Loading...
HomeMy WebLinkAboutAgenda - 01-19-2021; 6-a - Zoning Atlas Amendment Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing) 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: January 19, 2021 Action Agenda Item No. 6-a SUBJECT: Zoning Atlas Amendment: Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing) DEPARTMENT: Planning and Inspections ATTACHMENTS: INFORMATION CONTACT: 1. Aerial Map of Properties Michael D. Harvey, Planner III, (919) 245-2597 2. Applicant Proposed Modifications Craig Benedict, Director, (919) 245-2592 3. Applicant Response to Public Comments 4. Statement of Consistency 5. Final Draft Conditions of Approval PURPOSE: To receive updates, consider Planning Board and staff recommendations, begin deliberation, and provide direction/take action on an applicant initiated Zoning Atlas Amendment for parcels north of Interstate 85/40, east of Mt. Willing Road, to Master Plan Development Conditional Zoning (MPD-CZ) district. Specifically, the Board will be taking action on an application submitted by Buc-ee's Limited to rezone two parcels with PIN numbers 9854-16-1576 and 9854-36-3711 (hereafter `the Property'): FROM: Office/Research and Manufacturing (O/RM); Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; Efland Interstate Overlay District. As indicated during the BOCC's January 12, 2021 meeting, the public comment period for this item closed at 9:00 a.m. on January 14, 2021. As a result, the BOCC will not be accepting further public comment on this item at tonight's meeting. BACKGROUND: BOCC review of this item began at the BOCC's December 15, 2020 Business meeting and concluded with the closure of the public hearing on January 12, 2021. Agenda materials from the public hearing can be accessed at: http://server3.co.orange.nc.us:8088/WebLink/Browse.aspx?startid=61357&row=1&dbid=0. Video from the December 15, 2020 and January 5 and 12, 2021 meetings can be accessed at: https://www.orangecountync.gov/967/Meeting-Videos 2 As indicated at the December 15 BOCC meeting, staff recommended the imposition of several conditions designed to address potential impacts of the Project, including: i. Stormwater: Imposition of a condition that requires the applicant to either: a. Abide by nutrient reduction strategies as detailed in Section 6.14.7 of the UDO without participation in the State recognized offsite mitigation program; or b. Any off-site mitigation has to occur in Orange County near the Property, within the County's Upper Eno Protected or Critical Watershed Protection Overlay District, to ensure preservation of local water quality. ii. Access Management: a. Driveway access from the Interstate on/off ramp be restricted to two driveways, one allowing access to the Project east of Mt. Willing Road (i.e. a right turn only into the Project) and one allowing access to the on/off ramp west of the US Highway 70/1-85 Connector Road (i.e. a right turn only out of the Project); Staff has continued to work with the applicant and NCDOT officials to preserve westbound Exit 160 as being part of a dual westbound exit for both Exit(s) 160 and 161 at the existing Exit 161 location. Attachment 2 contains the applicant's response to several recommended condition(s), including: 1. Alteration of land uses: a. District 1: Proposed car wash eliminated; b. Development Area 5: Building square footage reduced from 150,000 to 75,000 sq.ft.. 2. Impervious area versus Open Space: a. Impervious area limited to 60% or approximately 2,718,144 sq.ft. (62.4 acres) of land area; b. Open space increased to 40% or approximately 1,812,096 sq.ft. (41.6 acres) of land area. 3. Setbacks: Northern boundary property line/land use buffer area increased to 50 ft. as requested by staff; 4. Stormwater: a. Install debris screens on all stormwater inlets to address comment(s) from the Eno River Association; b. Nutrient Removal: Project will not exceed: i. Nitrogen: 1.2 pounds per acre per year; and ii. Phosphorous: 0.24 pounds per acre per year. Nutrient export loads are equal to/less than export loads from property in current, undeveloped state. 5. Use of Private Mitigation Credits: Consistent with 6.14.7(D) of the UDO applicant shall: a. Purchase approved `private mitigation bank credits' within the Upper Eno River Watershed. If no credits are available, applicant shall: 3 i. Purchase approved private mitigation bank credits within Orange County (if available); OR ii. Purchase approved private mitigation bank credits in the Falls Lake Watershed (if available); OR iii. Utilize any mitigation option permitted by the UDO. Conditions must mutually be agreed to by the applicant. Staff is seeking direction from the BOCC on said condition(s) for final review/agreement by the applicant. The current list of condition(s) is contained within Attachment 5. During review of the Project, local residents identified the following concerns: a. The Project is out of character with the rural Efland community; b. There has been insufficient public outreach, including concerns the Town of Hillsborough had not been more involved in reviewing the Project; c. Economic development benefits have been exaggerated and are overestimated; d. The Project will not generate the types of jobs desired by the County (i.e. provision of a living wage, jobs meeting County social justice goals, etc.); e. Development of a `60 pump/120 individual fuel station' travel center is inconsistent with a County goal of reducing dependency on fossil fuels; f. There is no guarantee that `Phase 2' of the Project (i.e. hotel, offices, retail, manufacturing, etc.) will ever be developed; g. Proposed traffic changes, including the elimination of Exit 160 and prohibition of left turns from Ben Johnson Road to the 1-85/US Highway 70 connector road, will have negative impacts on motorists. Traffic redesign will exacerbate existing traffic congestion and create public safety concerns; h. Stormwater runoff will have a negative impact on adjacent sensitive water features as well as the County's Seven Mile Creek Preserve; i. Insufficient information has been provided ensuring adequate protection of groundwater from fuel contamination; j. The Project will significantly increase/exacerbate existing light pollution in the area; k. There is no justification for an 80 ft. tall freestanding sign advertising the Project. Attachment 3 contains the applicant's responses to these concern(s). Staff's comments will be provided separately. Effect of Denial or Withdrawal: In the event the rezoning application is denied or withdrawn, it should be noted that Section 2.2.8 of the UDO states that no application for the same or similar amendment, affecting the same property or portion thereof, may be submitted for a period of one year. The one year period begins on the date of denial or withdrawal. Planning Director's Recommendation: The Planning Director recommends approval of the: 1. Statement of Consistency indicating the zoning atlas amendment(s) are reasonable and in the public interest as contained in Attachment 4. 4 2. Ordinance amending the Zoning Atlas, as well as imposing development conditions, for the identified parcels as contained in Attachment 5. FINANCIAL IMPACT: This request has been reviewed by various County departments who have determined that the approval or denial of the request would not create the need for additional funding for the provision of County services. Costs associated with advertising, including the public hearing notice and mailings, were paid by the applicant in accordance with the adopted Orange County Fee Schedule. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal impact associated with this item notwithstanding the Project will adhere to existing adopted local, State, and Federal environmental regulations. RECOMMENDATION: The Manager recommends the Board: 1. Review and provide direction to staff on recommended conditions (Attachment 5); or 2. Take action on the Zoning Atlas amendment for parcels north of Interstate 85/40, east of Mt. Willing Road, to Master Plan Development Conditional Zoning (MPD-CZ) district. ORA Zoning N � 5 FORREST AVE i i .SOl1TMERN DR ; �, a' I p Zoo ! J LL' OF 00 W J J m I\ N TURNER w 0 orUpper`Eno �, Prot 854363711 Y 5� �' 9854161576,E _ hJ Z _ - _ � r r r r r Ck a , a t� _ � o I Q Project Parcels AR NC2 � - 0 Watersheds - 0 R1RM Upper Eno EC5 Efland Interstate 11 Zoning: O/RM rr i in=500 feet Q Efland Village 12 Overlayers: Efland Interstate CCOUNTY A Feet a 500 Major Transportation Corridor NoPlanning and Inspections Department(BC) Major Transportation Corridor 0 LC1 Upper Eno Protected 10/23/2020 O:\GIS Workspace\Projects\Efland Station\Efland Station.aprx\Zoning Future Land Use Map 6 F�QRRES1T AVE. i i SQU�TjHERN DR I �, p I Ji LO LU J i I c� N TURNER ST Z, Upper Eno yap o�`` Protected 9854363711 0 � hJ5 9854161576 �� Z v 4 9 FN� ,,'�� 0 Project Parcels Watershed Critical Areas � Upper Eno � . . Water Supply Watersheds Critical Resource Protection Areas N tin=500feet ORANGE Feet Agricultural Residential COUNTY 0 500 Planning and Inspections Department(BC) Commercial-Industrial Transition 10/23/2020 O:\GIS Workspace\Projects\Efland Station\Efland Station.aprx\Future Land Use Map 7 T NELSON M U L L f N S NELSON MULLINS RILEY & SCARBOROUGH LLP ATTORNEYS AND COUNSELORS AT LAW Beth Trahos 4140 Parklake Ave, Suite 200 (919) 329-3884 Raleigh, NC 27612 T 919.329.3800 F 919.329.3799 beth.trahos@nelsonmullins.com nelsonmullins.com January 8, 2021 Mr. Michael Harvey Orange County Planning Department 131 W. Margaret Lane, Suite 201 Hillsborough,NC 27278 Via Email: mharvey@orangecountync.gov Dear Michael: We have listened to the comments made by the public in the various board meetings and by email to the Board of County Commissioners. In response,we offer the following changes to the Efland Station Master Plan focused on improving our stormwater management plan: • We will alter development densities as follows: (a)in Development Area 5,we will reduce the permitted square footage from 150,000 square feet to 75,000 square feet; and (b) in Development Area 1, we will remove the car wash use. o This will allow us to reduce impervious area to no greater than 60% and increase open space to 40% of the subject property, allowing more area for stormwater infiltration. • We will increase setbacks on the northern boundary of Development Area 5 to 50'. o This meets Planning Staff s recommendation for buffering in this area. • We will install debris screens on all stormwater inlets to prevent trash and other debris from entering stormwater control measures, an added protection for area streams. o We offer this change in response to a comment received from the Eno River Association. • Rather than meeting the State and County standards for nutrient removal found in Section 6.14.7(A)(1)(a) and (b) of the UDO, the subject property will not exceed the following unit-area mass loading rates: (a) Nitrogen, 1.2 pounds per acre per year; and (b) Phosphorous, 0.24 pounds per acre per year. o These nutrient export loads are equal to or less than export loads from subject property in its existing,undeveloped state. • For offset fees pursuant to 6.14.7(D), commonly referred to as "credits", the property owner shall purchase approved private mitigation bank credits within the Upper Eno River Watershed, if available. If no approved private mitigation bank credits are available within the Upper Eno River Watershed, the property owner shall purchase approved private mitigation bank credits within Orange County, if available. If no approved private mitigation bank credits are available in Orange County, the property owner shall purchase CALIFORNIA I COLORADO I DISTRICT OF COLUMBIA I FLORIDA GEORGIA I MARYLAND I MASSACHUSETTS I NEW YORK NORTH CAROLINA I SOUTH CAROLINA TENNESSEE I WEST VIRGINIA 8 Orange County Planning Department January 7, 2021 Page 2 approved private mitigation bank credits in the Falls Lake Watershed, if available. If no approved private mitigation bank credits are available in the Falls Lake Watershed, the property may utilize any mitigation option permitted by the UDO. Please let me know if you have questions. Thanks! With best regards, Elizabeth C. Trahos 9 Efland Station Domestic Water Demand Estimate(by Fixture Type) Fixture or Appliance 1 No.of Fixtures Wastewater Demand(GPM) Wastewater Demand(GPD) ; Average Daily Demand(GPM) Average Daily Demand(GPD) ; Peak Flow(GPM) Peak Flow(GPD) Standard Efficient Standard Efficient 1 Standard Efficient Standard Efficient Standard Efficient I Standard Efficient Flush Valve Toilet 79 17.6 14.0 25,300 20,300 1 21.1 16.9 30,360 24,360 52.7 42.1 75,900 60,900 Tank Toilet 120 0.4 0.3 600 500 0.5 0.4 720 600 1.2 1.0 1,800 1,500 Urinal i 39 2.0 1.0 3,000 1,500 2.4 1.2 3,600 1,800 6.1 3.0 9,000 4,500 Kitchen Faucet i 32 4.4 3.0 6,400 4,400 i 5.3 3.6 7,680 5,280 13.2 9.0 19,200 13,200 Bathroom Faucet i 166 7.6 5.2 11,000 7,500 9.1 6.2 13,200 9,000 22.8 15.6 33,000 22,500 Shower 120 1.4 1.2 2,100 1,700 i 1.7 1.4 2,520 2,040 4.3 3.5 6,300 5,100 Bath Tub 120 2.3 1.3 3,400 2,000 i 2.8 1.6 4,080 2,400 7.0 4.0 10,200 6,000 Dish Washer 24 0.7 0.4 1,000 600 i 0.8 0.5 1,200 720 2.0 1.2 3,000 1,800 Buc-ee's - 16.0 11.6 23,100 16,700 i 19.3 13.9 27,720 20,040 i 48.1 34.8 1 69,300 50,100 Total 52.5 38.0i 75,600 1 54,800 1 63.0 1 45.7 1 90,720 1 65,760 1 157.4 1 114.1 I, 226,800 1 164,400 Percentage Saved 27% This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. * Buc-ee's water demand is from water usage data taken from an existing site. **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirements Efland Station Domestic Water Demand Estimate(by Development Area) Wastewater Demand(GPM) Wastewater Demand(GPD) Average Daily Demand(GPM) Average Daily Demand(GPD) Peak Flow(GPM) Peak Flow(GPD) Development Area Na.of Fixtures Standard Efficient Standard Efficient Standard Efficient Standard Efficient Standard Efficient 1 Standard Efficient 1 - 16.0 11.6 23,100 16,700 19.3 13.9 27,720 20,040 48.1 34.8 69,300 50,100 2 208 25.3 18.8 36,500 27,100 30.4 22.6 43,800 32,520 75.9 56.4 109,500 81,300 3 6 0.8 0.6 1,200 900 1.0 0.7 1,440 1,080 2.4 1.9 3,600 2,700 4 480 9.7 6.6 14,000 9,500 11.6 7.9 16,800 11,400 29.0 19.7 11 42,000 28,500 5 6 0.6 0.5 1,000 700 0.8 0.6 1,200 840 1.9 1.4 3,000 2,100 Total 52.5 38.0 75,600 54,800 63.0 45.7 90,720 65,760 157.4 114.2 226,800 164,400 Percentage Saved 27% This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. * Buc-ee's water demand is from water usage data taken from an existing site. **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirement! Efland Station Domestic Water Demand Estimate(by Use) Development Area No.of Fixtures Wastewater Demand(GPM) Wastewater Demand(GPD) i Average Daily Demand(GPM) i Average Daily Demand(GPD) I Peak Flow(GPM) i Peak Flow(GPD) Standard Efficient Standard Efficient Standard Efficient Standard Efficient Standard Efficient i Standard Efficient Buc-ee's - 16.0 11.6 23,100 16,700 19.3 13.9 27,720 20,040 48.1 34.8 69,300 50,100 Restaurants 184 22.4 16.6 32,300 24,000 26.9 19.9 38,760 28,800 67.3 49.8 96,900 72,000 Retail j 21 j 2.6 2.0 j 3,700 2,900 i 3.1 2.4 j 4,440 3,480 j 7.7 5.9 j 11,100 8,700 Office 3 0.3 0.2 Soo 400 0.4 0.3 600 480 1.0 0.7 1,500 1,200 Medical Office Building(MOB) 6 0.8 0.6 1,200 900 1.0 0.7 1,440 1,080 2.4 1.9 3,600 2,700 Short Term Rental 480 9.7 6.6 14,000 9,500 11.6 7.9 16,800 11,400 29.0 19.7 42,000 28,500 Office/Service/Manufacturing 6 0.6 0.5 1,000 700 0.8 0.6 1,200 840 1.9 1.4 3,000 2,100 Total 52.5 38.0 75,600 54,800 63.0 45.7 90,720 1 65,760 1 157.4 54.8 226,800 164,400 Percentage Saved 27% This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. * Buc-ee's water demand is from water usage data taken from an existing site. **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirements 10 Flow(GPM) Flow(GPD) Initial Flow Time in Use Loads Flushes Units Standard Efficiency (mins) per day per day Standard Efficiency Standard Efficiency Flush Valve Toilet GPF 1.60 1.28 200 0.22 0.18 320 256 Tank Toilet GPF 1.60 1.28 3 0.00 0.00 5 4 Urinal GPF 1.00 0.50 75 0.05 0.03 75 38 Kitchen Faucets GPM 2.20 1.50 90 0.14 0.09 198 135 Bathroom Faucet GPM 2.20 1.50 30 0.05 0.03 66 45 Shower GPM 2.50 2.00 7 0.01 0.01 171 14 Bath Tub GPM 7.00 4.00 4 0.02 0.01 28 16 Dish Washer GPL 1 5.00 1 3.00 1 1 8 1 1 0.03 1 0.02 40 24 GPFI gallons per flush GPM I gallons per minute GPLI gallons per load Toilet Urinals Kitchen Faucets Bathroom Faucets Shower Bath Tub Dish Washer Development Assumption Assumption Assumption Assumption Assumption Assumption Assumption per Area Uses Area(SF) Area Per Facility No.of Units per Unit Total per Unit Total per Unit Total per Unit Total per Unit Total per Unit Total Unit Total Restaurants 32,000 8,000 4 16 64 8 32 8 32 8 32 0 0 0 0 6 24 2 Retail 30,000 10,000 3 3 9 1 3 0 0 3 9 0 0 0 0 0 0 Office 3,500 3,500 1 1 1 1 1 0 0 1 1 0 0 0 0 0 0 3 Medical Office Building(MOB) 8,000 8,000 1 3 3 1 1 0 0 2 2 0 0 0 0 0 4 Short Term Rental 120 1 120 0 0 0 0 1 120 1 120 1 120 0 0 5 office/Service/Manufacturing 75,000 37,500 2 1 2 1 2 0 0 1 2 0 0 0 0 0 0 Total 199 39 32 166 120 120 24 Sources Buc-ee's Flows from existing stores with low flow fixtures Toilets httos://www.epa.goy/watersense/commercial-toilets Urinals httos://www.eoa.eov/watersense/urinals Faucets ht[ns://www.ena.eov/watersense/bathroom-faucets Dishwasher httos://www.cnet.com/how-to/how-much-water-do-dishwashers-use/tt:":text=Gettin¢%20them%20clean%20in%20the.¢allons%20of%20water%20ner%20vear. Bath Tub httos://www.auali[vba[h.com/discover/nos,/18226/euide-water-flow-ratesit-text=Most%20tub%20faucets%20run%20at%20aooroximately%204%20to%207%20eallons%20oer%20minute. 11 NELSON M U L L I N S NELSON MULLINS RILEY & SCARBOROUGH LLP ATTORNEYS AND COUNSELORS AT LAW Beth Trahos 4140 Parklake Ave, Suite 200 (919) 329-3884 Raleigh, NC 27612 T 919.329.3800 F 919.329.3799 beth.trahos@nelsonmullins.com nelsonmullins.com January 14, 2021 Chair Price and Members of the Orange County Board of Commissioners Via Email: ocbocc@orangecountync.gov RE: Efland Station Master Plan Dear Chair Price and Commissioners: I Thank you for the time you have taken over the past three meetings to listen to our presentation in support of the Efland Station Master Plan and to receive community input about the project. Most of you will recall that Stan Beard of Buc-ee's approached Orange County early last year to inquire as to the viability of the property that is the subject of the Efland Station Master Plan for a mixed use, master planned project anchored by a Buc-ee's. He spent time talking with your Planning staff,Economic Development staff,the County Manager's office and even with the then- serving Board of County Commissioners. Given the positive feedback from all interested parties, Buc-ee's proceeded to file an application with an engineered master plan providing a detailed concept plan for Efland Station. Efland Station will be a mixed-use,master planned project that will allow for 425,000 square feet (recently reduced from 500,000 square feet) of gross building area on a 1041 acre tract currently used primarily for grazing cattle. Under the Efland Station Master Plan,no more than 60% of the subject property may be impervious area, as compared to 70% under the current zoning, and at least 40% of the site must be open space, as compared to 30%under the current zoning. The subject property is located north of Interstate 85/40,south of the railroad and west of the 70/85 Connector.Approximately 125,000 cars drive by the site on Interstate 85/40 every day.Noise from the heavily traveled highway and busy railroad can be heard on the site today. The area is currently well lit as the North Carolina Department of Transportation has installed light poles along the frontage to provide for highway safety. Efland Station will be anchored by a Buc-ee's Travel Center which will create more than $1,000,000.00 in much needed tax revenue for Orange County and up to 200 full time, good jobs with starting pay at $15 per hours and benefits, including 3 weeks of vacation, access to health insurance and a 401(k). Orange County has identified$15 per hour as a living wage and pays 1 This results in an annual wage of$31,200 per year for employees working 40 hours each week, including 3 weeks of vacation. CALIFORNIA I COLORADO I DISTRICT OF COLUMBIA I FLORIDA I GEORGIA I MARYLAND I MASSACHUSETTS I NEW YORK NORTH CAROLINA I SOUTH CAROLINA I TENNESSEE I WEST VIRGINIA 12 some of its employees at a similar rate 2. All jobs, with the exception of two management positions brought in to start the store,will be filled locally. Buc-ee's Travel Center has identified this site as a good location for their business because of the existing 125,000 cars traveling daily along Interstate 85/ 40, as well as Highway 70. The great majority of visitors to Buc-ee's will already be driving down one of these major roadways. A stop at Buc-ee's will create increased awareness of and interest in Efland that will likely generate opportunities for other businesses to flourish. Efland Station plans to capitalize on this renewed interest in Efland. In addition to Buc-ee's,the Efland Station Master Plan plans for neighborhood services and retail shops, full service, sit-down restaurants (drive-thru restaurants are prohibited), a hotel with 120 rooms,offices and financial services,medical uses,and select light manufacturing uses.This Phase II could result in another $1,000,000.00 in tax revenue and additional good jobs in more varied fields for nearby residents. The subject property is in the Upper Eno River Watershed outside of the critical watershed area. Consistent with Orange County's watershed policy, this area that has been designated by Orange County's 2030 Comprehensive Plan as a Commercial-Industrial Transition Activity Node. Orange County intends for the most intense uses permitted in the county to be developed in this area. Development in other areas of the Upper Eno River Watershed has been curtailed to allow for intense land uses in the area adjacent to busy highways and the railroad with access to public utilities. Since then, your professional staff and appointed boards and commissions have spent significant time and effort in providing a detailed review of the proposal. More specifically, Efland Station has been reviewed by the following: I. Planning Staff and Planning Board Review Planning staff review of the Efland Station Master Plan has been on-going since the plan was filed in August 2020. The resulting 19-page staff report addressed every planning related topic including access,transportation improvements, utilities, erosion control, stormwater, solid waste, land use buffers and setbacks,an environmental assessment,analysis regarding the Orange County Comprehensive Plan and the Efland-Mebane Small Area Plan, the financial impact, the social justice impact and the environmental impact of the Efland Station Master Plan. This thorough and professional review resulted in a back g p a and forth dialogue with the applicant agreeing to many changes to address Planning staff concerns. These commitments are z Indeed.com advertises COVID Temporary Certified Medical Assistant jobs with Orange County Health Department with starting pay of$15.32 an hour. In addition, Indeed.com is advertising a Veterinary Health Care Technician ("Vet Tech")with the Orange County Animal Services Department that pays a starting wage of$34,472,just$3,272 more than an entry level Buc-ee's employee. Employment as a Vet Tech requires an Associate's degree in Veterinary Medical Technology or related field,or three(3)years of veterinary experience;whereas,a position with Buc-ee's requires no special experience or education. 13 memorialized in a 24-page zoning ordinance containing conditions to address areas of impact or concern identified by the Planning Department. The Planning Board reviewed the Efland Station Master Plan on November 4, 2020, hearing comments from staff,the applicant and other interested parties. The Planning Director and the Orange County Planning Board unanimously recommend approval of the Efland Station Master Plan. II. Department of Environment, Agriculture, Parks and Recreation ("DEAPR") Orange County Commission for the Environment Review The DEAPR reviewed the Efland Station Master Plan providing scant comments in two letters. The first letter, dated October 13, 2020, described the use and condition of the subject property today noting the existence of two ephemeral streams on site that flow south toward the Seven Mile Creek. The letter indicated that protecting these two tributaries is in the public interest and recognized that the applicant's site plan protects the streams by placing them in open space. DEAPR staff suggests that a conservation easement may be appropriate for this open space area if the landowner desires to retain ownership of the area. Under such an arrangement, the county would maintain the sensitive area. The second letter, dated October 20, 2020, indicated that there was a historic resource on the subject property which has collapsed and no longer possesses any physical integrity. DEAPR staff made no other comments and raised no other concerns. The Commission for Environment reviewed the Efland Station Master Plan on January 11, 2021. The DEAPR staff report consisted of a list of environmental concerns apparently gathered from community input. No staff analysis of these concerns was provided. The applicant was not permitted to speak and no formal presentation was allowed about the Efland Station Master Plan or the 1000+pages of materials on the topic. Much of the board discussion focused on a letter prepared by a member of the commission in opposition to the project and apparently circulated to DEAPR staff and other board members in advance of the meeting. The applicant was not provided a copy of the letter in advance of the meeting. A slightly revised version of that letter was adopted by the Commission for the Environment in recommending denial of the project. The Commission for the Environment failed to consider the many environmental benefits of the Efland Station Master Plan made apparent in our letter to the commission attached hereto. III. Orange County Economic Development Review Economic Development Staff prepared a report entitled "Potential Economic Value of Efland Station to Orange County: Forecast of Jobs&Benefits and Annual Property & Sales Tax Revenue Projections"which has been provided as a part of the overall packet. The report concurs with the applicant's assessment that Buc-ee's will provide $1,000,000 in needed tax revenue and 200 good jobs in Phase I plus additional revenue and jobs as Phase II develops. 14 The Orange County Economic Development Commission unanimously recommends approval of the Efland Station Master Plan. Efland Station offers many benefits: good jobs paying a living wage with benefits, tax dollars to alleviate the burden on residential tax payers countywide, needed infrastructure investment for roads and utilities at no cost to taxpayers,all in a historically underutilized area of the county while also minimizing negative impacts by voluntarily agreeing to more open space and less building area and increased stormwater treatment measures than are required under the current zoning ordinance at the behest of your professional staff. We hope that you retain the interest and excitement you showed when Stan Beard first approached you about bringing Buc-ee's and Efland Station to Orange County more than one year ago. We hope you will join the Orange County Planning Board and the Orange County Economic Development Advisory Board in supporting the Efland Station Master Plan. With best regards, Elizabeth C. Trahos i 15 0707 NELSON M U L L I N S NELSON MULLINS RILEY & SCARBOROUGH LLP ATTORNEYS AND COUNSELORS AT LAW Beth Trahos 4140 Parklake Ave, Suite 200 (919) 3 2 9-3 8 8 4 Raleigh, NC 27612 T 919.329.3800 F 919.329.3799 heth.trahos@nelsonmullins.com nelsonmullins.com January 8, 2021 Orange County Commission for the Environment c/o Mr. David Stancil Department of Environment,Agriculture, Parks &Recreation Via Email: dstancil a,oran eg countync.gov RE: Efland Station Master Plan Dear Chair and Members of the Commission for the Environment: I write to provide information in support of the Efland Station Master Plan. By way of introduction, Efland Station is a mixed-use, master planned project that will allow for 425,000 square feet of gross building area on a 104± acre tract used primarily for grazing cattle. The subject property is located north of Highway 85/40,south of the railroad and west of the 70/85 Connector.Approximately 125,000 cars drive by the site on Highway 85/40 every day.Noise from the heavily travelled highway and busy railroad can be heard on the site today.The area is currently well lit as the North Carolina Department of Transportation has installed light poles ranging from 90 feet to 120 feet in height along the frontage to provide for highway safety. Efland Station will be anchored by a Buc-ee's Travel Center which will create more than $1,000,000.00 in much needed tax revenue for Orange County and more than 175 good jobs with starting pay at$15 per hour and benefits,including 3 weeks of vacation,access to health insurance and a 401(k). All management jobs, with the exception of two management positions brought in to start the store, will be filled locally. Buc-ee's Travel Center has identified this site as a good location for their business because of the existing 125,000 cars traveling daily along Interstate 85/Interstate 40,as well as,Highway 70. The great majority of visitors to Buc-ee's will already be traveling along the highway and simply stop to visit the travel center. In addition to Buc-ee's,the Efland Station Master Plan plans for neighborhood services and retail shops, full service, sit-down restaurants (drive-thru restaurants are prohibited), a hotel with 120 rooms, offices and financial services,medical uses, and select light manufacturing uses. The subject property is in the Upper Eno River Watershed outside of the critical watershed area. Consistent with Orange County's watershed policy,this area that has been designated by Orange County's 2030 Comprehensive Plan as a Commercial-Industrial Transition Activity Node. Orange County intends for the most intense uses permitted in the county to be developed in this area. Development in other areas of the Upper Eno River Watershed has been curtailed to i CALIFORNIA I COLORADO I DISTRICT OF COLUMBIA I FLORIDA ( GEORGIA I MARYLAND I MASSACHUSETTS I NEW YORK NORTH CAROLINA I SOUTH CAROLINA TENNESSEE I WEST VIRGINIA 16 allow for intense land uses in the area adjacent to busy highways and the railroad with access to public utilities. We offer the following information related to the environmental efficacy of the Efland Station project: I. Efland Station requires more open space and allows less building area than the existing zoning. Efland Station proposes a maximum of 425,000 square feet of building area with commitments to no more than 60% impervious area and at least 40% of the site required to be open space. These commitments far exceed requirements for by-right development under existing zoning, which development requires no further public review. The chart below compares development opportunities under the current zoning and as proposed by Efland Station. I Development Intensity Efland Station By-right Development Under Current Zoning with No Further Public Review Permitted Building Area 425,000 s . ft. 2,000,000+s . ft. Permitted Impervious Area 60% 62.4+ acres 70% 72.8+acres Required Open Space 40% 41.6f acres 30% 31.2±acres II. Efland Station includes stormwater mitigations that meet or exceed current, undeveloped conditions. The subject property is located in the Upper Eno River Watershed outside of the critical watershed area. The property is downstream of the West Fork Eno Reservoir(the Town of Hillsborough's drinking water source) and all Orange-Alamance Water System intake facilities. There is no opportunity for stormwater from the subject property to reach these public water supplies. That being said, Efland Station recognizes that all water eventually flows into a watershed potentially used for drinking water and is committed to being a good steward of water resources. Efland Station has committed to meeting the existing nitrogen export load from site in its current undeveloped state and reducing the phosphorus export load from the site in its current undeveloped state. The chart below compares the state and county standards, current conditions on the undeveloped site,proposed standards for Efland Station and by-right development under current zoning. The Efland Station Master Plan commitments include a significant reduction from current regulations for nitrogen loading rates and results in lower phosphorous loading rates than the existing,undeveloped condition. I 17 Nutrient Export State/County Current Efland By-right (pounds/per acre/per Standards Condition Station' Development year) Under Current Zonin a Nitrogen 2.20 1.20 1.20 2.20 Phosphorous 0.33 0.52 0.24 0.33 In addition, Efland Station commits to obtaining credits for off-site mitigation in the immediate area to the extent they are available. By-right development would be permitted to buy credits from the state credit bank, which may not directly improve the watershed in which the site is located. III. Buc-ee's Travel Center has never had a reportable fuel leak. Buc-ee's Travel Center includes a gas fueling facility with 60 gas pumps and 120 fueling positions, plus at least 10 electric vehicle charging stations. There are many more gas fueling positions planned than electric vehicle charging stations because there are many more gas vehicles on the road today. Although electric vehicles are becoming more affordable,today they are not affordable for most people. As the ratio of electric vehicles increases,so too will the ratio of electric charging stations. Buc-ee's Travel Center aims to serve the traveling public whatever fuel source they utilize. Regardless of the fuel source, the number of fueling positions will remain a minimum ofl20 positions. This number of fueling positions is needed because visitors tend to leave their vehicles at the fueling positions when they enter the store and often remain in the store for 20-30 minutes. Buc-ee's store is not a typical convenience store but instead more like a general store that stocks fresh foods made on the premises, home goods, local (North Carolina) arts and crafts, Buc-ee's themed merchandise, clothing, hats and the like. Fuel is stored in underground storage tanks constructed of multi-layered fiberglass/resin, double- walled tanks with interstitial monitoring for leaks. If a leak is detected, an audible alarm sounds and an email will be sent to the fuel and environmental team in Efland and in Texas. All federal and North Carolina system requirements will be met. The fuel delivery system is the most vulnerable to leaks. As a result, Buc-ee's has designed their fuel delivery system to exceed applicable environmental requirements. The fuel delivery system is comprised of double-walled piping with initial probe monitoring in every sump pump connected to a pipe. Here again, if a leak is detected, an audible alarm sounds and an email will be sent to the fuel and environmental team in Efland and in Texas. In addition, the fuel control system is programmed to immediately cut power to any fuel motors which pump fuel when a leak is detected. This allows for faster detection of any leak, and the immediate shut down feature significantly reduces the chances of a significant release. i a 1 Includes on-site stormwater treatment and off-site mitigation payments z Includes on-site stormwater treatment and off-site mitigation payments 18 Finally, all stormwater inlets in the fueling areas will be equipped with oil/water separator systems which will prevent incidental fuel spills at the pump from entering the stormwater system. Buc- ee's personnel also monitor and manually clean incidental fuel spills at the pump. IV. Efland Station is committed to water conservation and waste reduction. Efland Station will utilize low-flow fixtures throughout the development in an effort to conserve water. Stormwater from the Buc-ee's building roof will be used for irrigation on site. The planned car wash has been eliminated because of water use concerns. Efland Station has committed to the standards and guidelines of Orange County Solid Waste Management. These guidelines provide for the separate treatment of solid wastes, recyclable materials (including corrugated cardboard) and food wastes. V. Providing jobs and services within Efland reduces carbon emissions created by commuting long distances to work and other service uses. Efland is home to few businesses today. Efland Station will create an opportunity for Efland residents to work, shop and eat in close proximity to their homes, thereby, reducing carbon emissions associated with commuting to these necessary activities. In addition, drive-thru restaurants are prohibited, thus eliminating a common source of vehicle idling. VI. Efland Station is in accordance with Orange County's Comprehensive Plan, including commitment to the three spheres of sustainable growth. The Orange County 2030 Comprehensive plan identifies three spheres of sustainable growth: social, economic and environmental. Please see the graphic from Section 1.3 of the 2030 Comprehensive Plan below. FIGURE 1.1:THE THREE SPHERES OF SUSTAINABLE GROWTH 1 soc41 Ec000mlc Often termed the"triple bottom line,"sustainable growth can be achieved in Orange County by balancing environmental,social,and economic factors when setting County policies and 19 In creating its policies,the Comprehensive Plan addresses the"triple bottom line"created by these three equally important elements. The Future Land Use Map of the Comprehensive Plan designates the Property and portions of nearby land as "Commercial-Industrial Transition Activity Node," which is defined under the j Comprehensive Plan as: i "Commercial-Industrial Transition Activity Node_ Land near major transportation routes that could be provided with public water and wastewater services and is appropriate for retail and other commercial uses; manufacturing and other industrial uses; office and limited (not to exceed 25% of any Node) higher density residential uses. It is noted that the Future Land Use Map calls for very few such Commercial-Industrial Transition Activity Nodes,which reinforces the appropriateness of the location of the Project being squarely at"major transportation routes" and accompanying interchange of I-40/85 and Mt. Willing Road and interchange of I-40/85 and I-85 Connector. The appropriateness of the subject property, including its location along these major transportation routes,for the designation of intensification for commercial-industrial uses, makes the subject property on of the most appropriate location within the County for the proposed uses that will support in a balanced manner the corresponding community planning goal for providing job opportunities of area residents. The Property is located within the Southeast portion of the planning area of the Efland-Mebane Small Area Plan, a portion of the planning area that "enjoys access to major transportation facilities including Interstate 40185 and the US 70 Connector. Because of this, development potential for the area is high." Orange County planned for the subject property to be utilized in this manner. Efland Station fulfills Orange County's plans for the subject property and meets or exceeds all environmental regulations. We hope that you will join the Orange County Planning Board and the Orange County Economic Development Advisory Board in supporting the Efland Station project. With best regards, Elizabeth C. Trahos 20 LFLAND STATION RESPONSE TO INNACURATE & FALSE INFORMATION Efland Station thanks the hundreds of Orange County residents who participated in the public input process as we seek to bring a mixed-use development to an underserved part of the county. Unfortunately, a number of individuals opposed to Efland Station cited inaccurate or false information during their public comments. As Orange County Commissioners begin their discussions to approve the rezoning request, it is important that the public record be corrected on a number of fronts. 1) False: Buc-ee's is not conducive to Orange County's goal of transitioning toward electric vehicles and away from gasoline powered vehicles These assertions are not true and ignore Buc-ee's commitment to install an Electric Vehicle Charging Station infrastructure. Buc-ee's will initially install no fewer than 10 Electric Vehicle stations, which will increase by more than 50 percent the number of EV stations currently available in ALL of Orange County. Opponents failed to cite the fact that true "Plug-In" EVs (not hybrids that rely on a combustion engine and use gasoline) amount to less than 1% of all vehicles on the road today. Buc-ee's Charging Stations will account for 8% of the total fueling positions, thus serving as a model for other companies. As more EV's become prevalent, Buc-ee's will transition accordingly. 2) False: Buc-ee's Fuel Storage Tanks Negatively Impact Environmental Quality A number of opponents all cited a Columbia University study that looked at "two large gas stations" for "approximately three weeks." A short study of two gas stations that are not identified by size, construction, type or age of the tanks and vents should not be the basis for alleging negative environmental impact. Other studies and verification should be obtained before giving this particular study credence. Even if the study is accurate, which we do not concede, the study advocates not for the abolition of gas stations but for increased setbacks. The Efland Station Buc-ee's is located central to the 100-plus acre site with ample setbacks from adjacent properties all around it. Opponents also stated that Buc-ee's gas pumps will vent 600 gallons of fuel per day at half capacity. This is simply false. There is no evidence in any of our operating gas stations to support such an assertion. All of Buc-ee's fuel storage and delivery systems are state-of-the-art and engineered, constructed, installed, inspected and operated to meet or exceed all federal, state, and local requirements. No Buc-ee's Travel Center has ever experienced a reportable release. Fuel storage and delivery at the Efland Station location will be monitored 24 hours a day, 365 days a year, and we will be prepared with on- site cleanup protocols and immediately activate response teams if needed. 21 3) False: Efland Station is a general threat to Hillsborough and Orange-Alamance Water systems This not only a false assertion, but it is physically impossible for it to happen. The site location is downstream of the West Fork Eno Reservoir (Hillsborough source) and downstream of all Orange- Alamance Water System Intake facilities. These facts have been confirmed by the Orange County Planning Department. 4) Efland Station Stormwater controls are inadequate Efland Station will provide stormwater quality systems that will reduce both nitrogen and phosphorus loads beyond what is required by Orange County strict standards. In the case of phosphorus, the system will reduce levels to below what is being currently produced as an undeveloped cattle pasture. These facts have been confirmed by the Orange County Planning Department. Efland Station will be developed in accordance with the Orange County 2030 Comprehensive Plan promulgated to protect 20,000 acres of critical watershed basins. Efland Station accounts for 100 acres of the 2000 acres specifically designated for commercial development defined as a Commercial-Industrial Transition Activity Node between an Interstate and a railway. 5) False: Efland Station Stormwater controls use the "Preserved Green Space" thereby rendering them "not preserved" TruE Efland Station will create Preserved Green Space as what it is intended to be: 40 acres of pervious green area including undisturbed wetlands and properly buffered streams, walking paths, managed landscaping, and detention ponds. No more than 10 acres of the 40 acres will be used as stormwater quality devices. These facts have been confirmed by the Orange County Planning Department. 6) Rezoning the property to MPD-CZ is less beneficial to the area than the "by-right" ORM zoned development While the benefits of the Efland Station proposed uses can be subjectively reviewed, the hard number comparison between the two zoning designations clearly shows the benefits of MPD-CZ status: i. Impervious Cover: 70%for ORM Development; 60% for Efland Station. ii. Required Open Space: 31 acres for ORM; 41 acres for Efland Station. iii. Permitted Building Area: 2MM square feet for ORM; 425,000 square feet for Efland Station. There were also false assertions that ORM zoned developments, such as a million square foot distribution facility and 500,000 square feet of light manufacturing, would be open to scrutiny and public input before being approved. That is not the case. The County Commission and public has significantly more input for MPD-CZ zoning projects. These facts have been confirmed by Orange County Planning Department. 22 7) False: Efland Station is a Water and Sewer Consumption Glutton False data or willful ignorance is the source of this claim. Buc-ee's utility use estimates, shared with Planning Department, are taken specifically from a multitude of fully operating Buc-ee's stores with years of historical data. At full build-out, Efland Station Water Usage will consume less than 20% of available capacity. Efland Station Sewer Usage will consume less than 1S% of available capacity. Buc-ee's will also construct its first ever rainwater collection system for irrigation purposes. We have voluntarily deleted the carwash as part of the re-zoning application, and we will follow or exceed all standards required by OC Solid Waste Management. 8) False: Buc-ee's is limited to water consumption of 10,000 GIRD per UDO 4.2.3. True: Opponents who cited this reference failed to note that this limit refers to industrial users that incorporate water into their manufacturing process. It is not applicable to Efland Station. 9) False: Buc-ee's is a horrible place to work Multiple opponents cited website references and job sites such as Indeed.com to claim that Buc-ee's is not a suitable employer for Orange County. These speakers were very selective in their reviews. A visit to the Indeed.com website shows: i. Buc-ee's Employer Rating is 3.0 using a 5-Star system. 1. For context, Orange County's Employer rating is 3.7 out of 5. ii. Buc-ee's has almost an equal number of 5-Star Rating (134) as 1-Star Ratings (144). Buc-ee's is proud of our work environment and opportunities provided to more than 4,000 current employees. 10) False: Buc-ee's management and higher paying jobs are given to existing employees from Texas: True: Opponents continue to ignore or disregard Buc-ee's repeated commitment that other than the General Manager and one other manager who will transfer from existing stores, all other hires (200 Full Time) will come from the local community. This includes as many as 20 store management positions. 11) False: Traffic Will Be "A Nightmare" Statements about traffic patterns have been distorted or taken out of context. All of our data for traffic generation has been reviewed and approved by NCDOT. All of our data for traffic generation comes directly from Buc-ee's operating stores and years of historical data. Repeated references to our Robertsdale store and the requirement of Buc-ee's Blvd to be built by state or federal money are patently false; the "900-foot length" of an existing county road was renamed to Buc-ee's Blvd to enhance traffic flow with signage at the adjacent intersection. NDCOT has conceptually approved our traffic plan as a safer, more efficient, and long-term solution to a growing problem acknowledged by NDCOT and the County. The proposed traffic plan allows for a renewed discussion for the completion of the south and west bound connections from 1-85 to Highway 70 and a realignment of Ben Johnston Road. 23 Attachment 8 STATEMENT OF CONSISTENCY OF A PROPOSED UNIFIED DEVELOPMENT ORDINANCE MAP AMENDMENT WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN An applicant initiated amendment to the Zoning Atlas to rezone 2 parcels as follows: Parcel Township Owner of Current Zoning District Proposed Zoning District Identification Record Number (PIN) 9854-16-1576 Cheeks SL Efland Office Research Master Plan Development Heirs LLC Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Upper Eno Protected Efland Station; Watershed Protection Upper Eno Protected Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. 9854-36-3711 Cheeks Chad Lloyd Office Research Master Plan Development Land Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Investment Upper Eno Protected Efland Station; Company Watershed Protection Upper Eno Protected LLC Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. The Board of County Commissioners finds: a. The requirements of Section 2.8 of the UDO have been deemed complete; and, b. Pursuant to Sections 1.1.5, and 1.1.7 of the UDO and to Section 153A-341 of the North Carolina General Statutes, the Board finds sufficient documentation within the record denoting that the amendment is consistent with the adopted 2030 Comprehensive Plan. 1. The amendment is consistent with applicable plans because it supports the following 2030 Comprehensive Plan goals and objectives: • Land Use Overarching Goal: Coordination of the amount, location, pattern and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. The County and City of Mebane have engaged in numerous studies/joint planning efforts over the last several identifying 24 areas viable for the extension of utilities (i.e. sewer) in support of high intensity residential and non-residential land uses. The requested rezoning will allow development consistent with the overall spirit and intent of the adopted Comprehensive Plan as well as applicable joint planning efforts completed by the County and the City with respect to providing utility (i.e. sewer) services. This area was part of a small area plan, specifically the Efland-Mebane Small Area Plan (hereafter `the Plan'), adopted by the County in 2006. The purpose and intent of the Plan was to identify areas for urban style development focusing on viable locations for housing, community services, open space areas, and non-residential development. Upon adoption, the UDO was amended creating various overlay districts designed to implement the goals/policies of the adopted Plan. One of these districts was the Efland Interstate Overlay District. Per Section 4.4 of the UDO the intent of the overlay district is to: `... provide for a more urban style of development in an area of the county served, or intended to be served, by public water and sewer systems'. The properties subject to this rezoning request have been pre-determined to be suitable for urban style development and higher intensities consistent with the Plan. • Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. (See also Economic Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW-2.) The atlas amendment is consistent with this goal and objective with the approval of a rezoning of property creating a district allowing for the development of high density non- residential land uses in an area of the County designated for the location of adequate supporting infrastructure (i.e. water and sewer). The rezoning is also consistent with the goals/policies of the Efland-Mebane Small Area Plan, which identified the area in question as being suitable for higher intensity, urban scale, development due to the proximity to the Interstate and availability of utility services (i.e. water/sewer). 25 c. The amendment is reasonable and in the public interest because it: 1. Expands economic development prospects within the County, while continuing to protect adjacent and nearby land uses, consistent with the Comprehensive Plan as well as adopted Small Area Plans for the area. The atlas amendment involves the approval of a master plan establishing a detailed list of allowable non-residential land uses to aid in the marketing on an area designated within the Comprehensive Plan as being suitable for high intensity non- residential development. The expansion is consistent with County and City of Mebane plans outlining those parcels suitable for service by sewer that are prime for high intensity non-residential development. Further, the approved master plan establishes mandatory land use buffers and setbacks for development within the project to ensure off-site impacts are mitigated. The Board of County Commissioners hereby adopts this Statement of Consistency and findings expressed herein. Rene Price, Chair Date 26 ORD-2020-030 Attachment 5 AN ORDINANCE AMENDING THE ORANGE COUNTY ZONING ATLAS WHEREAS, Orange County has received and processed a petition submitted by Buc-ee's Limited (hereafter `the Applicant') seeking to amend the Orange County Zoning Atlas, as established in Section 1.2 of the Orange County Unified Development Ordinance (UDO); and WHEREAS, This petition seeks to rezone 2 parcels totaling approximately 104 acres of property to Master Plan Development Conditional Zoning District (MPD-CZD) for the purpose of developing the Efland Station development (hereafter `the Project); and WHEREAS, The properties subject to this rezoning are identified, utilizing Orange County Parcel Identification Numbers (PIN), as: i. A 92 acre tract of land PIN 9854-16-1576, and ii. A 12 acre parcel of land PIN 9854-36-3711 hereafter `the Property'; and WHEREAS, The applicant has voluntarily chosen to establish development and land use limitations on the Project to address potential conflicts with surrounding properties; and WHEREAS, This petition has been submitted in concert with a formal master plan in accordance with the provisions of Section 2.9.2 (C) of the UDO; and WHEREAS, the requirements of Section 2.8 and 2.9.2 of the UDO have been deemed complete; and WHEREAS, the Board has found the proposed zoning atlas amendment to be reasonably necessary to promote the public health, safety, and general welfare. BE IT ORDAINED by the Board of Commissioners of Orange County that the Orange County Zoning Atlas is hereby amended to rezone aforementioned 2 parcels of property to Master Plan Development Conditional Zoning (MPD-CZ) and allow development of the Project as detailed within the submitted application. BE IT FURTHER ORDAINED THAT The terms and conditions contained herein shall encumber the Property and bind the owners and lessees thereof, their successors in title and interest. The development of the Project as well as all necessary site improvements, both internal and external to the Project, shall be reviewed, approved, and developed in accordance with: 27 a. The applicable provisions of the Orange County Unified Development Ordinance (UDO), b. Any and all applicable Federal, State, and local regulations, and c. The application package, including traffic impact analyses, as submitted by the Applicant and as approved by the Orange County Board of Commissioners on BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the UDO the approval of this Conditional Zoning application is subject to the following mutually agreed to conditions: I. GENERAL: a. Approval of the Project does not constitute an explicit guarantee for utility services (i.e. water and sewer) by either the City of Mebane or Orange- Alamance Water System (OAWS). Provision of services shall be consistent with applicable utility connection policies and/or any existing utility agreements between the City of Mebane, OAWS, and Orange County; b. Approval of the Project does not constitute an explicit guarantee for roadway closures/development as denoted on the Master Concept Plan. Closure of the existing Exit 160, and development of right-in/right-out driveways on the existing Interstate on/off ramp, shall require additional review/hearings as part of NC DOT and Federal Highway Administration (FHWA) processes taking action on the request independent on this approval. If roadway realignment is approved, the Project will move forward consistent with the approved plan. If denied, the applicant will have to address necessary modification(s) at a future date. c. The Project shall be composed of 2 individual properties totaling approximately 104 acres of land area further defined as follows: i. PIN 9854-16-1576: An approximately 92 acre parcel currently zoned: 1. Office/Research and Manufacturing (O/RM); 2. Upper Eno Protected Watershed Protection Overlay District; 3. Efland Interstate Overlay District; and 4. Major Transportation Corridor (MTC) Overlay District. ii. PIN 9854-36-3711: An approximately 12 acre parcel currently zoned: 1. Office/Research and Manufacturing (O/RM); 2. Upper Eno Protected Watershed Protection Overlay District; 3. Efland Interstate Overlay District; and 28 4. Major Transportation Corridor (MTC) Overlay District. NOTE: Overlay District boundaries/designations are not impacted by this proposal. d. The Zoning Atlas for Orange County shall be designated MPD-CZ. Development shall be in accordance with the approved application packet, master concept plan, and the conditions detailed herein. II. SITE PLAN: a. All site plans proposing development within the Project shall be reviewed by City of Mebane and OAWS staff as part of existing courtesy review agreements; b. All site plans shall provide detail denoting the anticipated daily water and sewer needs for proposed land use(s). Further, all submitted site plans shall track cumulative water/sewer allocation for each proposed land use as part of submittal(s). A lack of water and/or sewer capacity shall result in the denial of the site plan; c. Consistent with existing inter-local utility agreements between Orange County and the City of Mebane, and the approved Application, the Project will have a daily sewer utility allotment of approximately 77,000 gallons a day of sewer service. Site plans proposing development/land uses exceeding cumulative daily sewer allotments shall be required to provide documentation from the City of Mebane indicating there is sewer capacity to serve the proposed development; d. Prior to the approval of a site plan allowing development within the Project, the County will need documentation from OAWS indicating there is sufficient water capacity to serve the Project. A lack of water capacity for a proposed use shall result in the denial of the site plan; e. The Orange County Staff Engineer, OAWS staff, and the City of Mebane Utility Director shall review and approve location(s) of proposed water and sewer lines prior to site plan approval and the initiation of land disturbing activity; f. The Orange County and City of Fire Marshal(s) shall review and offer comment on: i. Road layout and construction methodology, ii. Location of fire lanes, iii. Location of fire hydrants, and iv. Location of the proposed stand-pipe(s). as part of all site plan review. 29 g. Each site plan shall be required to demonstrate compliance with Section 6.16 Environmental Assessment of the UDO. In those cases where development exceeds established thresholds, a formal Environmental Impact Statement (EIS) may be required allowing for site plan approval; h. In addition to the standards detailed in Section 2.5 of the UDO, all landscaping plans shall include information denoting the proposed method of care (i.e. underground sprinklers, maintenance personnel, etc.) for the development. i. Identified conflicts associated with landscaping shall be resolved prior to the approval of the site plan for a given project; j. For all site plans submitted for the Project the Efland Volunteer Fire Department shall be considered a member of the County Development Advisory Committee (DAC) as outlined in Section 1.9 of the UDO to review a projects compliance with applicable development standards including, but not necessarily limited to: land use regulations, conditions of MPD-CZ approval, applicable State fire/building codes. k. Site plans shall contain documentation outlining proposed and/or existing cumulative impervious surface area as well as building/open space ratios within the Project. III. DIMENSIONAL STANDARDS: a. The Project shall observe a building square footage limit of 500,000 sq.ft. consistent with the submitted and approved Traffic Impact Analysis (TIA) approved as part of this master concept plan. Additional floor area may be developed with the submittal of a revised, updated, TIA processed and reviewed in accordance with the provisions of the UDO. b. Height — Principal Structures: Consistent with the definition of building height in Article 10 Definitions and Section(s) 6.2.2 and 6.5 3 of the UDO, the following height limitations shall be observed within the Project: i. Development Area(s) 1 and 5: 40 ft. ii. Development Area(s) 2 and 3: No structure shall exceed 5 stories or 60 ft. in height; iii. Development Area 4: No structure shall exceed 6 stories or 72 ft. in height. This shall be limited to the proposed Short-Term Rental Non- host occupied land use. iv. Development Area 6: 40 ft. There shall be an allowance of an additional 10 ft. of building height to accommodate telecommunication equipment, utility infrastructure including elevator housing, and alternative energy devices. 30 Measurement shall be taken from finished grade at the center point of the front building fagade. measure to rnidw$y poirir between edge measure 10 and eaves measure+o hlghni point / r,'-deck tine of coping builder hegghr Rill road H1P rim? GaNed roo{ Shed food M&Mrd ronf measured from finlened grade ai cwterpoinl of Irons building raude NOTE: drawing for illustrative purposes only. Determination of height shall be consistent with applicable County land use regulations, the various conditions herein, and shall be determined prior to site plan approval. c. Height — Water Tower Accessory Structure: Shall not exceed 110 ft. in height including any/all antenna apparatus erected on same.' d. Setbacks: The Project shall observe the following setbacks: Property Line: Freestanding Vehicular Use Areas: Signage: Building/Structures: Interstate 85/40 100 ft. including any gas 100 ft. and 40 ft. 10 ft. 3 right-of-way station canopy or fuel consistent with the pump. proposed MTC buffer break denoted on the approved Master Concept Plan 2 US Highway 40 ft. 4 40 ft. 4 10 ft. 5 70/Interstate Connector Road right-of- way 1 The applicant is requesting language be modified to indicate water tower height shall be based on utility service needs rather than an arbitrary height limit. z Staff is comfortable with the proposed vehicular use area setback as the condition is written. The applicant is proposing a managed break in the MTC buffer,consistent with existing allowances. They are, however, proposing to have landscaping in this area where none would normally be required. Staff is comfortable with the provision. 3 Staff will be recommending a minimum 25 ft.setback for signage erected adjacent to an Interstate right-of-way. 4 Staff is recommending 50 ft. 5 Staff is recommending a minimum 20 ft.setback for signage erected adjacent to the road right-of-way. 31 Property Line: Freestanding Vehicular Use Areas: Signage: Building/Structures: Mt. Willing Road 40 ft. 6 40 ft. 6 10 ft. right-of-way 100 ft. from residential land uses.7 External 40 ft. 8 40 ft. 9 Property Lines Development 10 ft.10 10 ft.11 5 ft. from private right- Area 1 - Internal of-way setbacks 10 ft. from public right-of-way 12 Other 20 ft. 20 ft. 5 ft. from private right- Development of-way 1s Areas - Internal setbacks e. Open Space: 40 acres (38%) of land within the Project shall be preserved as open space area. No building and/or parking areas shall be permitted. Walking trails, picnic tables, and/or other recreation amenities may be permitted consistent with the standards contained herein and in accordance with the provisions of the UDO; f. Cumulative impervious surface area for the Project shall not exceed 62%. IV. ACCESS AND TRANSPORTATION: In addition to the requirements of Section 6.10 Roadway Improvements and Multi-modal Transportation of the UDO the following standards shall apply:14 e Staff is recommending 50 ft. 'Staff is seeking confirmation from the applicant this includes 100 ft.from residentially zoned property west of Mt. Willing Road. 8 Staff is recommending the following: 100 ft.from external property lines abutting a residential land use/zoned parcel of property and 50 ft.adjacent to a non-residential land use/zoned parcel of property. 'Staff is recommending 50 ft. 10 Staff is recommending 20 ft. The Master Concept Plan denotes a variable 15 to 20 ft. landscape buffer separating vehicular use/building area from internal rights-of-way. Staff's proposed setback preserves this landscape area as shown. 11 IBID. 12 As all roadways are to be constructed to public right-of-way standards,and site visibility will be a concern,staff recommends a 10 ft.setback for signage from internal roadways. 13 Staff is recommending a 10 ft.setback. 14 As detailed in the December 15, 2020 staff abstract,staff has recommendations)on the imposition of additional conditions for access drives off of the Interstate on/off ramp as well as westbound Exit 160. 32 a. Internal streets shall be privately maintained; b. External roadway construction/improvements shall be completed or appropriately bonded prior to the issuance of a Certificate of Compliance (C of C) allowing the occupancy of a structure triggering completion of same; c. External roadway improvements shall be constructed in accordance with NC Department of Transportation requirements and guidelines, approved Traffic Impact Analysis (TIA), and the standards outlined herein; d. Final roadway layout, including pavement widths and driveways, shall be approved by the Orange County Fire Marshal's office and NC DOT as part of the final site plan review process required under Section 2.5 of the UDO and as detailed herein; e. Phase 1 shall involve development of a gravel access road off of Mt. Willing Road for emergency vehicle access. When the final driveway access allowing access to the Project from Mt. Willing Road is constructed, this gravel roadway can be eliminated;15 f. Site plan submittals shall be required to demonstrate internal/external traffic improvements necessary to address development impacts consistent with the submitted Transportation Impact Analysis (TIA); g. Any and all internal streets, sidewalks, bicycle lanes, etc. shall be designated for public access/use for employees/customers/visitors to the site; h. Driveway permits, when required, shall be applied for and issued by the North Carolina Department of Transportation; i. Orange County and North Carolina Department of Transportation shall approve the location of all proposed external utility poles housing street signals prior to installation; j. Segregated entrances and exits for pedestrian, construction vehicle, and non-construction vehicular traffic shall be developed to avoid conflict during construction activities for internal roadways; k. Any required or requested bus pullouts and/or transit shelters shall be constructed to serve the Project consistent with transit plans adopted by Orange County and shall be developed in accordance with the following: i. Outside of Development Area 6, there shall be a maximum of 2 bus stops serving the Project. Location of these stops shall be determined with each site plan submittal; ii. Each transit stop shall be a covered and enclosed on 3 sides to shield users from the elements, is The applicant is proposing a gravel roadway for emergency vehicle access(i.e.fire, EMS,Sheriff,etc.)to the Project. This has been approved by the County Fire Marshal. Staff would prefer the proposed driveway access from Mt.Willing Road be constructed in Phase 1 making it easier for Efland residents to access the Project. 33 iii. Kiosks shall be developed to provide transit information, including schedule and route information, and shall be illuminated to five (5) average maintained foot-candles. I. Traffic directional signage shall be required for all internal and external roadway as directed by Orange County and the North Carolina Department of Transportation including but not limited to: i. Stop signs, ii. Yield signs, iii. Bus parking and unloading informational signs iv. Lane ends, v. Merge signs, vi. Caution Pedestrian Traffic — Yield Signs, vii. Traffic safety signs designed to direct construction traffic throughout the site, viii. Traffic warning signs indicating the location of private driveways and forbidding public access to the various properties, and ix. Through traffic signs. m. Applicant shall be responsible for designating a speed limit for the Project, posting signage denoting same; n. Development of Area 6 shall be coordinated with the applicant, NC DOT, and Orange County Transportation Services consistent with the standards detailed herein and within the UDO. The applicant bears no responsibility for the development of Area 6. V. PERFORMANCE STANDARDS: a. The Project shall comply with Section(s) 6.4.2 through 6.4.7 of the UDO inclusive; b. Solid Waste Management: The following specific standards shall apply: i. Development within the Project shall contract for the private collection and disposal of solid wastes and for the collection and marketing of mixed recyclables (including corrugated cardboard), and food waste; ii. All site plans shall designate external space for the proper storage and collection of solid waste, recyclable materials (including corrugated cardboard) and food waste; iii. Storage/collection areas shall be located in such a manner as to provide convenient access for users of the facility and for safe and efficient access by collection vehicles. Their location shall be reviewed and approved as part of the site plan submittal/review process. 34 External space for collection of solid waste and recyclable materials. Materials collected shall be consistent with the County's Solid Waste Management ordinance. Waste collection areas shall be located in such a manner as to provide convenient access for users of the facility and safe passage for service vehicles. iv. In those cases where storage/collection areas are located across property or district lines for shared areas, developer shall prepare and record a joint access agreement, including a shared storage/collection facility agreement, establishing the sharing of the proposed storage/collection facility and that they can be serviced across property lines or district lines. This agreement shall be reviewed and approved by Orange County Solid Waste and representatives of the County Attorney's office; v. For food service and lodging operations, space shall be reserved for the storage/collection of food waste collection; vi. The layout and design of waste/storage facilities for solid wastes, recyclable materials (including corrugated cardboard), and food wastes shall comply with the standards and guidelines of Orange County Solid Waste Management (OCSW) and the Orange County Environmental Health Food & Lodging Division. Further, such waste/storage facilities shall be designed and situated so not to negatively affect adjacent properties; and shall be located so not to impact internal traffic flow or located in loading zones. vii. The following standards notes shall be placed on all site plan(s) addressing compliance with the County's Regulated Recyclable Materials Ordinance (RRMO): 1. Clean wood waste, scrap metal, and corrugated cardboard present in construction and demolition waste shall be recycled; 2. All haulers of construction and demolition waste shall be licensed with OCSW; 3. Prior to the issuance of a permit to demolish any structure five hundred (500) square feet or greater in size, the permitee or owner shall have requested and received a deconstruction assessment by OCSW Enforcement staff in accordance with the RRMO. viii. The following additional notes shall be provided on any submitted site plan: 1. Gate design will include gate retainers. 2. Orange County will not be responsible for any pavement damage that may result from service vehicles. 35 3. The developer shall reserve space within all solid waste collection areas for segregated grease rendering/recycling collection facilities and shall provide space for segregated food waste collection near the delivery entrance for any building that houses, proposes to include, or may at some future date incorporate a restaurant, cafeteria, bar, or other food service facility at any time. 4. All solid waste containers, dumpsters, recycling bins, etc. shall be located within an enclosure, buffered in accordance with the standards contained herein, and meeting the following criteria: a. Loading areas shall be designed and situated not to negatively affect adjacent properties. b. Solid waste enclosures shall be so located as to not impact internal traffic flow, c. Loading zones shall not be located within areas designated as housing for solid waste facilities. c. Architectural Design: In addition to the standards detailed in Section 6.5 of the UDO, the following specific standards shall apply to the Project: i. Development Area 1: 1. Development shall abide by the information detailed in Exhibit 1 of the approved Application package. ii. Development Area(s) 2 through 5: 1. Permitted exterior finishes and/or siding materials shall be limited to: a. Cement/concrete siding, such as Hardi-plank, b. Brick and/or stucco, c. Concrete in pre-cast or cast-in-place (CIP) applications. i. Where utilized, large expanses shall be broken- up and modulated with architectural variations like scoring, reveals, ornamental embellishments, etc. d. Concrete masonry units (CMU's) limited to: i. Standard block, painted for service areas out of public view, rears of parapets, etc. OR ii. Split-face and/or ground face CMU's 36 e. Dry-stack and/or ashlar stone shall be permitted only when utilized as an identifying characteristic for a structure. f. All storefronts and glass walls shall utilize glazing. Reflective and/or mirrored glass is prohibited. 2. Roofs shall abide by the following standards: a. Roof design that serve to enhance the capture of natural light shall be encouraged; b. All rooftop HVAC equipment, elevator overrides, and other similar devises shall be screened utilizing 1 of the following methods: i. Clad in exterior materials that are non-reflective or illuminated, OR ii. Designed as an architectural feature of the proposed structure, OR iii. Screened through some vegetative buffer or fencing. c. Solar panels shall be allowed to be installed along roof tops, including raised panels to allow for tracking of the sun's rays, in accordance with the following: i. The panels shall oriented or designed to prevent glare, and ii. Roof mounted panels shall be screened from view at through an architectural feature. iii. Metal roofs shall be non-reflective and designed to blend in with the architecture of the building. d. Ground mounted solar shall be screened from view by fencing or vegetative buffer. e. Sloped standing seam metal roofs shall be permitted as long as they are designed to blend in with the architecture of the building and the district, f. Flat roofs comprised of TCP, EPDM, rubber single-ply membrane and other similar products shall be permitted as long as the applicant demonstrates that the roof shall be hidden or shielded from the public's street view through the use of parapets, railings, or balusters. 37 3. Service Areas & Mechanical Equipment shall be screened from the adjoining Public Roads with walls designed to complement the building architecture of the adjacent buildings and/or landscaping. Architectural features such as, but not limited to, banding, medallions, changes in color or design features or materials will be provided to avoid a sterile, unarticulated blank treatment of such walls; 4. Screening of Structures. Meter banks, transformers and similar utility structures will be screened where visible from public view at grade level; 5. Backflow Preventers. Above ground back flow preventers and transformers will not be located within the Open Space Areas or within the required Urban Open Space unless they are required to serve the Open Space Areas in which they are located. Above ground back flow preventers and transformers that are located within the Open Space Areas as allowed by this Section will be screened; 6. Mechanical Equipment Screening. Roof top HVAC and related mechanical equipment will be screened from public view at grade level at the right-of-way location; 7. Dumpster Screening. Dumpster areas and recycling areas will be enclosed by a solid wall or fence with one side being a decorative gate. The wall or fence used to enclose the dumpster will be architecturally compatible with the building materials and colors used on the principal building; 8. Accessory Buildings. Any and all accessory buildings and enclosures whether attached to or detached from the main building, including automatic teller machines, shall be designed to complement the site architecture and shall be integrated with the same scale, texture, color and detailing of adjacent architectural design; 9. The applicable components of the Project will comply with applicable provisions of the ADA; 10 Any required deviation to address NCDOT drive slope requirements shall be limited to occur along access drives and/or between individual districts to avoid internal tract slope conflict creating accessibility issues. iv. Development Area 6: Development within this area shall be consistent with County architectural guidelines. d. Landscaping/Buffering: In addition to the standards contained in Section 6.8 of the UDO, the following specific standards shall apply to the Project: 38 i. All required landscaping shall be installed and maintained by the developer or their successor in perpetuity; ii. Existing vegetation shall be preserved, where possible, in identified buffer areas as indicated on the approved Master Concept Plan. If existing vegetation is utilized, a minimum of fifty percent (50%) of the critical root zone of the existing tree must be within the buffer and must remain undisturbed in order to apply towards land use buffer standards; iii. If a portion of any land use buffer must be disturbed to facilitate development, the disturbed portion shall be re-planted consistent with the approved Landscape Buffer Plan (Sheet C-6.0)of the Master Plan; iv. Landscaping shall comply with the following: Buffer Type (denoted Planting(s) — per 100 linear ft. on Master Concept Plat) 10' or 20' Type A . 1 Deciduous Canopy Tree Mixed Option • Deciduous Understory Tree • 2 Evergreen Understory Trees • 13 Shrubs 40' Type C . 7 Deciduous Understory Overhead Utility Trees Option • 5 Evergreen Understory Trees • 30 Shrubs 40' Type C . 3 Deciduous Canopy Trees Mixed Option • 1 Evergreen Canopy Tree • 2 Deciduous Understory Trees • 5 Evergreen Understory Trees • 40 Shrubs 40' Type B . 2 Deciduous Canopy Trees Deciduous Option • 2 Deciduous Understory Trees • 12 Shrubs Enhanced • 6 Deciduous Canopy Trees 40' Type D • 1 Evergreen Canopy Tree • 4 Deciduous Understory Trees Mixed Option . g Evergreen Understory Trees 70 Shrubs 39 • 6 ft. tall fence erected at the edge of landscaping 100' Type F 10 Deciduous Canopy Trees Deciduous Option 13 Deciduous Understory Trees 80 Shrubs 200' Type F 10 Deciduous Canopy Trees Deciduous Option 13 Deciduous Understory Trees 80 Shrubs v. Planting Requirements — Street Trees. All required street trees will be installed along existing and proposed public streets, not including alleys, when above and below ground utilities and stormwater infrastructure allow as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. Street trees shall be at least 1'/2 inches in caliper at time of planting. Canopy trees required as part of land use buffers may also be applied towards the Street Tree requirement. vi. Planting Requirements — Between Lot Plantings: Between lot plantings will not be required on any Development Area except as shown as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. vii. Planting Requirements — Foundation Plantings: The required foundation plantings shall be in accordance with the following: 1. Development Area 1: Plantings will be provided within proximity to all buildings using the following standards: a. Landscape islands will be directly adjacent to the primary sidewalks to each building. Total square footage provided for all landscape islands will be equivalent to 5 feet times the total length of the three primary sides (excluding the rear) of all buildings. Landscaping will not be placed in direct proximity to the building foundation due to safety and foundation infiltration concerns. 2. Development Areas 2 — 6: Landscape area at least five feet (5') wide for a minimum of fifty percent (50%) of the primary frontage side of the building. viii. Interior landscaping shall be consistent with the following: 1. In-general: 40 a. Unless otherwise modified herein, parking lot landscaping shall be provide consistent with Section 6.8.7 (d) (2) of the UDO; b. Shade trees shall be provided at a ratio of one (1), one and one half-inch (1.5") minimum caliper tree for every ten (10) car parking spaces; Caliper size is measured at the time of planting; c. No more than ten parking spaces shall be permitted in any single continuous row without being interrupted by a terminal landscape island except when directly adjacent to a building. No terminal landscape islands will be required for the first row of parking spaces when directly adjacent to any side of any building; d. When required, terminal landscape islands will be a minimum of 200 square feet and may include pavers and / or decorative stone within the required 200 square feet of the landscape island; e. Each terminal landscape island will be planted with a minimum of one canopy tree, as well as shrubs and / or ground cover. 2. Development Area 1: a. No landscape area shall be provided between the vehicular use areas and the right of way or adjacent property line except as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. Plantings required as part of the Land Use Buffers may be used to satisfy this requirement; 16 3. Development Areas 2 through 6: a. A landscape area at least five feet in width (which may include drainage and/or utility easements) shall be installed within parking areas. Plantings required as part of the Land Use Buffers may be used to satisfy this requirement. 17 ix. Rainwater harvesting shall be encouraged to serve as irrigation for landscaping including the use of all regional stormwater ponds developed within the Project. 16 Staff recommends a 10 ft.vegetated buffer shall be provided between vehicular use areas, including parking stalls,and internal access roads. These areas should exclude drainage/utility easements. Also this language contradicts applicant's recommended condition(s)on encouraging/promoting internal landscaping. 17IBID. 41 x. The Project shall comply with the provisions of Section 6.6.4 of the UDO related to preservation of required buffers within the Major Transportation Corridor (MTC) overlay district. This includes the ability to create visual breaks in the buffer in accordance with Section 6.6.4 (A) (5). g. Parking: In addition to the standards contained in Section 6.9 of the UDO, the following specific standards shall apply to the Project: i. Space(s) shall be required based on the following standard(s): 1. Retail: 1 space for every 300 sq.ft. of gross floor area; 2. Bank/Financial Institution: 1 space for every 200 sq.ft. of gross floor area. 5 stacking spaces shall be provided per individual drive-in window; 3. Office: 1 space for every 300 sq.ft. of gross floor area; 4. Eating and Drinking Establishment: 1 space for every 40 seats or 1 space for every 50 sq.ft. of floor area for public use whichever is greater; 5. Short-Term Rental Non Host Occupied: 1 space per room plus 1 space per shift employee; 6. Manufacturing: 1 space per 1,000 sq.ft. of floor area. ii. Car wash: there will be stacking/storage space provided to accommodate a minimum of 10 vehicles waiting for access to the proposed car wash facility. h. Signage: In addition to the standards contained in Section 6.12 of the UDO, the following specific standards shall apply to the Project: a. In general: i. Signs or marketing of any kind are prohibited within the common areas/open space of the Project; ii. In addition to the requirement of Section 6.12.7 of the UDO, sign submittals shall include a photo of the actual building exterior and a rendering with the proposed sign superimposed same; iii. All signs shall be internally illuminated; iv. Window signs or graphics of shall be limited to 25% of the window surface as defined from floor to ceiling. b. Specific sign limits: i. Development Area 1: 1. Freestanding Sign: a. Maximum Number: 1 42 b. Maximum Height: 80 ft. from natural grade;'$ c. Maximum Width: 22 ft.; d. Maximum Size of Sign: 470 sq.ft. further broken down as follows: i. Logo: 380 sq.ft. ii. Cabinet: 90 sq.ft. 2. Monument Sign: a. Maximum Number: 1 b. Maximum Height: 8 ft. from natural grade; c. Maximum Width: 13 ft.; d. Maximum Size of Sign: 65 sq.ft. 3. Wall Sign — Retail Center: a. Maximum Number: 3 b. Maximum Height: N/A; c. Maximum Width: i. Logo: 9 ft; ii. Sign Cabinet: 7 ft. d. Maximum Size of Sign: i. Logo 64 sq.ft. ii. Cabinet: 206.5 sq.ft. 4. Wall Sign — Car wash: a. Maximum Number: 4 b. Maximum Height: N/A; c. Maximum Width: i. Logo: 5 ft; ii. Sign Cabinet: 20 ft. d. Maximum Size of Sign: i. Logo 25 sq.ft. ii. Cabinet: 52 sq.ft. per sign. ii. Development Areas 2 through 6: 1. Monument Sign: 18 Staff has heard concerns from BOCC members the sign height is too high. Staff is asking for direction on appropriate height and size for the Project. 43 a. Maximum Number: i. 2 signs in Development Area(s) 2 and 3; ii. 1 sign in Development Area 4; iii. 3 signs in Development Area 5 b. Maximum Height: 20 ft. from natural grade; c. Maximum Width: 16 ft.; d. Maximum Size of Sign Panel Area: 240 sq.ft.; 2. Wall Sign: a. Multi-tenant Building: i. Maximum horizontal length or span of sign shall not exceed 80% of the width of the usable, one surface storefront of a particular Tenant's space; ii. Sign shall not exceed 64 square feet in area; iii. If the width of the storefront contains more than one building/facade material, the Tenant shall use only one building/facade material width to determine 80%; iv. No sign may cover two different fagade surfaces. b. Single-tenant Building: i. One wall sign per building fagade; ii. Allowable sign area shall not exceed 1 square foot of sign area per 1 foot of building length of each fagade up to a maximum size limit of 64 square feet; iii. No sign may cover two different fagade surfaces. 3. Directional Sign: a. Limited to necessary information for patrons (e.g. entrance/exit, directional, one-way) b. May not exceed 4 square feet in sign area c. May not exceed 4 feet in height d. Maximum of four (4) per building within any particular Development Area 4. Temporary Real Estate, Construction, and Financing Signs: 44 a. No sign shall exceed 24 square feet in area b. No more than two (2) signs per building site c. Construction and Financing Signs must be removed within 10 days of receipt of certificate of occupancy for any one building site. i. Lighting: In addition to the standards contained in Section 6.9 of the UDO, the following specific standards shall apply to the Project: i. All lighting shall be full-cut off fixtures; ii. Lighting in parking areas shall observe a height limit of 36 ft.; iii. All lighting shall comply with maximum foot-candle limits at property lines as noted in Section 6.11.6.A of the UDO. There shall be no net increase in existing lighting levels along the Interstate 85/40 on/off ramp beyond existing lighting installed and maintained by NC DOT; iv. Lighting within the Project shall abide by the standards detailed in Section 6.11.8 of the UDO. i. Stream Buffers: The Project shall comply with the provisions of Section 6.13 of the UDO. j. Stormwater regulations: The Project shall comply with the provisions of Section 6.14 of the UDO.19 A Master Stormwater Management Plan (SMP) shall be developed to address stormwater runoff for the entire development even though individual parcels may be responsible for installing stormwater control measures (SCMs). Stormwater facilities will be designed to meet current Ordinances with the development of each individual Development Area within the Project. Nitrogen and Phosphorus load contributions leaving the site must be held to 2.20 Ibs per acre per year and 0.33 Ibs per acre per year respectively. These standards shall be met via offset payments (nutrient buy-down payments) and/or on-site SCMs consistent with State law and the UDO. k. Erosion Control regulations. The Project shall comply with the provisions of Section 6.15 of the UDO. I. Flood regulations: The Project shall comply with the provisions of Section 6.21 of the UDO. 20 VI. PERMITTED AND PROHIBITED LAND USES: 19 As detailed in the December 15, 2020 staff abstract,staff has recommendation(s)on the imposition of additional conditions associated with stormwater management. 20 At this time there are no identified floodplains on the Property. 45 a. Permitted Uses: Shall be limited to those identified uses consistent with existing definitions contained within the UDO. i. Development Area 1: Approximately 26.59±acres in area developed within Phase I of the Project. Permitted uses shall be limited to: 1. Motor Vehicle Service Station limited to no more than 60 gas dispensers with a maximum of 120 fueling stations.21122 2. Retail and Eating and Drinking Establishment uses subject to the following conditions: a. Located within a single structure no more than 70,100 sq.ft. in area; b. Accessory use shall be limited to a car wash. ii. Development Area 2: Approximately 17.07 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Eating and Drinking Establishments limited to 32,000 sq.ft. of building area; 2. Retail uses limited to 30,000 sq.ft. of building area; and 3. Office and Financial Services uses limited to 4,000 sq.ft. of building area. iii. Development Area 3: Approximately 3.88 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Eating and Drinking Establishments limited to 8,000 sq.ft. of building area; and 2. Retail Uses limited to 16,000 sq.ft. of building area iv. Development Area 4: Approximately 3.84 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Short-Term Rental- Non-Host Occupied. v. Development Area 5: Approximately 21.05 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Medical Uses; 2. Office and Financial Service; 21 The applicant has indicated the need for the proposed individual fuel pumps is that motorists will stop to fuel their cars then go into the retail center for a prolonged period of time thereby limiting access to the fuel pump. Staff has heard numerous concerns from adjacent property owners related to the number of proposed pumps as well as the storage tanks necessary to support same. 22 The applicant will be providing a schematic for inclusion within the conditions detailing what a fueling station will look like. 46 3. Manufacturing, Assembly, Processing and Distribution Uses- Food Uses; 4. Manufacturing, Assembly, Processing and Distribution Uses- Other Uses limited specifically to Research Facility with Manufacturing, totaling no more than 150,000 square feet in approximately four (4) buildings. vi. Development Area 6: Approximately 1.62± acres directly adjacent to the railroad tracks. This area will be reserved for development by others to support area transit. No buildings or parking are planned for this site as a part of the Project. Bus/Rail Passenger Shelters are permitted. b. With the exception of Development Area 1 (Travel Center), Area 4 (Short- term Rental Non-Host Occupied), and Area 6 land uses/building square footage allotments can be transferred between development areas 2, 3, and 5. c. Prohibited Uses: i. No Eating and Drinking establishment with a drive-thru facility shall be permitted to be developed on the Property except as follows: 1. A take-out window shall be permitted for picking up pre- ordered food. ii. Except for Development Area 1, no Motor Vehicle Service Station, including but not limited to gas station, convenience store/gasoline sales uses, shall be allowed on the Property. For the purposes of this provision, the term "gasoline sales" shall include petroleum, ethanol, diesel or other motor vehicle fuels;23 iii. The following Manufacturing, Assembly, Processing and Distribution Uses — Food land uses are expressly prohibited: 1. Animal Feed Preparation, Manufacturing, Packaging, and Distribution; 2. Animal Slaughtering and Processing, Packaging and Distribution; 3. Seafood Preparation, Packaging and Distribution; 4. Starch, Vegetable Fats and Oils Manufacturing; 5. Tobacco Processing, Preparation, Packaging and Distribution. 2s This condition means the only Motor Vehicle Service land use(i.e.gas station)developed within the Project shall be in Development Area 1. 47 iv. All Manufacturing, Assembly, Processing and Distribution Uses — Other land uses are expressly prohibited except for Research Facility with Manufacturing land uses. v. The following Medical Uses are expressly prohibited: 1. Hospital; and 2. Veterinary Hospital. vi. The following Office and Financial Services Uses are expressly prohibited: 1. Building/Trade contractor offices with external equipment storage; and 2. Pawnshop/ payday loan services. vii. All Automotive/Transportation Uses are prohibited with the exception of: 1. Motor Vehicle Service limited to development within Development Area 1; and 2. Bus/Rail Passenger Shelters. viii. All Service Uses are prohibited with the exception of: 1. Eating and Drinking Establishments; 2. Car Wash as a customary accessory use to a Motor Vehicle Service land use limited to Development Area 1; and 3. Short-Term Rental- Non-Host Occupied limited to development within Development Area 4. VII. UTILITIES: a. Development within the Project shall be served by utility systems provided and maintained by: i. Public water - Orange Alamance Water System (OAWS) ii. Sewer services — City of Mebane Additional and/or alternative water and/or wastewater systems shall not be permitted. b. A written, signed agreement between a developer, Orange County, and the aforementioned utility providers shall be executed describing the timing, phasing, design, and financing of public water distribution and public sanitary sewer collection mains; c. Water systems and water pressure shall comply with all applicable OAWS utility standards, building, and fire codes based on the proposed land use; 48 d. Sizing/looping of utility lines shall be based on the proposed development, including water flow test data and shall be reviewed and approved by County staff and appropriate utility entity; e. Fire-flow test(s) of all installed hydrants shall be conducted, in coordination with OAWS and Orange County Emergency Services, to ensure compliance with applicable State Fire Code standards. VIII OTHER: a. Structures erected within the Project shall be designed to allow for incorporation of solar infrastructure installation on rooftops or in adjacent areas. b. Electric Vehicle Charging Stations: i. A paved EV charging station area serving no less than ten (10) vehicles including the required electrical conduit system will be constructed within Development Area 1, (completion of the charging station installation would occur at Applicant's sole discretion) ii. EV charging stations will be encouraged within other Development Areas provided that such facilities shall be ancillary to a principal land use and as a service to patrons or employees c. Consideration of L.E.E.D certified practices for components of the Project where feasible BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of published ordinances and that this ordinance is effective upon its adoption. Upon motion of Commissioner , seconded by Commissioner , the foregoing ordinance was adopted this day of ) 2021. I, Laura Jensen, Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on , 2021 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. WITNESS my hand and the seal of said County, this day of 3 2021. 49 SEAL Clerk to the Board of Commissioners