland Building Envelope Overview On Mon, Mar 1, 2021 at 1:11 PM Drew Wilgus <dwilgus@smithsinnett.com> wrote: Rob, Paxton and Curtis, Reporting on our call this morning: Garland and Cushman & Wakefield will need to advise on the curb flashing approach. Our intent is obviously to maintain the new roof’s warranty. As you are now aware, the skylight flashing assembly as submitted (second attached) is minimal. I agree with Calvin that simplicity is generally a good thing…. provided the flashing is accomplishing what it needs to. Referring to the detail as designed(first attached A1-01, detail 6), we would typically use a removeable counterflashing at this location for easier replacement or repair of the roof/base flashing at any time before the skylights are ready for replacement. However, if that flexibility is not a concern and the proposed alternative detail meets the warranty requirements for: 1) The roof system, 2) the skylights, and 3) the installer’s workmanship warranty; the tenant and architect are acceptive of that. Please respond to this group with your thoughts and direction and let us know if we need to discuss as a group later today. Note that neither Wayne Roofing nor the Contractors subcontractors are included in this correspondence and it is assumed any necessary information is disseminated to those parties. Thanks, DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 6 Drew Wilgus, AIA, LEED AP Associate | Architect smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram M: 919.455.4227 The information contained in this email (including any attachments) is confidential, may be subject to legal or other professional privilege and contain copyright material, and is intended for use by the named recipient(s) only. Access to or use of this email or its attachments by anyone else is strictly prohibited and may be unlawful. If you are not the intended recipient(s), you may not use, disclose, copy or distribute this email or its attachments (or any part thereof), nor take or omit to take any action in reliance on it. If you have received this email in error, please notify the sender immediately by telephone or email and delete it, and all copies thereof, including all attachments, from your system. Any confidentiality or privilege is not waived or lost because this email has been sent to you by mistake. Although we have taken reasonable precautions to reduce the risk of transmitting software viruses, we accept no liability for any loss or damage caused by this email or its attachments due to viruses, interference, interception, corruption or unapproved access. Please see our website to view our privacy notice / statement. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Drew Wilgus <dwilgus@smithsinnett.com> on behalf of Drew Wilgus Sent:Tuesday, March 9, 2021 2:17 PM To:Calvin Barber Cc:Ashley Taylor; tstiwalt@carolinaci.com; Paxton Whitmore Subject:RE: Skylight Flashing - Hillsborough Thanks Calvin. Looks pretty good. Just be sure there’s enough hook to screw the pieces together. Drew Wilgus, AIA, LEED AP Associate | Architect smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram From: Calvin Barber <cbarber@carolinaci.com> Sent: Tuesday, March 9, 2021 1:39 PM To: Drew Wilgus <dwilgus@smithsinnett.com> Cc: Ashley Taylor <ataylor@carolinaci.com>; tstiwalt@carolinaci.com Subject: Skylight Flashing - Hillsborough Drew, Here are pictures of the mock up of the flashing to be fabricated from .040 aluminum. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Paxton Whitmore <pwhitmore@garlandind.com> on behalf of Paxton Whitmore Sent:Tuesday, March 9, 2021 6:37 PM To:Drew Wilgus Cc:Calvin Barber; Ashley Taylor; tstiwalt@carolinaci.com Subject:Re: Skylight Flashing - Hillsborough Thanks Drew! Calvin, have you reached out to Wayne roofing to help with the install here/work on the roof part? We need to make sure certified Garland applicators are working on this part of the project. Paxton Whitmore Territory Manager - Richmond, VA The Garland Company, Inc. C: 804-334-6713 pwhitmore@garlandind.com www.garlandco.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Preview YouTube video Garland Building Envelope Overview To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Garland Building Envelope Overview On Tue, Mar 9, 2021 at 2:17 PM Drew Wilgus <dwilgus@smithsinnett.com> wrote: Thanks Calvin. Looks pretty good. Just be sure there’s enough hook to screw the pieces together. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 2 Drew Wilgus, AIA, LEED AP Associate | Architect smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram From: Calvin Barber <cbarber@carolinaci.com> Sent: Tuesday, March 9, 2021 1:39 PM To: Drew Wilgus <dwilgus@smithsinnett.com> Cc: Ashley Taylor <ataylor@carolinaci.com>; tstiwalt@carolinaci.com Subject: Skylight Flashing - Hillsborough Drew, Here are pictures of the mock up of the flashing to be fabricated from .040 aluminum. DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Drew Wilgus <dwilgus@smithsinnett.com> on behalf of Drew Wilgus Sent:Thursday, March 11, 2021 11:38 AM To:Calvin Barber Subject:Skylights - Updated Project schedule Calvin, Please remember to send me a revised schedule when you can. Drew Wilgus, AIA, LEED AP Associate | Architect smithsinnett ARCHITECTURE 4600 Lake Boone Trail | Suite 205 | Raleigh, NC 27607 O.919.781.8582 | smithsinnett.com twitter | facebook | linkedin | instagram DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE ID Task Mode Task Name Duration Start Finish 1 2 Deliver Skylight 0 days Fri 2/26/21 Fri 2/26/21 3 Protect Roof 1 day Fri 2/26/21 Fri 2/26/21 4 Skylight 1 4 days Mon 3/1/21 Thu 3/4/21 5 Demo/Protect Skylight 11 day Mon 3/1/21 Mon 3/1/21 6 Install Skylight 1 2 days Tue 3/2/21 Wed 3/3/21 7 A/E Inspection 1 day Thu 3/4/21 Thu 3/4/21 8 Skylight 2 8 days Fri 3/5/21 Tue 3/16/21 9 Demo/Protect Skylight 23 days Fri 3/5/21 Tue 3/9/21 10 Install Skylight 2 3 days Wed 3/10/21 Fri 3/12/21 11 A/E Inspection 1 day Mon 3/15/21 Mon 3/15/21 12 Substantial Completion0 days Mon 3/15/21 Mon 3/15/21 13 Punchlist 1 day Tue 3/16/21 Tue 3/16/21 14 Final Completion 0 days Tue 3/16/21 Tue 3/16/21 2/26 3/15 3/16 T W T F S S M T W T F S S M T W T F S S M T W Feb 28, '21 Mar 7, '21 Mar 14, '21 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Hillsborborgh Skylight Replacement Page 1 Project: Hillsborough Skylight Date: Thu 2/25/21 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE ID Task Mode Task Name Duration Start Finish 1 2 Deliver Skylight 0 days Fri 2/26/21 Fri 2/26/21 3 Protect Roof 1 day Fri 2/26/21 Fri 2/26/21 4 Resolve Flashing Details 10 days Mon 3/1/21 Fri 3/12/21 5 Skylight 1 4 days Mon 3/15/21Thu 3/18/21 6 Demo/Protect Skylight 11 day Mon 3/15/21 Mon 3/15/21 7 Install Skylight 1 2 days Tue 3/16/21 Wed 3/17/21 8 A/E Inspection 1 day Thu 3/18/21 Thu 3/18/21 9 Skylight 2 8 days Fri 3/19/21 Tue 3/30/21 10 Demo/Protect Skylight 23 days Fri 3/19/21 Tue 3/23/21 11 Install Skylight 2 3 days Wed 3/24/21 Fri 3/26/21 12 A/E Inspection 1 day Mon 3/29/21 Mon 3/29/21 13 Substantial Completion0 days Mon 3/29/21 Mon 3/29/21 14 Punchlist 1 day Tue 3/30/21 Tue 3/30/21 15 Final Completion 0 days Tue 3/30/21 Tue 3/30/21 2/26 3/29 3/30 T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T Feb 21, '21 Feb 28, '21 Mar 7, '21 Mar 14, '21 Mar 21, '21 Mar 28, '21 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Hillsborborgh Skylight Replacement Page 1 Project: Hillsborough Skylight 0 Date: Fri 3/12/21 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE ID Task Mode Task Name Duration Start Finish 1 2 Deliver Skylight 0 days Fri 2/26/21 Fri 2/26/21 3 Protect Roof 1 day Fri 2/26/21 Fri 2/26/21 4 Resolve Flashing Details 10 days Mon 3/1/21 Fri 3/12/21 5 Skylight 1 9 days Mon 3/15/21Thu 3/25/21 6 Demo/Protect Skylight 13 days Mon 3/15/21 Wed 3/17/21 7 Install Skylight 1 5 days Thu 3/18/21 Wed 3/24/21 8 A/E Inspection 1 day Thu 3/25/21 Thu 3/25/21 9 Skylight 2 11 days Tue 3/30/21 Tue 4/13/21 10 Demo/Protect Skylight 23 days Tue 3/30/21 Thu 4/1/21 11 Install Skylight 2 5 days Mon 4/5/21 Fri 4/9/21 12 A/E Inspection 1 day Mon 4/12/21 Mon 4/12/21 13 Substantial Completion0 days Mon 4/12/21 Mon 4/12/21 14 Punchlist 1 day Tue 4/13/21 Tue 4/13/21 15 Final Completion 0 days Tue 4/13/21 Tue 4/13/21 2/26 4/12 4/13 T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F Feb 21, '21 Feb 28, '21 Mar 7, '21 Mar 14, '21 Mar 21, '21 Mar 28, '21 Apr 4, '21 Apr 11, '21 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Hillsborborgh Skylight Replacement Page 1 Project: Hillsborough Skylight ( Date: Wed 6/9/21 DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 1 Calvin Barber From:Travis Stiwalt <tstiwalt@carolinaci.com> on behalf of Travis Stiwalt Sent:Monday, April 12, 2021 10:00 AM To:Drew Wilgus Cc:Angel Barnes; Ashley Taylor; john.woog@dematcompany.com Subject:Final meetings Hi Drew, As of today (4/12) I’ve been informed that construction is completed and we are go for our end project meeting. Would Wednesday morning work for you? Thank you -Travis DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE 08/03/2021 Sifford-Stine Insurance 214 South Main Street P O Box 597 Clover SC 29710 Kimberly Stone (803) 222-9468 (803) 222-7616 kstone@sifford-stine.com Carolina Contracting And Investment Inc. 1632 Village Harbor Drive Lake Wylie SC 29710 Ohio Security 24082 Ohio Casualty Ins Co 24074 2022 MASTER A Y BKS59800728 06/29/2021 06/29/2022 1,000,000 300,000 15,000 1,000,000 2,000,000 2,000,000 CSCHD A Y BAS59800728 06/29/2021 06/29/2022 1,000,000 Underinsured motorist combined single limit 1,000,000 B 0 Y USO59800728 06/29/2021 06/29/2022 5,000,000 5,000,000 A N XWS59800728 04/25/2021 04/25/2022 1,000,000 1,000,000 1,000,000 A RENTED/LEASED EQUIPMENT BKS59800728 06/29/2021 06/29/2022 BLANKET UP TO $25,000 Orange County is additional insured when required by written contract. Orange County PO Box 8181 Hillsborough NC 27278 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY DocuSign Envelope ID: 348125E7-D480-4807-896D-2DA6D1D90CCE