Loading...
HomeMy WebLinkAboutAgenda - 02-02-2021 Virtual Board Meeting; 5-a - Review of Zoning Atlas Amendment NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1) – Rougemont Self Storage 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 2, 2021 Action Agenda Item No. 5-a SUBJECT: Review of Zoning Atlas Amendment: NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1) — Rougemont Self Storage DEPARTMENT: Planning and Inspections ATTACHMENTS: INFORMATION CONTACT: 1. Application Package with Site Plan Michael D. Harvey, Planner III, (919) 245-2597 2. Vicinity and Current Zoning Map Molly Boyle, Planner II, (919) 245-2599 Craig Benedict, Director, (919) 245-2592 3. Orange County Future Land Use Map 4. Staff Review Comments 5. Meeting Notices and Materials 6. 2012 Ordinance to Amend Zoning Atlas and Imposed Conditions 7. Excerpt of Draft Planning Board Minutes from January 6, 2021 and Statement of Consistency 8. Statement of Consistency 9. Ordinance to Amend Zoning Atlas and Conditions of Approval PURPOSE: To hold a public hearing, receive the Planning Board/staff recommendation and public comment, close the public hearing, and consider action on an applicant initiated Zoning Atlas Amendment for a parcel within the Little River Township of the County. Specifically, Darrell Chandler of Rougemont Storage Center, LLC, is seeking to rezone approximately 7.37 acres of a parcel at 8927 Mile Branch Road to NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1). Approval of the zoning atlas amendment will allow for the expansion of the existing self-storage business. A copy of the application is contained in Attachment 1. BACKGROUND: Staff has processed a zoning atlas amendment application proposing to rezone a 7.37 acre portion of a 21 .54 acre parcel, further identified using Orange County Parcel Identification Number (PIN) 0910-23-7159 (hereafter `the Property'): FROM: Agricultural Residential (AR); NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1); Flat River Protected Watershed Protection Overlay District; and Little River Protected Watershed Protection Overlay District 2 TO: NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ- 1); Flat River Protected Watershed Protection Overlay District; and Little River Protected Watershed Protection Overlay District The County approved the rezoning of the property/development of a self-storage facility in 2012, with the public hearing occurring on August 27, 2012 and BOCC approval of the request on November 20, 2012. Agenda materials and minutes for these meeting(s) can be accessed at: http://server3.co.orange.nc.us:8088/weblink/Browse.aspx?dbid=0&startid=42108&row=1&cr=1. Attachment 6 contains a copy of the ordinance adopted in 2012 approving the aforementioned zoning atlas amendment and imposing conditions on the development of the approved self- storage business. As a general reminder, development of the property will be limited to applicable conditions imposed by the County as agreed to by the applicant. This includes continued compliance with existing, and any additional, imposed conditions. If the request is approved, the Zoning Atlas will indicate the property has been rezoned REDA-CZ-1, but development will only be permitted consistent with the approved site plan and conditions imposed specifically for the subject parcel. The basic facts concerning this application are as follows: Applicant: Darrell Chandler Rougemont Storage Center LLC 8927 Mile Branch Road Rougemont, NC 27572 A ent s : Chad Abbott C3 Design & Engineering 2537 E. Lyon Station Road Suite 102 Creedmoor, NC 27522 Parcel Information: A. Parcels and Size: PIN 0910-23-7159: An approximately 21.54 acre split zoned property with approximately: • 7.37 acres zoned AR; and • 14.17 acres zoned NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1). If the request is approved, the entire 21.54 acre parcel would be zoned REDA-CZ-1. A map denoting the vicinity and current zoning of the Property is contained in Attachment 2. The portion of the Property within the Little River Protected Watershed Protection Overlay District is limited to 12% impervious surface (5,227 sq. ft. per acre) for non-residential uses. The proposed development activity is contained within the Little River portion of the Property. B. Township: Little River. C. Future Land Use Map (FLUM) Designation: The parcel is located within the Agricultural Residential designation. Please refer to the maps contained in Attachment 3 for more information. 3 D. Growth Management System Designation: Rural Designated. E. Existing Conditions/Physical Features: Varying topography with wooded areas and water features (i.e. ponds and streams). Portions of the Property have been developed in support of a self-storage business. F. Roads: 1. North: Mile Branch Road, which serves as the access drive for the Property; 2. South: Bacon Road; 3. West: NC Highway 57; 4. East: The eastern property line does not have frontage or abut on a roadway. G. Water and Sewer: Development of the property will rely on individual well and septic systems. The Property is not in an area served by public water/sewer. Surrounding Land Uses: North: 80 acre parcel with a go-kart race track zoned AR; South: Bacon Road and AR zoned property ranging in size from 1.8 to 18 acres in area. There is a 2 acre parcel with an existing single-family residence; West: NC Highway 57, an 8 acre parcel with a single-family residence split zoned AR and Existing Commercial (EC-5), the Orange County Speedway on a 118 acre parcel also zoned AR; and East: A 7.6 acre parcel with an existing concrete processing operation zoned AR, Mile Branch Road, and the Orange/Durham County line. Conditional Zoning (CZ) Process: This process involves approval of a rezoning petition and a professionally prepared site plan allowing for the development of a specific land use. Applications are processed in a legislative manner (i.e., does not require sworn testimony or evidence) and decisions are based on the BOCC's determination that the project is consistent with the purpose and intent of the Comprehensive Plan and County regulations. The typical cadence for review is as follows: • First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). Staff Comment — DONE. This meeting was held in an on-line format on December 17, 2020. No members of the public attended. Please refer to Attachment 5 for more detail. • Second Action — The Planning Board reviews the application at a regular meeting and makes a recommendation to the BOCC. Staff Comment — DONE. The Board reviewed this request at its January 6, 2021 regular meeting, where they unanimously recommended approval. No members of the public spoke on the rezoning application. 4 • Third Action — The BOCC receives the Planning Board recommendation and makes a decision at a previously advertised public hearing. Staff Comment — Scheduled for February 2, 2021 . If the public hearing is held remotely, there is a 24-hour waiting period required before a decision can be effective, as per State legislation regarding virtual/remote meetings. The purpose of the 24-hour waiting period is to allow for submission of written comments. Per Section 2.9.2 (F) (3) of the Unified Development Ordinance (UDO), mutually agreed upon conditions can be imposed as part this process only if they address: 1. The compatibility of the proposed development with surrounding property, 2. Proposed support facilities (i.e. roadways and access points, parking areas and driveways, pedestrian and vehicular circulation systems, screening and buffer areas, etc.), and/or 3. All other matters the County may find appropriate or the petitioner may propose. If approved, the Zoning Atlas will be amended and the zoning designation of the subject 7.37 acre portion of the Property shall be changed to REDA-CZ-1. Development, including permitted land uses, would be in accordance with the approved development proposal and conditions imposed as part of the atlas amendment process. Development of the Property shall be permitted only through the review and approval of site plan application(s) in accordance within Section 2.5 of the UDO. This is so staff can verify all imposed conditions are adhered to and allow for final review by members of the Development Advisory Committee (DAC) as detailed within Section 1.9 of the UDO. Proposal: The applicant currently operates a self-storage facility on the property called Rougemont Self-Storage. As previously indicated herein, the self-storage operation is on a portion of property zoned REDA-CZ-1 while the southern portion of the parcel remains zoned Agricultural Residential (AR). The applicant is seeking to rezone the entire 21.54 acre parcel to REDA-CZ-1 to allow for the expansion of the existing self-storage facility, including: • 3 new storage buildings representing an 11,400 sq. ft. increase in impervious surface area; • Development of new internal access road/drive-aisles representing an additional 11,280 sq. ft. of new impervious area; • Development/installation of a new on-site spray septic system; and • Preservation of existing foliage, the erection of a new fence, and the planting of additional landscaping material to screen the project from adjacent properties. STAFF COMMENT: The property was included in the NC Highway 57 Small Area Plan study area and a self-storage facility was envisioned as an allowable use for the area. The small area plan was adopted by the BOCC on August 21, 2007 and can be accessed using the following link: https://www.orangecountync.gov/DocumentCenterNiew/4184/NC-57-Speedway-Small- Area-Plan-NC-57-SASAP-Task-Force-Cu rrently-Inactive-PDF. Section 5.2 Table of Permitted Uses of the UDO indicates a self-storage facility is a permitted use of property within the REDA-CZ-1 zoning district. 5 The proposed expansion is consistent with the provisions of the UDO, is consistent with the small area plan study, and is consistent with the County's original approval of the Conditional Zoning district in 2012. Access: The existing self-storage facility obtains vehicular ingress/egress from a driveway off of Mile Branch Road (State Road 1532). Access to the proposed new self-storage facilities will be through this existing driveway (i.e. no additional external driveway access proposed). STAFF COMMENT: Staff has received comments from NC Department of Transportation (NCDOT) staff indicating no concerns over the increase in traffic. According to the applicant, the additional 11,400 sq. ft. of mini-warehouse/storage unit space is expected to generate approximately 30 additional daily traffic trips to the site. Staff has determined the proposed expansion will not impact existing condition(s) imposed on the project as part of the original 2012 approval. As with all such projects, the site plan will be reviewed prior to the commencement of development activity by all County planning partners (i.e. NCDOT, County Fire Marshal, County Solid Waste, Environmental Health, Building Inspections, Erosion Control/Stormwater, etc.), presuming the atlas amendment is approved by the BOCC. Utilities: The project will be served by an on-site well and a spray septic system. STAFF COMMENT: A condition on the 2012 approval required on-site waste disposal facilities to be approved by Environmental Health and Building Inspections prior to the authorization of earth disturbing activities. Orange County Environmental Health will be involved in the review of the proposed installation of the new septic system, which is being permitted by the State consistent with applicable regulations. Erosion Control/Stormwater Regulations: The applicant has indicated the project will abide by existing stormwater and erosion control regulations in Sections 6.14 and 6.15 of the UDO respectively. STAFF COMMENT: The submitted site plan denotes the location of a new stormwater control measure (SCM) that will be required for compliance with the provisions of the UDO. The proposed expansion does not impact any existing conditions associated with the 2012 approval as it relates to stormwater management. Solid Waste: The applicant has indicated development within the project shall abide by the Orange County Solid Waste Management Ordinance. STAFF COMMENT: Orange County Solid Waste staff has indicated they have no concerns over the proposed expansion. Land Use Buffers: The applicant is proposing a 20' Type A land use buffer along NC 57 and Bacon Road. The applicant is also proposing a 10' land use buffer along the eastern property line adjoining the Argos Ready Mix cement mixing operation. For greater detail, please refer to the Landscape Plan (sheet C-1.5) in the Site Plan Under Separate Cover. STAFF COMMENT: The proposed buffers are consistent with the original Conditional Zoning District approval from 2012. The applicant will be required to maintain these buffers consistent with Section 6.8 Landscaping, Buffers & Tree Protection. Environmental Assessment (EA): Per Section 6.16.2 (A) of the LIDO, the application was exempt from the Environmental Assessment (EA) requirement because the development area for the project is less than two acres. 6 Analysis: As required under Section 2.9.2 (E) of the UDO, the Planning Director is required to: `cause an analysis to be made of the application' and pass that analysis on to the reviewing body. In analyzing this request, the Planning Director offers the following: 1. The application is complete in accordance with the requirements of Section 2.9.2 (C) of the UDO; 2. The proposal appears consistent with the various goals outlined within the Comprehensive Plan concerning development, including: a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. b. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features and that protect natural resources, cultural resources, and community character. c. Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural character, minimizes land use conflicts, supported by an efficient and balanced transportation system. d. Objective LU-3.1: Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. 3. The proposed development is consistent with existing/anticipated development within the area and the various land uses associated with the project are compatible with various goals/policies as detailed herein; 4. The project is consistent with the findings and recommendations contained within the NC Highway 57 Small Area Plan with respect to development in the area; 5. The proposed land use buffers are consistent with the 2012 approval and will adequately screen the land use from NC 57, Bacon Road, and the cement mixing operation to the east. Neighborhood Information Meeting: A neighborhood information meeting for the project was held on December 17, 2020 in accordance with Section 2.9.2 (D) of the UDO. The meeting was held in an on-line format due to current public health concerns. No members of the public attended the meeting. Public Notifications: In accordance with Section 2.8.7 of the UDO, notices were mailed via first class mail to property owners within 1,000 ft. of the subject parcel providing the date/time of the BOCC public hearing where the proposal is to be reviewed. These notices were mailed on January 15, 2021, 17 days before the meeting. Staff also posted the subject parcel with a sign indicating the date/time of the public hearing of the rezoning request on January 15, 2021. For more information, please refer to Attachment 5. Planning Board Recommendation: The Planning Board reviewed the zoning atlas amendment at its January 6, 2021 regular meeting. At this meeting the Board voted unanimously to 7 recommend approval of the Statement of Consistency (Attachment 8) and the proposed Zoning Atlas Amendment (Attachment 9). Excerpts of the minutes from the meeting, as well as the Board's signed Statement of Consistency, are included in Attachment 7. Agenda materials from the meeting can be viewed at: https://www.co.orange.nc.us/AgendaCenter/Planning-Board-26. Planning Director's Recommendation: The Planning Director recommends approval of the: 1. Statement of Consistency indicating the zoning atlas amendment is reasonable and in the public interest as contained in Attachment 8. 2. Ordinance amending the Zoning Atlas as well as imposing development conditions for the identified parcel as contained in Attachment 9. FINANCIAL IMPACT: This request has been reviewed by various County departments who have determined that the approval or denial of the request would not create the need for additional funding for the provision of County services. Costs associated with advertising, including the public hearing notice and mailings, were paid by the applicant in accordance with the adopted Orange County Fee Schedule. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal impact associated with this item notwithstanding the Project will adhere to existing adopted local, State, and Federal environmental regulations. RECOMMENDATION: The Manager recommends the Board: 1. Receive the request; 2. Conduct the public hearing and accept comment; 3. Provide direction to staff and the applicant on any additional conditions consistent with Section 2.9.2 (F) (3) of the UDO; 4. Close the public hearing 5. Authorize the acceptance of written comment(s) via e-mail to the Board at ocbocc@orangecountync.gov or by delivery to the Planning Department's office at 131 West Margaret Lane, 2nd floor, Hillsborough, North Carolina 27278, until 9:00 a.m. on Thursday February 4, 2021; 6. Consider action to approve the: a. Statement of Consistency (Attachment 8), and 8 b. Zoning Atlas Amendment (Attachment 9) as recommended by the Planning Board and Planning Director. If written comments to the rezoning request are received before the deadline stated in #5, this item will be brought back to the BOCC on February 16, 2021 for further consideration. If no written comments are received, the decision of the BOCC shall become effective at 9:01 a.m. on Thursday, February 4, 2021. Orange County Planning and Inspections Department 17 52 APPLICATION FOR ZONING ATLAS AMENDMENT Caca`` CONDITIONAL ZONING REQUEST APPLICANT INFORMATION: Date: 10/01/2020 Applicant:Darrell W Chandler e r Phone: 919-698-9748 Address: 9925 NC Hwy 57 r vS+n PSS Cell Phone: 3 3�, 3 G 70 7D Rougemont,NC 27572 E-mail:darreliwchandler@gmail.com PROPERTY SUBJECT TO REQUEST: Parcel identification Number(PIN): 0910237159 Address of property: NC 57&Bacon Rd, Rougemont,NC 27572 Owner of property: Darrell W Chandler Current Zoning Designation: AR Requested Zoning Designation: REDA-CZ-1 ** If Applicant/Owner are different people, include a signed, notarized, statement indicating that the owner has authorized 'the ^aYpilcalu w Juluwia IL-he rcyuc3a. In CuscS ii'ijcrc uacjc are �uuu��sac }►rvNcr�.y owners, please aataw► an additional document containing their signatures authorizing the submission of the application or other legal uucwueuiaduil esiabiisiw►g die appiicatiis righi iu Buie oil ilieir behalf. SUBMITTAL INFORMATION - Section 2.8.3 of the Unified Development Ordinance (UDO) l) A Map, at a legible scale, showing the property(s) subject to the request. A map may be procured at the Planning Department for a fee in accordance with the adopted Orange County Fee Schedule 2) A legal description of the property(s)proposed for rezoning 3) A list showing the names and addresses of all adjacent property owners within 500 feet of the subject property. I 4) A detailed narrative denoting the following: I A. I IL U LG e11G� lC1aLG 7vll« 11 liy .0 Jill 1 vy ajje proposed 1v�V Jeu_e qucSL.l ) lul lucorrected b. The changed,or changing,conditions(if any)that makes the proposed amendment reasonable necessary to Ipromote the public health, safety,and general welfare. I c. How the proposed amendment is consistent with, or carries out the intent and purpose oi;the Orange County Comprehensive Plan, I IIn addition to these general requirements, Section 2.9.2 of the UDO requires all Conditional Zoning to submit the Ifuiluwing additiunai 111furnlaholl: 11 A site nlan nrenared in accordance with the nrovisions of Section 2.5 of the T 1T)n inchldino the following information- a. A detailed description of the proposed use of property including an outline of the proposed operational characteristics of the proposed development. y I u. A d�talicd iidfuG S--JGy, - gardless of t1ie cstin-'Led number of iippS Pcr day,P1repared in accordance wiih ail applicable North Carolina Department of Transportation requirements or standards as well as Section 6.17 of the I UDO. c, The annrnnrlslta en6ronmental document 1nrenared in ar(-nrrlanCe anti, gpetinn A.I h of the T TW) I 10 d. A landscape plan showing the location of on-site significant trees;proposed screening, buffers, and landscaping; Iand any proposed treatment of any existing natural feature e. A summary of u6iAy services I I f_ A_ srhP. uh-,, for Constnirtinn/dev lonment of the nronerty_ Ig. Other required information identified by staff as part of the pre-application conference, and 2) The filing fee per the adopted Orange County fee schedule in affect as of the date of the application. I I ** NOTE: Please see attached documentation for submittal and process information associated with a Conditional 'Zoning request ** I I (we), the undersigned, have been made aware of the process for the review and action associated with a nn��itinnal T leP 51n liratinn and understand on!y comt»,lete appliratinns, rnntaininv all information renuirl-d by the Orange County UDO shall be reviewed and acted upon by the County. Further I (we) understand that any assistance I (we) may receive from County staff in preparing this application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does it guarantee an approval of the proposed atlas amendment by the County. Applicant Date: AppEcant 11 2537 E.LYON STAT/ON RD,STE 102 CSOESIGN & PO BOX361 ENGINEERING, RLLC CREEDMOOR,NC27522 CLIENT-FOCUSED• COMPREHENSIVE• COST-EFFECTIVE 919-230-0996 PROJECT NARRATIVE - ROUGEMONT SELF STORAGE PHASE 3 8927 Mile Branch Rd, Rougemont NC 27572 REV 3-13-2020 REV 10-23-2020 On behalf of Darrell W. Chandler, the owner of Rougemont Storage, we hereby request the rezoning of the parcel previously known as PIN 0910226989 (+/-8.74 acres) to REDA- CZ. The property has previously been recombined with the existing Rougemont Self Storage Facility at the address listed above. Therefore, the property is currently split zoned and would respectfully request the granting of the zoning map amendment to make the property in its entirety the same zoning district. Furthermore, as part of the Conditional Zoning requirement for this property, we are submitting and requesting approval to expand the current Self Storage facility onto this property as shown on the corresponding plans. The development of this property will be consistent with the existing Self Storage Development with respect to the type and quality of construction, and end product. This property will be served by a conventional well located on the existing property/development and will also provide for a conventional septic spray field on the subject property(expansion area) that will serve both properties from a sewage standpoint. The existing well is used for a single bathroom in the office of the existing facility and is expected to require no more than 100 GPD. Being an extension of the existing development, it is proposed that all traffic enter/exit through the existing gated access off Mile Branch Road. Using the ITE Trip Generation, its expected that +/-30 trips per day would result from the proposed 11,400 sf of mini-warehouse (storage unit) space. NCDOT has reviewed our proposal and concurs that the existing driveway is sufficient from a traffic standpoint and no additional information or studies are required. All proposed buildings and drives will be secured by a new fence that will tie to the existing fence and surround the proposed improvements. Stormwater will be captured and flow along the existing drainage patterns to a new Stormwater Control Measure (SCM) and will be treated per current falls lake standards. Preliminary calculations are on the Grading and Drainage Plan. It should be noted that the development on the subject property is quite limited due to a mis-mapping of the Little River ad Flat River Watersheds which restricts the development to 12% on the respective portions of the property. Ground topography does not support the current mapping of this line and until fixed, the property's J:\DD-PROJECTS\2018\18-079\CIVIL-18-079\Design\Planning\2020-10-27 Project Narrative REV.docx 1 12 2537 E.L YON STATION RD,STE 102 CSOESIGN & PO BOX361 ENGINEERING, PLLC CREEDMOOR,NC27522 CLIENT-FOCUSED• COMPREHENSIVE• COST-EFFECTIVE 919-230-0996 development is limited. The anticipated overall proposed disturbance is less than 40,000 sf, and therefore the EA/EIS are not applicable to this site. The previous development was required to comply with several conditions at the time of approval, all which have been adhered to and are listed on the plans. It is understood and acceptable to the applicant that the current proposal also adhere to these same standards as applicable. J:\DD-PROJECTS\2018\18-079\CIVIL-18-079\Design\Planning\2020-10-27 Project Narrative REV.docx 2 13 VICINITY MAP d' Courrtr ui,c lid X!, 0 1531 8ee�n Rd c6 y a LL � 0 F 0 ai r a' Rougemont Stcrage p SITE c N Q ¢ a Orange County A ,y 1 Rd Speedway T 0 N M T tg74 c3 v ai of n 0 N D) C 0 t'J C N Hanson Aggregates , a471 J_ co U N W 0 O K d t 0 0 Map data':2fl19 Ulliten STate? Terms Sendfeedback 1DOO ft- a m U 14 NORTH CAROLINA `OCX 384 WE 39t COMMISSIONER'S DEED ORANGE COUNTY THIS DEED, made and entered into this the � day of March, 1982, by and between EVERETT KENNEDY, CLAYTON HAITHCOCK and LUCIUS M. CHESHIRE, JR., acting as Commissioners as hereinafter stated, Parties of the First Part; and NELLIE C. NICHOLS and husband, LACY 27704 k NICHOLS, of 3811 Duke Homestead Road, Durham, North Carolina, Parties of the Second Part; WIT NESSETH: i THAT WHEREAS, in a certain special proceeding entitled "Julia C. i Mangum, et al, Petitioners, vs. Ila C. Woodlief, et al, Respondents" brought 1 11 and pending before the Clerk of Superior Court of Orange County, North Carolina, an order was made by said court appointing said Parties of the First Part as Commissioners to divide the lands described in the Petition in this matter; AND WHEREAS, the Court has approved a settlement of this matter by that Consent Judgment dated the 13th day of February, 1982 signed by all 1 parties hereto; AND WHEREAS, by said Consent Judgment, the Parties of the First Part as Commissioners were authorized and directed to make, execute and deliver to said Parties of the Second Part a good and sufficient deed for that portion of the subject lands allocated to the Parties of the Second Part by said Consent Judgment; NOW, THEREFORE, said Parties of the First Part, acting as i k Commissioners as aforesaid, under authority of said order of Court do hereby convey unto said Parties of the Second Part and their heirs, successors and assigns, the following described tract of land: i Being that tract of land lying and being in Little River Township, Orange County, North Carolina, and more particularly described as follows: BEING Tract No. 2 containing 8.74 acres as shown on plat and survey of Commissioner's Report, subdivision of Tract A of May Anna Clayton Estate, by Alois Callemyn, Registered Land Surveyor, dated January 29, 1981, � L recorded at Plat Book 33, page 72, Orange County Registry. i C0dMAN, ERNHOLZ. DICKEILSC N,BsRrIHOLZ.] TO HAVE AND TO HOLD said lands and premises together with all GLMHML I ATTORNEYSAT�LAW privileges and :appurtenances thereunto belonging to them the said Parties of CHAPEL HILL. N.C. HILLSBOROL'GH, N.C. E 7/s ?a_ ^& 1 I i 15 1 ou 384 PAGE 2 the Second Part and their heirs, successors and assigns in as fall and ample a manner as said Parties of the First Part as Commissioners as aforesaid are authorized and empowered to convey the same. IN TESTIMONY WHEREOF, said Parties of the First Part, acting as Commissioners as aforesaid, have hereunto set their hands and seals, this the day and year first above written. (SEAL) EVERETT KENN DY, Co X �-- SEAL) CLA7 HAITMOCK , Comr `%IJ / '. {SEAL} LUCIUS M. CH RE, JR. Comr. NORTH CAROLINA ORANGE COUNTY I, a Notary Public of said State and County do hereby certify atEVERETT KENNEDY, Party of the First Part, personally appeared before me this day and acknowledged the due execution of the foregoing Commissioner's Deed. as Commissioner. WITNESS my hand and notarial seal, this the .�t'L1 day of 1982. Notary blic My commission expir o NORTH CAROLINA ORANGE COUNTY 1, a�ae ! kr_rUevr� a Notary Public of said State and County do hereby certify that LEA ' ' N HAITHCOCK, Party of the First Part, personally appeared before me this day and acknowledged the due execution of the foregoing Commissioner's Deed. as Commissioner WITNESS my hand and notarial seal, this the of 1982. � day COLE'.,AN, BERNHOLZ, 1 DICKERSON,BERNHOLZ. II GLWHtLL 5t HARGRAVE Lary Public i ATTORNEYS AT LAW CHAPEL HILL, N.C. lj HILLSBOROUGH, N.C. 0. ' f ., 9 f h � 1 J i 16 I I I My commission expires: a13CY `.184 PACE 393 %NORTH CAROLINA ORANGE COUNTY E 1, � Pr- , a Notary Public of said State and County do hereby c rtify t�#tLUCI S M. CHESHIRE, JR., Party of the First Part, personally appeared before me this day and acknowledged the due execution of the foregoing Commissioner's Deed. as Commissioner WITNESS my hand and notarial seal, this the day of 1982. 1 ' y Publi My commission expires: NORTH CAROLINA — ORANGE COUNTY The foregoing certificates) of Donna Marie Snyder (Lloyd) A Notary �WVVQV" Public of the designated Governmental unitsXX (are) certified to be correct. Filed for registra- tion March 82 9: 1j AM Lion this the day of , 19 , at o'clock , in Record l3 ok 384 Page 391 Betty June Hayes, gister of eds Return: By: Assistant/D,epanr Register of Deeds I I iII I COLEMAN, BERNHOLZ. DICKBR.SON.BsRNHOLZ. GLEDHILL &HARGRAVE i ATTORNEYS AT LAW CHAPEL HILL. N.C. HILLSBOROUGH. N.C. i i i i 17 Property Owners within 500' of Subject Property: 1.) Name: Rougemont Storage Center LLC (Property none combined with proposed property) Address: 8927 Mile Branch Rd, Rougemont, NC 27572 2.) Name: We 3 Investments LLC Address: 9900 NC 57, Rougemont, NC 27572 3.) Name: Michael R Ammons Address: 9806 NC 57, Rougemont, NC 27572 4.) Name: Kenneth F & Nancy W Wallace Address: 9761 NC 57, Rougemont, NC 27572 5.) Name: Leonard H Mangum Address: N/A (PIN: 0910223106) 6.) Name: Michael N & Lucinda I Davis Address: N/A (PIN: 0910228451) 7.) Name: Hanson Aggregates Southeast Inc Address: N/A (PIN: 0910321178) 8.) Name: Argos Ready Mix LLC Address: 9017 Mile Branch Rd, Rougemont, NC 27572 9.) Name: Darrell Ray Harris Address: N/A (PIN:0910328408) 10.) Name: Orange County Speedway Real Estate LLC Address: 9740 NC 57, Rougemont, NC 27572 11.) Name: Darrell W Chandler Address: 9925 NC 57, Rougemont, NC 27572 18 ROY COOPER Govemor MICHAEL S.REGAN f. Secretary LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality November 18,2019 DARRELL W.CHANDLER—GENERAL MANAGER ROUGEMONT STORAGE CENTER,L.L.C. 8927 MILE BRANCH ROAD ROUGEMONT,NORTH CAROLINA 27572 Subject: Permit No. WQ0041050 Rougemont Storage Center WWTF Wastewater Irrigation System Orange County Dear Mr. Chandler: In accordance with your permit application request received July 25, 2019, and subsequent additional information received October 23, 2019, we are forwarding herewith Permit No. WQ0041050 dated November 18, 2019,to Rougemont Storage Center,.L.L.C. for the construction and operation of the subject wastewater treatment and irrigation facilities. This permit shall be effective from the date of issuance through January 31, 2026, and shall be subject to the conditions and limitations therein. The Permittee shall submit a renewal application no later than August 4,2025. Please pay attention to the monitoring requirements listed Attachments A and B. Failure to establish an adequate system for collecting and maintaining the required operational information shall result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, the Permittee has the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request shall be in the form of a written petition,conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings at 6714 Mail Service Center,Raleigh,NC 27699-6714. Otherwise,this permit shall be final and binding. One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this permit, please contact Ranveer Katyal at (919) 707-3661 or ranveer.katyal(a)ncdenr.€!ov. Sincerely, w da Culpepper,Director Division of Water Resources cc: Orange County Health Department(Electronic Copy) Raleigh Regional Office,Water Quality Regional Operations Section(Electronic Copy) North Carolina Department of Environmental Quality I Division of Water Resources 5,E Q� 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROU a 919.707.9000 19 Mr.Darrell W.Chandler November 18,2019 Page 2 of 2 Kevin D. Davidson,PE—Agri-Waste Technology,Inc.(Electronic Copy) Beth Buffington—Protection and Enforcement Branch(Electronic Copy) Laserfiche File(Electronic Copy) Digital Permit Archive(Electronic Copy) Central Files 20 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY RALEIGH WASTEWATER IRRIGATION SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143,General Statutes of North Carolina as amended, and other applicable Laws,Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rougemont Storage Center, L.L.C. Orange County FOR THE construction and operation of a 100 gallon per day (GPD) wastewater treatment and irrigation facility consisting of: a 1,500 gallon septic/re-circulation tank with an effluent filter and a 25 gallon per minute (GPM) re- circulation pump; an AdvanTex AX-20 treatment unit; a 3,000 gallon pump tank with an 11.2 GPM field- dosing pump and audio/visual high-water alarms;an ultraviolet(ITV)disinfection unit;a rain sensor;a 0.20 acre spray irrigation area with three spray heads; and all associated piping, valves, controls, and appurtenances to serve the Rougemont Storage Center WWTF,with no discharge of wastes to surface waters,pursuant to the application received July 25, 2019, subsequent additional information received October 23, 2019, and in conformity with the Division-approved plans and specifications considered a part of this permit. Please note that the Alternative Design Criteria has been approved for this facility pursuant to 15A NCAC 02T .0105(n). The following administrative code has been approved for the alternative design criteria: ➢ 15A NCAC 02T.0505(k)—Multiple pumps should be provided wherever pumps are used. The system tank has more than 24 hours of emergency storage, and in the event of a pump failure an alternative pump can be delivered and installed within 24 hours,thus exempting the need for multiple pumps. This permit shall be effective from the date of issuance through January 31, 2026, and shall be subject to the following conditions and limitations: WQ0041050 Version 1.0 Shell Version 181105 Page 1 of 11 21 I. SCHEDULES 1. Upon completion of construction and prior to operation of this permitted facility, the Permittee shall submit an engineering certification from a North Carolina licensed Professional Engineer certifying that the permitted facility has been constructed in accordance with G.S. 143-215.1, Administrative Code Title 15A Subchapter 02T,this permit, and the Division-approved plans and specifications. For phased and partially certified facilities, the Permittee shall retain the responsibility to track further construction a roved under thispermit-and shall provide a final engineering certification upon progect completion. Mail the Engineering Certification to the Division of Water Resources, Non-Discharge Branch, 1617 Mail Service Center,Raleigh,NC 27699-1617, or Non-Discharge.Reports iiwncdenr.gov. [15A NCAC 02T .0116(a)] 2. The Permittee shall notify the Raleigh Regional Office,telephone number(919)791-4200,at least two business days in advance of initial operation of the constructed facilities so that the Division can conduct a startup inspection. [15A NCAC 02T .0108(b)(1)(B)] 3. Prior to operation of the newly installed facilities, a Final Operation and Maintenance Plan shall be submitted for review. The plan shall be sent to the Division of Water Resources, Non-Discharge Branch, 1617 Mail Service Center, Raleigh,NC 27699-1617 or Non-Disc harge.Reports(@ncdenr. ov. [15A NCAC 02T.0108(b)(1)(B), 02T.0507(a)] 4. Upon completion of construction and prior to irrigation, a soil evaluation shall be completed for all areas where fill material is placed within the permitted irrigation areas. The report shall certify that areas utilizing fill material are capable of accepting the designed loading rate. This report shall specifically address,but not be limited to,soil features such as soil compaction and saturated hydraulic conductivity of the least permeable layer, soil fertility report and any amendments added, verification of fill suitability and depth of fill material(and to the seasonal high water table)across the field,as well as any other properties that might impact the soil's ability to accept irrigation water. The soil scientist evaluation shall be mailed to the Division of Water Resources, Non-Discharge Branch, 1617 Mail Service Center,Raleigh,NC 27699-1617 or Non-Discharge.Reportsancdenr.gov. Irrigation shall not occur until the Raleigh Regional Office approves the soils evaluation. [15A NCAC 02T .0108(b)(1)(A)] 5. The Permittee shall request renewal of this permit on Division-approved forms no later than August 4, 2025. [15A NCAC 02T .0105(b), 02T .0109] H. PERFORMANCE STANDARDS 1. The Permittee shall maintain and operate the subject non-discharge facilities so there is no discharge to surface waters, nor any contravention of groundwater or surface water standards. In the event the facilities fail to perform satisfactorily, including the creation of nuisance conditions due to improper operation and maintenance, or failure of the irrigation areas to assimilate the effluent, the Permittee shall take immediate corrective actions, including Division required actions, such as the construction of additional or replacement wastewater treatment or disposal facilities. [15A NCAC 02T .0108(b)(1)(A)] 2. This permit shall not relieve the Permittee of their responsibility for damages to groundwater or surface water resulting from the operation of this facility. [15A NCAC 02T .0108(b)(1)(A)] 3. Effluent quality shall not exceed the limitations specified in Attachment A. [15A NCAC 02T.0505(b)] 4. Application rates, whether hydraulic, nutrient, or other pollutant, shall not exceed those specified in Attachment B. [15A NCAC 02T .0505(c), 02T .0505(n)] 5. The Permittee shall connect the irrigation system to a rain or moisture sensor designed to prevent irrigation during precipitation events or wet conditions. [15A NCAC 02T.0505(x)] WQ0041050 Version 1.0 Shell Version 181105 Page 2 of 11 22 6. Wastewater irrigation fields permitted on or after December 30, 1983 have a compliance boundary that is either 250 feet from the wastewater irrigation area, or 50 feet within the property boundary, whichever is closest to the wastewater irrigation area. Any exceedance of groundwater standards at or beyond the compliance boundary shall require corrective action. Division-approved relocation of the compliance boundary shall be noted in Attachment B. Multiple contiguous properties under common ownership and permitted for use as a disposal system shall be treated as a single property with regard to determination of a compliance boundary. [15A NCAC 02L.0106(d)(2),02L.0107(b),02T.0105(h), G.S. 143-215.1(i), G.S. 143-215.1(k)] 7. The Permittee shall apply for a permit modification to establish a new compliance boundary prior to any sale or transfer of property affecting a compliance boundary(i.e.,parcel subdivision). [15A NCAC 02L .0107(c)] 8. No wells, excluding Division-approved monitoring wells, shall be constructed within the compliance boundary except as provided for in 15A NCAC 02L .0107(g). [15A NCAC 02L .0107] 9. Except as provided for in 15A NCAC 02L .0107(g), the Permittee shall ensure any landowner who is not the Permittee and owns land within the compliance boundary shall execute and file with the Orange County Register of Deeds an easement running with the land containing the following items: a. A notice of the permit and number or other description as allowed in 15A NCAC 02L .0107(f)(1); b. Prohibits construction and operation of water supply wells within the compliance boundary;and c. Reserves the right of the Permittee or the State to enter the property within the compliance boundary for purposes related to the permit. The Director may terminate the easement when its purpose has been fulfilled or is no longer needed. [15A NCAC 02L .0107(f)] WQ0041050 Version 1.0 Shell Version 181105 Page 3 of 11 23 10. The facilities herein were permitted per the following setbacks: a. The irrigation sites were originally permitted November 18,2019. The setbacks for spray irrigation sites originally permitted or modified on or after September 1,2018 are as follows(all distances in feet): i. Each habitable residence or place of assembly under separate ownership: 4001 ii. Each habitable residence or place of assembly owned by the Permittee: 2001 iii. Each private or public water supply source: 100 iv. Surface waters: 100 v. Groundwater lowering ditches: 100 vi. Surface water diversions: 25 vii. Each well with exception of monitoring wells: 100 viii.Each property line: 150 3 ix. Top of slope of embankments or cuts of two feet or more in vertical height: 15 x. Each water line: 10 xi. Subsurface groundwater lowering drainage systems: 100 xii. Public right of way: 50 xiii.Nitrification field: 20 xiv.Each building foundation or basement: 15 1 Habitable residences or places of assembly under separate ownership constructed after the facilities herein were originally permitted or subsequently modified are exempt from this setback. 2 Per a setback waiver recorded in the Orange County Register of Deeds,reduced setbacks from the wetted area to any habitable residence or place of assembly owned by the Permittee are as follows: Parcel No. Deed Book/Page Setback Easement 0910333879 6630/ 1373 100 feet 100 feet 3 Setbacks to property lines are not applicable when the Permittee, or the entity from which the Permittee is leasing,owns both parcels separated by the property line. [15A NCAC 02T.0506(a), 02T .0506(d), 02T .0506(e), 02T.0506(f)] WQ0041050 Version 1.0 Shell Version 181105 Page 4 of 11 24 b. The storage and treatment units were originally permitted November 18, 2019. The setbacks for storage and treatment units originally permitted or modified on or after September 1, 2018 are as follows(all distances in feet): i. Each habitable residence or place of assembly under separate ownership: 1001 ii. Each private or public water supply source: 100 iii. Surface waters: 50 iv. Each well with exception of monitoring wells: 100 v. Each property line: 50 2,3 1 Habitable residences or places of assembly under separate ownership constructed after the facilities herein were originally permitted or subsequently modified are exempt from this setback. 2 Setbacks to property lines are not applicable when the Permittee, or the entity from which the Permittee is leasing, owns both parcels separated by the property line. 3 Per a setback waiver recorded in the Orange County Register of Deeds,reduced setbacks from the storage and treatment units to any property line are as follows: Parcel No. Deed Book/Page Setback Easement 0910322905 6612/ 1824 25 feet 25 feet [15A NCAC 02T .0506(b), 02T .0506(d), 02T.0506(e), 02T.0506(f)] III. OPERATION AND MAINTENANCE REQUIREMENTS 1. The Permittee shall operate and maintain the subject facilities as a non-discharge system. [15A NCAC 02T .0500] 2. The Permittee shall maintain an Operation and Maintenance Plan, which shall include operational functions, maintenance schedules, safety measures, and a spill response plan. [15A NCAC 02T .0507(a)] 3. Upon the Water Pollution Control System Operators Certification Commission's (WPCSOCC) classification of the subject non-discharge facilities,the Permittee shall designate and employ a certified operator in responsible charge(ORC),and one or more certified operators as back-up ORCs. The ORC or their back-up shall operate and visit the facilities as required by the WPCSOCC. [15A NCAC 02T .0117] 4. The Permittee shall maintain vegetative cover on the irrigation sites, such that crop health is optimal, allows even effluent distribution, and allows inspection of the irrigation system. [15A NCAC 02T .0507(b)] 5. The Permittee shall take measures to prevent effluent ponding in or runoff from the irrigation sites listed in Attachment B. [15A NCAC 02T.0507(c)] 6. The Permittee shall not irrigate treated effluent during inclement weather, or when the soil is in a condition that will cause ponding or runoff. [15A NCAC 02T .0505(x)] 7. Irrigation equipment shall be tested and calibrated once per permit cycle. [15A NCAC 02T.0507(d)] 8. Only treated effluent from the Rougemont Storage Center WWTF shall be irrigated on the sites listed in Attachment B. [15A NCAC 02T .0501] 9. The Permittee shall not allow vehicles or heavy machinery on the irrigation area, except during equipment installation or maintenance activities. [15A NCAC 02T .0507(e)] WQ0041050 Version 1.0 Shell Version 181105 Page 5 of 11 25 10. The Permittee shall prohibit public access to the wastewater treatment,storage,and irrigation facilities. [15A NCAC 02T.0505(q)] 11. The Permittee shall dispose or utilize generated residuals in a Division-approved manner. [15A NCAC 02T .0508, 02T .1100]. 12. The Permittee shall not divert or bypass untreated or partially treated wastewater from the subject facilities. [15A NCAC 02T .05050)] 13. A protective vegetative cover shall be established and maintained on all berms, pipe runs, erosion control areas, surface water diversions, and earthen embankments(i.e., outside toe of embankment to maximum allowable temporary storage elevation on the inside of the embankment). Trees,shrubs,and other woody vegetation shall not be allowed to grow on the earthen dikes or embankments. Earthen embankments shall be kept mowed or otherwise controlled and accessible. [15A NCAC 02T.0507(g)] 14. Metering equipment shall be tested and calibrated annually. [15A NCAC 02T.0507(d)] IV. MONITORING AND REPORTING REOUIREMENTS 1. The Permittee shall conduct and report any Division required monitoring necessary to evaluate this facility's impact on groundwater and surface water. [15A NCAC 02T .0108(c)] 2. A Division-certified laboratory shall conduct all analyses for the required effluent, groundwater, and surface water parameters. [15A NCAC 02H.0800] 3. Flow through the treatment facility shall be continuously monitored, and daily flow values shall be reported on Form NDMR. Facilities with a permitted flow less than 10,000 GPD may estimate their flow from water usage records provided the water source is metered. [15A NCAC 02T .0105(k), 02T .0108(c)] 4. The Permittee shall monitor the treated effluent at the frequencies and locations for the parameters specified in Attachment A. [15A NCAC 02T .0108(c)] 5. The Permittee shall maintain records tracking the amount of effluent irrigated. These records shall include the following information for each irrigation site listed in Attachment B: a. Date of irrigation; b. Volume of effluent irrigated; c. Site irrigated; d. Length of time site is irrigated; e. Continuous weekly,monthly, and year-to-date hydraulic(inches/acre)loadings; f. Continuous monthly and year-to-date loadings for any non-hydraulic parameter specifically limited in Attachment B; g. Weather conditions; and h. Maintenance of cover crops. [15A NCAC 02T .0108(c)] WQ0041050 Version 1.0 Shell Version 181105 Page 6 of 11 26 6. Three copies of all monitoring data(as specified in Conditions IV.3. and IVA.) on Form NDMR for each PPI and three copies of all operation and disposal records (as specified in Conditions IV.5. on Form NDAR-1 for every site in Attachment B shall be submitted on or before the last day of the following month. If no activities occurred during the monitoring month, monitoring reports are still required documenting the absence of the activity. All information shall be submitted to the following address: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 [15A NCAC 02T.0105(1)] 7. The Permittee shall maintain a record of all residuals removed from this facility. This record shall be maintained for five years, and shall be made available to the Division upon request. This record shall include: a. Name of the residuals hauler; b. Non-Discharge permit number authorizing the residuals disposal,or a letter from a municipality agreeing to accept the residuals; c. Date the residuals were hauled; and d. Volume of residuals removed. [15A NCAC 02T .0508(b)] 8. A maintenance log shall be kept at this facility. This log shall be maintained for five years, and shall be made available to the Division upon request. This log shall include: a. Date of flow measurement device calibration; b. Date of irrigation equipment calibration; c. Visual observations of the plant and plant site; and d. Record of preventative maintenance(e.g.,changing of equipment,adjustments,testing,inspections and cleanings, etc.). [15A NCAC 02T.0507(h)] 9. An annual representative soils analysis (i.e., Standard Soil Fertility Analysis) shall be conducted on each irrigation site listed in Attachment B. These results shall be maintained at the facility for five years,and shall be made available to the Division upon request. Each Standard Soil Fertility Analysis shall include the following parameters: Acidity Exchangeable Sodium Percentage Phosphorus Base Saturation(by calculation) Magnesium Potassium Calcium Manganese Sodium Cation Exchange Capacity Percent Humic Matter Zinc Copper pH [15A NCAC 02T .0I08(c)] WQ0041050 Version 1.0 Shell Version 181105 Page 7 of 11 27 10. Noncompliance Notification: The Permittee shall report to the Raleigh Regional Office, telephone number (919) 791-4200, within 24 hours of first knowledge of the following: a. Treatment of wastes abnormal in quantity or characteristic, including the known passage of a hazardous substance. b. Any process unit failure (e.g., mechanical, electrical, etc.) rendering the facility incapable of adequate wastewater treatment. c. Any facility failure resulting in a discharge to surface waters. d. Any time self-monitoring indicates the facility has gone out of compliance with its permit limitations. e. Ponding in or runoff from the irrigation sites. Emergencies requiring reporting outside normal business hours shall call the Division's Emergency Response personnel at telephone number (800) 662-7956, (800) 858-0368, or (919) 733-3300. All noncompliance notifications shall file a written report to the Raleigh Regional Office within five days of first knowledge of the occurrence,and this report shall outline the actions proposed or taken to ensure the problem does not recur. [15A NCAC 02T .0108(b)(1)(A)] V. INSPECTIONS 1. The Permittee shall perform inspections and maintenance to ensure proper operation of the wastewater treatment and irrigation facilities. [15A NCAC 02T .0507(i)] 2. The Permittee shall inspect the wastewater treatment and irrigation facilities to prevent malfunctions, facility deterioration, and operator errors that may result in discharges of wastes to the environment, threats to human health, or public nuisances. The Permittee shall maintain an inspection log that includes the date and time of inspection, observations made, and maintenance, repairs, or corrective actions taken. The Permittee shall maintain this inspection log for a period of five years from the date of the inspection, and this log shall be made available to the Division upon request. [15A NCAC 02T .0507(h), 02T .0507(i)] 3. Division authorized representatives may, upon presentation of credentials, enter and inspect any property,premises,or place related to the wastewater treatment and irrigation facilities permitted herein at any reasonable time for determining compliance with this permit. Division authorized representatives may inspect or copy records maintained under the terms and conditions of this permit, and may collect groundwater, surface water, or leachate samples. [G.S. 143-215.3(a)(2)] WQ0041050 Version 1.0 Shell Version 181105 Page 8 of 11 28 VI. GENERAL CONDITIONS 1. Failure to comply with the conditions and limitations contained herein may subject the Permittee to a Division enforcement action. [G.S. 143-215.6A, 143-215.6B, 143-215.6C] 2. This permit is effective only with respect to the nature and volume of wastes described in the permit application, and Division-approved plans and specifications. [G.S. 143-215.1(d)] 3. Unless specifically requested and approved in this permit,there are no variances to administrative codes or general statutes governing the construction or operation of the facilities permitted herein. [15A NCAC 02T .0105(n)] 4. The issuance of this permit does not exempt the Permittee from complying with all statutes, rules, regulations, or ordinances that other jurisdictional government agencies(e.g., local, state, and federal) may require. [15A NCAC 02T .0105(c)(6)] 5. If the permitted facilities change ownership, or the Permittee changes their name, the Permittee shall submit a permit modification request on Division-approved forms. The Permittee shall comply with all terms and conditions of this permit until the permit is transferred to the successor-owner. [G.S. 143- 215.1(d3)] 6. The Permittee shall retain a set of Division-approved plans and specifications for the life of the facilities permitted herein. [15A NCAC 02T .0105(o)] 7. The Permittee shall maintain this permit until the proper closure of all facilities permitted herein, or until the facilities permitted herein are permitted by another authority. [15A NCAC 02T .01050)] 8. This permit is subject to revocation or modification upon 60-day notice from the Division Director, in whole or part for: a. violation of any terms or conditions of this permit or Administrative Code Title 15A Subchapter 02T; b. obtaining a permit by misrepresentation or failure to disclose all relevant facts; c. the Permittee's refusal to allow authorized Department employees upon presentation of credentials: i. to enter the Permittee's premises where a system is located or where any records are required to be kept; ii. to have access to any permit required documents and records; iii. to inspect any monitoring equipment or method as required in this permit;or iv. to sample any pollutants; d. the Permittee's failure to pay the annual fee for administering and compliance monitoring; or e. a Division determination that the conditions of this permit are in conflict with North Carolina Administrative Code or General Statutes. [15A NCAC 02T .0110] WQ0041050 Version 1.0 Shell Version 181105 Page 9 of 11 29 9. Unless the Division Director grants a variance, expansion of the facilities permitted herein shall not occur if any of the following apply: a. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has been convicted of environmental crimes under G.S. 143-215.6B, or under Federal law that would otherwise be prosecuted under G.S. 143-215.613, and all appeals of this conviction have been abandoned or exhausted. b. The Permittee or any parent,subsidiary,or other affiliate of the Permittee has previously abandoned a wastewater treatment facility without properly closing the facility. c. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has not paid a civil penalty,and all appeals of this penalty have been abandoned or exhausted. d. The Permittee or any parent,subsidiary,or other affiliate of the Permittee is currently not compliant with any compliance schedule in a permit, settlement agreement, or order. e. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has not paid an annual fee. [15A NCAC 02T .0120(b), 02T .0120(d)] 10. This permit shall not be renewed if the Permittee or any affiliation has not paid the required annual fee. [15A NCAC 02T .0120(c)] Permit issued this the 18'day of November 2019 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 0 .1� nda Culpepper,Director Division of Water Resources By Authority of the Environmental Management Commission Permit Number WQ0041050 WQ0041050 Version 1.0 Shell Version 181105 Page 10 of 11 30 Permit No. WQ0041050 Wastewater Irrigation System Rougemont Storage Center, L.L.C. November 18,2019 Rougemont Storage Center WWTF Orange County ENGINEERING CERTIFICATION ❑ Partial ❑Final as a duly licensed North Carolina Professional Engineer,having❑periodically/❑ fully observed the construction of the permitted facilities,do hereby state to the best of my abilities that the facility was constructed in compliance with G.S. 143-215.1, Administrative Code Title 15A Subchapter 02T, this permit, and the Division-approved plans and specifications. Documentation of any variation to this permit,and the Division-approved plans and specifications,is in the attached as-built drawings. Description of variations: Professional Engineer's Name Firm Name Firm No. Address City State Zip Code Telephone Email Seal, Signature,and Date THE COMPLETED ENGINEERING CERTIFICATION,INCLUDING ALL SUPPORTING DOCUMENTATION, SHALL BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES NON-DISCHARGE BRANCH By U.S. Postal Service By Courier/Special Deliver, 1617 MAIL SERVICE CENTER 512 N. SALISBURY ST. RALEIGH,NORTH CAROLINA 27699-1617 RALEIGH,NORTH CAROLINA 27604 WQ0041050 Version 1.0 Shell Version 181105 Page 11 of 11 31 THIS PAGE BLANK 32 ATTACHMENT A—LIMITATIONS AND MONITORING REQUIREMENTS Permit Number:WQ0041050 Version: 1.0 PPI 001—WWTF effluent EFFLUENT CHARACTERISTICS EFFLUENT LIMITS MONITORING REQUIREMENTS PCs Parameter Description Units of Monthly Monthly Daily Minimum Daily Maximum Measurement Sample Code Measure Average Geometric Mean Frequency Type 00310 BOD,5-Day(20°C) mg/L 30 Annual Grab 31616 Coliform,Fecal MF,M-FC Broth,44.5°C #/100 mL 200 Annual' Grab 50050 Flow,in Conduit or thru Treatment Plant GPD 100 Monthly Estimate 00610 Nitrogen,Ammonia Total(as N) mg/L 15 Annual' Grab 00625 Nitrogen,Kjeldahl,Total(as N) mg/L Annual' Grab 00620 Nitrogen,Nitrate Total(as N) mg/L Annual' Grab 00600 Nitrogen,Total(as N) mg/L Annual' Grab 00400 pH su 2 x Year 2 Grab 00665 Phosphorus,Total(as P) mg/L Annual' Grab 00530 Solids,Total Suspended mg/L 30 Annual' Grab 1. Annual sampling shall be conducted in June. 2. 2 x Year sampling shall be conducted in June and December. WQ0041050 Version 1.0 Attachment A Page 1 of 1 33 THIS PAGE BLANK 34 ATTACHMENT B—APPROVED LAND APPLICATION SITES AND LIMITATIONS Permit Number: WQ0041050 Version: 1.0 Rougemont Storage Center,L.L.C.—Rougemont Storage Center WWTF IRRIGATION AREA INFORMATION APPLICATION LIMITATIONS Field Owner CountyLongitude Latitude Lon Net Dominant Hourly Yearly g Acreage Soil Series Parameter Rate Max Units 1 Rougemont Storage Center,L.L.0 Orange 36.230919° -78.957123' 0.20 ApB 01284—Non-Discharge Application Rate 0.15 6.56 inches Totals 0.20 WQ0041050 Version 1.0 Attachment B Page 1 of 1 • 1 • • • • • Legend Proposed spray area i� V Proposed Treatment f�" R mont starage Storage I r setback Setback Waiver reatrn'e*t syste Y,* r i - r Waiver recorded not registered with county Ak GooUrr-7marth N ' f._ 400 ft 36 Molly Boyle From: Darrell Chandler <darrellwchandler@gmail.com> Sent: Wednesday,January 08, 2020 4:32 PM To: Chad Abbott Subject: Fwd:WQ0041050 Here is the map I requested today from the DWQ. It shows that the 200' setback has been waived down to a 100' setback. Disregard the not recorded with the county, it has been recorded Work#336-364-7070 Owner's Darrell's Cell#919-698-9748 ---------- Forwarded message --------- From: Katyal, Ranveer<Ranveer.Katyal @ ncdenr.gov> Date: Wed, Jan 8, 2020 at 2:31 PM Subject: WQ0041050 To: Darrell Chandler<darrellwchandler@ gmail.com> Good afternoon Mr. Chandler, This is a follow up to our discussion. I have attached the map and as per the setback waiver recorded, reduced setbacks from the wetted area to any habitable residence or place of assembly owned by the Permittee are as Parcel No. Deed Book l Page Setback 0910333879 6630 / 1373 100 feet 1 The spray head has a diameter of- 33 feet radius as per the submitted designs hence 133 feet from the spray head. i j r } f r l� lk f Waiver recorded mat registered with now NNW won w w w 38 Sincerely, Ranveer Katyal Environmental Engineer Non-Discharge Branch Department of Environmental Quality 919 707 3661 office ranveer.katyal@ncdenr.gov 512 N. Salisbury St. 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 3 39 Molly Boyle From: Patrick R. Mallett Sent: Friday, December 18, 2020 4:45 PM To: Molly Boyle Subject: FW: [External] 18-079 Rougemont Self Storage From: Edwards, Charles N [mailto:cnedwards@ncdot.gov] Sent: Tuesday, October 13, 2020 2:21 PM To: Chad Abbott; Jones, DeAngelo J Cc: Allison Averette; Patrick R. Mallett Subject: RE: [External] 18-079 Rougemont Self Storage Based on our previous discussions,the proposed site expansion will not result in additional traffic impacts that would require mitigation. No NCDOT action or approval is required. If you need further,feel free to coordinate directly with DeAngelo Jones as the primary point of contact for this project. C. N. Edwards Jr., PE (Chuck) District Engineer North Carolina Department of Transportation Division of Highways Division 7, District 1 336 570 6833 cnedwards(o)-ncdot.gov 115 East Crescent Square Drive P. O. Box 766 Graham, NC 27253 AJ From: Chad Abbott<chad@c3designeng.com> Sent:Tuesday, October 13, 2020 12:47 PM To: Edwards, Charles N <cnedwards@ncdot.gov>;Jones, DeAngelo J <djjonesl@ncdot.gov> Cc:Allison Averette<allison@c3designeng.com>; Patrick R. Mallett (pmallett@orangecountync.gov) <pmallett@orangecountync.gov> Subject: [External] 18-079 Rougemont Self Storage a"mail. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Good Afternoon Gentlemen, I hope you are doing well. I think you may have already talked with Pat regarding this, but we are expanding the current self-storage facility to add+/-11,400 sf of new storage units.This is only a small percentage increase and I had run some 1 40 trip generation numbers for it a while back and they are listed in the attached narrative.The county ordinance ask for a "traffic study"for such conditional zoning districts. I don't think that this increase would breech any thresholds of TIAs with you folks, and there for a "study"would be moot.So, if this is the case (as I think Pat has indicated from preliminary discussions with you) can you provide a memo or response letter stating for the record and use during our rezoning that the existing driveway has proven suitable and that the additional trips will not warrant additional improvements to the NCDOT street network? We would need to call this memo "RE:Traffic Study for Rougemont Self Storage". Let me know if you have any questions, comments, or what I could do to help. Regards, Chad E.Abbott, PE Principal Engineer [DESIGN F=NGlNEEf NS. PLLZ 2537 E. Lyon Station Rd.—Ste 102 (Physical) P.O. Box 361 (Mailing) Creedmoor, NC 27522 919.230.0996 x101 (Office) 919.625.7368 (Mobile) Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 2 41 DRAWING INDEX ROUGEMONT SELF STORAGE VICINITY MAP---- a COVERSHEET (:-, EXISTING CONDITIONS&DEMO PLAN C-1.1 PH III OVERALL SITE PLAN C-1.2 N SITE PLAN C-1.3 �'�,, 1-� 4y STORM DRAIN AGE PLAN C_I.4 NC HWY 57 & BACON RD ¢ �zo LANDSCAPE PLAN -'5 ROUGEMONT, NC 27572o CASE NUMBER: MA20-0001 k PROJECT CONTACTS � CONDITION APPLIED BY PREVIOUS APPROVAL: �} FNO1 i• >oszo-za�wacas� $ fig. xszmz @ accovnaxczw�,xaauuusoxaxcsmuxn rensoe NOT FORp �uxmrrs rvo.mus¢rzxrvnrx.xE xs,or.xE 7. y �,•i �o wawa nsxszm uczme ��"'ry�J'_ x�a�ax,vsxuo was„onxa.o,xaaw,x.xa,"a,oa�,a.x � d s x.zme - � aoxx,.a�s�oxaox.�,onoa.o,xaaaxx.xa,"ax,oa�,a,x o�s,xanx —. ti nseszm .:tea o`xauxwrovme.x ouxra aovrmaaxx�xcxwean,"Exrwimaaoevor � �I,� nsxszm uczme wH 11" CONSTRUCTION TMxo�� 'r row xxEo',00x�. /ENE-RE " ,. "'""°""°" °°""`"" SUBMITTAL&REVIEW LOG I * � ' z w S 2Ze H N U zo p PR- ia- ��079 " MAzo-0001 42 CONSTRUCTION SEQUENCE: ( ,/ j � r.k: o��l/ I I �. o € ;; I III y lrs; , I 1 I A. 09 �:�E,o�Eoo�ME; , E.Moµ =�o,a Emrc, . m �A., .Aow —' _ , NOT FOR O / CONSTRUCTION A—ro.Ei �OHE _OH R �Wo Ho BACON ROAD U a i o W A (60'PUBLIC ROW-SR 1531) IIRIIIII 18-079 MA20-0001 DISTURBED AREA:±50,000 SF p.iSAQ Keowwhsfsbelow. o x CBII before you dig. 43 VICINITY MAP F Y� L mg a SITE INFORMATION Z On \ (Lul] a a \OT FOR ao<aao zsa.v«nnc,.am,mm / .,�„ .• �y' •'`'. Lco' CONSTRUCTION 'imvae<E,namrvousreua,zw oos�ius aarus ooxxxa� �O� � \\ � �—, --.�4e'30..�.Ewa\-- \ — mxrnunmxoxaw, aer.nu.nex...wavru•o —.� r _ r m msu.mn xzF. ,s.ss. 1~•—•— 1 vveasx,xw�x�xxvm�xn uiw uw;60•lfi.nmce.v i . 1 1 oxn.v.ou..ow,xix�muenuwz-rxeess 1 1 �� � — ,.,a.,w.,E.� a]i 1 1 • � LEGEND&NOMENCLATURE { y \ °g ]ON ROAD— 'l U SRL3 Lazo Know what':below. a0feo-r» ----� Call before you dig. <>e _ \ _ ---- -- 18079 . „ax�o enolacia. C-1.2 MA20 0001 44 SITE NOTES: A� 0 ———— ————— —————————----- - --T / / LD Totrl:ffP —A,1,0—NZIEZ=Al I s I I.11 El I Z I_— W =A=­ I--- —BE 5TAT— ANYKN I==oAFN I TENANTACKNO—GES ­5 5TO-5 C—Eft 5HA11 NOTBE USED \OT FOR C rrvrov = E_R.E 1A C1—A-111 A STANDARDS OF EVALUATION: CONSTRUCTION C-, —5-C—AU86—r—Y-15 ==S=.1. IA. R— —A. —N ———————— T- ror.s, ...,arxa ro / / aeucC _E� 'T.—T—'=1-11T= LT'DET,fR,MIN.E.H.E.P,R=T�NES.�A'IR0,—D 0 W o E SU- 11, Ilk 7 -0--- -T 'H- T. �Eaow aoar — manmf UTILITY STATEMENT 8�Er 6YA 2 N­ M=T= .1 I—T ass�.ry / / v,: Z 6 C C)'. PR03—ft 18-079 0001 G PHICSu�LE US.EV,,—.rsT MA20- F— K-6a.h.t's below. sm2rm� BACON ROAD V (60'PUBLIC ROW-SR 1531) C-1.3 libeforeyoudig. &A 45 GRADING AND STORM DRAINAGE NOTES wn rz- - — ----- 99 �/ �/ IN R \ \ \ \ °° °\ 0 IT FORA tD— LD —7_Z- CONSTRUCTION J- 0 CHE aHE OHE 0 14 c) VAXr Z1. �D BACON ROAD '. 0 (60'PUBLIC ROW-SR 1531) RAVHICSU(F C3 PROJECl# 18-079 —PROJE- 40 f, MA20-0001 Know wears below. Call before you dig. Efir C-1.4 46 /N `"ICI PERMANENT SEEDING IN NORTH CAROLINA(TABLE 6.11L) TEMPORARY SEEDING IN NORTH CAROLINA 1 / IV ) \ \ O Z N� $ �� NOT T FOR MULCH SEEDINGHED °�°waa°w.zrsar rnuscna,mrwarm+,°°.. mvnrxa.ossse, nrnvsranrwrruxeeuse°asa "IHslUCT CONSTRUCTION T--T7 .,m.n.a-asw�1Er,,,r9m.®.-°are°•l. ,wuac P�SEEDBED PREPARATION °"E °"E- I N— SHRUB PLANTING DETAIL \ N RO T-EP—TING—DS UNE ®ac.a Man OW- O PROPOSED BUFFERS(AS SHOWN): Ura ...aoa".," ,°,.a."°w°°x « .nmmmrv,r� ate.°maaEE.a.°ce,. • az c, E ;o�irtiJ'r^:{ nsua.ntE vevn xwnrwx rvx. Knowwhafsbelow. F ° u Call before you dig. �W�� , 88 Y Nores .°°` ,uxaucc n°.rusauwxs sx°wnes°x,vr°nsxanrv° vcs nv"m„vr GUY SWING DETAIL rsa TYP.PROPOSED 20 BUFFER PLANTING PLAN p G n. „a ao FOR NC HWY 57&BACON ROAD F " «u.,°m"r.m°.w., k aavwesuee >eagEcrn: Al ,:�.. r L �18�079 -ail -M..0 g .ar�.aarora �rNrE�l EErn.noiEcrn: TREE PLANTING AND STAYING DETAIL onm. va,. msc TYP.PROPOSED 10'BUFFER PLANTING PLAN FOR STAKING DIAGRAM TREE GUYING DIAGRAM GUY SPACING DETAIL E TERN RE I EN I L ZONE OUN RY REDA-CZ-1 (Rougernont Storage) Vicinity and Zoning Map EC5 i i / i i Flat River Protected Watershed 1 �'♦ AR ED . -CZ- i i i i tic 0 EC5 BACON RD i Little River / Protected Watershed 1 I I PIN#:0910237159 ROUGEMONT STORAGE CENTER LLC i Data shown on this map is obtained from Orange County GIs and is for reference only. Exact locations and boundaries should be verified. 8927 MIKE BRANCH RD Map prepared by Orange County Planning&Inspections. Rougemont, NC 27572 12/20/2020-mboyle F-1 AR --Soils Survey Stream Streets N M EC5 OC Updated Stream Zoning 77 REDA-CZ-1 EO NWI Wetlands Water Body 1 inch=300feet USGS Stream 0 Parcels Watershed 0 75 150 Feet s w y� 7 � 49 Rougemont Storage - Future Land Use Map 2 . i i i i i i i i i i i i i i Fe i �Ay tic i i i i ON RD I I I 1 I 1 1 I 1 I I PIN#:0910237159 ROUGEMONT STORAGE CENTER LLC Data shown on this map is obtained from Orange County G I S and is for reference only. Exact locations and boundaries should be verified. 8927 MIKE BRANCH RD Map prepared by Orange County Planning&Inspections. Rougemont, NC 27572 12/21/2020-mboyle — County Boundary OC Updated Stream 0 Water Body Agricultural Residential NWI Wetlands —USGS Stream p Parcels 1 inch=400 feet —•Soils Survey Stream Streets 0 100 200 Feet 50 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 dh MEMORANDUM TO: Michael Harvey, Planner III, Current Planning Supervisor COPY TO: File FROM: Patrick Mallett, Erosion Control and Stormwater Supervisor DATE: 21 DEC2020 PROJECT: Rougemont Self Storage Phase III (Case #: MA20-0001) SUBJECT: Erosion Control and Stormwater Review of REDA-CZ-1 Application Staff has reviewed the submitted application materials for Phase III of the Rougemont Self Storage Facility and further referenced below. Zoning: Current Zoning: Agricultural Residential (AR) and NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning (REDA-CZ-1) Proposed Zoning: NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning (REDA-CZ-1) Site Information: Property ID Number (PIN)- 0910-23-7159 Property Size: 19.55 acres (7.37 acres in Phase III area) Location: NC Highway 57, Bacon Road, Mile Branch Road Watersheds: Little River Protected / Flat River Protected Major Plan Elements: • Access via existing Rougemont Storage Facility (Phases All ) using existing entrance; • Proposing 3 new in-door storage buildings totaling 11,400 sq. ft. (2 building @ 3,600 sq. ft. each and 1 building @) 4,200 sq. ft.); • 50,000 sq. ft. of anticipated new land disturbance; and • 22,680 sq. ft. of additional impervious area. As currently proposed, Erosion Control And Stormwater has no objections to the approval of this rezoning request. Please note, however, that the level of proposed land disturbance will require additional Erosion Control and Stormwater permits. These permits will need to be submitted, reviewed and approved prior to any on-site development activity. 51 Michael Harvey From: Molly Boyle Sent: Monday, December 21, 2020 8:34 AM To: Michael Harvey Subject: FW: [External] 18-079 Rougemont Self Storage From: Patrick R. Mallett Sent: Friday, December 18, 2020 4:45 PM To: Molly Boyle<mboyle@orangecountync.gov> Subject: FW: [External] 18-079 Rougemont Self Storage ITE trips are also in the plan and the narrative... From: Edwards, Charles N [mailto:cnedwards@ncdot.gov] Sent: Tuesday, October 13, 2020 2:21 PM To: Chad Abbott; Jones, DeAngelo J Cc: Allison Averette; Patrick R. Mallett Subject: RE: [External] 18-079 Rougemont Self Storage Based on our previous discussions, the proposed site expansion will not result in additional traffic impacts that would require mitigation. No NCDOT action or approval is required. If you need further, feel free to coordinate directly with DeAngelo Jones as the primary point of contact for this project. C. N. Edwards Jr., PE (Chuck) District Engineer North Carolina Department of Transportation Division of Highways Division 7, District 1 336 570 6833 cnedwards(a-)_ncdot.gov 115 East Crescent Square Drive P. O. Box 766 Graham, NC 27253 - 'm F From: Chad Abbott<chad@c3designeng.com> Sent:Tuesday, October 13, 2020 12:47 PM To: Edwards, Charles N <cnedwards@ncdot.gov>;Jones, DeAngelo J <diiones1@ncdot.gov> Cc:Allison Averette<allison@c3designeng.com>; Patrick R. Mallett (pmallett@orangecountync.gov) <pmallett@orangecountync.gov> Subject: [External] 18-079 Rougemont Self Storage 1 52 Wm ternal email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Inc. . Good Afternoon Gentlemen, I hope you are doing well. I think you may have already talked with Pat regarding this, but we are expanding the current self-storage facility to add +/-11,400 sf of new storage units.This is only a small percentage increase and I had run some trip generation numbers for it a while back and they are listed in the attached narrative.The county ordinance ask for a "traffic study"for such conditional zoning districts. I don't think that this increase would breech any thresholds of TIAs with you folks, and there for a "study" would be moot. So, if this is the case (as I think Pat has indicated from preliminary discussions with you) can you provide a memo or response letter stating for the record and use during our rezoning that the existing driveway has proven suitable and that the additional trips will not warrant additional improvements to the NCDOT street network? We would need to call this memo "RE:Traffic Study for Rougemont Self Storage". Let me know if you have any questions, comments, or what I could do to help. Regards, Chad E.Abbott, PE Principal Engineer ❑ ESON (=_NGINEEPdi G, PLLC 2537 E. Lyon Station Rd.—Ste 102 (Physical) P.O. Box 361 (Mailing) Creedmoor, NC 27522 919.230.0996 x101 (Office) 919.625.7368 (Mobile) Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 2 53 Michael Harvey From: Jeff Scouten Sent: Monday, December 21, 2020 8:48 AM To: Michael Harvey Subject: RE: Staff comment(s) on Daryl Chandler REDA rezoning - expansion of existing self storage facility Michael, I don't have any objection to the approval of the subject rezoning application. I'm pretty sure I already approved it in E'gov but maybe not. Let me know if you need anything else. Jeff Scouten Environmental Enforcement Supervisor Orange County Solid Waste Management 12.07 Eubanks Road Chapel Hill, NC 27516-7177 91e-e68-2788 (Office) Pursuant to North Carolina General Statute 132, correspondence sent and received from this account is a public record and may be disclosed to third parties. DUE TO COVID 19, REPLIES AND FOLLOW-UP TO EMAILS MAY BE DELAYED From: Michael Harvey<mharvey@orangecountync.gov> Sent: Monday, December 21, 2020 8:17 AM To: Phil Vilaro<pvilaro@orangecountync.gov>;Jason Shepherd <jshepherd@orangecountync.gov>; Elizabeth Farnan <efarnan@orangecountync.gov>;Jeff Scouten <jscouten@orangecountync.gov>; Patrick R. Mallett <pmallett@orangecountync.gov>; Christian Hirni <chirni@orangecountync.gov> Cc: Molly Boyle<mboyle@orangecountync.gov>; David Ward <dward@orangecountync.gov> Subject: Staff comment(s) on Daryl Chandler REDA rezoning-expansion of existing self storage facility I am in need of assistance. As parties are aware, we have reviewed on a few occasions a site plan proposing an expansion of an existing self-storage facility off of Mile Branch Road in the Little River Township of Orange County. The expansion is part of a Conditional Zoning atlas amendment we are preparing (relevant documents attached to aid in recollection). This has been discussed at DAC a few times, and all parties have offered comments within EnerGOV. What I am in need of are responses (emails, memos, etc.) of your'approval' of the project or any conditions that need to be imposed. 1 54 Michael Harvey From: Jason Shepherd Sent: Monday, December 21, 2020 9:42 AM To: Michael Harvey; Phil Vilaro; Elizabeth Farnan;Jeff Scouten; Patrick R. Mallett; Christian Hirni Cc: Molly Boyle; David Ward Subject: RE: Staff comment(s) on Daryl Chandler REDA rezoning - expansion of existing self storage facility Approved. Jason Permit and Inspection Information is now available online! Click here to access our portal Jason B. Shepherd Fire Marshal Orange County Emergency Services 510 Meadowlands Drive Hillsborough, NC 27278 919-245-6151 Office 919-257-8316 Cellular From: Michael Harvey<mharvey@orangecountync.gov> Sent: Monday, December 21, 2020 8:17 AM To: Phil Vilaro<pvilaro@orangecountync.gov>;Jason Shepherd <jshepherd@orangecountync.gov>; Elizabeth Farnan <efarnan@orangecountync.gov>;Jeff Scouten <jscouten@orangecountync.gov>; Patrick R. Mallett <pmallett@orangecountync.gov>; Christian Hirni <chirni@orangecountync.gov> Cc: Molly Boyle<mboyle@orangecountync.gov>; David Ward <dward@orangecountync.gov> Subject: Staff comment(s) on Daryl Chandler REDA rezoning-expansion of existing self storage facility I am in need of assistance. As parties are aware, we have reviewed on a few occasions a site plan proposing an expansion of an existing self-storage facility off of Mile Branch Road in the Little River Township of Orange County. The expansion is part of a Conditional Zoning atlas amendment we are preparing (relevant documents attached to aid in recollection). This has been discussed at DAC a few times, and all parties have offered comments within EnerGOV. What I am in need of are responses (emails, memos, etc.) of your'approval' of the project or any conditions that need to be imposed. I would be appreciative if this information could be provided by 10 a.m.Tuesday December 28, 2020 if at all possible. i 55 Attachment 5 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration ... 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 CERTIFICATION OF PUBLIC HEARING NOTIFICATION NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1) Rougemont Self Storage I, Michael D. Harvey, Planner with Orange County, North Carolina, DO HEREBY CERTIFY that in accordance with the provisions of Section 2.8 of the Orange County Unified Development Ordinance (UDO), I have or caused notice of a PUBLIC HEARING for the project referenced herein as follows: 1. MAILED NOTICES: Notices giving specifics on the zoning atlas amendment request, contact information, the dates/times/location of the BOCC public hearing including instructions on how to access the virtual public hearing and be able to offer comment(s) on the proposal were mailed: a. First class mail to all property owners within 1,000 ft. ( as identified by Orange County Tax records) of the subject properties; and b. Certified mail to the owner of the subject parcel. on January 15 2021, 17 days before the meeting. 2. SIGNS: Staff posted the subject parcels with signs indicating the date/time of the public hearing on January 15, 2021, 17 days before the meeting; Further, Planning Department staff caused a legal ad advertising the date, time, location, and purpose of the BOCC public hearing to run in the News of Orange and the Herald Sun on January 20 and 27, 2021. WITNESS my hand, this 15t" day of January, 2021. R a�l Current Plannind Supervisor 56 MICHAEL R AMMONS DARRELL W CHANDLER DARRELL W CHANDLER 9806 NC HWY 57 9925 NC HWY 57 9925 NC HWY 57 ROUGEMONT, NC 27572 Rougemont, NC 27572 Rougemont, NC 27572 MICHAEL& LUCINDA DAVIS DARRELL RAY HARRIS W R HARRIS 8426 DOUGHTON DR 13107 HWY 501 N 1526 BACON RD BAHAMA, NC 27503 ROUGEMONT, NC 27572 ROUGEMONT, NC 27572 W HARRIS DOUGLAS WE 3 INVESTMENTS LLC H LEONARD MANGUM 3520 PIEDMONT RD STE 410 4004 STONEBROOK FARM RD 712 SPRINGWOOD AVE ATLANTA, GA 30305 GREENSBORO, NC 27406 GIBSONVILLE, NC 27249 ARGOS READY MIX LLC DONALD&CAROL POOLE OC SPEEDWAY REAL ESTATE LLC 3015 WINDWARD PLZ, STE 300 401 BILL POOLE RD 9740 NC 57 ALPHARETTA, GA 30005 ROUGEMONT, NC 27572 ROUGEMONT, NC 27572 JOHN &PATRICIA RUSSICK I PORTILLO&S.AYALA HANSON AGGREGATES SE INC 9985 NC 57 1012 LANSING AVE 3520 PIEDMONT RD STE 410 ROUGEMONT, NC 27572 DURHAM, NC 27713 ATLANTA, GA 30305 ROUGEMONT STORAGE JANICE V TUCKER KENNETH & NANCY WALLACE 8927 MILE BRANCH RD PO BOX 308 9761 NC 57 Rougemont, NC 27572 TIMBERLAKE, NC 27583 Rougemont, NC 27572 57 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 January 14, 2021 NOTICE OF BOCC PUBLIC HEARING Review of Zoning Atlas Amendment for a Conditional Zoning District for Rougemont Storage To Whom It May Concern: Orange County Planning staff has received an application proposing to rezone property at 8927 Mile Branch Road to a Conditional Zoning District. Per Section 2.9.2 Conditional Zoning District of the Unified Development Ordinance, you are receiving this letter because property you own is within 1,000 ft. of the project site. The site is further described below: Site Information Parcel ID Number(PIN) 0910-23-7159 Owner Rougemont Storage Center, LLC Location 8927 Mile Branch Road at NC 57 and Mile Branch Road Acreage • Total=21.54 acres • Proposed for rezoning= 7.37 acres Proposed Land Use Expansion of existing self-storage facility, Rougemont Storage Current Zoning • NC Highway 57 Speedway Area—Rural Economic Development Area Conditional Zoning (REDA-CZ-1) • Agricultural Residential (AR) • Little River Protected Watershed Overlay District • Flat River Protected Watershed Overlay District Proposed Zoning • NC Highway 57 Speedway Area—Rural Economic Development Area Conditional Zoning(REDA-CZ-1) • Little River Protected Watershed Overlay District • Flat River Protected Watershed Overlay District What is being proposed? The applicant operates a self-storage facility on the property called Rougemont Storage. The storage operation is on the portion of the property in a conditional zoning district, specifically the Rural Economic Development Area Conditional Zoning District(REDA-CZ-1). The rest of the property is zoned for residential use. The applicant is seeking to rezone the residential acreage so that the entire property is in the conditional zoning district. If approved,this rezoning will allow the applicant to expand the existing self-storage facility. The proposed expansion includes: 58 ■ 22,680 sq. ft. of new impervious area, including 3 new storage buildings (11,400 sq. ft.); ■ A new on-site spray septic system; and ■ Screening from adjacent properties, including new fencing and plantings, as well as preserved vegetation. Please refer to the attached vicinity map and site plan for additional details or view the materials online at https•//www oran egecountync.gov/1722/Current-Interest-Projects. Why am I receiving this letter? You are receiving this letter because your property is located within 1,000 ft. of the two parcels subject to this rezoning petition. Per Section 2.8.7 of the UDO, staff is required to send written notice, via first class mail, to property owners within 1,000 ft. informing them of the Board of County Commissioners (BOCC)hearing where the application is to be reviewed. This notice is required to be mailed at least 15 days before the hearing. When is the public hearing? The BOCC will hold a public hearing and make a decision on this proposed amendment on the following date: Tuesday, February 2,2021 at 7:00 pm Consistent with COVID-19 protocols, and to ensure the health and safety of all participants, the meeting will be virtual and pre-registration is required if you wish to speak at the hearing. How can I participate in the hearing? The agenda will be posted online in advance of the meeting at http•//oran egecountync.gov/1707BOCC-Agendas. The meeting will be live streamed online for those who wish to view the meeting without speaking: www oran eg_countync.gov/967/Meeting-Videos. To speak at the public hearing,please email ocpubliccommentgoran eg c, ountync.gov no later than 3:00 pm on the day of the hearing. When submitting your request to speak, please include the following information: • The date of the meeting • The number and title of the agenda item you wish to speak on • Your name, address, email, and phone number • Note that the phone number must be the one you plan to use to call into the hearing (if participating by phone) After you register,you will receive an email with instructions and a link to access the hearing. If you do not have reliable internet access and would like to call into the hearing instead,please call the office of the Clerk to the Board no later than 5:00 pm on the hearing date at 919-245-2130. A staff member will provide you with the call-in number. Written comments to the Board of County Commissioners can be sent via e-mail to ocbocckorang_ecount�nc.gov or delivered to the address below: 59 Orange County Planning and Inspections West Campus Office Building 131 W. Margaret Lane, 2nd floor(physical) P.O. Box 8181 (mail) Hillsborough,NC You may call the Planning Department at(919) 245-2575 during normal office hours (8:00 a.m. to 5:00 p.m., Monday through Friday) with any questions. You may also e-mail questions to planningdept(a oran eg countync.s4ov. If you have any questions, please contact Current Planning staff at 919-245-2575 or email mharveyna oran eg ccountync.gov. We will be happy to assist. Best Regards, cm csF0cv& Molly Boyle, MPA, CZO Planner II Orange County Planning and Inspections Enclosures: Site Plan Vicinity Map Conditional Zoning Fact Sheet 60 2537 E.L YON STATION RD,STE 102 17SDESIGN PO BOX361 ENGINEERING, PLLC CREEDMOOR,NC27522 919-230-0996 CLIENT-FOCUSED-COMPREHENSIVE-COST-EFFECTIVE PROJECT NARRATIVE - ROUGEMONT SELF STORAGE PHASE 3 8927 Mile Branch Rd, Rougemont NC 27572 REV 3-13-2020 REV 10-23-2020 On behalf of Darrell W. Chandler, the owner of Rougemont Storage, we hereby request the rezoning of the parcel previously known as PIN 0910226989 (+/-8.74 acres) to REDA- CZ. The property has previously been recombined with the existing Rougemont Self Storage Facility at the address listed above. Therefore, the property is currently split zoned and would respectfully request the granting of the zoning map amendment to make the property in its entirety the same zoning district. Furthermore, as part of the Conditional Zoning requirement for this property, we are submitting and requesting approval to expand the current Self Storage facility onto this property as shown on the corresponding plans. The development of this property will be consistent with the existing Self Storage Development with respect to the type and quality of construction, and end product. This property will be served by a conventional well located on the existing property/development and will also provide for a conventional septic spray field on the subject property(expansion area) that will serve both properties from a sewage standpoint. The existing well is used for a single bathroom in the office of the existing facility and is expected to require no more than 100 GPD. Being an extension of the existing development, it is proposed that all traffic enter/exit through the existing gated access off Mile Branch Road. Using the ITE Trip Generation, its expected that+/-30 trips per day would result from the proposed 11,400 sf of mini-warehouse (storage unit) space. NCDOT has reviewed our proposal and concurs that the existing driveway is sufficient from a traffic standpoint and no additional information or studies are required. All proposed buildings and drives will be secured by a new fence that will tie to the existing fence and surround the proposed improvements. Stormwater will be captured and flow along the existing drainage patterns to a new Stormwater Control Measure (SCM) and will be treated per current falls lake standards. Preliminary calculations are on the Grading and Drainage Plan. It should be noted that the development on the subject property is quite limited due to a mis-mapping of the Little River ad Flat River Watersheds which restricts the development to 12% on the respective portions of the property. Ground topography does not support the current mapping of this line and until fixed, the property's J:\DD-PROJECTS\2018\18-079\CIVIL-18-079\Design\Planning\2020-10-27 Project Narrative REV.docx 1 61 2537 E.L YON STATION RD,STE f02 DESIGN POBOX361 ENGINEERING, PLLC CREEDMOOR,NC27522 919-230-0996 CLIENT-FOCUSED•COMPREHENSIVE•COST-EFFECTIVE development is limited. The anticipated overall proposed disturbance is less than 40,000 sf, and therefore the EA/EIS are not applicable to this site. The previous development was required to comply with several conditions at the time of approval, all which have been adhered to and are listed on the plans. It is understood and acceptable to the applicant that the current proposal also adhere to these same standards as applicable. J:\DD-PROJECTS\2018\18-079\CIVIL-18-079\Design\Planning\2020-10-27 Project Narrative REV.docx 2 62 VICINI`T"Y MAP g' C a +� tl 0 r RuU9eniont StUrAge Q SITE a 0 a Orange County � � Rd o Speedway l-4n 4-7 4 m m _ 0 Hanson Rggrles $ + m N W . a Go gle o Mao data ZZI19 Un4ta Steles Terns Send�eedbao 10204. — s a =-i 63 ViCIN=MAP < t x aOL sITE INFO xMnTiON �" - '�^•a "� a.R { '. \ i ` NOT `rr FORS s/yJ 7 zw y ah . • "ll � Ala CONSTRUCTION RE L 7.6 rr m �'� / / �� � i .mow � �c•m c _ w gg : z] S Gy F / IfnoMallb0 a yo. cln�aT = � I CaIlhePoreyoudlg. _ aunn W" Cd.2 Image reduced 64 ORANGE COUNTY PLANNING AND INSPECTIONS ORANGE COUNTY CONDITIOAL ZONING DISTRICTS N O RI'Fl CA ROI.I N A FACT SHEET This fact sheet explains the submittal and review process for a rezoning to a Conditional Zoning District. It also covers how a decision on a request is made and how you can participate. 1. What is a Conditional Zoning District? A Conditional Zoning District (CZD) is a tool to address impacts from certain land uses. These land uses have particular impacts on the immediate area or community which cannot be predetermined by general use district standards. The property owner proposes development standards to address these impacts. These standards could be things like minimum lot size, setbacks, parking, landscaping, open space management, allowable building area, preservation of natural areas, or similar matters. If approved, the use of the property would be subject to conditions created during the process. 2. What are the benefits of the CZD process? Conditional Zoning allows for more flexibility than other zoning tools. Rules in a General Zoning district would be applicable to all uses without any special considerations. Rules for a Special Use Permit require all the individualized considerations to be written in the ordinances beforehand. By allowing for special considerations to be determined at the time of application, Conditional Zoning is thought to be a more prudent use of time, money, effort, and other resources. 3. /s a CZD the same as a Special Use Permit(SUP)? No. With a SUP the County has determined potential development impacts of a given land use require special consideration of site-specific conditions against a set of established standards. An SUP is said to be a `quasi-judicial' decision because how facts are applied to these established standards. A CZD is said to be a `legislative' decision because the standards are both established and applied at the time of the decision. 4. Are CZDs and SUPs reviewed in a similar manner? No. CZDs are reviewed through the `legislative' review process while an SUP is reviewed under the `quasi-judicial' review process, further broken down as follows: • LEGISLATIVE: Decisions are made based on multiple factors including the proposal's consistency with the adopted Comprehensive Plan, recommendations made by the Planning Board and staff, comments received from the public (both for and against a project), as well as the elected officials' experiences, 65 opinions and judgment. This is the most common review process employed by the County and is used to review multiple development proposals (i.e. zoning atlas amendments, amendments to the UDO, review/action on subdivision proposals, etc.). • QUASI-JUDICIAL: Typically used to review land use development applications, commonly called a Special Use. In this process, the board responsible for rendering a decision acts much like a panel of judges, hearing factual evidence and sworn testimony. Decisions on whether a permit request must be issued or not are based on the competent, substantial, and material evidence presented by all sworn parties with standing. 5. How are CZD applications reviewed? Review of a CZD application occurs in multiple steps as outlined in the UDO summarized as follows: • An application for a zoning atlas amendment is submitted; • The proposal is reviewed by the County's Development Advisory Committee (DAC), which is essentially a staff review across multiple Departments (i.e. Building Inspections, Environmental Health, Emergency Services, Erosion Control/Stormwater, Solid Waste, etc.) and includes many technical advisors from external agencies such as the NC Department of Transportation; • The next step is the scheduling and holding of a Neighborhood Information Meeting (NIM), which is an opportunity for the developer to discuss their proposal with the local community and for County staff to review/discuss the review process; • The proposal is then reviewed by the Planning Board, which is an advisory group of County residents. The Board reviews the proposal, hears comments from the staff/applicant/general public, and makes a recommendation to the Board of County Commissioners (BOCC) for or against any proposal. • The final step is with a public hearing before the BOCC. The public hearing allows the public to voice their opinions to the Commissioners. After the public hearing is closed, the BOCC then makes their decision. This flow chart from the UDO helps illustrate: 66 Zoning, A"as and Application UDO Amendments Submittal Zoning Alias- Zoning Atlas: M Text Amendrnenf Conditional I General Use , Districts % " Zoning Diistdcts�,; Post Sign Mail Notice for Neighborhood Info. Meeting (NIM) and Planning Board Meeting ' Post Sign Mail Notice Neighborhood for Planning Board Information Meeting Meeting Development Advisory Committee Meeting Staff Recommendation to Planning Board Planning Board Review wand Recommendation.' Atlas Amendments: Text Publish Legal Ad Amendments: Post Sign Publish legal Ad Mail Notice `r Staff and PB Recommendations`,, a to BOCC i} Public l•learing BOCC Decision 'tote- Tr•js c_i^��r i; mean* as. a graphtc-al representation of irwc UDO text-the t-x shoti to+=e priority it-; any c-cr'lict or air-x>OJ"Y. 67 6. Are applicants required to submit site specific development plans for a CZD? Either a site specific development plan or a concept plan will be required depending on the type of request. Site specific development plans are meant to demonstrate how the project would comply with various requirements such as setbacks, impervious surface limits, parking lot design, landscaping, building area, and others. These types of plans are required for the following CZDs: • Agricultural Support Enterprises (ASE-CZ); • Home Park (HP-CZ); and • NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1). Master Plan Development Conditional Zoning District (MPD-CZ) applications are not required to submit a site specific development plan. They are required to submit a concept plan. 7. Why are MPD-CZ applications not required to submit a site specific development plan? Per Section 3.8 Conditional Districts — Master Plan Development (MPD-CZ) of the UDO, the purpose of the MPD-CZ District is to provide for: `..... unified large scale subdivisions, non-residential, and mixed- use developments that promote economical and efficient land use, improved level of amenities, appropriate and harmonious variety, creative design, and a better environment through the approval of a general concept Master Plan the permits defined flexibility to accommodate land use adjustments in response to evolving market trends. To that end, MPD-CZ projects are intended to allow for flexibility in dimensional/development standards with the overall goal of ensuring compatibility with planning objectives, anticipated development patterns, existing infrastructure planning, and surrounding properties. The master planning process allows applicants to either demonstrate compliance with applicable standards (i.e. setbacks, impervious surface limits, parking lot design, landscaping, building area, etc.) or provide `design alternatives' that meet the intent and spirit of existing regulations. Approval of an MPD-CZ, essentially, creates a new zoning district establishing mandatory development standards/criteria governing actual development activities. Through this process, the County has the opportunity to impose conditions on development activities to address potential impacts. 68 8. What else is required to be submitted as part of a CZD application? CZD requests are required to submit the following information: a. Completed application; b. A detailed description of the proposed use of property; c. A detailed traffic survey; d. Environmental Document(s); e. Landscape plan; f. A summary of utility services, including processing of wastewater; g. A schedule of construction of all elements of the proposal; h. Other information identified during the pre-application conference deemed essential to demonstrate the project's compliance with applicable regulations. 9. Can the County impose conditions on a CZD? Yes. The County has the ability to impose conditions, however, these conditions must be mutually agreed upon by the County and applicant. Further, conditions are limited to those addressing conformance of the development to applicable regulations and/or the adopted Comprehensive Plan/other relevant plans addressing: a. The compatibility of the proposed development with surrounding property; b. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and vehicular circulation systems, screening and buffer areas, etc.); and/or C. Other matters the County may find appropriate or the petitioner may propose, but limited to items within the County's regulatory authority. 10. How is development within an MPD-CZ district acted upon? Development within an MPD-CZ is permitted only through the review and approval of site plan application(s) in accordance within Section 2.5 of the UDO. This is so staff can verify all imposed conditions are adhered to. 11. Will this site plan be reviewed/commented on by the Planning Board or elected officials? No. The site plan shall be reviewed and acted upon by staff administratively consistent with the provisions of the UDO. 69 12. What are the benefits of the MPD-CZ process? The chief, primary, benefit is staff are able to review/process development of a parcel and/or multiple parcels under a uniform set of development criteria where there are shared opportunities for infrastructure development (i.e. parking areas, preservation of existing landscaping, outdoor lighting, signage, access management, stormwater management, etc.). Under general zoning standards, parcels are typically developed independently with little to no opportunity for the County to compel coordination of development activities. Each parcel would have to have its own parking area, stormwater feature, landscape buffers, allowable building area (i.e. floor area ratio), individual outdoor lighting fixtures, etc. From staff's standpoint this translates to more development activity, more impervious surface area, and increased opportunities for internal/external impacts. 13. Who may speak or offer comment during the review of a CZD? Everyone. Applicants and those individuals supporting, or opposed to, the application are encouraged to attend meetings where a CZD is discussed and offer comment(s). The best time to speak directly to the applicant is at the NIM. The NIM is also a good opportunity to ask questions of staff related to the process for the review of the application. The Planning Board is a good opportunity to learn more about the comments and recommendations from the advisory board and staff. The public can offer their opinions and comments in written form to the BOCC at any time, but the public hearing is the best time to speak publicly in person. 14. When would I learn about an application being submitted? There are various notification requirements associated with the review of a CZD application at various points along the process. There is a listing of current projects at the Planning page of the County website. The complete application package is made available to the public on the County website once it has been formally accepted for review by staff. Before the NIM, there will be notice posted at the site and mailed to those within 1,000 ft. of the property advertising the meeting. This is the same for the Planning Board and BOCC meetings where the application will be reviewed. BOCC meetings are also advertised in local newspapers. Planning Board and BOCC meeting agendas are posted on-line so the general public can review materials associated with the review of a CZD. You can be put on a list to receive notices about all BOCC meetings through a request to the BOCC Clerk's office. 70 Planning Board and BOCC are public meetings, which are open to public attendance. Only the BOCC public hearing includes a right to participate and that is limited (such as with the 3 minute time limit). 15. What is the most effective way of engaging with the process? Planning staff are available to answer questions on a development proposal and/or to explain process requirements. Attend the NIM to learn about the applicant's proposal and have an opportunity to ask questions and offer comments. Attend the Planning Board meeting to learn about staff and Board recommendation(s). Write to the BOCC or speak at the public hearing. At the public hearing you will be limited to 3 minutes, but there is no limit to emailed comments. If you share the opinion of others, try to join together and co-sign a single message. Try to be specific with particular proposals, recommendations or conditions. 16. Who do I contact with questions? • Questions about the application, procedural questions, or Planning Board meeting(s) should be directed to the Planning Department — (919) 245-2576; • To receive email notices of BOCC agendas/meetings, go to the following webpage: http://www.orangecountync.gov/1561/Electronic-Newsletters And select the link following "Board of County Commissioners (Sunshine)". Type in your email address and select Sign In. Next, click on the envelope icon in front of Board of County Commissioners (Sunshine) to receive email notifications. • Questions on Planning Board agendas can also be addressed by the staff of the Planning Department. Planning Board agenda packets, as well as meeting minutes, are posted on the County website and can be accessed here: https://www.orangecountync.gov/1194/Orange-County-Planning- Board-PB 17.What are the roles of staff, the Planning Board, and the elected officials in the review of a CZD? • STAFF: ➢ Determine if the application is complete with applicable submittal requirements (Section(s) 2.8 and 2.9.2 of the UDO); 71 ➢ Determine consistency with the adopted Comprehensive Plan; ➢ Review and make a determination if the proposal is consistent with applicable development standards or if proposed 'design alternatives' are consistent with the spirit/intent of the UDO; ➢ Recommend imposition of conditions to address potential impacts; ➢ Recommend approval/denial of the project based on the provisions of the UDO and the project's compliance with the Comprehensive Plan. • PLANNING BOARD: ➢ Review the development proposal and ask questions of the applicant and staff; ➢ Review/discuss staffs analysis; ➢ Although not required, the PB often will Receive public comment on the proposal; ➢ Make a recommendation on the approval or denial of the request to the BOCC. • BOCC: ➢ Schedule and hold a public hearing to receive the application; ➢ Hear from the applicant and staff; ➢ Receive public comment on the proposal; ➢ Review/discuss the staff and Planning Board's analysis and recommendation(s); ➢ Discuss imposition of conditions; ➢ Approve or deny the request. 18. How are decisions to approve or deny a CZD made? The BOCC approves or denies a CZD request based on: a. The proposals consistency with the adopted Comprehensive Plan; b. Consistency/compliance with other applicable plans (i.e. small areas plans, water/sewer infrastructure plans, transportation improvement plans, etc.); C. Suitability of proposed development with surrounding properties as well as the recognized/anticipated development patterns in the area where the project is located; d. Compliance with applicable development standards as embodied within the UDO and/or the appropriateness of proposed 'design alternatives'; e. Public comments; and 72 f. Staff and Planning Board recommendation(s). 19. Can I discuss the project with staff, members of the Planning Board, and the BOCC? Yes, you can have discussions with various parties outside of scheduled meetings/hearings concerning a CZD application. This would not be the case with an SUP or other quasi-judicial hearings, where the board members are precluded from deliberations outside the hearing. 20. Is there a record of the proceedings? Yes. Minutes from Planning Board and BOCC meetings where a CZD application is reviewed/discussed/acted upon are maintained by the County. The Planning Department maintains the application components and become a part of the file on that case. 21. What is the effect of a CZD approval? Per Section 2.9.2 (G) of the UDO, approval of a CZD is binding on the property. Development and use of the subject parcel(s) is governed by the submitted/revised application package, the actual ordinance adopted by the BOCC approving the rezoning request, all conditions imposed as part of the CZD review process, and the applicable provisions of the UDO. 22. Are decisions on CZD applications subject to further review? Yes. Decisions are subject to review by the Superior Court. Per Section 2.26.5 of the UDO, an appeal to Superior Court must be filled within 60 days from the date of adoption of the ordinance approving the zoning atlas amendment. 73 NOTICE OF PUBLIC HEARING ORANGE COUNTY BOARD OF COMMISSIONERS The Orange County Board of Commissioners will hold a public hearing on Tuesday, February 2, 2021 at 7:00 PM for the purpose of giving all interested residents an opportunity to speak for or against the items below. Due to current public health concerns, the hearing will be held on-line and pre-registration is required. The meeting will be live streamed at the following web address for those who wish to only view the meeting: www.orangecountync.gov/967/Meeting-Videos To register to speak at the public hearing, please send an email to ocpubliccomment@orangecountync.gov no later than 3:00 PM on the day of the hearing and indicate you wish to speak during the hearing. When submitting the request to speak, include the following: • The date of the meeting • The number and title of the agenda item (from the list below) you wish to speak on • Your name, address, email and phone number • The phone number must be the number you plan to call in from if participating by phone After registering to speak, an email that contains instructions and a link to sign up to access the hearing will be sent to the email address used to register. If you do not have access to an internet-enabled computer and would like to phone in to access the hearing, please call the office of the Clerk to the Board after January 29, 2021 at 919-245-2130 and a staff member will provide you with the call-in number. Public Hearing Items: 1. Zoning Atlas Amendment (REDA-CZ-1 — Rougemont Self Storage): In accordance with the provisions of Section 2.8 Zoning Atlas and Unified Development Ordinance Amendments of the Unified Development Ordinance, an applicant has applied to expand an existing conditional zoning district, REDA-CZ-1 (NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning). The proposed expansion is located at 8927 Mile Branch Road in Little River Township on a 21.54 acre parcel of land; 14.17 acres of the parcel are currently zoned REDA-CZ- 1. The rezoning request is as follows: FROM: REDA-CZ-1 (14.17 acres) and Agricultural Residential (7.37 acres) TO: REDA-CZ-1 (21.54 acres; entire parcel) 1 74 The parcel is further identified utilizing Orange County Parcel Identification Number (PIN) 0910-23-7159. The purpose of the rezoning is to allow for expansion of the existing self-storage operation. The Orange County Planning Board reviewed the application at its January 6, 2021 regular meeting and voted unanimously to recommend approval of the application. Agenda materials for this meeting can be viewed at: http://orangecountync.gov/AgendaCenter/Planning-Board-26 Information on the project is also available at: https://www.orangecountync.gov/1722/Current-Interest-Projects Substantial changes in items presented at the public hearing may be made following the receipt of comments made at the public hearing. In accordance with Session Law 2020-3 (Senate Bill 704), Section 4.31(a), which pertains to remote meetings during declared emergencies, written comments on items heard at a public hearing are accepted for 24 hours after the public hearing is closed and the Board of County Commissioners may not make a decision on public hearing items until after the 24-hour period for written comments has concluded. The full text of the public hearing items may be obtained no later than January 29, 2021 on the County's website: https://www.orangecountync.gov/1707/BOCC-Agendas Information will also be available from the Orange County Planning Department (contact information below) no later than January 22, 2021. Questions regarding the proposals may be directed to the Orange County Planning Department via phone at (919) 245-2575 during normal office hours (8:00 a.m. to 5:00 p.m., Monday through Friday). You may also e-mail questions to planningdept@orangecountync.gov. Written comments to the Board of County Commissioners can be sent via e-mail to ocbocc@orangecountync.gov. Written comments can also be dropped off at the Planning Department offices at 131 W. Margaret Lane, 2nd floor, Hillsborough, NC during normal office hours or mailed to the Planning Department at P.O. Box 8181, Hillsborough, NC 27278. PUBLISH: The Herald Sun News of Orange January 20, 2021 January 20, 2021 January 27, 2021 January 27, 2021 2 7-52,0 Ordinance 4:_ 'g� C, AN ORDINANCE AMENDING THE ORANGE COUNTY ZONING ATLAS WHEREAS, Orange County has received and processed a petition seeking to amend the Orange County Zoning Atlas, as established in Section 1.2 of the Orange County Unified Development Ordinance (UDO), and WHEREAS, This petition seeks to rezone 12 acre portion of a 35.8 acre parcel of property (PIN 0910-34-5040) to NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ- 1) Conditional Zoning for the purpose of developing a self-storage facility. WHEREAS, This petition has been submitted in concert with a formal site plan in accordance with the provisions of Section 2.9.2 (C) of the UDO, and WHEREAS, the portions of property to be rezoned are identified further as follows.- PIN 0910-34-5040. Darrell W. Chandler. Deed Book 5329, page 496, Lot A Plat Book 96, page 98, Orange County Registry. Description by William H. McCarthy, Jr., Professional Land Surveyor, License Number L-3248, Summit Design and Engineering Services , 504 Meadowland Drive, Hillsborough, NC 27278-8551. The following description is based on Plat Book 96, page 98 and does not represent an actual field survey. Summit project 12-0191. Physicaf descriptions of corners shown in parenthesis are for information only and are taken from Plat Book 96, page 98 and have not been recovered or verified. Location of right of way and centerline of Mile Branch Road taken from site plan "Affordable Rougemont Self-Storage-Site Plans" Sheet No. C-2, Summit Design and Engineering Services Project 12-0191, and does not represent an actual survey or location of Mile Branch Road. BEGINNING at a point ("Control Corner", "Pipe") at the southwest corner of Lot A Plat Book 96, page 98 referenced above in the southeast right of way of NC, Highway 57, thence along and with the southeast right of way of NC Highway 57 N. 41' 00' 38" E. 711.84' to a mathematical point in the west right of way of Mile Branch Road; thence continuing along the southeast right of way of NC Highway with the north right of way line of Mile Branch Road along two (2) courses as follows: (1) N. 41' 00' 38" E. 69.34' to a point ("Pipe") and (2) N. 41' 00' 35" E. 4.72' to a mathematical point in the east right of way of Mile Branch Road-, thence leaving the right of way of Mile Branch Road and continuing along and with the southeast right of way of NC Highway 57 N. 41' 00' 35" E. 526.17' to a mathematical point; thence leaving the right of way of NC Highway 57 along five (5) new zoning lines with Darrell W. Chandler as follows: (1) S. 14' 16' 38" E. 1025.32' to a mathematical point, (2) N. 86' 24' 18" W. 165.61' to a mathematical point, (3) N. 87* 21' 13" W. 252.13' to a mathematical point in the east right of way of Mile Branch Road, (4) N. 87' 21' 13" W. 35.68to a mathematical point in the centerline of Mile Branch Road and (5) with the centerline of Mile Branch 76 Road along a curve to the left having a radius of 1022.33' an arc length of 60.55' (chord bearing S. 31° 17' 04" E., chord distance 60.54') to a mathematical point in the south line of Lot A Plat Book 96, page 98 referenced above; thence with the south line of Lot A Plat Book 96, page 98 along five (5) courses as follows: (1) N. 87° 29' 47" W. 3.59' to a point ("PK"), (2) N. 87' 11' 02" W. 33.13' to a mathematical point in the west right of way of Mile Branch Road, (3) leaving the right of way of Mile Branch Road N. 87° 11' 02" W. 9.13' to a point ("Pipe"), (4) N. 87' 23' 21" W. 280.09' to a point ("Pipe") and (5) N. 87° 24' 05" W. 367.27 to a point ("Control Corner", "Pipe") at the southwest corner of Lot A Plat Book 96, page 98 referenced above in the southeast right of way of NC Highway 57, the place and POINT OF BEGINNING and being all of an area to be re-zoned from Orange County Zone AR to Orange County Zone REDA-CZ-1 containing 12.80 Acres. and, WHEREAS, the requirements of Section 2.8 and 2.9.2 of the UDO have been deemed complete, and WHEREAS, the Board has found the proposed zoning atlas amendment to be reasonably necessary to promote the public health, safety, and general welfare. BE IT ORDAINED by the Board of Commissioners of Orange County that the Orange County Zoning Atlas is hereby amended to rezone the 12 acre portion of the aforementioned parcel to NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1) Conditional Zoning district. BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the UDO the approval of this Conditional Zoning applicant is subject to the following mutually agreed to conditions: 1. The property shall be utilized only as a self-storage facility developed consistent with the submitted site plan. 2. Staff shall prepare a 'Declaration of Development Restrictions and Requirements' outlining all conditions and development limitations associated with this project that the applicant shall record within the Orange County Registrar of Deeds office within 90 days of approval. This document shall include an explanation of the allotment of impervious surface limits supporting the development of the proposed self-storage facility as well as the applicant's remaining property. 3. The proposal calls for the development of the project is 2 phases. Prior to the commencement of earth disturbing activity for Phase 2 of the project, the applicant shall apply for and install a well in accordance with applicable Orange County Health Department requirements. 4. Retail sales from the proposed rental office shall be limited to packing supplies (i.e. boxes, table, packing materials, etc.) and shall not involve the sale of general retail items such as food, drinks, or other similar items not consistent with the use of the property as a self-storage facility. 77 5. The applicant shall be required to obtain final approval for the proposed dumpster pad location from Orange County Solid Waste prior to the commencement of earth disturbing activity. 6. The applicant shall be required to obtain stormwater and erosion control permits from Orange County Erosion Control prior to the commencement of earth disturbing activity. 7. The applicant shall be required to obtain a driveway permit from the North Carolina Department of Transportation prior to the commencement of earth disturbing activity. The applicant shall provide the Orange County Planning Department with a copy of this permit. 8. The applicant shall be required to obtain building permits from the Orange County Inspections Department prior to the commencement of construction activity. 9. The applicant shall be required to obtain sign permits from the Planning Department in accordance with the provisions of the Orange County Unified Development Ordinance. 10.The applicant shall be required to maintain all required land use buffers in perpetuity in accordance with the requirements of Section 6.8 of the Orange County Unified Development Ordinance. 11.No ancillary commercial or residential use of individual storage facilities shall be permitted. This includes the use of storage facilities for automotive repair or retail sales. The applicant shall include this prohibition within storage unit lease documents informing clients of the prohibition. 12.No hazardous materials shall be stored on the property. The applicant shall include this prohibition within storage unit lease documents informing clients of the prohibition. 13.All required landscaping, as denoted on the site plan, shall be installed prior to the issuance of a Certificate of Occupancy allowing for the units to be rented/occupied. 14.The applicant shall contract with a private solid waste contractor to remove trash from the site consistent with the submitted site plan and in accordance with the Orange County Solid Waste Management Ordinance. BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of published ordinances and that this ordinance is effective upon its adoption. Upon motion of Commissioner _ seconded by Commissioners kAt- the foregoing ordinance was adopted this a day of , 2012. I, Donna S. Baker, Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said 78 Board at a meeting held on —4 , 2012 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. WITNESS my hand and the seal of said County, this J day of 2012. to Cat, d'6� t� ® Clerk Y the oar of Commissioners t 52 1T 44' COO% orth 79 DRAFT 1 MEETING MINUTES 2 ORANGE COUNTY PLANNING BOARD 3 JANUARY 6,2021 4 REGULAR MEETING 5 (Due to current public health concerns,this meeting was held virtually. 6 Members of the Planning Board, staff and public participated remotely) 7 8 MEMBERS PRESENT: David Blankfard (Chair), Hillsborough Township Representative; Adam Beeman (Vice-Chair), Cedar 9 Grove Township Representative; Kim Piracci, Eno Township Representative; Susan Hunter, Chapel Hill Township 10 Representative; Patricia Roberts, Cheeks Township Representative; Randy Marshall, At-Large Representative; Alexandra 11 Allman, At-Large Representative; Melissa Poole, Little River Township Representative; Carrie Fletcher, Bingham 12 Township Representative; Gio Mollinedo,At-Large Representative; 13 14 MEMBERS ABSENT: Vacant,At-Large Representatives 15 16 STAFF PRESENT: Craig Benedict, Planning Director; Perdita Holtz, Planning Systems Coordinator; Michael Harvey, Current 17 Planning Supervisor; Tina Love,Administrative Support 18 19 OTHERS PRESENT: Darrell Chandler, Chad Abbott 20 21 22 Perdita reviewed the technical processes and rules for the virtual meeting 23 24 25 AGENDA ITEM 1: CALL TO ORDER AND ROLL CALL 26 Chair David Blankfard called the meeting to order. 27 28 29 AGENDA ITEM 2: ELECTION OF CHAIR AND VICE-CHAIR FOR 2021. 30 a. Term Expiration Dates and Reappointment Eligibility by Member 31 32 MOTION by Melissa Poole to reappoint David Blankfard as Chair for 2021. Seconded by Patricia Roberts. 33 34 ROLLCALL VOTE: 35 Randy Marshall: Yes 36 Alexandra Allman Yes 37 Kim Piracci: Yes 38 Susan Hunter: Yes 39 Adam Beeman: Yes 40 Patricia Roberts: Yes 41 Carrie Fletcher Yes 42 Melissa Poole: Yes 43 David Blankfard: Yes 44 MOTION PASSED UNANIMOUSLY 45 46 Adam Beeman: I'll put myself out there for Vice-Chair again. 47 48 MOTION by Patricia Roberts to reappoint Adam Beeman as Vice-Chair for 2021. Seconded by Carrie Fletcher 49 50 ROLLCALL VOTE: 51 Randy Marshall: Yes 52 Alexandra Allman Yes 53 Kim Piracci: Yes 54 Susan Hunter: Yes 55 Adam Beeman: Yes 56 Patricia Roberts: Yes 80 DRAFT 57 Carrie Fletcher Yes 58 Melissa Poole: Yes 59 David Blankfard: Yes 60 MOTION PASSED UNANIMOUSLY 61 62 63 AGENDA ITEM 3: INFORMATION ITEMS 64 b. Planning Calendar for January and February 65 c. Buckhorn Small Area Plan Study — At the February 3, 2021 Planning Board Meeting, the 66 Planning Board is expected to receive an overview of the Plan, update on Mebane's planning 67 process, and provide input to the Orange County BOCC for its consideration on any 68 subsequent County implementation actions. 69 70 71 AGENDA ITEM 4: APPROVAL OF MINUTES 72 November 4, 2020 Regular Meeting Minutes 73 74 MOTION by Randy Marshall to approved the November 4, 2020 Regular Meeting Minute. Seconded by Susan Hunter. 75 76 ROLLCALL VOTE: 77 Randy Marshall: Yes 78 Alexandra Allman Yes 79 Kim Piracci: Yes 80 Susan Hunter: Yes 81 Adam Beeman: Yes 82 Patricia Roberts: Yes 83 Carrie Fletcher Yes 84 Melissa Poole: Yes 85 David Blankfard: Yes 86 MOTION PASSED UNANIMOUSLY 87 88 89 AGENDA ITEM 5: CONSIDERATION OF ADDITIONS TO AGENDA. 90 91 92 AGENDA ITEM 6: PUBLIC CHARGE 93 94 INTRODUCTION TO THE PUBLIC CHARGE 95 The Board of County Commissioners, under the authority of North Carolina General Statute, appoints 96 the Orange County Planning Board (OCPB) to uphold the written land development law of the County. 97 The general purpose of OCPB is to guide and accomplish coordinated and harmonious development. 98 OCPB shall do so in a manner, which considers the present and future needs of its citizens and 99 businesses through efficient and responsive process that contributes to and promotes the health, safety, 100 and welfare of the overall County. The OCPB will make every effort to uphold a vision of responsive 101 governance and quality public services during our deliberations, decisions, and recommendations. 102 103 PUBLIC CHARGE 104 The Planning Board pledges to the citizens of Orange County its respect. The Board asks its citizens to 105 conduct themselves in a respectful, courteous manner, both with the Board and with fellow citizens. At 106 any time, should any member of the Board or any citizen fail to observe this public charge, the Chair will 107 ask the offending member to leave the meeting until that individual regains personal control. Should 108 decorum fail to be restored, the Chair will recess the meeting until such time that a genuine commitment 109 to this public charge is observed. 110 111 112 AGENDA ITEM 7: CHAIR COMMENTS 81 DRAFT 113 114 115 AGENDA ITEM 8: ZONING ATLAS AMENDMENT(REDA—CZ-1) —ROUGEMONT SELF STORAGE—To review and make a 116 recommendation to the BOCC on an applicant initiated zoning atlas amendment to expand an existing 117 conditional zoning district called REDA-CZ-1 (NC Highway 57 Speedway Area Rural Economic 118 Development Area Conditional Zoning). The proposed expansion is located at 8927 Mile Branch Road in 119 Little River Township on a 21.54 acre parcel of land. The parcel is currently zoned REDA-CZ- 1 and 120 Agricultural Residential. The applicant is seeking to rezone the Agricultural Residential acreage so that 121 the entire parcel is in the REDA-CZ-1 district allowing for an expansion of the existing self-storage 122 operation. This item is scheduled for BOCC public hearing on February 2, 2021. 123 Presenter: Michael Harvey, Current Planning Supervisor 124 125 Michael Harvey Presented a PowerPoint Presentation to the Planning Board. 126 127 Chad Abbott: Good evening everyone, I'm Chad Abbott of C3 Design and Engineering and I represent Mr. Chandler, the 128 applicant on this project. I also worked on the previous project. I feel like what you have before you is a pretty 129 straightforward project. It is an expansion of an existing use so the typical questions that come up about allowing a use in 130 a certain area have already been decided upon in the past and have had no negative impacts on the surrounding 131 properties and no negative input from any surrounding property owners either first-hand or at the Neighborhood 132 Information Meeting (NIM). We had adhered to all the previous conditions imposed on the original development and will 133 continue to adhere to those same conditions upon development on this property as proposed. We respectively request 134 your recommendation for approval and I'd be happy to answer any questions you may have. 135 136 David Blankfard: Did anyone show up from the neighborhood at the NIM? 137 138 Chad Abbott: No Sir. 139 140 Melissa Poole: If I may, this is in my district and I'm very familiar with this area and I am familiar with the storage facility 141 there. There are not a lot of homes that are sitting directly adjacent to this project. I am good with moving forward. 142 143 Kim Piracci: I have a question, it looks like there is a pond across the street,what is that. 144 145 Chad Abbott: It is a farm pond, it's across the road. It's agriculturally zoned land, I don't know what they use it for. 146 147 Michael Harvey pulled up the GIS system to view the area/pond in question and clarified it is believed to be an amenity or 148 recreation pond as available data does not indicate there is a stream or other water feature connecting the pond to the 149 Chandler property east of NC Highway 57.. 150 151 Kim Piracci: That's not going to be affected by the septic system? 152 153 Michael Harvey: No, it shouldn't be. As indicated on the map, there does not appear to be a water feature identified in 154 County GIS connecting the pond to Mr. Chandler's property east of NC Highway 57. The Environmental Assessment work 155 also did not indicate any water connectivity between the property and the aforementioned pond. We have some of the 156 existing stormwater control measures that were required for the first phase of the project when we began working with Mr. 157 Chandler, he has determined it would be in his best interest and would help with his stormwater as well as shielding his 158 property,to preserve this area of existing foliage. Pointed out other features, septic fields, residents, rock quarry. 159 160 Michael Harvey concluded his PowerPoint Presentation 161 162 MOTION by Randy Marshall to approve the Statement of Consistency indicating that the Zoning Atlas Amendments are 163 reasonable and in the public interest as contained in Attachment 7 and recommend approval that the ordinance amending 164 the Zoning Atlas as well as the imposing development conditions for the identified parcel as contained in Attachment 8. 165 Seconded by Melissa Poole. 166 167 Randy Marshall: Yes 168 Kim Piracci: Yes 82 DRAFT 169 Patricia Roberts: Yes 170 Carrie Fletcher Yes 171 Adam Beeman: Yes 172 Melissa Poole: Yes 173 Susan Hunter: Yes 174 Alexandra Allman Yes 175 David Blankfard: Yes 176 MOTION PASSED UNANIMOUSLY 177 178 179 David Blankfard: Craig when do you think we will get the vacant positons filled? 180 181 Craig Benedict: The BOCC are having a Work Session in February and will be discussing all of the Advisory Boards. 1 182 would say probably either late February or March we could get something on an agenda in front of them. One of the topics 183 of discuss is should the BOCC round out the various boards to have multiple interests so that boards do not get overly 184 weighed,to try to keep it diverse whether it's the Economic Development Advisory Board or Commission for the 185 Environment or Planning Board to try to round out the applicants. It will be a general discussion at that Work Session. 186 187 Alexandra Allman: How does that work? Do they go to you and then you give them to us and we choose or does the 188 BOCC choose them, how does it work? 189 190 Craig Benedict: They have never come to Planning Staff or the Planning Board. They have always been advertised by 191 the County Clerk's office and then decided by the BOCC. The Planning Board can, off line,take a look at the applications 192 that are always available through the Clerk's office and speak with one of your Commissioners if you think it viable. We 193 may formalize that. Some boards actually do review applications and make recommendations. 194 195 Gio Mollinedo Arrived 196 197 198 AGENDA ITEM 9: PLANNING BOARD ANNUAL REPORT AND WORK PLAN: To discuss annual input form which informs the 199 BOCC of the past year's activities of advisory boards/commissions and assists in overall County work 200 planning. 201 PRESENTER: Craig Benedict, Planning Director 202 203 Craig Benedict presented a PowerPoint presentation to the Planning Board members 204 205 Kim Piracci: I'd like to go back to something you said. I don't see it written down but I think you said something about the 206 Board would have to agree on suggestions before we submit them to a developer? Can you tell me what that is and what 207 that means? 208 209 Craig Benedict: We have used this process already with the Planning Board, so when we review conditions that have been 210 suggested to be imposed on a conditional zoning proposal, if one of those modifications, conditions is to be amended, we 211 look for the Board to deliberate amongst themselves on what the amendment may be and vote internally on it. We don't 212 want to go to the developer and ask for conditions until we know that the Board wants to collectively say they want that 213 condition. This is a process we have used to try to get some sort of census from the Board and then ask either at that 214 meeting or at the next meeting if that is a condition that is agreeable by the applicant. 215 216 Kim Piracci: Would that exclude one of us from making a suggestion on the spot? 217 218 Craig Benedict: No, if for example you said Buc-ee's should have 50 EV electric charging stations instead of 50 gas 219 pumps,we would want to see if the rest of the Board thought that was a viable condition amendment before we ask the 220 applicant if they would agree to something like that. It's up to you to present your rationale for your amended condition or 221 new condition and then if there is consensus amongst the Board that it can be one of your recommendations. 222 223 Kim Piracci: Is that the sort of thing that happens before we meet with the developers or during? 224 83 STATEMENT OF CONSISTENCY OF A PROPOSED ZONING ATLAS MAP AMENDMENT WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN An applicant-initiated amendment to the Zoning Atlas to rezone a parcel as follows: Parcel Identification Township Owner of Current Zoning Proposed Zoning Number Record (PIN) • NC Highway 57 Speedway Area — Rural Economic NC Highway 57 Development Area Speedway Area — Conditional Zoning Rural Economic (REDA-CZ-1) Development Area Conditional Zoning Rougemont • Agricultural (REDA-CZ-1) 0910-23- Little River Storage Residential (AR) 7159 Center, LLC Little River Protected • Little River Watershed Overlay Protected District Watershed Overlay District Flat River Protected Watershed Overlay • Flat River Protected District Watershed Overlay District The Planning Board finds: 1. The requirements of Section 2.8 of the UDO have been deemed complete; and, 2. Pursuant to Sections 1.1 .5 and 1.1.7 of the UDO and to Section 153A-341 of the North Carolina General Statutes, the Board finds sufficient documentation within the record denoting that the amendment is consistent with the adopted 2030 Comprehensive Plan. a. The amendment is consistent with applicable plans because it supports the following 2030 Comprehensive Plan goals and objectives: i. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. ii. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features and that protect natural resources, cultural resources, and community character. iii. Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural 84 character, minimizes land use conflicts, supported by an efficient and balanced transportation system. iv. Objective LU-3.1: Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. The Planning Board hereby adopts this Statement of Consistency and the findings expressed herein and recommends the Board of County Commissioners consider adoption of the proposed Zoning Atlas Amendment. F 01.14.2021 David Blankfard, Chair Date 85 Attachment 8 STATEMENT OF CONSISTENCY OF A PROPOSED ZONING ATLAS MAP AMENDMENT WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN An applicant-initiated amendment to the Zoning Atlas to rezone a parcel as follows: Parcel Identification Township Owner of Current Zoning Proposed Zoning Number Record (PIN) • NC Highway 57 Speedway Area — Rural Economic NC Highway 57 Development Area Speedway Area — Conditional Zoning Rural Economic (REDA-CZ-1) Development Area Conditional Zoning Rougemont • Agricultural (REDA-CZ-1) 07910-23_ Little River Storage Residential (AR) • Center, LLC Little River Protected • Little River Watershed Overlay Protected District Watershed Overlay District • Flat River Protected Watershed Overlay • Flat River Protected District Watershed Overlay District The BOCC finds: 1. The requirements of Section 2.8 of the UDO have been deemed complete; and, 2. Pursuant to Sections 1.1.5 and 1.1.7 of the UDO and to Section 153A-341 of the North Carolina General Statutes, the BOCC finds sufficient documentation within the record denoting that the amendment is consistent with the adopted 2030 Comprehensive Plan. a. The amendment is consistent with applicable plans because it supports the following 2030 Comprehensive Plan goals and objectives: i. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. ii. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features and that protect natural resources, cultural resources, and community character. iii. Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural 86 character, minimizes land use conflicts, supported by an efficient and balanced transportation system. iv. Objective LU-3.1: Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. The atlas amendment is consistent with these goals and objectives as approval allows for development consistent with the previously approved NC Highway 57 Small Area Plan study. This study, now incorporated by reference within the Comprehensive Plan, called for expanding economic development opportunities in the Little River Township along NC Highway 57 and Mile Branch Road near the existing Orange County Speedway. The subject parcel was part of that study, and in 2012 the County approved development of a self-storage operation on a portion of the property with the approval of a zoning atlas amendment package. Approval of this request will allow the entire property to be used for a recognized allowable use consistent with the provisions of the Unified Development Ordinance (UDO) and the Comprehensive Plan. b. The amendment is reasonable and in the public interest because it: 1. Expands economic development prospects within the County, while continuing to protect adjacent and nearby land uses, consistent with the Comprehensive Plan as well as the adopted Small Area Plan for the area. The atlas amendment involves expansion of a previously approved REDZ-CZ-1 Conditional Zoning district allowing for expansion of an existing self-storage operation. The area in question has been designated as being viable for rural economic development within the Comprehensive Plan, and the proposed land use is consistent with the recommendation(s) detailed within the NC Highway 57 Small Area Plan study, approved by the County in 2007. The Board of County Commissioners hereby adopts this Statement of Consistency and findings expressed herein. Renee Price, Chair Date Attachment 9 87 Ordinance#: ORD-2021-003 AN ORDINANCE AMENDING THE ORANGE COUNTY ZONING ATLAS WHEREAS, Orange County has received and processed a petition seeking to amend the Orange County Zoning Atlas, as established in Section 1.2 of the Orange County Unified Development Ordinance (UDO), and WHEREAS, this petition seeks to rezone a 7.37 acre portion of a 21.54 acre parcel of property (PIN 0910-23-7159) to NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1) Conditional Zoning for the purpose of expanding an existing self-storage facility. WHEREAS, this petition has been submitted in concert with a formal site plan in accordance with the provisions of Section 2.9.2 (C) of the UDO, and WHEREAS, the portion of property to be rezoned is further identified as follows: Parcel Identification Number (PIN): 0910-23-7159 Owner: Rougemont Storage Center, LLC Deed Reference: Deed Book 6620, Page 1210 Being that tract of land lying in Little River Township, Orange County, North Carolina, and more particularly described as follows: Being Tract No. 2 containing 8.74 acres as shown on plat (Plat Book 120, Page 115) and survey of Commissioner's Report, subdivision of Tract A of May Anna Clayton Estate by Alois Callemyn, Registered Land Surveyor, dated January 29, 1981, recorded in Plat Book 33, Page 72 Orange County Registry. The description above is based on the information in Deed Book 6620, Page 1210 and does not represent an actual field survey. and, WHEREAS, the requirements of Section 2.8 and 2.9.2 of the UDO have been deemed complete, and WHEREAS, the Board has found the proposed zoning atlas amendment to be reasonably necessary to promote the public health, safety, and general welfare. BE IT ORDAINED by the Board of Commissioners of Orange County that the Orange County Zoning Atlas is hereby amended to rezone the 7.37 acre portion of the aforementioned parcel to NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1) Conditional Zoning district. BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the UDO, the approval of this Conditional Zoning application is subject to the following mutually agreed to conditions: 1 88 1. Nothing associated with the approval of this request shall invalidate, alter, or otherwise be construed as alleviating compliance with conditions imposed by Orange County consistent with ORDINANCE 2012-0055 as approved on November 20, 2012; 2. The property shall be utilized only as a self-storage facility developed consistent with the submitted site plan as acted upon by the Orange County Board of Commissioners on February 2, 2021; 3. Orange County Planning Staff shall prepare a `Declaration of Development Restrictions and Requirements' outlining all conditions and development limitations associated with this project that the applicant shall record within the Orange County Registrar of Deeds office within 12 months of approval. This document shall include an explanation of the allotment of impervious surface limits supporting the development; 4. This proposal is for Rougemont Storage Phase 3. Prior to the commencement of earth disturbing activities for Phase 3, the applicant shall apply for and install a well in accordance with applicable Orange County Health Department requirements; 5. Retail sales from the proposed rental office shall be limited to packing supplies (i.e. boxes, table, packing materials, etc.) and shall not involve the sale of general retail items such as food, drinks, or other similar items not consistent with the use of the property as a self-storage facility; 6. The applicant shall be required to obtain final approval for any dumpster pad locations from Orange County Solid Waste prior to the commencement of earth disturbing activity; 7. The applicant shall be required to obtain stormwater and erosion control permits from Orange County Erosion Control prior to the commencement of earth disturbing activity; 8. The applicant shall be required to obtain building permits from the Orange County Inspections Department prior to the commencement of construction activity; 9. The applicant shall be required to obtain any and all permits from the Orange County Fire Marshal prior to the commencement of construction activity; 10.The applicant shall be required to obtain sign permits from the Planning Department in accordance with the provisions of the Orange County Unified Development Ordinance (UDO); 11.The applicant shall be required to maintain all required land use buffers in perpetuity in accordance with the requirements of Section 6.8 of the Orange County Unified Development Ordinance. 12.No ancillary commercial or residential use of individual storage facilities shall be permitted. This includes the use of storage facilities for automotive repair or retail sales. The applicant shall include this prohibition within storage unit lease documents informing clients of the prohibition; 13.No hazardous materials shall be stored on the property. 89 The applicant shall include this prohibition within storage unit lease documents informing clients of the prohibition; 14.All required landscaping, as denoted on the site plan, shall be installed prior to the issuance of a Certificate of Compliance allowing for the units to be rented/occupied; 15.The applicant shall contract with a private solid waste contractor to remove trash from the site consistent with the submitted site plan and in accordance with the Orange County Solid Waste Management Ordinance. BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of published ordinances and that this ordinance is effective upon its adoption. Upon motion of Commissioner seconded by Commissioner , the foregoing ordinance was adopted this day of , 2021. Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on , 2021 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. WITNESS my hand and the seal of said County, this day of , 2021. SEAL Clerk to the Board of Commissioners