HomeMy WebLinkAboutAgenda - 05-18-2021;12-2 - Information Item - Memorandum - Blackwood Farm Park – Phase II Status Report 1 ORANGE COUNTY a Department of Environment, Agriculture, Parks&Recreation MEMORANDUM To: Bonnie M. Hammersley, County Manager From: David Stancil, Environment, Agriculture, Parks and Recreation Director Marabeth Carr, Landscape Architect Date: May 18, 2021 RE: Blackwood Farm Park— Phase I I Status Report The purpose of this memorandum is to provide an update on progress toward scheduled improvements for the next phase of Blackwood Farm Park, slated to begin this summer. During the last year, Susan Hatchell Landscape Architecture, PLLC and team (a design team of all women-owned businesses) has worked to develop pre- construction design and engineering services including securing permits, conducting engineering work and creating construction drawings and bid document specifications for Phase II of Blackwood Farm Park. As you know, Blackwood Farm Park is a 152-acre park near the intersection of New Hope Church Road and NC 86 between Hillsborough and Chapel Hill. The park was opened with limited facilities and a limited operating schedule in June 2015. During the past year or so the consultant has worked with staff and other agencies (including NCDOT) to develop a refined pre-construction plan that is consistent with the adopted master plan, which called for a low-impact approach for recreation amenities, while respecting the agricultural heritage of the site and protecting the historic structures, scenic vistas and opportunities for environmental education at the park. The master plan map is attached. As noted in a prior update to the Board in fall of 2019, the project scope that has been developed for Phase II includes: • Turn lanes on NC 86 for the new park entrance, to be located north of the existing narrow driveway; • The new entrance road for the park; Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351 2 • Parking area(s) for existing and proposed park amenities; • An amphitheater; • Large picnic shelter (designed as a dual use picnic/performance shelter); • Restroom facilities; • Park office and work/storage area for on-site park staff; • Stormwater and utility measures needed for the improvements above; • Schematic design drawings for the planned Learning/Nature Center (future phase); Construction of all of the above-listed facilities is subject to available funds once bids are received. In addition to this work, prior appropriations and other sources include funding to address improvements to the historic farmstead residence and the creation of a disc golf course, both of which will be done under separate contracts. Sketches of the design for selected facilities of Phase II are attached. Staff is also pursuing grant and partner funds for certain items in the master plan (such as the agricultural exhibits and garden areas and an environmental-themed children's trail). These improvements will be pursued using existing or new resources over the next few years. The Phase II project scope above is currently out for construction bid solicitation, with a potential bid award to come back before the Board for approval in June. Staff has remained in contact with the park neighbors and a virtual open house for is planned for May 26. As noted in the Manager's Recommended FY 2021-22 Budget, the park is scheduled to close for construction beginning in July. Construction is expected to take approximately one year. Funding for this project comes from previously-appropriated funds, as approved in prior Capital Investment Plans. An upcoming budget amendment will also transfer existing funds from the completed River Park project - funding for a performance stage reassigned to the amphitheater at Blackwood Farm Park. Remaining park amenities, including the proposed Learning/Nature Center, would be a future Phase III of Blackwood Farm Park - with potential partnerships and funding being pursued for the Learning/Nature Center. Funding for this phase is identified in the CIP in year 4 and beyond. Please let us know if we may provide any additional information. Copies: Travis Myren, Deputy County Manager Parks and Recreation Council Dan Derby, Parks Superintendent Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351 ------------------- r r �Aj Re-establish Historic Roadbed 7 - Gravel Parking Lot Vault Toilets f `, �'��_ _,I 1'•,1 New Park Entrance and NC 86 Turning Lanes Disc Golf �} --- ` t f r r Start/Finish ' _ �T Environmental Education i y Approx. 32 Ac. Disc Golf Area + �r f ss d Interactive Discovery Loop Trail Pond,Buffer Trail Outdoor Education II Dead �: a` y� Bus Drop off SSeep Non Paved Trails i & Parking Area Sm 11 Picrsic Seep Buffer / Re-establish Shejter "�. 1 rr Farm Terraces �:.�_ t. Gravel Access Drive Learning Center ' r 1 Re-established Large Picnic r_ _--- ,� 'Shelter Orchard Area ,,' Trail Head Pond f ,'f Farmstead ` s Vault Toilet "Y ° I +" 5�; Existing G�riv r Agricultural Exhibits _., Trail Park Office Special Ev nts a l L &Garden Area 6r ad Ser-icy `ehicles r Large Event , Oh Overflow Parking I - Amphitheaters Area(Grassed) r\- Honeybee Hives Stream -�fr Protect + Buffer.-�r Cemetery { -- I I . Sti�eaf i f f s r Ir �� i r Ir Old PQ Roadbed -1 J Trail ' �� T ;r--_ Preserve _ Vista! Non-Paved Trails f �� Natural Wooded Area l Possible Uses - Hiking Trails, Bike Trails, jInterpretive Forestry Signage a fl, I 0' 150' 300' 60D' Scale: 1'=15V-(r ORANGE COUNTY NORTH CAROLINA Susan Blackwood Farm Parkvs Hatcheil Updated Master Plan Department o/'Environment. DRAFT Landscape Architecture, PLLC EEBRUARY 1, 2021 Agriculture,Parks&Recreation 4 i. i BLACKWOOD FARM AMPHITHEATRE 5 � I '1 f I I 1 �L- BLACKWOOD FARM RANGER STATION 6 i BLACKWOOD FARM PICNIC SHELTER ROOF EXAMPLE • • • GREY STANDING SEAM METAL • • • CEDAR _ f i BOARD 1 BATTEN VAULT T 0