Loading...
HomeMy WebLinkAboutAgenda - 11-19-2001-10aORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Dale: November 19, 2001 Action Agenda IMm No. fQq SUBJECT: Souheast High Speetl Rail Tier I Drak Environmental Impact SMMment DEPARTMENT: Planning and Inspections PUBLIC HEARING (YIN) No ATTACHMENT(S): INFORMATION CONTACT: 1) SEHSR Tierl Drag ElS Public Heatlng Karen Lincoln, em. 2594 Information Package antl Comment Sheet Crag eenetlic[ ant. 2592 (antler separate rover) TELEPHONE NUMBERS: Hillsborough T32B181 Ohapel Hill 9884501 Durham 888-7331 Mebane (336)221-2031 PURPOSE: To receive a report on Me Southeast High Speed Rail (SEHSR) and potential impacts for Omnge County. BACKGROUND: The Nodh Carolina Department of Trenspodation (NCOOT) Rail Division has releasetl the Southeast High Speed Rail (SEHSR) Tier I Dmk Environmental Impact S+atemen[ (EIS). NCOOT cantlucted eleven (11) public hearings in North Caroline (September 11 Mrpugh November 8) to encourage public comment regaNing the projeM In atltli5on, wmplete tlrefts of the EIS are available for public review and comments e[ varbus Icpticns. Nearby Iccatbns where the drek EIS can be revlewetl include the NCDOT Oisfdct 1 Office in Raleigh, Me NCDOT Division 5 OMce in purham, and the Lee County Managels Office In Sanfortl. NGOOT will mnsitler comments submMetl during [hle process in making the Stutly Area Recommendation Report, whch is to be completed by the end of Chia year. The EIS process for this project is divitletl into two tiers. The puryose of the Tler I EIS is to mnsitler regional impacts of Me incremental high speed rail protect in osier to itlentify a general mMtlrr locatlon, and b gather public Input info the proceee. The Tler II phase of [he project will provitle tlefails M track bcations (relocafians), ste0on anangements antl other Flnal tlesign elements. The Tier I Dmfi EIS compares potential environmental impacts and engineering concema for nine (9) alternative routes throughout the stutly area. Bix of Mose alternatives use the Notlh Carolina Railroatl (NCRR) corritlor that traverses Omnqe County. NCDOi will use Me wmpadson of impacts in Tier I Draft EIS, along wiM public comments, [o tletertnine alternatives to be cardetl forward iMO a Final Tier I EIS. The Fetleral Highway Administration (FHAJ and Fetlerel Railroad Atlminlebafion (FRA) will then issue a Recortl of Decision (ROD) for Me pmject. If Me ROD selects a build alternative, the protect will begin the Tier II phase The Tler I EIS uses secontlary tlate sources and general trends within the study area tc compare environmental impacts of the nine sltematives. The mnGUSions, therefore, are based on a "big picWre' perspective and no[ basetl on actual surveys antl preclce impacts. Specific impels, z benefits and mitigation measures will be tletailetl in the Tler II environmental documentation prOCe33. Impacts of the SEHSR protect In Orange County cannot be fully determined until the RecoN of Decision has been matle antl tlefails to be determined In the Tler II EIS have been worketl out. The Tier II s[utly pracesa la scheduletl to begin in January 2003. The altachetl information package from the public hearing heltl in Durham on September 18, 2001 contains pertinent pages fromthe Executive Summary of the Tier I Drak EIS. (The In/ormepon package sent under separate cover has been espied /mm the October 16, 2001 9000 agenda materials. Please refer to the October 16 in/ortnatlon package for color pullouts o1 the ettemeflve mules, which are provided in black antl while in the aftachetl in/armaGOn peckegeJ FINANCIAL IMPACT: None at this time. RECOMMENDATION: The Atlminlstretlon recommentls that the BOaM receive the mport end address any comments [o stafr b be bnvartletl fc NCOOT Rail Division.