HomeMy WebLinkAboutAgenda - 10-21-2003-10aORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA ITEM ABSTRACT
Meeting Date: October 21, 2003
Action Agenda
Item No. ~Q~_
SUBJECT: Upper Neuse River Basin Association's (UNRBA) Upper Neuse Watershed
Management Plan
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) N
ATTACHMENT(S):
Sections of Upper Neuse Watershed
Management Plan Specific to Orange County
INFORMATION CONTACT:
Craig Benedict., Planning Director, ext. 2592
Tom Altieri, Planner III, ext. 2579
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To receive a report from Mr. Chris Dreps of the Upper Neuse River Basin
Association (UNRBA) on the Upper Neuse Watershed Management Plan and the
recommendations for the portion of Orange County that lies within the Neuse River
Basin.
BACKGROUND: Orange County is a member of the UNRBA with Commissioner
Barry Jacobs serving as the County's representative on the Board of Directors. The
Watershed Management Plan is a joint effort between the State of North Carolina and
the regional local governments. The County's Comprehensive Pllan Land Use Element
update strongly considers water quality as a linchpin of land use planning.
Following is a list of topics that will be covered during Mr. Dreps' presentation:
• Upper Neuse Watershed Management Plan Planning Process
• Implementation
• Key Findings
• Upper Neuse Basin and Sub-Watersheds
• Full Implementation of Existing Regulations
• Drinking Water Quality Impacts
• Water Quality Impairment: Chlorophyll a
• Recreation and Habitat Impacts
• Impervious Cover: Existing, Year 2025, and at Buildout
• Location of Impaired Waters
• What is the Plan?
• 5 Watershed Management Techniques
2
• New Development Site Management -Overarching Strategy
• Strategies Recommended for Orange County
• Additional Considerations for Orange County
The Upper Neuse Watershed Management Plan strongly supports the County Planning and
Inspection Department's proposed Land Use Element density adjustments. The following table
provides a comparison between densities recommended in the Upper Neuse Watershed
Management Plan (UNWMP) and densities that Orange County Planning Staff is pursuing as
part of the Comprehensive Plan Land Use Element Update:
Watershed
UNRBA Density
Recommendation
OC Staff Proposed
Density
Recommendation
1 du per 2* ac (first 10
West Fork Eno (Northwest Upper Eno, ac) and then 5 ac
Part 1 du er 5 ac thereafter
1 du per 2* ac (first 10
No change ac) and then 5 ac
Lake Oran a Northeast U er Eno, Part recommended 1 thereafter
1 du per 2* ac (first 10
ac) and then 5 ac
Cor oration Lake U er Eno, Part 1 du er 5 ac thereafter 2
1 du per 2* ac (first 10
Lake Ben Johnston (Upper Eno and ac) and then 5 ac
Sevenmile Creek 1 du er 5 ac thereafter 2
Lake Michie Flat River 1 du er 5 ac 1 du er 5 ac
*May contain up to, but no more than, 5 lots with a density of 1 du/2ac. The 6th and all
subsequent lots must not exceed a density of 1 du/sac.
[1]Existing minimum density requirement: In Critical Area - 1 du per 2ac; In Protected Area
- 1 du per 1 ac
[2]With the exception of the Efland transition area, 1 du per 0.5 ac
Following is a link to a copy of the complete Plan:
Full Report: http://www.unrba.org/projact.htm If you have difficulty accessing
the Plan, lease contact Tom Altieri direct) for a co at 245-2579.
Orange County, Hillsborough, and the remaining 5 counties, 7
Who's Involved: municipalities, and local Soil and Water Conservation Districts in the
watershed
FINANCIAL IMPACT: None.
RECOMMENDATION(S): The Manager recommends that the Board receive as information
and provide any comments.
Upper Neuse Watershed Management Plan Appendix A
Development Ordinance Changes Recommended for
Orange County's subwatersheds
Orange County's jurisdiction within the Upper Neuse Watershed covers portions of six upland
drinking water supply watersheds; this land area constitutes approximately 25 percent of the Upper
Neuse Watershed. For each drinking water supply watershed, you will find a brief description of the
land area, existing regulations, and recommended changes to the development ordinance. First,
there are two important notes:
The TAC recommended testing two alternative management scenarios: 5-acre lot zoning and 3-
acre lot zoning with a small village allowed per township. A village was defined as a 50-acre area
developing under a high density option (up to 70 percent imperviousness). Although the 5-acre
lot zoning was the only scenario that absolutely met the non-degradation target (except for the
Lake Orange subwatershed where existing zoning is sufficient), for two subwatersheds (West Fork
Eno Corporation Lake, and Little River) the 3-acre lot zoning with village exceeded the water
quality target by only 1 to 2 µg/I of chlorophyll a which was deemed adequate to address the
target. Therefore, both are listed as meeting the target for these two subwatersheds.
2. Modeling demonstrated that Lake Ben )ohnston is more sensitive to alternative management
options. The Lake Ben Johnston subwatershed includes the West Fork Eno, Lake Orange, and
Corporation Lake subwatersheds and can therefore potentially be impacted by activities that
increase loading in those drainages. The West Fork Eno and Lake Orange reservoirs have more
storage than Corporation Lake and thus provide more nutrient trapping than Corporation Lake.
The trapping allows for different options to be selected for the West Fork Eno and Lake Orange
subwatersheds, while still protecting the downstream waters. However, if Orange County wishes
to meet the non-degradation target for the Lake Ben )ohnston drinkingwater supply, the
remaining drainage in the Corporation Lake subwatershed (i.e., the area below the West Fork
Eno and Lake Orange subwatersheds) and the direct drainage to Lake E3en Johnston should be
zoned at 1 unit per 5 acres and 5 percent maximum impervious area for new development, or
should meet the nitrogen loading performance standard of 1.7 Ibs/ac/yr and phosphorus loading
performance standard of 0.3 Ibs/ac/yr, rather than zoning for 1 unit per 3 acres with villages.
Northwest Upper Eno
Area in Orange County: 9.5 sq. mi.
2.4 percent of land area of Orange County
Existing development regulations: ORANGE
• 1 unit per 2 acres in Critical Area COUNTY
• 1 unit per acre and 12 percent impervious surface area maximum in
Protected Area
• Stream buffer approximately 100 feet
UNRBA May 2003 A-5
4
Upper Neuse Watershed Management Plan
Development regulation changes required to meet non-degradation target:
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent imperviousness
Options for Managing Water Quality
1. 1 unit per 5 acres and 5 percent impervious surface area maximum or
2. 1 unit per 3 acres plus 1 village per township or
3. Performance standards for all new developments: maximum nitrogen and phosphorus surface
loading of 1.7 Ibs/ac/yr and 0.3 Ibs/ac/yr, respectively.
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
Northeast Upper Eno (Lake Orange)
Area in Orange County: 9.1 sq. mi.
2.3 percent of land area of Orange County
D
Existing development regulations:
ORANGE
• 1 unit per 2 acres in Critical Area
COUNTY
• 1 unit per acre and 12 percent impervious surface area maximum in
Protected Area
• Stream buffer approximately 100 feet
Development regulation changes required to meet non-degradation target:
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent. imperviousness
Options for Managing Water Quality
Existing regulations meet targets
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
A
UNRBA May 2003 A-6
Upper Neuse Watershed Management Plan Appendix A
Upper Eno (Corporation Lake)
Area in Orange County: 41.4 sq. mi.
10.3 percent of land area of Orange County
Existing development regulations:
• 1 unit per 2 acres in Critical Area
• 1 unit per acre and 12 percent impervious surface area maximum in
Protected Area
• Stream buffer approximately 100 feet
Development regulation changes required to meet non-degradation target:
ORANGE
COUNTY
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent: imperviousness
Options for Managing Water QualitX
1. 1 unit per 5 acres and 5 percent impervious surface area maximum or
2. 1 unit per 3 acres plus 1 village per township or
3. Performance standards for all new developments: maximum nitrogen and phosphorus surface
loading of 1.7 Ibs/ac/yr and 0.3 Ibs/ac/yr, respectively.
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
Upper Eno and Sevenmile Creek (Lake Ben Johnston)
Area in Orange County: 60.2 sq. mi.
15.0 percent of land area of Orange County
Existing development regulations:
• 1 unit per 2 acres in Critical Area
• 1 unit per acre and 12 percent impervious surface area maximum in
Protected Area
• Stream buffer approximately 100 feet
Development regulation changes required to meet non-degradation target:
r r; z
r;.~~:.:
~.g
ORANGE
COUNTY
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent imperviousness
UNRBA May 2003 A-7
Upper Neuse Watershed Management Plan Appendix A
Options for Managing Water Quality
1. 1 unit per 5 acres and 5 percent impervious surface area maximum or
2. Performance standards for all new developments: maximum nitrogen and phosphorus surface
loading of 1.7 Ibs/ac/yr and 0.3 Ibs/ac/yr, respectively.
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
--- ----
Little River Reservoir
Area in Orange County: 62.2 sq. mi.
15.5 percent of land area of Orange County j
Existing development regulations
i ORANGE
• 1 unit per 2 acres and 6 percent impervious surface area maximum ` COUNTY ~'
• Stream buffer approximately 100 feet `L_.____ J
Development regulation changes required to meet non-degradation
target:
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent: imperviousness 1 unit per
Options for Managing Water Quality
1. 5 acres and 3.5 percent impervious surface area maximum or
2. 1 unit per 3 acres plus 1 village per township or
3. Performance standards for all new developments: maximum nitrogen a.nd phosphorus surface
loading of 1.7 Ibs/ac/yr and 0.3 Ibs/ac/yr, respectively.
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
Flat River (Lake Michie)
Area in Orange County: 7.1 sq. mi.
1.8 percent of land area of Orange County
Existing development regulations:
• 1 unit per acre
• 12 percent impervious surface area maximum
• Stream buffer approximately 100 feet
ORANGE
COUNTY
UNRBA May 2003 A-8
7
Upper Neuse Watershed Management Plan Appendix A
Development regulation changes required to meet non-degradation target:
Habitat Requirement
Enhanced peak flow management for any new developments >10 percent imperviousness
Options for Managing Water Quay
1. 1 unit per 5 acres and 5 percent impervious surface area maximum (for all County jurisdictions)
or
2. Performance standards for all new developments: maximum nitrogen and phosphorus surface
loading of 1.7 Ibs/ac/yr and 0.3 Ibs/ac/yr, respectively, or
3. Durham builds upland lake and Orange County regulations are unchanged.
See Chapter 4 for other recommended actions related to monitoring and enforcement,
education, point source controls, and stream/wetland restoration.
UNRBA May 2003 A-9