Loading...
HomeMy WebLinkAboutAgenda - 10-30-2003-2aNorth Carolina Moving Ahead! Project List -Division 7 Qrange County Attachment 2a -Joint Meeting Discussion Items County Route Location Description Project Description Length Est. Cost Program (miles} Year Orange US 70 From SR 1562(Palmers Grove Ch. Rd.) Widen, resurface, construct turn lanes, 3.86 $625,000 2004 to NC 86 install guardrail and concrete islands. Orange US 70 From NC 86 to Alamance Co. Widen, resurface, construct turn lanes, 9.24 $1,500,000 2004 install guardrail and concrete islands. Orange SR 1777 From SR 1009 (Old NC 86) to begin Widen, resurface and upgrade guardrail 3.18 $675,000 2004 (Homestead Rd) curb and gutter 0.11 miles west of NC 86 Orange SR 1006 (Orange From SR 1115 (Arthur Minnis Rd.) to Widen, resurface and upgrade guardrail 7.31 $900,000 2004 Grove Road} SR 1009 (Old NC 86) Orange Multiple; TBD Town of Chapel HiIllCarrboro (various Upgrade signal system 1.00 $450,000 2004 routes Orange US 15-501/NC 54 At SR 1902{Manning Dr.) Extend right turn lane and upgrade signal 0.10 $250,000 2004 Orange SR 1346 (Saddle Bridge aver Mill Creek. Replace Bridge 0.10 $250,000 2004 Club Road) Orange NC 86 From SR 1730 (Whitfield Rd.) to US 70 Install guardrail, widen, construct turn 7.19 $1,500,000 2005 Bus. lanes, and resurface. Orange SR 1942 (Jones From SR 1005 (Old Greensboro Rd.} to Upgrade and install guardrail as needed. 4.84 $900,000 2005 Ferry Road.) Chatham Co. Line and from SR 1937 Widen and resurface. (Old Fayetteville Rd.) to SR 1942 Orange SR 1004 From US 70 to SR 1352 (Carr Store Install guardrail, improve sight distance, 6.38 $1,000,000 2005 (EflandlCedar Road} widen and resurface. Grove Road.) Orange SR 1005 (Old From SR 1942 (Jones Ferry Rd.) to Install guardrail, improve sight distance, 9.4 $1,500,000 2005 Greensboro Rd.} Alamance Co. Line widen and resurface. Orange SR 1002 (St. From US 70 to Durham County Line Install guardrail, improve sight distance, 6.9 $1,100,000 2005 Mary's Rd.} widen and resurface.