Loading...
HomeMy WebLinkAboutOUTBoard Agenda Packet - 042121 AGENDA ORANGE UNIFIED TRANSPORTATION BOARD Wednesday, April 21, 2021 OUTBoard Meeting — 6:30 pm ZOOM MEETING Link NOTE: Due to current public health concerns, the meeting will be virtual. Members of the OUTBoard TAS and staff will be participating in the meeting remotely. Interested members of the public can view and participate in the meeting by following the instructions at the end of the agenda 1. Call to Order 2. 3 - 4 Approval of Minutes January 20, 2021 OUTBoard Meeting 3. Consideration of Additions or Changes to Agenda 4. Regular OUTBoard Agenda 4.a. 5 - 8 Proclamation — May Bike Month (Nish Trivedi, Brandi Beeker) Action: OUTBoard update the resolution and recommend BOCC consider it. 4.b. 9 — 56 DCHC MPO CTP Amendment #3 (Nish Trivedi) Action: Staff recommends OUTBoard provide comments. 4.c. 57 — 78 US 15/501 Study— Phase 2 (Nish Trivedi) Action: Staff recommends OUTBoard provide comments. 4.d. 79 — 86 Small Non-STIP Transportation Projects (Nish Trivedi) Action: Staff recommends OUTBoard provide comments. 5. Staff Report/Updates 5.a. 87 — 92 MPO/RPO and NCDOT (Nish Trivedi) Action: Receive the Update. 6.a. 93 — 96 NCDOT Luncheon Info Item The next scheduled OUTBoard meeting date is May 19, 2021 —TBD Charge of the OUTBoard (from Section I, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUTBoard may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUTBoard shall serve in an advisory capacity to the Planning Board. Public Comments / Participation Instructions There are two methods for public comment: • Written submittals by email or drop-off • Speaking during the virtual meeting Written Public Comments Members of the public are encouraged to provide written public comments by emailing comments to ntrivedi(a--)orangecountync.gov no later than 3:00 p.m. on the afternoon of the meeting. Please include in the Subject line of the email the title of the agenda item your comment. Written comments can also be dropped off at the Planning Department's offices at 131 W. Margaret Lane, 2nd floor, Hillsborough, NC during normal business hours (8:00 a.m. to 5:00 p.m. Monday through Friday). Please leave your comments in the drop-off box near the front counter and call (919) 245-2575 to notify staff that there has been a drop-off. Written comments will be scanned emailed to the OUTBoard members and staff. Verbal Public Comments Members of the public must contact Planning Department staff via email at tlove orangecountync.gov no later than 3:00 p.m. on the afternoon of the meeting and indicate they wish to speak during the meeting. When submitting the request to speak, please include the following: • The date of the meeting • The title of the agenda item you wish to speak on • Your name, address, email and phone number o The phone number must be the number you will call in from if participating by phone During the meeting, speakers will be called upon in the order in which requests to speak were received. Each speaker may speak once per agenda item and has 3 minutes to address the board. Ceding time to another speaker is not permitted. Written comments continue to be encouraged and can be sent to ntrivedi(a�orangecountync.gov Zoom Meeting Registration Both members of the public who wish to speak at the meeting and those who wish to only view the meeting must register to receive a link to the meeting. Persons wishing to speak must register with the same name provided in the email that notified staff you wish to speak. The link to sign up for the meeting is: https://orangecountync.zoom.us/webinar/register/WN gtjoRAa4SyKr2gNxCZFsNA If you do not have internet access, you may participate in the meeting via phone. Please call (919) 245-2575 during regular business hours to receive information on the number to call-in to, the meeting ID, and a password. Review Process The OUTBoard is an appointed volunteer advisory board which makes recommendations to the Board of County Commissioners (the elected officials). The Board of County Commissioners holds a formal public hearing and makes decisions. 3 DRAFT 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 JANUARY 20,2021 4 REGULAR MEETING 5 (Due to current public health concerns, this meeting was held virtually. 6 Members of the OUTBoard, staff and public participated remotely) 7 8 MEMBERS PRESENT: Amy Cole (Vice-Chair), At-Large Representative; Tom Gray, Hillsborough Township 9 Representative; Randy Marshall, Bingham Township Representative; Tony Blake, At-Large Representative; Roy 10 Schonberg, Chapel Hill Township Representative; Jamie Crandell, Eno Township Representative; Joshua Mayo, At- II Large Representative; Heather McAndrew,At-Large Representative; 12 13 MEMBERS ABSENT: Eric Broo (Chair), At-Large Representative; David Laudicina, Cheeks Township Representative; 14 Johanna Birckmayer, At-Large Representative; Todd Jones, At-Large Representative; Vacant, Little River Township 15 Representative;Vacant, Cedar Grove Township Representative 16 17 STAFF PRESENT: Nish Trivedi, Transportation Planner; Tom Ten Eyck, Transportation/Land Use Planner; Tina Love, 18 Administrative Support 19 20 21 AGENDA ITEM 1: CALL TO ORDER,DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 22 Amy Cole called the meeting to order and quorum was established 23 24 25 AGENDA ITEM 2: APPROVAL OF MINUTES 26 MOTION by Tony Blake to approve the September 16, 2020, OUTBoard Minutes. Seconded by Randy Marshall. 27 28 Roy Schonberg: Yes 29 Joshua Mayo: Yes 30 Heather McAndrew: Yes 31 Tom Gray: Yes 32 Jamie Crandell: Yes 33 Tony Blake: Yes 34 Randy Marshall: Yes 35 Amy Cole: Yes 36 VOTE: UNANIMOUS 37 38 39 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 40 41 42 AGENDA ITEM 4: REGULAR OUTBOARD AGENDA 43 44 AGENDA ITEM 4A: 2020 ANNUAL REPORT AND 2021 WORK PLAN—(NISH TRIVEDI) 45 46 Nish Trivedi reviewed the abstract for the work of the OUTBoard for 2020 and the anticipated work plan for 2021. 47 48 Tony Blake asked if there were plans for bus shelters. 49 50 Nish Trivedi will bring that information back to the next meeting. 51 52 Amy Cole requested to have the wording changed for#6 under emerging issues to something more strongly worded. 53 Instead of saying 'consider' studying to studying policies so that it is a continuation effort rather than something the 1 4 DRAFT 54 OUTBoard is thinking about doing. She added that it is still a needed effort to have that collaboration between the 55 Town and the County and there is still a lot of work to do on it. 56 57 Nish Trivedi indicated that he would make that change. 58 59 Amy Cole asked about the pedestrian data on the report for the school. 60 61 Tom Ten Eyck related that since the students are not physically in school, it's not really possible to collect the 62 pedestrian data and there is no definitive timeline on when that might happen. 63 64 Amy Cole suggested the need for traffic calming measures and pedestrian safety, traffic lights etc.to reduce traffic 65 and speed in that area. She asked if it is possible to get an update from NCDOT. 66 67 Tom Ten Eyck will bring it up at the next quarterly meeting with NCDOT. 68 69 MOTION by Tony Black to approve the 2020 Annual Report and 2021 Work Plan as amended. Seconded by Roy 70 Schonberg. 71 72 Roy Schonberg: Yes 73 Joshua Mayo: Yes 74 Heather McAndrew: Yes 75 Tom Gray: Yes 76 Jamie Crandell: Yes 77 Tony Blake: Yes 78 Randy Marshall: Yes 79 Amy Cole: Yes 80 VOTE: UNANIMOUS 81 82 83 AGENDA ITEM 5: STAFF REPORTS/UPDATES 84 85 AGENDA ITEM 5A: ORANGE COUNTY TRANSIT PLAN UPDATE(TOM TEN EYCK)- 86 87 Tom Ten Eyck gave the OUTBoard updates for the Orange County Transit Plan and referred the members to 88 information about the plan on the website https://octransit202O.com/ 89 90 91 AGENDA ITEM 513: MPO/RPO AND NCDOT UPDATES(NISH TRIVEDI)— 92 93 Nish Trivedi gave MPO/RPO, BGMPO and NCDOT updates to the OUTBoard 94 95 96 AGENDA ITEM 6: INFORMATION ITEMS 97 98 AGENDA ITEM 7:ADJOURNMENT 99 OUTBoard meeting was adjourned by consensus 100 101 102 103 Erik Broo, Chair 2 5 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: April 21, 2021 Action Agenda Item No. 4.a. SUBJECT: Proclamation — May Bike Month DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Draft Resolution Nishith Trivedi, Transportation Planner, 919- 245-2582 PURPOSE: Review, update and recommend the Board of County Commissioners (BOCC) consider the proclamation recognizing May as Bike Month. BACKGROUND: May is National Bike Month, promoted by the League of American Bicyclists and celebrated in communities from coast to coast. National Bike Month was first celebrated in 1956. The overall goals of National Bike Month are to showcase the many benefits of bicycling and to encourage more folks to try bicycling. The Orange Unified Transportation Board (OUTBoard) continues to advocate for multimodal travel throughout Orange County. Over the past few years, it has conducted numerous education events informing the public about bicycle opportunities. Numerous research and other articles have been published demonstrating the health benefits of bicycling as a commute mode to work, including: • Forbes Magazine - New Research Indicates Cycling To Work Has Extraordinary Health Benefits • Harvard Medical School - 5 Benefits-of-cycling • PubMed Central (PMC) US National Library of Medicine - Cycling: Health Benefits and Risks The OUTBoard and Orange County Transportation Planning Staff have drafted a proclamation recognizing May as National Bike and requests BOCC consider it. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff requests OUTBoard review the proclamation and recommend the BOCC consider it. 6 Attachment 1 Item 4.a. ORANGE COUNTY BOARD OF COMMISSIONERS PROCLAMATION May— "BIKE MONTH" Bike to Work Day is always the third Friday in May and Bike to Work Week is the week of Bike to Work Day. May is National Bicycle Month Whereas, the bicycle is a viable and environmentally sound form of transportation and active transportation is an important part of addressing our climate emergency; and Whereas, thousands of North Carolinians experience the joys of bicycling year- round, but especially during the month of May through educational programs, races, commuting events, trail work days, charity events, or just getting out and going for a ride; and Whereas, bicycling is an inexpensive form of travel that can be utilized by all ages, and Whereas, bicycling activities and attractions have great potential to have a positive impact on Orange County's economy and tourism industry and to stimulate economic development by making the state attractive to businesses and citizens who enjoy the outdoors and healthy lifestyles; and Whereas, creating bicycle-friendly communities improves health, well-being, and quality of life, to boost community spirit, to improve traffic safety, and to reduce pollution and congestion; and Whereas, May has been declared National Bike Month by the League of American Bicyclists every year since 1956; and Whereas, communities throughout Orange County and North Carolina will be promoting bicycling as a leisure activity and as an environmentally-friendly alternative to the automobile during the month of May 2021; and Whereas, the education of bicyclists and motorists as to the proper and safe operation of bicycles is important to ensure the safety and comfort of all road users; and Whereas, Orange County funded and completed a Bicycle Safety Campaign to raise awareness of how motorists and bicyclists can best coexist safely on the road, and Whereas, the Orange County encourages bicycling and has marked bicycle routes through the county; and 7 Attachment 1 Item 4.a. Now, therefore, be it resolved proclaimed that the Board of Orange County Commissioners hereby recognizes the month of May 2021 as National Bike Month and Bicycle Safety Month, and Be it further resolved proclaimed that the Board of Orange County Commissioners urges all who support bicycling to support locally planned bicycling events and urges all road users to share the road safely. Add signature line for Chair Price 9 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: April 21, 2021 Action Agenda Item No. 4.b. SUBJECT: DCHC MPO CTP Amendment #3 DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. CTP Report Nishith Trivedi, Transportation Planner, 919- 245-2582 PURPOSE: Review the Orange County Comprehensive Transportation Plan (CTP) Amendment #3 and provide comments that will be submitted to Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO). BACKGROUND: On August 8, 2019, the North Carolina Department of Transportation (NCDOT) adopted a new Complete Streets Policy, to "encourage non-vehicular travel without compromising the safety, efficiency, or function of the facility". Subsequently, NCDOT distributed a Complete Streets Implementation Guide that specifies, "The adopted CTP will be considered the controlling plan for the identification of non-motorized facilities to be evaluated as part of a roadway project." The new Complete Streets Policy gives NCDOT the opportunity to consider paying for multimodal facilities - bike lanes, sidewalks, side paths, bus stop pullouts and pads - when they are part of roadway improvement projects through NCDOT's new Cost Share (section 6 - Complete Streets Implementation Guide). NCDOT will not consider projects until they are included in the CTP. Highway projects are then subject to inclusion in the Metropolitan Transportation Plan (MTP), NCDOT's Strategic Prioritization of Transportation (SPOT) process and funding in the Strategic Transportation Improvement Program (STIP) before becoming reality. We have an opportunity to include these types of multimodal features on our roadway projects only if the projects in Attachment 1 are included in the CTP. The CTP is the first step in a series of plans that need to be completed before a project is funded. The CTP is to represent the `universe' of possible projects and is not fiscally constrained. Projects in CTP eventually progress to the Metropolitan Transportation Plan (MTP) and some MTP projects are submitted for the states Strategic Prioritization of Transportation (SPOT). General Example: • CTP — 100 projects (not financially constrained) • MTP —40 of the 100 projects (finically constrained) • SPOT — 10 of the 40 projects (numerically constrained by STI law) = 10% CTP projects 10 Following the State's action, on November 13, 2019 the DCHC MPO amended its 2045 MTP by including the State's new Complete Streets Policy and identified which projects would receive Complete Streets consideration. Since then, MPO staff has been working with local jurisdictions to identify potential CTP amendments so that they will be consistent with the amended MTP and new state policy. Though no project has been implemented through the new policy to date, the CTP sets the stage for NCDOT assistance in multimodal improvements as part of future roadway projects. Since the MTP was amended, County transportation planning staff has been working with DCHC MPO, NCDOT, and local jurisdiction staff in updating Orange County's CTP within the DCHC MPO planning area, in light of State's new Complete Streets Policy. From December 2019 to August 2020, staff reviewed the Orange County CTP and made recommendations to the Orange County Unified Transportation Board (OUTBoard). The recommendations used an analytical process that coordinated efforts with local jurisdictions and DCHC MPO staff as well as gave consideration to Environmental Justice, transit plans, freight plans, regional traffic modeling and county-level road safety statistics. All DCHC MPO member jurisdictions have provided a comprehensive list of CTP amendments for all modes, and they are separated into individual sections in the attached CTP Report (Attachment 1). DCHC MPO has started processing this amendment in-house in accordance with their Public Involvement Plan. Previous Steps: • August 19, 2020, OUTBoard began reviewing potential amendments to the CTP. • September 16, 2020, OUTBoard recommended Orange County Board of County commissioners (BOCC) approve a list of CTP amendments. • October 6, 2020, BOCC approved Orange County CTP Amendments • October 8, 2020, Transportation Staff submitted CTP Amendments to DCHC MPO. Next Step - Public Involvement: • April 14, 2021 — DCHC MPO Board releases amendment #3 for public input. • May 12. 2021 — DCHC MPO Board conducts a public hearing on Amendment #3. • May 25, 2021 — Public involvement period ends. • June 9, 2021 — DCHC MPO Board can adopt Amendment #3. • July 1 or August 4-5, 2021 — North Carolina Board of Transportation can adopt Amendment #3 FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends OUTBoard provide comments. 11 Technical Committee 2/24/2021 Item 7 ti�Of NORTH O9AO4 DURHAM•CHAPEL HILL•CARRSORO q DCHC O 9^ Q 'OpTFt gPO� METROPOLITAN PLANNING ORGANIZATION OiatAam County .ear. Durllan2 County Orange County own oo Caz7Aoro mown ofC6ia�el lrlZ ' . City . mown of�lrlTs6orouglc o1 �rlw* Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan February 24, 2021 12 Technical Committee 2/24/2021 Item 7 Amendment #3 The Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) hereby amends the Comprehensive Transportation Plan (CTP) to add, delete, and modify highway, public transportation, bicycle, and multi-use path projects as detailed in this document. Proposed Changes Amendment#3 consolidates several types of projects that require changes to the CTP. The table below indicates the starting page number for a summary, project table, and maps for each CTP mode. Mode Document Page Highway Summary 3 ------------------------ -------------- Table 4 Maps 8 Interchange/Grade Separations Summary 15 ------------------------ -------------- Table 16 ------------------------ -------------- Maps 17 Sidepaths (Complete Streets) Summary 18 ------------------------ -------------- Table 19 Maps 26 Rail, Fixed-Guideway and Bus Summary 33 ------------------------ -------------- Rapid Transit Table 34 Maps 35 Public Transportation Summary 36 ------------------------ -------------- (Operational Strategies) Table 37 ------------------------ -------------- Maps Not Available Bicycle and Pedestrian Summary 38 ------------------------ -------------- Table 39 Maps Not Available Multiuse Paths Summary 41 ------------------------ -------------- Table 42 Not Maps Available Public Involvement Schedule --The MPO's public involvement policy requires that a major amendment to the CTP be released for public input for a minimum of 42 days. The schedule for Amendment #3 will be: • Month #1 -- DCHC MPO Board release amendment#3 for public input. • Month #2— DCHC MPO Board conduct a public hearing on Amendment#3. DRAFT CTP Amendment#3 1 13 Technical Committee 2/24/2021 Item 7 • Month #2.5 — Public involvement period ended. • Month #3— DCHC MPO Board can adopt Amendment#3. • Month #4— North Carolina Board of Transportation can adopt Amendment#3 Notification --The MPO will post Amendment#3 to the MPO Web site and work with the jurisdictions and counties within the MPO to publish public affair notices. All notices will be in both English and Spanish. The MPO will push the Amendment notice through its social media channels and the MPO contact email database. DRAFT CTP Amendment#3 2 14 Technical Committee 2/24/2021 Item 7 —Highway— The table on the next page identifies updates, deletions and additions to the CTP Highway table, and is broken out by highway type, e.g., interstate, U.S. highways. StFik thFO U.Th font depicts text that is to be deleted, and bold font is text that is to be added. A series of maps that cover the DCHC MPO planning area follows the table. A bright green shadow, , indicates which highways on the map are to be amended. A summary of the reasons for the proposed highway updates includes: • New Roadway Needs —Some new roadway needs have been identified since the adoption of the CTP. Examples of these needs include modernization of rural roadways in Orange County and a more direct connection between US 15-501 bypass and Cole Mill Road. • New and Discontinued Local Plans—The roadway network of the recently approved Efland-Buckhorn-Mebane Access Management Plan needs to be integrated into the CTP. Roadway improvements that were based on the discontinued Durham-Orange Light Rail Transit plan can be deleted from the CTP. • New Development Impacts— Modifications are needed to the CTP roadway network between US 70 and NC 98 in Durham County based on new developments and site plans. DRAFT CTP Amendment#3 3 15 Technical Committee 2/24/2021 Item 7 Highway Segment c 2015 Existing System 2040 Proposed System }, 0 0. Existing 2040 `M Dist. a Capacity 2011 Volume 2040 � Z a ID Facility From To 3 (mi) m ROW Width (vpd) Volume E+C WC +° ° a CTP Class - „� H U to Interstates -777 There are no interstate amendments U.S. Highways U-5304 D US 15-501(Fordham Blvd) E Franklin St. Raleigh Rd. (NC 54) CH 2.1 4 - - 36,600 28,000 37,100 1.01 NI bF 4G Blvd Full U-5304 F US 15-501(Fordham Blvd) E Franklin St. 1-40 CH 1.6 4 130-490 44-115 36,600 41,000 46,700 1.28 NI 4G 6F Blvd Full U-5304 B US 15-501/NC 54(Fordham Manning Dr. US 15-501 CH 1.2 4 - - 36,600 41,000 43,500 1.19 NI bF 4G Blvd Full Blvd) U-5304 B US 15-501/NC 54(Fordham Manning Dr. Raleigh Rd. (NC 54) CH 0.9 4 - - 36,600 51,000 57,800 1.58 NI bF 4G Blvd Full Blvd) -- US 70 Efland Cedar Grove Rd MPO Boundary OR 2.6 260 22 12,400 6,700 11,200 0.90€* NI ADQ- Maj None 3C -- US 70 Efland Cedar Grove Rd 1-85/US 70 Connector OR 1.4 2 60-150 22-46 12,400 4,400 9,200 0.74€* NI ADQ- Maj None 2A -- US 70 US 70 BUS INC 751 Pleasant G..ee o, OR 0.6 2 150 22 29,700 6,800 17,400 0.59 €* NI ADQ- Maj None Groucho Rd 2A -- US 70/US 70 BUS NG 751 Groucho Rd Pleasant Green Rd OR 1.0 2 150 22 29,700 6,800 17,400 0.59 Ex ADQ Maj None -- US 70A Lawrence Rd US 70 OR 1.1 260 22 12,400 2,500 4,800 0.39 & NI ADQ- Maj None 2A -- US 70A Lawrence Rd Elizabeth Brady Rd OR, Hboro 1.2 260 22 12,400 6,700 13,800 1.12 €* NI ADQ7 Maj UAD 2A US 70A/NC 86 Elizabeth Brady Rd S Churton St OR, Hboro 0.8 2 100 22 12,400 9,200 12,100 0.98 €* NI ADQ- Maj None 2A NC Routes NC 54 Old Payettevill W Jones Ferry Rd Carr 0.9 4 150 48 36,600 24,000 36,400 0.99 Ex ADQ Blvd None Main St NC 54 Old Fayetteville Rd Jones Ferry Rd W Main St Carr 0.3 4 150 48 36,600 24,000 36,400 0.99 NI ADQ Blvd None -- NC 86 1-40 Whitfield Rd OR 0.1 4 60-100 64-72 36,600 - 16,700 0.46€* NI ADQ7 Maj None 4G -- NC 86 Whitfield Rd New Hope Church Rd. OR 3.5 260 22 14,600 6,400 17,700 1.21 €* NI ADQ- Maj UAD 2A NC 86 New Hope Church Rd. OLD NC 10 OR 2.7 3 100 24 12,400 10,000 29,700 2.40& NI ADQ- Maj UAD 2A Secondary and Local Roads DRAFT CTP Amendment#3 4 16 Technical Committee 2/24/2021 Item 7 Highway Segment c 2015 Existing System 2040 Proposed System }, 0 0. Existing 2040 E `� Dist. Capacity 2011 Volume 2040 : 0 M a Facility Fro To 3 (mi) era ROW Width (vpd) Volume E+C V/C +° ° a CTP Class 0. m ,; CA N ACC Boulevard Ext Angier Av Ext Leesville Rd Dur,DurCity 0.7 0 - - - 0.00 Rec 3C Min None ACC Boulevard Ext Leesville Rd Northern Durham Dur,DurCity 0.8 0 - - - 0.00 Rec 3C Min None Parkway DURH0018-H Angier Ave Extension US70 Northern Durham DurCity 0.8 0 - - - - 0.00 Rec 2€2J Min None Parkway -- Becketts Old NC 86 New connector ever! 85 Hboro 1.7 2 - - - - - 0.00 Ex ADQ Min None Ridge/Millstone/Oakdale NC 86 DURH0020-H Brier Creek Pkwy Extension T.W.Alexander Dr Andrews Chapel Rd Dur 0.4 0 - - - - - 0.00 Ree Min None Ex ADQ DURH0020-H °r0^r PloN,Extension A.Rd- e%ys Chapel Rd Leesville Rd Dur 0.5 4 - 20 - - - 0.00 NI 3A Min None Andrews Chapel Rd Brier Creek Pkwy DURH0021-H Briggs Av(Extension) Riddle Rd Ed Cook Rd DurCity 0.7 0 - - - - - 0.00 Rec 2.1 Min None Bowhall Dr Fendol Farm Rd Olive Branch Rd DurCity 0.8 0 - - - - - 0.00 Rec 3C Min None Cole Mill Rd Extension Cole Mill Rd NC 147 DurCity 0.3 4 110 Rec 4D Blvd None -- Dairyland Rd. Dodsons Crossroads Old NC 86 OR 5.0 2 - 20-21 12,400 5,500 8,000 0.65 €x NI A Q7 Min None 2B Del Webb Arbors Dr Leesville Rd Wake County line DurCity 1.4 3 - - - - - 0.00 Ex ADQ Min None -- Efland Cedar Grove Rd Brookhollow Rd US 70 OR 2.7 2 - - 12,400 3,100 5,100 0.41 €x NI ADQ Min None 2A U-3436 Eno Mtn Rd realignment Eno Mountain Rd Mayo St OR 0.3 0 - - - - - 0.00 Rec 2-A 2E Min Min TE-5205 Erwin Rd Cameron Blvd Lasalle St DurCity 0.8 4 90 55 26,000 18,000 21,500 0.83 N4 Ex 4D Blvd None TE-5205 Erwin Rd Fulton St Lasalle St DurCity 0.5 5 100 55-60 28,100 24,000 27,800 0.99 N4 Ex 4D Blvd None TE-5205 Erwin Rd. Anderson St Fulton St DurCity 0.4 4 100 60-75 26,000 14,000 16,700 0.64 NI•Ex 4D Blvd None ORAN0107-H Erwin Rd. Sage Rd ` htea Rd Dry Creek CH,OR 1.0 2 60-100 18-23 12,900 7,600 16,000 1.24 NI 2E Min Min Rd ORAN0107-H? Erwin Rd. Sage Rd Dry Creek Rd Whitfield Rd CH,OR 0.9 2 60-100 18-23 12,900 7,600 16,000 1.24 NI 2E Min Min MTP-17.1 Estes Dr Ext N GFee^s"^"^ Rd Seawell School Road CH 0.5 2 - - 11,600 13,000 17,500 1.51 NI 2E Min Min Railroad crossing MTP-17.1 Estes Dr Ext N Greensboro St Carr 0.4 2 - - 11,600 13,000 17,500 1.51 NI 2E Min Min Railroad crossing Fendol Farm Pkwy Leesville Rd Bowahll Dr DurCity 0.7 3 - - - - - 0.00 Ex ADQ Min None ORAN0108-H Freeland Memorial Dr S Churton St Valley Hboro 0.7 0 - - - - - 0.00 Rec 2E Min None Extension Forge Rd DRAFT CTP Amendment#3 5 17 Technical Committee 2/24/2021 Item 7 Highway Segment c 2015 Existing System 2040 Proposed System }, 0 0. Existing 2040 E 4) `N Dist. Capacity 2011 Volume 2040 � 0 M a ID Facility From To 3 (mi) q ROW Width (vpd) Volume E+C WC +° ° a CTP Class 0. �, CA U to DURH0045-H Hopson Rd Extension INC 55 Grandale Dr Dur 1.4 0 - - - - 0.00 Rec 2K 2E Blvd None Kemp Rd NC 98 Carpenter Pond Rd Dur 3.2 2 - - - - - 0.00 NI 2E Min None -- King St. (East) N Churton St US70 Bypa-&&N.Cameron Hboro 0.2 2 - - 11,600 3,500 7,000 0.61 Ex ADQ Min None St 0.4 MTP-53 Leesville Rd realignment US 70 Leesville Rd Dur 0 - - - - - 0.00 Rec 2A Min None ORAN0116-H Mt.Willing Rd 1-40/85 US 70 OR 0.7 2 - - 11,600 6,600 8,900 0.76 NI 2€ 4G Min None New Collector Rd(east-west; Buckhorn Rd Mt Willing Rd OR 3.3 2 Rec 2E Min None Orange County EBM AMP) New Collector Rd (north-south; Buckhorn Rd Mt Willing Rd OR 0.4 2 Rec 2E Min None Orange County EBM AMP) -- New Hope Church Rd. INC 86 Old NC 10 OR 1.9 2 - - 12,400 3,400 9,600 0.77 €x NI ADQ Min None 2B -- New Hope Church Rd. 1-40 NC 86 OR 0.7 2 - - 12,400 1,900 6,900 0.56€x NI ADQ Min None 2A Oakdale Dr Old NC 86 Orange Grove Rd. OR, Hboro 1.1 2 - - 12,400 3,800 11,500 0.93 €x NI ADQ Min None 2E -- Old Greensboro Rd. Jones Ferry Rd MPO Boundary OR 2.7 2 - - 12,400 4,600 6,500 0.53 €x NI ADQ- Min None 2B Olive Branch Rd Carpenter Pond Rd Olive Branch Rd DurCity 0.5 0 - - - - - 0.00 NI 2E Min None Extension Olive Branch Rd Extension Olive Branch Rd Shady Grove/N Exeter DurCity 0.2 0 - - - - - 0.00 Rec 2E Min None Way U-5848 Orange Grove Connector Orange Grove Rd s New collector OR, Hboro 0.2 0 - - - - - 0.00 Rec 4G Blvd Min street -- Orange Grove Rd Oakdale Dr Dimmocks Mill Rd OR 1.8 2 - - 12,400 3,586 7,800 0.63 €* NI APQ Min None 2A -- Orange Grove Rd Oakdale Dr S Churton St OR, Hboro 1.5 2 - - 11,600 3,200 9,100 0.79 €* NI APQ Min None 2E TE-5205 Pettigrew St(East) S Dillard St S Alston Ave DurCity 0.7 2 40-55 - - - - 0.00 NI•Ex Q-� Min None ADQ TE-5205 Pettigrew St(West) W Chapel Hill St S Dillard St DurCity 0.7 2 47-55 27-40 - - - 0.00 NI•Ex Q-� Min None ADQ -- St Marys Rd Guess Rd Pleasant Green Rd OR 3.3 2 - - 12,400 2,900 6,900 0.55 €* NI ADQ Min None 2A -- St Marys Rd Pleasant Green Rd US 70 Bypass OR 5.1 2 - - 12,400 2,400 6,000 0.48€* NI ADQ Min None 2A St. Marys Rd N.Cameron St Thomas Ruffin St Hboro 0.2 2 - - 11,600 3,500 7,000 0.61 NI 2E Min None St.Marys Rd Thomas Ruffin St US 70 Bypass Hboro 0.9 2 - - 11,600 3,500 7,000 0.61 NI 2B Min None DURH0024-H C....penteF Pend Rd Ext Leesville Rd Carpenter Pond Rd Dur 0.7 2 - - - - - 0.00 NI 2E Min None Shady Grove Rd DRAFT CTP Amendment#3 6 18 Technical Committee 2/24/2021 Item 7 Highway Segment c 2015 Existing System 2040 Proposed System o Existing 2040 ate, `� Dist. Capacity 2011 Volume 2040 3 41 N o � aa, Facility Fro TA[ o 3 (mi) ROW Width (vpd) Volume E+C V/C �° ° a CTP Class a 1 i - Vn U of DURH0072-H University Dr MLK Jr Pkwy Shannon Rd DurCity 0.5 4 - - 26,000 17,000 23,800 0.92 A14 Ex 4D Blvd None W Ten Rd Buckhorn Rd US 70 Connector OR 4.2 2 Ex 3c Min None ni iou -�4 Flik_r_i,,ypr rzen a;te rim der 43.If —44 8- - A.W Ree _€ MAR 4eee DRAFT CTP Amendment#3 7 CTP Highways -- Amendment #3 -- Central Durham 19 ♦♦♦ CTP Highways ♦ ■■ Freeway,Recommended Po4nte or ti Freeway ML,Needs Improvement ti Freeway,Needs Improvement Freeway ML,Existing L Hammond St ri Freeway,Existing ♦ 001 Boulevard,Recommended t ■ t✓•Boulevard,Needs Improvement SpruntAve ` q erbeest j Boulevard,Existing > ■ t✓•Other Major Thoroughfare,Needs Improvement a ■ j, E... ■ Other Major Thoroughfare,Existing ♦�'`� rEi i ■ P, — —Minor Thoroughfare,Recommended �'--' t Q ' : beC Minor Thoroughfare,Needs Improvement er_ �-/ = ■ - Minor Thoroughfare,Existing Engle lc, Ave ■ ♦� t♦ U 11111JAmendment#3 1 + W Knox St ■ ♦ u ♦ :.. - in a reed St > ♦ ♦ •♦♦ `tpve V Markham Ave y ♦ , ♦ a, n 1 0 3 • F f ly W lenity Ave ♦ ♦ ♦ `ti h t9re. Minery Ave 1� — ♦♦ ■ t gi'ery' P to _ esp Garet� y� �♦ o ♦ � ■ - arc Chap -:❑mpns Or �i Z ■ e� ■ �♦ q° ♦Juniper Sto JI w o ii ■ Duk, ♦ ♦ ro g ■ ■ IJ nivti rsi ty t.1_,1�.�,_,�,j ■ �•. I I 11 SL x n ■ ■ ♦ Eva ■ • Ross Rd ■ i1 chead Avc ♦ %♦ ■ r ■ ■ ■ Dute. r ♦♦ ,, Lrberh,sf Rochelle gf ■ ■ -:.ir: Lyon ''poi S -llanrl ■■ l It,:lu V. Park t ♦,. r F.1. - ■ P: ■ ood Ave`n 1 W Lakes C11 N;t 'tSt ♦� p neeS, BfvmsSt 31d PJe ■ . 1110o0burnRd Y FU lead St h o Hlllsid ♦+ a aNi Ward St rn Pai6 LinWo _� E Fai6. o. odAve a � 4 L Na lion �e S f Qo Av e u tJ�rth Caro lire EEnd Ave p Central UN onnSt rs0 a Creek ■ n o rn I `.gods R ■ Cecil St 3 rk ♦.�' ♦ 0 r • , ■ 1 u t `yam n � ` ■ ,e RP u �, Fi '9i ■ ` pk ♦ rc _ a n p ■ '` Elmira VP ` ark ltR 0 PSources: Esri, HERE,;Garmin, USGS,Intermap, INCREMENT NRCan,Esri Japan, METI, Esri China (Hong Kong),Esri Korea, Esri(Thailand).�NGCCC,(c)OpenStreetMa, ontributors,and the GIS User Community DRAFT CTP Amendment#3 8 CTP Highways -- Amendment #3 -- South Durham 20 ■ CTP Highways « ■ ■ ■■ Freeway,Recommended I Ili:,. ,� ♦ ♦ IN Freeway MIL,Needs Improvement ■ ■Freeway,Needs Improvement Freeway MIL,Existing Freeway,Existing ♦ , . ■■ Boulevard,Recommended _ ♦♦♦ , Boulevard,Needs Improvement ♦♦ — o Boulevard,Existing 7l Other Major Thoroughfare,Needs Improvement w♦ ♦�• ♦ 46 Other Major Thoroughfare,Existing ■ ■ - - —Minor Thoroughfare,Recommended , ♦ ♦ ■ ■ Minor Thoroughfare,Needs Improvement ♦♦ ♦•,� ♦*�#\�� ■ Minor Thoroughfare,Existing ` ♦ ♦ Pte< ♦ ■ Amendment#3 .�� Iw■ {ill : , ' ■ — Hope Valley ■ ♦�♦ Country ,� ♦♦ Club ♦♦ ♦ - ♦ ■ 1 ■ La lae shore -- _ ��♦ ♦ ■ Golf Course '♦ rhi ♦ ♦♦ C.lut •• ■ ■ ■■ ■ ■ ■ ■■ ■ 1 - �- ♦ ..,♦♦ ■ t � 1 ♦♦ 1 i r o� Durham_ - -— Chatham Sources: Esri, HERE,Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japan METI, Esri China ♦ (Hong Kong),Esri`Korea, Esri(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User Community DRAFT CTP Amendment#3 9 CTP Highways -- Amendment #3 -- East Durham 21 Technical Committee 2/24/2021 Item 7 CTP Highways 1 ■E O Freeway,Recommended �Freeway ML,Needs Improvement E-wim Freeway,Needs Improvement Freeway ML,Existing Freeway,Existing ■E O Boulevard,Recommended ♦ wimom Boulevard,Needs Improvement ♦♦ Boulevard,Existing ♦ mimom Other Major Thoroughfare,Needs Improvement mimom Other Major Thoroughfare,Existing ♦. — — •Minor Thoroughfare,Recommended —Minor Thoroughfare,Needs Improvement ♦, —Minor Thoroughfare,Existing I ,: ♦♦♦♦ Gees gt ■ ♦ \ Amendment#3 %1 ■ ■ ♦♦ Fen ♦♦ -. I Rse ♦♦ _ , Falls Lake 5 ♦♦ l ♦ l ■ ♦� ♦♦ Falls L`bke ®♦ : Falls Lake \\ Y ♦ Falls lake State • f1■ ♦ Rec ream.A ♦ ♦� ♦ EEn r ■ ■ ■ ■ �r r ♦ Fa It s V d bge - Golf Course ! ■ eev. G` 1 ♦ ■ pie � ■ It ?� \ 'o jll rl ■ ♦ Q 1 • ♦ • �♦ `16 • Sources: Esri, HERE,Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri ■ • Japan, METI,Esri China(Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) ■ ■ - - - - - - OpenStreetMap contributors,an d,the GIS User Community DRAFT CTP Amendment#3 10 CTP Highways -- Amendment #3 -- North Durham 22 Technical Committee 2/24/2021 Item 7 CTP Highways ENE, Freeway,Recommended ■ ■ ■ Freeway ML, Needs Improvement ougemont ■ ■ ■ Freeway,Needs Improvement Freeway ML, Existing Freeway,Existing ENE, Boulevard,Recommended - Boulevard,Needs Improvement - Boulevard,Existing - Other Major Thoroughfare,Needs Improvement ahama - Other Major Thoroughfare,Existing Minor Thoroughfare,Recommended Minor Thoroughfare,Needs Improvement Minor Thoroughfare,Existing Amendment#3 r 1 1 1 V.:L Springs Park � Country Club Sources: Esri, HERE,Gamin, WAS GS, Ifitermiap, INCREMENLT. ,NRCan,Esri „I Japan, ME;TI,'Esri Chiat(�g Kong), E'i Korea,�sri(Thailand), NGCC, (c) OpenStreetMap c+nt] butors,and the GIS User Community DRAFT CTP Amendment#3 11 CTP Highways -- Amendment #3 -- Orange County (South) 23 Technical Committee 2/24/2021 Item 7 01 ♦ 1 � � 1 Pa rk Carolina North Fb race'a`:dlmm Ani Forest f ♦ YAW I ■ Z ■ Q ■ 1 :1 III ■ CTP Highways Catrtbu ♦ i t Freeway,Recommended 1 Freeway ML,Needs Improvement Freeway,Needs Improvement Freeway ML,Existing Freeway,Existing ENE, Boulevard,Recommended - Boulevard,Needs Improvement I - Boulevard,Existing - Other Major Thoroughfare,Needs Improvement - Other Major Thoroughfare,Existing `ra I Minor Thoroughfare,Recommended o3maecu7°Y10 j Minor Thoroughfare,Needs Improvement n3 D,,, Minor Thoroughfare,Existing Sources: Esri, HERV Garmin, USGS, Intermap, INCREMENT-P�NRCan,Esri Japan, ME-TI, Esri China Amendment#3 (Hong Kong),Esri Korea, Esri(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User Community DRAFT CTP Amendment#3 12 CTP Highways -- Amendment #3 -- Orange County (N 0 rV al Committee 2/24/2021 Item 7 24 .4 borough _�-_L tT 1-r•-r.�Ll�ii y = ♦ �M�, •♦♦ # At1� f S♦ •'1, ♦ram ♦!�. • CTP Highways E m m Freeway,Recommended M Freeway ML,Needs Improvement M Freeway,Needs Improvement y ■ Freeway ML,Existing o` �Freeway,Existing H 1 ■��Boulevard,Recommended Boulevard,Needs Improvement Boulevard,Existing 00Pe Other Major Thoroughfare,Needs Improvement r Other Major Thoroughfare,Existing Minor Thoroughfare,Recommended Minor Thoroughfare,Needs Improvement Minor Thoroughfare,Existing •� ' r 2 1 Amendment#3 Sources: Esrl, HERE,l.ar win, USGS, Intermap, INCREMENT P,NRC,an;"Es"ri'Japan, METI, Esri China (Hong Kong),Esri Korea, Estrl(Thailand), NGCC,(c)OpenStreetMap contributors,and'the GIS User MPO Boundary Community ♦ r DRAFT CTP Amendment#3 13 CTP Highways -- Amendment #3 -- Chatham Countyechnical Committee 2/24/2021 Item 7 25 r -- - - - - - - "- - - - - - -., - - - 4 CTP Highways E m m Freeway,Recommended Freeway ML,Needs Improvement r_Freeway,Needs Improvement Freeway ML,Existing P, r_Freeway,Existing ■��Boulevard,Recommended Boulevard,Needs Improvement Boulevard,Existing ;P Mar th as� r_Other Major Thoroughfare,Needs Improvement Other Major Thoroughfare,Existing Minor Thoroughfare,Recommended �Minor Thoroughfare,Needs Improvement -,f,J ,y,3 Pre serveat Minor Thoroughfare,Existing Jordan Lake Golf Club Amendment#3 Sources: Esri, HERE,Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japan, METI, Esri China MPO Boundary (Hong Kong),Esri Korea, Esri(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User Community DRAFT CTP Amendment#3 14 26 Technical Committee 2/24/2021 Item 7 —Interchange and Grade Separations— The table on the next page identifies two interchanges to be added to the UP Interchange table. A map on the subsequent page shows the location of those interchanges, depicted as a bright green ball, 0 . These interchanges are being evaluated as alternatives in long- and mid- term plans. DRAFT CTP Amendment#3 15 27 Technical Committee 2/24/2021 Item 7 HIGHWAY -- INTERCHANGES AND GRADE SEPARATIONS ID Facility Type IStatus Juris Comments Interstates There are not any interstate interchange or grade separation projects. US Highways There are not any US Highway interchange or grade separation projects. NC Routes -- INC 147/Cole Mill Rd Extension Int Rec DurCity Connect US 15-501 Bypass and NC 147 to Cole Mill Rd NC 54/Southwest Durham Drive Int Re c DurCity Connect NC 54 and Southwest Durham Drive Secondary and Local Roads There are not any secondary or local road interchange or grade separation projects. DRAFT CTP Amendment#3 16 CTP Interchanges & Grade Separations -- Amendment #328 Technical Committee 2/24/2021 Item 7 S plant Avc O Interchange-ML, Recommended O We O Interchange-Intersection-ML, Needs Improvement W Club Blvd qe O fn 0 hrCan O Interchange-Intersection ML, Existing O Interchange-Intersection, Recommended N d o OL °ph Rd O Interchange-Intersection, Needs Improvement D O Interchange-Intersection, Existing z CP1 � 4 Pan. 4 aT O Grade Separation, Recommended GaNl,s gP R O Grade Separation, Needs Improvement y Duke Uni O Grade Separation, Existing `a'°h°ne4 my h .,"yRd WCh O Amendment#3 n Moreh L W Lak IY�or ayv e.� Pnnce Sr Bwhrl.StN °n 'VoOtlburn Rd x Ward St ��° a ca 1 ¢ o _ ; a Nation Ave° 4,ct+` + rc G° tFd I J Picket)Rd - I+ Rd \A0g1at�..__- -- c r �' Oak tt x _OVMa'n Rd ! ' Cortonwoy�,Dr kPC y� O 41. c°j/ieR Crete yO _ OniversitY u ° a d eete R ' - ¢. r• a4 ^ . o 3 o v o 0 ont Ra v 0 Q h o� Arnrne Rd m d'Py OM.'hd Luther King Jr pk,y' Archtlalepr Southern O l N Bountlanes DIY C<erk I 3 y°' ey�oltls qve W N o � Sup °a Rd o °eOr I - 9 S < ho .ar r FbU'.'alkv aF e�°a � 0 4 F `9'Ra surcwn Sot rC� 't` n °over �a ° Old Durham Rd ° Rd 0 o O Old Chapel Ndl Rd w ° On-' Th= p sh„F=�� Swarthmore Rd Eestgab Ephesus Church Rd �o e` 0 Wlllgy0 z Dr C, I A 5�°Y. or �a ° ^ o o Z r � Cleland Dr i° ate ° 1-1 Lancasterp � 0, Ht�h4 n 0 a 8 °s L rh�,.c^I Hill on ChaP�Hd\FW>y -,,li 3 Pire t' Nds c G o Or JClute - 3 W-d Park m ' ¢ W indcrest R On a Or 'ye/sort Chapel l/lll Mwy ° a a Sources: Esri, HERE,Garmin?1USGS, Intermap;_I,NeREMENT P,NRCan,Esri Japan, METI,Esri Ch '(Hong Kong), Esr or@aEsri(Thailand), NGCC,(c) tribut � D b OpenStreetMap conors';�and the GIS User Community-; DRAFT CTP Amendment#3 17 29 Technical Committee 2/24/2021 Item 7 —Sidepaths (Complete Streets)— The North Carolina Department of Transportation (NCDOT) published Complete Streets implementation guidelines that support sidepaths along major roadways. The table on the following page identifies highway segments with a "needs improvement" or "recommended" (i.e., new roadway) status that are to include a bicycle/pedestrian sidepath as an integral part of the construction and budget. The DCHC MPO has already identified many of these highway segments for sidepaths in Amendment#2 to the Metropolitan Transportation Plan (MTP), which was adopted in November 2019. The DCHC MPO has also identified other sidepaths that would connect to this network but these additional sidepaths are identified in the multiuse paths (MUP) table of CTP Amendment #3 because they are to be built along highways that are not designated for improvements. Note that a sidepath and multiuse path (MUP) are the same type of facility. For the sake of clarity, the CTP distinguishes a sidepath as part of a highway improvement project, and a MUP as a stand-alone bicycle/pedestrian project that in some cases might be constructed along a roadway that is not being improved. Following the sidepath table, a series of maps that cover the DCHC MPO planning area show, using a bright purple shadow, �, which highways and interchanges are to have a sidepath. In addition to the table and maps, Amendment#3 will also reference the North Carolina Complete Streets policy and guidelines to ensure that the public understands that the DCHC MPO plans to enforce Complete Streets. DRAFT CTP Amendment#3 18 30 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N w E ID Facility TO (mi) J M, 1 CTP Class a Interstates -- Sidepaths There are no sidepaths on interstates in Amendment#3 U.S. HI hwa s -- Sidepaths CHAT0101-US 15-501 Manns Chapel Rd. MPO Boundary Chat 3.8 4 NI 4F Blvd Full CHAT0101-US 15-501 Smith Level Rd Manns Chapel Rd Chat 1.1 4 NI 4F Blvd Full U-5304 D US 15-501(Fordham Blvd) E Franklin St. Raleigh Rd. (NC 54) CH 2.1 4 NI 6F Blvd Full U-5304 F US 15-501(Fordham Blvd) E Franklin St. 1-40 CH 1.6 4 NI 4G Blvd Full US 15-501 BUS(Durham DURH0003 Chapel Hill Blvd) Academy Rd US 15-501 DurCity 1.2 4 NI 4D Blvd None US 15-501 BUS(Durham DURH0003 Chapel Hill Blvd) Academy Rd Chapel Hill Rd DurCity 0.4 4 NI 4D Blvd None US 15-501 BUS(Durham DURH0003 Chapel Hill Blvd) Chapel Hill Rd University Dr DurCity 0.8 4 NI 4D Blvd None US 15-501/NC 54 U-5304 B (Fordham Blvd) Manning Dr. US 15-501 CH 1.2 4 NI 6F Blvd Full US 15-501/NC 54 U-5304 B (Fordham Blvd) Manning Dr. Raleigh Rd. (NC 54) CH 0.9 4 NI 6F Blvd Full DURH0005 US 501(Duke St) Stadium Dr 1-85 DurCity 0.9 5 NI 4GSS Blvd Min DURH0005 US 501(Duke St) W Carver St Stadium Dr DurCity 0.5 5 NI 4GSS Blvd Min DURH0005 US 501(Duke St) N Roxboro St W Carver St DurCity 1.1 5 NI 4GSS Blvd Min MTP-92 US 501(Roxboro Rd) N Duke St Infinity Rd DurCity 1.6 5 NI 4GSS Blvd Min MTP-92 US 501(Roxboro Rd) Infinity Rd Milton Rd DurCity 0.6 5 NI 4GSS Blvd Min MTP-92 US 501(Roxboro Rd) Milton Rd Sandlewood Dr DurCity 1.2 4 NI 4GSS Blvd Min US 501 BUS(Roxboro St- DURH0006 North) Old Oxford Rd E Club Blvd DurCity 1.1 4 NI 4G Blvd None -- US 70 Efland Cedar Grove Rd MPO Boundary OR 2.6 2 NI 3C Maj None -- US 70 Efland Cedar Grove Rd 1-85/US 70 Connector OR 1.4 2 NI 2A Maj None DRAFT CTP Amendment#3 19 31 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N a) E ID Facility From To (mi) J � 6 N CTP Class a ORAN0101 US 70 1-85/US 70 Connector West Hill Ave N OR 1.1 2 NI 4G Blvd Min ORAN0101 US 70 N Churton St West Hill Ave N OR, Hboro 1.6 2 NI 4G Blvd Min ORAN0101 US 70 N Churton St US 70A OR, Hboro 3.8 2 NI 4G Blvd Min ORAN0102 US 70 Mt Hermon Church Rd US 70A OR 2.1 2 NI 4A Blvd Min -- US 70/US 70 BUS NC 751 Groucho Rd OR 1.0 2 NI 2A Maj None NC Routes -- Sidepaths R-5821 NC 54 Old Fayetteville Rd MPO Boundary OR,Carr 2.6 2 NI 2A Maj Min -- NC 54 W Main St Jones Ferry Rd Carr ? 4 Ex ADQ Blvd None -- NC 54 Old Fayetteville Rd W Main St Carr ? 4 Ex ADQ Blvd None U-5774 B NC 54 Fordham Blvd Burning Tree Dr CH 0.5 6 NI 6E Blvd Full U-5774 B NC 54 Burning Tree Dr Friday Center Dr CH 0.5 6 NI 6E Blvd Full U-5774 C NC 54 1-40 Friday Center Dr DurCity, Dur,1 1.8 4 NI 6ESS Blvd Full U-5774 G NC 54 1-40 NC 751 DurCity 1.2 2 NI 4D Blvd Full U-5774 H NC 54 NC 751 Rollingwood DurCity 1.4 2 NI 4D Blvd Full U-5774 I NC 54 Barbee Road Fayetteville Rd DurCity 1.0 2 NI 4D Blvd Full U-5774 J NC 54 Barbee Road NC 55 DurCity 1.3 2 NI 4D Blvd Full -- NC 54 S Alston Ave NC 55 DurCity 0.4 4 Ex ADQ Maj UAD -- NC 54 Davis Dr S Alston Ave DurCity, Dur 1.7 5 Ex ADQ Maj UAD -- NC 54 Davis Dr S Miami Blvd DurCity, Dur 0.9 4 Ex ADQ Blvd None -- NC 54(Miami Blvd -South) Hopson Rd. Slater Rd DurCity 0.4 4 Ex ADQ Maj UAD -- NC 54(Miami Blvd-South) Wake County Line Page Rd DurCity 0.7 4 Ex ADQ Maj UAD -- NC 55(Avondale Dr) 1-85 N Roxboro St DurCity 0.3 4 Ex ADQ Maj None CHAT0102-NC 751 Marthas Chapel Rd O'Kelly Chapel Rd Chat 5.4 2 NI 4E Blvd Min MTP-77.3 NC 751 Fayetteville Rd O'Kelly Chapel Rd DurCity, Dur 0.7 2 NI 4D Blvd None MTP-77.3 NC 751 Fayetteville Rd Stagecoach Rd DurCity, Dur 1.0 2 NI 4D Blvd None MTP-77.3 NC 751 Renaissance Pkwy Stagecoach Rd DurCity, Dur 0.9 2 NI 4D Blvd None MTP-77.2 NC 751 Southpoint Autopark Blvd INC 54 DurCity 0.8 2 NI 4D Blvd None DRAFT CTP Amendment#3 20 32 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N a) E ID Facility To (mi) J �, 6 N CTP Class t ORAN0104 NC 86 1-85 OLD NC 10 OR, Hboro 0.3 2 NI 4D Blvd Min ORAN0104 NC 86 1-85 US 70A Hboro 0.6 2 NI 4D Blvd Min ORAN0105 NC 86 N NC 57 Cornelius St OR, Hboro 0.3 2 NI 4D Maj Min -- NC 86 N Coleman Loop(N) NC 57 OR 2.9 2 Ex ADQ Maj None DURH0014 NC 98(Holloway St) US 70 E N Miami Blvd DurCity 0.4 4 NI 4G Blvd Ref DURH0014 NC 98(Holloway St) Junction Rd US 70 E DurCity 0.3 5 NI 4G Blvd Ref DURH0014 NC 98(Holloway St) Junction Rd Lynn Rd Ext DurCity 0.8 4 NI 4G Blvd Min DURH0014 NC 98(Holloway St) Lynn Rd Ext S Mineral Springs Rd DurCity, Dur 1.3 4 NI 4G Blvd Min DURH0014 NC 98(Wake Forest Hwy) Nichols Farm Rd S Mineral Springs Rd DurCity, Dur 0.5 4 NI 4G Blvd Min MTP-81.1 NC 98(Wake Forest Hwy) Wake County Line Nichols Farm Rd DurCity, Dur 6.0 2 NI 4D Blvd Min Secondary and local Roads --sidepaths CHAT0103-Andrews Store Rd. Manns Chapel Rd. US 15-501 Chat 3.3 2 NI 2B Min None DURH0018 Angier Ave Extension US 70 Northern Durham Parkway Dur 0.8 0 Rec 2E Min None U-5845 Churton St(South) 1-85 US 70A Hboro 1.0 2 NI 4D Blvd Min -- Cole Mill Rd Hillsborough Rd 1-85 N DurCity 0.2 6 Ex ADQ Maj None DURH0030 Cole Mill Rd 1-85 N Rose Of Sharon Rd DurCity 1.2 4 NI 4D Blvd None DURH0030 Cole Mill Rd Rose Of Sharon Rd Sparger Rd DurCity 1.3 2 NI 4D Blvd None Danziger Dr Ext bridge (I- DURH0033 40) Mt Moriah Rd E Lakeview Dr DurCity,CH 0.4 0 Rec 3C Min None ORAN0107 Erwin Rd. Sage Rd Dry Creek Rd CH,OR ? 2 NI 2E Min Min ORAN0107 Erwin Rd. Dry Creek Rd Whitfield Rd CH,OR ? 2 NI 2E Min Min MTP-17.1 Estes Dr Ext Railroad Crossing Seawell School Road CH,Carr ? 2 NI 2E Min Min MTP-17 Estes Dr Ext MLK Jr Blvd Seawell School Road CH 0.8 2 NI 4G Min Min DURH0039 Farrington Rd Old Chapel Hill Rd 1-40 DurCity 0.8 2 NI 4D Blvd None MTP-22.1 Fayetteville Rd NC 751 Scott King Rd DurCity, Dur 0.1 2 NI 4G Blvd None MTP-22.1 Fayetteville Rd Renaissance Pkwy Scott King Rd DurCity, Dur 1.8 2 NI 4G Blvd None MTP-24.11 Garrett Rd NC 751 Old Chapel Hill Rd DurCity 2.1 2 NI 4D Blvd None DURH0040 Garrett Rd Durham Chapel Hill B Old Chapel Hill Rd DurCity 1.0 2 NI 4D Blvd None DURH0041 Glover Rd Extension US 70 Angier Av DurCity 0.6 0 Rec 2E Min None DRAFT CTP Amendment#3 21 33 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N a) E Facility From To (mi) J N CTP Class a DURH0043 Hebron Rd Extension Hebron Rd N Roxboro/Wellington Dr DurCity 0.5 0 Rec 2E Min None DURH0044 Hillandale Rd 1-85 W Club Blvd DurCity 0.7 2 NI 4G Blvd None MTP-36 Homestead Rd Rogers Rd Old NC 86 OR,Carr 2.1 2 NI 2E Min Min MTP-35 Homestead Rd MLK Jr Blvd Rogers Rd CH,Carr 1.3 2 NI 2E Min Min DURM023Z Hopson Rd. Triangle Expressway Louis Stephens Dr DurCity, Dur 0.9 2 NI 4D Blvd None MTP-202 Hopson Rd. S Miami Blvd Triangle Expressway DurCity 0.9 2 NI 4D Blvd None MTP-53 Leesville Rd realignment US 70 Leesville Rd Dur 0.8 0 Rec 2A Min None DURH0049 Lynn Rd Extension Lynn Rd US 70 DurCity, Dur 1.1 0 Rec 2J Blvd None ORAN0114 Marriot Way Friday Center Dr Marriot Way Extension CH 0.1 2 NI 2E Min None ORAN0114 Marriot Way Extension Marriot Way Barbee Chapel Rd CH 0.1 0 Rec 2E Min None MTP-242 Mt.Carmel Church Rd Bennett Rd US 15-501 CH 0.4 2 NI 4G Min None New Hope Commons Dr ORAN0118 Ext New Hope Commons Dr Eastowne Dr DurCity,CH 0.4 0 Rec 3C Min None U-4721 AB Northern Durham Parkway US 70 Flat River Dr DurCity, Dur 2.0 0 Rec 4G Blvd Full U-4721 AB Northern Durham Parkway Flat River Dr Sherron Rd DurCity 0.7 2 NI 4G Blvd Full U-4721 AB Northern Durham Parkway Sherron Rd S Mineral Springs Rd DurCity, Dur 1.4 0 Rec 4G Blvd Full U-4721 AB Northern Durham Parkway S Mineral Springs Rd NC 98 DurCity, Dur 0.1 4 NI 4G Blvd Full U-4721 AC Northern Durham Parkway NC 98 N Mineral Springs Rd DurCity, Dur 0.4 4 NI 4G Blvd Full U-4721 AC Northern Durham Parkway N Mineral Springs Rd Glenn School Rd DurCity, Dur 3.2 0 Rec 4G Blvd Full U-4721 AC Northern Durham Parkway Glenn School Rd 1-85 DurCity, Dur 0.2 4 NI 4G Blvd Full U-4721 B Northern Durham Parkway 1-85 North Glenn Rd DurCity, Dur 0.4 4 NI 4G Blvd None U-4721 B Northern Durham Parkway Glenn Rd Old Oxford Rd DurCity, Dur 2.2 0 Rec 4G Blvd None DRAFT CTP Amendment#3 22 34 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N a) E ID FacilityI j FA F To (mi) J N CTP Class a ORAN0119 Old NC 86 Eubanks Rd 1-40 OR 5.0 2 NI 2A Min Min U-5845 Old NC 86 1-40 1-85 Hboro 1.5 2 NI 4D Blvd Min -- Orange Grove Rd Oakdale Dr Dimmocks Mill Rd OR 1.8 2 Ex ADQ Min None -- Orange Grove Rd Oakdale Dr S Churton St OR, Hboro 1.5 2 Ex ADQ Min None US 7-013us New collector U-5848 Orange Grove Connector Orange Grove Rd street OR, Hboro 0.4 0 Rec 4G Blvd Min MTP-94 Roxboro St Ext(South) S Roxboro E Cornwallis Rd DurCity 1.2 0 Rec 4D Blvd None DURH0066 Sherron Rd. Stallings Rd S Mineral Springs Rd DurCity, Dur 3.1 2 NI 4D Blvd None MTP-230 SW Durham Dr NC 54 George King Rd DurCity, Dur 0.4 0 Rec 2J Blvd None MTP-230 SW Durham Dr George King Rd Ephesus Church Rd DurCity, Dur 1.1 2 NI 2J Blvd None MTP-230 SW Durham Dr Ephesus Church Rd 1-40 DurCity, Dur 0.4 0 Rec 2J Blvd None MTP-104 SW Durham Dr Old Chapel Hill Rd. US 15-501 DurCity 1.0 4 NI 4D Blvd None MTP- 106.1 SW Durham Dr US 15-501 Mt. Moriah Rd DurCity 0.4 0 Rec 4D Blvd None U-5823 Woodcroft Pkwy Extension NC 751 Garrett Rd DurCity 1 0.2 1 0 Rec 2J 1 Blvd 1 Min Under Consideration -- sidepaths US 501 BUS (Roxboro St- -- North) 1-85 E Club Blvd DurCity 0.3 5 Ex ADQ Maj UAD U-5774 H NC 54 Fayetteville Rd Rollingwood DurCity 0.3 4 Ex ADQ Maj None MTP-77.2 NC 751 1-40 Renaissance Pkwy DurCity 0.2 6 Ex ADQ Maj Min MTP-77.2 NC 751 1-40 Southpoint Autopark Blvd DurCity 0.2 4 Ex ADQ Blvd None -- Danziger Dr Mt Moriah Rd Danziger Dr end DurCity 0.4 3 Ex ADQ Min None DURH0035 Ellis-Glover Connector Ellis Rd Glover Dur 1.3 0 Rec 2E Min None TE-5205 Erwin Rd Cameron Blvd Lasalle St DurCity 0.8 4 NI 4D Blvd None TE-5205 Erwin Rd Fulton St Lasalle St DurCity 0.5 5 NI 4D Blvd None TE-5205 Erwin Rd. Anderson St Fulton St DurCity 0.4 4 NI 4D Blvd None MTP-17.1 Estes Dr Ext N Greensboro St Railroad crossing CH,Carr ? 2 NI 2E Min Min -- Fayetteville Rd NC 54 Renaissance Pkwy DurCity 0.7 4 Ex ADQ Blvd None -- Fayetteville Rd Woodcroft Pkwy NC 54 DurCity 1.0 4 Ex ADQ Blvd None DRAFT CTP Amendment#3 23 35 Technical Committee 2/24/2021 Item 7 Highway -- Sidepaths Segment c o Dist. N a) E ID Facility To (MI) M �, 6 N CTP Class t MTP-23 Fayetteville Rd Barbee Road Woodcroft Pkwy DurCity 1.4 2 NI 4D Blvd Min MTP-23 Fayetteville Rd Barbee Road MILK Parkway DurCity 0.3 3 NI 4D Blvd Min MTP-23 Fayetteville Rd Riddle Rd MILK Parkway DurCity 0.7 2 NI 4D Blvd Min -- Garrett Rd NC 54 NC 751 DurCity 0.1 5 Ex ADQ Maj None -- Hebron Rd. Danube Ln Denfield St DurCity 0.4 2 Ex ADQ Min None -- Hebron Rd. Danube Ln Old Oxford Rd DurCity 1.1 2 Ex ADQ Min None -- Hopson Rd. Louis Stephens Dr NC 55 DurCity, Dur 0.5 4 Ex ADQ Blvd None -- New Hope Commons Dr Mt Moriah Rd New Hope Commons Ext DurCity 0.3 3 Ex ADQ Min None -- New Hope Commons Dr Mt Moriah Rd New Hope Commons end DurCity 0.1 2 Ex ADQ Min None New Hope Commons Dr DURH0054 extension (North) New Hope Commons Dr Third Crossing Rd DurCity 0.1 0 Rec 3B Min None ORAN0119 Old NC 86 Dairyland Rd Eubanks Rd OR 1.7 2 NI 2A Min Min -- Sherron Rd S Mineral Springs Rd US 70 Dur 1 0.2 1 5 Ex ADQ I Mai I UAD DRAFT CTP Amendment#3 24 36 Technical Committee 2/24/2021 Item 7 HIGHWAY -- INTERCHANGES AND GRADE SEPARATIONS -- SIDEPATHS ID Facility Type Status Juris Comments Interstates There are no interstate interchange or grade separation Sidepath amendments. US Highways U-5304A US 15-501/NC 54/Columbia St Interchange Int NI CH Proposed interchange upgrade U-5304E US 15-501/Manning Dr Int NI CH 2O16-2017 feasibility study U-5774A US 15-501/NC 54 Interchange upgrade Int NI CH Proposed Interchange; U-5774A is same project U-5717 US 15-501/Garrett Rd interchange Int Rec DurCity Interchange-see adopted corridor plan U-5720 US 70/Miami Blvd interchange Int Rec DurCity, Dur New interchange to accommodate US 70 freeway NC Routes There are no NC route interchange or grade separation Sidepath amendments. Secondary and Local Roads There are no secondary or local road interchange or grade separation Sidepath amendments. DRAFT CTP Amendment#3 25 CTP Sidepaths -- Amendment #3 -- Central Durham 37 Technical Committee 2/24/2021 Item 7 '.♦� Pb k G u�i ♦♦♦ V edlocd� L_ Parr. ♦♦ • Glendale Sidepath-Interchange Heights Part. dian TO E Harnmor''t sl w Idi a • ♦ ■ SpruntAve E IerbeeSl ; �Sidepath-Highway v ■ • y LL MPO Boundary •- >rJ a it"gyp a '-- - ■ G.,F ♦ .r ■♦ , o E"91MOot Ave ■ ♦ �♦ WKnox St R:,1. v C;reen St ' ♦♦ Pv e m G • ♦• Je ■ V Markham Ave w ♦ r' V(Dinity Ave A O kr,�m �y'P� Ddinery Ave �l ♦♦ ■ 4 Park / y ♦ ♦♦ I T Sarah Ot oWsy.v_ PDuke ,v eW Gardens p • • ■ '4 Rac Cha CamPdsDr 5 LL • m aer • Z y° Juniper St N ra o • a♦ v 0 < ■ ■ v Dulw O rk A m ■ ■ IJ ni ly � U a St r a ■ o-.tope.ux�d acson5i ��. oot 2 n ■■ rl r: a4 ■ E. ■ Ross Rd ■ ehead Ave Jf ■ ■ m ■ ■ Gue..- ♦- ,.1. Rochelle St ■ ■ ■ ■ ll nr,e i:n'' Lyon c �`, - ■ ■ :,o III'.it• Park aai t • ■ ■ ood Ave rn • ■ W Laket+ Chest lst ♦ ■ P rice St BivinsStN atdP O wao ■ hoo x y EU lead St daun Rd r o y H,1 Iside Ash C St Ward St rest rn Park Lihyvo F Hills od Av Park e opy� r♦ o �/a lion S t Ave B ♦ • u wrlhCaroliro ♦ E End PVe O p Central _ U Umv ft, h ♦ ♦♦ f Ne on St 'O c. Creel Cecil St " ♦ Obod- � ♦, 3 in ♦ , Pa rk� ^c`5� R m N f' ♦♦♦ o ,r�lc Sa FraG4�b �■ %0 a `� Elmira kP ■ ♦ ,� Park Campus ■ \ v•, Sources: Esri, HERE,HGarmin, USGS,Intermap, INCREME-NT P,NRCan,Esri Ja 11 pat METI, Esri China All, (Hong Kong),Esri Korea, Esri(Thailand:), N,GCC,(c)OpenStre�etM ap contributors\,and the GIS User Community ■ \ DRAFT CTP Amendment#3 26 CTP Sidepaths -- Amendment #3 -- South Durham 38 Technical Committee 2/24/2021 Item 7 ■ ■ Duke ■ unr�srsity • • Go IF C I u b AIIP ■. I ■ � • ieh � � � — Hope Vall • . Country 1 ■ ■ ' • r ��♦. ♦ - - - - - - - � - a � I N ♦ Sidepath-Interchange •. Side path-Highway - Cna;ham Sources: Esri, HERE,Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japan,METI, Esri China MPO Boundary (Honig Kong),Esri Korea, Esri(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User ♦ Community 1 DRAFT CTP Amendment#3 27 CTP Sidepaths -- Amendment #3 -- East Durham 39 100 ._r3 rP;iLr —Wea�et pld I I ! r Y .• t ♦ �♦r Gr 1 1 ♦ Fall 1 Falls Lake t t ■ ■ '� Falls ke ■ Falls Lake \ \ ♦� ♦♦ — Falls Lake Stale ♦1 Rec real.n.Area O . ■ � Lilo. ■ ■ it _ ■ ■ ♦ ♦. I — I O � 1 ♦ 1 �a 1 o ■ ♦ o Q � 1 ■ ♦ �. Sidepath-Interchange 1 yoo` Sidepath-Highway 1 � ♦ 1 Sources.,Esri, HERE,Garmin, US — —— — _ - % Japan, METI,Esri China(Hong Ko MPO Boundary ♦ i- - OpenStreetMap contributors?l'and t DRAFT CTP Amendment#3 28 CTP Sidepaths -- Amendment #3 -- North Durham 40 Sidepath-Interchange Sidepath-Highway MPO Boundary ahar»� rr� I y�y -RU n r Em Ri e Ciry Park I O :aLr rnnyz 1'n4 �Sv O ♦ s-W ,r ��♦ O • 0 ♦♦ • ♦ **■• one Cl Sources: Esri, 'ERE, t armin, US'GS Intermap, INCREMENT P,NRCan,Esri �. J spa},wMET�sri Chin, (Hong�Kongi), Esri Korea, Es�(Thailand), N'GCC, (c) OpenStreetMap contributors,and the�GlS User'Comrnunity DRAFT CTP Amendment#3 29 CTP Sidepaths -- Amendment #3 -- Orange County (South) 41 Technical Committee 2/24/2021 Item 7 arnnrA4 • inns Rd ■ r + O + ♦ r 5 n n 3' O M ith '` • _�- cer • Pa rk • Carolina • North 1-brace r • Forest • • ■ I ■ arrbor l I I ! r eensboro Rd 1 nley I Golf I reensboro Rd Course I O � I 1 I I as ! Nr Sidepath-Interchange OameucUy I o`a. e � C` Sidepath-Highway Sources- Esri, HERE,Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japan, METI, Esri China MPO Boundary - - _ _ _ _(Hong Kong),Es6i Korea, Esri(Thailand), NGCC,(c)OpenStreetMap.cont'ributorS,nd-the GIS User - Communit) -- --- -- - DRAFT CTP Amendment#3 30 CTP Sidepaths -- Amendment #3 -- Orange County (�North� 42 Tec nical Commit ee 2/24/2021 Item 7 �t lo y� 1 1 0 Eno 1=.i,.:i ` \ _ Slate P-I borough ■ • ♦■ teOro • _ _`�yl� ♦ fit-,* ♦ ♦ �°tea M o-a � W o° Sidepath-Interchange J- 7 Sidepath-Highway Sources: Esri, HERE�Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japarn14M'1TI, Esri China MPO Boundary (Hong Kong),Esri Korea Etji(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User Community DRAFT CTP Amendment#3 31 CTP Sidepaths -- Amendment #3 -- Chatham County 43 Technical"Committee 2/24/2021 Item 7 C ha Vub '.;tpet, Governors C lu b o` b� r v. y3���ls C han Mar th as Gh Sidepath-Interchange Reserve at Jordan Lalw (CIuL - Sidepath-Highway Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P,NRCan,Esri Japan, METI, Esri China MPO Boundary (Hong Kong),Esri Korea, Esri(Thailand), NGCC,(c)OpenStreetMap contributors,and the GIS User Community DRAFT CTP Amendment#3 32 44 Technical Committee 2/24/2021 Item 7 —Rail, Fixed Guideway and Bus Rapid Transit— The table and map on the next two pages identify high capacity transit and bus rapid transit (BRT) that are to be added to the CTP. The reasons for adding these project include: • Suspended Light Rail Transit—The suspended Durham-Orange Light Rail Transit plan left several major travel corridors without a plan to provide sufficient transit service. In place of the proposed D-0 LRT, high capacity transit facilities will be implemented along the former D-0 LRT corridor to connect Durham and Chapel Hill. These facilities, which the DCHC MPO added to the 2045 MTP via Amendment#2 in November 2019, will likely use differing combinations of BRT facilities such as dedicated bus lanes, enhanced bus stations, signal preemption and separate bus-only ramps at interchanges. • Extended High Capacity Transit— High capacity transit services have been extended from the Chapel Hill North-South BRT to Hillsborough, Pittsboro, and Carrboro. DRAFT CTP Amendment#3 33 45 Technical Committee 2/24/2021 Item 7 RAIL, FIXED GUIDEWAY AND BUS RAPID TRANSIT Speed Existing System Proposed System Agency Limit Dist. Trains I ROW Trains per Other Local ID Facility/ Route Section (From -To) (Operator) Class (mph) (mi) Type I ROW (ft) per day Type (ft) day Modes CHT BRT 15501 [US 15 501 (`h-Athal'n P`O Rty Park aR d Rode e Fixed Guideway Hi-CA QRAN0101_R MaSGR Fa m Rdl '-IS- 15-501 to Mt Me ah Rd Durhan3 GT 354-5 4" — — — lRus Rapid Transit) — Y — Fixed Guideway High CHT BRT US 15-501 Mason Farm Rd to 1-40 CHT -- 35-45 4.8 -- -- -- (Bus Rapid Transit) -- Frequency -- CHT BRT (North-South extension to Chatham Southern Village to Chatham Fixed Guideway High County) County park-and-ride CHT -- 35-45 2.6 -- -- -- (Bus Rapid Transit) -- Frequency -- UNC Hospital on Mason Farm Rd, D_0 I RT NCRA Preferred Chapel Hill (Orange Co)to NCCU- Fixed Guideway Alternative Bus Rapid Durham Tech on Alston Ave, avg (Light Rail Transit) approx High TE-5205 Transit Durham (Durham County) -- -- 20-35 17.9 -- -- -- (Bus Rapid Transit) 28-62 Frequency M BRT (via US 15-501, US 15- Fixed Guideway High 501 Bypass, and NC 147) 1-40/US 15-501 to NCCU -- -- 45-55 10.2 -- -- -- (Bus Rapid Transit) -- Frequency -- Fixed Guideway High Capacity Transit (High Capacity High (CH/Hillsborough) Chapel Hill-Hillsborough CHT -- 35-45 8.6 -- -- -- Transit) -- Frequency -- Fixed Guideway High Capacity Transit (High Capacity High (CH/Pittsboro) Chapel Hill-Pittsboro CHT -- 35-45 4.3 -- -- -- Transit) -- Frequency -- Bus Rapid Transit (downtown Durham to RTP Fixed Guideway High -via NC 147 and 1-40) Downtown Durham to RTP -- -- 55-65 10.0 -- -- -- (Bus Rapid Transit) -- Frequency -- DRAFT CTP Amendment#3 34 DCHC MPO Comprehensive Transportation Plan (CTP) 46 Amendment #3 -- Fixed Guideway (including BRT) Technical Committee 2/24/2021 Item 7 Hillsborough '�f'J (°Jraad 0.° d,Ra :u1? � I o 4111 H Hebron Rd b 4�? i a a�wo o II I 9d a I, o Goay. od qa �� Carver St � 4os' Uea ryy� ECIoy Blv �orte�P CheekO °s rnRW Club \v-. c m-rrt y Jf II G rham c°or iea / o � se m II ( q e_ �8i W+k�F°rwtlN+Y'- •;lnifSeld Pa o ELa n5, qR o't R d. va?r i. 9 Twm ' Creeks 1` � aov°r pJ.yR y ` c `or Rd b d e Park \• f ism m �j 1. R'ddle s ad l U ! 'S Camll, AJ" �ej fir" o iQ Nen11Tr ?rt N Est. - ° QJ g�'°4 °o'oo Fo�. �A 'ty �ycG �90 vr� /N/n/l// jlj noQeo °a T hWAt—nd Dr'u we 4 Chapel-Hill C1'rb ' o Co Creek Country Oldor creenzao<oaa t o t,�as rF r o° Int'I A,rp.,t Fixed Guideway Z �7 z y Amendment #3 Sources: Esri, HERE,Garmin, USGS, Intermap ll (Hong Kong),Esri Korea, Esri(Thailand), NGC DCHC MPO Boundary y Community DRAFT CTP Amendment#3 35 47 Technical Committee 2/24/2021 Item 7 —Public Transportation (Operational Strategies)— The table and map on the next two pages identify transit emphasis corridor projects that are to be added to the CTP. A City of Durham transit plan has identified the need for three transit emphasis corridors. These improvements make it easier for the riders to get to bus stops, make them more comfortable and secure waiting for the bus, and help increase the bus speed. The facilities might include sidewalks, crosswalks, curb ramps, pavement markings, shelters, and benches, and service, and systems such as prioritized traffic signals. The map of GoDurham Transit Emphasis Corridors is not yet available in the CTP map format. Meanwhile, a City of Durham map is available at the bottom of this Webpage: https://durhamnc.gov/4372/GoDurham-Better-Bus-Protect DRAFT CTP Amendment#3 36 48 Technical Committee 2/24/2021 Item 7 PUBLIC TRANSPORTATION (Operational Strategies) Existing System Proposed System AM Peak Off Peak Dist. Headway Headway Other Local ID Facility/ Route Section (From -To) Agency (mi) Type Headway (min.) (min.) Type Headway Modes Fayetteville Street--Transit Fayetteville Street Corridor Fixed Operational -- Emphasis Corridor (Route 5) GoDurham -- route 15 15 30 Strategies Regular -- Holloway Street--Transit Holloway Street Corridor and Fixed Operational -- Emphasis Corridor Village Transit Center(Route 3) GoDurham -- route 15 15 30 Strategies Regular -- Chapel Hill Street--Transit Chapel Hill Street Corridor (Route Fixed Operational -- Emphasis Corridor 6) GoDurham -- route 15 15 30 Strategies Regular -- DRAFT CTP Amendment#3 37 49 Technical Committee 2/24/2021 Item 7 —Bicycle and Pedestrian— Several jurisdictions have updated their local bicycle and pedestrian plans and want to reflect those changes in the CTP. The table on the next page shows the proposed changes to the CTP Bicycle table. The CTP Bicycle and Pedestrian map that depicts these bicycle changes is in development and will not be posted for the February 24, 2021 Technical Committee meeting. DRAFT CTP Amendment#3 38 50 Proposed Bicycle-Pedestrian-Multiuse Changes - DCHC MPS GTP°mmittee2/24/2021 Item BICYCLE Dist. (mile) Local ID Facility/ Route Section (From -To) 1WStatus DescriptionA&J Jurisdiction DURH0372-B W Chapel Hill St Pettigrew St to Morgan St Needs Improvement Sharrow 0.5 DurCity (modify) W Chapel Hill St [Ramseur St(LOOP)]to Morgan St Needs Improvement Sharrow 0.2 DurCity (add) W Chapel Hill St William Vickers Av to Ramseur St(Loop) Needs Improvement Protected bicycle lane 0.3 DurCity DURH0016-B Avondale Dr N Roxboro St to E Geer St Needs Improvement Bicycle Lane 1.1 DurCity (modify) Avondale Dr N Roxboro St to [Belt Line Trail] Needs Improvement Bicycle Lane 0.8 DurCity (delete) Trail behind shopping center on Avondale (add) Avondale Dr/Alston Ave Beltline Trail to Bryant Bridge Trail Needs Improvement MUP 0.7 DurCity DURH0005-B Alston Ave Extension Alston Ave to Old Oxford/N Roxboro St Recommended Bicycle Lane on roadway 3.4 DurCity (delete) extension U-3308, S Alston Ave E Geer St to Wake County Line Needs Improvement Bicycle Lane 10.1 DurCity, Dur DURH0304-B (delete) (add) N Alston Ave E Geer St to US 70 Bus(Holloway St) Needs Improvement Bicycle Lane 0.6 DurCity, Dur (add) N Alston Ave US 70 Bus(Holloway St)to E Main St Existing Bicycle Lane 0.5 DurCity, Dur U-3308, S Alston Ave E Main St to Wake County Line Needs Improvement Bicycle Lane 10.1 DurCity, Dur DURH0304-B (add) (modify these four entries to"protected bike, possible MUP") DURH0388-B W Ramseur St Chapel Hill St to Roxboro St Needs Improvement Bicycle Lane 0.6 DurCity DURH0385-B W Morgan St Cleveland St to Morris St Needs Improvement Bicycle Lane 0.4 DurCity DURH0386-B W Morgan St Morris St to Main St Needs Improvement Bicycle Lane 0.5 DurCity DURH0247-B N Great Jones St W Morgan St to W Chapel Hill St Needs Improvement Bicycle Lane 0.1 DurCity DURH0254-B N Roxboro St E Main Street to Monk Rd Needs Improvement Bicycle Lane 4.9 DurCity (modify) N Roxboro St [US 70 Bus(Holloway St)]to Monk Rd Needs Improvement Bicycle Lane ? DurCity (add) N Roxboro St W Ramseur St to US 70 Bus (Holloway St) Needs Improvement Protected bicycle lane, ? DurCity possbile MUP Note: All bicycle segments are on road. Appendix C -Amendment# 3 DRAFT CTP Amendment#3 39 51 Proposed Bicycle-Pedestrian-Multiuse Changes - DCHC MPS GTP°mmittee2/24/2021 Item BICYCLE Dist. (mile) Local ID Facility/ Route Section (From -To) Status Description Jurisdiction DURH0029-B Blackwell St Pettigrew St to Lakewood Ave Needs Improvement Sharrow 0.3 DurCity (delete) (add) Blackwell St NC 147 to W Pettigrew St to to Durhma Stati Needs Improvement MUP 0.5 DurCity (delete these seven Roxboro/Mangum entries because MOVEDurham does not have bike lanes in these segments) DURH0307-B S Duke St University Dr to N Roxboro St Needs Improvement Bicycle Lane 4.9 DurCity DURH0248-B N Gregson St Jackson St to Duke St Needs Improvement Bicycle Lane 1.8 DurCity DURH0369-B Vickers Ave Jackson St to University Dr Needs Improvement Bicycle Lane 0.8 DurCity DURHO169-B Holloway St Roxboro Rd to Ganyard Farm Way Needs Improvement Bicycle Lane 3.6 DurCity, Dur DURH0251-B N Mangum St Lakewood Ave to Markham Ave Needs Improvement Bicycle Lane 1.7 DurCity DURH0219-B Mangum-Roxboro S Mangum St to E Lakewood Ave Needs Improvement Bicycle Lane 0.1 DurCity Connector DURH0254-B N Roxboro St E Main Street to Monk Rd Needs Improvement Bicycle Lane 4.9 DurCity (add these five Roxboro/Mangum entries to include shorter segments that were part of larger deletions in the set of entries above) DURHO169-B Holloway St US 70 to Ganyard Farm Way Needs Improvement Bicycle Lane 3.6 DurCity, Dur (add) DURH0254-B N Roxboro St 1-85 to Monk Rd Needs Improvement Bicycle Lane 4.9 DurCity (add) (add) S Roxboro St E Cornwallis Rd to Summit St Existing Bicycle lane 0.5 DurCity (add) S Roxboro St Summit St to E Umstead St Needs Improvement Bicycle lane 1.1 DurCity (add) N Mangum St E Morgan St to neighborhood bikeway(near Needs Improvement Bicycle lane 0.2 DurCity E Corporation St) Note: All bicycle segments are on road. Appendix C - Amendment # 3 DRAFT CTP Amendment#3 40 52 Technical Committee 2/24/2021 Item 7 —Multiuse Path— The CTP Amendment#3 has added many sidepaths to major roadways based on changes to the Complete Streets policy and guidelines. In addition to these sidepaths, Amendment#3 will add multiuse paths to connect to the sidepaths and create complete multiuse use path networks. Also, several jurisdictions have updated their local multiuse plans and want to reflect those changes in the CTP. The table on the next page shows the proposed additions to the CTP multiuse table. The CTP multiuse map that depicts these additions is in development and will not be posted for the February 24, 2021 Technical Committee meeting. DRAFT CTP Amendment#3 41 Proposed Bicycle-Pedestrian-Multiuse Additions - DCHC M,P� �� 53 ec is o mittee 2/24/2021 Item 7 Multiuse Local ID Facility/Route Section (From -To) tatus Description Dist. (mile) Jurisdiction Andrews Store Rd US 15-501 to Manns Chapel Rd NI Multiuse Path 3.30 Chat Angier Av Extension US 70 to Northern Durham Pkwy Recommended Multiuse Path 0.80 Dur Avondale Dr/Alston Ave Belt Line Trail to Bryant Bridge Trail NI Multiuse Path 0.70 Dur Blackwell St/ Ramseur St American Tobacco Trail to Durham Belt NI Multiuse Path 0.50 Dur Line Trail Churton St 1-85 to US 70 A NI Multiuse Path 0.90 Or,Hboro Cole Mill Rd 1-85 to Rose of Sparger Rd NI Multiuse Path 2.50 DurCity Danziger Dr Ext bridge (1-40) Mt. Moriah Rd to E. Lakeview Dr Recommended Multiuse Path 0.40 DurCity, CH Ellis-Glover Connector Ellis Rd to Glover Rd Recommended Multiuse Path 1.30 DurCity, Dur Erwin Rd Anderson St to Cameron Blvd NI Multiuse Path 1.80 DurCity Erwin Rd Sage Rd to Whitfield Rd NI Multiuse Path 1.80 CH, Or Estes Dr Ext MLK Jr Blvd to RR tracks NI Multiuse Path 1.30 CH, Carr Farrington Rd 1-40 to Old Durham-Chapel Hill Rd NI Multiuse Path 0.80 DurCity Fayetteville Rd Riddle Rd to NC 751 NI Multiuse Path 1.90 DurCity, Dur Garrett Rd NC 54 to US 15-501 NI Multiuse Path 3.20 DurCity, Dur Glover Rd Extension US 70 to Angier Av Recommended Multiuse Path 0.60 DurCity, Dur Hebron Rd Old Oxford Rd to Denfield NI Multiuse Path 1.60 DurCity, Dur Hebron Rd Extension Hebron Rd to N Roxboro Rd/Wellington Recommended Multiuse Path 0.50 DurCity Hillandale Rd Erwin Rd to 1-85 NI Multiuse Path 1.50 DurCity Homestead Rd Old NC 86 to Rogers Rd NI Multiuse Path 3.40 CH, Carr, Or Hopson Rd Miami Blvd to NC 55 NI Multiuse Path 1.80 DurCity, Dur Leesville Rd realignment US 70 to Leesville Rd Recommended Multiuse Path 0.80 Dur Lynn Rd Extension Lynn Rd to US 70 Recommended Multiuse Path 1.10 DurCity, Dur Marriott Way Friday Center Dr to Barbee Chapel Rd Recommended Multiuse Path 0.20 CH Mt Carmel Ch Rd US 15-501 to Bennett Rd NI Multiuse Path 0.40 CH,Or NC 54 Jones Ferry Rd to Old Fayetteville Rd NI Multiuse Path 1.00 Carr NC 54 Old Fayetteville Rd to MPO boundary NI Multiuse Path 2.60 Carr,Or NC 54 Old Fayetteville Rd to W Main St NI Multiuse Path 0.30 Carr NC 54 US 15-501 (Fordham Blvd)to Wake NI Multiuse Path 11.80 DurCity, Dur, CH County Line NC 751 NC 54 to Martha's Chapel Rd NI Multiuse Path 9.40 DurCity,Dur, Chat NC 751 (Hope Valley Rd) NC 54 to S Roxboro St NI Multiuse Path 1.10 DurCity NC 86 US 70 (Cornelius St)to Coleman Loop (N) NI Multiuse Path 3.20 OR, Hboro Appendix C - Amendment # 3 DRAFT CTP Amendment#3 42 Proposed Bicycle-Pedestrian-Multiuse Additions - DCHC M,P� �� 54 ec is o mittee 2/24/2021 Item 7 Multiuse Local ID Facility/ Route Section (From -To) mmmkRtatus Description Dist. (mile) Jurisdiction NC 86 US 70 A to Old NC 10 NI Multiuse Path 0.90 Hboro NC 98 N Miami Blvd to Wake County line NI Multiuse Path 9.30 DurCity, Dur New Hope Commons Dr Mt. Moriah Rd to New Hope Commons Dr NI Multiuse Path 0.30 DurCity Ext New Hope Commons Dr New Hope Commons Dr to Eastowne Dr Recommended Multiuse Path 0.40 DurCity,CH Extension Northern Durham Parkway 1-85 to Old Oxford Rd Recommended Multiuse Path 2.60 DurCity, Dur Northern Durham Parkway NC 98 to 1-85 Recommended Multiuse Path 3.80 DurCity, Dur Northern Durham Parkway US 70 to NC 98 Recommended Multiuse Path 4.20 DurCity, Dur Old NC 86 Dairyland Rd to 1-85 NI Multiuse Path 6.50 OR, Hboro Orange Grove Connector Orange Grove Rd to new connector street Recommended Multiuse Path 0.40 OR, Hboro Orange Grove Rd Dimmock's Mill to S Churton St NI Multiuse Path 3.30 OR, Hboro S Roxboro Rd Extension Roxboro Rd to W Cornwallis Rd Recommended Multiuse Path 1.20 DurCity Sherron Rd S Mineral Springs Rd to US 70 NI Multiuse Path 3.30 DurCity, Dur Southwest Durham Dr NC 54 to 1-40 Recommended Multiuse Path 1.90 DurCity, Dur Southwest Durham Dr Old Durham Chapel Hill Rd to Mt Moriah Recommended Multiuse Path 1.40 DurCity Rd US 15-501 Smith Level Rd to MPO Boundary NI Multiuse Path 4.90 Chat US 15-501 (Fordham Blvd) NC 54 (Raleigh Rd)to 1-40 NI Multiuse Path 5.80 CH US 15-501 Bus (Durham US 15-501 Byp to University Dr NI Multiuse Path 2.40 DurCity Chapel Hill Blvd) US 15-501/NC 54 (Fordham NC 54 (Raleigh Rd) to US 15-501 S NI Multiuse Path 2.10 CH Blvd) US 501 N Duke St to Sandlewood Dr NI Multiuse Path 3.40 DurCity, Dur US 501 (N Duke St) 1-85 to N Roxboro St NI Multiuse Path 2.50 DurCity US 501 Bus (N Roxboro St) W Club Blvd to Duke St NI Multiuse Path 2.70 DurCity US 70 NC 751 to MPO boundary in Orange NI Multiuse Path 14.30 OR, Hboro County Woodcroft Pkwy Extension NC 751 to Garrett Rd Recommended Multiuse Path 0.20 DurCity Interchanges and Intersections US 70/Miami Blvd Interchange Recommended Multiuse Path N/A DurCity, Dur US 15-501/Garrett Rd Interchange Recommended Multiuse Path N/A DurCity Appendix C - Amendment # 3 DRAFT CTP Amendment#3 43 Proposed Bicycle-Pedestrian-Multiuse Additions - DCHC M,P� �� 55 ec is o mittee 2/24/2021 Item 7 Multiuse Local ID Facility/ Route ISection (From -To) mmmkRtatus Description Dist. (mile) Jurisdiction US 15-501/NC 54/Columbia St Interchange NI Multiuse Path N/A CH US 15-501/Manning Dr Interchange Recommended Multiuse Path N/A CH US 15-501/NC 54 Interchange NI Multiuse Path N/A CH Appendix C - Amendment # 3 DRAFT CTP Amendment#3 44 56 57 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: April 21, 2021 Action Agenda Item No. 4.c. SUBJECT: US 15/501 Study — Phase 2 DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Phase 1 Summary Report Nishith Trivedi, Transportation Planner, 919- 2. Phase 2 Scope of Services 245-2582 PURPOSE: Review the US 15/501 Corridor Study and provide comments that will be submitted to Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO). BACKGROUND: November 11, 2020, DCHC MPO completed the US 15/501 Corridor Study addressing all public comments following the MPO's public review period and public hearing. The study focuses on a small segment of the regional corridor from Ephesus Church Road in Chapel Hill t o University Drive in Durham. The Study's summary report is provided (Attachment 1) for your reference; key highlights include: • Study Purpose and Scope — Convert auto-centric state highway to multimodal corridor • Corridor is broken into unique segments addressing different issues. o Segment 1 — Ephesus Church Road to 140 interchange 0 1-40 interchange and surrounding quadrants o Segment 2 — 1-40 to US 15/501 Bypass o Segment 3 — US 15/501 Bypass to Chapel Hill Road o Segment 4 — Chapel Hill Road to University Drive • Travel profile focuses on bi king, walking, transit, job, housing, environmental sensitivity, and vehicular traffic. • Public Process — Mobility tour, visioning exercises, website, public workshops, steering committee, corridor analysis, qualitative screening, multimodal alternatives screening, quantitative screening. • All alternatives focused on transit, bike/walking, jobs/housing and v ehicular, final alternatives selected were based on individual segments. o Segment 1 — 6 travel lanes, center turn lane, outside dedicated bus lanes, side path on both sides including grade separated pedestrian crossing at Eastowne Drive. 0 1-40 Interchange — Grade separated bike/ped connecting New Hope Commons to Eastowne Drive and Patterson Place to Gateway, improve auto safety. o Segment 2 — 6 travel lanes, inside dedicated bus lanes, wide (14') outside shoulders, side paths on both sides o Segment 3 —4 travel lanes, landscaped median, side paths on both sides o Segment 4 — 2 travel lanes, on-street parking, dedicated sidewalk and bike lane • Implementation — 50 projects identified and split into short (0 — 10 years), mid (10 — 20 years) and long (over 20 years) term strategies. 58 • Result of Phase 1 — not approved or rejected, no formal action taken. Chapel Hill and Durham representatives on the DCHC MPO Board have requested MPO staff continue investigating other ways to address their concerns through another study. DCHC MPO has initiated a Phase 2 s tudy, with a new Scope of Services (Attachment 2) focused on addressing their concerns with additional information. The study will have its own public involvement process similar to Phase 1. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends OUTBoard provide comments. 0 L 0 -j The US 15-501 Corridor Study is a long term plan, with the goal to Reimagine US 15-501 as a integrated, multimodal corridor. • ' US 15.511 CORRIDOR r magining15501.com 60 STUDY ,�w w VIEW ki US 15-501 between the City of Durham and the Town of Chapel Hill is _ an auto-centric arterial highway that is in stark contrast to the vibrant multimodal downtowns that anchor the facility on either end. The goal of this study is to Reimagine US 15-501 as an integrated, multimodal corridor informed by a community vision and goals, and supported by strategies that lead to the implementation of that vision. Ala I The Study Corridor For analysis purpose and due to the differing nature of the corridor, the study broke the corridor into segments: Segment 1: Ephesus Church Road to 1-40 Interchange 1-40 Quadrant: 1-40 Interchange and surrounding quadrants 14* AA- _ ► Segment 2: 1-40 to US 15-501 - Bypass v Segment 3: US 15-501 Bypass to Chapel Hill Road ► Segment4:Chapel Hill Road to University Drive 61 ii I SEGMENT 1 I SEGMENT 2 SEGMENT 3 SEGMENT 4 ` 4 13,000 12,000 15,000 ° I • ROCKWOOD F—I ¢ SHOPPING 18 B' ' \ O I O Q CENTER 1 W!� 52,000 000000 SOUTH SQUARE o to OF 49,000 NEWHOPE Z y I COMMONS p PATTERSON PLACE y O 41,000 .• 501 I I 1 15 I •43,000 DURHAM RD OLD CHAPEL H L R 0 0.5 11�ile I 8,000 MS PLAZA i • Existing Grade Separation I Transportation Improvement Program(TIP) STGAT Grade Separation I OComprehensive Transportation Plan(CTP) Proposed Grade Separation I\ 0 CTP Proposed Interchange i • 2015 Average Annual Daily Traffic(AADT) I I I W ME="" COMMUNITYAND TRAVEL PROFILE (KL Transit ► Gaps in the existing system ► Corridor served by multiple transit agencies Biking and Walking ► Difficult to efficiently serve existing ► Lack of connectivity between activity development from US 15-501 centers ► Challenging to provide local service ► Few facilities along the corridor along the corridor ► Areas of concentrated demand ' Bus operations impacted by congestion and delay ► Several areas with high concentrations of captive users T 1 1 T 1 1 1 1 1 1 1 1 1 ❑ ❑ 1 � 1 ❑ ❑ 1 1 '...1 ❑ 1 0o G7 X 0 p � ❑ G ❑ r �° — o � ❑ ❑ r ❑ ❑ ❑ ❑ — poo ❑ � r ❑ ❑ 0 � - = o ❑ 0 ❑ r• or ❑ c!i n � — o _ o _ . o _ _ J0 0 0 X _ 4 rfli 11 63 Highway ► US 15-501 is a gateway to the region ► High conflict between "to" and "through" travelers ► New development pattern should increase Jobs and Housing local trips within developments ► Attractive destination for travelers outside ► Study area will experience substantial the study area growth in jobs and housing over the ► Traffic crash patterns reflect high 30-year planning horizon congestion levels ► Growth is primarily focused around the 1-40 interchange, Blue Hill District, T Gateway, and South Square area 1 1 ► Proposed new development will be Environmentally 1 1 mixed-use high density which has Sensitive Areas 1 several benefits, including: 1 1 ► New Hope Creek corridor 1 — A greater number of trips 1 are made internal to the ► Natural Heritage Area in the NW 1 quadrant of 1-40 and US 15-501 1 development 1 1 — More transit supportive 1 T I Encourages active transportation I I I T 1 • 1 1 1 M 1 • 0 • 1 1 1 I • 1 L I 1 . � 1 L O j 0 O OO O 0 0 oOO 000 0 � o vo a 0 0 0 0 00 o0 tITLf 4 � 0 0 _ - o /� L Q - - 5 O The purpose 64 VISIONING 0 of the first public meeting was to create a corridor vision and corridor goals for US 15-501. The meeting aimed TATION to present existing conditions to clarify why the study is being conducted, verify what will be achieved when the plan is implemented, and reflect the thinking of diverse groups in the community. ♦ r,� f w� 7k<• 65 Visioning Process ► Conducted a mobile tour ► Visioning exercise with tour participants ► Visioning exercise with citizens and at public workshops ► Received comments from online comment map Key Themes Emerging from the Visioning Process ► Multimodal ► Connectivity ► Mobility Corridor Vision ► By 2045, US 15-501 between Durham and Chapel Hill will be a key multimodal transportation corridor,that will complement and support high capacity transit and the adjacent, mixed use, and multimodal supportive development. The corridor will provide for the safety, mobility, and accessibility of all users, including motorists, pedestrians, bicyclists, and public transportation users; including connections across and through the corridor. Corridor Goals ► Improve accessibility and connectivity for all modes ► Improve mobility for all users ► Enhance safety and health ► Stimulate land use, community, and market performance vitality ► Protect sensitive environmental lands within the study area 7 66 IMPROVEMENT STkAT EG A range of improvement strategies and Online comment map ideas were captured from the following: ► public workshop ► Project Steering Committee ► Corridor analysis Tier 1 Qualitative Screening This screening evaluated strategies against a rubric designed to evaluate and score each strategy against the study goals and objectives. ► Safety, multimodal network connections, — — — accessibility, equity,environment, health, community, and economy. I I Multimodal Alternatives - - - Tier 1 screening resulted in a reduced number of multimodal strategies that were combined into complimentary packages of multimodal alternatives that were further evaluated by the Project Team, Project Steering Committee and vetted by the public and MPO Policy Board, resulting in two final alternatives. Tier 2 Quantitative Screening - - - - - - This screening involved a detailed evaluation of the alternatives and the development of conceptual designs. Input was received from the public and Project Steering Committee on the conceptual designs. s 67 Durham-Orange Light Rail Transit (D-O LRT) ► Prior to the completion of this study, a decision was made by the governing bodies to discontinue work on D-O LRT. ► The Project Steering Committee and MPO Board directed the Project Team to develop a third alternative that could help achieve the goal of linking Chapel Hill and Durham with fast,frequent,and reliable transit service. ► Alternative 3 mirrors Alternative 2 in every way except for the addition of dedicated bus lanes within the study area between Ephesus Church Road and the US 15-501 Bypass. r - - - - - - - - - - - - - 1 I I The purpose of the second 1 0'U515-501 SEGMENT THREE STPATEC,ES s,sso, public meeting was to allow the public to review I �, and comment on proposed _ _ I concepts for addressing future transportation I l challenges. This meeting I ` 1 helped guide the project 1 team in selecting concepts to be studied in detail. I I L I r — — — — — — — — — — — — - - The purpose of the third public meeting was to I _ allow the public to review the final three proposed recommendations for addressing future I �. transportation challenges. 1 This meeting helped guide the project team in I _- 1 selecting the final preferred alternative for the study. L - - - - - - - - - - - - - J �, .; 68 RECOMMENDED ALTERNATINir. The recommended alternative aims to provide a comprehensive multimodal alternative for the entire corridor. In Segment the focus is on trying to find a balance between the conflicting priorities of accessibility and mobility with a design that improves the flow of through traffic, but also provides tools for creating a more urban environment through reduced travel speeds, increasing the number and safety of crossing locations for bicyclists and pedestrians, and streetscaping to provide a more urban feel. In Segment 2,the focus is on mobility with a design that focuses on multimodal grade separations,while recommending local street networks within developments adjacent to the corridor for local traffic and bicycle and pedestrian movements along the corridor. High capacity transit service along Segments 1 and 2 is prioritized with the inclusion of a bus only lane. In Segments 3 and 4,the recommended alternative aims to provide a more urban cross section that reduces the speed of vehicles and provides a more pedestrian friendly environment with bicycle and pedestrian facilities and land use closer to the corridor. For the entire corridor,capitalize on opportunities to create land use patterns that promote multimodal travel, and incorporate urban design and human-scale design. Mobility vs. Accessibility r The ideal use of a corridor designed for mobility is to move Arterial I people and goods from place to place. L _ J I I Co for I I The ideal use of a corridor r designed for accessibility is the Local ease with which people can reach an activity. L Focusing solely on - will come at the - - balanceother,so a key challenge of this corridor is trying to create a between .. accessibility. 69 Key features of the recommended alternative for each segment include the following: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Segment 1 ► Convert US 15-501 to a Reduced Conflict ► Provide bicycle and pedestrian connections Intersection design (aka Superstreet) to throughout Segment 1, both along and improve safety and to better balance across US 15-501, including a grade accessibility and mobility.To encourage a separated pedestrian crossing at Eastowne more urban design,signals will be timed to Drive slow the progression of traffic, pedestrian crossings will be provided at intersections ' Connect Legion Road to Old Durham Road and at midblock U-turns,and streetscaping ► Implement local street network as proposed is encouraged by Blue Hill District TIA ► Provide outside running bus only lane ° , 1 { H { 1 { { { 1 H 1 1 ter RV -v4 Segment 1 conceptual cross section - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1-40 Quadrant Redesign 1-40 interchange to improve safety ► Grade separated 2-lane roadway with and operations (diverging diamond),with bicycle and pedestrian facilities across 1-40 addition of pedestrian facilities on the bridge connecting Patterson Place to Gateway across 1-40 P. Grade separated bicycle and pedestrian facility across 1-40 connecting New Hope Commons to Eastowne Drive n 70 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Segment 2 ► Grade separate Mt Moriah Road and provide ► Provide bicycle and pedestrian connections bicycle and pedestrian facilities on bridge throughout Segment 2, both along and ► Urban interchanges at SW Durham Drive across US 15-501 and Garrett Road ► Provide multimodal connectivity between Implement Patterson Place and New Hope Sandy Creek Drive, Chapel Hill Blvd Service Commons local street network Road,and Garrett Road Segment 2 conceptual cross section - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Segment 3 ► Reduce the footprint of the current cross- ► Implement better street connectivity(future section to implement a fully multimodal focus on an urban grid system) to the north 4-lane urban cross-section with landscaped and south of US 15-501 Business median ► Redesign Academy Road and Chapel Hill ► Add roundabouts at key locations to Road interchange to better reflect urban improve connectivity and to further slow design traffic and create a more urban environment Segment 3 conceptual cross section 12 7 - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Segment 4 ► Implement 2-lane urban cross-section with ► Redesign University Drive intersection as a landscaped median, consolidated driveways, Roundabout with bicycle and pedestrian and roundabouts at key intersections facilities ► Provide sidewalks, bike lanes, and parking on both sides of the roadway Segment 4 conceptual cross section Land Use Strategies for the Corridor ► Follow framework strategies established in the appropriate Comprehensive Plans, Ephesus Church Road-Fordham Boulevard Small Area Plan, and Patterson Place Design District. ► Utilize the flexibility offered by the various Design Districts to encourage innovative design and architecture,and create a mix of uses with an urban fabric supportive of multimodal travel. ► Where appropriate, encourage designs that change the form of the corridor with buildings fronting the street and parking behind or to the side, and sidewalks to provide connectivity. ► Create areas of transition between more intense development nodes and commercial and residential areas. ► Respect environmentally sensitive areas. 7 IMPLEMENTATION The US 15-501 Corridor Study is a long term plan,with the goal to Reimagine US 15-501 as a integrated, multimodal corridor. Due to the long term nature of this plan, the implementation of recommendations documented in this plan have been broken into three phases: - Long Term- anticipated after 20 years Mid Term- 4a Short Term- anticipated within 10-20 years anticipated within 10 years Along with differing timeframes for the recommendations, implementation will be overseen by different entities. Major roadway projects, like new interchanges,will be funded and built by the North Carolina Department of Transportation (NCDOT) and will include bicycle and pedestrian facilities. Standalone bicycle and pedestrian improvements or smaller roadway projects, could be funded by local municipalities like the Town of Chapel Hill or City of Durham. Developers may also be responsible for constructing new streets or bicycle and pedestrian facilities on parcels as they redevelop. With all the stages of implementation,there is a recognition that more detailed level analysis and design will be completed.At this time, more context sensitive details, like final placement of crosswalks or streetscaping will be determined. See for example the aerial photo below that shows an illustration of how a Reduced Conflict Intersection design can be implemented within an urban corridor with high pedestrian activity. (photo is East Grand River Avenue, East Lansing, Michigan) ,. ---„- r �. rr --------------- Example Pecluced Conflict Intersection rban Design - rI' S� � .: f 14 F1 PROJECT DETAILS This US 15-501 Corridor Study Report Summary, is meant to provide an overview of the corridor study. For more detailed information on the study process, recommendations, and implementation plan please visit the project website: https://reimagining15501.com/ For more information on the study, please visit: Durham-Chapel Hill-Carrboro MPO http://www.dchcmpo.org[ Or visit the project website https://reimaginingISSOI.com/ For additional comments, please contact: Andy Henry and rew.henryCabdurhamnc.gov is I Moving towar s a o e balanced an timod If re reimagining15501.co 0 US 15-511 CURRIUUR •,a Ifi. .r:1T71 MPO Board 03/10/2021 Item 9 75 Draft US 15-501 Corridor Study Scope — Summary (version:January 19,2021) This scope summarizes the tasks and products needed to finish the US 15-501 Corridor Study. Staff will use this summarized scope to create a request for proposal to select a consultant known for their creative bicycle, pedestrian and transit planning solutions. The request for proposal will emphasize that the DCHC MPO seeks solutions for the US 15-501 Corridor that are truly aspirational and lead the travel of our future rather than react to it. Review Draft Corridor Study and Process The consultant will become familiar with the draft US 15-501 Corridor Study report, including the vision and goals, demographic and travel profiles, public participation process, alternatives, recommendations and implementation, and the conceptual design. It is important that the consultant understand how the Study's proposed transportation system for the Chapel Hill segment and the 1-40/US 15-501 quadrant area did not meet the newly adopted Goals and Objectives of the DCHC MPO and the interests of several people who provided comments to the Board. The proposed design of the Chapel Hill segment favored vehicle travel over that of bicyclists and pedestrians, and included an 8-lane cross-section and Reduced Conflict Intersection (RCI) that would make bicycle and pedestrian crossing hazardous. The sole interchange proposed for the 1-40/US 15-501 quadrant was viewed as providing inadequate access to the Patterson Place and New Hope Commons developments, and as making bicycle and pedestrian movement hazardous between the developments. The consultant will review segment 1 (i.e., Chapel Hill) and the 1-40/US 15-501 quadrant area because these two areas need further public input, technical analysis, and development to create a Corridor Study that can be adopted. Segments 2, 3, and 4 will also require review and further development, but the level of effort in these segments is not expected to be as high as segment 1 and the 1-40/US 15-501 quadrant area. The consultant will conduct an informational meeting with the Project Steering Committee to identify and understand the unresolved issues in the draft Corridor Study report, conceptual design, and process. The Project Steering Committee is composed of staff from the DCHC MPO, Town of Chapel Hill, City of Durham, Durham County, GoTriangle, GoDurham, and NCDOT who were involved in the US 15-501 Corridor Study. Product • DCHC MPO will produce: A compilation of the comments received on the draft US 15-501 Corridor Study and staff responses to the comments, which identifies Page 1 Draft MPO Board 03/10/2021 Item 9 76 the unresolved issues. The draft report, summary report, and conceptual design in original software format; and, any demographic or travel data (e.g., counts and crashes) requested by the consultant Conduct Issues Meeting with Stakeholders The consultant will conduct one meeting with three different stakeholder groups to identify and understand the issues that stakeholders have with the draft Corridor Study. The stakeholder groups will be: segment 1 (i.e., Chapel Hill segment); 1-40/US 15-501 quadrant area; and, segments 2, 3 and 4. There are three stakeholder groups because the issues and membership of each group is expected to be fairly distinct. If needed, the meetings will be virtual (i.e., online). The consultant will prepare any materials for the meeting, design the meeting format, and conduct the meeting. DCHC MPO staff will provide administration and coordination, including: identify and notify potential stakeholders; prepare the attendee list for each stakeholder group; and, obtain the meeting site if there is an in-person meeting. Product • Consultant will produce: Summary of issues in draft US 15-501 Corridor Study for each stakeholder group that might include maps and conceptual designs • DCHC MPO will produce: Attendee list, meeting site, Web site and social media support Conduct Solutions Meeting with Stakeholders The consultant will conduct one meeting with each stakeholder group to identify proposed solutions to the unmet transportation needs and issues that were identified in the previous issues meeting. The consultant will identify the best meeting format and preferred format of the meetings' output materials for each of the stakeholder groups based on the issues to be addressed and the level of technical detail needed to update the draft US 15-501 Corridor Study. The consultant will prepare materials for the meeting and produce the output materials. DCHC MPO staff will provide administration of the stakeholder groups, meeting support (e.g., documenting participant input), and, the meeting site if there is an in-person meeting. The Durham County and Orange County transit plans are expected to be drafted or approved in the April-to-June 2021 period. The consultant will need to incorporate transit services, facilities and infrastructure from those plans into the US 15-501 Corridor Study. The staff from the DCHC MPO and its partner agencies will assist with this coordination. The product will be. Page 2 MPO Board 03/10/2021 Item 9 77 Draft Product • Consultant will produce: text, maps, conceptual designs, drawings, or any output material that that is needed to convey the ideas of the stakeholder group • DCHC MPO will produce: Attendee list, meeting site; Durham County and Orange County transit plans (in draft or final form), Web site and social media support Develop Draft Plan The consultant will develop a draft conceptual design for segment 1, the 1-40/US 15-501 quadrant area, and segments 2, 3, and 4 based on information from the stakeholder meetings. The DCHC MPO staff will update the summary report and full report. The consultant will present the draft conceptual design to the Project Steering Committee (PSC), the DCHC MPO Technical Committee, and finally to the DCHC MPO Board to be released for public comment. DCHC MPO staff will arrange the meetings and any electronic document distribution. Product • Consultant will produce: Draft conceptual design for segment 1, the 1-40/US 15- 501 quadrant area, and segment 2, 3, and 4; and, meeting presentation materials • DCHC MPO will produce: Meetings, document distribution, and Web site and social medial support Public Engagement The consultant will develop the format and materials for a public engagement activity and conduct the engagement activity to get feedback on the conceptual design, summary report, and full report. The consultant will gather and organize the feedback. The DCHC MPO staff will administer the meeting, including: conduct public and social media notification; acquire an in- person meeting site (if the meeting is not virtual); and, document the public input. It is expected that an in-person activity can be a single event for all three areas (i.e., segment 1, the 1-40/US 15-501 quadrant area, and segments 2, 3, and 4). However, a virtual meeting will need to be divided into a separate meeting for the three areas. Product • Consultant will produce: Materials for a public engagement activity, and document the public engagement input • DCHC MPO will produce: Public and social media notification, in-person meeting facility, and Web site support Page 3 DraftMPO Board 03/10/2021 Item 9 78 Final Document The consultant will incorporate the solutions into the final US 15-501 Corridor Study conceptual design. The DCHC MPO staff will make the final changes to the summary report and full report. The consultant will present the final US 15-501 Corridor Study to the DCHC MPO Board for approval. Product • Consultant will produce: Conceptual design for final US 15-501 Corridor Study • DCHC MPO will produce: Summary report and final report for US 15-501 Corridor Study, and Web site support Page 4 79 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: April 21, 2021 Action Agenda Item No. 4.d. SUBJECT: Small Non-STIP Transportation Projects DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Summary of NCDOT Non-STIP Funding Nishith Trivedi, Transportation Planner, 919- Sources for Transportation Improvements 245-2582 2. Small Transportation Projects PURPOSE: Biannual opportunity for OUTBoard members to submit suggestions for North Carolina Department of Transportation (NCDOT) non-Strategic Transportation Improvement Program (STIP) projects. BACKGROUND: NCDOT has a variety of non-STIP funding sources for small transportation projects (Attachment 1). Such programs include: • High Impact-Low Cost Program • Spot Safety • Hazard Elimination Program • Spot Mobility Program. • Annual Maintenance Resurfacing Common characteristics of these local non-STIP projects are: • Do not involve right-of-way acquisition; • Construction ready to be under contract within 24 months of approved funding; • Costs over $250,000 typically requires resolution of support from local elected body; • Funding can be paired with other funding sources; and • Subject to Board of Transportation (BOT) approval. Throughout each fiscal year, opportunities may arise for Orange County to submit small transportation projects to NCDOT. The turn-around time between local submission and NCDOT project review is typically very short. Once non-STIP projects are approved, there is very little design review or public involvement as these are typically considered "construction ready." The small transportation project lists as an ongoing inventory addressing the County's small and immediate transportation issues. The Planning staff is requesting OUTBoard members assist staff in identifying potential local non-STIP projects, using the examples provided in Attachment 1 as a reference. OUTBoard members represent and reside in all areas of the county, and typically are more familiar with 80 the roads they travel than staff. Staff has developed a Small Transportation Projects (Attachment 2) and regularly update. No project is too small. NCDOT Maintenance Yard is located in Orange County, they can: • Fix pot holes; • Maintain ditches and culverts; • Fill cracks in roadway surfaces; and • Maintain line of sight in critical areas like intersections. While formal small project requests will be discussed by the OUTBoard on a biannual basis, feel free to send possible projects to staff at any time to be added to our running list. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends OUTBoard provide comments. 81 Attachment 1 Item 4.d. Summary of "Non-STIP" Funding Sources for Transportation Improvements High Impact-Low Cost Program: • Purpose- Deliver localized roadway improvements deemed to have substantial benefit while minimizing cost and project delivery time • State funded program • Introduced in 2017 legislative session • Funded in 2017-2019 biennium and 2020-2021 biennium • Program recurrence undetermined • Approx. $3.5 million per Division per biennium • Project cap $1.5 Million • Projects over $250 K require resolution of support from local elected body • Selection Criteria 0 30% Traffic Volume 0 15% Accident Data 0 15% Existing Lane Width 0 10% Existing Shoulder Width 0 5% Pavement Condition 0 5% Mufti-Modal Benefit 0 10% Other Funding Availability to Offset Project Costs 0 10% County Economic Prosperity Ranking • Local input solicited • Current/Recent Orange County Projects o Extend northbound right turn lane on Churton Street at US 70 (Summer 2019) o Efland Cedar Grove Road- Widen lanes 2' and resurface (2020-2021 biennium) • Examples of Potential Project Types o Intersection improvements (turn lanes, radius improvements, realignments) o Signalization or modification of existing signals o Widening lanes and resurfacing o Pavement strengthening o Other projects that do not require R/W acquisition or utility relocation Spot Safety Program: • Purpose- Deliver smaller localized improvements to address identified safety and operational issues • State funded program currently at $9M/ year statewide • Historically recurring funding • Project cap $400K but can be combined with other funding sources • Can be paired with other funding sources 82 Attachment 1 Item 4.c. • Projects assessed on a quarterly basis for relative cost/benefit scoring based on anticipated reduction in frequency and/or severity of crashes • R/w acquisition and utility relocation costs are eligible but should be minimized • Project delivery in 18-24 months following funding approval • Current/Recent Projects in Orange County o Buckhorn Road at West Ten Road- Install all-way stop (complete) o NC 86 at Sawmill Road- Install flasher, channelization and sight distance improvements(complete) o Old NC 10 at Lawrence Road- Horizontal Curve and superfetation improvements (Spring 2020) • Examples of Potential Projects o Horizontal and vertical alignment improvements o Sight line improvements o Signalization and/or modification to existing signal o Paved shoulders o Rumble strips o Enhanced signing, markings, markers o Intersection flashers o All-Way stops o Guardrail Hazard Elimination Program: • Purpose- Essentially the same as Spot Safety Program but typically used for projects with higher costs and longer delivery timeline • Federal funded program subject to federal regulations • Historically recurring funding • Projects assessed on a quarterly basis for relative cost/benefit scoring based on anticipated reduction in frequency and/or severity of crashes • Projects programmed in STIP but not subject to SPOT process • ROW acquisition and utility relocation costs are eligible but should be minimized • Examples of potential projects o Same as Spot Safety but generally higher cost and longer duration • Current/Recent Projects in Orange County o Efland Cedar Grove Road south of Highland Farm Road- Realign horizontal curve (complete) o W. Franklin Street at Merrit Mill Road/Brewer Lane, Chapel Hill- Pedestrian improvements (Summer 2019) Spot Mobility Program: • Purpose- Deliver smaller localized improvements to address identified congestion and operational issues. • State funded program 83 Attachment 1 Item 4.c. • Historically recurring funding • Project cap $750K but can be combined with other funding sources • Projects assessed on a quarterly basis relative to cost/benefit on anticipated reduction in travel time during peak periods • R/w acquisition and utility relocation costs are eligible but should be minimized • Project delivery in 18-24 months following funding approval • Examples of potential projects: o Turn lanes o Signalization to improve side street operation o Modification of signal phasing/timing to improve efficiency o Lane widening o Off-site improvements at public and private schools subject to NCGS 136- 18(29a) • Current/Recent Projects in Orange County o Reimbursement to CHCSS for turn lanes at Chapel Hill High School Expansion- (Reimbursement upon satisfactory completion by school system) Annual Maintenance Resurfacing: • Program Purpose- Repair and Resurface existing pavements to provide for acceptable operation and maintenance condition • State funded program • Recurring annual allocation per county/division as stipulated by enacted State budget • 5-year program developed for implementation and updated annually • Projects selected based on relative ranking of biennial pavement condition survey, engineering judgement and local jurisdiction input • Close coordination with local stakeholders is critical in project selection and scheduling • Widening of existing travel lanes and/or installation of paved shoulders possible where warranted but limited to no more than 10% of program • Other improvements not eligible Staff Small Transportation Projects 3/15b 21 Segments Other 4:59 PM # Segment Improvement Update 1 Orange Grove Road from Patriots Point Drive to 1-40 May be part of NCDOT MSTA 2 Bowman Road between Ben Wilson Road and W. Ten Road Part of 2019 E-B-M AMP, Mebane Growth Area 3 Eno Mountain Road/Mayo Street Now part of Hillsborough's NC-86 Connector Study 4 1 Efland-Cedar Grove Road improvements Funded through High Impact/Low Cost # Other Update Synchronize traffic signals on NC-86 (MLK) from Duke Chapel Hill jurisdiction, contact Chapel Hill engineering and 1 Forest and Weaver Dairy Road NCDOT Resurface Rocky Ridge Road from Dairyland Road to Arthur 2 IMinnis Road with extra shoulder Review HMIP and coordinate with NCDOT for update Bike lane 3/4 mile Old NC-86 from Farm House Road to Carrboro jurisdiction, Carrboro addressing through their 3 Dairyland Road Town Council approved Bike Plan Update Grading improvement on Jones Ferry Road from Old NCDOT is aware and is on its HMIP resurfacing list and 4 Fayetteville Road to County line bridge replacement, will follow up with NCDOT 5 NCDOT Bike Passing signs Coordinate with NCDOT when funding becomes available Dairyland Rd west of Old NC-86 a Orange Grove Rd north of Dairyland Rd b Orange Grove Rd south of Elfin Blvd c. In Hilllsborough, requires Hillsborough action Bradshaw Quarry Rd west of Orange Grove Rd d Old Greensboro Rd west of Jones Ferry Rd e Jones Ferry Rd west of Old Greensboro Rd f Homestead Rd east of Old NC-86 g. In Carrboro, requires Carrboro action Mebane Oaks Rd north of Bradshaw Quarry Rd h Old Greensboro Rd east of Haw River I Borland Rd north of Arthur Minnis Rd j Union Grove Church Rd south of Arthur Minnis Rd k Hillsborough Rd north of Old Fayetteville Rd split I. In Carrboro, requires Carrboro action NCDOT informed it is DOT policy to install on NC/US routes when resurfacing roads. SR routes and other roads are treated on a case-by-case 6 Center lane reflectors bases. Staff Small Transportation Projects 3/1JR21 Intersections 5:14 PM # Intersection Improvement Update Morrow Mill Rd awaiting SPOT 6 results Neville Rd Left turn lanes installed, awaiting SPOT 6 results 1 NC-54 Dodson Crossroads NCDOT evaluating for low-cost staff improvement,non-project Orange Grove Rd signalized, left turn lanes installed, awating SPOT 6 results White Cross Rd awaiting SPOT 6 results Guess Rd awaiting SPOT 6 results Efland-Cedar Grove Rd Part of US-70 Multimodal Study starting Jan 2022 2 US-70 St. Mary's Rd Part of US-70 Multimodal Study starting Jan 2022 US-70 Business HSIP eligible, under NCDOT investigation, Pleasant Green Road Part of US-70 Multimodal Study starting Jan 2022 Old NC-10 US-70A Part of Hillsborough's NC-86 connector study NC-57 Submitted for SPOT 6.0 Mobility, scores very well 3 NC-86 New Hope Church Rd Philips Rd Sawmill Rd Walnut Grove Church Rd High Rock Rd Efland-Cedar Grove Rd 4 Lebanon Rd N. Frazier Rd Submitted for SPOT 6 through DCHC MPO Daniels Farm Rd Mill Creek Rd 5 Old NC-86 Arthur Minnis Rd Submitted for SPOT 6.0 Modernization, awating score 6 Orange Grove Rd Davis Rd Submitted for SPOT 6.0 Modernization, awating score 7 Lawrence Rd 1-85 8 S. Churton St US-70 Bus Part of Hillsborough's NC-86 connector study 9 Efland Cedar Grove US-70 NCDOT looking into for traffic forecasts. 86 Agenda Item 5.a. Technical Committee 3/24/2020 Item 1 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date U-6245 Construct paved shoulders,turn lanes and overlay on SR Oct.2020 Nov.2020 $829,000 Construction 100%complete Chad Reimakoski 49187.1.1 1146(West Ten Road)from SR 1114(Buckhorn Road)to 49187.2.1 west of SR 1137(Bushy Cook Road) 49187.3.1 SS-6007C Guardrail installation on NC 86 just north of SR 1839 Feb.2022 Mar.2022 $50,400 Funds approved 9/5/19 and released Chad Reimakoski 48888.1.1 (Alexander Drive). 6/23/20 Derek Dixon 48888.3.1 P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2021 FY2023 $7,200,000 PE funding scheduled 7/1/2020, Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 46395.3.1 1-3306A 1-40 widening from 1-85 to Durham Co. line(US 15/501 8/17/2021 FY2024 $175,600,000 Planning and design activities underway, Laura Sutton 34178.1.3 Interchange)in Chapel Hill RFQ Advertisement DB 11/3/20 34178.1.4 34178.1.5 34178.2.2 34178.3.GV3 SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) Jun. 2022 Nov.2022 $261,000 Planning and design activities underway Chad Reimakoski 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of 47936.2.1 Hillsborough. Improvements consist of wedging pavement 47936.3.1 and grading shoulders. SS-6007E All Way Stop installation and flashing beacon revisions at Jun.2022 Sept.2022 $28,800 Funds approved 3/5/20 but not released Dawn McPherson 49115.1.1 the intersection of SR 1005(Old Greensboro Road)and SR 49115.3.1 1956(Crawford Dairy Road/Orange Chapel Clover Garden Road) 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chris Smitherman 45910.1.1 (Buckhorn Road)to West of SR 1006(Orange Grove Road) 45910.3.1 1-5967 Interchange improvements at 1-85 and SR 1009(South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning Laura Sutton 45917.1.1 Churton Street)in Hillsborough and Design activities underway, 45917.2.1 Coordinate with 1-0305 and U-5845 45917.3.1 Page 1 DCHCMPO Jan.2021 Page 7 of 10 Agenda Item 5.a. Technical Committee 3/24/2020 Item 1 As NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT TIP/WBS# Description LET/Start Completion Cost Status Project Lead Date Date 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 FY2029 $11,156,000 PE funding approved 10/10/17, Chris Smitherman 45911.1.1 (Orange Grove Road)to Durham County line Coordinate with 1-5967, 1-5984 and 1-0305 45911.3.1 R-5821A Construct operational improvements including 6/20/2028 FY2031 $50,700,000 PE funding approved 10/10/17, Planning Chris Smitherman 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR activities underway,Coordinating with 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old NC54 West Corridor Study 47093.3.2 Fayetteville Road). U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1-7/18/2028 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton 50235.1.1 40 to Eno River in Hillsborough and Design activities underway, 50235.2.1 Coordinate with U-5848 and 1-5967 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton 47530.1.1 Hillsborough and Design activities underway, 47530.2.1 Coordinate with 1-0305 and 1-5959 47530.3.1 1-0305 Widening of 1-85 from west of SR1006(Orange Grove 1/1/2040 FY2044 $132,000,000 PE funding approved 6/5/18, Planning Laura Sutton 34142.1.2 Road)in Orange Co.to west of SR 1400 (Sparger Road)in and design activities underway, Project 34142.2.2 Orange Co. reinstated per 2020-2029 STIP(funded 34142.3.2 project)and delete project 1-5983 Page 2 DCHCMPO Jan.2021 Page 8 of 10 Agenda Item 5.a. Technical Committee 3/24/2020 Item 169 North Carolina Department of Transportation 1/1 412 0 2 1 Active Projects Under Construction -Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE S T WOOTEN Nordan,PE, $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 5/29/2022 25.9 31.94 COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 CORPORATION James M C204078 B-4962 REPLACE BRIDGE#46 OVER ENO RIVER ON US-70 BYPASS. CONTI ENTERPRISES, Howell,Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 54.79 77.64 INC DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS LITTLE MOUNTAIN Howell,Bobby J $319,319.80 6/25/2018 2/15/2020 8/6/2018 2/15/2020 100 92.94 W-5707A INTERSECTIONS BUILDERS OF CATAWBA COUNTY INC DG00461 REHAB.BRIDGE#031 ON SR 1010(E.FRANKLIN ST.)OVER BOLIN M&J CONSTRUCTION Howell,Bobby J $2,456,272.12 11/12/2018 7/15/2019 3/15/2019 12/26/2020 100 81.39 CREEK&BOLIN CREEK TRAIL CO OF PINELLAS COUNTY INC DG00462 REHAB.BRIDGES 264,288,260,543 IN GUILFORD COUNTY AND ELITE INDUSTRIAL Snell,PE,William $967,383.15 8/1/2019 1/1/2020 BRIDGE 031 IN ORANGE COUNTY PAINTING INC H DG00483 RESURFACE SR 1010(MAIN STREET/FRANKLIN STREET)FROM SR CAROLINA SUNROCK Howell,Bobby J $845,631.59 5/18/2019 8/7/2020 1005(JONES FERRY ROAD)TO INC 86(COLUMBIA STREET) LLC DG00485 U-5846 SR 1772(GREENSBORO STREET)AT SR 1780(ESTES DRIVE), FSC II LLC DBA FRED Howell,Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 67 66.32 CONSTRUCT ROUNDABOUT SMITH COMPANY Page 1 of 1 Page 9 of 10 Agenda Item 5.a. gp NCDOT DIV 7 PROJECTS LOCATED IN TARPO-UNDER DEVELOPMENT TIPIWBS# Description Let/Start Date Completion Cost Status Project Lead Comments/PE Suspended in May 2020 Date SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10)west of Jun.2022 Nov.2022 $261,000 Planning and design activities underway Chad Reimakoski DMP,State Spot Safety,DPOC,Surveys complete,$40,000 PE,65%plans pending, 47936.1.1 SR 1561/SR 1709(Lawrence Road)east of Hillsborough. ROW plans complete June/July,SCR moved ROW to 9/30/19 and Let from 12/5119 to 47936.2.1 Improvements consist of wedging pavement and grading 4/3120,SCR moved ROW to 11/27/19 and let 6/1/20,SCR moved ROW to 11/25/20 and 47936.3.1 shoulders. Let 6/1/21 by CE directive(1 year push),No public meeting scheduled,Finish design In- house,PE continue working on 65%plans,SCR moved ROW to 11/24/21 and LET to 6/1/22,HB77 Candidate,SS Move Forward List 11/23/20 SS-6007E All Way Stop installation and flashing beacon revisions at the Jun.2022 Oct.2022 $28,800 PE funds approved 3/5/20 and released Dawn McPherson DMP,State Spot Safety,OCC,PE$2,700,HB77 Candidate,SS Move Forward List 49115.1.1 intersection of SR 1005(Old Greensboro Road)and SR 1956 6/23/20 11/23/20 49115.3.1 (Crawford Dairy Road/Orange Chapel Clover Garden Road). 1-5958 Pavement rehabilitation on 1-40/1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Chris Smitherman DMP,STIP,DDRL,Executive Hold,Revised STIP 2020-2029 Let 11/17/26,SCR to 45910.1.1 (Buckhom Road)to west of SR 1006(Orange Grove Road). move LET from 11/21123 to 11117/26 to assist in balancing funds 45910.3.1 1-5959 Pavement rehabilitation on 1-85 from west of SR 1006(Orange 11/16/27 FY2029 $11,156,000 Planning activities pending Chris Smitherman DMP,STIP,DDRL,Executive Hold,Revised STIP 2020-2029 Let 11/16/27,SCR to 45911.1.1 Grove Road)to Durham County line. move LET from 11/19/24 to 11/16/27 to assist in balancing funds 45911.3.1 R-5821A Construct operational improvements including 6120128 FY2030 $3,194,000 Planning and design activities underway, Chris Smitherman DMP,STIP,DDRL,Waiting on feasibility corridor study from DCHCMPO,NTP 1/23/18, 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 coordinating with NC54 West Corridor Study seeping meeting 6/25/18,ROW acquisition scheduled 6/15/20($730,000),Executive 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville Hold,SCR move ROW to 6/15/21 due to insufficient funds,Revised STIP 2020-2029 Let 47093.3.2 Road). 6/20/28,SCR move ROW from 6/15/21 to 5/15/26 and LET from 6/21122 to 6/20/28 for balancing funds,CON Build NC Bonds Page 1 TARPO-Orange Co Apr.2021 Agenda Item 5.a. 91 North Carolina Department of Transportation 4/1/2021 Active Projects Under Construction-Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE S T WOOTEN Nordan,PE, $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 5/29/2022 48.55 42.11 COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 CORPORATION James M C204078 B-4962 REPLACE BRIDGE#46 OVER ENO RIVER ON US-70 BYPASS. CONTI ENTERPRISES, Howell,Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 70.17 91.62 INC DG00461 REHAB.BRIDGE#031 ON SR 1010(E.FRANKLIN ST.)OVER BOLIN M&J CONSTRUCTION Howell,Bobby J $2,456,272.12 11/12/2018 7/15/2019 3/15/2019 12/26/2020 100 83.62 CREEK&BOLIN CREEK TRAIL CO OF PINELLAS COUNTY INC DG00462 REHAB.BRIDGES 264,288,260,543 IN GUILFORD COUNTY AND ELITE INDUSTRIAL Snell,PE,William $967,383.15 8/1/2019 1/1/2020 BRIDGE 031 IN ORANGE COUNTY PAINTING INC H DG00483 RESURFACE SR 1010(MAIN STREET/FRANKLIN STREET)FROM SR CAROLINA SUNROCK Howell,Bobby J $845,631.59 5/18/2019 8/7/2020 1005(JONES FERRY ROAD)TO NC 86(COLUMBIA STREET) LLC DG00485 U-5846 SR 1772(GREENSBORO STREET)AT SR 1780(ESTES DRIVE), FSC II LLC DBA FRED Howell,Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 67 73.24 CONSTRUCT ROUNDABOUT SMITH COMPANY DG00507 48 SECONDARY ROADS IN ALAMANCE COUNTY AND ONE WHITEHURST PVING Hayes,PE, $1,042,639.12 7/1/2021 6/30/2022 SECONDARY ROAD IN ORANGE COUNTY CO.,INC Meredith D Page 1 of 1 92 Agenda Item 6.a. 93 Orange County & NCDOT Highway Luncheon Division 7 and District 1 March 31 , 2021 12:00 p.m. https://global.gotomeeting.com/noin/696570845 I. INTRODUCTIONS Attendees: Renee Price, Jamezetta Bedford, Bonnie Hammersley, Travis Myren, Tom Altieri, Nish Trivedi, Tom Ten Eyck, Chuck Edwards, Pat Wilson, Wright Archer, Dawn McPherson, Margaret Hauth, Jenn Weaver II. DISCUSSION TOPICS A. Updates to the State Transportation Improvement Program (STIP) (NCDOT) A year after the COVID pandemic caused shutdowns across the state, the timeline for STIP projects has been adjusted based on revenue streams and phasing back into pre-pandemic conditions. Status: NCDOT to provide any updates. - Wright Archer: At this time last year, we were in a different place budget-wise. With severe hurricane issues and the pandemic, there were some real budget shortfalls. In November, balance was around $700,000 and as of last week, we're at about $1.5 million. Lots of projects are on hold, but we're starting projects back on. - Jenn Weaver: Roadside maintenance questions have come in. Can you speak to that? - Wright: Went from picking up 4 million pounds in 2018 to 9 million pounds in 2019 to 2 million in 2020. Looking to revitalize that now; maintenance was affected by budgetary constraints, but that's rebounding as well. B. US-70 at US-70 Business — Highway Safety Improvement Program (HSIP) (Orange County) Orange County Staff submitted this intersection for potential safety improvements to be evaluated and implemented by NCDOT through their SPOT Safety/Mobility or HSIP program. NCDOT has flagged it for HSIP for investigation and identify possible countermeasure. Status: NCDOT to provide any updates to results. - Nish Trivedi: The intersection of US 70/US 70A has had a lot of accidents and we've looked at the data (crash analysis). In communicating with NCDOT, we were told this was being considered for HSIP. Dawn McPherson: Touched base with associate, Brian Thomas; there is no response yet with recommendations based on investigation but that there should be information by the end of March. We should be able to bring something at that point in time after it comes forward; this is still in process. Tom Altieri: Something that Orange County Transportation Planning staff has been working on with the OUTBoard is trying to find smaller projects that can be funded (non-STIP) in order for them to be funded. Commissioners Price and Bedford, you'll remember hearing from the OUTBoard chair at a work session that there's interest in these types of projects. We've been working with NCDOT staff(particularly Dawn McPherson) to understand the mechanics of this process and how to get funding for these types of projects. Hopefully over time, we can have more success in this area. - Renee Price: Is there a thought to put in an actual traffic signal at this location or consider road realignment? - Nish: Since NCDOT is doing the investigation of this project, they'll decide on what treatment is best. 1 Agenda Item 6.a. 94 Orange County & NCDOT Highway Luncheon Division 7 and District 1 March 31 , 2021 12:00 p.m. - Dawn: If you're not going to go through the STIP process, it's going to be a smaller, lower-cost fix. Maybe if realignment seemed required, it could be added to the STIP at a later date. This is not, technically, an HSIP project yet; right now, it is being studied. NCDOT will do the investigation, provide recommendations to the County and will then seek out a funding source to fix the problem (with the potential safety/mobility problem). C. NC-54 at Dodson Crossroads (NCDOT) Orange County Staff submitted this intersection for potential safety improvements to be evaluated and implemented by NCDOT through their SPOT Safety/Mobility or HSIP program; current analysis has determined it does not qualify. NCDOT Division 7 Traffic Engineering staff is investigating low- cost countermeasures that may be implemented by NCDOT staff without requiring a full project. Status: NCDOT to provide any updates. - Dawn: We're looking at the possibility of looking at loop locations and back plates on traffic signals. Those are two items that we're looking at doing for those locations. - Jamezetta Bedford: What's a backplate? - Dawn: The back of the signal is black to help enhance that there is a traffic signal there and helps you better see that there is a red/yellow/green signal. - Renee: Is there a timeline for this? - Dawn: Probably by the end of April. D. Braided Intersection between Exits 160 and 161 on 1-40/1-85 (NCDOT) With the developer no longer pursuing the construction of Efland Station, questions remain about the process to change the "braided intersection" that falls between Mt. Willing Road and the US 70/1-85 Connector as well as any plans for widening that section of I-40/1-85. Status: NCDOT to provide any updates. - Chuck Edwards: Buc-ee's was proposed to go into the Efland interchange. There was a lot of discussion about the traffic impacts of that development (around 30,000 vehicle trips a day). One of the major things being looked at was removing the Exit 160 (Mt. Willing side). If you put a lot of traffic on that type of interchange, there are operational problems with that "weaving" scenario. One idea was to reconfigure the interchange. Public seemed to have questions about this. With no Buc-ee's, there's no major changes. The CTP for the area does show that the 1-85/US 70 Connector interchange has been identified as "needing improvement." As traffic grows sufficiently (either background or because of a project), it will need to change. With all of that being said, there's nothing on the current TIP to modify that interchange. - Renee: Are you going to look at the US 70 Connector? - Chuck: The Connector has had a few SPOT projects on the list (since you can only go to and from the East on it currently). Last time it went on SPOT, it didn't score well enough to get programmed. It should continue to be sought out in the SPOT process. - Tom A: A couple of reasons why that project hasn't scored well is because of the very high- capacity of the four-lane, divided section of the Connector. It's also an expensive project. Recommendation was to remove above-grade interchange to at-grade, and that's expensive and does not score well. Eventually, that bridge will need to be replaced or removed, but some things, like cost savings of removal vs replacement, are not factored into that process. In our discussions with NCDOT, we did feel like there was interest from NCDOT in the project, but SPOT is objective and we all must play by the same rules. Eventually getting it to a full movement, at grade, intersection would be beneficial. - Chuck: As SPOT has evolved, there's an "express design" (high-level feasibility study). Informs the process. We can do an express design if that helps. 2 Agenda Item 6.a. 95 Orange County & NCDOT Highway Luncheon Division 7 and District 1 March 31 , 2021 12:00 p.m. - Nish: This has been a County priority and is still on the SPOT list. I'm not aware of any express design that is being used currently. - Wright: We are looking at the way we design with value engineering. They used to be at the end of the process, and we're looking to bring them in to an earlier part of the process. That way, we get different ideas earlier in the process. We use this to try to get costs down to a reasonable level. E. Traffic Safety Issue in the Dogwood Acres Neighborhood (NCDOT) The BOCC has received an additional complaint with regard to traffic and safety in the Dogwood Acres neighborhood. The NCDOT Traffic Engineering investigation (Attachment 1) to the original complaint was given to Orange County Planning and the Orange County BOCC in November 2020. Status: NCDOT to provide any updates. - Dawn: Recommendation is not to improve intersection. We did not see any type of safety concerns in that area that we could tangibly see that would involve an all-way stop in that area. - Renee: Did you email the constituent? - Dawn: I believe that we have, and Chuck had reached out at one point. - Wright: Dawn, can you follow-up on that? - Dawn: Yes, I can and can copy Renee Price on that too. In the future, please feel free to forward this over to my office. F. Hillsborough Train Station and Feasibility Study on NC 86 Connector (Hillsborough) Hillsborough will share the status of their train station project as well as the progress of their feasibility study with consulting firm VHB on the NC 86 Connector. Status: Hillsborough staff to provide any updates. - Margaret Hauth: We did get notice from NCDOT that there's a freeway funding agreement between the town, NCDOT and GoTriangle. We will start the process of seeking a design team now. We did a conceptual study a few years ago to help inform this process, and so we're using that now. This project includes no improvements in the rail corridor. We will not be building a platform or outside improvements in that area for the time being. NC railroad isn't committing to anything right now. RFQ for design team will go out later this summer, and then design will be 18 months to two years. One thing we got besides the building is $100,000 to design a connection for pedestrians from the building to the downtown of Hillsborough. - Jenn: We're excited that this is moving and will accept any advocacy on our behalf to get the train to stop. - Renee: So you're building a station and the train may not stop? - Margaret: That has been our direction. There's some curve removal that creates an issue. Norfolk Southern has not shown interest in passenger activity in their corridor, while NC railroad has been a partner. There are steps that we have to go through in order to get a train to the station. - Renee: So if GoTriangle says that we're appropriately sized for rail, are we able to use it in 10- 15 years when we reach that threshold? - Margaret: Still would require Norfolk Southern's affirmation. Moving on to NC 86 Connector topic: - Margaret: NC 86 has used some of its funding from MPO to identify a solution at Eno Mountain Road and Mayo Street. Using two roundabouts instead of realignment is more cost-effective. Looking at river to Orange Grove Road and how to make improvements in an area that is rich with barriers (businesses, creeks, power lines, railroad, etc.). Working on that now and hoping to find a project that will become a TIP project in the future. 3 Agenda Item 6.a. 96 Orange County & NCDOT Highway Luncheon Division 7 and District 1 March 31 , 2021 12:00 p.m. - Renee: Where are the roundabouts? - Margaret: Mayo Street and Eno Mount Street, both at Orange Grove Road. The two roundabouts are safer and more cost-effective. III. NCDOT UPDATES ON PENDING OR ACTIVE PROJECTS A. TIP Projects B. Resurfacing and/or Bridge Replacements - Project list found as an attachment from NCDOT. - Chuck will double-check on an item for the MST initiative and whether the bridge will connect to it. - Jamezetta: Was this a part of the BG MPO project that got submitted to SPOT 6? - Nish: No. There is not SPOT 6 project for Buckhorn Road as a submitted project. - Jamezetta: How does all of this US 70 work (US 70 study) connect to everything? - Nish: The study will cover all of US 70 (west of Mebane to east Orange County). - Jamezetta: How come the roundabout at Estes Drive takes so long? - Chuck: That project has a lot of utility conflicts (OWASA). That one should be wrapped up soon and we're finishing up with the road work. - Jamezetta: Is NCDOT completing a section of the MST with the project update that is by the bridge? - Wright: There is a bench under the bridge for the MST trail. It will be another project (NCDOT won't be responsible for the building of the trail). - Jamezetta: Concerns about getting sidewalks out by Cedar Ridge HS and New Grady Brown Elementary. Is there an update on this? - Chuck: There is a lot of history there. Bottom line is that you've got two schools south of 1-40 and the homes are north of 1-40. One stopgap measure was to install pedestrian safety fencing, which you've seen. Long term, having sidewalks would be a positive. We did an MSTA study, but we weren't able to do pedestrian counts because COVID hit. We will go back to that after we get back to normal, but I think it'll take SPOT in order to get it up to where people will want to see it. - Chuck: Widening of 1-40 will be awarded in this coming August. Discussion of NC 86 study; this is a third part of the TIP project and has been pulled out because of complexity of issues. IV. ADDITIONAL ITEMS A. Mt. Willing Road and Buckhorn Road Intersection — Funding and Installation Progress - Dawn: It's looking like it's coming up on the Board for approval and potentially have funding by June 9t" or 10t". It has to be approved by the Board (concept, then funding). Potentially getting it funded by early summer, and we'll get back to you on that. - Renee: Has this been an issue with traffic because of the development that is taking place north of there? - Dawn: I think it's always been an issue, but with added development, this will enhance the need for this project. 4