Loading...
HomeMy WebLinkAboutAgenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing) 1 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 15, 2020 Action Agenda Item No. 5-b SUBJECT: Zoning Atlas Amendment: Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing) DEPARTMENT: Planning and Inspections ATTACHMENTS: INFORMATION CONTACT: 1. MPD-CZ Application Package and Michael D. Harvey, Planner III (919) 245-2597 Exhibit(s) only provided electronically Craig Benedict, Director (919) 245-2592 due to size — posted on the County website as detailed below] 2. Vicinity and Current Zoning Maps 3. Future Land Use and Growth Management Systems Maps 4. Project Correspondence and Staff Comment(s) 5. Notes from Neighborhood Information Meeting 6. Excerpt of Draft Planning Board Minutes from November 4, 2020 and Statement of Consistency 7. Notification Materials and Certification 8. Statement of Consistency 9. Ordinance amending the Orange County Zoning Atlas — Draft Conditions of Approval PURPOSE: To hold a public hearing, receive the Planning Board/staff recommendation and public comment, close the public hearing, and schedule action for a specific future date on an applicant initiated Zoning Atlas Amendment for parcels within the Cheeks Township of Orange County. Specifically, Buc-ee's Limited is seeking to rezone 2 parcels totaling approximately 104 acres to Master Plan Development Conditional Zoning (MPD-CZ) district. As indicated herein, due to the size of the application, it is available electronically on the County website at: https://www.orangecountync.gov/1722/Current-Interest-Projects. BACKGROUND: On August 7, 2020 a Zoning Atlas Amendment application was received proposing to rezone 2 parcels, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854-36-3711 (hereafter `the Property'): 2 FROM: Office/Research and Manufacturing (O/RM); Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. (map of parcels) I II III '' I I I II 'I' ICI' I111"I I " '1 10 1 .. •: [TH •gyp• ° 0 • • O t ; • b •b _^ PIN 9854-36-3711 O p'• � ,s p O Z' N inaedWed '• ,w PIN 9854-16-1576 185 140 W e7�1665 ..}.S''40��'•r/ht C'E.�JVNn ` t1 1ELPS�4Iq00E ENT 1Oil The basic facts concerning this application are as follows: Applicant: Buc-ee's Limited (LTD) 327 FM 2004 Lake Jackson, TX 77566 A ent s : Elizabeth (Beth) Trahos Kelsey W. Hall, P.E. Earl Lewellyn, P.E. Attorney Kimley-Horn Kimley-Horn Nelson-Mullins 300 Morris Street 300 Morris Street 4140 Parklake Ave Suite 200 Suite 200 Raleigh, NC 27612 Durham, NC 27701 Durham, NC 27701 Parcel Information: A. Parcels and Size: Subject parcels, identified utilizing Orange County Parcel Identification Numbers (PIN), are: 1. PIN 9854-16-1576: An approximately 92 acre parcel. 2. PIN 9854-36-3711: An approximately 12 acre parcel. If approved, the new MPD-CZ district would be approximately 104 acres in area. A vicinity map denoting the location of the parcels, and current zoning, is contained in Attachment 2. 3 B. Township: Cheeks. C. Future Land Use Map (FLUM) Designation: Both parcels are located within the Commercial Industrial Transition Activity Node. A copy of the FLUM Map is contained in Attachment 3. D. Growth Management System Designation: Both parcels are Urban Designated. A copy of the Growth Management System Map is contained in Attachment 3. E. Existing Conditions/Physical Features: Varying topography with wooded areas, cleared area apparently used as pasture for farm animals, and water features (i.e. ponds, streams, wetland areas). F. Roads: 1. North: Southern Drive (roadway located within the Southern railroad right-of-way). Neither Property has direct frontage and/or access to Southern Drive; 2. South: Interstate 85/40 including interstate on/off ramp; 3. West: Mt. Willing Road; 4. East: US Highway 70/1-85 Connector road. G. Water and Sewer: Water utility services are provided by Orange-Alamance Water System (OAWS). Wastewater utilities (i.e. sewer) are provided by the City of Mebane. Surrounding Land Uses: North: Railroad, Single-family residential land uses on parcels zoned Rural Residential (R-1), Home park on a parcel zoned R-1; Undeveloped 6 acre parcel zoned Office/Research and Manufacturing (O/RM); South: Interstate 85/40; West: Mt. Willing Road, restaurant and gas station on parcels zoned Neighborhood Commercial (NC-2), Single-family residential land uses on parcels zoned R-1; East: US Highway 70/1-85 Connector Road and Ben Johnson Road, large undeveloped parcels of property zoned Agricultural Residential (AR). MPD Conditional Zoning (CZ) Process: Involves review/action of a rezoning petition and a master concept development plan allowing for the development of specific land use(s). Applications are processed in a legislative manner (i.e., does not require sworn testimony or evidence) and decisions are based on the BOCC's determination that the project is consistent with the purpose and intent of the Comprehensive Plan. As this is a MPD-CZ proposal, a formal site plan is not required to be submitted. Applicants are required to produce a concept plan consistent with the provisions of Section 6.7 of the Unified Development Ordinance (UDO). The typical cadence for review is as follows: • First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). 4 Staff Comment — DONE. This meeting was held in an on-line format on September 15, 2020. Notes from this meeting are contained within Attachment 5. Please note, staff held a follow-up information meeting on October 28, 2020 to review modifications to the application package (i.e. name change, land use buffer/access management changes, etc.). • Second Action — The Planning Board reviews the application at a regular meeting and makes a recommendation to the BOCC. Staff Comment. The Planning Board completed its review of the Project at its November 4, 2020 regular meeting, voting unanimously to recommend approval. • Third Action — The BOCC receives the Planning Board recommendation and makes a decision at a previously advertised public hearing. Staff Comment — If the public hearing is held remotely, there is a 24-hour waiting period required before a decision can be effective per State legislation regarding virtual/remote meetings. The purpose of the 24-hour waiting period is to allow for submission of written comments. Per Section 2.9.2 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part this process only if they address: 1. The compatibility of the proposed development with surrounding property, 2. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and vehicular circulation systems, screening and buffer areas, etc.) and/or 3. All other matters the County may find appropriate or the petitioner may propose. If approved, the Zoning Atlas will be amended and the zoning designation of the property shall be changed to MPD-CZ. Development, including permitted land uses, would be in accordance with the approved development proposal and conditions imposed as part of the atlas amendment process. Development of the Property shall only be permitted through the review and approval of site plan application(s) in accordance within Section 2.5 of the UDO. This is so staff can verify all imposed conditions are adhered to and allow for final review by members of the Development Advisory Committee (DAC) as detailed within Section 1.9 of the UDO. Proposal: The applicant is proposing to rezone the Property to MPD-CZ district allowing for the development of Efland Station, formerly known as Beaver Crossing, summarized as follows: i. Intended to: `... create a mixed-use unified development providing a variety of retail, service, hotel, dining, light industrial/office flex space uses consistent with the Orange County 2030 Comprehensive Plan ...'; ii. Construction of approximately 500,000 sq.ft. of building area supporting various land uses, specifically: a. A Travel Center including a 120 pump gas station and approximately 64,000 sq.ft. of retail; STAFF COMMENT: The applicant has clarified it will be 60 pumps with 120 actual fuel nozzles/hoses (i.e. 2 fuel nozzles per pump). b. 120-room multi-story hotel; 5 c. 150,000 sq.ft. of Office/Service/Manufacturing land uses; d. 8,000 sq.ft. of medical office space; e. 30,000 sq.ft. of retail space; f. A 3,500 sq.ft. drive-in bank; g. 12,000 sq.ft. of casual restaurant(s); and h. 20,000 SF of high-turnover sit-down restaurant(s) space. iii. Designation of parcel for development of transit facilities/amenities along the northern portion of the Property (south of railroad); iv. Preservation of approximately 38% or 40 acres (1,742,400 sq.ft.) of open space; v. Roadway access proposed off of: a. Right-in/right-out driveways off of the Interstate 85/40 on/off ramp; b. Driveway access off of US Highway 70/1-85 Connector Road; and c. Mt. Willing Road. Development will be completed in 2 phases with the travel center completed in Phase 1 and remaining land uses in Phase 2 (hereafter `the Project'). The applicant is proposing imposition of development and design standards (i.e. architectural design, signage, internal and external setback limits, height limits, landscaping/buffer standards, outdoor lighting standards, erosion control/stormwater, etc.) governing overall development of the project if the MPD-CZ district is approved by the County. STAFF COMMENT.- Proposed land uses, excluding the Travel Center, are currently permitted within the existing O/RM general use zoning district. Development of these uses would be `permitted by right' (i.e. staff administrative review of site plan without advisory board/elected official review/comment). The applicant has elected to go through the MPD-CZ process for the following reasons: • Development of the Property `as a whole' rather than subdividing land into separate parcels for independent development (i.e. separate access points, parking, stormwater facilities, grading/land disturbance, access drives, etc.); • Employment/use of comprehensive traffic access management strategies; • Maximize preservation of open space; • Provide for comprehensive stormwater management/treatment; • Minimize the overall land disturbance/grading activities associated with the Project; and • Seek approval for the proposed Travel Center land use. Staff has heard concerns from residents the MPD-CZ designation allows for more intensive development activity than currently permitted. This is not necessarily correct. If approved, the Project would result in more open space area and less overall constructed building area than what is permitted by-right with the existing zoning designation. The main difference between the existing O/RM district and the MPD-CZ is the potential development of the proposed travel center as detailed herein. 6 Staff has also heard concerns approval of the MPD-CZ will eliminate existing Planning Board and BOCC involvement with the review and approval of site plans. As staff has detailed in numerous meetings, and herein, the majority of proposed land uses are currently permitted 'by right'. This means the Planning Board and BOCC already have no involvement with site plan review or approval. For example, a 120 room hotel could be developed on the property today without public notice/review/comment or review/action by Planning Board/BOCC members. Staff would review/take action on a site plan submitted in accordance with Section 2.5 of the UDO. The MPD-CZ process is providing an opportunity for more public review/comment than would currently be allowed under the current general use zoning designation. Access: The Project is proposing phased access improvements, namely: i. Two right-in/right-out driveways off Interstate 85/40 on/off ramp, developed in Phase 1 (initial development) as shown below: yf e Access drive—app.600 ft. west of the US Highway 70/1- !15.; ; '� _+ t+a 85 Connector Road !��'f�".:'� �r'�%�•-r� '�. 1'i7.i..t.I f.T'l. � Pd i -S:K Access drive—app. ' `" A 600 ft.east of Mt. Interstate 85/40 ' Willing Road ii. Driveway off of US Highway 70/1-85 Connector Road, developed in Phase 1, 500 ft. north of Ben Johnson Road including installation of a new traffic signal (shown below): 7 } _-----_-___-- - 401- _ NI .� � New driveway � ■ �y - T�J x Yellow areas denote roadway improvements(i.e.road widening/new . 4k pavement)including new travel lanes. R iii. Access of off Mt. Willing Road across from Turner Street controlled by a Stop Sign constructed in Phase 2 (shown below): -` STOP I q Ilk- New driveway ` 'F 4P +1 -%% iv. Elimination of westbound Exit 160 off 1-85/40 (i.e. the Efland/Mt. Willing Exit) in Phase 1. 8 The exit will be combined with existing Exit 161 (US Highway 70/1-85 Connector Road). As staff understands it, signage will be added indicating Exit 161 allows access to `Efland' and `Mt Willing Road'. To access Mt. Willing Road from west bound 1-85/40, travelers will be required to: a. Exit the Interstate at Exit 161; b. Stop at the proposed new stoplight; c. Go straight through the intersection, driving onto the existing Interstate 85/40 on/off ramp; d. Travel approximately 3,200 ft. west arriving at Mt. Willing Road. STAFF COMMENT. The current configuration (i.e., Exits 161 and 160) of the interchange is commonly referred to as a "braided ramp interchange" where entrance/exit points overlap. Vehicular traffic utilizes shared access roadways resulting in weaving conflicts between traffic attempting to exit and access the Interstate using these same travel lanes. The current interchange configuration was designed approximately 25 years ago using traffic volumes based on anticipated land use and traffic growth/distributions assumptions in place at that time. In reviewing the matter with NC DOT, the current layout is not particularly desirable due to inherent operational and safety problems associated with the traffic movement conflicts and relatively short distance provided for deceleration/acceleration for motorists'. Current traffic weaving maneuvers result in potentially unsafe conditions which would be significantly exacerbated by increases in traffic volumes. While it is fair to say this Project has accelerated the need to consider revising the existing interchange, Planning staff have been informed by NC DOT that improvement(s) to the interchange would eventually be made to address public safety issues. These `improvements' would likely have involve eliminating westbound Exit 160 to address public safety issues as traffic volumes increase in the area. The elimination of westbound Exit 160/reconfiguration of Exit 161, requires additional review as part of NC DOT and Federal Highway Administration (FHWA) processes, which are independent of this zoning atlas amendment process. If approved, the project will move forward consistent with the master concept plan. If denied, the applicant will have to address modification(s) at a future date. As a practical matter, the processing of this rezoning request is the first step in this process. During our initial review of the Project, staff made the following recommendation(s) concerning the proposed location of right-in/right-out driveway points (Attachment 4): ➢ Eliminating the access drive(s) on the interstate on/off ramp west of US Highway 70/1-85 Connector Road altogether; OR ➢ Limit the two proposed access drives to an `entrance only' east of Mt. Willing Road and an `exit only' west of the US Highway 70/1-85 connector road versus a right-in/right-out for both driveways as current designed. If the proposed access drives were eliminated altogether, motorists would access Interstate 40/85 from the Project either via the US Highway 70/1-85 Connector Road 9 or Mt. Willing Road. Staff made this recommendation in an effort to preserve Exit 160 as currently configured and reduce anticipated traffic conflicts. NC DOT staff have indicated westbound Exit 160 may be eliminated/relocated/redesigned to address anticipated traffic safety needs as traffic volumes increase in the area. Further, the applicant expressed concern over not having direct access to the Project via the on/off ramp. Staff still believes there is merit to continue investigating limiting the proposed access drives to be an `entrance only' and/or `exit only' thereby reducing potential vehicular conflicts and continued study on preserving westbound Exit 160, recognizing the ultimate decision on these components of the Project have to go through a separate State and Federal review process. ii. Installation of new traffic signals (i.e., new driveway/Exit 161 intersection with US Highway 70/1-85 Connector Road and the intersection of the 1-85/40 on/off ramp with Mt. Willing Road) in Phase 1; iii. Turning Ben Johnson Road into a `right turn only'. Vehicles attempting to access the Interstate from Ben Johnson Road will turn right onto US Highway 70/1-85 Connector Road, complete a U-turn at the proposed signal approximately 500 ft. north, and access the Interstate via the existing on/off ramp. This work would be completed in Phase 1; iv. Numerous roadway improvements (i.e. widening for adding of turning lanes, development of traffic stops, etc.). STAFF COMMENT.- Both Planning and NC DOT staff have reviewed the proposal. Comments are contained in Attachment 4. Improvements will need to be made to Mt. Willing Road to accommodate the current/anticipated traffic flow. County Comprehensive/Transportation Planning staff have recommended a roadway design consistent with the approved Efland-Buckhorn- Mebane Access Management Plan (EBM AMP). As currently envisioned, the widening of Mt. Willing Road would be addressed through the typical County/NC DOT roadway improvement process. The applicant has indicated a willingness to reserve/dedicate necessary right-of-way to accommodate roadway improvements and abide by the following consistent with the EBM AMP: 10 Y u u `�4 F " � w „• , r w it m YM 100 uN eLXY IWY 4 LANE DIVIDED (17'-6" RAISED MEDIAN)WITH CURB & GUTTER, WIDE OUTSIDE LANES,AND SIDEWALKS P05TE05PEED 35-45 MPH AM- 4 G MN W 4 LANE DIVIDED(17'-6-RAISED MEDIAN)WITH CURB & GUTTER, BIKE LANES,AND SIDEWALKS P06MV SPEED 35-45 MPH Driveway access to the Project from Mt. Willing Road will be developed in a future phase (i.e. will not be part of the initial development of the travel center in Phase 1). The applicant has proposed a temporary access road from Mt. Willing Road for emergency vehicle access (i.e., fire, ambulance, Sheriff, etc.). This temporary access proposal has been approved by the County Fire Marshal. Staff has concerns vehicles will be unable to access the proposed travel center directly from Mt. Willing Road until Phase 2, the proposed elimination of Exit 160, and the individual right-in and right-outs allowing access to the proposed Travel Center off of the Interstate on/off ramp. Utilities: The project is proposed to be served by public water (Orange-Alamance Water System) and sewer (City of Mebane). Orange County is continuing to work with Orange-Alamance and City of Mebane officials to address any and all necessary improvement(s) to accommodate the Project. Sewer services shall be provided consistent with the existing inter-local utility agreement between the County and the City of Mebane. STAFF COMMENT: The application was forwarded to Orange-Alamance Water System and City of Mebane staff. As of the writing of this abstract, staff has not received formal comment(s) from Orange-Alamance staff but have received acknowledgement, via email to the Director, they have capacity to serve the Project. There are memorandums from the County Staff Engineer and City of Mebane in Attachment 4 concerning provision of services. 11 Erosion Control/Stormwater Regulations: The applicant has indicated the project will abide by existing stormwater, Section 6.14, and erosion control, Section 6.15, regulations of the UDO. STAFF COMMENT. There have been numerous public comment(s) made over stormwater runoff impacting adjacent parcels, including the County's Severn Mile Creek Preserve. Staff has also heard complaint(s) from local residents over the Project negatively impacting water quality. The County has nutrient reduction strategies addressing water quality issues consistent with State regulations. Typically these strategies are achieved with the installation/management of stormwater control measures (SCMs). State rules allow developers to pay `offset fees' to aid in meeting these regulations. These fees are part of a `nutrient trading program' allowed under State rules to fund riparian restoration/enhancement projects constructed elsewhere within the watershed. The goal is to promote overall watershed health and compliance with applicable nutrient reduction strategies. Currently, the predominant strategy utilized in the State is the restoration and/or enhancement of riparian forested buffers on agricultural lands. The concern is use of offset payment methods will not address potential impacts to adjacent water features (i.e. streams, wetlands, etc.). While the overall health of the watershed may be `protected', the quality of local waterways could still be negatively impacted. It has been suggested by both staff and local residents the applicant be required to either: • Abide by nutrient reduction strategies as detailed in Section 6.14.7 of the UDO without participation in the State recognized offsite mitigation program; or • Any off-site mitigation has to occur in Orange County near the Property to ensure preservation of local water quality. Staff is supportive of imposing either as a condition. Solid Waste: The applicant has indicated development within the project shall abide by the Orange County Solid Waste Management Ordinance. Land Use Buffers/Setbacks: The applicant is proposing: • PIN 9854-16-1576: o Northern property line: ■ 40 ft. land use buffer and setback; STAFF COMMENT: Staff has recommended a 50 ft. land use buffer and only allowing for vehicular access (i.e. travel lanes) within 75 ft. of the northern property line. This effectively would impose a 75 ft. setback for all structures. The applicant has indicated they are amenable to a 50 ft. land use buffer. The applicant has offered, as a condition, to erect a 6 ft. wall outside of the buffer creating additional shielding of the Project along the northern property line as well. 12 o Western property line (Mt. Willing Road): ■ 40 ft. land use buffer and setback; STAFF COMMENT: Staff has recommended a 50 ft. buffer and setback. NORTH CAKU-1NA M"16-- RT RESIDENCTIAL LISE l 1�- 4 &'FENCE ON INTERIOR f DEVELOPMENT OF40'SUFFER (MIXED OPTION) I AREAS ENHANCED 3Cr JTI_ITYEASEME.NT „I l aa'MIJ��ED GPTION ��EllELdPMENT 46'TYPE A SUF�F� R1 RESIDENnAL USE 1 - t — �� ba'JII IIY WFMFNT TJ rM XE7 OPTIC.: 40'TYPE C BUFFER - [OVFRF�AD UTILITY OP'ryONI 75'Flr'URE ROADWAY - IK'PRC,-VFIVFNT RESERVATIOA fY I --- v Y _ — PRLSI DEVELOPMENT AREA 4 G4'UT1L1 Y EASEMENT� -- - PRESERVED GHLL }l SPACE AREA 1 I 1 10'7VREA HUFFk14.^.`.. I �i ] _ SMI%ED OPTION - - rFIJTUf2E INTERNAL �LAN65CJIfhHG(TYP,) 4 DEVELOPMENT l lJ AREAS r MANAGEMENT FACIL I Y 7C TYPE A&FFER IUIwrh C1PTIM& o Southern property line - Major Transportation Corridor (MTC) Buffer: The applicant is proposing to develop/install/maintain an enhanced MTC Buffer as follows: ■ A 100 ft. buffer extending approximately 1,000 linear feet east from the intersection of Mt. Willing Road consistent with Section 6.6.4 of the UDO; ■ 40 ft. buffer along approximately 1,220 linear feet of the interstate on/off ramp in front of the proposed travel center; STAFF COMMENT: Section 6.6.4 (A) (5) of the UDO allows for the clearing of up to 50% of the MTC buffer to create a `visual break' along the Interstate. The applicant is proposing a managed buffer in this area versus a total clearing of landscaping (i.e. foliage will be replanted and a buffer shall be maintained in perpetuity). ■ East of the 40 ft. managed buffer, the applicant will maintain a 100 ft. buffer extending approximately 220 linear feet towards the US Highway 70/1-85 Connector Road; ■ A 200 ft. enhanced MTC buffer running approximately 746 ft. east towards the US Highway 70/1-85 Connector Road. 13 The MTC buffer proposal is depicted as follows on the submitted master concept plan: M = DEVELOPMENT -LOPMEN- DEVELOPMEN- Lr C6-b AREA 2 1 F" �'M`I X,L151 17,T 0 1 I-P :AREA 1 �J T I J P I I 'FAUTY %XEDOPTCNy 66 W&URLMAN D BRUFF®R MY TYFE F BUFFER 4'rTK NUFFER I OV TYK F BUFFER SDKPUQLMFON) MJM=5W7JQN) IDECIUL 0 111 QFF4FT-RCUMAJOR 7rff.VrMFF F SUFFER I-A'P.RTA7JNMRRJrQR I-WI-Q INTERSTATE 11,(;Jm.CmLvJLfi) 10'OMEN TMWARTJ MIDOR o Eastern property line (US Highway 70/1-85 Connector Road): ■ 40 ft. land use buffer and setback. STAFF COMMENT: Staff does not have a concern with this proposal. • PIN 9854-36-3711: • Northern Property line (south of railroad): ■ 40 ft. land use buffer and setback. STAFF COMMENT: Staff does not have a concern with this proposal relating to the setback/buffer from the railroad right-of-way. • Western Property line (adjacent to existing Home Park): ■ 40 ft. land use buffer and setback. STAFF COMMENT: Development adjacent to the existing Home Park (i.e. manufactured housing community) is limited to serving various transit needs as determined by Orange County. There will be no `commercial' development activities. As a result, staff does not have a concern with this proposal. Staff does recommend allowing for an access easement which would allow residents from the Home Park to access the Project and, more importantly, the development area intended to support regional transit needs. • Eastern Property line (US Highway 70/1-85 Connector Road): ■ 40 ft. land use buffer and setback. STAFF COMMENT: Staff does not have a concern with this proposal relating to the US Highway 70/1-85 Connector Road right-of-way. 14 AGRICULTURAU RESIDENTIAL USE pf;11ELQPMEh1"C AREA 6 30'G`YERHEA7 ENFVk [3 JTILIT"EASEVENT aU'TYPE d BUFfiEwR �Mlnra{�tION} STORMWATER AO'TYPE C BUFFER MANAGE=MFNI FACT-Ilv (OVERHEAD UTILITY OPTION) 70' 1 YPE A RUFi EFL IMIXED OPTION) f fRSERvCO GREEN -. 'r � SPACE AREA -- - DEVELOPMENT �• � �� • .�r AREA 3 •°` ,0 ° i BF WETLAND BUFrER - 1 W dTILITY 1 f5 l s •'+j f P W D OPT14N} o V Ldph ENT i'' AGRICULTUF1 AREA 2 � � RESIDENTIAL USE ------------- 40'TYPE C BUFFER (M[XED OPTION) STAFF COMMENT: Per Section 6.8.12 (C) of the UDO, land use buffers are based on proposed development as well as existing land use(s) on the adjacent parcel. Further, Section 6.8.7 (D) (1) (a) of the UDO requires parking areas to provide a- landscape area at least ten feet in width, exclusive of drainage and/or utility easements, between the vehicular use areas and the right of way or adjacent property line. • Stream buffers shall be in accordance with the provisions of Section 6.13 of the UDO and range from 65 to 80 ft. based on slope; Environmental Assessment (EA): The applicant completed the EA for this project as required under Section 6.16 of the UDO. At this time the EA indicates: i. Project will not impact any environmentally sensitive areas; STAFF COMMENT: Existing water features (i.e. streams, ponds, wetlands) are located within identified open space areas. Stream buffers are protected consistent with Section 6.13 of the UDO. ii. Steep slopes along the southeastern property line are going to be preserved in established open space/Major Transportation Corridor (MTC) buffers; 15 iii. No culturally/archeologically significant areas have been denoted on the properties; STAFF COMMENT.- As detailed in within documents contained within Attachment 6 historic structure(s) were previously identified on the property in 1993. These structures no longer possess physical integrity lending them to preservation efforts. iv. There are no floodplains on the Property; v. No endangered species have been identified as being on the Property. STAFF COMMENT.- At this stage of review, staff has determined the master concept plan appears to address protection of applicable on-site environmental features. Further review by staff will be necessary, presuming approval of the rezoning application, to address environmental impacts associated with anticipated development. Staff is concerned about fuel storage, and potential impacts arising from a leak, but the UDO does not contain a measureable standard by which we can regulate. Storage tanks are permitted through the State. As presently configured, the Project proposes 6 double-walled concrete encased storage tanks for fuel, each with a maximum capacity of 40,000 gallons of fuel storage. The permitting of these underground tanks will be consistent with NC Department of Environmental Quality (NC DEQ) standards. There are concerns over the potential impact(s) associated with the storage of the necessary fuel supporting 60 gas pumps/120 gas nozzles that will have to be addressed during future site plan review and State permitting of the fuel storage tanks. On October 28, 2020 the applicant provided a response to staff's environmental assessment review memo focusing on fuel storage and the oil/water separations that have to be included in the stormwater inlet systems proposed for the Project. This information is contained in Attachment I. Staff and the applicant have recommended the imposition of various condition(s) to address development impacts as contained in Attachment 9. Other pertinent information concerning the proposed MPD-CZ is as follows: • Future Land Use Map (FLUM) Designation: As previously detailed herein, both parcels are located within the Commercial-Industrial Transition Activity Node (CITAN). The FLUM can be accessed utilizing the following link: http-//www.orangecountync.gov/DocumentCenter/View/4054/Future-Land-Use-Map-PDF. • Comprehensive Plan: Per Appendix F, "Relationships Between Land Use Categories and Zoning Districts Matrix" of the adopted Orange County Comprehensive Plan, the MPD-CZ district is a permissible zoning designation for property located within a CITAN. For more information on the definition of activity node, and to review the allowed zoning designations permitted within same, the Comprehensive Plan can be accessed utilizing the following link: http://www.orangecountync.gov/1242/2030-Comprehensive-Plan. • Growth Management System Map Designation: As previously indicated herein, both parcels within an `Urban' designated area. STAFF COMMENT: The Growth Management System Map is a tool utilized by staff to identify permit review thresholds for residential (i.e. subdivision) projects. 16 • Water and Sewer Management, Planning and Boundary Agreement (WASMPBA): The parcels are located within Orange County's Primary Service Area meaning public utilities (i.e. water and sewer) could be extended. As detailed above, public utility service would be provided by the Orange-Alamance Water System (OAWS) and the City of Mebane. The document can be accessed utilizing the following link: http://www.orangecountync.gov/DocumentCenter/View/4190/Water-and-Sewer- Management-Planning-and-Boundary-Agreement-PDF. • Efland-Mebane Small Area Plan: The parcels are located within an area the small area plan designates as supporting high-intensity/urban style development including non- residential development(s). The adopted plan can be accessed utilizing the following link: https://www.orangecountync.gov/DocumentCenterNiew/4196/Efland-Mebane-Small- Area-Plan-PDF. Analysis: As required under Section 2.9.2 (E) of the LIDO, the Planning Director is required to: '... cause an analysis to be made of the application' and pass that analysis on to the reviewing body. In analyzing this request, the Planning Director offers the following: 1. The application is complete in accordance with the requirements of Section 2.9.2 (C) of the UDO; 2. The proposal appears consistent with the various goals outlined within the Comprehensive Plan concerning development, including: a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. b. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features and that protect natural resources, cultural resources, and community character. c. Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural character, minimizes land use conflicts, supported by an efficient and balanced transportation system. d. Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. e. Economic Development Objective ED-2.1: Encourage compact and higher density development in areas served by water and sewer. f. Economic Development Objective ED-2.10: Extend public water and sewer into all three Economic Development Districts. 3. The proposal appears consistent with the various goals/policies outlined within the Efland-Mebane Small Area Plan, approved by the BOCC in 2006. Specifically, the 17 Project is proposing development of high intensity non-residential land uses in an area reserved specifically for such development as identified within the Plan. 4. The applicant has provided a basic environmental assessment as part of this submittal. Staff has reviewed and determined there ought to be no significant environmental impact from this project based on existing conditions. Staff is recommending the imposition of a condition as part of the approval of this project that additional environmental studies be prepared for all site plans as detailed in Section 6.16 of the UDO; 5. The proposed development is consistent with existing/anticipated development within the area and the various land uses associated with the project are compatible with various goals/policies as detailed herein. During review of the Project, local residents identified the following concerns related to the Project, which staff is including herein for information purposes only: a. The Project is out of character with the rural Efland Community; b. Development of a `120 nozzle gas station' is inconsistent with a County goal of reducing dependency on fossil fuels; c. Stormwater runoff from the Project will have a negative impact on adjacent sensitive water features as well as the County's Seven Mile Creek Preserve; d. Insufficient information has been provided ensuring adequate protection of groundwater from fuel contamination; e. The Project will significantly increase/exacerbate existing light pollution in the area; f. There is no justification for an 80 ft. tall freestanding sign. Neighborhood Information Meeting: A neighborhood information meeting for the project was held on September 15, 2020 in accordance with Section 2.9.2 (D) of the UDO. The meeting was held in an on-line format due to current public health concerns. A synopsis of comments made at the meeting can be found within Attachment 5. Planning staff held a virtual outreach meeting on October 28, 2020 to review applicant modification(s) to the Project including, but not limited to: name change (from Beaver Crossing to Efland Station), access management and landscaping modifications. Public Notifications: In accordance with Section 2.8.7 of the UDO, notices were mailed via first class mail to property owners within 1,000 ft. of the subject parcels providing the date/time of the BOCC public hearing where the proposal is to be reviewed. These notices were mailed on November 25, 2020, 19 days before the meeting. Staff also posted the subject parcels with signs indicating the date/time of the public hearing on December 4, 2020, 11 days before the meeting. For more information, please refer to Attachment 7. Courtesy Review: This request was submitted to the City of Mebane and Orange-Alamance Water System (OAWS) as part of our courtesy review program. To date, staff has not received comment(s) from OAWS staff. Planning Board Recommendation: The Planning Board reviewed the zoning atlas amendment at its November 4, 2020 regular meeting. At this meeting the Board voted unanimously to 18 recommend approval of the Statement of Consistency (Attachment 8) and the proposed Zoning Atlas Amendment (Attachment 9). Excerpts of the minutes from the meeting, as well as the Board's signed statement of consistency, are included in Attachment 6. Agenda materials from the meeting can be viewed at: https://www.co.orange.nc.us/AgendaCenter/Planning-Board-26. Planning Director's Recommendation: The Planning Director recommends approval of the: 1. Statement of Consistency indicating the zoning atlas amendment(s) are reasonable and in the public interest as contained in Attachment 8. 2. Ordinance amending the Zoning Atlas, as well as imposing development conditions, for the identified parcels as contained in Attachment 9. Presuming: a. BOCC and applicant acceptance of recommended conditions as contained in Attachment 9; b. Direction from the BOCC, with the applicants consent as imposition of conditions must be mutual, on imposition of the following addressing staff concerns on: i. Stormwater: Imposition of a condition that requires the applicant to either: 1. Abide by nutrient reduction strategies as detailed in Section 6.14.7 of the UDO without participation in the State recognized offsite mitigation program; or 2. Any off-site mitigation has to occur in Orange County near the Property, within the County's Upper Eno Protected or Critical Watershed Protection Overlay District, to ensure preservation of local water quality. ii. Access Management: 1. Driveway access from the Interstate on/off ramp be restricted to 2 driveways, one allowing access to the Project east of Mt. Willing Road (i.e. a right turn into the Project only) and one allowing access to the on/off ramp west of the US Highway 70/1-85 Connector Road (i.e. a right turn out of the Project only); Staff shall continue to work with the applicant and NC DOT officials to preserve westbound Exit 160 as being part of a dual westbound exit for both Exit(s) 160 and 161 at the existing Exit 161 location. FINANCIAL IMPACT: This request has been reviewed by various County departments who have determined that the approval or denial of the request would not create the need for additional funding for the provision of County services. Costs associated with advertising, including the public hearing notice and mailings, were paid by the applicant in accordance with the adopted Orange County Fee Schedule. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this agenda item: 19 GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal impact associated with this item notwithstanding the Project will adhere to existing adopted local, State, and Federal environmental regulations. RECOMMENDATION: The Manager recommends the Board: 1. Receive the request; 2. Conduct the public hearing and accept comment; 3. Provide direction to staff and the applicant on any additional conditions consistent with Section 2.9.2 (F) (3) of the UDO; 4. Close the public hearing 5. Authorize the acceptance of written comment(s) via e-mail to the Board at ocbocc@orangecountync.gov or by delivery to the Planning Department's office at 131 West Margaret Lane, 2nd floor, Hillsborough, North Carolina 27278, until 9:00 a.m. on Thursday December 17, 2020; STAFF COMMENT. In accordance with Session Law 2020-3 Section 4.31(a), regarding remote meetings during declared emergencies, while voting may be allowed on the night of the meeting, staff is recommending the Board vote at a subsequent meeting due to the complex nature of the project. Session Law 2020-3 further allows the record to be supplemented by written comments on items heard at a public hearing by accepting written comments for 24 hours after the public hearing is closed. Due to the late hour at which this public hearing is expected to conclude, staff is recommending an additional period of time in excess of this 24 hour period to accept written comments. 6. Schedule a vote to approve the: a. Statement of Consistency (Attachment 8), and b. Zoning Atlas Amendment (Attachment 9) at the Board's January 19, 2021 business meeting as recommended by the Planning Board and Planning Director. No additional public comments shall be received on this item at the January 19, 2021 business meeting. ORA Zoning NC 20 FORREST AVE i i .SOl1TMERN DR ; �, a' I p Zoo ! J LL' OF 00 W J J m I\ N TURNER w 0 orUpper`Eno �, Prot 854363711 Y 5� �' 9854161576,E _ hJ Z _ - _ � r r r r r Ck a , a t� _ � o I Q Project Parcels AR NC2 � - 0 Watersheds - 0 R1RM Upper Eno EC5 Efland Interstate 11 Zoning: O/RM rr i in=500 feet Q Efland Village 12 Overlayers: Efland Interstate CCOUNTY A Feet a 500 Major Transportation Corridor NoPlanning and Inspections Department(BC) Major Transportation Corridor 0 LC1 Upper Eno Protected 10/23/2020 O:\GIS Workspace\Projects\Efland Station\Efland Station.aprx\Zoning Future Land Use Map 21 F�QRRES1T AVE. i i SQU�TjHERN DR I �, p I Ji LO LU J i I c� N TURNER ST Z, Upper Eno yap o�`` Protected 9854363711 0 � hJ5 9854161576 �� Z v 4 9 FN� ,,'�� 0 Project Parcels Watershed Critical Areas � Upper Eno � . . Water Supply Watersheds Critical Resource Protection Areas N tin=500feet ORANGE Feet Agricultural Residential COUNTY 0 500 Planning and Inspections Department(BC) Commercial-Industrial Transition 10/23/2020 O:\GIS Workspace\Projects\Efland Station\Efland Station.aprx\Future Land Use Map Growth Management System 22 HH I IL 11FORRESTAVE i i SOUTHERN-DR C) > � I Q J I L.L LEI } � I J � J I\S I I � � I N TURNER-ST = wh/LL 9854363711 0 0� 5� 9854161576 ��hJ Z• v I / 6 FN� ON�1/S�IV RD /EST TEN RD 0 Project Parcels N 1 in=500 feet ORS GE Feet Urban Designated coUN7 0 500 Planning and Inspections Department(BC) Rural Designated 10/23/2020 O:\GIS Workspace\Projects\Efland Station\Efland Station.aprx\Growth Management System 23 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 W-2 �+ r August 31, 2020 Kelsey Westwood Hall, P.E. 300 Morris Street Suite 200 Durham, NC 27701 RE: REVIEW of Conditional Zoning Atlas Amendment — Master Plan Development (MPD) for STAFF INITIAL REVIEW COMMENTS To Whom It May Concern: On or about August 7, 2020 the Orange County Planning Department received a Conditional Zoning Atlas Amendment application for a parcel of property located north of Interstate 85/40 within the Cheeks Township. Specifically, staff received an application to rezone an approximately 104 acres of property, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854-36-3711 (hereafter 'the Property'): FROM: Office/Research and Manufacturing (O/RM) ; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. According to the submittal, the purpose of the development is to: '... create a mixed-use unified development providing a variety of retail, service, hotel, dining, light industrial/office flex space uses consistent with the Orange County 2030 Comprehensive Plan '. As proposed, development will occur on approximately 104 acres of land land and involve approximately 500,000 sq.ft. of building area supporting previous identified land use categories (hereafter `the Project'). Review and action on the Project shall be in accordance with the provision(s) of Section 2.9 Conditional Districts of the Unified Development Ordinance (UDO). 1 24 In accordance with Section 2.2 Applications of the Unified Development Ordinance (UDO), staff began a sufficiency review of the submittal that was deemed complete and formally accepted for review on August 12, 2020. As a general reminder the timeline for the review of the project remains as follows: a. August 14 through August 28, 2020 — Staff review and comment. b. September 14 through 18, 2020 — Neighborhood Information Meeting (NIM). A NIM shall be held allowing local property owners to ask the applicant questions and for staff to provide information on the process associated with the review of the project. Given current COVID-19 pandemic protocols, this will be an on-line meeting sponsored/administered by the applicant with presentation materials linked on the County website. The applicant is responsible for sending out notices to all property owners within 1,000 ft. of the Property notifying them of the date/time of the NIM. These notices are required to be sent 15 days prior to the date of the NIM and are required to have a statement on the actual envelope indicate the letter is Notification of a Neighborhood Information Meeting (NIM) — Beaver Crossing. Staff will assume responsibility for posting a sign on the Property advertising the NIM c. October 7, 2020 —Anticipated Planning Board meeting; d. November 5, 2020 — First available date for public hearing by the BOCC. NOTE: The public hearing will be a virtual meeting. In accordance with Session Law 2020-3 Section 4.31(a), pertaining to remote meetings during declared emergencies, written comments on items heard at a public hearing are accepted for 24 hours after the public hearing is closed. The BOCC will be unable to make a decision on public hearing items until the 24-hour period for the submittal of written comments has concluded. In reviewing the submitted application package, staff would like to offer the following observation(s) and comment(s): I. COMMENT(S): A. GENERAL: 1. Staff is continuing to review language on utility permitting and connection standards with the Orange Alamance Water (water provided) and the City of Mebane (sewer provider) staff and will provide additional feedback as soon as possible. 2. The Property is located within an area defined as a High Quality Water (HQW) zoned by the State of North Carolina. As site specific 2 25 development plans are submitted, the State will be reviewing the proposal for compliance with applicable standards. Please note 'uncovered areas' in HQW zones shall be limited at any one time to a maximum total area of 20 acres within the boundaries of the Property. Larger areas may be uncovered with the written approval of the Director of the Division of Land Resources of the Department of Environment and Natural Resources. 3. When reviewing similar development proposals, conditions have been recommended by advisory board/elected officials requiring a specific number, or percentage of required, parking be designed to accommodate electrical charging stations. Staff believes there will be similar interest for the Project. Section 2.5 H Sustainable Design of the Narrative contains the following statement: Electric Vehicle Charging Stations: (i) a paved EV charging station area including the required electrical conduit system will be reserved within Development Area 1, (but completion of the charging station installation would occur at Applicant's sole discretion) and, (ii) as to other Development Areas, EV charging stations will be encouraged, provided that such facilities shall be ancillary to a principal land use and as a service to patrons or employees. It is staff's opinion advisory board/elected officials will be looking for specifics (i.e. actual number of stations). 4. When reviewing similar development proposals, conditions have been recommended by advisory board/elected officials requiring the creation/designation of parking spaces to support `park and ride' activities. Staff believes there will be similar interest for the Project. 5. The Narrative will need more information on the anticipated water needs/usage of the Project. Staff is concerned existing infrastructure is not suitable to support all anticipated land uses and comply with applicable State Fire Codes. 6. Sewer services will be provided by the City of Mebane. Consistent with the current inter-local agreement with the City, there is a maximum daily sewer allocation for this entire area. The Narrative needs to provide additional detail on the anticipated sewer needs/usage for the Project. Staff is concerned this one development could negatively impact available sewer service to the entire area based on the engineering design for the existing 12 inch sanitary sewer line. Staff needs this additional detail on anticipated sewer flow to review with the City of Mebane and formulate a response. At a minimum, staff may be looking at a condition requiring low flow toilets and/or low flow users to ensure the continued viability of the system as a whole. 3 26 7. In general, staff will be recommending conditions for this Project that the applicant shall comply with all utility connection requirements/policies enforced by the City of Mebane and Orange Alamance Waster System Incorporated. II. SPECIFIC — NARRATIVE: A. Page 6 of the narrative contains a few grammatical errors that should be corrected, detailed below: To that end, and in accordance with the provision of Section 2.9.2 of the (UDO), we hereby submit this application requests to rezone the approximately 104.55 acres of land generally depicted on Sheet CI.0 (the Property") to the Master Plan Development Conditional Zoning (MPD- CZJ oonig designation to allow for the development of the Project consistent with the land uses, development standards and other terms and provisions of this rezoning plan (including these Development Standards and accompanying Sheets, the "Rezoning Plan'). B. Page 7 of the narrative `estimates' the amount of open space for the project at 30%. Staff believes the narrative can definitively state the amount of proposed open space for the Project. As an aside, there is language in the same paragraph indicating the proposed open space will be 'well in excess of UDO minimum standards'. Typically, the minimum open space area required for such projects is 30% when you factor in total limits on impervious surface area for non-residential development, landscaping/buffering requirements, installation of stormwater control measures, etc. C. Page 7, second paragraph of the narrative contains a few grammatical errors that should be corrected, detailed below: Significant new internal roads,_ an4-pedestrian improvements, and off-site traffic improvements are proposed to serve the new development activities and support/improve mobility and assure appropriate access management. These new roadway improvements will ensure acceptable levels of service in the area, remove the duplicative ramp activity on 1- 40185 between Hwy 70 and Mt. Willing Road, and—re-route obtrusive overhead transmission lines along that section of the 1-40185 frontage, and provide much needed connectivity from Mt. Willing Road/Turner Road by way of a new street through the Project to connect with the 1-85 Connector, among other improvements. Staff believes the following comment(s)/observation(s) should be considered/addressed: i. It might be prudent to include a reference to the various map(s) and/or document(s) where this information is for the layperson reading the narrative; 4 27 ii. Be mindful some may not agree with your characterization of the current location of the overhead power lines as being `obtrusive'. Some may argue they are only `obtrusive' to you and that your proposed relocation plan will only transfer the problem to 'others'; iii. The narrative uses the term `acceptable levels of service'. Be mindful that there will be some property owners within the notification area who would argue the proposed traffic impacts of the project are not acceptable to them; iv. Staff is not clear on what is meant by the statement `remove duplicative ramp activity on 1-40185 between Hwy 70 and Mt. Willing Road'. D. The narrative on page 7 provides a synopsis of beneficial impacts with the development of 'Phase 1' of the Project (i.e. the Buc-ee's Travel center). There is, however, no overview of the project as a whole. Staff is concerned a lack of analysis/explanation of the anticipated benefits of the Project as a whole will become a focal point of criticism. E. Page 9 of the narrative uses the term `vacant' to describe property to the south of the Project. As a general observation, staff has seen previous projects criticized for using the term `vacant' with residents arguing there is nothing inherently wrong with property that is undeveloped. Staff suggests you consider revising language within the document to indicate property without land uses/developments be referred to as `undeveloped' rather than 'vacant'. F. Page 10 of the narrative, under Section 1-5 (B) contains the following language: `Therefore, there will be instances where modifications will be allowed without requiring administrative review under the UDO ...' Staff believes what you are trying to articulate is that certain modifications to the Project will not require 'BOCC review/approval'. Technically, the Project is always under `administrative review' by staff consistent with the provision(s) of the Unified Development Ordinance (UDO). Staff does not want someone to argue your narrative is inconsistent with the UDO. G. Consistent with Section 1-5 (C) of the Narrative, staff understands you are requesting `vested rights' for the Project. This request, however, may not be necessarily required. What this proposal represents is, ultimately, the adoption of a new zoning district governing development of approximately 104 acres of property. There will be development requirements, conditions, and a list of permitted land uses for this new district. If approved, the new zoning district is not subject to being extinguished without formal County action to rezone the property consistent with Section 2.8 of the UDO. 5 28 Staff is continuing to review language with the Attorney's office and will provide additional analysis in the near future. H. Page 16 Section 2-3 Project Development Areas subsection (A) of the Narrative inadvertently repeats a phrase twice: For ease of ease of reference and as an organizing feature associated with the master planned nature of the Project, a series of 6 Development Areas (as defined in Section 1-5 above) are generally depicted on Sheets C2.0 & 2.1 along preserved green/open space areas . Staff also recommends you add the following language to the last paragraph of this section: The exact boundaries of the Development Areas and preserved green/open space areas may be modified to account for Development/Site Elements (as defined below) and other modifications needed to fulfill the design and development intent of the Rezoning Plan. Please note in this context, modification refers specifically to location and not required minimums. An approved dimensional standards (i.e. floor area ratio limits, minimum percentage of property reserved/preserved as open space, minimum number of required parking spaces, etc.) shall be adhered to unless otherwise modified in accordance with the provisions of the UDO. I. Section 2-4 Permitted Uses, Development Levels, and Use Conversion Rights (page 17) subsection (A): i. Staff recommends revising number 1 as follows: The Property may contain and may be developed with uses permitted by right in the MPD-CZ district as proposed herein, together with accessory uses as allowed in the MPD-CZ district, but except as expressly limited by the provisions of subsections 2- 48. and C. below. Sheet C 2.0 of the Master Concept Plan makes reference to specific land use categories being developed within the Project. These are the land use categories you are proposing for development within the Project. Reference needs to be made that allowable land use categories are linked to your `rezoning plan' and `master concept plan'. ii. Staff recommends you list out the requested land use categories in the narrative as currently depicted within the Master Concept Plan for the Project. A new Section 1.a could be include within the narrative reading as follows: 1 (A) As submitted, the Project will allow development of individual land uses consistent with the following land use categories in accordance with 6 29 Section 5.2 Table of Permitted Uses of the County's UDO. i. -Manufacturing, Assembly, Processing, and Distribution Uses — Food Uses, excluding those land uses identified herein-,_ ii. Manufacturinq, Assembly, Processing, and Distribution Uses — Other Uses, limited specifically to Research Facility with Manufacturinq; iii. Medical Uses, excluding those land uses identified herein; iv. Office and Financial Services Uses, excluding those land uses identified herein; V. Automotive/Transportation Uses limited specifically to Motor Vehicle Service Station (i.e. gas station) and Bus/rail Passenger Shelters land uses; vi Service Uses limited specifically to Eating and Drinkin�q Establishments and Short Term Rental — Non-host Occupied land uses. Development of individual land uses shall occur consistent with the standards imposed as part of the MPD-CZ approval process and those specific re ulq ation(s) contained within the UDO allowing for the development of that specific land use. iii. Staff recommends you include language indicating the proposed car wash is considered to be an accessory use to the proposed Motor Vehicle Service Station. Further, in order for the `car wash' to be considered an 'accessory use', it shall be located within the same development district as the proposed Motor Vehicle Service Station (i.e. Development Area 1); iv. The Narrative will need to provide more detail on what 'temporary uses' are envisioned for the Project. Currently, there is no allowance for 'temporary' activities within an MPD-CZ district. J. Section 2-4 Permitted Uses, Development Levels, and Use Conversion Rights (page 17) subsection (B): i. Please correct the following grammatical issue: Except for the uses allowed for Development Area 1 (including without limitation retail sales to include among 7 30 other uses the sale of gas and related products and services and quick service EDEE uses with drive-through facilities , no gas station nor convenience store/gasoline sales uses and will be allowed on the Property, and no fast food restaurant with drive-thru window facility will be allowed on the Property. For the purposes of this provision, the term "gasoline sales" shall including petroleum, ethanol, diesel or other motor vehicle fuels. ii. Number 2: 1. Staff believes you are attempting to reference allowable land uses for a MPD-CZ district as detailed in Section 5.2 of the UDO. If this assumption is correct, please revise existing language accordingly: i. Staff recommends you provide a list of all 'prohibited' land uses for each proposed category, for example: a. Manufacturing, Assembly, Processing, and Distribution Uses — Food Uses: The following land uses are expressly prohibited: i. Animal Feed Preparation, Manufacturing, Packaging, and Distribution; ii. Animal Slauqhterinq and Processing, Packaging, and Distribution; iii. Seafood Preparation, Packaging, and Distribution; iv. Starch, Vegetable Fats and Oils Manufacturing; and V. Tobacco Processing, Preparation, Packaging, and Distribution b. Manufacturing, Assembly, Processing, and Distribution Uses — Other Uses, is expressly limited to Research Facility with Manufacturing; C. Medical Uses. The following land uses are expressly prohibited: i. Hospital, ii. Veterinary Hospital d. Office and Financial Services Uses. The following land uses are expressly prohibited: i. Building/ rade contractor offices with external equipment storage yards: 8 31 ii. Pawnshop/payday loan services; e Automotive/Transportation Uses is expressly limited specifically Motor Vehicle Service Station (i.e. gas station) and Bus/rail Passenger Shelters land uses; f. Service Uses limited specifically to Eating and Drinking Establishments and Short Term Rental — Non-host Occupied land uses; This list is consistent with existing UDO language and simplifies what will and will not be permitted within the Project. b. The narrative should be revised to include additional detail(s) on proposed development activities, namely: i. A description/identification of each individual development area or `pod' within the Project (i.e. acreage of development area, intended access, allowable floor area, etc.); ii. Anticipated number of buildings and their size; iii. An explanation on the anticipated number of .parking spaces; iv. An explanation of loading berths/zones for each area or 'pod'; This information should also be placed on the Master Concept Plan as well (Sheet C 2.0 and/or c 2.1). K. PERFORMANCE STANDARDS: i. IN GENERAL: The Narrative needs to contain a summary of the findings of the Environmental Assessment (Exhibit F) as you begin the discussion of the Project's `performance standards'. Specifically, an analysis of the information demonstrating compliance with applicable standards (i.e. Section 6.16.3 (B) of the UDO) which will be vital in documenting your rationale for arguing an Environmental Impact Statement, as detailed in Section 6.16.4 of the UDO, is not required for the Project. ii. Floor Area Ratio (FAR): the Narrative indicates the Project will observe a FAR of 0.65 or 28,314 sq.ft.of building floor area per acre of property. If we presume single-story building(s) for the Project, this would translate to a maximum of 2,944,656 sq.ft. of building area (67 acres). Staff realizes we will not be dealing with single-story structures throughout the project, but is concerned this proposed FAR is inconsistent with the Transportation Impact Analysis (TIA) submitted for this project, which estimates traffic generated for 9 32 approximately 500,000 sq.ft. of building area/land uses (Exhibit F). The FAR either needs to be: • Modified to be consistent with the building square footage utilized in the development of the TIA, • The TIA need to be modified to document traffic impacts anticipated for the square footage of proposed building area based on a FAR of .65, or • A condition needs to be recommended that floor area exceeding that studied as part of the TIA will require modification to the MPD-CZ consistent with Section 2.9.2 of the UDO. The FAR for the Project should also be listed on the Master Concept Plan, specifically sheet(s) C 2.0 and/or 2.1. iii. Open Space: the Narrative indicates there will be a minimum of 30% open space for the project, translating to approximately 32 acres of land area. Please correct the narrative to reflect 30% of the proposed 104 acre development site. iv. Proposed building height for the Project is listed at a maximum of 60 ft. Existing language indicates `accessory structures' may exceed 60 ft. in overall height. Typically there are additional setback requirements for structures exceeding 40 ft. in height per Section 3.7 of the UDO. Staff recommends references in the narrative to a '60 ft. height limit' be replaced with the following: Buildings within the development shall abide by the height limitations and allowances established within Section 3.4 Office/Research and Manufacturinq of the UDO. Building height shall be limited to 35 ft. 2 feet of additional height shall be allowed for one foot increase in require setback from an external road/property line with a maximum cap of 60 ft. Additional information is required on the anticipated accessory land uses exceeding the 60 ft. height limit. Put simply: the applicant will need to provide a detailed list of land uses, other than signs, exceeding the height limit and the rationale for same. Height limit(s) will also need to be listed on the Master Concept Plan, specifically sheet(s) C 2.0 and/or 2.1. v. A total impervious surface limit should be established for the project. Under current regulations, development with this area of the County could be a maximum of 70% with compliance development of stormwater control measures. After conferring with the Director, it has been recommended the narrative contain language discussing the cumulative/shared nature of the development (i.e. shared access roads, shared parking, common stormwater control measures, open space preservation, 10 33 etc.) resulting in an overall reduction in the amount of land clearing/grading that will be required to accommodate the Project. This will result in an overall reduction in the anticipated environmental impact of the Project thereby potentially justifying additional impervious surface area. vi. The Narrative indicates the Project will comply with the provision(s) of Section(s) 6.13 Stream Buffers and 6.21 Flood Regulations of the UDO. This includes preserving required buffers around identified water features (i.e. streams, wetlands, floodplain, etc.) as defined in the UDO. vii. The Narrative appears to indicate the Project will comply with the provision(s) of Section(s) 6.14 Stormwater and 6.15 Erosion Control of the UDO. Orange County Erosion Control and Stormwater Management staffs are reviewing the proposed conditions. As a general observation: If it is your intention to make use of nutrient buy-down tools, the Narrative should contain language denoting same. viii. Staff encourages the applicant to use on-site ponds, designed to capture runoff, for irrigation purposes as detailed on page 22 of the Narrative. L. ENVIRONMENTAL FACTORS: The Narrative indicates the project shall abide by the provisions of Section 6.4 Performance Standards of the UDO inclusive (i.e. noise, vibration, air pollution, etc.). M. ARCHITECTURAL DESIGN STANDARDS: The proposed architectural design standards appears consistent with the provisions of Section 6.5 Architectural Design Standards of the UDO. N. SETBACKS: Staff is recommending the following: i. 100 ft. perimeter structure setback from all external property lines and right-of-way (i.e. Mt. Willing Road, the Interstate, etc.); ii. Vehicular use areas (i.e. access drive-isle, parking, loading berths): 1. 100 ft. from residentially zoned property (i.e. the property north of the Project); 2. 50 ft. from all other property lines/external public rights-of- way; 3. Staff is recommending all internal setbacks be 20 ft. iii. Signage: the proposed setbacks appear reasonable. Having said that, staff would like to discuss the potential need for more restrictive setbacks for signs exceeding 48 ft. Specifically, staff is looking to address potential impacts from a large sign becoming compromised and collapsing. 11 34 O. LANDSCAPING: The Narrative contains landscaping and buffering requirements in Section 2.5 Performance Standards (E) beginning on page 26. i. In General: The section should provide detail on the landscape and buffer management standards for the Project, including the amount of proposed foliage within identified landscaped areas. ii. Section 6.8.7 (F) of the LIDO, the County establishes various buffer types outlining the number/species of foliage required within every 100 linear ft. of property. The narrative will need to define what level of landscaping is going to be required consistent with this standard. Sheet C 6.0 of the Master Concept Plan contains this information. Staff recommends it be placed in the Narrative as well. Staff shall provide comment(s) on proposed buffers in the next section of this document. iii. Number 4 Planting Requirement(s) — Street Trees. Language within this section of the Narrative is inconsistent with information provided on Sheet C 6.0. There are going to be instances where a canopy tree will be required more than once for every 100 linear ft. iv. Number 6 Planting Requirements — Foundation Plantings. Staff is recommending the following: 1. A minimum of 40% of the building foundation in District 1 shall be landscaped with foliage by means of raised planters, sidewalk cutouts, or portable planters. v. Number 7 Planting Requirements — Vehicular Use Areas. Staff is recommending the following: 1. The Project shall comply with the provisions of Section 6.8.7 (D) (1) of the UDO requiring all parking areas observe a vegetative buffer, at least 10 ft. in width, separating parking from adjacent open space, vehicular use areas, property lines, etc. vi. Number 9 Interior Landscaping. Staff is recommending the following: 1. Language appears to indicate interior parking lot landscaping shall be installed where above/below ground utility and stormwater infrastructure allows. Development of the Project will be required to take into consideration these factors while allowing for the installation of required landscaping. Staff believes the Project can and should comply with all internal tree planting standards. vii. Please revise this section of the Narrative to contain the following additional detail(s): 12 35 1. Canopy trees installed within a landscape island shall be, at a minimum, 1 % inch caliper at dbh at time of installation; 2. Staff recommends inclusion of a typical 'tree grate area' design schematic showing the 'tree grate area' design as well as the anticipated installation of proposed foliage. P. SIGNS: Staff summarizes the proposed signage for the Project as follows: i. Current County sign regulation(s) would allow the following within an O/RM district general use zoning district: 1. 1 on premise sign with a height limit of 24 ft. and a maximum area of 72 sq.ft. for parcels that are large than 60,000 sq.ft. and have more than 300 linear ft. of frontage on a NC Department of Transportation maintained roadway; 2. 1 wall sign per building fagade with frontage on a street right- of-way. Maximum allowable area for a wall sign is 64 sq.ft. for parcels that are larger than 60,000 sq.ft., have more than 300 linear ft. of frontage on a NC Department of Transportation maintained roadway, and contain a structure with more than 100 linear ft. of building length facing a public right-of-way; 3. Window signs are limited to a maximum of 30% of the total window area within the sign is to be located; 4. Per Section 6.12.13 a service station would be allowed signage on the gas pumps as follows: a. No internal or external illumination shall be permitted; b. Signs shall be limited to four square feet in area; c. Signs must advertise items for sale on the property. Under no circumstances may a sign advertise a sale, activity, business, or product not associated with the principal use of property 5. With respect to signage on a canopy, the UDO currently indicates advertising material shall be limited to trademarks, logos, and the name of the service station or other similar display limited to six square feet of area. Signage on the canopy is usually reserved to the portion of the canopy facing/with frontage along a right-of-way. ii.The submitted application proposes the following: 1. Development Area 1 (i.e. Buc-ees Travel Center): a. 1 on premise sign approximately 100 ft. tall with a total sign area of 601 sq.ft.; - Roughly constituting a 800% increase in allowable sign area; 13 36 b. 3 wall signs (i.e. on portions of the building that could have frontage/visibility from a road right-of- way) each approximately 270 sq.ft. in area (total cumulative sign area of 810 sq.ft.); - Roughly constituting a 400% increase in allowable sign area per sign; c. Logos on the canopy — 4 total logos each approximately 50 sq.ft. in area (total cumulative sign area of 200 sq.ft.); - Roughly constituting a 900% increase in allowable sign area per sign; d. A total of 16 signs on several separate gas pumps advertising fuel type, each sign 5.5 sq.ft. in area (total of approximately 88 sq.ft.) — A negligible increase in allowable sign area (i.e. allowed 4 sq.ft. proposing 5.5 sq.ft.). 2. Other development areas: a. A total of 8 monument signs, each with 240 sq.ft. of sign area not exceeding 20 ft. in height (cumulative of 1,920 sq.ft. of sign area); b. Wall Signs: 64 sq.ft. of wall sign area for each individual tenant space (insufficient information to determine cumulative sign area); c. Directional and temporary/construction/real estate signage consistent with the provisions of Section 6.12 Signs of the UDO. A rough estimate of total requested sign area for the Project appears to be between 2,800 and 3,600 sq.ft. depending on the number of individual tenants requiring wall signage. While the Conditional Zoning process allows the County to make additional signage allowances (i.e. height, allowable sign area, etc.), the requested signage is several orders of magnitude beyond what we current regulations would allow on the property. The Narrative should contain information justifying the nature of the request based on the overall Property area of 04 acres and the specific design elements of the Project. For example, the applicant may choose to include language within the Narrative arguing that under current regulations, the 104 acres of property zoned O/R M general use could be subdivided to create approximately 24 separate 4 acres lots, each with its own sign allotment. In this scenario, there would be a maximum of: • 24 freestanding signs (1 for each separate parcel) totaling 1,728 sq.ft, of allowable sign area; and 14 37 • 24 wall signs (presuming 1 sign for a single building on the 24 separate parcels) totaling 1,536 sq.ft. of sign area. The Narrative would have to `demonstrate' how the proposed signage for the Project would be consistent with the overall development potential of this 104 acres of O/R M zoned property if you were dealing with multiple, individual parcels. As a general observation staff is concerned over the proposed 100 ft. free standing sign for in Development Area 1 (i.e. Buc-ee's Travel center) and recommends a maximum height limit of 60 ft. for the proposed sign. This recommendation takes into consideration this site is higher elevation than surrounding properties and the Interstate. With respect to flags, staff recommends a maximum of 3 flags be allowed per individual development area, with a size limit of 24 sq.ft. per flag, consistent with Section 6.12.12 (A) of the UDO. Staff is not comfortable with the proposal to allow 2 flags each development area comply with the provision(s) of your proposal as articulated on page 29 of The Narrative. Staff is not comfortable recommending approval of the proposed standard, specifically each individual building being allowed to have 2 flags, as this is inconsistent with the spirit and intent of Section. Q. LIGHTING: Staff has the following comment(s)/recom mend ation(s): i. An audit of current lighting levels should be completed and made part of the Narrative. This audit will establish the baseline of existing illumination in and around the Property, most notably along the Interstate service road, allowing for a determination as to how much light already exists in the area. Once the results of this audit are available, staff would have no problem recommending a condition for Development Area 1 (i.e. Buc-ee's Travel center) that: there shall be no net increase in existing foot-candle/lumen levels along the southern property line adjacent to the Interstate service road with development in Development Area 1 of the Project. ii. Staff has no concerns over the proposed maximum pole height of 36 ft. iii. Staff agrees with the recommended condition that all fixtures shall be full-cut off design consistent with Section 6.11.6 of the UDO. iv. If the location of outdoor lighting fixtures is known, a formal lighting plan is required to be submitted as part of the MPD-CZ application (refer to Section 6.11.5 (B) of the UDO). If not, please add language indicating same within the Narrative. v. Staff recommends the applicant add language to the narrative indicating all security lights shall abide by the requirements of Section 6.11.3 (J) of the UDO. 15 38 vi. Add language indicating formal lighting plans shall be submitted with all site plans where outdoor lighting is proposed. vii. Add language that lighting for the project shall comply with applicable NC Department of Transportation requirements for roadway lighting. R. PARKING: At this time, staff has no comments on the proposed parking ratios (i.e. number of spaces per sq.ft. of building area based on land use) contained in Section III of the Narrative (page 32). III. TRANSPORTATION IMPACT ANALYSIS (TIA): There are 2 phases to the Project, specifically: • Construction of a 120 pump gas station (Phase 1); and • Construction of: 0 120-room hotel (square footage of structure unknown); 0 8,000 sq.ft. of medical office space; 0 30,000 sq.ft. of specialty retail space; o A 3,500 sq.ft. drive-in bank; 0 12,000 sq.ft. of casual restaurant; and 0 20,000 SF of high-turnover sit-down restaurant space (Phase 2). As previously indicated herein the overall size of the structures referenced within the TIA appears inconsistent with the Narrative and information provided on the Master Concept Plan. In reviewing the TIA, staff would offer these initial comments: A. On August 31, 2020 staff was informed by NC Department of Transportation (NC DOT) staff they required clarification on various issues and had `tabled' their review of the TIA proposal until responses were received. PLEASE NOTE: DOT's review of this TIA is essential to the Project being able to move forward in the zoning atlas amendment process. B. Staff is concerned the proposed square footages for structures, as detailed on the Master Concept Plan and within the Project narrative, are not clearly reflected within the TIA. Put simply, there appears to be more building area generating potential traffic impacts that are not addressed in the submittal we are currently reviewing. C. Staff would like to review the possibility of reserving a 50 ft. right-of-way along the northern property line to accommodate a future access road for parcels fronting on Southern Drive to obtain access to Mt. Willing Road. 16 39 This could be a separate roadway or some form of internal connectivity for these adjacent parcels to the internal roadway network within the Project. This is to address potential loss of Southern Drive as an access for these parcels in the event of railroad expansion. D. Staff is concerned about the proposed drive access points along the Interstate exit ramp running parallel with the southern Property line. Specifically, staff is concerned about what appears to be 2-way traffic access onto the exit ramp from Development Area 1 (i.e. Buc-ee's Travel center). Staff will be recommending to the applicant and NC DOT the proposal be revised to allow for right-turn only for these driveways, specifically: • Entrance to the Project near the intersection of Mt. Willing Road; • Exit onto the allowing drivers to access Development Area 1 near the intersection of the UD Highway 70 connector. This presumes NC DOT allows for the development of driveway/access roads onto the exit ramp serving Development Area 1. E. Orange County Planning supports the proposed US Highway 70 connector improvements as detailed on the Master Concept Plan and referenced within the TIA. F. Mt. Willing Road is on the County's adopted 2019 Efland-Buckhorn- Mebane Access Management Plan (EBM AMP) as well as the Orange County CTP. Staff will be recommending the incorporation of the following: i. 4-Lane divided cross section (page 20 of the EBM AMP) ii. The current right-of-way for Mt. Willing Road is 60 ft. Staff is recommending a 25' reservation of additional right-of-way along the western boundary of the Property in support of future improvements along the roadway. iii. Staff will be requiring a 100 right-of-way (41F) or 110' right-of- way (4G) — NOTE: sample cross sections on next page; iv. County staff will recommend to the BOCC that Mt. Willing Road improvements be approved as a County priority in SPOT 7 and subsequent processes. 17 40 ll ll Q Q ' L-6,:4, 4 F YDEWAtR Win 5A fWAL[ _10 z• 14' �r tTb'MEDUv tz• tA• z_' 1a Nx Nv f00'MN.2G"fO/WAV 4 LANE DIVIDED (17'-6" RAISED MEDIAN)WITH CURB&GUTTER, WIDE OUTSIDE LANES,AND SIDEWALKS P05TED SPEED 35-45 MPH e-I e 4 w Nx Wn acE 11 11 U U p� mx ►a (V= 1ry fAMWK` 2 L5 E 17' tt' 77-CEP.W NN T N4 t1aNN RIGiIEQF WAY _ ___ _ 4 LANE DIVIDED(17'-6"RAISED MEDIAN)WITH CURB&GUTTER, BIKE LANES,AND SIDEWALKS P05TED SPEED 35-45 MPH G. Mt. Willing at 1-40 EB off ramp should be considered for a signalized intersection in Phase 2. H. Stop sign currently at the off ramp; there is a 4-way stop intersection with W. Ten Road just south of this juncture. Staff will be working with the applicant to secure the necessary right-of-way dedication to facilitate these proposals. I. Staff would like to see an area of the project (either in Phase I or II) be reserved for connection to the transit systems of the area; this could include: i. A bus stop location with signage ii. A bus shelter with signage J. A "Future Transit Amenity by others" on a 1.62-acre parcel on the northeast edge of the project area is listed on the second page of the Master Concept Plan, but was not indicated in either TIA. K. Staff is interested in the internal roadway features of the project site (when both phases are built out) and what accommodations (sidewalks, side paths, bike lanes, etc.) might be included. 18 41 IV. MASTER PLAN SET: A. Section 6.7.1 (B) (1) of the UDO requires a map of the development site. While the Master Concept Plan set provides the majority of required detail(s), specifically Sheet(s) C 2.0 and 2.1 the submittal should be modified as indicated: i. Label and identify the various `lines' on the submitted map(s). Staff recommends you use different colors to help distinguish the information contained on the individual maps. ii. Sheet(s) C 2.0 and 2.1 should display the stream/wetland buffer area per Section 6.13 of the UDO. iii. As previously indicated herein, Sheet(s) C 2.0 and 2.1 should display the following information: 1. Proposed floor area ratio (FAR) for the Project. 2. Proposed impervious surface area for the Project. 3. Proposed open space. 4. Breakdown of landscape/buffer area (i.e. acreage) for the Project. 5. Proposed setbacks (internal and external). 6. Anticipated number of parking spaces, loading berths/stalls, etc. 7. Maximum allowable building height (in general and per each individual development `pod' if there will be a difference). 8. Anticipated number of parking spaces with access to alternative energy charging stations (if proposed). iv. The Project will involve the relocation of existing overhead utility lines. Staff will need documentation indicating the relocated power line/easement(s) have been approved, and if development is located within the easement said activity has been approved by the utility provider. v. Sheet C 6.0 and 6.1 serves as the landscape master plan for the project. Staff recommend(s) the following: 1. A 75 ft. land use buffer along the northern property line separating the residential land uses from Development Area(s) 5 and 3. Planting requirements would follow what is proposed for the Type F buffer option as depicted on Sheet 6.1. 2. The proposed tree planting requirements appear to be consistent with the provisions of Section 6.8.6 (F) of the UDO. 19 42 3. Denote internal landscaping (i.e. parking lot and parking lot perimeter, building, preservation of existing significant foliage, etc.) on Sheet 6.0 of the Master Concept Plan set. 4. Major Transportation Corridor (MTC) buffers, including requested breaks consistent with Section 6.6.4 of the UDO. Staff is recognizes the proposal calls for a managed MTC buffer, versus a cleared 'visual break', for the approximately 1,200 linear ft. of Property along the Interstate exit. This proposed 'managed MTC buffer break' constitutes a design standard exceeding current UDO requirements. vi. The roadway cross-section on Sheet C 5.0 appears acceptable for internal roadway development. Staff recommends the drawing be updated to show typical landscaping installation as well. vii. Provide language (Sheet C 2.0) indicating if denoted stormwater control measures (SCMs) are: 1. For illustrative purposes (i.e. final SCM location shall be determined with the submittal of a formal stormwater management plan in accordance with the UDO); 2. Are anticipated to serve as master drainage basin areas or for specific 'pods'. viii. Sheet C 4.0: Section 6.7.1 (B) (6) of the UDO requires a map detailing the utility master plan for the project. While this Sheet provides the majority of required detail(s), the submittal should be modified as indicated: 1. Provide notes detailing anticipated/proposed utility lines (i.e. water/sewer) anticipated within the project. 2. Denote the anticipated location of sidewalks to assist staff ascertain if there will be any conflicts with utility location. 3. The map will need to be modified to include the detailed design calculations for the project indicating that the proposed utility lines are sufficient for expected development and associated/estimated density for the project. 4. Include a note indicating: 'All onsite utilities shall be underground unless approved by the Board of County Commissioners'. 5. Indicate connection points to various utility lines. 6. Denote the location of any anticipated/planned utility infrastructure (i.e. pump stations, etc.). 7. Provide detail on anticipated fire flow for the proposed utility lines with detail on how same will support the project. As a general reminder fire flow requirements are necessary for consideration when sizing water lines. 20 43 8. Provide detail on the anticipated placement of manholes and elevations same. This will include the provision of a typical manhole construction detail. 9. Denote anticipated stub out locations. 10.Additional detail on expected build-out. This information shall be essential in evaluating the ability of installed infrastructure to meet current and future needs of the project. Please note this document represents staff comments on the project thus far and should in no way be construed as our final determination. Additional correspondence shall be provided as necessary outlining our comments on the project. This will include comment(s) from other County agencies (i.e. Erosion Control/Stormwater, Fire Marshal, Solid Waste, County's Attorney office, etc.) and external review partners (i.e. NC Department of Transportation, City of Mebane, Orange-Alamance Water, etc.) We will of course be more than happy to meet with you in person to review these comments, any new issues, and methods of complying with other regulatory requirements. Please contact me at (919) 245-2597 and/or mharvey(aD-orangecountync.gov schedule and/or discuss the project in greater detail. Sincerely, Mich el D. Harve AIC CFM, CZO Current Planning Supervisor Orange County CC: Travis Myren, Deputy County Manager; Craig Benedict, Planning Director; Steve Brantley; Economic Development; James Bryan, County Attorney's Office; Chris Rollins, City of Mebane; Cy Stobber, City of Mebane; Chuck Edwards, NC DOT; OAWS staff; Elizabeth (Beth) Trahos, Attorney for the Applicant File. 21 44 Kimley>>>Horn October 15, 2020 Michael D. Harvey AICP, CFM, CZO Current Planning Supervisor Orange County 131 W. Margaret Lane Suite 201 P.O. Box 8181 Hillsborough, NC 27278 Conditional Zoning Atlas Amendment Master Plan Development (MPD) Comment Responses Review Comments found on page: GeneralComments .................................................................................................................................I NarrativeComments:..............................................................................................................................3 Transportation Impact Analysis (TIA) Comments: ..............................................................................14 MasterPlan Set Comments:..................................................................................................................17 EngineeringComments: .......................................................................................................................19 Environment, Agriculture,Parks& Recreation Comments:.................................................................22 SolidWaste Comments:........................................................................................................................22 General Comments 1. Staff is continuing to review language on utility permitting and connection standards with the Orange Alamance Water (water provided) and the City of Mebane (sewer provider) staff and will provide additional feedback as soon as possible. Response: Comment noted. Kimley-Horn is working to schedule meetings with Orange Alamance Water and the City of Mebane to discuss the improvements necessary for connection to existing water and sewer near the site. 2. The Property is located within an area defined as a High-Quality Water (HQW) zoned by the State of North Carolina. As site specific development plans are submitted, the State will be reviewing the proposal for compliance with applicable standards. Please note `uncovered areas' in HQW zones shall be limited at any one time to a maximum total area of 20 acres within the boundaries of the Property. Larger areas may be uncovered with the written approval of the Director of the Division of Land Resources of the Department of Environment and Natural Resources. 00 Morris Street, Suite 200, 45 Kimley)))Horn Page Response:We will comply with the land area disturbance limitation required by the HQW.We are working with Orange County and the state of North Carolina to identify the best approach to abide by the requirements. 3. When reviewing similar development proposals, conditions have been recommended by advisory board/elected officials requiring a specific number, or percentage of required, parking be designed to accommodate electrical charging stations. Staff believes there will be similar interest for the Project. Section 2.5 H Sustainable Design of the Narrative contains the following statement: Electric Vehicle Charging Stations. (i) a paved EV charging station area including the required electrical conduit system will be reserved within Development Area 1, (but completion of the charging station installation would occur at Applicant's sole discretion) and, (ii) as to other Development Areas, EV charging stations will be encouraged,provided that such facilities shall be ancillary to a principal land use and as a service to patrons or employees. It is staffs opinion advisory board/elected officials will be looking for specifics (i.e. actual number of stations). Response: No less than 10 electric vehicle charging stations will be provided within Development Area 1. Refer to Sheet C2.0 of the Rezoning Plan and Section 2-5.B.12 of the Narrative for details. 4. When reviewing similar development proposals, conditions have been recommended by advisory board/elected officials requiring the creation/designation of parking spaces to support`park and ride' activities. Staff believes there will be similar interest for the Project. Response: A portion of the site (Development has been reserved for a Future Transit N Area 6) Amenity to be designed and constructed by others as described within Sections 3-2 and Section 2-4.0 of the Narrative. 5. The Narrative will need more information on the anticipated water needs/usage of the Project. Staff is concerned existing infrastructure is not suitable to support all anticipated land uses and comply with applicable State Fire Codes. Response:Additional information regarding anticipated water needs and usage of the project is now provided within Section IV of the Narrative. 6. Sewer services will be provided by the City of Mebane. Consistent with the current inter-local agreement with the City,there is a maximum daily sewer allocation for this entire area. The Narrative needs to provide additional detail on the anticipated sewer needs/usage for the Project. Staff is concerned this one development could negatively impact available sewer service to the entire area based on the engineering design for the existing 12-inch sanitary sewer line. Staff needs this additional detail on anticipated sewer flow to review with the City of Mebane and formulate a response. At a minimum, staff may be looking at a condition requiring low flow toilets and/or low flow users to ensure the continued viability of the system as a whole. Response: Additional information regarding anticipated sanitary sewer needs and usage of the project is now provided within Section IV of the Narrative. 7. In general, staff will be recommending conditions for this Project that the applicant shall comply with all utility connection requirements/policies enforced by the City of Mebane and Orange Alamance Waster System Incorporated. Response: Comment noted. Kimley-Horn is working to schedule meetings with Orange Alamance Water and the City of Mebane to discuss the improvements necessary for connection to existing water and sewer near the site. 00 Morris Street, Suite 200, Durham, NC 27701 . .: I 46 Kimley>>>Horn Page 3 Narrative Comments: A. Page 6 of the narrative contains a few grammatical errors that should be corrected, detailed below: To that end, and in accordance with the provision of Section 2.9.2 of the (UDO), we hereby submit this application request to rezone the approximately 104.55 acres of land generally depicted on Sheet C1.0 (the Property') to the Master Plan Development Conditional Zoning (MPD- CZ) designation to allow for the development of the Project consistent with the land uses, development standards and other terms and provisions of this rezoning plan (including these Development Standards and accompanying Sheets, the "Rezoning Plan'). Response: The Narrative has been revised as noted above. Refer to Section 1-1 of the Narrative for details. B. Page 7 of the narrative 'estimates' the amount of open space for the project at 30%. Staff believes the narrative can definitively state the amount of proposed open space for the Project. As an aside, there is language in the same paragraph indicating the proposed open space will be 'well in excess of LIDO minimum standards.' Typically, the minimum open space area required for such projects is 30% when you factor in total limits on impervious surface area for non-residential development, landscaping/buffering requirements, installation of stormwater control measures, etc. Response: The Narrative has been revised to show the percentage of open space depicted on the Rezoning Plan and proposed with the project. Refer to Sections 1-1 and 2.4.0 of the Narrative for details. C. Page 7, second paragraph of the narrative contains a few grammatical errors that should be corrected, detailed below: Significant new internal roads, pedestrian improvements, and off-site traffic improvements are proposed to serve the new development activities and support/improve mobility and assure appropriate access management. These new roadway improvements will ensure acceptable levels of service in the area, remove the duplicative ramp activity on 1- 40185 between Hwy 70 and Mt. Willing Road, re-route obtrusive overhead transmission lines along that section of the 1-40185 frontage, and provide much needed connectivity from Mt. Willing Road/Turner Road by way of a new street through the Project to connect with the 1-85 Connector, among other improvements. Response: The Narrative has been revised as noted above. Refer to Section 1-1 of the Narrative for details. Staff believes the following comment(s)/observation(s) should be considered/addressed: i. It might be prudent to include a reference to the various map(s) and/or document(s) where this information is for the layperson reading the narrative; Response: Comment noted. Additional references to relevant maps and documents have been added throughout the Narrative as deemed necessary. ii. Be mindful some may not agree with your characterization of the current location of the overhead power lines as being 'obtrusive'. Some may argue they are only 'obtrusive' to you and that your proposed relocation plan will only transfer the problem to 'others'; Response: The overhead powerline relocation will remain within the limits of the proposed development and is not anticipated to impact adjacent property owners. 00 Morris Street, Suite 200, Durham, NC 27701 • .: 47 Kimley>>>Horn Page 4 iii. The narrative uses the term 'acceptable levels of service'. Be mindful that there will be some property owners within the notification area who would argue the proposed traffic impacts of the project are not acceptable to them; Response: Comment noted. The term "Level of Service" is a quantitative engineering measure of traffic operations correlated to volume to capacity ratios, vehicle delay, density, and other measured paraments at acceptable levels as defined by the Highway Capacity Manual and NCDOT. iv. Staff is not clear on what is meant by the statement 'remove duplicative ramp activity on I- 40/85 between Hwy 70 and Mt. Willing Road'. Response: This statement is in reference to removal of Westbound 1-40 Exit 160,which duplicates the function of Exit 161. D. The narrative on page 7 provides a synopsis of beneficial impacts with the development of'Phase 1' of the Project(i.e. the Buc-ee's Travel center). There is, however, no overview of the project as a whole. Staff is concerned a lack of analysis/explanation of the anticipated benefits of the Project as a whole will become a focal point of criticism. Response: The Narrative has been revised to provide more explanation for the project has a whole. Refer to Section 1-1 of the Narrative for details. E. Page 9 of the narrative uses the term 'vacant' to describe property to the south of the Project. As a general observation, staff has seen previous projects criticized for using the term 'vacant' with residents arguing there is nothing inherently wrong with property that is undeveloped. Staff suggests you consider revising language within the document to indicate property without land uses/developments be referred to as 'undeveloped' rather than 'vacant'. Response: The reference in the Narrative to adjacent `vacant' properties has been revised to show that the properties are `undeveloped' as recommended. Refer to Section 1-3 of the Narrative for details. F. Page 10 of the narrative, under Section 1-5 (B) contains the following language: 'Therefore, there will be instances where modifications will be allowed without requiring administrative review under the UDO ..." Staff believes what you are trying to articulate is that certain modifications to the Project will not require 'BOCC review/approval'. Technically, the Project is always under'administrative review' by staff consistent with the provision(s) of the Unified Development Ordinance (UDO). Staff does not want someone to argue your narrative is inconsistent with the UDO. Response: The Narrative has been revised to specify that certain modifications to the project will not require Board of County Commissioners review and approval. Refer to Section 1-6.13 of the Narrative for details. G. Consistent with Section 1-5 (C)of the Narrative, staff understands you are requesting 'vested rights' for the Project. This request, however, may not be necessarily required. What this proposal represents is, ultimately, the adoption of a new zoning district governing development of approximately 104 acres of property. There will be development requirements, conditions, and a list of permitted land uses for this new district. If approved, the new zoning district is not subject to being extinguished without formal County action to rezone the property consistent with Section 2.8 of the UDO. Staff is continuing to review language with the Attorney's office and will provide additional analysis in the near future. Response: Comment noted. If necessary, the Narrative will be revised upon additional analysis by Orange County. 00 Morris Street, Suite 200, Durham, NC 27701 . .: I 48 Kimley>>>Horn Page 5 H. Page 16 Section 2-3 Project Development Areas subsection (A) of the Narrative inadvertently repeats a phrase twice: For ease of reference and as an organizing feature associated with the master planned nature of the Project, a series of 6 Development Areas(as defined in Section 1-5 above) are generally depicted on Sheets C2.0 & 2.1 along preserved green/open space areas. Staff also recommends you add the following language to the last paragraph of this section: The exact boundaries of the Development Areas and preserved green/open space areas may be modified to account for Development/Site Elements (as defined below) and other modifications needed to fulfill the design and development intent of the Rezoning Plan. Please note in this context, modification refers specifically to location and not required minimums. An approved dimensional standard (i.e. floor area ratio limits, minimum percentage of property reserved/preserved as open space, minimum number of required parking spaces, etc.) shall be adhered to unless otherwise modified in accordance with the provisions of the UDO. Response: The Narrative has been revised as noted above. Refer to Section 2-3 of the Narrative for details. I. Section 2-4 Permitted Uses, Development Levels, and Use Conversion Rights(page 17)subsection (A): i. Staff recommends revising number 1 as follows: The Property may contain and may be developed with uses permitted by right in the MPD-CZ district as proposed herein, together with accessory uses as allowed in the MPD-CZ district, but except as expressly limited by the provisions of subsections 2- 4B. and C. below. Sheet C 2.0 of the Master Concept Plan makes reference to specific land use categories being developed within the Project. These are the land use categories you are proposing for development within the Project. Reference needs to be made that allowable land use linked to our'rezonin Ian and master concept plan'. categories are li g p g Y been revised as Response: The Narrative has be requested. Refer to Section 2-4 of the p Narrative for details. ii. Staff recommends you list out the requested land use categories in the narrative as currently depicted within the Master Concept Plan for the Project. A new Section 1.a could be included within the narrative reading as follows: 1(A)As submitted, the Project will allow development of individual land uses consistent with the following land use categories in accordance with Section 5.2 Table of Permitted Uses of the County's UDO: i. Manufacturing. Assembly, Processing, and Distribution Uses — Food Uses, excluding those land uses identified herein; ii. Manufacturing, Assembly, Processing and Distribution Uses — Other Uses, limited specifically to Research Facility with Manufacturing; iii. Medical Uses, excluding those land uses identified herein; iv. Office and Financial Services Uses, excluding those land uses identified herein, v. Automotive/Transportation Uses limited specifically to Motor Vehicle Service Station (i.e. gas station) and Bus/rail Passenger Shelters land uses: vi. Service Uses limited specifically to Eating and Drinking Establishments and Short-Term Rental—Non-host Occupied land uses. Development of individual land uses shall occur consistent with the standards imposed as part of the MPD-CZ approval process and those specific regulation(s) contained within the UDO allowing for the development of that specific land use. 00 Morris Street, Suite 200, Durham, NC 27701 • .: 49 Kim ey>>>Horn Page 6 Response: The Narrative has been revised as requested. Refer to Section 2-4 of the Narrative for details.Additional Uses have been added to describe all permitted uses. iii. Staff recommends you include language indicating the proposed car wash is considered to be an accessory use to the proposed Motor Vehicle Service Station. Further, in order for the 'car wash' to be considered an 'accessory use', it shall be located within the same development district as the proposed Motor Vehicle Service Station (i.e. Development Area 1) Response: The car wash is now located within Development Area 1 and is described as an accessory use. Refer to Section 2-4 of the Narrative and Sheet C2.0 of the Rezoning Plan for details. iv. The Narrative will need to provide more detail on what'temporary uses'are envisioned for the Project. Currently, there is no allowance for'temporary' activities within an MPD-CZ district. Response: References to `temporary uses' have been removed from the Narrative. J. Section 2-4 Permitted Uses, Development Levels, and Use Conversion Rights(page 17)subsection (B): i. Please correct the following grammatical issue: Except for the uses allowed for Development Area 1 (including without limitation retail sales to include among other uses the sale of gas and related products and services and quick service EDEE uses with drive-through facilities), no gas station nor convenience store/gasoline sales uses and will be allowed on the Property, and no fast food restaurant with drive-thru window facility will be allowed on the Property. For the purposes of this provision, the term "gasoline sales"shall include petroleum, ethanol, diesel or other motor vehicle fuels. Response: The Narrative has been revised as requested. Refer to Section 2-4.13 of the Narrative for details. The language has also been revised to indicate that no drive-thru windows will be permitted. Take out windows are allowed to accommodate a prevalent practice that has developed during the COVID crisis. ii. Number 2: 1. Staff believes you are attempting to reference allowable land uses for a MPD-CZ district as detailed in Section 5.2 of the UDO. If this assumption is correct, please revise existing language accordingly: i. Staff recommends you provide a list of all 'prohibited' land uses for each proposed category, for example: a. Manufacturing, Assembly, Processing, and Distribution Uses—Food Uses: The following land uses are expressly prohibited. i. Animal Feed Preparation, Manufacturing, Packaging, and Distribution; ii. Animal Slaughtering and Processing, Packaging, and Distribution, iii. Seafood Preparation, Packaging, and Distribution. iv. Starch, Vegetable Fats and Oils Manufacturing: and v. Tobacco Processing, Preparation, Packaging, and Distribution b. Manufacturing, Assembly, Processing, and Distribution Uses—Other Uses, is expressly limited to Research Facility with Manufacturing, c. Medical Uses. the following land uses are expressly prohibited. i. Hospital; ii. Veterinary Hospital III 11911 00 Morris Street, Suite 200, Durham, NC 27701 • .: 50 Kimley>>>Horn Page 7 d. Office and Financial Services Uses. The following land uses are expressly prohibited: i. Buildinglfrade contractor offices with external equipment storage yards; ii. Pawnshop/payday loan services; e. Automotive/Transportation Uses is expressly limited specifically Motor Vehicle Service Station (i.e. gas station) and Bus/rail Passenger Shelters land uses: f. Service Uses limited specifically to Eating and Drinking Establishments and Short Term Rental — Non-host Occupied land uses; This list is consistent with existing LIDO language and simplifies what will and will not be permitted within the Project. Response: The Narrative has been revised to include a detailed list of prohibited land use categories similar to the sample list provided above. Refer to Section 24.13 of the Narrative for details. a. The narrative should be revised to include additional detail(s) on proposed development activities, namely: i. A description/identification of each individual development area or pod'within the Project (i.e. acreage of development area, intended access, allowable floor area, etc.); ii. Anticipated number of buildings and their size; iii. An explanation on the anticipated number of parking spaces; iv. An explanation of loading berths/zones for each area or`pod; This information should also be placed on the Master Concept Plan as well(Sheet C 2.0 and/or C2.1). Response: The Narrative has been revised to provide additional details on the proposed development to the greatest extent possible. Refer to Section 2-4.0 of the Narrative for and Sheet C2.0 of the Rezoning Plan for details. K. PERFORMANCE STANDARDS: i. IN GENERAL: The Narrative needs to contain a summary of the findings of the Environmental Assessment (Exhibit F) as you begin the discussion of the Project's 'performance standards'. Specifically, an analysis of the information demonstrating compliance with applicable standards (i.e. Section 6.16.3(B) of the LIDO)which will be vital in documenting your rationale for arguing an Environmental Impact Statement, as detailed in Section 6.16.4 of the UDO, is not required for the Project. Response: A summary of the findings of the Environmental Assessment are now included within the Narrative. Refer to Section 1-5 of the Narrative for details. ii. Floor Area Ratio(FAR): the Narrative indicates the Project will observe a FAR of 0.65 or 28,314 sq.ft. of building floor area per acre of property. If we presume single-story building(s) for the Project, this would translate to a maximum of 2,944,656 sq.ft. of building area (67 acres). Staff realizes we will not be dealing with single-story structures throughout the project, but is concerned this proposed FAR is inconsistent with the Transportation Impact Analysis (TIA) submitted for this project, which estimates traffic generated for approximately 500,000 sq.ft. of building area/land uses (Exhibit F). The FAR either needs to be: • Modified to be consistent with the building square footage utilized in the development of the TIA, 00 Morris Street, 00 Durham, NC 27701 • .: 51 Kimley>>>Horn Page 8 • The TIA need to be modified to document traffic impacts anticipated for the square footage of proposed building area based on a FAR of 0.65, or • A condition needs to be recommended that floor area exceeding that studied as part of the TIA will require modification to the MPD-CZ consistent with Section 2.9.2 of the UDO. The FAR for the Project should also be listed on the Master Concept Plan, specifically sheet(s) C 2.0 and/or 2.1. Response: The Narrative has been modified to specify that the FAR for each Development Area shall not exceed 0.65 provided that the total development of the project shall not exceed 500,000 SF of gross floor area. The addition of this provision within the Narrative allows for total development of the site to be consistent with the TIA. Refer to Section 2-5.A.2 of the Narrative and Sheet C2.0 of the Rezoning Plan for details. iii. Open Space: The Narrative indicates there will be a minimum of 30% open space for the project,translating to approximately 32 acres of land area. Please correct the narrative to reflect 30% of the proposed 104 acre development site. Response: The Narrative has been corrected to show a minimum of 40 acres of open space for the project which equates to approximately 38% of the site. Refer to Section 2-5 of the Narrative for details. j for the Proect is listed at a maximum of 60 ft. Existing language iv. Proposed building height � indicates 'accessory structures' may exceed 60 ft. in overall height. Typically, there are additional setback requirements for structures exceeding 40 ft. in height per Section 3.7 of the UDO. Staff recommends references in the narrative to a'60 ft. height limit' be replaced with the following: Buildings within the development shall abide by the height limitations and allowances established within Section 3.4 Office/Research and Manufacturing of the UDO. Building height shall be limited to 35 ft. 2 feet of additional height shall be allowed for one foot increase in require setback from an external road/property line with a maximum cap of 60 ft. Additional information is required on the anticipated accessory land uses exceeding the 60 ft. height limit. Put simply: the applicant will need to provide a detailed list of land uses, other than signs, exceeding the height limit and the rationale for same. Height limit(s)will also need to be listed on the Master Concept Plan, specifically sheet(s) C 2.0 and/or 2.1. Response:The Narrative has been revised to modify the language for allowable building height above 35' and additional detail is provided for land uses that may exceed the 60' i height limit. Refer to Section 2-5.A.4 of the Narrative and Sheet C2.0 of the Rezoning j Plan for details. v. A total impervious surface limit should be established for the project. Under current regulations, development with this area of the County could be a maximum of 70% with compliance development of stormwater control measures. After conferring with the Director, it has been recommended the narrative contain language discussing the cumulative/shared nature of the development (i.e. shared access roads, shared parking, common stormwater control measures, open space preservation, etc.) resulting in an overall reduction in the amount of land clearing/grading that will be required to accommodate the Project. This will result in an overall reduction in the anticipated environmental impact of the Project thereby potentially justifying additional impervious surface area. 00 Morris Street, Suite 200, Durham, NC 27701 101 • .: 52 Kimley>>>Horn Page 9 Response: A total impervious surface limit of 62% is now proposed for the project, which is more restrictive than the maximum of 70% permitted under the UDO. Refer to Section 2-5.A.1 of the Narrative for details. vi. The Narrative indicates the Project will comply with the provision(s) of Section(s) 6.13 Stream Buffers and 6.21 Flood Regulations of the LIDO. This includes preserving required buffers around identified water features(i.e. streams,wetlands, floodplain, etc.)as defined in the UDO. Response: Comment noted. Additional language has been added to Section 2-5.13.5 of the Narrative to specify preservation of required buffers around identified water features where possible and Sheet 3.1 of the Rezoning Plans shows the buffers to be preserved. vii. The Narrative appears to indicate the Project will comply with the provision(s) of Section(s) 6.14 Stormwater and 6.15 Erosion Control of the LIDO. Orange County Erosion Control and Stormwater Management staffs are reviewing the proposed conditions. As a general observation: If it is your intention to make use of nutrient buy-down tools, the Narrative should contain language denoting same. Response: The Narrative has been revised to specify that water quality requirements will be met on site by SCMs or nutrient buy-down payments. Refer to Section 2-5.13.8.c.ii of the Narrative for details. viii. Staff encourages the applicant to use on-site ponds, designed to capture runoff, for irrigation purposes as detailed on page 22 of the Narrative. Response: The applicant will attempt to utilize onsite runoff to the greatest extent practical for irrigation purposes and to provide regional stormwater ponds that will be available to individual site developers for irrigation purposes. Refer to Section 2-5 of the Narrative for details. L. ENVIRONMENTAL FACTORS: The Narrative indicates the project shall abide by the provisions of Section 6.4 Performance Standards of the LIDO inclusive (i.e. noise, vibration, air pollution, etc.). Response: Comment noted. Refer to Section 2-5 of the Narrative for details. M. ARCHITECTURAL DESIGN STANDARDS: The proposed architectural design standards appears consistent with the provisions of Section 6.5 Architectural Design Standards of the LIDO. Response: Comment noted. Refer to Section 2-5 of the Narrative for details. N. SETBACKS: Staff is recommending the following: i. 100 ft. perimeter structure setback from all external property lines and right-of-way (i.e. Mt. Willing Road, the Interstate, etc.); Response: The proposed setbacks are provided within Section 2-5 of the Narrative. Although a full 100' perimeter structure setback is not proposed,significant buffers are proposed along all external property lines and right-of-way and planting and screening requirements along the rear property line have been increased to address concerns from adjacent property owners. Refer to Sheets C6.0, C6.1, and C6.2 for information on proposed buffers. ii. Vehicular use areas (i.e. access drive-aisle, parking, loading berths): 1. 100 ft. from residentially zoned property (i.e. the property north of the Project); 2. 50 ft. from all other property lines/external public rights-of-way; 3. Staff is recommending all internal setbacks be 20 ft. 53 Kimley>>>Horn Page 10 Response: The proposed setbacks are provided within Section 2-5 of the Narrative. Although a full 100' setback is not proposed along the northern property boundary,enhanced plantings and a 6'fence will be provided to screen adjacent residentially zoned parcels from the development. Additionally, a variable width buffer is provided along external public rights-of-way (between 40' and 200'). All internal setbacks for Development Areas 2-5 are 20' and a 10' buffer is now proposed within Development Area 1. Refer to Sheets C6.0, C6.1, and C6.2 for additional information on proposed buffers. iii. Signage: the proposed setbacks appear reasonable. Having said that, staff would like to discuss the potential need for more restrictive setbacks for signs exceeding 48 ft. Specifically, staff is looking to address potential impacts from a large sign becoming compromised and collapsing. Response: The sign has been relocated such that it is further than 200 feet from 40/85. The sign will be designed to meet building code standards. O. LANDSCAPING: The Narrative contains landscaping and buffering requirements in Section 2.5 Performance Standards (E) beginning on page 26. i. In General: The section should provide detail on the landscape and buffer management standards for the Project, including the amount of proposed foliage within identified landscaped areas. Response: Section 2-5.E of the Narrative has been updated to include additional detail on the landscaping and buffer management standards. All required internal landscaping shall be installed and maintained by the developer or their successor in perpetuity. The"Land Use Buffers"section of the Narrative has been updated to include the exact quantities and types of proposed foliage as requested. Please see the "Landscape Buffer Requirements & Calculations" table for more information. ii. Section 6.8.7 (F) of the UDO, the County establishes various buffer types outlining the number/species of foliage required within every 100 linear ft. of property. The narrative will need to define what level of landscaping is going to be required consistent with this standard. Sheet C 6.0 of the Master Concept Plan contains this information. Staff recommends it be placed in the Narrative as well. Staff shall provide comment(s) on proposed buffers in the next section of this document. Response: In Section 2.5.E. the "Land Use Buffers" section of the Narrative has been updated to include the exact quantities and types of proposed foliage as requested. Please see the "Landscape Buffer Requirements & Calculations" table for more information. iii. Number 4 Planting Requirement(s) — Street Trees. Language within this section of the Narrative is inconsistent with information provided on Sheet C 6.0. There are going to be instances where a canopy tree will be required more than once for every 100 linear ft. Response: Section 2-5.E of the Narrative has been revised to note that street trees will be installed per the requirements illustrated on the Landscape Buffer Plan (Sheet C6.0). iv. Number 6 Planting Requirements — Foundation Plantings. Staff is recommending the following: 1. A minimum of 40% of the building foundation in District 1 shall be landscaped with foliage by means of raised planters, sidewalk cutouts, or portable planters. 00 Morris Street, Suite 200, Durham, NC 27701 . .: 54 Kimley>>>Horn Page 11 Response: For all building foundations within Development Area 1, Planting areas will be provided adjacent to the three primary sides (excluding the rear) of all buildings in the form of landscape islands. Landscape islands will be directly adjacent to the primary sidewalks to each building. Total square footage provided for all landscape islands will be equivalent to 5 feet times the total length of the three primary sides (excluding the rear) of all buildings. Landscaping will not be placed in direct proximity to the building foundation due to safety and foundation infiltration concerns. Section 2-5.E.8 of the Narrative has been updated to reflect this requirement. v. Number 7 Planting Requirements—Vehicular Use Areas. Staff is recommending the following: 1. The Project shall comply with the provisions of Section 6.8.7(D) (1) of the LIDO requiring all parking areas observe a vegetative buffer, at least 10 ft. in width, separating parking from adjacent open space, vehicular use areas, property lines, etc. Response: The Narrative has been updated to clarify the Rezoning Plan request as related to planting requirements within vehicular use areas. Refer to Section 2-5.E.9 for details. vi. Number 9 Interior Landscaping. Staff is recommending the following: 1. Language appears to indicate interior parking lot landscaping shall be installed where above/below ground utility and stormwater infrastructure allows. Development of the Project will be required to take into consideration these factors while allowing for the installation of required landscaping. Staff believes the Project can and should comply with all internal tree planting standards. Response: The Narrative has been updated to clarify the Rezoning Plan request as related to planting requirements within vehicular use areas. Refer to Section 2-5.E.9 for details. vii. Please revise this section of the Narrative to contain the following additional detail(s): 1. Canopy trees installed within a landscape island shall be, at a minimum, 1 '/2 inch caliper at dbh at time of installation; Response: The Narrative has been updated to require that all canopy trees installed within a landscape island shall be a minimum of 1 %inch caliper at DBH at the time of planting. See Section 2.5.E.3 of the Narrative. 2. Staff recommends inclusion of a typical'tree grate area' design schematic showing the 'tree grate area' design as well as the anticipated installation of proposed foliage. Response: Tree grate areas are not currently proposed because all trees will be installed outside of the sidewalk within the proposed streetscape. Refer to Sheet C6.0 of the Rezoning Plan for details. Additionally, all applicable construction details will be included as part of the submitted site plan package after completion of the rezoning process. P. SIGNS: Staff summarizes the proposed signage for the Project as follows: i. Current County sign regulation(s)would allow the following within an O/RM district general use zoning district: 1. 1 on premise sign with a height limit of 24 ft. and a maximum area of 72 sq.ft. for parcels that are large than 60,000 sq.ft. and have more than 300 linear ft. of frontage on a NC Department of Transportation maintained roadway; 2. 1 wall sign per building fagade with frontage on a street right- of-way. Maximum allowable area for a wall sign is 64 sq.ft. for parcels that are larger than 60,000 sq.ft., 00 Morris Street, Suite 200, Durham, NC 27701 . .: 55 Kimley>>>Horn Page 12 have more than 300 linear ft. of frontage on a NC Department of Transportation maintained roadway, and contain a structure with more than 100 linear ft. of building length facing a public right-of-way; 3. Window signs are limited to a maximum of 30%of the total window area within the sign is to be located; 4. Per Section 6.12.13 a service station would be allowed signage on the gas pumps as follows: a. No internal or external illumination shall be permitted; b. Signs shaft be limited to four square feet in area; c. Signs must advertise items for sale on the property. Under no circumstances may a sign advertise a sale, activity, business, or product not associated with the principal use of property 5. With respect to signage on a canopy, the UDO currently indicates advertising material shall be limited to trademarks, logos, and the name of the service station or other similar display limited to six square feet of area. Signage on the canopy is usually reserved to the portion of the canopy facing/with frontage along a right-of-way. ii. The submitted application proposes the following: 1. Development Area 1 (i.e. Buc-ees Travel Center): a. 1 on premise sign approximately 100 ft. tall with a total sign area of 601 sq.ft.; - Roughly constituting a 800% increase in allowable sign area; b. 3 wall signs (i.e. on portions of the building that could have frontage/visibility from a road right-of-way) each approximately 270 sq.ft. in area (total cumulative sign area of 810 sq.ft.); - Roughly constituting a 400% increase in allowable sign area per sign; c. Logos on the canopy — 4 total logos each approximately 50 sq.ft. in area (total cumulative sign area of 200 sq.ft.); - Roughly constituting a 900% increase in allowable sign area per sign; e as pumps advertising fuel type, each sign several separate 9 d. A total of 16 signs on se p g p p 5.5 sq.ft. in area (total of approximately 88 sq.ft.) — A negligible increase in allowable sign area (i.e. allowed 4 sq.ft. proposing 5.5 sq.ft.). 2. Other development areas: a. A total of 8 monument signs, each with 240 sq.ft. of sign area not exceeding 20 ft. in height(cumulative of 1,920 sq.ft. of sign area); b. Wall Signs: 64 sq.ft. of wall sign area for each individual tenant space (insufficient information to determine cumulative sign area); c. Directional and temporary/construction/real estate signage consistent with the provisions of Section 6.12 Signs of the LIDO. A rough estimate of total requested sign area for the Project appears to be between 2,800 and 3,600 sq.ft. depending on the number of individual tenants requiring wall signage. While the Conditional Zoning process allows the County to make additional signage allowances (i.e. height, allowable sign area, etc.), the requested signage is several orders of magnitude beyond what we current regulations would allow on the property. The Narrative should contain information justifying the nature of the request based on the overall Property area of 104 acres and the specific design elements of the Project. For example, the applicant may choose to include language within the Narrative arguing that under current regulations, the 104 acres of property zoned O/R M general use could be subdivided to create approximately 24 separate 4 acres lots, each with its own sign allotment. In this scenario, there would be a maximum of: 00 Morris Street, 00 Durham, NC 27701 . .: 56 Kimley>>>Horn Page 13 24 freestanding signs(1 for each separate parcel)totaling 1,728 sq.ft. of allowable sign area; and 24 wall signs(presuming 1 sign for a single building on the 24 separate parcels)totaling 1,536 sq.ft. of sign area. The Narrative would have to 'demonstrate' how the proposed signage for the Project would be consistent with the overall development potential of this 104 acres of O/R M zoned property if you were dealing with multiple, individual parcels. As a general observation staff is concerned over the proposed 100 ft. free standing sign for in Development Area 1 (i.e. Buc-ee's Travel center) and recommends a maximum height limit of 60 ft. for the proposed sign. This recommendation takes into consideration this site is higher elevation than surrounding properties and the Interstate. With respect to flags, staff recommends a maximum of 3 flags be allowed per individual development area, with a size limit of 24 sq.ft. per flag, consistent with Section 6.12.12 (A) of the UDO. Staff is not comfortable with the proposal to allow 2 flags each development area comply with the provision(s) of your proposal as articulated on page 29 of The Narrative. Staff is not comfortable recommending approval of the proposed standard, specifically each individual building being allowed to have 2 flags, as this is inconsistent with the spirit and intent of Section. Response: The sign standards have been revised within Section 2-5.F of the Narrative. The narrative reflects the argument made here that total signage is consistent with that permitted if the site is developed on a piecemeal basis. The height limit has been reduced to eighty (80)feet.Please see Exhibit D.1. Flags have been removed as signage option. Q. LIGHTING: Staff has the following comment(s)/recommendation(s): i. An audit of current lighting levels should be completed and made part of the Narrative. This audit will establish the baseline of existing illumination in and around the Property, most notably along the Interstate service road, allowing for a determination as to how much light already exists in the area. Once the results of this audit are available, staff would have no problem recommending a condition for Development Area 1 (i.e. Buc-ee's Travel center)that there shall be no net increase in existing foot-candle/lumen levels along the southern property line adjacent to the Interstate service road with development in Development Area 1 of the Project. Response: A study has been completed to determine existing light levels. Please see Exhibit J. This standard has been addressed in Section 2-5.G of the Narrative. ii. Staff has no concerns over the proposed maximum pole height of 36 ft. Response: Comment noted. iii. Staff agrees with the recommended condition that all fixtures shall be full-cut off design consistent with Section 6.11.6 of the LIDO. Response: Comment noted. iv. If the location of outdoor lighting fixtures is known, a formal lighting plan is required to be submitted as part of the MPD-CZ application (refer to Section 6.11.5 (B) of the LIDO). If not, please add language indicating same within the Narrative. 00 Morris Street, Suite 200, Durham, NC 27701 . .: 57 Kimley>>>Horn Page 14 Response: Additional language has been added to the Narrative to specify that lighting plans will be submitted as part of the site plan process. Refer to Section 2-5 of the Narrative for details. v. Staff recommends the applicant add language to the narrative indicating all security lights shall abide by the requirements of Section 6.11.3 (J) of the UDO. Response: Language has been added to specify that security lighting within Development Areas 2 -5 shall abide by the requirements of Section 6.11.3(J)of the LIDO. Refer to Section 2-5.G.2 of the Narrative for details. vi. Add language indicating formal lighting plans shall be submitted with all site plans where outdoor lighting is proposed. Response: The requested language has been added to the narrative. Refer to Section 2-5 for details. vii. Add language that lighting for the project shall comply with applicable NC Department of Transportation requirements for roadway lighting. Response: The Narrative has been revised to specify that lighting for the project will comply with applicable NCDOT requirements. R. PARKING:At this time, staff has no comments on the proposed parking ratios(i.e. number of spaces per sq.ft. of building area based on land use) contained in Section III of the Narrative (page 32). Response: Comment noted. Transportation Impact Analysis (TIA) Comments: There are 2 phases to the Project, specifically: Construction of a 120 pump gas station (Phase 1); and Construction of: 120-room hotel (square footage of structure unknown); 8,000 sq.ft. of medical office space; • 30,000 sq.ft. of specialty retail space; A 3,500 sq.ft. drive-in bank; 12,000 sq.ft. of casual restaurant; and 20,000 SF of high-turnover sit-down restaurant space (Phase 2). I As previously indicated herein the overall size of the structures referenced within the TIA appears inconsistent with the Narrative and information provided on the Master Concept Plan. Response: The Narrative has been modified to specify that the FAR for each Development Area shall not exceed 0.65 provided that the total development of the project shall not exceed 500,000 SF of gross floor area. The addition of this provision within the Narrative allows for total development of the site to be consistent with the TIA. Refer to Section 2-5.A.2 of the Narrative and Sheet C2.0 of the Rezoning Plan for details. i In reviewing the TIA, staff would offer these initial comments: A. On Augu st 31 2020 staff was informed p d b NC Department of Transportation (NC DOT) staff they required clarification on various issues and ha d 'tabled' their review of the TIA proposal until 58 Kimley>>>Horn Page 15 responses were received. PLEASE NOTE: DOT's review of this TIA is essential to the Project being able to move forward in the zoning atlas amendment process. Response: Comment noted. As a result of their preliminary review, NCDOT requested supplemental sensitivity analyses. Recognizing that this information was forthcoming,their review was paused. The Congestion Management Unit of NCDOT has now completed their review of all associated analyses and has forwarded their comments to the District Engineer. We expect formal comments from NCDOT before 10120. B. Staff is concerned the proposed square footages for structures, as detailed on the Master Concept Plan and within the Project narrative, are not clearly reflected within the TIA. Put simply, there appears to be more building area generating potential traffic impacts that are not addressed in the submittal we are currently reviewing. Response: The Narrative has been modified to specify that the FAR for each Development Area shall not exceed 0.65 provided that the total development of the project shall not exceed 500,000 SF of gross floor area. The addition of this provision within the Narrative allows for total development of the site to be consistent with the TIA. Refer to Section 2-5.A.2 of the Narrative and Sheet C2.0 of the Rezoning Plan for details. C. Staff would like to review the possibility of reserving a 50 ft. right-of-way along the northern property line to accommodate a future access road for parcels fronting on Southern Drive to obtain access to Mt. Willing Road. This could be a separate roadway or some form of internal connectivity for these adjacent parcels to the internal roadway network within the Project.This is to address potential loss of Southern Drive as an access for these parcels in the event of railroad expansion. Response: At this time, a 50' right-of-way is not proposed along the northern property line because there is existing access from these properties to Mt.Willing Road through Southern Drive. D. Staff is concerned about the proposed drive access points along the Interstate exit ramp running parallel with the southern Property line. Specifically, staff is concerned about what appears to be 2- way traffic access onto the exit ramp from Development Area 1 (i.e. Buc-ee's Travel center). Staff will be recommending to the applicant and NC DOT the proposal be revised to allow for right-turn only for these driveways, specifically: • Entrance to the Project near the intersection of Mt. Willing Road; • Exit onto the allowing drivers to access Development Area 1 near the intersection of the f UD Highway 70 connector. i This presumes NC DOT allows for the development of driveway/access roads onto the exit ramp serving Development Area 1. Response: The two Development 1 driveways onto the service road are limited to right- in/right-out movements only. Two-way traffic onto the service road is not proposed. The proposed number and configuration of site driveways is necessary to provide adequate capacity for and efficient dispersal of overall projected traffic demands. E. Orange County Planning supports the proposed US Highway 70 connector improvements as detailed on the Master Concept Plan and referenced within the TIA. Response: Comment noted. F. Mt. Willing Road is on the County's adopted 2019 Efland-Buckhorn- Mebane Access Management Plan (EBM AMP) as well as the Orange County CTP. Staff will be recommending the incorporation of the following: 00 Morris Street, Suite 200, Durham, NC 27701 1011 • .: 59 Kimley>>>Horn Page 16 i. 4-Lane divided cross section (page 20 of the EBM AMP) Response: A 4-lane divided cross section is not proposed or deemed necessary as part of this project, but a 25' reservation has been provided along Mt. Willing Road to accommodate future expansion by others if desired. ii. The current right-of-way for Mt. Willing Road is 60 ft. Staff is recommending a 25' reservation of additional right-of-way along the western boundary of the Property in support of future improvements along the roadway. Response: A 25' reservation has been provided along Mt.Willing Road to accommodate future expansion by others if desired. iii. Staff will be requiring a 100 right-of-way (4F)or 110' right-of-way (4G)—NOTE: sample cross sections on next page; Response:A 25' reservation has been provided along Mt.Willing Road to accommodate future expansion by others if desired. iv. County staff will recommend to the BOCC that Mt. Willing Road improvements be approved as a County priority in SPOT 7 and subsequent processes. Response: Comment noted. G. Mt. Willing at 1-40 EB off ramp should be considered for a signalized intersection in Phase 2. Response: The applicant proposes to install a traffic signal at this intersection in Phase 2 subject to NCDOT approval. H. Stop sign currently at the off ramp; there is a 4-way stop intersection with W. Ten Road just south of this juncture. Staff will be working with the applicant to secure the necessary right-of-way dedication to facilitate these proposals. Response: The Applicant is not clear what right-of-way dedication or proposals are being referenced. No improvements are being proposed at the subject 4-way stop intersection. Please clarify. I. Staff would like to see an area of the project (either in Phase I or II) be reserved for connection to the transit systems of the area; this could include: i. A bus stop location with signage f ii. A bus shelter with signage Response: Development Area 6 is reserved for future transit improvements by others. Additionally, Section 3-2 of the Narrative specifies the proposed transit improvements committed as part of this project. J. A"Future Transit Amenity by others"on a 1.62-acre parcel on the northeast edge of the project area is listed on the second page of the Master Concept Plan, but was not indicated in either TIA Response:This area is being set aside for development by others. As such,there is no traffic generated in association with this project. K. Staff is interested in the internal roadway features of the project site (when both phases are built out) and what accommodations (sidewalks, side paths, bike lanes, etc.) might be included. Response:The Rezoning Plan provides a cross section to show the proposed improvements included as part of the development. Refer to Sheet C5.0 for details. 00 Morris Street, Suite 200, Durham, NC 27701 • .: 60 Kimley>>>Horn Page 17 Master Plan Set Comments: L. Section 6.7.1 (B) (1) of the UDO requires a map of the development site. While the Master Concept Plan set provides the majority of required detail(s), specifically Sheet(s) C 2.0 and 2.1 the submittal should be modified as indicated: i. Label and identify the various 'lines' on the submitted map(s). Staff recommends you use different colors to help distinguish the information contained on the individual maps. Response: The different line types have been called out on Sheets C2.0 and C2.1. The line types have been differentiated in the sheet legends. ii. Sheet(s) C 2.0 and 2.1 should display the stream/wetland buffer area per Section 6.13 of the LIDO. Response: The stream/wetland buffer area is now included as part of Sheets C2.0 and C2.1 of the Rezoning Plan. iii. As previously indicated herein, Sheet(s) C 2.0 and 2.1 should display the following information: 1. Proposed floor area ratio (FAR) for the Project. 2. Proposed impervious surface area for the Project. 3. Proposed open space. 4. Breakdown of landscape/buffer area (i.e. acreage) for the Project. 5. Proposed setbacks (internal and external). 6. Anticipated number of parking spaces, loading berths/stalls, etc. 7. Maximum allowable building height(in g general and per each individual development pod if there will be a difference). 8. Anticipated number of parking spaces with access to alternative energy charging stations (if proposed). Response: The information referenced above is now included on Sheet C2.0 to the greatest extent possible. Refer to the Rezoning Plan for details. iv. The Project will involve the relocation of existing overhead utility lines. Staff will need documentation indicating the relocated power line/easement(s) have been approved, and if development is located within the easement said activity has been approved by the utility provider. Response: Comment noted. Documentation will be provided as soon as it becomes available. v. Sheet C 6.0 and 6.1 serves as the landscape master plan for the project. Staff recommend(s) the following: 1. A 75 ft. land use buffer along the northern property line separating the residential land uses from Development Area(s) 5 and 3. Planting requirements would follow what is proposed for the Type F buffer option as depicted on Sheet 6.1. Response: The buffer along the northern property line remains at 40 feet in width but is planted as an enhanced Type D buffer. This new buffer type includes the Type D requirements as well as a 6-foot-high fence.We feel that planting this buffer any more densely will result in failure of the vegetation due to overcrowding. The enhanced Type D buffer elevation is illustrated as a elevation graphic on Sheet C6.1 Landscape Buffer Elevations. 00 Morris Street, 00 Durham, INIC 27701 . .: 61 Kimley>>>Horn Page 18 2. The proposed tree planting requirements appear to be consistent with the provisions of Section 6.8.6 (F) of the UDO. Response: Comment noted. 3. Denote internal landscaping (i.e. parking lot and parking lot perimeter, building, preservation of existing significant foliage, etc.)on Sheet 6.0 of the Master Concept Plan set. Response: Internal landscaping has been noted on Sheet 6.0 Landscape Buffer Plan of the plan set. 4. Major Transportation Corridor(MTC) buffers, including requested breaks consistent with Section 6.6.4 of the UDO. Staff recognizes the proposal calls for a managed MTC buffer, versus a cleared 'visual break', for the approximately 1,200 linear ft. of Property along the Interstate exit. This proposed 'managed MTC buffer break' constitutes a design standard exceeding current UDO requirements. Response: Comment noted. vi. The roadway cross-section on Sheet C 5.0 appears acceptable for internal roadway development. Staff recommends the drawing be updated to show typical landscaping installation as well. Sheet C5.0 has been revised to show typical Response: The cross section on landscaping installation as requested. vii. Provide language(Sheet C 2.0) indicating if denoted stormwater control measures(SCMs)are: 1. For illustrative purposes(i.e. final SCM location shall be determined with the submittal of a formal stormwater management plan in accordance with the UDO); Response: A note has been added to Sheet C2.0 to specify that SCMs are conceptual in nature and the final location and design will be submitted separately. 2. Are anticipated to serve as master drainage basin areas or for specific'pods.' Response: A note has been added to Sheet C2.0 to specify that the SCMs are anticipated to serve as master drainage basin areas and are not exclusively serving each pod. viii. Sheet C 4.0: Section 6.7.1 (B) (6) of the UDO requires a map detailing the utility master plan for the project. While this Sheet provides the majority of required detail(s), the submittal should be modified as indicated: 1. Provide notes detailing anticipated/proposed utility lines (i.e. water/sewer) anticipated within the project. Response: Additional details are now provided on Sheet 4.0 to identify the anticipated size of proposed water and sewer mains for the project. 2. Denote the anticipated location of sidewalks to assist staff ascertain if there will be any conflicts with utility location. Response: Sidewalks are shown where locations are known, and utilities have been routed to avoid conflicts to the greatest extent possible. Refer to Sheet C4.0 for details. kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 62 Kimley>>>Horn Page 19 3. The map will need to be modified to include the detailed design calculations for the project indicating that the proposed utility lines are sufficient for expected development and associated/estimated density for the project. Response: Anticipated design flows for sanitary sewer and potable water are now shown on a table on Sheet C4.0 (Water and Sewer Map). 4. Include a note indicating: 'All onsite utilities shall be underground unless approved by the Board of County Commissioners'. Response: The requested note has been added to Sheet C4.0 (Water and Sewer Map). 5. Indicate connection points to various utility lines. Response: Connection points have been called out on Sheet C4.0 (Water and Sewer Map). 6. Denote the location of any anticipated/planned utility infrastructure (i.e. pump stations, etc.). Response: The location of anticipated infrastructure is provided on the plans. See Sheet C4.0 for details. 7. Provide detail on anticipated fire flow for the proposed utility lines with detail on how same will support the project. As a general reminder, fire flow requirements are necessary for consideration when sizing water lines. Response: A note has been added to Sheet C4.0 detailing the anticipated fire flow and potential improvements required. 8. Provide detail on the anticipated placement of manholes and elevations same. This will include the provision of a typical manhole construction detail. Response: Anticipated manhole locations are shown on the plans, and elevations for existing structures are shown on sheet C1.0 Existing Conditions. Proposed structures will tie into existing structures, and the proposed elevations will primarily be driven by site grading to be determined at the Site Plan level. 9. Denote anticipated stub out locations. Response: Anticipated stub out locations are shown on the plan. Refer to Sheet C4.0 for details. 10. Additional detail on expected build-out. This information shall be essential in evaluating the ability of installed infrastructure to meet current and future needs of the project. Response: A note detailing additional water needs for the full build-out has been i added to Sheet C4.0 (Water and Sewer Map). Engineering Comments: A. General: i. Orange County requests that the applicant consider Orange County's proposed recordation of up to four (4) 30-ft wide public sanitary sewer easements as shown on the attached redlines. 00 Morris Street, 00 Durham, NC 27701 • .: 63 Kimley>>>Horn Page 20 See Attachment 1. This accommodation would allow for potential future public sewer service to multiple private tracts that are located adjacent to the Project. Response: Four easements are now provided to allow future public sewer service to private tracts adjacent to the project. Refer to Sheet C4.0 (Water and Sewer Map) for details. ii. The Project is located within the Upper Eno Protected Watershed Zoning Overlay District(Neuse River Basin), as zoned by Orange County, and within an area classified as a High-Quality Water (HQW), as zoned by the State of North Carolina. Orange County and the North Carolina Department of Environmental Quality (NCDEQ) will review the Project for compliance with applicable Orange County and State standards, as formal site development plans are finalized and submitted. Response: Comment noted. We will comply with the land area disturbance limitation required by the HQW.We are working with Orange County and the state of North Carolina to identify the best approach to abide by the requirements. B. Water: i. Public water service will likely be provided by Orange Alamance Water System (OAWS). This statement shall in no way be interpreted as a final determination by Orange County or OAWS to serve the Project with public water. Response: Comment noted. Kimley-Horn is working to schedule meetings with Orange Alamance Water to discuss the improvements necessary for connection to existing water and sewer near the site. ii. OAWS staff has informally notified Orange County Engineering staff that OAWS has available water capacity based on the evaluation of a DRAFT sanitary sewer capacity summary (average daily demand) of 76,421 gallons per day (GPD) as provided to Orange County by the applicant on September 1, 2020, However, OAWS has not yet formally confirmed with Orange County Engineering staff an ability to serve the Project with public water. Orange County Engineering staff is not aware of any detailed water demand data received by Orange County to date. Response: Comment noted. Additional information on anticipated flows is now provided within the Narrative and the Rezoning Plan. iii. So as to prevent a potentially negative impact to available public water capacity within the regional water service area, Orange County Engineering staff recommends a reassessment of proposed water demands via the incorporation of low-flow water fixtures and/or lower-flow end users throughout the Project, where feasible. Response: The use of low flow water fixtures will be considered as part of the discussions with OAWS to ensure that the available water capacity is taken into account when necessary infrastructure improvements are designed and constructed. iv. If updated water demand data are available, applicant shall provide them to Orange County, specifically so that OAWS may further evaluate their available water capacity and their desire to serve the Project with public water. Response: Comment noted. Additional information on anticipated demands is now provided within the Narrative and the Rezoning Plan. v. Provide additional information on the proposed dead-end waterline near the intersection of Ben Johnston Road on the east side of the Project. It appears that the proposed water line will exist i i kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 • .: 64 Kimley>>>Horn Page 21 as a dead end throughout both phases of the Project. Applicant shall ensure that NCDEQ and OAWS design criteria and/or direction are followed specific to the proposed dead-end water line. Response:A flushing hydrant and mechanical joint cap are now shown at the termination of the proposed waterline. Refer to Sheet C4.0 for details. vi. Water utility design, permitting, and construction shall conform to NCDEQ and/or OAWS standards. Response: Comment noted. Standards will be met as part of the site plan and construction drawing review process. C. SEWER: i. Sewer service will likely be provided by City of Mebane. This statement shall in no way be interpreted as a final determination by Orange County or City of Mebane to serve the Project with public sewer. Response: Comment noted. Kimley-Horn is working to schedule meetings with the City of Mebane to discuss the improvements necessary for connection to existing water and sewer near the site. ii. City of Mebane staff has informally notified Orange County Engineering staff that the City of Mebane has available sewer capacity based on the evaluation of a DRAFT sanitary sewer capacity summary (average daily demand) of 76,421 gallons per day (GPD) as provided to Orange County by the applicant on September 1, 2020. However, the City of Mebane has not yet formally confirmed with Orange County Engineering staff an ability to serve the Project with public sewer. Only limited sewer demand data have been made available to Orange County Engineering staff to date. Response: Comment noted. Additional information on anticipated flows is now provided within the Narrative and the Rezoning Plan. iii. So as to prevent a potentially negative impact to available public sewer capacity within the regional sewer service area, Orange County Engineering staff recommends a reassessment of proposed sewer demands via the incorporation of low-flow water fixtures and/or lower-flow end users throughout the Project, where feasible. Response: The use of low flow water fixtures will be considered as part of the discussions with the City of Mebane to ensure that the available sewer capacity is taken into account when necessary infrastructure improvements are designed and constructed. iv. If updated sewer demands are available, applicant shall provide them to City of Mebane so that City of Mebane may further evaluate their available sewer capacity and their desire to serve the Project with public water. Response: Comment noted. Additional information on anticipated flows is now provided j within the Narrative and the Rezoning Plan. v. The existing terminal sewer manhole along Mt. Willing Road is located in front of Orange County PIN 9844965832, slightly south of where currently shown on the preliminary Water and Sewer Map as submitted to Orange County. See Attachment 2. Response: The existing terminal manhole is shown per surveyed information. Refer to Sheet C1.0 for details. W*1 300 Morris Street, Suite 00 Durham, NC 27701 . .: 65 Kimley>>>Horn Page 22 vi. Sewer utility design, permitting, and construction shall conform to NCDEQ and/or City of Mebane standards. Response: Comment noted. Standards will be met as part of the site plan and construction drawing review process. D. STORMWATER MANAGEMENT: i. Stormwater management design, permitting, and construction shall conform to Section 6.14 of the Orange County Unified Development Ordinance (UDO). Response: Comment noted. Standards will be met as part of the site plan and construction drawing review process. E. EROSION & SEDIMENTATION CONTROL: i. Erosion & Sedimentation Control (E&SC) design, permitting, and construction shall conform to Section 6.15 of the Orange County Unified Development Ordinance (UDO). Response: Comment noted. Standards will be met as part of the site plan and construction drawing review process. Environment, Agriculture, Parks & Recreation Comments: A. The planned development would set aside areas of open space consisting of protected riparian buffers along the two tributaries, roadside buffers adjacent to the service road, Mt Willing Road, and interstate connector, and adjacent property buffers along all aspects of the property boundaries. Both parcels have been utilized in active agriculture, primarily beef cattle production, for the known history of ownership. Over half of the total project area is in some stage of early successional forest, having been left to fallow at some point over the last 20-30 years. On the western and southern borders of the property lie two ephemeral streams that drain into two unnamed tributaries as they flow south. Both of the tributaries drain directly into Seven Mile Creek, part of the Upper Eno watershed, a class WS-ll, High Quality Watershed, with Nutrient Sensitive Water designation. The streams lay within the Upper Eno Protected Watershed on the property and the Upper Eno Critical Watershed corridors immediately after leaving the property. The property and the streams mentioned are approximately 1 mile north of the County's Seven Mile Creek Natural Area and less than % mile from the Seven Mile Creek Natural Heritage Area as is inventoried in the North Carolina Natural Heritage Program. Due to the importance of these tributaries to the water quality and species of the Seven Mile Creek watershed, it is in the County's and the public interest to have the areas around the two tributaries protected as an extension of the site's open space, and to assist the landowner toward that end. Staff recognizes the site plan submitted shows the developer's effort to this effect. If the landowners wish the area to remain in private ownership, they could grant a conservation easement to the County. As the easement"grantee" the County would be responsible for monitoring the site at least once each year to make sure that the terms of the easement are not violated. Advance notice would be provided to the landowners before County staff entered the property for easement monitoring. Response: Comment noted. Dedication of a conservation easement will be considered as part of the rezoning process. Solid Waste Comments: 00 Morris Street, Suite 200, Durham, NC 27701 .: 66 Kimley>>>Horn Page 23 A. I have drafted a suggested revision to the subject Performance Standards for Solid Waste for the Beaver Crossing Project. A copy of that document is attached for your review and comment. Given the size and scope of this project, OCSW won't be able to provide recycling collection services there so they will have to privately contract for that service along with garbage collection, cardboard collection for recycling, and food waste collection for recycling. I am asking that my version be used in place of what the applicant has in their application narrative. Response: Comment noted. The Narrative has been revised to include the revised language. 00 Morris Street, Suite 200, Durham, NC 27701 . .: 67 e6ane Positively chcvmii7g DATE: October 21, 2020 TO: Nolan D. Raney, P.E. — Kimley-Horn FROM: Kyle Smith—City of Mebane Utilities Director SUBJECT: Efland Station (formally Beaver Crossing) Sanitary Sewer Mr. Raney, This letter is to inform you and/or your developer that the subject property (104 acres PIN #s 9854-16-1576 and 9854-36-3711) has access gravity sewer in the area with the ability to serve the property. The City does not guarantee gravity sewer services as the elevations of the site, line locations, proposed buildings, and other environmental features may control connection types and locations and/or potential line extensions. The City of Mebane does have the available capacity for the estimated 76,421 gallons average daily flow as this anticipated flow will count against the previously allocated flow for Orange County. As an effort to preserve sewer capacity within the region, the City of Mebane request the use of low-flow end users in conjunction with low-flow fixtures throughout the Efland Station Project where feasible. This willingness to serve the Efland Station Project with sanitary sewer shall be subject to Orange County zoning approval and shall expire on December 31, 2022 should no sewer flow be permitted by the State. At this time the remainder of the sewer allocation shall return to Orange County for other potential projects unless a request to extend the willingness to serve is granted. Sincerely, lzzre� Kyle Smith, P.E. City of Mebane Utilities Director CITY OF MEBANE 636 Corregidor St.I Mebane,NC 27302 0 919 563 3401 919 304 6836 ksmith@cityofinebane.com 68 Beaver Crossing Master Planned Development Conditional Zoning(MPD-CZ)—August 2020 Section 2-5, PERFORMANCE STANDARDS, B. Environmental Factors, 6. Solid Waste. Requested Language Revisions byJ. Scouten, Orange County Solid Waste Management Dept. 8117120 as written below: 6. Solid Waste and Recycling.The following standards shall apply to the management of solid waste, recyclable materials (including corrugated cardboard), and food waste: a. The developer of the Project or an individual development site within the Project shall contract for the private collection and disposal of solid wastes and for the collection and marketing of mixed recyclables (including corrugated cardboard), and food waste. b. The developer of the Project or an individual development site within the Project shall provide external space for the proper storage and collection of solid waste, recyclable materials (including corrugated cardboard) and food waste. c. Storage/collection areas shall be located in such a manner as to provide convenient access for users of the facility and for safe and efficient access by collection vehicles. d. In cases where storage/collection areas are located across property lines or district lines for shared areas, the developer shall prepare and record a joint access agreement (and a shared storage/collection facility agreement) to assure that sharing parties may use the proposed storage/collection facility and that they can be serviced across property lines or district lines. e. The developer shall reserve space within all storage/collection facilities that serve food and lodging operations for segregated food waste collection near the delivery entrance for any such building that houses, proposes to include, or may at some future date incorporate a restaurant, cafeteria, bar, other food service facility, or a lodging facility. f. The layout and design of waste/storage facilities for solid wastes, recyclable materials (including corrugated cardboard), and food wastes shall comply with the standards and guidelines of Orange County Solid Waste Management (OCSW) and the Orange County Environmental Health Food & Lodging Division. Further, such waste/storage facilities shall be designed and situated so not to negatively affect adjacent properties; and shall be located so not to impact internal traffic flow, or located in loading zones. g. The following OCSW standard notes shall be placed on any site/construction plan: • In accordance with the Orange County Regulated Recyclable Materials Ordinance (RRMO), clean wood waste, scrap metal, and corrugated cardboard present in construction and demolition waste shall be recycled. • In accordance with the RRMO, all haulers of construction and demolition waste shall be licensed with OCSW. • Prior to the issuance of a permit to demolish any structure five hundred (500) square feet or greater in size, the permitee or owner shall have requested and received a deconstruction assessment by OCSW Enforcement staff in accordance with the RRMO. JS (OCSW) Sep 2020 69 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning 131 W. Margaret Lane (919) 245-2575 "~ v Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY I P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 on MEMORANDUM TO: Travis Myren, Deputy County Manager Craig Benedict, Planning Director FROM: Michael D. Harvey, Current Planning Supervisor DATE: October 13, 2020 SUBJECT: ENVIRONMENTAL ANALYSIS of Efland Station (formerly Beaver Crossing) The following memorandum serves as a synopsis of development opportunities and/or constraints associated with approximately 100 acres of property within the Cheeks Township of Orange County. Specifically, this memorandum provides an analysis of environmental constraints associated with the proposed Efland Station (formerly Beaver Crossing) development. BACKGROUND: On or about August 7, 2020 the Orange County Planning Department received a Conditional Zoning Atlas Amendment application to rezone 2 parcels located north of Interstate 85/40, west of Mt. Willing Road, within the Cheeks Township. Specifically, staff received an application to rezone approximately 104 acres contained in 2 separate parcels, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854-36-3711 (hereafter `the Property'): FROM: Office/Research and Manufacturing (O/RM) ; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. 70 (map of parcels) I LI II' Y I l ^"I I 'I -ICI' I I'll'"I - I " 'I - I'• J .• •q+% .�(. - •l� ...�.... - .. o •i • s - DR o •- � O � • ° • ° r • • o • ® 3 • • • •° • o O ro �• .c Oy o ® O N � �. Protected .. . Watersh r l k PIN •: 4 • • 1.Y.. d 185 541 7'7 W -195 EF40 V•J LOE .I . I Er'P'$V,0 E ENT 100 / .- r '9 PROPOSAL: According to the submittal, the purpose of the development is to: `... create a mixed-use unified development providing a variety of retail, service, hotel, dining, light industrial/office flex space uses consistent with the Orange County 2030 Comprehensive Plan As proposed, development will occur on approximately 104 acres of land and involve approximately 500,000 sq.ft. of building area supporting previous identified land use categories (hereafter `the Project'). As proposed, the Project would involve development of the following specific land uses: • Construction of a 120 pump gas station with an approximately 64,000 sq.ft. retail center; • Construction of: 0 120-room hotel (square footage of structure unknown); 0 150,000 sq.ft. of Office/Service/Manufacturing land uses; 0 8,000 sq.ft. of medical office space; 0 30,000 sq.ft. of specialty retail space; o A 3,500 sq.ft. drive-in bank; 0 12,000 sq.ft. of casual restaurant; and 0 20,000 SF of high-turnover sit-down restaurant space Review and action on the Project shall be in accordance with the provision(s) of Section 2.9 Conditional Districts of the UDO. If the proposal is approved by the BOCC, 71 development of the Property will be consistent with the master plan and any/all conditions imposed by the County as part of its action on the zoning atlas amendment. As part of the submittal, the applicant provided a completed Environmental Assessment (EA) application. Staff has also received comment(s) from the Orange County Department of Environment, Agriculture, Parks and Recreation (DEAPR) attached for reference purposes. CURRENT CONDITIONS: I. PIN 9854-16-1576: An approximately 90 acre parcel previously utilized as a farm (i.e. pasture) with frontage on: • Mt Willing Road (western property line); and • 1-85/40 freeway on/off ramp (southern property line). There are barns/sheds along the western property line near Mt. Willing Road. There are utility lines running through the parcel, specifically a sewer line through the middle of the property and power lines along the southern property line running parallel with the 1-85/40 freeway on/off ramp. Staff has identified the following environmental features: a. Water Features: There are streams running approximately 600 ft. east on the property from Mt. Willing Road and several hydrologically connected ponds (i.e. streams, springs, etc.) on the parcel as well.; Available information indicates there are wetlands on the property, including an area along the western property line, approximately 400 ft. east of an existing driveway access off Mt. Willing Road; b. Floodplain: The parcel is not encumbered by floodplain; c. Slope: i. Northern property line: Varying degree of slope towards the 1-85/40 freeway on/off ramp ranging from 4% to 7.5% with the average highest elevation being approximately 676 ft.; ii. Southern property line: Varying degree of slope towards the I- 85/40 freeway on/off ramp ranging from 5% to 10% with the average highest elevation being approximately 660 ft.; iii. Eastern property line: North of the intersection of the 1-85/US 70 Connector with the 1-85/40 freeway on/off ramp, there are significant grade changes in the property ranging from 8% to 12% with the average highest elevation being approximately 658 ft.; iv. Western property line: Varying degree of slope towards the 185/40 freeway on/off ramp ranging from 4% to 6% with the average highest elevation being approximately 630 ft. d. Vegetation: 72 i. Northern property line: There significant vegetation on the portion of property towards Southern Drive composed of pine and other hardwoods. Along the residentially zoned parcels to the north-west, towards Mt. Willing Road, there is almost no existing vegetation; ii. Southern property line: There is significant existing vegetation running through the middle of the property/north of the 1-85/40 freeway on/off ramp composed primary of pines and other hardwoods; iii. Eastern property line: Significant existing vegetation composed primary of pines and other hardwoods; iv. Western property line: Along Mt. Willing Road there is very little existing vegetation. 11. PIN 9854-36-3711: An approximately 10 acre parcel of undeveloped property with frontage on: • Southern railroad (northern property line); and • 1-85/US 70 Connector (eastern property line). There is no information indicating there are utilities on this parcel. Staff has identified the following environmental features: a. Water Features: Based on available data, there are no water features (i.e. streams, ponds, floodplains, etc.) on the parcel; b. Floodplain: The parcel is not encumbered by floodplain; c. Slope: In general, the property has a west/east slope with the highest elevation (i.e. adjacent to PIN 9854-16-1576) of 672 ft. and the lowest elevation, adjacent to the 1-85/US 70 Connector road, at 630 ft.; d. Vegetation: There is an approximately 5 acres area of property, including an area with frontage along the 1-85/US 70 Connector road, which has been cleared. The remaining portions of the property have significant vegetation composed of various hardwoods. CURRENT CONDITIONS — OTHER: The following needs to be kept in consideration when reviewing the potential development of the Project: a. Upper Eno Protected Watershed: The Project is located within the Neuse River Basin and is within the State's defined Upper Eno Watershed area, a class WS-11 watershed with Nutrient Sensitive Water designation serving as a public water supply for Hillsborough residents. The County has designated the area as being within the Upper Eno Protected Watershed Protection Overlay District, which establishes limits on the total cumulative percentage of impervious surface area. As discussed in more detail herein, impervious surface can be as high as 70% or 30,492 sq.ft. of impervious 73 surface area per acre of property with the incorporation of stormwater control devices. At the writing of this memorandum the Project proposes the development of several stormwater devices, which would potentially allow up to 70% impervious surface area on the Property. b. Seven Mile Creek Preserve: The Project is approximately 1 mile north of the County's Seven Mile Creek Natural Area and the Seven Mile Creek Natural Heritage Area, as defined/ inventoried in the North Carolina Natural Heritage Program. The Seven Mile Creek Natural Area is a County designated preserve, which is also a part of the 366 acre Upper Eno Nature Preserve, acquired throughout the 1970's and 1980's at a time when a possible future reservoir was being considered. Once the need for the reservoir was eliminated, the County began conservation efforts to maintain the area as a natural area. The County designated natural area includes portions of two significant natural heritage areas, specifically the `Crabtree Creek Monadnock Ridge' and the `Sevenmile Creek Sugar Maple Bottom' featuring large stands of southern sugar maples, hackberry and swamp chestnut oaks and serves as a host for several state listed rare plants and significant wildlife species. ENVIRONMENTAL REVIEW: I. COUNTY DOCUMENT(S): a. Unified Development Ordinance (UDO): i. Per Section 6.13 Stream Buffers, identified water features (i.e. streams, hydrologically connected ponds, wetlands, etc.) are required to be left undisturbed. The width of this required natural area ranges from 65 ft. to 80 ft. based on the slope of the property in and around the water feature; STAFF COMMENT: The submittal indicates identified water features will be located within designated open space areas, with vegetation either being preserved or re-established consistent with applicable County standards. Please note: the applicant has the ability to seek a permit from the US Army Corps of Engineer to locate a roadway within/adjacent to identified wetland areas. The proposed driveway off of Mt. Willing Road will be required to secure a permit before development activity can occur. Section 6.13.6 of the UDO lists various development activities that are permitted within identified stream buffers, which include roadway development. ii. Impervious surface: The Property is located within the Upper Eno Protected Watershed Protection Overlay District. Per Section 4.2.6 Impervious Surface/Detention Pond Requirements for Non- 74 residential Uses of the UDO, the Project will have to comply with the following impervious surface limitation(s): 1. Development is limited to 12% or 5,227 sq.ft. of impervious surface area per acre of property; 2. Projects can observe a 70% or 30,942 sq.ft. per acre impervious allotment with the installation of stormwater control measures (SCMs). STAFF COMMENT: Impervious surface area is defined in Article 10 Definitions of the UDO as: A surface composed of any material that impedes or prevents the natural infiltration of water into the soil. Such surfaces include concrete, asphalt and gravel surfaces. These include, but are not be limited to, streets and parking areas, sidewalks, patios, and structures that cover the land. According to the submittal, development of the Project will involve multiple SCMs to address compliance with various provision(s) of the UDO. As a result, there is potential to have 70% impervious on the Property. The Project is required, at a minimum, to design their SCMs to accommodate the on-site infiltration of the first inch of runoff. iii. Stormwater: Per Section 6.14, the Project would have to abide by the following: 1. Nutrient load contribution(s) must meet the standards listed in Section 6.14.7 of the UDO and as required by the North Carolina Department of Environmental Quality (NCDEQ); STAFF COMMENT: New development exceeding established nutrient loading rates are required to include engineered stormwater controls designed to have a Primary and/or Secondary Stormwater Control Measure (SCM) per NCDEQ requirements. 2. Systems shall be designed to control and treat, at a minimum, the stormwater runoff generated by one inch of rainfall from all project area surfaces; 3. Development shall be required to observe a no net increase in peak flow leaving the site from predevelopment conditions for the 1 year, 24 hour, storm. STAFF COMMENT: The Project will comply with the provisions of Section 6.14 of the UDO. 75 iv. Erosion Control: The applicant has indicated the Project will comply with the provisions of Section 6.15 of the UDO. This includes compliance with the following: 1. High Quality Waters (HQW): Under applicable State regulations, surface waters are classified into various, unique, `designations' in an attempt to identify/define the best uses to be protected within said waters. For example is the water feature ideal for swimming, fishing, for use as a drinking water supply and therefore activities should be limited, etc. These designations carry with them water quality standards designed to address potential impacts. These designations, ultimately, are designed to protect water quality, wildlife, or other special characteristics. The `High Quality Water' (HQW) classification is intended to protect waters rated excellent, based on biological and physical/chemical characteristics, to serving as public water supplies, nursery areas, etc. Under current local/State regulations, development is limited to no more than 20 acres of land area being `uncovered' (i.e. disturbed) at any one time. State regulations would allow for additional acreage to be `uncovered' only with the issuance of a waiver by state staff. This Project is in a HQW area and will have to abide by a 20 acre disturbance limit unless the applicant applies to the State for a waiver. v. Environmental Assessments (EA) and Impact Statements (EIS): Section 6.16 outlines the submittal/review of environmental document(s) for projects disturbing a set amount of land area. STAFF COMMENT: All MPD-CZ projects are required to complete and submit and EA application. Regulations are designed to require the full disclosure of anticipated development activities on a given parcel of property so the County can proactively work with a developer/land owner to either avoid or mitigate impacts to environmentally sensitive areas (i.e. streams, floodplains, wetlands, steep slopes, water features, etc.). STAFF COMMENT: Per Section 6.16.4 of the UDO, a project is deemed to have a `significant environmental impact' when it: • Involves surface or subsurface extraction activity requiring a Mining Permit issued by the State; • Involves long-term storage or disposal of hazardous wastes; 76 • Requires an EIS by a Federal or State agency; • Fails to adequately protect identified in "Inventory of Sites of Cultural, Historic, Recreational, Biological, & Geological Significance in the Unincorporated Portions of Orange County' and the "Orange County Inventory of Natural Areas"; • Involves a land surface application wastewater treatment system, within the Water Quality Critical Area of Water Supply Watersheds as defined by the Orange County Comprehensive Land Use Plan. At this time, staff has reviewed the submitted EA and made a preliminary determination the Project will not have a negative impact on on-site environmental features. Presuming approval of the Project additional environmental review, including the completion of a formal Environmental Impact Statement (EIS), will more than likely be required with the development of the proposed travel center/120 pump gas station and fuel storage area. This would occur at the site plan submittal stage. b. Orange County Inventory of Natural Areas and Wildlife Habitats: A County staff generated report completed in 1987, updated in 2004, identifying environmentally sensitive areas, natural and cultural resources subject to protection during development activities. In reviewing this document, staff notes the following: i. The Property was not identified in the document as having significant wildlife, heritage areas, or identified cultural resource areas needed heightened protection(s); ii. The report designates the water features on the Property need to be preserved/protected; iii. The report does not indicate the presence of protected/endangered species on the Property; iv. The report indicated development activity within/near the Property needed to take into consideration protection of the Seven Mile Creek area/preserve, approximately 1 mile south of the Project (i.e. south of 1-85/40); v. There are significant wildlife corridors south of the Project. The Property, however, does not contain identified wildlife corridors. As indicated herein, there is a significant natural area approximately 1 mile south of the Project (i.e. Seven Mile Creek) that will have to be taken into consideration when reviewing potential impacts of the Project. One concern staff has continuously heard from adjacent property owners, is the need for large fuel storage tanks serving the proposed 120 gas pumps and potential environmental impact(s) associated with fuel spills/leaks. 77 c. County Historic Resources Inventory: While completing an inventory of historic resources in Orange County, staff determined there were 2 structures on the property having potentially significant historic value. These were a one-room dwelling and a detached kitchen built sometime in 1870. Planning staff has confirmed these structures are not eligible for listing on the National Register of Historic Places and have almost entirely collapsed due to neglect and the exposure to the elements. These structures no longer possesses physical integrity and have been deemed to be beyond saving. II. STATE INFORMATION: a. State of NC Natural Heritage Program: In reviewing available State date, staff has determined the following: i. The Property was not identified as having protected heritage areas or identified cultural resource areas; ii. Water features were identified; STAFF COMMENT: As indicated herein, identified water features will be preserved/protected consistent with applicable County stream buffer standards exceeding State minimum requirements. iii. There was no indication of protected/endangered species being identified on the Property; iv. There was no indication of significant wildlife corridors on the Property. CONCLUSION: At this stage of review, staff has determined the master concept plan appears to address protection of applicable environmental features. Further review will be necessary, presuming approval, to address environmental impacts of anticipated development (i.e. proposed travel center). As indicated herein, there are concerns over the potential impact(s) associated with the storage of the necessary fuel to support 120 gas pumps. 78 ORANGE COUNTY Department of Environment, Agriculture,Parks&Recreation MEMORANDUM To: Michael Harvey, Current Planning Supervisor, Planning and Inspections Dept. From: Christian Himi,DEAPR Land Conservation Manager Date: October 13, 2020 Re: Beaver Crossing Thank you the opportunity to review and comment on the proposed Beaver Crossing rezoning proposal and draft site plans. The subject property is compiled of three separate parcels (PIN's 9854-16-1576, 9854-36-3711), located west of Hillsborough on the north side of I-40/85 and service road;between Mt. Willing Road and the I-85/US-70 Connector in Efland. Both Parcels drain into two unnamed tributaries that drain south to Seven Mile Creek,which flows directly to the Eno River. DEAPR comments on subdivisions are generally intended to a)address any concerns with respect to potential impacts on important natural or cultural resources,and b)identify any areas that might be desirable for possible dedication to the County for public recreation/open space pursuant to Section 7.11.5 of the Unified Development Ordinance. Natural Resources Review Comments: The planned development would set aside areas of open space consisting of protected riparian buffers along the two tributaries,roadside buffers adjacent to the service road,Mt Willing Road, and interstate connector, and adjacent property buffers along all aspects of the property boundaries. Both parcels have been utilized in active agriculture,primarily beef cattle production, for the known history of ownership. Over half of the total project area is in some stage of early successional forest, having been left to fallow at some point over the last 20-30 years. On the western and southern borders of the property lie two ephemeral streams that drain into two unnamed tributaries as they flow south. Both of the tributaries drain directly into Seven Mile Creek,part of the Upper Eno watershed, a class WS-II,High Quality Watershed,with Nutrient Sensitive Water designation. The streams lay within the Upper Eno Protected Watershed on the property and the Upper Eno Critical Watershed corridors immediately after leaving the property. The property and the streams mentioned are approximately 1 mile north of the County's Seven Mile Creek Natural Area and less than '/z mile from the Seven Mile Creek Natural Heritage Area as is inventoried in the North Carolina Natural Heritage Program. Due to the importance of these tributaries to the water quality and species of the Seven Mile Creek watershed,it is in the County's and the public interest to have the areas around the two tributaries protected as an extension of the site's open space, and to assist the landowner toward that end. Staff recognizes the site plan submitted shows the developer's effort to this effect. If the landowners wish the area to remain in private ownership,they could grant a conservation easement to the County. As the easement"grantee"the County would be responsible for monitoring the site at least once each year to make sure that the terms of the easement are not violated. Advance notice would be provided to the landowners before County staff entered the property for easement monitoring. 79 If the owners or their agents are interested in exploring this option, I would be happy to sit down with them to discuss potential pros and cons. If you have questions please contact Christian at x-2514. 80 ORANGE COUNTY ��ft. Department of Environment, Agriculture,Parks&Recreation MEMORANDUM To: Michael Harvey, Current Planning Supervisor, Planning and Inspections Dept. From: Peter Sandbeck,DEAPR Cultural Resources Coordinator Date: Oct. 20,2020 Re: Beaver Crossing Thank you the opportunity to review and comment on the proposed Beaver Crossing rezoning proposal and draft site plans. The subject property is compiled of two separate parcels(PIN's 9854-16-1576 and 9854-36-3711), located west of Hillsborough on the north side of I-40/85 and service road;between Mt. Willing Road and the I-85/US-70 Connector in Efland. This memo is being provided to address potential impacts to important cultural resources, as a follow up to our earlier DEAPR memo regarding natural resources. Cultural Resources Review Comments: There is only one previously identified historic resource located within the proposed project area, on the larger of the two parcels(PIN 9854-16-1576). This is identified as the Thompson House in our Orange County Historic Resources Survey and in the State Historic Preservation Office GIS database(site number OR1136). I photographed and documented this historic property in November, 2014, at the time the County contracted with an archaeological consulting firm to undertake a Cultural and Archaeological(C&A) Survey of this large parcel as part of the planning process for the Buckhorn-Efland-Mebane sewer project. That archaeological survey project did not find any significant archaeological or cultural resources within that parcel;the final report is on file with DEAPR. The Thompson House consists of two separate log structures—a one-room dwelling and a detached one- room kitchen—both built c. 1870. The dwelling portion was enlarged c. 1900 with a wood frame addition that created a two-room house with a loft above. There is one deteriorated farm structure of uncertain purpose standing near these log structures. The site was first documented as part of our County historic resources inventory in 1993,then updated in 2014. It is not eligible for listing on the National Register of Historic Places due to its extremely poor condition. Since 2014,the log house and kitchen have almost entirely collapsed due to neglect and the elements, so the property no longer possesses physical integrity. As with any development, care should be taken to locate, identify and protect any potential human burial sites or cemeteries. The current Cemetery Census web site and the County GIS site do not show any identified burials on this parcel. Great care should be taken by the project developers to watch for potential burials.Anyone who encounters what appears to be a burial or grave should immediately contact the Orange County Cultural Resources Coordinator at 919-245-2517. If you have questions,please contact me at(919)245-2517. cc: David Stancil Chris Hirni 81 Nish and Tom's Comments on Buc-ee's TIA - Developer is willing to put in a number of off-site improvements (and investments). Orange County Planning has been pushing for US 70 Connector improvements for some time; the US 70 Connector remains a County priority by resolution. Mt. Willing is on the locally adopted 2019 Efland-Buckhorn-Mebane Access Management Plan as well as the Orange County CTP with the following recommendations: o 4-Lane divided cross section (page 20 of the EBM AMP) ■ 1 00' ROW (4F) or 1 1 0' ROW (4G) — cross sections on next page ■ Current ROW is 60'; recommending a 25' ROW reservation for future improvements along Mt. Willing Road ■ County staff will recommend to the BOCC that Mt. Willing Road improvements be approved as a County priority in SPOT 7 and subsequent processes. Mt. Willing at 1-40 EB off ramp should be considered for a signalized intersection in Phase 2 o Stop sign currently at the off ramp; there is a 4-way stop intersection with W. Ten Road just south of this juncture. - Ben Johnson Road is not yet on the Triangle Regional Model (TRM) yet, but this project would help to support its addition to the TRM. o Ben Johnson Road turns into Dimmocks Mill Road and leads into Hillsborough; Dimmocks Mill Road was recently added to the TRM. - Neither the West RI/RO nor the East RI/RO indicate the length of the stem; developer should specify stem length since these roadways feed directly into 1-40 Service Road ramps. Staff would like to see an area of the project (either in Phase I or 11) be reserved for connection to the transit systems of the area; this could include: o A bus stop location with signage o A bus shelter with signage ■ A "Future Transit Amenity by others" on a 1.62-acre parcel on the northeast edge of the project area is listed on the second page of the Master Concept Plan, but was not indicated in either TIA. - Staff is interested in the internal roadway features of the project site (when both phases are built out) and what accommodations (sidewalks, side paths, bike lanes) might be included. 82 NCDOT Cross Sections: x A 4 MK MDI. 11 J W MIµ FAN. 4FEWALK 1& la 2' 1 i' 12' 17'-f MEPLAH 12' 1 A' 2 10 ► + NK 10a M N-W HT OF WAY 4 LANE DIVIDED (17'-6" RAISED MEDIAN) WITH CURB & GUTTER, WIDE OUTSIDE LANES, AND SIDEWALKS P05TE1)5PEE❑35-45 MPH - 4 A ^ MIN. MIX INKE V Y � �k. MR /l [ + NJC LANE LANE 501WALA T G„� 70' 2' 5' IT 77' 17'.drMEDMN do 97' 11' B' 2' 7p MI R M IR 110-MI .R WOFWAY 4 LANE DIVIDED (17'-6" RAISED MEDIAN) WITH CURB & GUTTER, BIKE LANES, AND SIDEWALKS F o!3-rm 5PPPD 35-45 MPH 83 Michael Harvey From: Michael Harvey Sent: Friday, September 18, 2020 12:22 PM To: Chuck Edwards Cc: Craig Benedict (cbenedict@orangecountync.gov); Travis Myren; Steve Brantley Subject: Beaver Crossing Chuck: as an update, Craig and I have been meeting on the Beaver Crossing project this morning. It is our considered opinion, at least at this time, we need to preserve both existing Exits 161 (Connector) and 160 (MT. Willing). While we recognize there may need to be modification(s)to traffic patterns as proposed by the applicant,we believe this would be more in line with the County's goals/interests in long term traffic planning. We suggest a meeting with you all and the applicant the week of September 28, which we will coordinate, to discuss in more detail. Many thanks! Michael D. Harvey AICP, CFM, CZO Current Planning Supervisor Orange County 131 West Margaret Lane Suite 201 PO Box 8181 Hillsborough, NC 27278 (919) 245-2597 WNW- ORANGE COUNTY NORTH CAROLINA Permit and Inspection Information is NOW AVAILABLE ONLINEH Click here to access our portal Pursuant to North Carolina General Statute 132, correspondence sent and received from this account is a public record and may be disclosed to third parties. SERVICE IMPACTS FROM COVID-19 PLEASE NOTE: Orange County planning staff are still operating with limited in-person availability due to the COVID-19 pandemic. For the latest information and guidance relating to Orange County's COVID-19 response, visit https://www.orangecountVnc.gov/Coronavirus The following adjustments have been made to protect employees and the general public to ensure that service levels can be maintained throughout the duration of the COVID-19 pandemic. 1 84 Office Hours: Current Planning offices shall be open from 10 a.m.to 3 p.m. daily for the receipt of applications and working with the general public. Members of the general public needing to see a planner will to wear face coverings (i.e. masks) and observe social distancing(i.e. stay a minimum of 6 ft. apart). Planning staff can be reached at the following: ❑ Michael Harvey, Supervisor: (919) 245-2597 or mharvev@orangecountync.gov ❑ Patrick Mallett, Planner 2: (919) 245-2577 or pmallett@orangecountync.gov ❑ Molly Boyle, Planner 1: (919) 245-2599 or.mbovle@orangecountVnc.gov ❑ Tyler Sliger, Planning Technician: (919) 245-2598 or tsliger@orangecountync.gov Meetings: Meeting(s) shall occur by appointment only during revised operating hours listed above. Please note staff will observe appropriate social distancing requirements and staff 6 feet away from parties attending a meeting at all times. Plan Review:Applications for development projects shall be accepted: ❑ Electronically via e-mail; ❑ By Mail sent to: Orange County Planning ATTN: Current Planning Division PO Box 8181 Hillsborough, NC 27278 ❑ Dropped off in person during the revised operating hours listed above. PLEASE NOTE: Applications physically dropped off at Planning offices shall be placed in an appropriately labeled drop box and shall not be handed by staff until appropriate social distancing protocols can be observed. Staff will be unable to review and discuss the proposal with you at the time of submittal. Submittal of Fees: Fees can be submitted with the application (mail and in person).Those applicant's needed to pay using a credit card shall be contacted by staff to process a payment over the phone. PLEASE NOTE: Until further notice,cash shall not be accepted/handled by staff. Permits: Permits shall be processed as quickly as possible. Please note deficiencies in the application submittal will impact staff's ability to process the development request. Inspections: Inspections shall be completed either on a first come basis or via appointment. If staff is required to meet applicants in the field, appropriate social distancing policies shall be adhered to. Communications: Current Planning staff can be reached at the e-mail addresses and phone numbers listed above. z 85 Michael Harvey From: Nishith Trivedi Sent: Thursday, September 24, 2020 8:58 AM To: Michael Harvey Cc: Thomas Ten Eyck; Tom Altieri; Craig Benedict Subject: RE: Beaver Crossing Michael, I have finished my review of the attached two addendums for Beaver Crossing. Here are my 2 cents: • Developer may not need to remove the West bound off ramp onto service road.Though I see the benefit— reducing conflict points and less traffic on service road—the cost is more traffic getting off at Mt. Willing exit to access the site. o The added traffic light at Mt. Willing south of the interchange is appreciated but more traffic will still go to Mt. Willing even with westbound off ramp removed from service drive. • The amount of traffic added to the US-70/1-85 Connector is significant, this additional traffic may also come from and go into Ben Johnston road. As the Connector is a 4 lane divided highway, it needs left turn lanes into Ben Johnston Road due to increasing traffic o Right in/Right out on Ben Johnston Road is counterproductive • 1 do not see any benefit from moving the east driveway access north 400', it puts it very close to the power easement and rail overpass. Below is a picture depicting the close proximity where this driveway access would go. 1 86 .w. • Is the developer familiar with US-271 in Cleveland Ohio or any other similar situation where there are two interchanges in close proximity to each other with a service road connecting them. I know there are a lot in Texas, Charlotte, and Georgia. Here is what I am refereeing to about US-271 z YoUrsTr'61.y AA+ yRestauran# Beachwood ONION Home2. uites bV Hilton! Trader J I ism Cleveland Beachwood Sep 24 ar 0 uw DoubleTree by Hilton uw Hotel Cleveland East Be. �r �St ep 24-25 - 1101 Red Lobs#er.�` , rt • I i + r - #�w Embassyuites'by Hilton Cleveland Beachwood $IGr2 25 ' 1 Q2 Life i . :` Super 8 I Wyndham m *Frtnes r �1 Beachwood/ Cleveland... Aloft Cleveland Beachwood . { -Sep 24-25 4 - I A Hotelsbby FA arriott '�T IevelandtBeachwood #: UH Ablui �Aul Sep24-'25, f_ irtals Center Emergency-Rob rTi * �2g ospital lyrnan•s.T Vern- t + Dine-in, eliverr&-.. r Harwrd-Rd'"Q r amp eor Ieveland��ularrio#t S Evr# e� _ hick-fil`At�. . : •, �bu.' BABY' r Y Y 88 i� wnp 9F5 rIM1 - �rf6M�.l.. . Viand Aft ♦• Granted the above example is an exaggeration. Service road has more lanes than the interstate. But the idea is the same. Hope this helps. Nish From: Michael Harvey Sent: Monday, September 21, 2020 8:22 AM To: Travis Myren; Craig Benedict; Steve Brantley; Amanda Garner; Tom Altieri; Thomas Ten Eyck; Nishith Trivedi Cc: James Bryan Subject: FW: Beaver Crossing FYI —I will not have a chance to review until the middle of this week From: Lewellyn, Earl <Earl.Lewellyn@kimley-horn.com> Sent: Friday, September 18, 2020 12:53 PM To: Michael Harvey<mharvey@orangecountync.gov> Cc: Stan Beard <Stan.Beard@buc-ees.com>; Beth Trahos (beth.trahos@nelsonmullins.com) 4 89 <beth.trahos@nelsonmullins.com>; Westwood, Kelsey<Kelsey.Westwood@kimley-horn.com> Subject: [EXTERNAL MAIL!] Beaver Crossing Good afternoon Michael. Hope you are well. Attached are 2 TIA addenda that we recently sent to NCDOT. The first one is a sensitivity analysis that adds 10%to the Buc-ee's Trip Generation. It also includes analysis of the Saturday peak with full buildout of phases 1 and 2. The second study examines the alternate access option, which shifts the access to the US 70 Connector about 400'to the north. Please let me know if you have any questions? Thanks and have a great weekend! Earl Lewellyn, P.E. Kimley-Horn 1 300 Morris Street, Suite 200, Durham, NC 27701 Direct: 919 653-5874 1 Mobile: 919 971 2258 1 Main: 919 682 3583 Connect with us: Twitter I Linkedln I Facebook I Instagram I Kimley-Horn.com Celebrating 13 years as one of FORTUNE's 100 Best Companies to Work For *** WE HAVE MOVED! *** Please note our new address for your records. 300 Morris Street, Suite 200, Durham, NC 5 90 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Engineering / Erosion Control / Stormwater � 131 W. Margaret Lane Suite 201 (919) 245-2575 ORANGE COUNTY P. O. Box 8181 (919) 644-3002 (FAX) NORTH CAROLINA Hillsborough, NC 27278 www.orangecountync.gov At October 14, 2020 Kelsey Westwood Hall, P.E. 300 Morris Street, Suite 200 Durham, NC 27701 RE: REVIEW of Conditional Zoning Atlas Amendment — Master Plan Development (MPD) for Beaver Crossing INITIAL REVIEW COMMENTS — ENGINEERING DIVISION Dear Ms. Hall: On or about August 7, 2020 the Orange County Planning Department received a Conditional Zoning Atlas Amendment application for a parcel of property located north of Interstate 85/40 within the Cheeks Township. Specifically, staff received an application to rezone an approximately 104 acres of property, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854-36-3711 (hereafter 'the Property'): FROM: Office/Research and Manufacturing (O/RM); Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTG) Overlay District; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTG) Overlay District; Efland Interstate Overlay District. According to the submittal, the purpose of the development is to: '... create a mixed-use unified development providing a variety of retail, service, hotel, dining, light industrial/office flex space uses consistent with the Orange County 2030 Comprehensive Plan As proposed, development will occur on approximately 104 acres of land and will involve approximately 500,000 square feet of building area supporting previous identified land use categories (hereafter 'the Project'). The Orange County Current Planning Department issued initial review comments for the Project on August 31, 2020. What follows are supplementary preliminary observations and comments by the Orange County Engineering Division, specific to water, sewer, stormwater management, and erosion & sedimentation control (E&SC): 91 10/13/2020 Page 2 of 4 Kelsey Westwood Hall, P.E. MPD for Beaver Crossing — Engineering Comments 1. COMMENTS: a. GENERAL: i. Orange County requests that the applicant consider Orange County's proposed recordation of up to four (4) 30-ft wide public sanitary sewer easements as shown on the attached redlines. See Attachment 1. This accommodation would allow for potential future public sewer service to multiple private tracts that are located adjacent to the Project. ii. The Project is located within the Upper Eno Protected Watershed Zoning Overlay District (Neuse River Basin), as zoned by Orange County, and within an area classified as a High Quality Water (HQW), as zoned by the State of North Carolina. Orange County and the North Carolina Department of Environmental Quality (NCDEQ) will review the Project for compliance with applicable Orange County and State standards, as formal site development plans are finalized and submitted. b. WATER: i. Public water service will likely be provided by Orange Alamance Water System (OAWS). This statement shall in no way be interpreted as a final determination by Orange County or OAWS to serve the Project with public water. ii. OAWS staff has informally notified Orange County Engineering staff that OAWS has available water capacity based on the evaluation of a DRAFT sanitary sewer capacity summary (average daily demand) of 76,421 gallons per day (GPD) as provided to Orange County by the applicant on September 1, 2020. However, OAWS has not yet formally confirmed with Orange County Engineering staff an ability to serve the Project with public water. Orange County Engineering staff is not aware of any detailed water demand data received by Orange County to date. iii. So as to prevent a potentially negative impact to available public water capacity within the regional water service area, Orange County Engineering staff recommends a reassessment of proposed water demands via the incorporation of low-flow water fixtures and/or lower-flow end users throughout the Project, where feasible. iv. If updated water demand data are available, applicant shall provide them to Orange County, specifically so that OAWS may further evaluate their available water capacity and their desire to serve the Project with public water. v. Provide additional information on the proposed dead-end water line near the intersection of Ben Johnston Road on the east side of the Project. It appears that the proposed water line will exist as a dead end throughout both phases of the Project. Applicant shall ensure 92 10/13/2020 Page 3 of 4 Kelsey Westwood Hall, P.E. MPD for Beaver Crossing — Engineering Comments that NCDEQ and OAWS design criteria and/or direction are followed specific to the proposed dead end water line. vi. Water utility design, permitting, and construction shall conform to NCDEQ and/or OAWS standards. c. SEWER: i. Sewer service will likely be provided by City of Mebane. This statement shall in no way be interpreted as a final determination by Orange County or City of Mebane to serve the Project with public sewer. ii. City of Mebane staff has informally notified Orange County Engineering staff that the City of Mebane has available sewer capacity based on the evaluation of a DRAFT sanitary sewer capacity summary (average daily demand) of 76,421 gallons per day (GPD) as provided to Orange County by the applicant on September 1, 2020. However, the City of Mebane has not yet formally confirmed with Orange County Engineering staff an ability to serve the Project with public sewer. Only limited sewer demand data have been made available to Orange County Engineering staff to date. iii. So as to prevent a potentially negative impact to available public sewer capacity within the regional sewer service area, Orange County Engineering staff recommends a reassessment of proposed sewer demands via the incorporation of low-flow water fixtures and/or lower-flow end users throughout the Project, where feasible. iv. If updated sewer demands are available, applicant shall provide them to City of Mebane so that City of Mebane may further evaluate their available sewer capacity and their desire to serve the Project with public water. v. The existing terminal sewer manhole along Mt. Willing Road is located in front of Orange County PIN 9844965832, slightly south of where currently shown on the preliminary Water and Sewer Map as submitted to Orange County. See Attachment 2. i. Sewer utility design, permitting, and construction shall conform to NCDEQ and/or City of Mebane standards. d. STORMWATER MANAGEMENT: i. Stormwater management design, permitting, and construction shall conform to Section 6.14 of the Orange County Unified Development Ordinance (UDO). e. EROSION & SEDIMENTATION CONTROL i. Erosion & Sedimentation Control (E&SC) design, permitting, and construction shall conform to Section 6.15 of the Orange County Unified Development Ordinance (UDO). 93 10/13/2020 Page 4 of 4 Kelsey Westwood Hall, P.E. MPD for Beaver Crossing — Engineering Comments This document represents the Orange County Engineering Division's comments and observations on the Project thus far, and shall not be interpreted as a final determination. Please contact me at (919) 245-2583 and/or csandt orangecountync.gov if you have any questions or comments. Sincerely, CGr6g� 'J. Christopher J. Sandt, P.E. Staff Engineer Enclosures: Attachment 1, Attachment 2 CC: Craig N. Benedict, Orange County Steve Kaltenbach, Orange County Michael D. Harvey, Orange County Elaina Cheek, Orange County FILE ]t rJ ..OLN 3� bM =p.o-► YHfYRbl�.Il Wl�. .. {lII Vim' �[noMWM-�i+a�NM it M4x. Mxa .rm� ,a6 IwWy'SYP�p NV-ld 89iSVV4 94.r 1111 �0Z:9 90 dHW 2i3M35 dA}H 2i31NM [. UJOH O(AalwiN L.o Or�{ssoa0 a3nd3e iocreas'.r, I .f Yr fig• �e 0- i° , , : 2W oouj c� ' I ' LU LL 70 70 p IL U 0 >J 00 P tillI �•" �'' -w R� ry I 1 J - r I - - f — f _-------- a Y. 1 J- co �,l I ti : U a w I I i M I r, 0 E _0 C LU ol -ai aY _ _ - - T- - [ Ok ip agP a l_ a w ' :qa Ioid:d!a1w�IoW's HYId InOAY1 H3Na9 AUAVUD 6 [swt.rF Jweri'�Md�/uG I w NTpww•�'r!vel ��iRrun� 6u.uu�ld 16uu�wiEV� ur I �d Q®H�a^F�{�m sa;elnossV p-inyndn sggOH w "" .� i 'N 5rb 9HYl�It cU.'r�r� 9 e � ,� 1 , � wo4J� g F ;s.C-.0 ❑ 0 w - , I _! 1 O _zo2o¢zo � e _ M1 N ®. p N o ki x a — N3z 1 1� 2w _ N u la + a�un �n 0 W yl 1 ffi �S 33b1 Li31N^ ,r rr rr y m 0 0 W G' W N C7 -- Z_ + a FLn !W Is ZLLI ILL N o QW t7 a a ti a a ' �.9 x r - a c�i a N 7 .mw.Wr>Qer....� wKnn�ai r ; xxreasau�tt9.9aaeo[o�'d m� .0..3HId N3 3 $ b aK>t ww.�Wen w.ed�r.wr I'M.'>rol�•'^a'n.on - 31LiOHd ONtl N9'W-Id M39 ALAtlHE] Sp A p `pJJ x OCJ'Atl1Il073JHvtl0 2 + Q ��✓ T1Ydi[70 i VJS co"avm NU JSEM IWA..4 aw...,d 16.1 is,.. NOMNaM L BSVM OM 2NY83 Y-NACHXXM l sajepossy y�Jny�dn sggaH ! !Smm AL Mm awm C g �y R ?¢� LLI :i a 3 i a s (11 e ._I J SCim {a9 4 I B �3 3 a a■I � p, sR ]I T� ■3 01 z a M Vx 7 4 � h ` � � g � . . . .. . . ... ........ u, z l z N a7oa�.S'CgPig 8 71 o i _ �� n� � 3m row v f]YN oc+x.•I..fAI N � gill C: w�Gn zz o 6 rwz3 r _¢r5c,z�m- w o�zw ... ... ...... Z-w O 3WOQ3m d _ � IN 8 cwioU� ew-- �j - Lza 1 z C: o L o m m J s I . ly gR y �oWo "U zz-aJa �'R i a� — � .t.cs w.l��,,; o w�?Nd��i i .e ��x Q xwv Yno,9, &_� _ oo � ;; ,.`....a, z K� A Wo 0 2 LU Sun q P� IN N _ x� zi aY W {L - 'aw k'3o3 ^L C - z wFmF W >atr G �o �= aw w Q d C dRd� 2 `s sc� All y El � I .y;1 ]liv Ll,.49 IH [N -Iw R YI q 4 w. Si qc oo 97 Michael Harvey From: Beth Trahos <beth.trahos@nelsonmullins.com> Sent: Friday, October 23, 2020 11:43 AM To: Michael Harvey Cc: Stan Beard;Westwood, Kelsey Subject: FW: [EXTERNAL] Eno 100Kv Line Relocation Michael- Below please find an email from Duke Energy indicating conceptual approval for the powerline relocation. Final approval will come with delineation of the easement meeting all Duke Energy standards before physical relocation takes place. Let me know if you have any questions. Thanks, and have a great weekend! Beth n NELSON MtJLLII ELIZABETH C. TRAHOS PARTNER beth.trahos@nelsonmullins.com GLENLAKE ONE I SUITE 200 4140 PARKLAKE AVENUE I RALEIGH, NC 27612 T 919.329.3884 F 919.329.3799 NELSONMULLINS.COM VCARD VIEW BIO From: Plumley, Lisa <Lisa.PIumley@duke-energy.com> Sent:Wednesday, October 21, 2020 1:37 PM To:Stan Beard <Stan.Beard@buc-ees.com>; Holleman, Leah Alexandra <Leah.Holleman@duke-energy.com>; Pait, Bruce E. <Bruce.Pait@duke-energy.com> Cc: Scott Ratcliff<ratcliffeng@gmail.com> Subject: RE: [EXTERNAL] Eno 100Kv Line Relocation Stan, So sorry for the delay in response, I wanted to double check that both Engineering and Asset Protection groups were OK with the plans from a conceptual standpoint. Engineering(Leah Holleman) approves, and I have Bruce's response copied below: At this level,Transmission Asset Protection does not object to the project moving forward subject to the following: 1. We want to ensure that we have a new easement that is clear of structures and obstructions from edge to edge and good access to the easement and all of our future structure locations. 1 98 2. We should make note and consider the potential need for danger tree rights from the adjacent property owner to the north near the northeast corner of the future transmission line route. As to Bruce's second point, we typically off-set our easement from any property boundaries by about 50'to ensure no 3rd party rights would be needed.This is not a requirement,just a suggestion, as acquiring third party danger tree rights are often difficult to obtain when considering numerous property owners. We thought it would be important to point this out early on for your awareness. Let me know if you need any further information from us. Happy to help! Thanks, Lisa Plumley Project Manager Duke Energy,Carolinas West Transmission Office: (980)373-1219 1 Cell: (704)303-3848 Lisa.PIumley@Duke-Energy.com Nelson Mullins is continuing to monitor developments related to COVID-19, including guidance from the Centers for Disease Control and various health officials; and federal, state, and local government authorities. The firm has implemented precautionary measures and plans to ensure the continuation of all firm services to clients from both in office and remote work arrangements across our 25 geographically disperse offices. Click here to visit the Nelson Mullins Coronavirus Resources page. Information described therein is subject to change. Confidentiality Notice This message is intended exclusively for the individual or entity to which it is addressed. This communication may contain information that is proprietary,privileged, confidential or otherwise legally exempt from disclosure. If you are not the named addressee, you are not authorized to read, print, retain, copy or disseminate this message or any part of it. If you have received this message in error,please notify the sender immediately either by phone (800-237-2000) or reply to this e-mail and delete all copies of this message. 2 99 ��mTFoh m O� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER J.ERIC BOYETTE GOVERNOR SECRETARY October 27, 2020 ORANGE COUNTY Mr. Earl Lewellyn, PE Kimley-Horn and Associates Inc. 300 Morris Street, Suite 200 Durham,NC 27701 Subject: Proposed Buc-ee's West Orange Site Located on SR 1239, I-85/ US 70 Connector and SR 1120, Mt Willing Road • Review of Traffic Study(TIA) Dear Mr. Lewellyn, Staff from NCDOT Division 7 and the Transportation and Mobility Unit have reviewed the submittals listed below for the above-mentioned development. I offer the following comments based upon the information provided. • TIA dated June 2020 and sealed June 30, 2020 • TIA Phase 2 dated August 2020 and sealed August 6, 2020 • TIA Addendum#1 dated and sealed September 11, 2020 • TIA Addendum#2 dated and sealed September 15, 2020 • Memorandum entitled Beaver Crossing- Efland NC- Exit 160 Weaving Assessment dated and sealed October 8, 2020 General: The proposed site consists of a 120-pump gas station with convenience store and a number of outparcels identified as a 120-room hotel, 8,000 square feet(SF) of medical office space, 30,000 SF of specialty retail space, a 3,500 SF drive-in bank, 12,000 SF of fast casual restaurant space, and 20,000 SF of high-turnover sit-down restaurant space. The site is to be developed in two phases with the gas station comprising phase 1 to be completed in 2022 and the remaining uses to be developed in phase 2 with completion scheduled for 2023. The site is expected to generate an estimated 34,922 daily vehicle trips upon buildout. Proposed site access consists of a full movement access located on Mailing Address: Telephone:(336)570-6833 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(336)570-6873 115 EAST CRESCENT SQUARE DRIVE DIVISION 7,DISTRICT I Customer Service: 1-877-368-4968 GRAHAM,NC 27253 PO BOX 766 GRAHAM,NC 27253-0766 Website:www.ncdot.gov 100 the I-85/US 70 Connector approximately 400' north of the existing Ben Johnston Road and two right in-right out accesses on what is described in the study as a service road resulting from the modification of the existing braided interstate interchange via removal of the existing westbound 160 exit ramp. A full movement access on Mt. Willing Road directly across from Turner Street is proposed in phase 2. Interstate Interchange Modifications: As previously noted, the traffic study includes recommendations for modification of the existing westbound I-40/85 braided interstate interchange with removal of the existing westbound exit 160 ramp resulting in conversion of the braided configuration to a one- way service road providing access to Mt. Willing Road via reassignment of traffic currently using this exit 160 to the 161 exit ramp and utilizing the resulting service road to access Mt. Willing Road. Site access to the resulting service road in the form of two right in-right out driveways is proposed. NCDOT staff is in general agreement with the conclusion in the above-referenced weaving assessment that the current configuration is not desirable due to the presence of a high speed conflict point at the existing exit 160 gore and the relatively short weaving length provided by the existing braided ramps. Staff also concurs that operational and safety problems will worsen with the increase in traffic associated with the proposed development and/or future traffic growth. The proposed modification of the interchange and the proposed break in the controlled access right of way to accommodate the proposed site accesses will require review and approval by the NCDOT Right of Way Disposal and Controlled Access Committee as well as the Federal Highway Administration. The Applicant has not yet made the necessary submittals to these bodies; therefore, the outcome of this proposal is not determined at this time. The remaining comments in this letter are based on the presumption that the modification will proceed as proposed and contingent upon approval. In the event that the request is not approved, additional traffic operational analysis for alternate scenarios will be needed. Required Road Improvements: As a condition of the pending NCDOT Driveway Permit and contingent upon approval of the interstate interchange modification and controlled access breaks as described above, the Applicant will be required to construct the following road improvements to mitigate traffic impacts attributable to site traffic to ensure acceptable operation. Phase 1 Improvements: The following improvements shall be constructed with development of phase 1 and prior to placing the proposed gas station with convenience store into operation. Intestate Interchanjze Modification: Subject to FHWA approval, modify the existing interchange as follows: • Remove existing westbound 160 exit ramp • Reconfigure to provide for a one-way service road with dual thru lanes extending from the 1-85/US 70 Connector to the westbound 160 on ramp and proceeding as a single thru lane to Mt. Willing Road 101 I-40/85 Westbound Service Road and East RI-RO Driveway: • Provide one northbound ingress lane and one southbound egress lane with stop control on the driveway • Provide a minimum 100' internal protected stem length • Provide a westbound exclusive right turn lane with 150' of full storage and appropriate deceleration and transition accommodation per NCDOT requirements I-40/85 Westbound Service Road and West RI-RO Driveway: • Provide one northbound ingress lane and one southbound egress lane with stop control on the driveway • Provide a minimum 100' internal protected stem length • Provide a westbound exclusive right turn lane with 200' of full storage and appropriate transition per NCDOT requirements I-40/85 Westbound Service Road and Mt. Willing Road: • Provide a three-lane westbound approach consisting of the following: o One full single thru lane o One exclusive continuous right turn lane o One exclusive left turn lane with 280' of full storage and appropriate transitions per NCDOT requirements. • Provide a coordinated traffic signal at this intersection. I-40/85 Eastbound Ramp and I-85/US 70 Connector Intersection: • Provide a two-lane eastbound approach consisting of the following: o One full combination thru-left-right turn lane o One exclusive left turn lane with 400' of full storage and appropriate transitions per NCDOT requirements • Extend existing southbound left turn lane to provide for 400'of full storage and appropriate transitions per NCDOT requirements • Provide a coordinated traffic signal at this intersection. I-40/85 Westbound Ramp and I-85/US 70 Connector Intersection: • Provide a three-lane northbound approach consisting of the following: o Dual full thru-lanes o One exclusive left turn lane with 250' of full storage and appropriate transition per NCDOT requirements • Provide a four-lane westbound approach consisting of the following: o One full thru lane 102 o One combination thru-left turn lane with 450' of full storage and appropriate transition per NCDOT requirements. o Dual exclusive right turn lanes with 450' of full storage each and appropriate transition per NCDOT requirements. • Provide coordinated traffic signal at this location. Proposed Site Access and I-85/US 70 Connector Intersection: • Locate site access as far to the north as possible while adhering to applicable roadway design guidelines to maximize intersection spacing relative to Ben Johnston Road • Evaluate alternatives to accommodating northbound U-turns from Ben Johnston Road in order to increase intersection efficiency at the site access via possible right turn overlap and signal timing afforded by relocated U-turn movements. • Provide a three-lane eastbound approach consisting of the following: o One full exclusive right turn lane o One exclusive right turn lane with 300' of full storage and appropriate transition per NCDOT requirements o One exclusive left turn lane with 200' of full storage and appropriate transition per NCDOT requirements. o Provide a minimum internal protected stem of 300' • Provide dual eastbound ingress lanes • Construct dual northbound left turn lanes with 330' of full storage each and appropriate transitions per NCDOT requirements. • Construct a southbound exclusive right turn lane with 100' of storage and appropriate transition per NCDOT requirements • Provide coordinated traffic signal at this location. I-85 and US Connector and Ben Johnston Road Intersection: • Install appropriate median and channelization to convert Ben Johnston Road to RI-RO. • Accommodate resulting U-turns at the following intersections: o Southbound U-turns- I-85/US 70 Connector and I-40/85 Eastbound Ramps o Northbound U-turns- Evaluate alternatives to accommodating U-turns from Ben Johnston Road in order to increase intersection efficiency at the site access intersection via possible right turn overlap and signal timing afforded by relocated U-turn movements Phase 2 Improvements: The following improvements shall be constructed with development of phase and prior to placing the proposed site uses into operation. 1-40/85 Eastbound Ramps and Mt. Willing Road Intersection: 103 • Provide a two-lane eastbound approach consisting of the following: o One full combination thru-left turn lane o One exclusive right turn lane with 350' of full storage and appropriate transition per NCDOT requirements • Extend existing southbound left turn lane to provide for 400' of full storage with appropriate transition per NCDOT requirements. • Provide coordinated traffic signal at this location. Mt. Willing Road and Turner Road/Proposed Site Driveway Intersection: • Provide a two-lane westbound approach consisting of the following: o One full exclusive left turn lane o One exclusive right turn lane with a minimum of 100' of full storage and appropriate transition per NCDOT requirements o Provide a minimum of 100' internal protected stem length • Provide dual eastbound ingress lanes to accommodate free-flow right turn movements. • Construct a northbound exclusive free-flow right turn lane with 200' of full storage and appropriate transition per NCDOT requirements • Construct a southbound exclusive left turn lane with 100' of full storage and appropriate transition per NCDOT requirements • Monitor intersection for signalization. Multi-modal and Streetscave Enhancements: Any locally stipulated multi-modal enhancements including but not limited to sidewalk, bike lanes, bus pull offs, lighting, landscaping etc. on State maintained routes are subject to NCDOT requirements and approval through the encroachment process. General Requirements: It is necessary to obtain an approved driveway permit and/or encroachment agreement(s) prior to performing work on the NCDOT right of way. As a condition of the permit, the permitee shall be responsible for design and construction of the above stipulated improvements in accordance with NCDOT requirements. An approved permit will be issued upon receipt of approved roadway and signal construction plans, inspection fee, and any necessary performance and indemnity bonds. The applicant shall dedicate any additional right of way necessary to accommodate the required road improvements or future improvements as stipulated. Intersection radii and geometry shall be designed to accommodate turning movements of the largest anticipated vehicle. All pavement markings shall be long life thermoplastic. Pavement markers shall be installed if they previously existed on the roadway. 104 The permitee shall be responsible for the installation and relocation of any additional highway signs that may be necessary due to these improvements and shall comply with the requirements of the MUTCD. Feel free to contact me if you have any questions. Sincerely, D"uSigned by: C. N dwarfs Jr. , Pf C606@6060F9M58... C. N. Edwards Jr., PE District Engineer Cc: W. R. Archer, III, PE, Division Engineer Kevin Lacy, PE, State Traffic Engineer D. M. McPherson, Division Traffic Engineer Brian Thomas, PE, Regional Traffic Engineer Doumit Ishak, PE, Congestion Management Regional Engineer Orange County 105 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 Fe MI September 18, 2020 SUMMARY MEETING NOTES Neighborhood Information Meeting (NIM) for Master Plan Development Conditional Zoning District (MPD-CZ) Application Beaver Crossing Consistent with the requirement(s) of Section 2.9.2 (D) Conditional Zoning District — Neighborhood Information Meeting of the Orange County Unified Development Ordinance (UDO), a neighborhood information meeting (NIM) was held on Wednesday September 15, 2020 for a Master Plan Development Conditional Zoning (MPD-CZ) District Zoning Atlas Amendment for property north of Interstate 40/85 and east of Mt. Willing Road within the Cheeks Township of Orange County. The project is commonly known as Beaver Crossing. The applicant sent a notice of the meeting date, time, and on-line meeting registration link to all property owners within 1,000 feet of the subject property, consistent with the requirements of the UDO. ATTENDEES: Stan Beard (Applicant Representative — Buc-ee's); Beth Trahos (Attorney for Applicant); Kelsey Westwood (Kimley Horn — Site Plan/Engineering Design for Project); Earl Lewellyn (Kimley-Horn — Traffic Engineer who completed the TIA); Michael Harvey and Craig Benedict (Orange County Planning); A total of 55 individuals attended the call, including those listed above. Given the virtual nature of the call, a complete list of attendees is not available. The following names were available on the virtual format: Marshall Welch; Rick; Jared and Heather Cates, Sita; A Pate; Steven; Heather Smith; Douglas Efland; Jennifer; Steven; Mikki Fleming; Chris Smith; M and N Efland; Rob Roberts; Lindsay Efland; PM; Bill Efland; Jaye Ruth Efland; Joe Williams; and Kaye Cartmill. SUMMARY OF PROJECT: The applicant summarized the proposal as follows: 106 On August 7, 2020, the applicant submitted a Zoning Atlas Amendment application requesting the rezoning of approximately 104 acres of property, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854- 36-3711 (hereafter `the Property'): FROM: Office/Research and Manufacturing (O/RM); Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; Efland Interstate Overlay District. TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; Efland Interstate Overlay District. (map below): Y - ® ® O O O F�FSE� JE 9854363711 FEFN cF ° CHAP LLOYD LAND INVESTMENT • ® ® •° o ° o ® ® COMPANY LLC +-• 10 ° • _°• • ° •a q 6177194 o Upper.Eno a ® o�a Protected - • • J®• - Watershed �� • � c> ^t� 2 e o L F!, F _ OsiAg ry ti; C� —0 9854161576 o- x R SL EFLAND HEIRS LLC 599 71493 185 3.140 1N Eh t E. _ 185Ni4�E _----_._-. 9!85 add E ENT 188 7N i 11 0 Review and action on the Project shall be in accordance with the provision(s) of Section 2.9 Conditional Districts of the Unified Development Ordinance (UDO). 107 In accordance with Section 2.2 Applications of the Unified Development Ordinance (UDO), staff began a sufficiency review of the submittal that was deemed complete and formally accepted for review on August 12, 2020. The applicant spoke generally about the project using a PowerPoint presentation. A copy of the presentation is attached hereto as Exhibit A. The applicant began by orienting the attendees to the property location, explaining the existing and proposed zoning districts and discussing the Comprehensive Plan. The applicant discussed the detailed uses permitted in each development pod identified by numbers 1-6 using the Master Plan Land Use Plan Map C2.1. The traffic impact analysis and planned road improvements, including the elimination of exit 160 per NCDOT, were discussed. The landscape plan and open space areas where also discussed. Finally, the applicant discussed job creation (especially for low barrier to entry jobs that pay a living wage), sales taxes and the ad valorem taxes expected from the planned Buc-ee's and the larger commercial development. At full build out, the project is expected to generate in excess of $2,000,000 per year in taxes. The meeting was then opened to questions from attendees which are discussed in detail below. The following summary of the proposed project is provided by Planning Staff based upon the initial project submittal as follows: 1. Project involves 104 acres (4,530,240 sq.ft.) of property; 2. The project will observe a floor area ratio of 0.65 (28,314 sq.ft. of allowable building area per acre (43,560 sq.ft.) of property) with a maximum potential of over 2,900,000 sq. Ft. of anticipated building area, although the applicant indicated that they intended to impose a limit of 500,000 sq. ft. of maximum building area; 3. There will be approximately 30 acres (30%) of open space, although applicant noted in that there would be a total of 40 acres (38%) of open space when including maintained buffer area and indicated the submittal would be updated to confirm this figure; 4. Setbacks from various property lines would be as follows: 108 Setback from Freestanding Buildings and Signs Property Lines Structures+Vehicular Use:areas Interstate 85 One hundred(100)feet average 10' from public right- Interstate 40 Forty(40) feet minimum of-way Interstate 85 Connector,'U.S. Forty(40) feet 10' from public right- Highway 70 of-way Mount Willing Road Forty(40) feet 10' from public right- of-way 100' from residential uses External Rear Property Line Forty-(40) feet 10' from public right- of-way 100' from residential uses Internal Front, Side, and Rear Zero (0) feet 5' from private right- (Development Area 1) of-way 10' from public right- of-way Internal Front. Side, and Rear Twenty(20) feet 5' from private right- (Development Areas 2-6) of-wav 5. Buildings shall observe a 60' height limit consistent with County regulations. Accessory structures (i.e. water tower, telecommunication tower, etc.) may be higher; 6. Application contains a master sign plan proposing the following signage: a. Development Area 1 (i.e. Buc-ees Travel Center): i. 1 on premise sign approximately 100 ft. tall with a total sign area of 601 sq.ft.; ii. 3 wall signs (i.e. on portions of the building that could have frontage/visibility from a road right-of-way) each approximately 270 sq.ft. in area (total cumulative sign area of 810 sq.ft.); iii. Logos on the canopy — 4 total logos each approximately 50 sq.ft. in area (total cumulative sign area of 200 sq.ft.),- iv. A total of 16 signs on several separate gas pumps advertising fuel type, each sign 5.5 sq.ft. in area (total of approximately 88 sq.ft.). b. Other development areas: i. A total of 8 monument signs, each with 240 sq.ft. of sign area not exceeding 20 ft. in height (cumulative of 1,920 sq.ft. of sign area); ii. Wall Signs: 64 sq.ft. of wall sign area for each individual tenant space; iii. Directional and temporary/construction/real estate signage consistent with the provisions of Section 6.12 Signs of the UDO. 109 7. Outdoor lighting shall abide by County regulations as it relates to allowable lighting intensities at property lines and the use of full cut off fixtures; 8. Access to the development shall be off of: a. A proposed driveway off of Ben Johnson Road and Mt. Willing Road; b. Access drives are also proposed off of the Interstate off-ramp to the south of the property; 9. The project shall abide by applicable erosion control and stormwater regulations as detailed in Section(s) 6.14 and 6.15 of the County UDO; 10.Stream and floodplain buffers shall be preserved consistent with County regulations; 11.Permitted land uses include: a. A Buc-ee's Travel Center including 120 pump gas station and car wash with approximately 70,000 sq.ft. of retail/restaurant area serving same; b. 150,000 sq.ft. of office/light industrial/ flex space; c. 120-room hotel (square footage of structure unknown); d. 8,000 sq.ft. of medical office space; e. 30,000 sq.ft. of specialty retail space; f. A 3,500 sq.ft. drive-in bank; g. 12,000 sq.ft. of casual restaurant; and h. 20,000 SF of high-turnover sit-down restaurant space. 12.The applicant reviewed maps contained within the Traffic Impact Analysis (TIA) of the application package (Exhibit G) and discussed anticipated traffic impacts/improvements. This included discussion of improvements the Interstate exist ramps, including the elimination of Exit 160 known locally as the Efland Exit. PUBLIC COMMENT(S) AND QUESTIONS: A. Several comment(s) and concerns were expressed over the proposed elimination of Exit 160. Property owners expressed extreme displeasure with the loss of the existing Efland exit, expressing concern over anticipated `impacts'. APPLICANT: Well in advance of the rezoning submittal, there was extensive coordination with NCDOT officials regarding the proposed access plan. Based on those discussions it is our understanding that, irrespective of this project, NCDOT desires to close the I-40 Westbound Exit 160 due to inadequate weaving distance along the service road between this Exit Ramp and the I-40 Entrance Ramp, which does not currently satisfy standard NCDOT guidelines. This concern is further compounded by the prevailing speeds. As a result, the traffic impact analysis (TIA) was prepared based on NCDOT direction to close this exit ramp. The study recommends extensive improvements to accommodate 110 the redirected traffic demands as well as site traffic impact via Westbound 1-40 Exit 161. The cost of these extensive improvements will be born by the developer as a part of this project rather than by taxpayers at some point in the future. Attendees inquired who at NCDOT was involved in this project so that they could be contacted directly. Kevin Lacy was identified as the primary contact. An email address for Mr. Lacy was requested by several neighbors of the call. Mr. Lacy can be reached at: jklacncdot.gov COUNTY STAFF: The applicant has submitted a traffic impact analysis to the County and NC Department of Transportation (DOT) for review. Staff from both agencies have requested additional information on anticipated traffic demand and the various proposals to address same. Concern had been expressed to the applicant concerning the proposed loss of Exit 160, but all parties (i.e. applicant, County Planning, NC DOT) are still completing their reviews of the proposal. DOT staff has requested additional information from the applicant, which is being produced. As review comment(s) are finalized, this matter will continue to be reviewed and discussed. B. Why do we need a 120 pump gas station in Orange County? APPLICANT: The proposed zoning allows for a Buc-ee's Travel Center, including 120 fueling positions. Unlike a typical gas station, Buc-ee's offers this number of fueling position recognizing that many customers leave their cars at a fueling position for thirty minutes or more while visiting the many amenities offered by the travel center. In this way, queuing is minimized. This project also allows for a broader mix of uses in a master planned project including restaurants, retail, office, medical office, a hotel and industrial/flex uses. This combination of uses is desirable in that it meets recommendations of the Future Land Use Map in the Orange County Comprehensive Plan. In addition, it provides opportunities for employment that pays a living wage in the Efland Community and creates a significant a non-residential tax base for the benefit of the broader community. At completion, the project is estimated to contribute $2,000,000.00 in sales and ad valorem taxes per year to Orange County coffers. COUNTY STAFF: C. I am concerned over proposed access driveways onto the Interstate on/off ramp south of the property (listed as a `service road' on maps provided by the applicant). There does not appear to be sufficient space allowing people to accelerate to merge onto the Interstate safely. Further, there will be a lot more congestion on the ramp making access to Mt. Willing Road haphazard. The proposed traffic pattern is too dangerous. APPLICANT: As noted in the question, NCDOT is also concerned about existing weaving operations along this service road, and for that reason 111 has required removal of 1-40 Westbound Exit 160, eliminating the closely spaced, high-speed freeway weaving maneuvers. The resulting operations along the service road and movements onto the 1-40 Entrance ramp will be improved due to slower speeds and metering of traffic by upstream signal and stop controlled intersections, thereby improving safety. COUNTY STAFF: D. What traffic improvements are proposed on Ben Johnson, Mt. Willing, and the Interstate access ramp (i.e. traffic lights, stop signs, restricted turn lanes, etc.)? APPLICANT: Please see the attached Exhibit B, which details planned roadway improvements consistent with NCDOT recommendations. COUNTY STAFF: E. Mt. Willing Road is very congested. Existing traffic existing/accessing the Interstate, even without this project, creates huge backups during morning and evening rush hour periods along the roadways. This includes backups along Forrest Avenue. This project will only exacerbate the problem. How will the applicant rectify this issue? APPLICANT: Significant roadway and traffic signal improvements are proposed at the interchange ramps and site access along Mt. Willing Road. Site traffic will have minimal impact north of the Mt. Willing site entrance and does not necessitate additional roadway improvements outside of those already proposed. Please see the attached Exhibit B referencing roadway improvements which are consistent with NCDOT recommendations. COUNTY STAFF: F. Isn't this property in a Critical Watershed? APPLICANT: No, the property is not within a critical watershed area. The development will meet stormwater and erosion control requirements outlined by the Orange County development ordinance and the state of North Carolina. Our open space is concentrated in an area where environmentally sensitive features exist. COUNTY STAFF: The subject parcels are not located within a critical watershed area as defined by the State of North Carolina. The parcels are located within the Upper Eno Protected Watershed Protection Overlay district. Consistent with applicable watershed management standards, development on these properties are required to abide by: • Established impervious surface (i.e. asphalt, concrete, gravel, structures, etc.) limit of 70%. This will require the installation of stormwater control measures throughout the project consistent with the UDO; • Erosion Control permitting standards as detailed in Section 6.15 of the UDO; 112 • Stormwater management standards, including nutrient removal, as detailed in Section 6.14 of the UDO. G. Will existing streams and water features have to be buffered? APPLICANT: There are streams and other water features on the property (shown on Sheets C3.0 and C3.1 of the Rezoning Plan) that are to be buffered consistent with County regulations. These areas are slated for preservation in designated open space areas within the project. COUNTY STAFF: All water features are required to be buffered consistent with Section 6.13 Stream Buffers of the UDO. The anticipated buffer will be 65 ft. on each side of the stream bank. H. I see the overhead power lines are being relocated. How will this impact property owners to the north and west of the project? APPLICANT: The overhead powerline relocation will remain within the limits of the proposed development and is not anticipated to impact adjacent property owners. COUNTY STAFF: I. 1 am concerned over ground water contamination fuel leaks/spills impacting water quality and contaminating our groundwater. What steps are being taken to address this potential issue and preserve/protect our well water? APPLICANT: We follow all current design criteria required at the federal, state, and local levels and are subject to plan review, construction inspections, and final cover procedures required at all levels. To date, no travel center fueling system has ever had a reportable release and we work hard to maintain that standard. As an additional precaution not required by code, the developer is committed to installing oil-water separators as a part of the stormwater systems which are to be located in close proximity to the fueling stations to intercept incidental hydrocarbons gathered by stormwater runoff so that they can be collected and disposed of appropriately. COUNTY STAFF: J. I am concerned over air quality. How are you going to address the venting of gas tanks and comply with applicable air quality standards? APPLICANT: We will comply with all federal, state and local regulatory requirements. Exposure to gasoline vapors during vehicle refueling is regulated on the macro scale by the federal government. All vehicles manufactured today come equipped with a required Onboard Refueling Vapor Recovery (ORVR) system which captures the vapors displaced during refueling and keeps them within the vehicle. COUNTY STAFF: K. Where will fuel be stored? 113 APPLICANT: Fuel will be stored in 6 underground, double-walled, concrete encased, constantly monitored tanks each with a capacity of 40,000 gallons for a total capacity of 240,000 gallons. COUNTY STAFF: L. What signage is proposed for this project? Are you really proposing a 100 ft. tall sign? This is inconsistent with the rural nature of Efland. APPLICANT: The original submittal included the Applicant's standard hi- rise sign height of 100'. The purpose of the sign height is to provide the interstate traveler, traveling at high speeds, with enough notice to see the sign, change lanes, and maneuver safely to the exit. Subsequent to the initial application, a balloon test was conducted to best determine the appropriate height of the sign. That test concluded that a height of 80' is sufficient. The application has not yet been updated but the revised submittal will reflect a height limit of 80'. COUNTY STAFF: M. Several general comment(s) were made that Efland is a rural community that this project will severely impact. APPLICANT: The subject property is located immediately adjacent to Highway 40/85, one of the most heavily traveled roadways in our state, at a highly traveled connection to Highway 70. The subject property is designated as a Commercial-Industrial Transition Activity Node on the Future Land Use Map in the Orange County Comprehensive Plan. The Comprehensive Plan defined Commercial-Industrial Transition Activity Nodes as follows: "[I]and near major transportation routes that could be provided with public water and wastewater services and is appropriated for retail and other commercial uses, manufacturing and other industrial uses; offices and limited (not to exceed 25% of any Node) higher density residential uses." Similarly, the Efland-Mebane Small Area Plan encourages "Mixed Use" in the southeast portion of the planning area. Change is planned and appropriate for this area. N. Several individuals made the comment they were supportive of development, and the need for additional non-residential development to lessen the tax burden on residential property owners. These individuals, however, do not believe a 120 pump gas station is what should occur to address this need. APPLICANT: The subject property is currently zoned Office/Research and Manufacturing (O/RM) with the Upper Eno Protected Watershed Protection Overlay District, the Major Transportation Corridor Overlay and the Efland Interstate Overlay District. A wide variety of land uses are permitted in O/RM district including, all as shown on Table 5.2 entitled the "Table of Permitted Uses" in the UDO. A sample of uses permitted in the O/RM district is listed below: 114 • Manufacturing, Assembly, Processing of Food Products Except as identified in the Table 5.2 of the UDO, entitled "Table of Permitted Uses", Section 27(A)-(G); • Manufacturing, Assembly, Processing of Non-Food Products Except as identified in the Table 5.2 of the UDO, entitled "Table of Permitted Uses", Section 28(A)-(Q); • Hospital, Veterinary Clinic, Veterinary Hospital and other Medical Uses subject to the standards identified in the Orange County UDO; • Office and Financial Services subject to use standards set out in the UDO; • Service Uses except as identified in the Table 5.2 of the UDO, entitled "Table of Permitted Uses", in Section 62 (A)-(Q); • Telecommunication Towers subject to standards in the UDO or a special use permit depending on tower height; and • Elevated Water Storage Tanks with a special use permit. O. This property is located within an area defined by the State of North Carolina as a High-Quality Water (HQW) area. Why are we allowing a project of this magnitude in an HQW area? APPLICANT: We will comply with the land area disturbance limitation required by the HQW. We are working with Orange County and the state of North Carolina to identify the best approach to abide by the requirements. COUNTY STAFF: State Surface Water Classifications are designations applied to surface water bodies (i.e. streams, rivers, lakes, etc.) in an attempt to identify and define `protected activities' (i.e. swimming, fishing, drinking water supply, etc.) for said waters. Based on a water features classification, development(s) are required to adhere to specific standards addressing these `protected activities'. It needs to be remembered these `classifications' are one of many `tools' used by the State and local government(s) to protect water features. The High-Quality Waters (HQW) classification is intended to protect waters which are rated excellent, based on biological and physical/chemical characteristics, and serve what staff will term `public purposes' which can include serving as public drinking water supply. State and County regulation(s) do not establish `prohibited' land uses for HQW designated water features. Rather, development activities are severely curtailed, specifically there can be no more than 20 acres of `uncovered' property area at any one time. The State allows for waivers with the approval of a formal erosion control plan. 115 In this instance, there are no regulation(s) prohibiting this development from locating within an HQW area. Development of the project, however, will have to comply with applicable land disturbance limits and erosion control guidelines enforced by the County. P. Mt. Willing and surrounding roadways are rural county roads. What steps are going to be taken to preserve our safety from additional traffic? APPLICANT: Traffic generated by this project is predominately Interstate oriented. As such, roadways north of the site will experience only limited increases in traffic. As noted earlier, the planned removal of the 1-40 Westbound Exit Ramp (Exit 160) will eliminate the existing substandard high-speed weaving condition along the westbound service road that is of concern to NCDOT. Consistent with TIA and NCDOT recommendations, numerous roadway and traffic signal improvements are proposed within the study area to mitigate resulting traffic demands and improve safety. Additional, supporting information about the unsafe conditions that exist at Exit 160 is available in a memo from Kimley-Horn dated October 8, 2020. COUNTY STAFF: Staff is reviewing the Transportation Impact Analysis, submitted as part of the application package, with staff from the NC Department of Transportation. Q. Why is Mt. Willing being utilized as an access point for this project? APPLICANT: The access onto Mt Willing Road provides for local traffic interconnectivity and provides for more efficient dispersal of site traffic, minimizing traffic impacts to the overall street network. COUNTY STAFF: Mt. Willing Road offers another point of access for the project and allows for greater traffic flow/access to help address concern(s) over `overloading' one or two roadways with too much traffic. The project will, essentially, have three central access points to help disperse traffic congestion. R. In staff's August 31, 2020 letter, they identified an inconsistency related to the proposed floor area ratio for the project and the estimated square footage of the development used as part of the traffic impact analysis. How can we move forward with this project as there appears to be a conflict with the information used in creation of the transportation study? APPLICANT: We are fully aware of staff's concern and are working to rectify the matter. A revised submittal will include a commitment to no more than 500,000 square feet of building square footage, which is significantly less square footage than what is allowed in the current OR/M zoning designation. This limitation is commensurate with the traffic impact analysis. S. This application should not be reviewed until there can be physical meetings allowing for more public participation and discussion. There are people in the area who either have poor internet access and cannot participate or are not computer savvy enough to ensure they are able to have their voices heard. 116 COUNTY STAFF: The on-line meeting format is being conducted consistent with adopted State rules allowing local governments to process development proposals/applications. While staff understands there are concerns over adjacent property owners being able to participate in the discussion of this project, the County is following established protocols. To that end, additional opportunities are available multiple allowing individuals to participate the pending Planning Board meeting and BOCC public hearing. This includes provision of a call-in numbers so property owners with limited/no internet access can participate in the discussion. T. How many stories are permitted within the 60' height allowance? APPLICANT: The submittal is being revised to reflect a height of 35' with an increased setback for every foot above 35' up to 60'. Certain elements may exceed this height limitation, such as electrical lines, signs, water towers, telecommunication towers, and utility structures. COUNTY STAFF: A 60 ft. building height allowance will typically result in 5 separate floors. U. Are uses going to generate significant noise? APPLICANT: We do not anticipate significant noise being generated on the subject property, especially given the ambient noise from the nearby highways. Of course, we will abide by the county noise ordinance. COUNTY STAFF: At this time there is no indication of the noise level that could be generated by individual land uses. The County does have, and enforces, noise regulations. Development of, and those uses permitted to operate within, this project will have to abide by applicable standards. V. What is the expected construction timeline? APPLICANT: After full development approvals, construction is likely to take 12- 18 months, depending on site work requirements. W. Has the Applicant performed an environmental study? APPLICANT: Yes, as part of the application process, we completed an environmental assessment application package that is being reviewed by Orange County. X. Are trees included in the landscaped buffer? APPLICANT: Yes. Orange County requires a vegetative buffer along the perimeter of the project. Sheets C-6.0 and C-6.1 of the Master Concept 117 Plan denotes our anticipated buffer program being reviewed by County staff. Y. What are the specific landscape standards being proposed for this project? APPLICANT: The landscape standards for the development are outlined within the narrative submitted as part of the application. Aside from minor allowances within Tract 1 , Tracts 2 through 6, the plans generally abide by the requirements outlined in the Orange County Unified Development Ordinance. Sheets C6.0 and C6.1 of the Rezoning Plan detail the landscape standards proposed with the development Z. Is this information available to the public? COUNTY STAFF: Yes. Information on this zoning atlas amendment is available on the County website at: https://www.orangecountync.gov/792/Planning-Inspections. AA. What is the schedule of review for this project? COUNTY STAFF: As indicated the review of this project is adhering to the following schedule: • October 7, 2020 — Anticipated Planning Board meeting; • November 5, 2020 — First available date for public hearing by the BOCC. Both meetings will be virtual meeting. Link(s) allowing interested parties to attend the meeting will be included within the various notification letters sent out by the County and will also be posted to the County website. In accordance with Session Law 2020-3 Section 4.31(a), pertaining to remote meetings during declared emergencies, written comments on items heard at a public hearing are accepted for 24 hours after the public hearing is closed. The BOCC will be unable to make a decision on public hearing items until the 24-hour period for the submittal of written comments has concluded. BB. What happens if the City of Mebane says the project cannot be served by their sewer system? APPLICANT: We are working with the City of Mebane and Orange Alamance Water System to implement system upgrades to ensure that the site can be served by water and sewer services as planned. COUNTY STAFF: 118 EXHIBIT A PowerPoint Presentation 119 Beaver Crossing Existing Zoning: O/RM Proposed Zoning: MPD-CZ III NELSON MULLINS 120 Two Parcels totaling 104. 55± acres J iller-1wl'"" r� low— NELSON MULLINS T s 121 General Area Will ME Mall Bill IMPIle 1 9 ` ;' 'ate n:lG+ y: yt:y Owe - 9-14 1 1 _ � •�� qQ� Y 122 ExistingZoning • Office/Research Manufacturing (O/RM ) with N R _ the following overlays : Upper Eno Protected �C - 2 Watershed Protection Overlay District; Major c � 3 c Transportation Corridor Overlay District; Efland Interstate Overlay District Master Plan n Development -: � - - aste a Conditional Zoning ( MPD- CZ) retaining all overlays NELSON Comprehensive Plan - Commercial-Industrial 123 Transition Activity Node Commercial-Industrial Transition Activity Node: Land near major transportation routes that could be provided with public water and wastewater services and is appropriate for retail and other commercial uses; manufacturing and other industrial uses; office and limited (not to exceed 25% of any Node) higher density residential uses." Efland-Mebane Small Area Plan 124 • The Property is located within the Southeast portion of the planning area of the Efland-Mebane Small Area Plan, a portion of the planning area that "enjoys access to major transportation facilities including Interstate 40/85 and the US 70 Connector. Because of this, development potential for the area is high ." • The southeast portion of the planning area should be considered for "Mixed Use" designation to be developed only when public water and sewer systems area available to the area. 125 Site Plan 1 J4 d MT IL41 1� 1 Ai— -AIim / f l Lu tLLJ i J LJ { • I f +M1 SITE PLAN IS CONCEPTUAL IN s <J] NATURE AND IS SUBJECT m y CWkN6E. m S Calle.fanyoudq. "'��.� NELSON 126 Site Plan �1tYf•rs'rr[�� '�1i�rAitc�:N•rAow _ . .. r I 7 I i------------ % \ I i rr II I 1 L--_=J ---L-J r / IL: 1 1 Irk — —� -----D-�---,— I----------- ' it / f `�� LAND USE BY DEVELOPMENT AREA DEVELOPMENTA EA TOTAL AREA IAC.! USES LEGEND { _ RETAIL= .10SF ASSTATI�'M1 1 25.04 GONWIh PCSITI U-1—ELINGONS -� DEF POSITIGNS=4 EATING AND DRINKING ESTABLISHMENT=12"SF 2 1080 RETAIL=10,O SF OFFICE ANDFINANCIALSEW—S=3,5003F EATING AND DRINKING ESTABLISHMENT=20,000SF 3 1100 GEN ERAL.1 L-21,000SF MOB_" OB=6,000 SF 4 545 SHORTTERMRENTA--NON-HOSTOGCUPIED=120 KEYS — CAR WASH WITH—TUNNEL 5 21.15 GFFICEI SERVICEI MANl1FACTlIRING=150,0005E 6 1.62 FUTURETRANSITAHENITY BYCThERS — 11T1LITYTGWER 0 PARCEL INTERNAL ROADWAYS 5.% PRESERVEDGREEN SPACEAREA TQTAL 104.55 7 NELSON MULLINS 1Z7 Mixed Use Project - Retail, Services, hotel, dining, office flex space/light industrial • Phase I - Buc-eels Travel Center: Fueling Stations Car Wash Retail Store - ■ Plentiful and Famously Clean Bathrooms ■ Family-friendly -- ■ No tractor-trailers allowed r ■ Homemade BBQ and sandwiches -� : 1;8 Mixed Use Project - Retail, Services, hotel, dining, office flex space/light industrial Phase II : • Retail shops; • Restaurants; • Hotel with no more than 120 rooms; • Offices and Financial Services; • Medical Uses; • Select Manufacturing Uses; and • Utilities and Telecommunications Uses. 129 Landscape Buffers and Open Space k HA RNL ~~ R1 RE$IGEM1ITIAL U$E i���— AQRICLILTURAL '. RESIDENTIhLU3E y'� � � iSli{ ,1 aEm4TAE.RLs�E.MAe.6i4E€hf/�Tx o. �1 . C&IffHi ELEMEHT rVao-=m R fRGA9 pw20 9VR !— illEVELOPMENT M I II �pyTgMFJG YIIfIVCOF,1019 ti,. ui/,.q[asxi R"{�iln' R R7 RESIUENTIRL USE it - xunmrEreelle.fr P�� J • `� � 6�EYELOPYIFYIT,yIEil{ r PAESERVWGPEEW lr urLliTc�snf r—`�•,� PRE$ERYE�piEEN I _ SPAIXAREA 9PAEE AREA l.{F 1 1 ��� _ 2trTRf kfY/fFi S G7 L' e ffil1TEA&IfKA I1 FI[]FMEM1fT qt try 6EVELOPYAENT �� � AHF— `4 °Y- CULTURRLI lay P6.aloEYrtluu9E � ��� LL ,1 - LL rarvxwrAnoNoafnaooR 1-V54-09NTERSTATE Q"I°1°'aOP1f°'° Tflv�@��PO�R�iarq�N ENMR ��� d COF dL�iR � \ J J In L.iNPY-A.E BUFFER RE—R—A GALGIIL441g19 AGRICULTURAL! ` RESIDENTL4L USE \ IL LEflENO U W LLJ 146VARLALLF WIDTIAMFFERCALCULATICN } Vw.rx�m.Aart,F..u..E ,.u:,.aA.,x.u:,-�...�.. Kr, wrn,�6elow. $ Calllwwn you nrp. °DG.0 130 Landscape Buffers and Open Space _ _ k ti� G j ��� 1',�40'TYPE{8LlFFER-tl4E RHEA D UTILITYBpIIOH�,,... }� �oou� �a L v a v eZa L � L � G 1 1 1 �o �pd d'� r • � �3�� S� - I#1MOINE6mIulE ��� Yx.,»•onr.,.r.,uinn � �� ! r—]4V TYP E B BUFFER-DMI DLJO L6 OPTION ILL O tl v v �g d 1 LL W o ln'TYPE F. A;uFFER-MlxEotl PTION.aa.an n•rmxcu�cunnw �•nox C,]W.0 s.csuc ) 7ypE F BU FFEk-tlELI[Iu8u50PTION c.�loo�c Co Z C 4 9 9 +l P Z ❑ II O M J rW' a b ,;KF. �✓4, 'y+[ti.+0y. M �+k. 'a P 011 W i � n m j PTJ 40'TYPE{BUFFER-MixEDOPIION 1O" 2W-TYPEF BUFFER-6E{Ih000S OPTIONPCA S J ��/ s<<sxv.aa.onaumGu cunam I—:,"-- ��aamnw.xnG u uuom n r.nox �C6.1 131 Economic Development Benefits • Quality Jobs Buc-ee's pays a living wage plus benefits o Low barrier to entry c) Office, medical, manufacturing, hospitality jobs also available • Ad valorem and Sales Taxes f 13uc-CE'S (N o Phase I - in excess of $ 1,000,000 APPLY o At full build out, in excess of $2,000,000 NOW! www.buc-ees.com • START: $14-$17/hr. • 40 hr. Work Weeks • 3 Weeks Vacation • Healthcare • 401K in? NELSON 132 Thank you . Any questions ? Beth Trahos beth.trahos@nelsonmullins.com GLENLAKE ONE SUITE 200 4140 PARKLAKE AVENUE RALEIGH, NC 27612 T 919.329.3884 F 919.329.3799 133 EXHIBIT B Roadway Improvements Map 134 b STOP �% 144 -- -------------------- --------- - -----A�r s "1! ,,. \} V1, v`\ j1t obi �o 4.1 W. —F7 o� STOP •,' t.� �/r�- 'i•� r 7 ---- e ----— � STOP - I✓r�/'(• \ l40 EASr ' �— Ht MOVL LXISIING PAVLMLNT FOR WE EXIT 100 . • � :. �� �� �..:- ode� / �. `\ LEGEND r lb ; l EXISTING LANEAGE BUC-EE'S SITE BU ROADWAY v h PROPOSED LANEAGE OFFSITE�, 1/ l�I/OADVV Al PROPOSED EDGE OF TRAVEL llU l IOV EIVIEIVTS PROPOSED CURB!WD GUTTER PROPOSED PAVED SHOULDER EFLAND,NORTH CAROLINA '�-� A- OCTOBER 08,2020 ——EXISTING PROPERTY LINE N 0 ROADWAY IMPROVEMENT • a OPROPOSED CONCRETE MONOLITHIC ISLAND PROPOSED LANDSCAPE S O MEDIAN GRAPHIC SCALE ASPHALT PAVEMENT REMOVAL „m„ rlx rcc!i : TRAFFIC SIGNAL k6Fi »>Horn 135 DRAFT 1 MEETING MINUTES 2 ORANGE COUNTY PLANNING BOARD 3 NOVEMBER 4,2020 4 REGULAR MEETING 5 (Due to current public health concerns,this meeting was held virtually. 6 Members of the Planning Board, staff and public participated remotely) 7 8 MEMBERS PRESENT: David Blankfard (Chair), Hillsborough Township Representative; Adam Beeman (Vice-Chair), Cedar 9 Grove Township Representative; Kim Piracci, Eno Township Representative; Susan Hunter, Chapel Hill Township 10 Representative; Patricia Roberts, Cheeks Township Representative; Randy Marshall, At-Large Representative; Hunter 11 Spitzer, At-Large Representative; Alexandra Allman, At-Large Representative; Melissa Poole, Little River Township 12 Representative; Carrie Fletcher, Bingham Township Representative; Gio Mollinedo,At-Large Representative; 13 14 MEMBERS ABSENT: Vacant,At-Large Representative;Vacant,At-Large Representative; 15 16 STAFF PRESENT: Craig Benedict, Planning Director; Perdita Holtz, Planning Systems Coordinator; Michael Harvey, Current 17 Planning Supervisor;Tom Altieri, Comprehensive Planning Supervisor; Brian Carson, GIS Tech III, Christopher Sandt, Staff 18 Engineer; Molly Boyle: Planner; Tina Love,Administrative Support; Steve Brantley, Economic Development Director, 19 Amanda Garner,Assistant Economic Development Director; 20 21 APPLICANT AND ASSOCIATES PRESENT: Stan Beard, Buc-ee's Ltd., Director of Real Estate; Beth Trahos, Nelson Mullins, 22 Partner; Earl Lewellyn, Kimley-Horn, Engineer; Kelsey Westwood, Kimley-Horn, Engineer; 23 24 PROPERTY OWNER/PROPERTY OWNER REPRESENTATIVES: Ben Lloyd, Robbin Taylor-Hall 25 26 OTHERS PRESENT:John Bannon, Jeff Bruett, Erica Cartmill, Matt Cartmill, Jared Cates, Evelyn Cecil, Cathy Chapman,Jane 27 Cheshire-Allen, Bobby Cobb, Mary Cooter,Valerie Curry,Will Drummond, Laura Easterling, Rosemary Edwards, Donald 28 Efland, Knox Efland, Donald Efland, Marsha Efland, Paul Efland, Carroll Enterkin, Sherry Eshelman, Kathy Evans, 29 Alexandra Farrell, Caroline Foster,Jacob Foster, Chrisean Fuller, Matt Gandy, Sam Gharbo, Robert Golan,Alexandra 30 Griffin, Brian Harry, Jimmy Holcomb,Joseph Howard, Julie Laws, Jamie Lawson, Chad Lloyd,Jon Lorusso, Kristen 31 Marbais, Catherine Matthews, Diana Montgomery, Patricia O'Connor, Helen Pak-Harvey, Larmar Proctor, Steve Ramarge, 32 Noah Ranells, Michelle Rash, Linda Richardson,Andrea Riley, Loren Roberts, Eric Russell,Anne Shortlife, Chris Smith, 33 Heather Smith, Shontea Smith,Tim Spruill, Jeanne Tate,Aimee Tattersall, Del Ward, Richard Ward, Frances Wheeler, Rex 34 Williams, Laurie Wolfe, Elaine Wright, Janine Zanin; Kaye Brown 35 36 Perdita Holtz reviewed the technical processes and rules for the virtual meeting 37 38 AGENDA ITEM 1: CALL TO ORDER AND ROLL CALL 39 Chair David Blankfard called the meeting to order. 40 41 AGENDA ITEM 2: INFORMATION ITEMS 42 a. Planning Calendar for November and December 43 44 AGENDA ITEM 3: APPROVAL OF MINUTES 45 October 7, 2020 46 47 Adam Beeman: I have a correction on line 115, it should say that aren't. 48 49 MOTION by Adam Beeman to approved the October 7, 2020 Planning Board Meeting Minutes with correction. Seconded 50 by Carrie Fletcher. 51 52 ROLLCALL VOTE: 53 Susan Hunter: Yes 54 Adam Beeman: Yes 55 Patricia Roberts: Yes 56 Melissa Poole: Yes 136 DRAFT 57 Alexandra Allman Yes 58 Carrie Fletcher Yes 59 Kim Piracci: Yes 60 Gio Mollinedo Yes 61 David Blankfard: Yes 62 MOTION PASSED UNANIMOUSLY 63 64 AGENDA ITEM 4: CONSIDERATION OF ADDITIONS TO AGENDA. 65 66 AGENDA ITEM 5: PUBLIC CHARGE 67 68 INTRODUCTION TO THE PUBLIC CHARGE 69 The Board of County Commissioners, under the authority of North Carolina General Statute, appoints the 70 Orange County Planning Board (OCPB) to uphold the written land development law of the County. The 71 general purpose of OCPB is to guide and accomplish coordinated and harmonious development. OCPB 72 shall do so in a manner, which considers the present and future needs of its citizens and businesses 73 through efficient and responsive process that contributes to and promotes the health, safety, and welfare 74 of the overall County. The OCPB will make every effort to uphold a vision of responsive governance and 75 quality public services during our deliberations, decisions, and recommendations. 76 77 PUBLIC CHARGE 78 The Planning Board pledges to the citizens of Orange County its respect. The Board asks its citizens to 79 conduct themselves in a respectful, courteous manner, both with the Board and with fellow citizens. At 80 any time, should any member of the Board or any citizen fail to observe this public charge, the Chair will 81 ask the offending member to leave the meeting until that individual regains personal control. Should 82 decorum fail to be restored, the Chair will recess the meeting until such time that a genuine commitment 83 to this public charge is observed. 84 85 Randy Marshall Arrived 86 87 AGENDA ITEM 6: CHAIR COMMENTS 88 89 David Blankfard: There are 18 speakers with 3 minutes each to speak so what does the Board think about how late to run 90 this meeting? 91 92 Planning Board Member consensus was to try to end the meeting by 10:00 p.m. and possibly reconvene at a later date. 93 94 AGENDA ITEM 7: ZONING ATLAS AMENDMENT(MASTER PLAN DEVELOPMENT APPLICATION—EFLAND STATION) —To review 95 and make a recommendation to the BOCC on a developer-initiated application for and MPD-CZ(Master 96 Plan Development Conditional Zoning). The proposed project encompasses approximately 104 acres 97 located north of Interstate 85/40,west of Mt.Willing Road,within Cheeks Township. The two parcels 98 comprising the proposed project are currently zoned Office/Research and Manufacturing (0/RM)with 99 three different overlay districts(overlay districts are to remain unchanged). This item is scheduled for 100 BOCC public hearing on December 15, 2020. 101 Presenter: Michael Harvey, Current Planning Supervisor 102 103 Michael Harvey presented a PowerPoint Presentation 104 The Applicant's Representatives Stan Beard and Beth Trahos Presented a Project PowerPoint Presentation 105 106 Gio Mollinedo left the meeting at approximately 7:45 p.m. 107 108 The Applicant's Representatives Earl Lewellyn Presented a PowerPoint Transportation Presentation for the Project. 109 110 David Blankfard: I had a question for Earl, you said you based the traffic impact on a 10% increase from actual data from 111 Buc-ee's, if you took the actual data from Buc-ee's would that change your recommendations for the exit 160 for removing 112 it? 137 DRAFT 113 114 Earl Lewellyn: If we dropped back the traffic generation intensity by that 10%would we still be recommending removal of 115 160, yes we would indeed. It was an issue brought up even before we instituted that addition. 116 117 David Blankfard: Would that exit have to be removed on day one? 118 119 Earl Lewellyn: My personal recommendation is yes,you would absolutely want to have it operational at day one and 1 120 believe that is the opinion of NCDOT too. 121 122 Melissa Poole: There is a hotel in phase 2 do you already have that or it's just a proposal and you don't know what it will 123 be? 124 125 Beth Trahos: There is not a specific hotel user today. 126 127 Stan Beard: If I can address some of the phase 2 questions,we only call it phase 2 because it will be subsequent to Buc- 128 ee's operating and breaking in as we get the kinks out of our operating,traffic. We watch that very intently for the first half a 129 year and then once we get comfortable with where we are and everyone else around us,we will start fielding inquiries from 130 other users, hotels, retail shops, sit-down restaurants who like think we are a good fit for them. A hotel, and please keep in 131 mind that we will continue to own this entire development for the foreseeable future. We're going to be very stringent who 132 the hotel is, it's going to be in the higher up major chain type of offerings. The same thing with sit down restaurants. 133 134 Melissa Poole: My question is around a lot of public comments that I've seen have been around potential crime and I know 135 that is a concern. It always is any time you've got any industrialized space, particularly when you are going to have a hotel. 136 So, can you commit to an internal entry to rooms hotel versus an external. 137 138 Stan Beard: This will be a hallway hotel,there will not be a motel situation at all. 139 140 Melissa Poole: On pages 114-115 from the memo from Department of Environment,Ag and Parks and Rec(DEAPR) 141 regarding the Seven Mile Creek watershed, and it references; the staff recognizes the site plan submitted shows the 142 developers effort to preserve the watershed (I'm summarizing that)as the easement grantee,the County would be 143 responsible for monitoring the site. It looks like a recommendation, I'm just curious as to with this recommendation,what's 144 going on with that? 145 146 Michael Harvey: You're talking about Christian Hirni's memo(shared screen). Obviously, as Ms.Trahos has indicated, 147 there are several open spaces areas (Mr. Harvey identified the areas on the map denoting open space) and the darker 148 areas are stream buffers around identified wetland areas and streams. In discussions with DEAPR staff there was a 149 question on whether or not there would have to be conservation easements put around these areas to preserve and protect 150 the water features.The applicant has already indicated that they are going to comply with Section 6-13, the stream buffer 151 standards, of the Unified Development Ordinance (UDO). As a result, the natural area in and around these streams would 152 have to be protected with either a 65 or 85 foot buffer. In certain instances,there will actually be more land are preserved, 153 though designed open space, in a natural state increasing established County buffers. I believe what Mr. Hirni was 154 referring to is that we(the County)would have to monitor development activities to ensure that the buffer is protected 155 consistent with existing land use regulations. One of the concerns Mr. Hirni has also talked about is the potential for 156 environmental degradation of the Seven Mile Creek preserve which is the area south of the Project(shown on GIS). This is 157 the area(Mr. Harvey identified an area of property at the southeastern portion of the project)that does flow, at least is 158 anticipated to flow, across the interstate approximately 1,000 feet south to property owned by Orange County and others 159 within the Seven Mile Creek Preserve area. What the County is also obligated to do is hold this applicant to existing 160 stormwater control measures as detailed within the UDO, including nutrient(nitrogen and prosperous) removal as part of 161 our stormwater rules. When you look at the totality of the development and you look at DEAPR's memo and staff 162 conditions,we believe that we have addressed DEAPR's concern and that a conservation easement is not going to be 163 necessarily warranted due to existing compliance with County regulatory standards. There are going to be multiple moving 164 parts to that issue but it needs to be remembered what regulations we have in place and how they will be enforced on this 165 project if approved. 166 167 Craig Benedict: To restate the summary, if approved,the master plan development rezoning is a document that gets 168 recorded and stays with the land. These uses and various regulations they have to adhere to are ongoing commitments by 138 DRAFT 169 the property owner and monitored by the County because it is a rezoning and we have to ensure that what was in that 170 master plan document continues in the future. 171 172 Adam Beeman: The traffic analysis, has that taken into account all the residents that get off that exit every day to go home. 173 I'm one of those residents and I'm not feeling the shutdown of exit 160. You offer me no alternatives to get home other 174 than running through traffic lights that I don't have to do now. Why can't those driveways come out to the intersection 175 where you want to put lights? If you were to put a light at the intersection,why can't your driveways come out there and not 176 be on that ramp? I understand NCDOT's long-term plan but there's no way to address any of the residents that live north of 177 Hwy. 70, I'm of those thousands of residents that get off that exit every day and I know you've estimated 185 seconds but 1 178 don't believe that, if I get caught at that light, I'm going to go up and over and get caught at another light so that adding at 179 least 3 or 4 minutes to my commute just to get off the ramp. I don't know why we have to have the right in/right out and lose 180 the 160 exit. Right now, a lot of us depend on getting off that exit and getting home, it's the only way for us to get home. 181 182 Earl Lewellyn: The first and biggest concern is that with the additional increase in traffic,whether it from this project or 183 another,that the weaving area between the ramps combined with the speed of exiting traffic onto the service road whether 184 there's another ramp there or not, is in fact a problem from a capacity standpoint and a safety standpoint. It may not be 185 dramatic today but with increases in traffic,whether the accesses occur onto the service road or not,that traffic if it is going 186 westbound still has to use that facility to get east and west. That is the biggest criteria. We have struggled with trying to 187 find options as well that would satisfy DOT's criteria, maintaining access for the public through the existing path. The 188 reason we did the comparison is because we always hear people say they had to wait at a traffic signal. In these 189 operations, traffic signals probably along Mt. Willing Road, cycle lengths are going to be somewhere in the nature of 60 to 190 70 seconds. Cycle lengths along the US 70 connector and the interchange ramps along the US 70 connector are probably 191 going to be in the order of 90 seconds just given the volumes and the number of phases that have to be there. That is what 192 is driving the travel time that we mentioned. It's basically the delay at the signals and it depends on when you hit the signal 193 and that's why there is variation in those times from the simulations and simply just traveling along the street. We feel that 194 is very accurate and calibrated with current conditions. 195 196 Adam Beeman: You are inserting two light into the equation that right now we don't have to contend with at all the biggest 197 contention is coming off the ramp and hitting the stop sign on Mt.Willing and hanging a right and going out into the country. 198 We will have to come of 161, hit a light, come back up over that ramp, hit another light and then continue on our route. If 199 there was the 70/85 connector that didn't force us into Hillsborough and you could make a left onto 70 then I would say 200 have at it and do what you have to do but that interjection of those two lights is going to make a huge difference on a lot of 201 people's lives in northern Orange County. There is no other way for us to get there. If we take the 85 connector it forces us 202 down 70 and you have to ride up 86 or you have to come back up. There is no good way. I think a lot of people aren't 203 going to be happy. I don't know the answer to it but I'm not happy about the lights. I understand the timing and the queues 204 and add Buc-ee's traffic now the commuters have to contend with all the traffic in and out of your store. It's going to be a 205 real turn off for the residents north of the County. I, for one, I want the development but I'm not a fan of how you are going 206 to get this traffic flow. It is going to have a huge impact on a lot of people out in Northern Orange County. A lot of people 207 come from Virginia down Efland-Cedar Grove. I don't know why there are so many driveways. If you could stay away from 208 Mt. Willing at all costs,then it might negate some of the impact but there are a lot of people who travel out to the country to 209 go home and come to the highway to go to work every day. 210 211 Earl Lewellyn: I respect what you are saying. I actually live not too far away and travel through this area myself. Most 212 often on the weekends, occasionally during the week. I certainly don't want this to be a problem area either. That is why we 213 did the comparison to quantify how much additional time will be spent just traveling whether it's that signal or traveling 214 through there. The other thing to keep in mind is these right in and out assess points,traffic on the service road will 215 continue moving through and there will be two lanes all the way through so we have to keep that in mind. The real reason 216 we're doing this is primarily safety and capacity that is related to the existing exit 160 configuration. 217 218 Stan Beard: There is no getting around the aggravation that all the Efland folks feel about this situation. If I were part of 219 that, I would have that same aggravation.What we have strived to do all along,from the first day we met with the local DOT 220 engineer and moving through the various planning stages with those guys to figure out a way to make this work for 221 everybody. They were adamant that our development or any development at this tract, this 100 acres on 40/85, if any 222 development came along, it would trigger some fairly massive traffic changes. As we all know, no one likes to say it and no 223 one wants to hear it,with growth comes some shifts in traffic patterns and habits. Where we are here is that most 224 intersections east of here and plenty of intersections west of here are all lit. When you get down to the bottom of the ramp, 139 DRAFT 225 you are looking at a signal. What you guys have managed to do is to stay out of that issue for a while and what we are 226 seeing now is what we believe to be a great site for Buc-ee's. We really like being here;this is a cool site for us. Given the 227 fact that we are who we are,we have the ability to work with the County and work with you guys figuring out all sorts of 228 ways to as least impactful as we can. The traffic issues are unavoidable if we or anyone else is to go there, NCDOT is 229 going to stick to their guns and say we don't like the braided ramp, never have, we're getting rid of them and whoever 230 comes in is going to get rid of them. What we've done is our traffic studies are based on our traffic. The last thing, the very 231 last thing that Buc-ee's needs is a traffic problem and that means the traffic problem throughout that whole intersection. 232 What we hope we have done and we have experience in doing this and we have feedback from NCDOT and our engineers 233 all along the way,that we are creating a more efficient, safe intersection. It's going to cost you a couple of minutes or more 234 and I apologize for that being a guy who has great respect for my own exit ramp when I come home. We are hoping you 235 guys in Efland, that this can become a real development for Efland that isn't 2 million square feet of distribution center. 236 That is only'/z million square feet of cool stuff. Buc-ee's and a nice hotel, nice sit down restaurants where it becomes part 237 of Efland and part of your commute.We have looked at every other way.To get DOT's permission to construct a project on 238 that 100 acres is going to take answering their concerns and their big concern is that eventually that is a failing system and 239 it will fail and they'll have accidents and they'll have to spend 12 million to fix it where we're here and we will spend the 240 dollars to make this work for us and for the neighborhood. 241 242 Michael Harvey: I want to remind the Board in order for any reconfiguration of these exits to occur,there has to be NCDOT 243 and Federal Highway Administration action through various processes independent of this Zoning Atlas Amendment. If 244 elimination of(westbound) Exit 160 is approved,the project moves forward consistent with this master plan. If it's not 245 approved, then the applicant will have to work with NCDOT and the County Planning staff to develop and incorporate 246 another solution. Keep in mind there is an external process that will have to occur in order for this to become reality. Staff 247 has made recommendations on conditions associated with traffic management and impacts. 248 249 Carrie Fletcher: For Mr. Beard,first of all why do you think having a giant travel oriented business right there in Efland,we 250 have several large refueling stations, not in the very far distance from where you want to build, an exit or two over. Do we 251 really have a need for such a large refueling station? What justifies the use of this land for such a large project? Two, how 252 do we keep Orange County's vision of a rural community and I bought into Orange County ten years ago because it was a 253 rural community. Many people still have that vision. I understand the need for development, I understand the zoning, 1 254 understand the whole reason behind why we are reaching out for people to come and do projects like this but what will 255 keep people thinking Orange County is a rural community. Have we changes our mind on how we want to envision 256 ourselves. The third is the property you're going to build this on,who owns this right and how do you get access to it? I'm 257 unclear on that. Maybe I am blurry on that but I would like clarification on that. 258 259 Stan Beard: The first answer is our business is to be the best pit stop off of any road trip you've been on. The clean 260 restroom and plentiful foods available all of that,the friendly atmosphere is a Buc-ee's experience. We've been doing this a 261 long time,we have a bunch of stores in Texas and we are in Alabama and about to open in Georgia. Building in Florida 262 and South Carolina so what we want to do and the reason we are here at this site is that we want to be in the middle of 263 somebody's trip road trip either going East, West, North, South that needs to stop for a clean restroom, reasonable gas and 264 cool stuff to buy. That brings us to a freeway system that has two merged interstates for a stretch that carries a 125,000 265 cars per day on that stretch. It travels East/West through Orange County and it is in the middle of a well-traveled length of 266 folks going from Virginia all the way over towards this way. Where we are now, is it's on a 100 acre tract next to the 267 freeway bounded by the railway and the 70185 connector and so I respect the fact that Orange County is a rural place and 1 268 agree I think it is and I think the Efland area in particular is beautiful and very rural feeling. I do not think that this tract is a 269 rural tract. I think it is an undeveloped 100 acres that could very easily be a truck stop which we are not. We are would 270 rather not be compared to the truck stops. We have the ability here to fit into a spot where a distribution center might go or 271 a warehousing farm. We're in a position where we can give back a lot of good things, benefits, less intensive development, 272 more green space. You've heard it all but it's true,we are not covering up 2 million square feet of this 100 acres with 273 buildings. We are one quarter of that. That is why we are there,we are there because it is a good opportunity for us and it 274 fits within our strategy of reaching a wide range of folks.There are going to be local folks who shop there but 70%of them 275 are traveling from all over the place and they are going to get to stop in Efland, Orange County for 45 minutes and you 276 never know they might stay. I hope I answered the rural part. I will say that we, I don't get too detailed, but I'm fairly certain 277 that we follow along with all of the comprehensive use plans,the nodes. 278 140 DRAFT 279 Beth Trahos: I was going to add briefly that is another attractive element of this site. It is one of your Commercial Industrial 280 Activity nodes so this is among the uses that are recommended by your Future Land Use map for this property. I think that 281 is another reason that it's attractive for this use. 282 283 Stan Beard: As to who owns it, some of the Efland family owns it and then the smaller parcel is owned by Ben Lloyd. Local 284 folks who have been around awhile and I think you will hear from Ben later that he wasn't even going to talk to us until he 285 came and saw it. He saw an operating Buc-ee's and it changed his mind. I hope I answered your questions. 286 287 Carrie Fletcher: I think you did a fine job and I appreciate the time to do all that. Those are my main concerns. I think the 288 project actually looks quite well thought out. I always have concerns about major building in Orange County because 1 289 enjoy the rural life style and I'm sure a lot of people that are going to have comments tonight are also going to be 290 concerned about that aspect of your building. We protect our Orange County quite adamantly and vigorously it's very 291 personal for many of us so I hope you appreciate my questions and thank you for your time. 292 293 Stan Beard: We think our positioning in that area is very appropriate for what we are and we do think that if you go to 294 Highway 70 just a mile north and drive that whole stretch,you would never know we were there. 295 296 Carrie Fletcher: I'm not sure about that giant sign though. 297 298 Adam Beeman: I know you can't tell us about current tenants for the Efland Station but maybe you could fill us in on the 299 type of tenants you have at other ones as far as major restaurants. What type of restaurants or brands tend to follow Buc- 300 ee's. 301 302 Stan Beard: Again,we are very particular about who our neighbors are and so who we allow to be our neighbors and who 303 usually want to be our neighbors are fairly well established regional or national sit down type restaurants, Chili's, Olive 304 Garden, Lone Star Steakhouse, it will not be fast food or drive thru. We restrict drive thru. We have pick up windows like 305 Panera or a Qdoba or those types that are in smaller shopping center regional, neighborhood type stuff,you'll see in our 306 other developments. We are extremely protective of our brand and our operating. We are all about creating the safest 307 place on the freeway for you, your family,your wife,your daughters to stop in the middle of the night, alone and go to the 308 restroom and hear a cheery voice and get a nice sandwich. 309 310 Chair Blankfard asked if Planning Board members had additional questions at this time. Hearing none, he suggested 311 opening up the meeting to public comments. Members of the public were required to sign up with staff in advance and 312 were called upon in the order they contacted staff. Perdita Holtz and Brian Carson facilitated the technical aspects of the 313 public comment time. 314 315 Kaye Brown: I'm Kaye Brown and just 49 days ago I heard the Buc-ee's Travel Center was coming to the site 4,000 feet 316 from a small horse farm I've owned since 1988 and less than one week ago today, I learned that Buc-ee's plans for the 317 efficient grab and go needs of the tens of thousands of daily customers will mean that I can no longer travel Ben Johnson 318 Road to either the interstates or US 70 and I have for three decades just to get to my farm. Why this rush to push this 319 negative project through in 49 days? A time when we've had COVID panic and election panic and now we have a Buc-ee's 320 in Efland panic. Why hasn't a project of this size and impact been through the typical developer/community dialogues with 321 advisory panels and focus groups? Well as a licensed general contractor,with a degree in real estate design and 322 development, I think I know why. Efland Station doesn't need focus groups because it doesn't have anything at all to do 323 with Efland. Efland is merely being asked to house the Buc-ee's. How do I know this? Because you just heard Stan Beard 324 speaking for Buc-ee's and he has been asked numerous time why did you choose Efland for this project and he 325 consistently replies, 125,000 cars pass this site every day that's why,this site was made for Buc-ee's. Well, I frankly 326 applaud his straight up honest answer. The company's business model, quite simply to the largest number of these 327 travelers to the stores quickly and efficiently for a pleasant but brief visit. So why are Buc-ee's so big? Well their founder 328 Beaver Aplin said in the Texas monthly interview last year,we like to be spacious,we like to give everybody their own 329 space,their own shopping experience. It's one of the reasons it gets so big because if you try to enhance the place 330 everywhere it grows and grows and the next thing you know,well it might all seem a touch overkill, he said. Yes, it does, 331 overkill, here we are one week after the final road plans were posted in a week filled with many panics and I ask has 332 anybody has time to look at these plans, much less collect their thoughts in time to express them to you. Buc-ee's has built 333 this exact rural prototype elsewhere which is very lucky because it give you a chance to learn from the experiences of many 334 others. It's quite easy to compare the pre-imposed occupancy, travel estimates for a project of this size. Planning 141 DRAFT 335 departments have these projects on file. DOTs know current traffic counts, do the two match? Or, are we, in Orange 336 County going to be like Robertsdale,Alabama or Benton or Madisonville,Texas all places that suffered hugely from the 337 costly underestimates of Buc-ee's traffic and as everybody admits Buc-ee's is a heavy traffic generator. They choose their 338 own estimates so I ask you, please get those numbers so you can make the right choice. 339 340 Matt Cartmill: This is a big proposal and will have a big impact on Orange County. (bad connection—audio garbled)we 341 have no say in how this property gets developed. New zoning will give Buc-ee's and the Planning Department mutually 342 agreeable negotiating conditions which neither you nor the community will ever get to review again. Otherwise, Mr. Beard 343 the director of real estate said in a meeting on Thursday, quote: zoning gives the community a say in future development 344 that isn't true as Mr. Beard ought to know. He said,this rezoning is more restrictive than what's there at the moment. But 345 MPD-CZ zoning is carte blanc zoning. Promises about future development which would (bad connection—audio garbled) 346 Whatever Buc-ee's thinks is good for its bottom-line when the time comes. Mr. Beard admitted on Thursday that it was at 347 least 6 to 8 years and whatever then if anything will have to serve Buc-ee's needs. Local needs aren't their concern. 348 They're focused on the thousands of cars moving through their huge parking lot. The surrounding community is a nuisance 349 that Buc-ee's has to barricade the site with a fence on the north boundary. Their proposed roadway change isn't designed 350 for(bad connection—audio garbled)traffic in and out of their acres of grab and go merchandising with little real concern for 351 their effect on Mr. Beeman and other local folks. Buc-ee's spokesman tell all their plans have local needs in mind and that 352 Buc-ee's will anchor wonderful future development, hotels and elegant shops, restaurants that will somehow want to come 353 and locate next to a gas station. This is imaginary (bad connection—audio garbled)a real trap. Tell us that zoning places 354 severe restriction on future development. It'won't. They asked their 120 nozzles each with it's own pump somehow add 355 up to only 60 pumps. They hope that all this misdirect will pay off for them in the short run and they hope to keep that as 356 short as possible by pushing this proposal through on the fastest track they can. Efland and Orange County don't need the 357 world's largest gas station. We need sensible development on a local scale meets local needs and what we need first off is 358 more time for deliberation. I ask to table this proposal. Give more time that way all the results for good and for ill Buc-ee's 359 would bring this town and this county. 360 361 Tim Spruill: My wife and I moved from Chapel Hill 21 years ago to Efland in order to get away from an urban environment. 362 Exit 160 was then and is now the perfect place of Efland. A small peaceful rural town that still has trees, cows and nature. 363 This was exactly what we wanted until now not much has changed. Buc-ee's will change all of that. Most of the current 364 land that Buc-ee's will be located on will be covered in concrete and buildings, about approximately 60 acres. The entire 365 pasture and old field eco system will be destroyed and with it all of the animals and plants that make Efland rural and 366 pleasant and a draw for probably most of the people who live there. The remaining opposed 40 acres of open space will be 367 a lawn, a monoculture with minimal eco system function, very unlike the native soil and trees and vegetation that currently 368 limit carbon releases to the atmosphere at a time when global warming is a primary concern for humanity decreasing 369 carbon sync is not in line with sustainability principles. Buc-ee's will be providing what is already available, lots of gas 370 stations to fuel more carbon emissions and lots of concrete. In addition, it will draw thousands of cars and the associated 371 pollution and present potential contamination of soil, air and water. I strongly oppose this proposed development as it is not 372 in line with the existing zoning designation which should not be changed and in addition it is hardly consistent with 373 maintaining the existing rural character of Efland. The County needs to be serious about supporting sustainable 374 community, maintaining the existing 0/RM designation will be the evidence of that. 375 376 Jared Cates: Hello, I live 1000 feet from the proposed site and I am not anti-development but I feel that Buc-ee's will 377 negatively impact our community's quality of life and has the potential to stifle future economic growth in the area due to 378 overwhelming traffic. When we moved to Efland,we researched the development plans for the area and heard rumors of a 379 Target being developed in a portion of this same proposed site. We knew that development was coming and still made a 380 decision to purchase our home because of existing area plans and the 0/RM zoning of the nearby site was seemingly 381 designated with significant community input. Also, I can buy more things at a Target than Chinese-made beaver trinkets. 382 However,we would not have moved to Efland had we known that one of the largest gas stations in the country, a 24/7 383 monstrosity that provides no goods or services that our community actually needs, will be moving in within 1000 feet of our 384 home. What is the point of community planning if residents cannot actually plan their lives and investments appropriately 385 around what the community has planned for? Orange County has proven it can be innovative with economic development 386 and land use planning at critical urban/rural nodes and that it listens to its citizens when making long-term plans, however, 387 this proposal is the opposite of innovative. It does not fit with what this area has planned for in short-and long-term growth 388 particularly when it comes to traffic impacts on surrounding roads. Buc-ee's claims that one of the largest gas stations in 389 the world makes sense to be situated in Efland, a critical transportation node for western and northern Orange County. 390 Even with the proposed road infrastructure improvements that node cannot handle a 25,000 plus daily trips this 142 DRAFT 391 development would bring to the immediate area. The at grade rail crossing at Mt.Willing Road is already a debacle for 392 future growth in the area and is quite concerning as not included in the developer's TIA or road improvement plans. It's also 393 quite concerning to me that NCDOT has seemingly changed their stance on exit 160 after telling me in September that they 394 were not concerned that background traffic growth trends or quote/unquote any development would necessitate the closure 395 of Exit 160 Westbound, quite interesting. We already have several locally owned gas stations in Efland,we do not need 396 more. While Buc-ee's may help Orange County's coffers in the short term, it would create long-term infrastructure 397 challenges that will not be paid for by Buc-ee's. The developers have stated that phase 2 may not even be considered for 398 development for 6 to 8 years. The travel center anchor would not serve Efland or Orange County residents or even 399 guarantee infrastructure for the establishment of needed services with its concept plan. We've been told that either Buc- 400 ee's or something similar to RTLP which honestly just feels like a threat. I think it's a threat I'm willing to gamble with. 1 401 believe a warehouse would create less issues for the surrounding community and commuters related to traffic congestion, 402 light and noise pollution and criminal activity than the largest 24/7 gas station in the country has the potential to create. 403 Please read the much more detailed concerns and information that our group of western Orange neighbors have pulled 404 together and our website voices4efland.com and please read the reasons that 975 voices for Efland and Orange petition 405 signers share our same concerns on change.org. I ask you to please vote against this rezoning petition that is not aligned 406 with the years of work done by this county to prepare this site for development with our community's input. 407 408 Jeff Bruett: I have a lot of concerns here, I've just recently found out about this project in early October and I've been doing 409 a little bit of reading and listening to the plans. There is nothing that has to be done to exit 160. Buc-ee's does not have to 410 attach to that road at all. That's not necessary, Buc-ee's can connect to Mt.Willing Road and the 85/70 connector. You're 411 going to start Phase 1 and Phase 1 involves deleting exit 160 completely. Nobody is going to be able to get off at exit 160 412 and get home, thousands of people go up through this way and it connects all the way up to Highway 86 up in Northern 413 Orange County and you are going to completely cut everybody off from that. There is no reason Buc-ee's has to be 414 connected to this road and because it's being connected, now it's being altered and now it has to meet all the latest 415 NCDOT plans when in actuality, south of the interstate you've got the same exact traffic plan as you've got on the north 416 side of the interstate. All Buc-ee's has to do is connect to Mt. Willing Road and the 85/70 connector and then the roads 417 need to be modified on Highway 70 because you cannot go west when you come off 161 onto Highway 70. This whole 418 thing does not take into consideration any accidents that happen on the interstate which happen very often. Now people 419 have no way of getting off of the interstate and getting onto 70. And I don't know how long this thing is going to take to 420 build but this exit is going to be closed the whole entire time. These things need to be done, the interstate/Highway 70 421 needs to be redesigned so people can go west on it and people that are driving east on Highway 70 to avoid Buc-ee's that 422 want to go to work and get on the interstate on exit 161, they need a way to turn south off of 70 onto the connector road. 423 That would be a simple solution to make this problem so people that live in this community and don't need to go to Buc-ee's 424 don't have to drive by Buc-ee's every time we have to go home. You're channeling us all through Buc-ee's and we don't 425 like it,we don't care for it and rezoning this place and then snub our noses in all this has got the whole community upset 426 and we're not happy about it and it needs to be reconsidered. 427 428 Heather Smith: During college, I was forced to move from campus housing because the school decided to bulldoze it for a 429 parking lot, after college my husband and I moved into a Hillsborough rental for$600 a month, an investor flipped it and 430 listed it as a rental for$1900 a month this year. We moved to another rental in 2013 until the landlord gave up 30 days to 431 move out so he could sell it for$375,000 which was above what we could afford as young first time home buyers but we 432 decided it was time to find a home. We were outbid on properties in Orange County until we eventually found our home in 433 Efland. One of the few affordable places remaining in the County. We felt satisfaction and relief knowing we had 434 ownership. For the past 5 years we have diligently tended our acre, planted fruit trees, pollinator plants and bees that 435 forage in nearby fields. I have driven daily down that braided ramp dreading the day that heritage trees and golden rod 436 would be replaced by development. However, I would have never imagined that this would be the development slated for 437 this space or that once again I would feel so utterly powerless against development after having invested in ownership. 438 You see that's the peril of private land. What happens on the land around me and impacts my quality of life that's why we 439 have regulations and government to protect air,water, light, noise, property values and a community that residents have 440 invested in over many years. From negative impacts and predatory developments that are a peril to us all. Preferably, the 441 threats of you could get a warehouse instead, a warehouse that could be built on the current 0/RM zoning would not have 442 impacts as lasting or severe as those from a corporation built on the pillars of rampant consumption and fossil fuels. A 443 model that requires drawing people who visit so they can marvel at the sheer spectacle of it. There's a dangling carrot of 444 Phase 2 that would bring additional businesses like banks and dining establishments that people in our community might 445 use but let's not forget that Phase 2 is not promised or that the developer stated it would be at least 6 to 8 years before they 446 consider adding those pieces to the puzzle. There are many unknown, uncalculated costs that we're not considering as the 143 DRAFT 447 conversation is centered on logistics. We could easily take Durham as a cautionary tale. More than half the land in 448 Durham is owned by people who do not live there. In fact,they do not even live in the state. That means residents do not 449 have ownership of their community and corporations with no connection other than deep pockets dictate the community's 450 future. I have weighed the potential for tax revenue and jobs, I have pondered alternative developments, based on other 451 Buc-ee's, I continue to conclude that this development will bring a cascade of impacts that will alter my life as a homeowner 452 in Efland for the next 40 years. If my neighborhood even remains residential for that long. Since there is no gas station of 453 this size in North Carolina,we unfortunately don't have a way to place a dollar sign on the negatives but once we degrade 454 the environment,we don't get it back. There is no way to know if my property value will be hurt by the diminished night sky, 455 noise and traffic or if this change will create a wave of land grabs that will gentrify the area causing our property taxes to go 456 up, not down, as some residents seem to think this would do. Both of those outcomes make me feel like my investment in 457 Orange County is being sacrificed. One thing I do know for certain is I did not sign up for this when I bought my home here 458 and I'm opposed to zoning for Efland Station. 459 460 Chris Smith: Hi folks, I am among the residents of Efland who received a letter informing me of the proposal to build Efland 461 Station since I live within 1000 feet of the parcels, it was required. The list of mixed uses sounded attractive though but 462 never having heard of a Buc-ee's, I started my research and it didn't take very long to get past their marketing language 463 and photos to begin reading assessments of their business and to realize the impact they will have on the Efland 464 community. I read how Denton,Texas eagerly accepted their Buc-ee's with incentives and open arms. Denton was locked 465 up in a legal battle over a tax valuation that Buc-ee's declared too high even after they promised many millions and more 466 before construction. I read about the town of Corinth where the local officials challenged Buc-ee's traffic assessments and 467 discovered that the totals to be greatly under-counted. Corinth's mayor wrote that a mixed-use development of similar size 468 made more tax revenue than a single Buc-ee's location. The promises Buc-ee's offered did not hold to scrutiny for the 469 Town of Corinth and they rejected the development. Buc-ee's promises quality jobs and touts their hourly wages and 470 benefits for entry-level workers and it is typical to argue with quarantine for more an hour. Again, it didn't take long to find 471 hundreds of job reviews across multiple platforms detailing why$14 an hour from Buc-ee's isn't worth it. I wondered what 472 the environmental impacts are living close to a gas station built for the informal Texas credo of bigger is better, I read peer 473 review research about the many trade-offs associated with our carbon bound habits. Gasoline and cancer causing 474 benzene in the air and ground water escaping through methods by which corporate environmental engineers are unaware 475 or overlooked. What does Efland get for playing host to 25,000 daily vehicle movements? All of the so called 476 improvements make the travel center work but don't solve any problems or concerns for Efland. We get to endure a host of 477 traffic headaches created so that all roads will lead to Buc-ee's. We'll be the ones looking up every night at a cartoon 478 beaver that's at least 20 feet taller than regulations because it's good for business. Me in my home and on my own 479 property will breathe the stale air of hot gas pumps and car fumes in the summer and listen to the constant drone of 480 engines through their fence called a wall at the last meeting and 30 feet short of regulation buffer in the winter. For these 481 reasons and more detailed at Voices4Efland.com I oppose the request for the Master Plan Conditional Zoning and the 482 effective removal of the Efland community from a decade's long planning process. Development begets development until 483 Efland residents new and old will find themselves run out or bought out. Buc-ee's promises to make good money,traveler's 484 stopping by are sure to marvel at the stuffed beaver toys and clean bathrooms but if they less than a thousand away from 485 the oasis of consumption and disregard for the future they'll find me living less well than I did before Buc-ee's came to 486 Efland, assuming that the future of economic development around me won't impact my ability to live here. 487 488 Patricia O'Connor: Hi, I live in Mebane off West Ten Road approximately 3 miles from the proposed Buc-ee's development. 489 First, I will offer that I am not opposed to development. It's necessary for a community to survive and thrive and I'm not 490 naive enough to think that things will stay the same because I want them to but development should be thoughtful. 491 Something that will enhance and add real value to the lives of the citizens in the community where it resides. Point one, 492 while Buc-ee's could provide about 175 jobs, I believe the overall impact of the project would be negative. From that 175 493 subtract the number of people in the community who might lose their jobs and livelihoods because they can't compete with 494 the giant. The small businesses who could be put out of business. It's hard to predict right now who those will be but there 495 are sure to be causalities. Number 2,the environmental impact will be enormous,you can't add that much impervious 496 surface to an area that borders a watershed without creating conditions for potential contamination. A single gallon of 497 gasoline could contaminate 750 thousand gallons of water. The dribs and drabs dropping onto the concrete surface from 498 refueling or spillage during filling the underground tanks is enough. Never mind the catastrophic breach of one of those 499 tanks. How much would it cost to provide another water source for Hillsborough if the water was contaminated and who 500 would foot the bill. You can bet it won't be Buc-ee's. Other than the 10 EV charging stations mandated by current MPD-CZ 501 standards,there is nothing green about the project. No mention of green building materials or use of solar panels. Does 502 Buc-ee's have a written working environmental policy in place? Does the policy strive to make important improvements in 144 DRAFT 503 manufacturing, reducing and reusing first and then recycling? Do they comply with the industry's voluntary testing or is 504 there environmental concern combined to the petroleum storage and possible leakage? Point 4,the 24-hour noise and 505 light pollution would impact the nearby neighbors in a negative way. It's a known fact that constant and incessant noise can 506 lead to increased stress and anxiety which of you would want to live next to Buc-ee's? Are you really ok with telling the 507 concerns homeowners to just suck it up? Additionally, light pollution can wreak havoc across a broad range of animal 508 species often affecting hormone levels, breeding cycles, activity paths and vulnerability to predators. The human need to 509 have beef jerky or a Barbeque sandwich at 2 a.m. shouldn't be more important than caring for our environment. Point 5, 510 the amount of traffic that Buc-ee's hopes to draw will be disruptive to Efland, Hillsborough and perhaps even Mebane. 511 Maintenance of the surrounding roads will be left to our state and offset some of the tax revenue generated. Number 6,the 512 feel of the rural community will be forever lost. Buc-ee's is already insisting on heightened signs and reduced buffers as if 513 their sheer size isn't enough to let everybody know where they are. They are already dictating how business is to be done 514 in our neighborhood which doesn't sound like the cooperative business partner interested in enhancing the community it 515 want so inhabit. I oppose Buc-ee's for all these reasons. 516 517 Aimee Tattersall: Buc-ee's plans for Efland Station include 60 pumps stations and 120 nozzles for pumping gasoline. 1 518 come before you today to make the case that like it or not, gasoline will start being phased out over the next two decades in 519 favor of electricity which can be produced by several renewable resources such as solar,wind and biomass. If approved, it 520 will be two years into this decade before Buc-ee's is opens, at least. On October 23, 2020,the BBC aired this interview 521 entitled,Why BP is Betting Against Oil. BP's chief economist, Spencer Dale,warns that fossil fuel industry against 522 complacency about the speed of the coming transition to renewable energy. I implore you to listen to this 17 minute 523 interview before making any decisions about the wisdom of approving 120 gasoline nozzles in Efland. The link is in my 524 written report. The CEO of BP, Bernard Looney, said in the introduction of the interview that BP's goal is to become net 525 zero by 2050 or sooner and to help the world get to net zero. The carbon budget is finite and time is running out. Quoting 526 from the interview,the fossil fuel industry being too complacent about the speed of which renewable energy will disrupt their 527 business in next three decades,that's the contention of Spence Dale chief economist for BP and the extended interview 528 with BBC, Spencer Dale explains the thinking behind his company's plan to cut its own oil and gas production by 40% 529 before the end of this decade and it's not just about heading off the threat of catastrophic climate change, even in their 530 business as usual scenario, they expect to unprecedentedly fast shift towards solar,wind and biomass energy. Renewable 531 energy will penetrate the energy system more quickly than any fuel ever seen in history. 120 gasoline nozzles have a short 532 future in Efland but have the potential of long-term damage. Thank you listening. 533 534 Andrea Riley: I currently live on Brookhollow Road in Efland and I am definitely opposed to this change of the zoning. 1 535 cannot imagine a worse proposal for the Efland area. The first point I want to make is that under the MPD-CZ the site plan 536 is conceptual only for Buc-ee's. They have not committed to the second phase, it is all conceptual and at this point,there 537 will be no more consultation on future development with the Efland community or with elected officials if this is passed. 538 This will only allow for the change of the zoning and the zoning is conceptual only. There is no consequential proposal to 539 build anything except the 120 pump gas station so if you go ahead and ok this rezoning, you will not have any more input. 540 We will not have any more input and even the County Commissioners will not have any more input into what happens if 541 there is a Phase 2. It's very obvious that the sales people from Buc-ee's, Mr. Beard and the lawyer, Ms.Trahos, are 542 interested in promoting the interest of Buc-ee's. They are here to sell us a bill of goods basically. Do we trust this company 543 to give us straight information. This company has been involved in tax evaluation battles in Texas,their home state. 544 They've been involved in potentially illegal price fixing business practices with Alabama and this increase traffic 545 infrastructure cost due to the unforeseen traffic congestion has affected various communities. Please listen to the people 546 who came before me, do your research, go online, look at Voice4Efland and see all of the this information that is there for 547 you to read. They are not telling the truth about the impact that this development will have on this community. I am glad to 548 see I'm upsetting Mr. Beard because you're upsetting me. I don't want this proposal to go through and I hope that you 549 people vote against it. If it does go forward, there will be a lot of people going to the Orange County Commissioners trying 550 to stop this because this is not something this community wants or needs. One of the most important aspects of this is the 551 discharge that unqualified the underlying aquafer is going to be affected because of the extent of impervious surfaces. This 552 is all going to affect the underground water. It's going to affect the Seven Mile Creek and the Eno and the water that goes 553 to Hillsborough if there is any contamination that occurs, cleanup of the aquifer would be practically impossible and this is in 554 a region that has been required by the state to emulate critically unhealthy air quality resulting mainly from vehicle 555 emissions. We do not need gas stations. 556 557 Erica Cartmill: Hi everyone,when I was a child, I was completely obsessed with horses, animals and nature. In our home 558 in suburban Durham, I read books like Misty of Chincoteague and All Creature Great and Small about the deep relationship 145 DRAFT 559 between man and nature. I dreamed of exploring the woods and finding animal friends of my own. When I was very 560 young, my dream was to be grown up, in my mind that meant 8 and live on a farm.When I reached 8 and there was no 561 farm in sight, my dream changed to being 12 with a farm. By the time I was 12, 1 was actually living that dream. My 562 parents had bought a small parcel of land off Ben Johnson Road right down the road from the planned development, and 563 set about building a farm. I remember visiting that land for the first time driving down the rugged dirt road to reach a wild 564 meadow of grasses and brambles at age 9. 1 couldn't quite visualize my mother's description of horse pastures and 565 building placement but I knew it was already a magical place. As the farm took shape, so did my childhood. I spent 566 countless hours climbing trees, catching lizards, building forts and pretending to live off the land. I got to know our 567 neighbors and learned to collect eggs, grow tomatoes and stand my ground when geese charged during my frequent visits 568 to their farm. I learned to drive on our ride on mower. I learned how to make a fishhook, spot poison ivy and get red clay 569 out of jeans. It was a beautiful childhood, one full of nature, neighbors and adventure. As an adult, I've been fortunate to 570 pursue my love of animals professionally. I study animal behavior as a professor at UCLA. I love getting the spark of 571 enthusiasm about animals in my students, many of whom grew up in Los Angeles and have never been for a simple walk in 572 the woods. However, I desperately miss the friendly small energy and the magical wilderness of my childhood. Much of 573 Los Angeles resembles a Buc-ee's station, cars crawl the concrete world and busy people wait at stop lights with eyes 574 glued to their phones on their way to shop for quote unquote cool stuff. Few people make eye contact, no one says good 575 morning.The city is always crowded and yet it is always with people passing by, hurrying somewhere else. It's hard to 576 make a real home for yourself, it's hard to belong when so many are just passing through. I come back to visit our farm in 577 North Carolina several times each year. Every year I record the spring peepers croaking in a puddle right where Ben 578 Johnson Road meets 70. 1 carry those recordings with me every day in L.A. and listen when I want to be carried back 579 home. If this development goes through those frogs will be silenced forever. My hope is to move back to North Carolina 580 one day so that my children can have a childhood where they know their neighbors and where the dirt on their clothes is 581 red clay and not soot from smog. I'm not opposed to development or progress, I know that small towns can't stay small 582 forever and that people need economic development to thrive but a project like Buc-ee's does not have the best interest of 583 our community at heart. It's shortsighted at a time when transportation practices are changing rapidly. It will bring tens of 584 thousands of cars into the small community each day. None of these cars will bring friendly faces of new neighbors just like 585 Los Angeles the cars will be filled with busy people passing through on their way to somewhere else. Buc-ee's isn't 586 investing in this community, it's draining it. Development will pollute the water and air, increase traffic congestion to such a 587 degree that sustainable development projects will be deterred from investing in the area and will fundamentally change the 588 character of a beautiful corner of North Carolina. 589 590 Bobby Cobb: Good Evening, I'm a property owner and business owner in Efland. I'm happy to have land development 591 conversations transpire regarding Efland. We all knew it was coming. Northern Orange is the last growth frontier for this 592 county. Chapel Hill is going straight up, Hillsborough proper has limited room to grow but Efland and Cheeks is truly the 593 promised land. I do mean the word land literally. Efland is the final frontier in our county for land development growth. 1 594 support the Efland Crossing/Efland Station project. However,what concerns me is what the landscape will look like for 595 Phase 2. What type of retailer will come to Efland? What type of dining facilities will come to Efland? What types of 596 businesses will come to Efland? We need a bank in Efland. We need a natural foods grocery store in Efland. I believe 597 that in fact, Phase 2 will be what will sustain Efland over the long haul, not a 60 station 120 handle convenience center. In 598 50 years will we still even have cars that run off gasoline? That's why I challenge the Planning Board to think responsibly 599 and mindfully about the Buc-ee's business model that would initiated for Phase 2. Middle class housing is a huge need in 600 Efland, low-income housing is a huge need in Efland. We will always need good food resources to survive. We will always 601 need good doctor choices and resources. We will always want a nice sit down restaurant to take our families out to eat. 1 602 simply challenge the Planning Board to be mindful about what you recommend to the County Commissioners. Think about 603 what Efland will look like 20, 30, 50 years from now and think about what you're kids and grandkids would be proud of. 604 Let's make Efland a good choice and your suggestions and recommendations should really be thought out. 605 606 Del Ward: I have lived on Ben Johnson Road for most of my life. One of my favorite things about where I live is that there 607 is nature nearly everywhere I turn. Though I may hear the sound of semi-trucks blasting down the highway. I do have the 608 Eno River passing by me where I see many fish and turtles, coyotes and other wildlife live happily. On the other side of the 609 road from me is the beautiful Duke Forest with a rich and fruitful ecosystem. Another thing I quite like about where I live is 610 that there isn't an eyesore of a Texas owned gas station that has 120 gas handles built on a protected watershed. Efland 611 has absolutely no need for a development like this. As of 2018, Efland had a population of roughly 810 people so Stan tell 612 me why we need 120 gas handles. As of today, between exits 150 and 165 there are 20 separate gas stations with over 613 200 gas handles. There are also 104 diesel gas handles so why would we need to add 120 more to that equation in a town 614 that has only a little over 800 people living in it? Besides that, the fact that there is an abundance of gas stations in the 146 DRAFT 615 area, I've seen absolutely no evidence of any environmental research done. You're talking about building a 24-hour 616 convenience center on a protected watershed for the Eno River. A river which spans over 40 miles through two separate 617 counties. If there is water pollution which there most certainly will be, it will not only affect the local ecosystem but will have 618 long lasting and damaging effects on the ecosystems in and around the Eno River. I have seen no evidence of research on 619 how light pollution will affect the bird population here or any other local species for that matter. The only research that has 620 been provided is traffic research done by the developers themselves which states that 32 new trips will be added to the 621 traffic pattern per minute. We do not have the infrastructure for this. I have a neighbor on Ben Johnson Road that in the 622 past 15 years has had 10 cars fly off the road into his front yard. Building Buc-ee's will only make my road a more 623 dangerous road than it already is. Now Beth Trahos says that Efland is quote barely rural, I don't need a lawyer from 624 Raleigh to tell me about the area I live in. We most certainly do live in a rural area. She also says that in Phase 1 there will 625 be 175 quote good jobs. Well Beth if you look online you can see that the average Buc-ee's employee rating is lower that 626 Walmart,Amazon, and all the managerial positions will be outside hires. Efland and Hillsborough are gorgeous,fairly 627 untouched gems in this region and they should stay that way. Stan considers his project to be growth, I agree with him it is 628 a growth just like cancer is. My hometown isn't a pit stop Stan Beard. It's where I and tons of other good hard working 629 folks live. People's first impression of Efland or Hillsborough should not be a Texas owned gas station built on protected 630 land with a dumbass beaver for a mascot. 631 632 Jacob Foster: I grew up in the Shenandoah Valley in a rural community like Efland near a small town like Hillsborough. 633 Over the years, I watched as the character of my hometown from fields and forest to friendly neighbors was disfigured and 634 destroyed by ill-considered development. I have seen giant gas stations like this one carelessly planted in a formerly quiet 635 spot which quickly grows into a noisy ruin. I came to North Carolina to attend Duke University where I met my future wife. 636 For the past 20 years, I have been visiting her family farm in Efland. We shared one of our first kisses on a lonely stretch of 637 country road less than a mile from the proposed Buc-ee's site. That farm and this area have taken me back to the 638 landscape of my childhood we have built many wonderful memories there wandering the fields with our human, canine and 639 equine family. Our careers have taken us far away from North Carolina to the concrete desert of Los Angeles yet our 640 families remain and our regular visits to Efland have been a balm to the city sick soul.We have always cherished the hope 641 of settling in Orange County and giving our children the same experience we had growing up of nature, the quiet 642 countryside and small town living where you can spend summer days wandering with friends over fields and down gravel 643 roads. Buc-ee's threatens that future. It threatens your community. Peace, quiet and a clean environment are your most 644 precious assets whether from the perspective of lifelong residents or of those seeking a better life away from urban sprawl 645 like Carrie Fletcher and like me. Those assets will be destroyed. Planning and mitigation cannot restore peace when 646 thousands of cars and strangers pass through your community every day. They cannot block the diesel,the fumes,the 647 light pollution and the noise that Buc-ee's will bring to your quiet home. As an independent environmental assessment 648 would no doubt reveal,they cannot stop runoff and leakage from contaminating the local water, harming wildlife from the 649 humble spring peepers to the endangered residents of the Eno River. I am not an opponent of progress, change happens, 650 it must, but where is the Orange County renowned for its sensible progressive approach to local development? Where is 651 the spirit of care for the environment,the concern for sustainability? Look into your hearts my friends,what is most 652 precious about your community?What is your greatest asset? What will make Orange County a place that you and your 653 children and my future children are proud to call home? Is it the world's largest gas station? Or is it taking a stand for the 654 environment, the planet and for rural America. If you allow this plan to move forward, remember, sooner or later, the day 655 comes when you can't hide from the things that you've done anymore. I fear that when your car is parked amid a hundred 656 others at Buc-ee's, you'll look back on this day and wish you had chosen to a stand for your community. I hope you will 657 take that stand today. 658 659 Caroline Foster: I am a current resident of nearby Durham. My ties to the Efland area are familial. I have spent time with 660 relatives on their farmland and have taken various trips with community friends as well to explore the wildlife in the area and 661 it is substantially meaningful to me and also to my children. One of the things that we love most about the region that we 662 live currently, is that we are not far off from places like Efland and where you can just explore nature. You can come and 663 take a walk,just view wildlife, and you're not constantly bombarded by massive developments such as what is being 664 proposed with this Buc-ee's development. It's been extremely critical to me as a parent to raise my children in an area 665 where they have some access to wild land where they have access to experience nature and respect it and have the 666 opportunity to live in communities that not only recognize and respect the undeveloped land that they have amongst them 667 but actually think about how to, if that land needs to be developed as others have mentioned here before me, I am also not 668 an opponent to progress. However, I think that progress should, if developments need to be built, that the considerations of 669 what the individuals living nearby actually need are taken into account and that we are also looking on down the road and 670 thinking about what our children need and what our needs in the moment are as well. What is being proposed here is not 147 DRAFT 671 something that anybody in Efland needs. It's far more massive and far beyond the scope of what any resident of Efland 672 could use and it's clearly a development that is designed to bring in an enormous amount of traffic that will be extremely 673 detrimental both in terms of the environmental impacts as well as the impacted traffic. Back to the idea of really thinking 674 sustainably about what is a development that has the community's best interest at heart on down the road. I don't think a 675 massive fossil fuel structure is in line with that and furthermore,where it's being built,we are going to put a whole bunch of 676 petroleum tanks into the ground on a protected aquifer just doesn't make any sense. 677 678 Ben Lloyd: In the spring of 2019, 1 was contacted and visited by a representative of an organization called Buc-ee's high- 679 end convenience mart and gasoline station. He told me that he was in negotiation with the Efland family on the property 680 that is being considered and known as the Sim Efland property. He proposed and continued to tell me that what they would 681 put here would create 200 jobs and put 2 million dollars a year into the County tax bucket. My concerns were that number 682 one, I own a farm that has been in operation for 98 years. There has never been acre sold as of today. I have lived here 683 myself for 90 of those 98 years. Soon after his visit, I began thinking about what should happen to Efland and what we 684 needed. After the 98 years,there has never been a sale as thus said and I wrote the County Manager a letter telling her 685 that I'd had numerous opportunities to sell property but had always refused to do so. I told her that I would make a 686 commitment that until something came along that was worthwhile and to the benefit of Orange County, I never had any 687 intention of selling any. Then I started thinking with what had been explained to me about Buc-ee's would this be the 688 development that we would need. In relation to that and my concerns, I flew to Houston, Texas to visit a Buc-ee's. The 689 owner and several of his staff met me and gave me a complete tour of the Buc-ee's organization there and I was amazed 690 how immaculate of a facility that I was visiting. I was so impressed that when I returned home, I called this Buc-ee's 691 representative and told him that I would make my property available which was to be utilized as the westbound entrance for 692 the Buc-ee's organization. I have sit here tonight and listened,we have people talking doom and gloom and I question the 693 validity of their opinion on that. As a matter of fact, several of the people that I have listened to tonight, don't live here. 694 Some as far away as California. I spent three years in California in the military. I am highly concerned about the objections 695 that people have. I think Buc-ee's work with DOT and continue everything that will be to the benefit to Orange County. The 696 property will be, in my opinion, it will be a tremendous asset to Orange County. I support them being here. 697 698 Jimmy Holcomb: It's heartbreaking to come after Mr. Lloyd. I know how emotionally difficult this decision probably was for 699 him and his family to sell land that he has cherished and also for the Efland family. About 20 years ago, my husband and I 700 bought a 60 acre heritage farm about 9 minutes from the proposed Buc-ee's, northwest of the center of Efland. We came 701 here because of the natural environment,the rural environment, the dark night sky, all the reasons that one would move to 702 the country. The bright stars and the quiet. Some level of commercial development is to be expected everywhere, of 703 course, and we've been interested and sort of fascinated that Efland has grown so slowly compared to other places which 704 for us has been a good thing. We don't disagree with development on principle,we understand that it happens. We 705 expected it to happen in Efland much sooner that it has happened. We understand the revenue pressures in the County to 706 some extent but this project does seem to push the limits of common sense and attention to long-term community interests. 707 Without getting into those details, the project just appears to hitch our progressive modern county to a dinosaur technology 708 while the world is scrambling for Teslas and plug in super chargers. Today, on the Testa website, I can reserve an aI1- 709 electric semi-tractor trailer truck, if I could afford it. Gasoline and oil cannot possibly be what Orange County wants to be 710 known for. My husband and I view this super-scaled gas station as sad and empty and soulless but we do know that these 711 are subjective and emotional responses that County officials can't really put into a spreadsheet. If the County decides to 712 approve this kind of showcase to dead-end fossil fuels,we only urge you, the advisory commission and the full board to 713 give maximum attention to our soil,water and quality of lives. Very important to me and my husband are those dark night 714 skies and the stars so I'm just going to concentrate on that one aspect. For years our place has been known as the place 715 to put down a blanket and watch the meteor showers. Over the last 10 years,we've watched the stars in the southwest sky 716 disappear in the growing glow of Mebane as it rakes in tax revenue. Please make this project model not of enormous 717 leaking underground gas tanks but of sustainable development. I urge you to look up the international dark sky association 718 which has extremely complete data on light pollution and is willing to send consultants. 719 720 Catherine Matthew: I'm an Efland resident and I speak on behalf of the non-human residents in the proposed development 721 area of exit 160. 1 speak specifically tonight for reptiles and amphibians many species of which live on the 104 acres which 722 are currently destined to be destroyed if the land is rezoned and sold to Buc-ee's, a Texas travel center. I am an Eastern 723 Box Turtle, your state reptile; my back wound is modified before my shell on which I will stay forever as long as I am alive. 724 My life span is long, as long as 100 years, longer than most of you will live. I am slow to mature and don't usually lay eggs 725 until I am 20 years old. You've probably seen me or my relatives crossing roads in Orange County. That is one of the most 726 dangerous things a box turtle can do but it is sometime necessary to do so to find food or look for a mate. Many box turtles 148 DRAFT 727 are killed by automobiles and crossing an interstate is nearly impossible without some help from humans. Wildlife 728 underpasses work but there are none in Orange County. You may think that box turtles in Orange County are doing fine 729 but we are not. While there are adult turtles around and it is possible to see us crossing county roads, many of us have 730 been killed and our population is in decline. Where will I go if you pave over my home. I am a North Carolina species of 731 concern. I am a Marble Salamander, North Carolina's state salamander one of two state amphibians. I am a member of 732 the Mole Salamander family and our family is called mole because all of the mole salamanders spend most of our lives 733 underground. As fall begins and I move towards what will become a body of water when the fall rains fall, I find a mate and 734 then I lay as many as 100 eggs that are about the size of BBs. I wrap my body and my tail around the eggs as we lay 735 quietly under a log or rock and I stay with my eggs until the rains arrive. I do not live as long as the box turtle but then 736 neither do you. Unless you drive country road carefully and fall rains at night then you may never have seen me but I am 737 there. I am there and other mole salamanders like the spotted salamanders are there too. The spotted salamanders are 738 spring breeders and they spend one month above ground in temporary bodies of water, shallow pools without fish. In just 739 the last few months, scientist realized that we glow in the dark. My brilliant black and silver colors change to orange and 740 green with a blue light and a yellow filter you can see the miracle too. There are so many more things that humans don't 741 know yet about us and may not have a chance to uncover. Where will you go if you pave over our landscape. I speak for 742 the reptiles and amphibians. 743 744 David Blankfard: Does the applicant want to add any response to what the citizens have said? 745 746 Stan Beard: We appreciate the passion and we respect everyone's stance. We get it. I want to make some things clear. 1 747 will say that we've never been compared to BP nor the City of Los Angeles so those are a couple of first for us. I want to 748 reiterate what we are and what we are not. Folks saying they are not opposed to responsible growth. We offer to this 100- 749 acre tract that is alongside Interstate 40/85 an opportunity for the area to experience the Phase 2 which I need to clarify that 750 my answer the other night was that the completion of Phase 2 would take 5 to 8 years. We absolutely will have the uses, 751 the hotels,the sit down restaurants, the banks, the neighborhood retail that we have said we would bring. You can look at 752 other areas where we have developed and you will see those same people. We have done this before. I would implore the 753 folks to actually read the articles that are referred to on the Voices of Efland website. I would argue that that every single 754 one of those articles is actually a pretty good representation of who we are. There is some very misguided ideas out there. 755 I would also implore you to read the planning documents. There is a traffic study, there is a traffic letter from NCDOT, 756 Chuck Edwards,the man that Mr. Cates spoke to. He wrote the letter, please read that. The environmental report is in 757 there. We are not in a protected watershed we have absolutely every reason in the world to protect everything around us. 758 We do not want to be BP in that arena so we understand the community and we want to be part of it. We have a history of 759 being part of communities and so I just want to thank everybody for showing up. 760 761 David Blankfard: Does anybody have anything to add? I have one in that I would like to add that the hotel would have 762 interior hallways and that the guest rooms don't open to the outside. 763 764 Stan Beard: Agreed. 765 766 Kim Piracci: Have you thought about putting solar panels on the top of your building? 767 768 David Blankfard: It's in the write-up. 769 770 Beth Trahos: We are allowed to do that as a part of our document, also,water reuse is mentioned in the document as well. 771 772 Stan Beard: Actually, Buc-ee's is going to be building its first rainwater reclamation system for our aeration system here. 773 We encourage solar panels,we run into on our buildings because they are pretty highly structurally odd and we don't want 774 to put an extra burden on top of them but we encourage solar panel and solar arrays throughout the rest of the 775 development. 776 777 David Blankfard: Have you looked into whether the building is LEED or well certified? 778 779 Stan Beard: It is in our best interest to have the most efficient building possible. LEED really doesn't work for us in a sense, 780 we incorporate many LEED certified systems within our buildings but we will not be a LEED certified building. 781 149 DRAFT 782 Michael Harvey: I want to remind the Board, one of the conditions the applicant has asked for on page 188 is that 783 consideration of LEED certified practices for components of the project where feasible will be incorporated. We've also got 784 standards governing placement of solar, encouraging the placement of solar. 785 786 Adam Beeman: Typically,when big projects like this come in they tend to hire contractors from outside the state. Is there 787 any way we can get a commitment from you guys to hire local contractors? 788 789 Stan Beard:Typically,we have 2 or 3 fairly major general contractors who build our buildings.They've built them for years 790 and they know how to do them. But what they do is they come to every single locale and figure out who their local subs are 791 going to be. I've given data before, I just don't have it at my fingertips, local construction dollars are a big part of our project. 792 A lot of local sizable subcontractor will have opportunity to be part of this project. 793 794 Michael Harvey: I have some additional review of conditions and discussion on stormwater, signage, and traffic 795 management issues. 796 797 Michael Reviewed the Draft Conditions Contained in Attachment 9 from Pg. 166 to Pg. 188 including potential stormwater 798 conditions to address concerns over impacts to the Seven Mile Creek Preserve area south of the Interstate, signage height, 799 and access management for the project. Michael also read into the minutes an email from Steve Ramarge on the closure of 800 westbound Exit 160 and possible modifications to the proposed traffic access management plan for the Project that could 801 preserve the exit as currently configured. 802 803 David Blankfard: Can I get a motion to add the requirement discussed that the hotel have interior hallways. 804 805 MOTION by Melissa Poole to adopt the condition that any hotel is interior accessed. Seconded by Randy Marshall. 806 807 ROLLCALL VOTE: 808 Randy Marshall: Yes 809 Kim Piracci: Yes 810 Adam Beeman: Yes 811 Susan Hunter: Yes 812 Patricia Roberts: Yes 813 Alexandra Allman Yes 814 Melissa Poole: Yes 815 David Blankfard: Yes 816 Carrie Fletcher Yes 817 MOTION PASSED UNANIMOUSLY 818 819 Adam Beeman: I would like the applicant to commit to a minimum of 30 spaces for a commuter park and ride so people 820 can park their cars there and hitch a ride with someone else to work and there is no worry about being stuck in a lot getting 821 towed away. 822 823 Beth Trahos: There is an area identified on the master plan to be utilized by the County in some in form or fashion to 824 support transit. If that was the route the County chose to take it could certainly be accommodated given the designation 825 and commitments made as a part of the master plan. 826 827 Adam Beeman: I don't know if their future plan is the bus stop or it's a train station. I know a lot of people travel through 828 there and it would be nice for people to drop their car and catch a ride. It would be nice to have that designation. 829 830 Stan Beard: We have reserved development area 6 for a public transit facility to be determined by all of us. When we hear 831 park and ride we get a little jumpy and so we would definitely work with you on what that looks like as far as security, 832 lighting and rules, etc. In some conversations park and rides weren't that great but that maybe an actual bus stop/drop off 833 would be more in line with what Orange County wanted. If you guys want to figure out a way to manage that development 834 area 6 we're all for it. We would be respectfully careful about what that was but yes we will work with you. 835 Michael Harvey: Would it be sufficient if the Planning Board took the position in its recommendation that the County 836 Commissioners consider as part of development area 6, a park and ride amenity as part of the regional transportation 837 efforts would that address your concern? 150 DRAFT 838 839 Adam Beeman: That's fine as long as there is somewhere we have the potential spot. 840 841 Craig Benedict: We are presently working on the Orange County Transportation Plan due to the change of not having light 842 rail so we are looking for other places to augment our bus system and we'll keep this in mind that we now have some 843 property where it could be considered. 844 845 Carrie Fletcher: I'd like to agree with that too. I'd like to have that option. 846 847 David Blankfard: Do we need to add anything to this proposal for that? 848 849 Craig Benedict: I think it's covered by having area 6 be designated, as suggested already,within the document. 850 851 MOTION by Randy Marshall to move the Statement of Consistency of a proposed Unified Development Ordinance Map 852 Amendment with the adopted Orange County 2030 Comprehensive Plan. The Planning Board finds the requirements of 853 Section 2.8 of the UDO have been deemed complete and Pursuant to Sections 1.1.5 and 1.1.7 of the UDO and to Section 854 153A-341 of the North Carolina General Statutes, the Board finds sufficient documentation within the record denoting that 855 the amendment is consistent with the adopted 2030 Comprehensive Plan. The amendment is reasonable and in the public 856 interest because it expands economic development prospects within the County,while continuing to provide adjacent and 857 nearby land uses, consistent with the Comprehensive Plan as well as adopted Small Area Plans for the area. Seconded by 858 Melissa Poole. 859 860 ROLLCALL VOTE: 861 Randy Marshall: Yes 862 Kim Piracci: Yes 863 Adam Beeman: Yes 864 Susan Hunter: Yes 865 Patricia Roberts: Yes 866 Alexandra Allman Yes 867 Melissa Poole: Yes 868 Carrie Fletcher Yes 869 David Blankfard: Yes 870 MOTION PASSED UNANIMOUSLY 871 872 MOTION by Randy Marshall to move the adoption of an ordinance amending the Orange County Zoning Atlas shown in 873 Attachment 9 on page 166 and the conditions what the Planning Board has reviewed and agreed upon previously. 874 Seconded by Adam Beeman. 875 876 ROLLCALL VOTE: 877 Randy Marshall: Yes 878 Kim Piracci: Yes 879 Adam Beeman: Yes 880 Susan Hunter: Yes 881 Patricia Roberts: Yes 882 Alexandra Allman Yes 883 Melissa Poole: Yes 884 Carrie Fletcher Yes 885 David Blankfard: Yes 886 MOTION PASSED UNANIMOUSLY 887 888 AGENDA ITEM 8: ADJOURNMENT 889 Meeting was adjourned by consensus 10:20 p.m. 890 891 892 David Blankfard, Chair 151 STATEMENT OF CONSISTENCY OF A PROPOSED UNIFIED DEVELOPMENT ORDINANCE MAP AMENDMENT WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN An applicant initiated amendment to the Zoning Atlas to rezone 2 parcels as follows: Parcel Township Owner of Current Zoning District Proposed Zoning District Identification Record Number (PIN) 9854-16-1576 Cheeks SL Efland Office Research Master Plan Development Heirs LLC Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Upper Eno Protected Efland Station; Watershed Protection Upper Eno Protected Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. 9854-36-3711 Cheeks Chad Lloyd Office Research Master Plan Development Land Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Investment Upper Eno Protected Efland Station; Company Watershed Protection Upper Eno Protected LLC Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. The Planning Board finds: a. The requirements of Section 2.8 of the UDO have been deemed complete; and, b. Pursuant to Sections 1.1 .5, and 1.1.7 of the UDO and to Section 153A-341 of the North Carolina General Statutes, the Board finds sufficient documentation within the record denoting that the amendment is consistent with the adopted 2030 Comprehensive Plan. 1. The amendment is consistent with applicable plans because it supports the following 2030 Comprehensive Plan goals and objectives: • Land Use Overarching Goal: Coordination of the amount, location, pattern and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. The County and City of Mebane have engaged in numerous studies/joint planning efforts over the last several identifying 152 areas viable for the extension of utilities (i.e. sewer) in support of high intensity residential and non-residential land uses. The requested rezoning will allow development consistent with the overall spirit and intent of the adopted Comprehensive Plan as well as applicable joint planning efforts completed by the County and the City with respect to providing utility (i.e. sewer) services. This area was part of a small area plan, specifically the Efland-Mebane Small Area Plan (hereafter `the Plan'), adopted by the County in 2006. The purpose and intent of the Plan was to identify areas for urban style development focusing on viable locations for housing, community services, open space areas, and non-residential development. Upon adoption, the UDO was amended creating various overlay districts designed to implement the goals/policies of the adopted Plan. One of these districts was the Efland Interstate Overlay District. Per Section 4.4 of the UDO the intent of the overlay district is to: `... provide for a more urban style of development in an area of the county served, or intended to be served, by public water and sewer systems'. The properties subject to this rezoning request have been pre-determined to be suitable for urban style development and higher intensities consistent with the Plan. • Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. (See also Economic Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW-2.) The atlas amendment is consistent with this goal and objective with the approval of a rezoning of property creating a district allowing for the development of high density non- residential land uses in an area of the County designated for the location of adequate supporting infrastructure (i.e. water and sewer). The rezoning is also consistent with the goals/policies of the Efland-Mebane Small Area Plan, which identified the area in question as being suitable for higher intensity, urban scale, development due to the proximity to the Interstate and availability of utility services (i.e. water/sewer). 153 c. The amendment is reasonable and in the public interest because it: 1. Expands economic development prospects within the County, while continuing to protect adjacent and nearby land uses, consistent with the Comprehensive Plan as well as adopted Small Area Plans for the area. The atlas amendment involves the approval of a master plan establishing a detailed list of allowable non-residential land uses to aid in the marketing on an area designated within the Comprehensive Plan as being suitable for high intensity non- residential development. The expansion is consistent with County and City of Mebane plans outlining those parcels suitable for service by sewer that are prime for high intensity non-residential development. Further, the approved master plan establishes mandatory land use buffers and setbacks for development within the project to ensure off-site impacts are mitigated. The Planning Board hereby adopts this Statement of Consistency and findings expressed herein and recommends the Board of County Commissioners consider adoption of the proposed Zoning Atlas Amendment(s). f f f -- f 11 .19.2020 David Blankfard, Chair Date Attachment 7 154 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director ?. Administration ... �� 131 W. Margaret Lane (919) 245-2575 "W � Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 "1! "%&bl 1 al:" CERTIFICATION OF PUBLIC HEARING NOTIFICATION MASTER PLAN DEVELOPMENT CONDITIONAL ZONING (MPD-CZ) DISTRICT — EFLAND STATION (FORMERLY BEAVER CROSSING) I, Michael D. Harvey, Planner with Orange County, North Carolina, DO HEREBY CERTIFY that in accordance with the provisions of Section 2.8 of the Orange County Unified Development Ordinance (UDO), I have or caused notice of a PUBLIC HEARING for the project referenced herein as follows: 1. MAILED NOTICES: Notices giving specifics on the zoning atlas amendment request, contact information, the dates/times/location of the BOCC public hearing including instructions on how to access the virtual public hearing and be able to offer comment(s) on the proposal were mailed: a. First class mail to all property owners within 1,000 ft. ( as identified by Orange County Tax records) of the subject properties; and b. Certified mail to the owners of the 2 parcels. on November 25, 2020, 19 days before the meeting. 2. SIGNS: Staff posted the subject parcels with signs indicating the date/time of the public hearing on December 4, 2020, 11 days before the meeting; Further, Planning Department staff caused a legal ad advertising the date, time, location, and purpose of the BOCC public hearing to run in the News of Orange and the Herald Sun on December 2 and 9, 2020. WITNESS my hand, this 4t" day of December, 2020. Michao Harvey Current Planning Supervisor 155 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning 131 W. Margaret Lane `919) 644-3002 FAX ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 o November 25, 2020 Notice of Board of County Commissioners (BOCC) Public Hearing Review of Zoning Atlas Amendment for Master Plan Development Conditional Zoning District (MPD-CZ) Known as Efland Station (formerly Beaver Crossing) To Whom It May Concern: The purpose of this letter is to notify you of an upcoming Board of County Commissioner (BOCC) public hearing pertaining to proposed amendments to the Orange County Zoning Atlas, specifically the processing of a Master Plan Development Conditional Zoning (MPD-CZ) District application. The review/process of this application, as well as this notification, is occurring in accordance with the provisions of Section(s) 2.8 Zoning Atlas and Unified Development Ordinance Amendments and 2.9.2 Conditional Zoning District of the Orange County Unified Development Ordinance (UDO). BACKGROUND: On or about August 7, 2020 the Orange County Planning Department received a Conditional Zoning Atlas Amendment application to rezone 2 parcels located north of Interstate 85/40, east of Mt. Willing Road, within the Cheeks Township. Application materials are available on the County website, specifically under the Current Interest Projects of the Planning Department webpage access utilizing the following link: https://www.orangecountync.gov/1722/Current-Interest-Projects. Specifically, staff received an application to rezone an approximately 104 acres of property, further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 and 9854-36-3711 (hereafter `the Property'): FROM: Office/Research and Manufacturing (O/RM) ; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. 156 TO: Master Plan Development Conditional Zoning (MPD-CZ) district; Upper Eno Protected Watershed Protection Overlay District ; Major Transportation Corridor (MTC) Overlay District ; Efland Interstate Overlay District. (map of parcels) ,. 3W .t�rr ,�, 4 -rsi , �t• � r . PIN 9854-36-3711- ON' it �:� '7f�1, t r�+ • � r• �e l .� + J � Wat • t e , a r �$ x .a � PIN 9854 16-1576 sk 1t i / ti, t .1. "_wii"`,., /n1 I@A •tj.•�,�9 I _ � rt' tl °QW ��_ �_�---_ 1.�3•.AD4ry ,.__ - 9�5�444000�3��,��� �� yJ ��-` . - PROPOSAL: According to the submittal the purpose of the Project, now known as Efland Station, is to: '... create a mixed-use unified development providing a variety of retail, service, hotel, dining, light industrial/office flex space uses consistent with the Orange County 2030 Comprehensive Plan As proposed, development will occur on approximately 104 acres of land and involve construction of approximately 500,000 sq.ft. of building area supporting previous identified land uses (hereafter `the Project'). As proposed, the Project would involve development of the following specific land uses: • Phase 1 - Construction of a 60 pump (2 nozzles per pump) gas station with an approximately 64,000 sq.ft. retail center; • Phase 2 - Construction of: o 120-room hotel (square footage of structure unknown); o 150,000 sq.ft. of Office/Service/Manufacturing land uses; o 8,000 sq.ft. of medical office space; o 30,000 sq.ft. of specialty retail space; o A 3,500 sq.ft. drive-in bank; 157 o 12,000 sq.ft. of casual restaurant; and o 20,000 SF of high-turnover sit-down restaurant space. As part of this submittal, the applicant is proposing the imposition of development and design standards (i.e. architectural, signage, setbacks, height limitations, landscape/buffer standards, outdoor lighting, parking, etc.). If the proposal is approved by the County, development of the Property will be consistent with the master plan and any/all conditions imposed by the County as part of its action on the zoning atlas amendment. WHY YOU ARE RECEIVING THIS LETTER: As previously indicated, you are receiving this letter as your property is located within 1,000 ft. of the 2 parcels subject to a rezoning petition. Per Section 2.8.7 of the LIDO, staff is required to send written notice, via first class mail, to property owners within 1,000 ft. informing them of the date/time of,the Planning Board meeting where the application is to be reviewed. This notice is required to be mailed 15 days before the date of this meeting. The BOCC will hold a public hearing on this Zoning Atlas Amendment on: Tuesday December 15, 2020 at 7:00 p.m. for the purpose of giving all interested parties an opportunity to speak on the proposal. Consistent with COVID-19 protocols, and to ensure the health and safety of all participants, the meeting will be virtual and pre-registration is required if you wish to speak at the hearing. The meeting will be live streamed at the following web address for those who wish to only view the meeting: www.orangecountync.gov/967/Meeting-Videos. To register to speak at the public hearing, please send an email to ocpubliccomment@orangecountync.gov on or after December 11 but no later than 3:00 PM on the day of the hearing (i.e. December 15, 2020) and indicate you wish to speak during the hearing. The agenda will be posted on December 11 at http://orangecountyne.gov/1707/BOCC-Agendas. When submitting the request to speak, include the following: • The date of the meeting • The number and title of the agenda item (from the agenda posting which occurs on December 11) you wish to speak on • Your name, address, email and phone number • The phone number must be the number you plan to call in from if participating by phone After registering to speak, an email that contains instructions and a link to sign up to access the hearing will be sent to the email address used to register. 158 If you do not have access to an internet-enabled computer and would like to phone in to access the hearing, please call the office of the Clerk to the Board after December 11, 2020 at 919-245-2130 and a staff member will provide you with the call-in number. Written comments to the Board of County Commissioners can be sent via e-mail to ocbocc@orangecountync.gov. Written comments can also be dropped off at the Planning Department offices at 131 W. Margaret Lane, 2"d floor, Hillsborough, NC during normal office hours or mailed to the Planning Department at P.O. Box 8181, Hillsborough, NC 27278. The full text of the public hearing items may be obtained no later than December 11, 2020 on the County's website at: hftps://www.orangecountync.gov/1 707/BOCC-Agendas. Questions regarding the proposals may be directed to the Orange County Planning Department via phone at (919) 245-2575 during normal office hours (8:00 a.m. to 5:00 p.m., Monday through Friday). You may also e-mail questions to planningdept@orangecountync.gov. All of these link(s) will be posted to the County website at: hftps://www.orangecountync.gov/1722/Current-Interest-Projects. Sincerely, �r'aig Benedict, AICP % f Planning Director Orange County 159 LAND I _r" -L- I I- --�--- 1-__ _- 1 _•r I I I I LAND USE BY DEVELOPMENT AREA sae - LZ { a I -----� 1 ;I _I •s•'ien« , „ \ ;, KK 0 5 ,I •:. �� 1 ;; _; �:._.. � ��\ \�/ orswxwue.ww .vuwmr ns w¢rta � i — �L•.,•• I --___— __ _ I � 3g __ 5 ~ __ r____ —�__ --- — q S� .I•1 Il i 1 1 I / sxaosEe x,a.« `� g --------------- it UNE £ NIE0.47ATE \ — w Q i I J a I I W LL w \ rd �§ ORAPNIC SCAIE IN FEET NOTE SITS PLAN IS CONCEPIUALIN 0,�f,0o sao�° Knowwnarebelow. L� Call before you dig. NUMBER. NATURE AND IG SUBJECT 70 Ch4WGE 160 LAND USE BY DEVELOPMENT AREA wOi59i io ew°XERi+x � I l_ weu l 1 . °., xxovru-x°xx o°aruo-im srorsooau s z A--77 x.xwRWoxx.omxx ic SITE LEGEND d %W d --�-- ------- ---- f ' �� — — --- — - a i I I I r 17IQ I ' unia� \',` J_I_I_u I i I i i i i ---__ _ ___________ s; �s`.,� 1�1.•�i�.I I .— � m ec ixnu�,moerom wrote� �i I � i----------``���\ � j'� _ I ��� ��/ st.x w..w omu 1• T -g �'i; Plli� ;I �� x °Tm �� __� ` • � � / srmux.xxn uuaomwr r.mnr NOTE: `may mN ) m ili rimW ' V/ a / x�wxrMTMeo�x. .rxd�ax x� 1 l } ,S �zPn az Norm VesiHo `!� ` °mow, J Q �— d W SS / muu.xwr.x.uxnuu°raraevworaar°eom„xe J rn a W > I —'�z_ \ O a6 I I o �t5 ' � Z 33 0 Z ci \ ----- �� s Uj id I V W Gl 'C SC IN FEET NGIE:SITEPLANISCDNCEPNALIN C 1 KnowwhafsbelOw. NATUREANDISSUWECT TO CHANGE Call before You dlg. SHE/E�TrNUM9ER o 161 ZAM rl r TURNER ST -•--'_ e , 7. L ..4P 1„� - jir . �/ �r�� ` ,r• .�.Z i�r 2 Tj•f-j-T .�.�•.rt� i l _.ram y� .. E �'..�1+ 1.4Y1WLI�yyJ N�.yyy/y WJ ,.... /'. a�M^YTl__ 'r•' I� - . .•�i.b , Q4 � \ ��� , � � J+urvu:uiYUJuLJ+uui+:u+Yi+iifi�,yyyi,L'iiyyuy; �'•,. � �,_ y�.Y�y • �\ —— _ --••--^..Try--,—--.- ,MD WESS .. R�E EE£ l�D EAST .; - ' • rFOR�NB ExT Z PaEYENr r - _ LEGEND So- , BUC—EELS SITE E 7 EXISTING LAYEAGE ! � PROPOSED LANEAGE OFFSITE E ROADWAY -PROPOSED E.OF TRAVEL t+ IIMPROVEMEIY S PROPOSED CURB AND GOITER ` •- �'� y PROPOSED PAVED SHWIDER r•�- EFl�IND,NORTH CAROUNA r � .• OCTOBER 06.2O20 EXISTING PROPERTY LINE N ROALWAY IMPROVEMENTS . l PROPOSED CONCRETE PROPOSED ISLAND •PROPOSED LANDSCAPE S ".L '.ais3 MEDIAN ..c GRAPHIC SCALE ®ASPHALT PAVEMENT h Jm REMOVAL �••• •� a �.,�� � TRAFF/CSIGNAL �� Klmley»)Horn 162 163 ORANGE COUNTY PLANNING AND INSPECTIONS ORANGE COUNTY CONDITIOAL ZONING DISTRICTS NOR 144 CAR01.1 NA FACT SHEET This fact sheet explains the submittal and review process for a rezoning to a Conditional Zoning District. It also covers how a decision on a request is made and how you can participate. 1. What is a Conditional Zoning District? A Conditional Zoning District (CZD) is a tool to address impacts from certain land uses. These land uses have particular impacts on the immediate area or community which cannot be predetermined by general use district standards. The property owner proposes development standards to address these impacts. These standards could be things like minimum lot size, setbacks, parking, landscaping, open space management, allowable building area, preservation of natural areas, or similar matters. If approved, the use of the property would be subject to conditions created during the process. 2. What are the benefits of the CZD process? Conditional Zoning allows for more flexibility than other zoning tools. Rules in a General Zoning district would be applicable to all uses without any special considerations. Rules for a Special Use Permit require all the individualized considerations to be written in the ordinances beforehand. By allowing for special considerations to be determined at the time of application, Conditional Zoning is thought to be a more prudent use of time, money, effort, and other resources. 3. Is a CZD the same as a Special Use Permit(SUP)? No. With a SUP the County has determined potential development impacts of a given land use require special consideration of site-specific conditions against a set of established standards. An SUP is said to be a `quasi-judicial' decision because how facts are applied to these established standards. A CZD is said to be a `legislative' decision because the standards are both established and applied at the time of the decision. 4. Are CZDs and SUPs reviewed in a similar manner? No. CZDs are reviewed through the `legislative' review process while an SUP is reviewed under the `quasi-judicial' review process, further broken down as follows: • LEGISLATIVE: Decisions are made based on multiple factors including the proposal's consistency with the adopted Comprehensive Plan, recommendations made by the Planning Board and staff, comments received from the public (both for and against a project), as well as the elected officials' experiences, 164 opinions and judgment. This is the most common review process employed by the County and is used to review multiple development proposals (i.e. zoning atlas amendments, amendments to the UDO, review/action on subdivision proposals, etc.). • QUASI-JUDICIAL: Typically used to review land use development applications, commonly called a Special Use. In this process, the board responsible for rendering a decision acts much like a panel of judges, hearing factual evidence and sworn testimony. Decisions on whether a permit request must be issued or not are based on the competent, substantial, and material evidence presented by all sworn parties with standing. 5. How are CZD applications reviewed? Review of a CZD application occurs in multiple steps as outlined in the UDO summarized as follows: • An application for a zoning atlas amendment is submitted; • The proposal is reviewed by the County's Development Advisory Committee (DAC), which is essentially a staff review across multiple Departments (i.e. Building Inspections, Environmental Health, Emergency Services, Erosion Control/Stormwater, Solid Waste, etc.) and includes many technical advisors from external agencies such as the NC Department of Transportation; • The next step is the scheduling and holding of a Neighborhood Information Meeting (NIM), which is an opportunity for the developer to discuss their proposal with the local community and for County staff to review/discuss the review process; • The proposal is then reviewed by the Planning Board, which is an advisory group of County residents. The Board reviews the proposal, hears comments from the staff/applicant/general public, and makes a recommendation to the Board of County Commissioners (BOCC) for or against any proposal. • The final step is with a public hearing before the BOCC. The public hearing allows the public to voice their opinions to the Commissioners. After the public hearing is closed, the BOCC then makes their decision. This flow chart from the UDO helps illustrate: 165 Zoning A"as and Application UDO AmendrrmDnts Submittal Zoning Ailas• ZoningLAIIGS: Tenet Amendments Conditional I GenewDistricts f Zoning ts Post Sign I Mail Notice for Neighborhood Info. Meeting (HIM) and Planning Board Meeting Post Sign f Mai Notice Neighborfiood for Planning Board Information Meeting Meeting Development Advisory Committee Meeting Staff Rec ommendafion to Planning Board Planning Board Review and liecommendation Aflas Amendments: Text Publish Legal Ad Amendments: Post Sign Publish Legal Ad Mail Notice Ir Staff and fd Recoasmendahon to SOCC Public Hearing BOCC Decision Note: This chart is meant as a graphical representation of the UDO text:the text shag take priority in are/conflict or arnbk uity- 166 6. Are applicants required to submit site specific development plans for a CZD? Either a site specific development plan or a concept plan will be required depending on the type of request. Site specific development plans are meant to demonstrate how the project would comply with various requirements such as setbacks, impervious surface limits, parking lot design, landscaping, building area, and others. These types of plans are required for the following CZDs: • Agricultural Support Enterprises (ASE-CZ); • Home Park (HP-CZ); and • NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1). Master Plan Development Conditional Zoning District (MPD-CZ) applications are not required to submit a site specific development plan. They are required to submit a concept plan. 7. Why are MPD-CZ applications not required to submit a site specific development plan? Per Section 3.8 Conditional Districts — Master Plan Development (MPD-CZ) of the UDO, the purpose of the MPD-CZ District is to provide for: `..... unified large scale subdivisions, non-residential, and mixed- use developments that promote economical and efficient land use, improved level of amenities, appropriate and harmonious variety, creative design, and a better environment through the approval of a general concept Master Plan the permits defined flexibility to accommodate land use adjustments in response to evolving market trends. To that end, MPD-CZ projects are intended to allow for flexibility in dimensional/development standards with the overall goal of ensuring compatibility with planning objectives, anticipated development patterns, existing infrastructure planning, and surrounding properties. The master planning process allows applicants to either demonstrate compliance with applicable standards (i.e. setbacks, impervious surface limits, parking lot design, landscaping, building area, etc.) or provide `design alternatives' that meet the intent and spirit of existing regulations. Approval of an MPD-CZ, essentially, creates a new zoning district establishing mandatory development standards/criteria governing actual development activities. Through this process, the County has the opportunity to impose conditions on development activities to address potential impacts. 167 8. What else is required to be submitted as part of a CZD application? CZD requests are required to submit the following information: a. Completed application; b. A detailed description of the proposed use of property; c. A detailed traffic survey; d. Environmental Document(s); e. Landscape plan; f. A summary of utility services, including processing of wastewater; g. A schedule of construction of all elements of the proposal; h. Other information identified during the pre-application conference deemed essential to demonstrate the project's compliance with applicable regulations. 9. Can the County impose conditions on a CZD? Yes. The County has the ability to impose conditions, however, these conditions must be mutually agreed upon by the County and applicant. Further, conditions are limited to those addressing conformance of the development to applicable regulations and/or the adopted Comprehensive Plan/other relevant plans addressing: a. The compatibility of the proposed development with surrounding property; b. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and vehicular circulation systems, screening and buffer areas, etc.); and/or C. Other matters the County may find appropriate or the petitioner may propose, but limited to items within the County's regulatory authority. 10. How is development within an MPD-CZ district acted upon? Development within an MPD-CZ is permitted only through the review and approval of site plan application(s) in accordance within Section 2.5 of the UDO. This is so staff can verify all imposed conditions are adhered to. 11. Will this site plan be reviewed/commented on by the Planning Board or elected officials? No. The site plan shall be reviewed and acted upon by staff administratively consistent with the provisions of the UDO. 168 12. What are the benefits of the MPD-CZ process? The chief, primary, benefit is staff are able to review/process development of a parcel and/or multiple parcels under a uniform set of development criteria where there are shared opportunities for infrastructure development (i.e. parking areas, preservation of existing landscaping, outdoor lighting, signage, access management, stormwater management, etc.). Under general zoning standards, parcels are typically developed independently with little to no opportunity for the County to compel coordination of development activities. Each parcel would have to have its own parking area, stormwater feature, landscape buffers, allowable building area (i.e. floor area ratio), individual outdoor lighting fixtures, etc. From staffs standpoint this translates to more development activity, more impervious surface area, and increased opportunities for internal/external impacts. 13. Who may speak or offer comment during the review of a CZD? Everyone. Applicants and those individuals supporting, or opposed to, the application are encouraged to attend meetings where a CZD is discussed and offer comment(s). The best time to speak directly to the applicant is at the NIM. The NIM is also a good opportunity to ask questions of staff related to the process for the review of the application. The Planning Board is a good opportunity to learn more about the comments and recommendations from the advisory board and staff. The public can offer their opinions and comments in written form to the BOCC at any time, but the public hearing is the best time to speak publicly in person. 14. When would I learn about an application being submitted? There are various notification requirements associated with the review of a CZD application at various points along the process. There is a listing of current projects at the Planning page of the County website. The complete application package is made available to the public on the County website once it has been formally accepted for review by staff. Before the NIM, there will be notice posted at the site and mailed to those within 1,000 ft. of the property advertising the meeting. This is the same for the Planning Board and BOCC meetings where the application will be reviewed. BOCC meetings are also advertised in local newspapers: Planning Board and BOCC meeting agendas are posted on-line so the general public can review materials associated with the review of a CZD. You can be put on a list to receive notices about all BOCC meetings through a request to the BOCC Clerk's office. 169 Planning Board and BOCC are public meetings, which are open to public attendance. Only the BOCC public hearing includes a right to participate and that is limited (such as with the 3 minute time limit). 15. What is the most effective way of engaging with the process? Planning staff are available to answer questions on a development proposal and/or to explain process requirements. Attend the NIM to learn about the applicant's proposal and have an opportunity to ask questions and offer comments. Attend the Planning Board meeting to learn about staff and Board recommendation(s). Write to the BOCC or speak at the public hearing. At the public hearing you will be limited to 3 minutes, but there is no limit to emailed comments. If you share the opinion of others, try to join together and co-sign a single message. Try to be specific with particular proposals, recommendations or conditions. 16. Who do 1 contact with questions? • Questions about the application, procedural questions, or Planning Board meeting(s) should be directed to the Planning Department — (919) 245-2675; • To receive email notices of BOCC agendas/meetings, go to the following webpage: hftp://www.orangecountync.gov/1561/Electronic-Newslefters And select the link following "Board of County Commissioners (Sunshine)". Type in your email address and select Sign In. Next, click on the envelope icon in front of Board of County Commissioners (Sunshine) to receive email notifications. • Questions on Planning Board agendas can also be addressed by the staff of the Planning Department. Planning Board agenda packets, as well as meeting minutes, are posted on the County website and can be accessed here: https://www.orangecountync.gov/1194/Orange_County-Planning- Board-PB 17.What are the roles of staff, the Planning Board, and the elected officials in the review of a CZD? • STAFF: ➢ Determine if the application is complete with applicable submittal requirements (Section(s) 2.8 and 2.9.2 of the UDO); 170 ➢ Determine consistency with the adopted Comprehensive Plan; ➢ Review and make a determination if the proposal is consistent with applicable development standards or if proposed 'design alternatives' are consistent with the spirit/intent of the UDO; ➢ Recommend imposition of conditions to address potential impacts; ➢ Recommend approval/denial of the project based on the provisions of the UDO and the project's compliance with the Comprehensive Plan. • PLANNING BOARD: ➢ Review the development proposal and ask questions of the applicant and staff; ➢ Review/discuss staffs analysis; ➢ Although not required, the PB often will Receive public comment on the proposal; ➢ Make a recommendation on the approval or denial of the request to the BOCC. • BOCC: ➢ Schedule and hold a public hearing to receive the application; ➢ Hear from the applicant and staff; ➢ Receive public comment on the proposal; ➢ Review/discuss the staff and Planning Board's analysis and recommend ation(s); ➢ Discuss imposition of conditions; ➢ Approve or deny the request. 18. How are decisions to approve or deny a CZD made? The BOCC approves or denies a CZD request based on: a. The proposals consistency with the adopted Comprehensive Plan; b. Consistency/compliance with other applicable plans (i.e. small areas plans, water/sewer infrastructure plans, transportation improvement plans, etc.); C. Suitability of proposed development with surrounding properties as well as the recognized/anticipated development patterns in the area where the project is located; d. Compliance with applicable development standards as embodied within the UDO and/or the appropriateness of proposed 'design alternatives'; e. Public comments; and 171 f. Staff and Planning Board recommendation(s). 19. Can /discuss the project with staff, members of the Planning Board, and the BOCC? .Yes, you can have discussions with various parties outside of scheduled meetings/hearings concerning a CZD application. This would not be the case with an SUP or other quasi-judicial hearings, where the board members are precluded from deliberations outside the hearing. 20. Is there a record of the proceedings? Yes. Minutes from Planning Board and BOCC meetings where a CZD application is reviewed/discussed/acted upon are maintained by the County. The Planning Department maintains the application components and become a part of the file on that case. 21. What is the effect of a CZD approval? Per Section 2.9.2 (G) of the UDO, approval of a CZD is binding on the property. Development and use of the subject parcel(s) is governed by the submitted/revised application package, the actual ordinance adopted by the BOCC approving the rezoning request, all conditions imposed as part of the CZD review process, and the applicable provisions of the UDO. 22. Are decisions on CZD applications subject to further review? Yes. Decisions are subject to review by the Superior Court. Per Section 2.26.5 of the UDO, an appeal to Superior Court must be filled within 60 days from the date of adoption of the ordinance approving the zoning atlas amendment. 172 NORTH CAROLINA RAILROAD DEPARTMENT OF COPPLE PROPERTIES LLC COMPANY TRANSPORTATION C/O HOWARD R COPPLE 2809 HIGHWOODS BLVD 331 W MAIN ST 213 MT WILLING RD RALEIGH, NC 27604 SUITE 100 EFLAND, NC 27243 DURHAM, NC 27701 DANIEL G MCDONALD ETAL DEPARTMENT OF SL EFLAND HEIRS LLC BETTY J MCDONALD TRANSPORTATION 4890 SW NATCHEZ ST 2555-403 ST JAMES DR SE PO Box 25201 TUALATIN, OR 97062 SOUTHPORT, NC 28461 RALEIGH, NC 27611 BRETT H KAHLER CARL THOMAS HICKS AMERICA SARASWATA SANGHA 1116 SOUTH ST JANET R HICKS 1040 JAYAGURU LN DURHAM, NC 27707 PO BOX 126 EFLAND, NC 27243 EFLAND, NC 272430126 CLINT G BOGGS DEPARTMENT OF ROGER L KIRCHNER 270 BOGER RD TRANSPORTATION 313 CENTER ST MOCKERVILLE, NC 27028 PO BOX 15580 EFLAND, NC 27243 DURHAM, NC 27704 CARLTON A LAWS ENVIRONMENTAL HEATING M M FOWLER INC LYNNE J LAWS SOLUTIONS LLC 4220 NEAL RD 1300 FAUCETTE MILL RD 270 BOGER RD DURHAM, NC 27705 HILLSBOROUGH, NC 27278 MOCKERVILLE, NC 27028 MARSHALL A WELCH RONNIE OMAR ALDANADUARTE TIERRE L COOPER TARA L WELCH 320 CENTER ST 312 CENTER ST 301 CENTER ST EFLAND, NC 27243 EFLAND, NC 27243 EFLAND, NC 27243 CARLTON A LAWS TRUSTEE KELLY L GALLAGHER CARL C MAY LYNNE J LAWS TRUSTEE 300 CENTER ST PO BOX 70 1300 FAUCETTE MILL RD EFLAND, NC 27243 EFLAND, NC 27243 HILLSBOROUGH, NC 27278 STEVEN M RAMARGE LISA ANDREWS JEFFREY FORREST HAMLIN MARSHA L RAMARGE LACY E ANDREWS 5801 SNEED RD PO BOX 155 305 MT WILLING RD ROUGEMONT, NC 275729131 EFLAND, NC 272430155 EFLAND, NC 27243 VALERIE A CURRY FORREST RESOURCESLLC JOHN BANNON 5644 THOM RD C/O JOSEPH T FORREST JENNIFER SALEMSON Mebane, NC 27302 14 A WATER ST 1822 BUSHY COOK RD MEDFORD, MA 2155 EFLAND, NC 27243 STEPHEN FLINT HAMLIN DAVID CAMERON FORREST JOHN TIMOTHY OROURKE 5801 SNEED RD 215 CENTER ST STEPHANIE SNYDER OROURKE ROUGEMONT, NC 275729131 EFLAND, NC 27243 PO BOX 1144 HILLSBOROUGH, NC 27278 173 LATONIA YVETTE CARTER TALBERTS FOOD MART 3 INC JULIE A LAWS 202 CENTER ST 1480 CRAWFORD DAIRY RD 206 CENTER ST EFLAND, NC 27243 CHAPEL HILL, NC 27516 EFLAND, NC 27243 RITA FREEMAN MANGALAM LLC MCECKERT LLC 4409 ELLO DR 225 MT WILLING RD 1811 RAMS WAY Hillsborough, NC 27278 EFLAND, NC 27243 HILLSBOROUGH, NC 27278 HOWARD R COPPLE EFLAND VOLUNTEER CHARLES DANAKIMREY JANICE COPPLE FIRE CO INC 140 S LAKEWOOD TRL 213 MT WILLING RD P O BOX 39 ROXBORO, NC 27574 EFLAND, NC 27243 EFLAND, NC 27243 EFLAND LEASING EFLAND LEASING EFLAND LEASING COMPANY LLC A COMPANY LLC B COMPANY LLC C PO BOX 246 PO BOX 246 PO BOX 246 EFLAND, NC 27243 EFLAND, NC 27243 EFLAND, NC 27243 ANDREW B LLOYD JR ETAL DOROTHY M EFLAND HRS BLTK LLC MARIE L DAVIS PO BOX 525 6720 PENTECOST RD 2701 US 70W EFLAND, NC 27243 CEDAR GROVE, NC 27231 EFLAND, NC 27243 ANDREW B LLOYD JR EFLAND VILLAGE HOLDINGS JOHN LINDSAY EFLAND III 2701 US 70W P O BOX 60 P O BOX 296 EFLAND, NC 27243 EFLAND, NC 27243 EFLAND, NC 272430296 RAYMOND JAMES TRUST NA FREDERICK J BENNETT SFR3 LLC TRUSTEE 3406 SOUTHERN DR 500 WESTOVER DR#14104 PO BOX 23559 EFLAND, NC 27243 SANFORD, NC 27330 ST PETERSBURG, FL 33742 HUGH M LOFTIN CURTIS RONALD CECIL NORTH CAROLINA RAILROAD P O BOX 156 DORIS S CECIL COMPANY EFLAND, NC 272430156 PO BOX 112 2809 HIGHWOODS BLVD EFLAND, NC 272430112 RALEIGH, NC 27604 KATIE DUFFY JEFFERY J WIEBE MARY JANE SYKES GLASGOW 2407 CHESTNUT RIDGE CHURCH 4712A DAIRYLAND RD 4615 LEBANON RD RD HILLSBOROUGH, NC 27278 EFLAND, NC 272430116 EFLAND, NC 27243 PAUL V DARLING SPIRITUAL ASSEMBLY OF THE ELDON JON HIGGINS KATHLEEN A DARLING BAHAIS OF ORANGE COUNTY NC BONNIE L BUSH 3310 SOUTHERN DR INC 3309 FOREST AVE EAST EFLAND, NC 27243 2202 SCHLEY RD EFLAND, NC 27243 Hurdle Mills, NC 27541 174 DOROTHY M EFLAND HRS EDWARD SANSEVERINO DORIS SQUIRES CECIL PO BOX 525 LINDA SANSEVERINO CURTIS RONNY CECIL EFLAND, NC 27243 3303 FORREST AVE PO BOX 112 EFLAND, NC 27243 EFLAND, NC 272430112 JOLINDA O SWIGGETT DORIS S CECIL LARRY F WARREN 3227 FOREST AV JULIE CHARLENE CECIL PO BOX 818 EFLAND, NC 27243 P O BOX 112 HILLSBOROUGH, NC 27278 EFLAND, NC 27243 DAVID C WAGNER UNITED STATES OF AMERICA JOHNNY C CATES LISA C WAGNER C/O US MARSHALLS SERVICE PEGGY CATES 1916 MOOREFIELDS RD 324 W MARKET ST 3102 W TEN RD Hillsborough, NC 27278 GREENSBORO, NC 27401 EFLAND, NC 272439705 JAMES H NICHOLSON ODELL CECIL MINNIS JR WILLIAM EDWARDC RABTREE RENEE H NICHOLSON BRENDA G MINNIS ANN N CRABTREE 3211 FORREST AVE 3210 SOUTHERN DR PO BOX 61 EFLAND, NC 27243 EFLAND, NC 272439714 EFLAND, NC 272430061 HOWARD BENTLY CECIL JR ANDY LLOYD LAND INVESTMENT TIMOTHY KYLE LLOYD EVELYN M CECIL COMPANY LLC 3225 US 70 W 3223 FORREST AVE C/O BEN LLOYD Efland, NC 27243 EFLAND, NC 27243 2701 HWY 70 EFLAND, NC 27243 AIS FORESTRY & FARMING LLC WILLIAM M HICKS III EFLAND RURITAN CLUB 319 CHAPANOKE RD COREY L HICKS PO BOX 250 STE 102 2315 CLARK FARM ROAD EFLAND, NC 27243 RALEIGH, NC 27603 EFLAND, NC 27243 NOEL G PAK HARVEY GRAHAMS MOBILE HOME WINDHAM MOBILE HOME PARK HELEN P HARVEY PARK LLC INC 3211 US 70 W 3201 US 70 W PO BOX 462 EFLAND, NC 272439609 EFLAND, NC 272439609 EFLAND, NC 27243 JAMES L JORGENSON SIMONE SHEPARD NATHAN HALL TAMMY A JORGENSON 3008 GYM RD LISA HALL 3014 GYM RD EFLAND, NC 27243 3058 GYM RD EFLAND, NC 272439729 EFLAND, NC 27243 WALLACE KENT MURRAY JO ANN MURRAY LUCKY 4 PROPERTIES LLC PEGGY MURRAY 2918 GYM RD 3131 US 70 W 3004 GYM RD EFLAND, NC 27243 Efland, NC 27243 EFLAND, NC 27243 CHRISTOPHER T SMITH EFLAND METHODIST CHURCH ANDREW B LLOYD JR HEATHER N SMITH 3418 US 70 W 2701 US 70 W 3102 GYM RD EFLAND, NC 27243 EFLAND, NC 27243 EFLAND, NC 27243 175 BRICIA KRISTELY C DIAZ ETAL W & J FAMILY FARM LLC WALLACE KENT MURRAY DULCE MARIA LOPEZ DIAZ 5004 NC 86 N 2912 GYM RD 2406 WHITE PINE DR HILLSBOROUGH, NC 27278 Efland, NC 27243 DURHAM, NC 27705 176 NOTICE OF PUBLIC HEARING ORANGE COUNTY BOARD OF COMMISSIONERS The Orange County Board of Commissioners will hold a public hearing on Tuesday, December 15, 2020 at 7:00 PM for the purpose of giving all interested residents an opportunity to speak for or against the items below. Due to current public health concerns, the hearing will be held on-line and pre-registration is required. The meeting will be live streamed at the following web address for those who wish to only view the meeting: www.orangecountync.gov/967/Meeting-Videos To register to speak at the public hearing, please send an email to ocpubliccomment@orangecountync.gov no later than 3:00 PM on the day of the hearing and indicate you wish to speak during the hearing. When submitting the request to speak, include the following: • The date of the meeting • The number and title of the agenda item (from the list below) you wish to speak on • Your name, address, email and phone number • The phone number must be the number you plan to call in from if participating by phone After registering to speak, an email that contains instructions and a link to sign up to access the hearing will be sent to the email address used to register. If you do not have access to an internet-enabled computer and would like to phone in to access the hearing, please call the office of the Clerk to the Board after December 11, 2020 at 919-245-2130 and a staff member will provide you with the call-in number. Public Hearing Items: 1. Zoning Atlas Amendment (Master Plan Development Application — Efland Station): In accordance with the provisions of Section 2.8 Zoning Atlas and Unified Development Ordinance Amendments of the Unified Development Ordinance, an applicant has applied to rezone 2 parcels, totaling approximately 104 acres, in Cheeks Township: FROM: Office/Research and Manufacturing (O/RM); Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; and Efland Interstate Overlay District. TO: Master Planned Development — Conditional Zoning (MPD-CZ) for Efland Station; Upper Eno Protected Watershed Protection Overlay District; Major Transportation Corridor (MTC) Overlay District; and Efland Interstate Overlay District. 1 177 The parcels are further identified utilizing Orange County Parcel Identification Numbers (PIN) 9854-16-1576 (approximately 92 acres) and 9854-36-3711 (approximately 12 acres) and are located north of Interstate 85/40, east of Mt. Willing Road, and west of the Interstate 85/US Highway 70 Connector. The Orange County Planning Board reviewed the application at its November 4, 2020 regular meeting and voted unanimously to recommend approval of the application. Agenda materials for this meeting can be viewed at: http://orangecountync.gov/AgendaCenter/Planning-Board-26 Information on the project is also available at: https://www.orangecountync.gov/1722/Current-Interest-Projects Substantial changes in items presented at the public hearing may be made following the receipt of comments made at the public hearing. In accordance with Session Law 2020-3 (Senate Bill 704), Section 4.31(a), which pertains to remote meetings during declared emergencies, written comments on items heard at a public hearing are accepted for 24 hours after the public hearing is closed and the Board of County Commissioners may not make a decision on public hearing items until after the 24-hour period for written comments has concluded. The full text of the public hearing items may be obtained no later than December 11, 2020 on the County's website: https://www.orangecountync.gov/1707/BOCC-Agendas Information will also be available from the Orange County Planning Department (contact information below) no later than December 4, 2020. Questions regarding the proposals may be directed to the Orange County Planning Department via phone at (919) 245-2575 during normal office hours (8:00 a.m. to 5:00 p.m., Monday through Friday). You may also e-mail questions to planningdept@orangecountync.gov. Written comments to the Board of County Commissioners can be sent via e-mail to ocbocc@orangecountync.gov. Written comments can also be dropped off at the Planning Department offices at 131 W. Margaret Lane, 2nd floor, Hillsborough, NC during normal office hours or mailed to the Planning Department at P.O. Box 8181, Hillsborough, NC 27278. PUBLISH: The Herald Sun News of Orange December 2, 2020 December 2, 2020 December 9, 2020 December 9, 2020 2 178 Attachment 8 STATEMENT OF CONSISTENCY OF A PROPOSED UNIFIED DEVELOPMENT ORDINANCE MAP AMENDMENT WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN An applicant initiated amendment to the Zoning Atlas to rezone 2 parcels as follows: Parcel Township Owner of Current Zoning District Proposed Zoning District Identification Record Number (PIN) 9854-16-1576 Cheeks SL Efland Office Research Master Plan Development Heirs LLC Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Upper Eno Protected Efland Station; Watershed Protection Upper Eno Protected Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. 9854-36-3711 Cheeks Chad Lloyd Office Research Master Plan Development Land Manufacturing (O/RM); Conditional Zoning (MPD-CZ) Investment Upper Eno Protected Efland Station; Company Watershed Protection Upper Eno Protected LLC Overlay District ; Watershed Protection Overlay Efland Interstate Overlay District ; District; and Efland Interstate Overlay Major Transportation District; and Corridor (MTC) Overlay Major Transportation Corridor District (MTC) Overlay District. The Board of County Commissioners finds: a. The requirements of Section 2.8 of the UDO have been deemed complete; and, b. Pursuant to Sections 1.1.5, and 1.1.7 of the UDO and to Section 153A-341 of the North Carolina General Statutes, the Board finds sufficient documentation within the record denoting that the amendment is consistent with the adopted 2030 Comprehensive Plan. 1. The amendment is consistent with applicable plans because it supports the following 2030 Comprehensive Plan goals and objectives: • Land Use Overarching Goal: Coordination of the amount, location, pattern and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. The County and City of Mebane have engaged in numerous studies/joint planning efforts over the last several identifying 179 areas viable for the extension of utilities (i.e. sewer) in support of high intensity residential and non-residential land uses. The requested rezoning will allow development consistent with the overall spirit and intent of the adopted Comprehensive Plan as well as applicable joint planning efforts completed by the County and the City with respect to providing utility (i.e. sewer) services. This area was part of a small area plan, specifically the Efland-Mebane Small Area Plan (hereafter `the Plan'), adopted by the County in 2006. The purpose and intent of the Plan was to identify areas for urban style development focusing on viable locations for housing, community services, open space areas, and non-residential development. Upon adoption, the UDO was amended creating various overlay districts designed to implement the goals/policies of the adopted Plan. One of these districts was the Efland Interstate Overlay District. Per Section 4.4 of the UDO the intent of the overlay district is to: `... provide for a more urban style of development in an area of the county served, or intended to be served, by public water and sewer systems'. The properties subject to this rezoning request have been pre-determined to be suitable for urban style development and higher intensities consistent with the Plan. • Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. (See also Economic Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW-2.) The atlas amendment is consistent with this goal and objective with the approval of a rezoning of property creating a district allowing for the development of high density non- residential land uses in an area of the County designated for the location of adequate supporting infrastructure (i.e. water and sewer). The rezoning is also consistent with the goals/policies of the Efland-Mebane Small Area Plan, which identified the area in question as being suitable for higher intensity, urban scale, development due to the proximity to the Interstate and availability of utility services (i.e. water/sewer). 180 c. The amendment is reasonable and in the public interest because it: 1. Expands economic development prospects within the County, while continuing to protect adjacent and nearby land uses, consistent with the Comprehensive Plan as well as adopted Small Area Plans for the area. The atlas amendment involves the approval of a master plan establishing a detailed list of allowable non-residential land uses to aid in the marketing on an area designated within the Comprehensive Plan as being suitable for high intensity non- residential development. The expansion is consistent with County and City of Mebane plans outlining those parcels suitable for service by sewer that are prime for high intensity non-residential development. Further, the approved master plan establishes mandatory land use buffers and setbacks for development within the project to ensure off-site impacts are mitigated. The Board of County Commissioners hereby adopts this Statement of Consistency and findings expressed herein. Rene Price, Chair Date 181 Attachment 9 AN ORDINANCE AMENDING THE ORANGE COUNTY ZONING ATLAS WHEREAS, Orange County has received and processed a petition submitted by Buc-ee's Limited (hereafter `the Applicant') seeking to amend the Orange County Zoning Atlas, as established in Section 1.2 of the Orange County Unified Development Ordinance (UDO); and WHEREAS, This petition seeks to rezone 2 parcels totaling approximately 104 acres of property to Master Plan Development Conditional Zoning District (MPD-CZD) for the purpose of developing the Efland Station development (hereafter `the Project); and WHEREAS, The properties subject to this rezoning are identified, utilizing Orange County Parcel Identification Numbers (PIN), as: i. A 92 acre tract of land PIN 9854-16-1576, and ii. A 12 acre parcel of land PIN 9854-36-3711 hereafter `the Property'; and WHEREAS, The applicant has voluntarily chosen to establish development and land use limitations on the Project to address potential conflicts with surrounding properties; and WHEREAS, This petition has been submitted in concert with a formal master plan in accordance with the provisions of Section 2.9.2 (C) of the UDO; and WHEREAS, the requirements of Section 2.8 and 2.9.2 of the UDO have been deemed complete; and WHEREAS, the Board has found the proposed zoning atlas amendment to be reasonably necessary to promote the public health, safety, and general welfare. BE IT ORDAINED by the Board of Commissioners of Orange County that the Orange County Zoning Atlas is hereby amended to rezone aforementioned 2 parcels of property to Master Plan Development Conditional Zoning (MPD-CZ) and allow development of the Project as detailed within the submitted application. BE IT FURTHER ORDAINED THAT The terms and conditions contained herein shall encumber the Property and bind the owners and lessees thereof, their successors in title and interest. The development of the Project as well as all necessary site improvements, both internal and external to the Project, shall be reviewed, approved, and developed in accordance with: 182 a. The applicable provisions of the Orange County Unified Development Ordinance (UDO), b. Any and all applicable Federal, State, and local regulations, and c. The application package, including traffic impact analyses, as submitted by the Applicant and as approved by the Orange County Board of Commissioners on BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the UDO the approval of this Conditional Zoning application is subject to the following mutually agreed to conditions: I. GENERAL: a. Approval of the Project does not constitute an explicit guarantee for utility services (i.e. water and sewer) by either the City of Mebane or Orange- Alamance Water System (OAWS). Provision of services shall be consistent with applicable utility connection policies and/or any existing utility agreements between the City of Mebane, OAWS, and Orange County; b. Approval of the Project does not constitute an explicit guarantee for roadway closures/development as denoted on the Master Concept Plan. Closure of the existing Exit 160, and development of right-in/right-out driveways on the existing Interstate on/off ramp, shall require additional review/hearings as part of NC DOT and Federal Highway Administration (FHWA) processes taking action on the request independent on this approval. If roadway realignment is approved, the Project will move forward consistent with the approved plan. If denied, the applicant will have to address necessary modification(s) at a future date. c. The Project shall be composed of 2 individual properties totaling approximately 104 acres of land area further defined as follows: i. PIN 9854-16-1576: An approximately 92 acre parcel currently zoned: 1. Office/Research and Manufacturing (O/RM); 2. Upper Eno Protected Watershed Protection Overlay District; 3. Efland Interstate Overlay District; and 4. Major Transportation Corridor (MTC) Overlay District. ii. PIN 9854-36-3711: An approximately 12 acre parcel currently zoned: 1. Office/Research and Manufacturing (O/RM); 2. Upper Eno Protected Watershed Protection Overlay District; 183 3. Efland Interstate Overlay District; and 4. Major Transportation Corridor (MTC) Overlay District. NOTE: Overlay District boundaries/designations are not impacted by this proposal. d. The Zoning Atlas for Orange County shall be designated MPD-CZ. Development shall be in accordance with the approved application packet, master concept plan, and the conditions detailed herein. II. SITE PLAN: a. All site plans proposing development within the Project shall be reviewed by City of Mebane and OAWS staff as part of existing courtesy review agreements; b. All site plans shall provide detail denoting the anticipated daily water and sewer needs for proposed land use(s). Further, all submitted site plans shall track cumulative water/sewer allocation for each proposed land use as part of submittal(s). A lack of water and/or sewer capacity shall result in the denial of the site plan; c. Consistent with existing inter-local utility agreements between Orange County and the City of Mebane, and the approved Application, the Project will have a daily sewer utility allotment of approximately 77,000 gallons a day of sewer service. Site plans proposing development/land uses exceeding cumulative daily sewer allotments shall be required to provide documentation from the City of Mebane indicating there is sewer capacity to serve the proposed development; d. Prior to the approval of a site plan allowing development within the Project, the County will need documentation from OAWS indicating there is sufficient water capacity to serve the Project. A lack of water capacity for a proposed use shall result in the denial of the site plan; e. The Orange County Staff Engineer, OAWS staff, and the City of Mebane Utility Director shall review and approve location(s) of proposed water and sewer lines prior to site plan approval and the initiation of land disturbing activity; f. The Orange County and City of Fire Marshal(s) shall review and offer comment on: i. Road layout and construction methodology, ii. Location of fire lanes, iii. Location of fire hydrants, and iv. Location of the proposed stand-pipe(s). 184 as part of all site plan review. g. Each site plan shall be required to demonstrate compliance with Section 6.16 Environmental Assessment of the UDO. In those cases where development exceeds established thresholds, a formal Environmental Impact Statement (EIS) may be required allowing for site plan approval; h. In addition to the standards detailed in Section 2.5 of the UDO, all landscaping plans shall include information denoting the proposed method of care (i.e. underground sprinklers, maintenance personnel, etc.) for the development. i. Identified conflicts associated with landscaping shall be resolved prior to the approval of the site plan for a given project; j. For all site plans submitted for the Project the Efland Volunteer Fire Department shall be considered a member of the County Development Advisory Committee (DAC) as outlined in Section 1.9 of the UDO to review a projects compliance with applicable development standards including, but not necessarily limited to: land use regulations, conditions of MPD-CZ approval, applicable State fire/building codes. k. Site plans shall contain documentation outlining proposed and/or existing cumulative impervious surface area as well as building/open space ratios within the Project. III. DIMENSIONAL STANDARDS: a. The Project shall observe a building square footage limit of 500,000 sq.ft. consistent with the submitted and approved Traffic Impact Analysis (TIA) approved as part of this master concept plan. Additional floor area may be developed with the submittal of a revised, updated, TIA processed and reviewed in accordance with the provisions of the UDO. b. Height — Principal Structures: Consistent with the definition of building height in Article 10 Definitions and Section(s) 6.2.2 and 6.5 3 of the UDO, the following height limitations shall be observed within the Project: i. Development Area(s) 1 and 5: 40 ft. ii. Development Area(s) 2 and 3: No structure shall exceed 5 stories or 60 ft. in height; iii. Development Area 4: No structure shall exceed 6 stories or 72 ft. in height. This shall be limited to the proposed Short-Term Rental Non-host occupied land use. iv. Development Area 6: 40 ft. There shall be an allowance of an additional 10 ft. of building height to accommodate telecommunication equipment, utility infrastructure including elevator housing, and alternative energy devices. 185 Measurement shall be taken from finished grade at the center point of the front building fagade. mmasure to nw*wAy point between ridge measure to and eaves measure+o hlghni poini fir` '-deck tine of coping Fla!road Hid roof Ga'7tea#roof fined Mal Men9�rd bulldu9 hewghr rgod mebasured from AnIsmd grade at wnterpointof iranl building igude NOTE: drawing for illustrative purposes only. Determination of height shall be consistent with applicable County land use regulations, the various conditions herein, and shall be determined prior to site plan approval. c. Height — Water Tower Accessory Structure: Shall not exceed 110 ft. in height including any/all antenna apparatus erected on same.' d. Setbacks: The Project shall observe the following setbacks: Property Line: Freestanding Vehicular Use Areas: Signage: Building/Structures: Interstate 85/40 100 ft. including any gas 40 ft. consistent with the 10 ft. 3 right-of-way station canopy or fuel proposed MTC buffer pump. break denoted on the approved Master Concept Plan 2 US Highway 40 ft. 4 40 ft. 3 10 ft. 5 70/Interstate Connector Road right-of- way 1 The applicant is requesting language be modified to indicate water tower height shall be based on utility service needs rather than an arbitrary height limit. z Staff is comfortable with the proposed vehicular use area setback as the condition is written. The applicant is proposing a managed break in the MTC buffer,consistent with existing allowances. They are, however, proposing to have landscaping in this area where none would normally be required. Staff is comfortable with the provision. 3 Staff will be recommending a minimum 25 ft.setback for signage erected adjacent to an Interstate right-of-way. 4 Staff is recommending 50 ft. 5 Staff is recommending a minimum 20 ft.setback for signage erected adjacent to the road right-of-way. 186 Mt. Willing 40 ft. 6 40 ft. 5 10 ft. Road right-of- 100 ft. from way residential land uses.7 External 40 ft. 8 40 ft. 9 Property Lines Development 10 ft.10 10 ft.11 5 ft. from private Area 1 - Internal right-of-way setbacks 10 ft. from public right-of-way 12 Other 20 ft. 20 ft. 5 ft. from private Development right-of-way 13 Areas - Internal setbacks e. Open Space: 40 acres (38%) of land within the Project shall be preserved as open space area. No building and/or parking areas shall be permitted. Walking trails, picnic tables, and/or other recreation amenities may be permitted consistent with the standards contained herein and in accordance with the provisions of the UDO; f. Cumulative impervious surface area for the Project shall not exceed 62%. IV. ACCESS AND TRANSPORTATION: In addition to the requirements of Section 6.10 Roadway Improvements and Multi-modal Transportation of the UDO the following standards shall apply:14 a. Internal streets shall be privately maintained; e Staff is recommending 50 ft. 'Staff is seeking confirmation from the applicant this includes 100 ft.from residentially zoned property west of Mt. Willing Road. 8 Staff is recommending the following: 100 ft.from external property lines abutting a residential land use/zoned parcel of property and 50 ft.adjacent to a non-residential land use/zoned parcel of property. s Staff is recommending 50 ft. 10 Staff is recommending 20 ft. The Master Concept Plan denotes a variable 15 to 20 ft. landscape buffer separating vehicular use/building area from internal rights-of-way. Staff's proposed setback preserves this landscape area as shown. 11 IBID. 12 As all roadways are to be constructed to public right-of-way standards,and site visibility will be a concern,staff recommends a 10 ft.setback for signage from internal roadways. 13 Staff is recommending a 10 ft.setback. 14 As detailed in the December 15, 2020 staff abstract,staff has recommendations)on the imposition of additional conditions for access drives off of the Interstate on/off ramp as well as westbound Exit 160. 187 b. External roadway construction/improvements shall be completed or appropriately bonded prior to the issuance of a Certificate of Compliance (C of C) allowing the occupancy of a structure triggering completion of same; c. External roadway improvements shall be constructed in accordance with NC Department of Transportation requirements and guidelines, approved Traffic Impact Analysis (TIA), and the standards outlined herein; Cl. Final roadway layout, including pavement widths and driveways, shall be approved by the Orange County Fire Marshal's office and NC DOT as part of the final site plan review process required under Section 2.5 of the UDO and as detailed herein; e. Phase 1 shall involve development of a gravel access road off of Mt. Willing Road for emergency vehicle access. When the final driveway access allowing access to the Project from Mt. Willing Road is constructed, this gravel roadway can be eliminated;15 f. Site plan submittals shall be required to demonstrate internal/external traffic improvements necessary to address development impacts consistent with the submitted Transportation Impact Analysis (TIA); g. Any and all internal streets, sidewalks, bicycle lanes, etc. shall be designated for public access/use for employees/customers/visitors to the site; h. Driveway permits, when required, shall be applied for and issued by the North Carolina Department of Transportation; i. Orange County and North Carolina Department of Transportation shall approve the location of all proposed external utility poles housing street signals prior to installation; j. Segregated entrances and exits for pedestrian, construction vehicle, and non-construction vehicular traffic shall be developed to avoid conflict during construction activities for internal roadways; k. Any required or requested bus pullouts and/or transit shelters shall be constructed to serve the Project consistent with transit plans adopted by Orange County and shall be developed in accordance with the following: i. Outside of Development Area 6, there shall be a maximum of 2 bus stops serving the Project. Location of these stops shall be determined with each site plan submittal; ii. Each transit stop shall be a covered and enclosed on 3 sides to shield users from the elements, ss The applicant is proposing a gravel roadway for emergency vehicle access (i.e.fire, EMS,Sheriff, etc.)to the Project. This has been approved by the County Fire Marshal. Staff would prefer the proposed driveway access from Mt. Willing Road be constructed in Phase 1 making it easier for Efland residents to access the Project. 188 iii. Kiosks shall be developed to provide transit information, including schedule and route information, and shall be illuminated to five (5) average maintained foot-candles. I. Traffic directional signage shall be required for all internal and external roadway as directed by Orange County and the North Carolina Department of Transportation including but not limited to: i. Stop signs, ii. Yield signs, iii. Bus parking and unloading informational signs iv. Lane ends, v. Merge signs, vi. Caution Pedestrian Traffic — Yield Signs, vii. Traffic safety signs designed to direct construction traffic throughout the site, viii. Traffic warning signs indicating the location of private driveways and forbidding public access to the various properties, and ix. Through traffic signs. m. Applicant shall be responsible for designating a speed limit for the Project, posting signage denoting same; n. Development of Area 6 shall be coordinated with the applicant, NC DOT, and Orange County Transportation Services consistent with the standards detailed herein and within the UDO. The applicant bears no responsibility for the development of Area 6. V. PERFORMANCE STANDARDS: a. The Project shall comply with Section(s) 6.4.2 through 6.4.7 of the UDO inclusive; b. Solid Waste Management: The following specific standards shall apply: i. Development within the Project shall contract for the private collection and disposal of solid wastes and for the collection and marketing of mixed recyclables (including corrugated cardboard), and food waste; ii. All site plans shall designate external space for the proper storage and collection of solid waste, recyclable materials (including corrugated cardboard) and food waste; iii. Storage/collection areas shall be located in such a manner as to provide convenient access for users of the facility and for safe and efficient access by collection vehicles. Their location shall be reviewed and approved as part of the site plan submittal/review process. 189 External space for collection of solid waste and recyclable materials. Materials collected shall be consistent with the County's Solid Waste Management ordinance. Waste collection areas shall be located in such a manner as to provide convenient access for users of the facility and safe passage for service vehicles. iv. In those cases where storage/collection areas are located across property or district lines for shared areas, developer shall prepare and record a joint access agreement, including a shared storage/collection facility agreement, establishing the sharing of the proposed storage/collection facility and that they can be serviced across property lines or district lines. This agreement shall be reviewed and approved by Orange County Solid Waste and representatives of the County Attorney's office; v. For food service and lodging operations, space shall be reserved for the storage/collection of food waste collection; vi. The layout and design of waste/storage facilities for solid wastes, recyclable materials (including corrugated cardboard), and food wastes shall comply with the standards and guidelines of Orange County Solid Waste Management (OCSW) and the Orange County Environmental Health Food & Lodging Division. Further, such waste/storage facilities shall be designed and situated so not to negatively affect adjacent properties; and shall be located so not to impact internal traffic flow or located in loading zones. vii. The following standards notes shall be placed on all site plan(s) addressing compliance with the County's Regulated Recyclable Materials Ordinance (RRMO): 1. Clean wood waste, scrap metal, and corrugated cardboard present in construction and demolition waste shall be recycled; 2. All haulers of construction and demolition waste shall be licensed with OCSW; 3. Prior to the issuance of a permit to demolish any structure five hundred (500) square feet or greater in size, the permitee or owner shall have requested and received a deconstruction assessment by OCSW Enforcement staff in accordance with the RRMO. viii. The following additional notes shall be provided on any submitted site plan: 1. Gate design will include gate retainers. 190 2. Orange County will not be responsible for any pavement damage that may result from service vehicles. 3. The developer shall reserve space within all solid waste collection areas for segregated grease rendering/recycling collection facilities and shall provide space for segregated food waste collection near the delivery entrance for any building that houses, proposes to include, or may at some future date incorporate a restaurant, cafeteria, bar, or other food service facility at any time. 4. All solid waste containers, dumpsters, recycling bins, etc. shall be located within an enclosure, buffered in accordance with the standards contained herein, and meeting the following criteria: a. Loading areas shall be designed and situated not to negatively affect adjacent properties. b. Solid waste enclosures shall be so located as to not impact internal traffic flow, c. Loading zones shall not be located within areas designated as housing for solid waste facilities. c. Architectural Design: In addition to the standards detailed in Section 6.5 of the LIDO, the following specific standards shall apply to the Project: i. Development Area 1: 1. Development shall abide by the information detailed in Exhibit 1 of the approved Application package. ii. Development Area(s) 2 through 5: 1. Permitted exterior finishes and/or siding materials shall be limited to: a. Cement/concrete siding, such as Hardi-plank, b. Brick and/or stucco, c. Concrete in pre-cast or cast-in-place (CIP) applications. i. Where utilized, large expanses shall be broken-up and modulated with architectural variations like scoring, reveals, ornamental embellishments, etc. d. Concrete masonry units (CMU's) limited to: i. Standard block, painted for service areas out of public view, rears of parapets, etc. OR ii. Split-face and/or ground face CMU's 191 e. Dry-stack and/or ashlar stone shall be permitted only when utilized as an identifying characteristic for a structure. f. All storefronts and glass walls shall utilize glazing. Reflective and/or mirrored glass is prohibited. 2. Roofs shall abide by the following standards: a. Roof design that serve to enhance the capture of natural light shall be encouraged; b. All rooftop HVAC equipment, elevator overrides, and other similar devises shall be screened utilizing 1 of the following methods: i. Clad in exterior materials that are non- reflective or illuminated, OR ii. Designed as an architectural feature of the proposed structure, OR iii. Screened through some vegetative buffer or fencing. c. Solar panels shall be allowed to be installed along roof tops, including raised panels to allow for tracking of the sun's rays, in accordance with the following: i. The panels shall oriented or designed to prevent glare, and ii. Roof mounted panels shall be screened from view at through an architectural feature. iii. Metal roofs shall be non-reflective and designed to blend in with the architecture of the building. d. Ground mounted solar shall be screened from view by fencing or vegetative buffer. e. Sloped standing seam metal roofs shall be permitted as long as they are designed to blend in with the architecture of the building and the district, f. Flat roofs comprised of TCP, EPDM, rubber single-ply membrane and other similar products shall be permitted as long as the applicant demonstrates that the roof shall be hidden or shielded from the public's street view through the use of parapets, railings, or balusters. 192 3. Service Areas & Mechanical Equipment shall be screened from the adjoining Public Roads with walls designed to complement the building architecture of the adjacent buildings and/or landscaping. Architectural features such as, but not limited to, banding, medallions, changes in color or design features or materials will be provided to avoid a sterile, unarticulated blank treatment of such walls; 4. Screening of Structures. Meter banks, transformers and similar utility structures will be screened where visible from public view at grade level; 5. Backflow Preventers. Above ground back flow preventers and transformers will not be located within the Open Space Areas or within the required Urban Open Space unless they are required to serve the Open Space Areas in which they are located. Above ground back flow preventers and transformers that are located within the Open Space Areas as allowed by this Section will be screened; 6. Mechanical Equipment Screening. Roof top HVAC and related mechanical equipment will be screened from public view at grade level at the right-of-way location; 7. Dumpster Screening. Dumpster areas and recycling areas will be enclosed by a solid wall or fence with one side being a decorative gate. The wall or fence used to enclose the dumpster will be architecturally compatible with the building materials and colors used on the principal building; 8. Accessory Buildings. Any and all accessory buildings and enclosures whether attached to or detached from the main building, including automatic teller machines, shall be designed to complement the site architecture and shall be integrated with the same scale, texture, color and detailing of adjacent architectural design; 9. The applicable components of the Project will comply with applicable provisions of the ADA; 10 Any required deviation to address NCDOT drive slope requirements shall be limited to occur along access drives and/or between individual districts to avoid internal tract slope conflict creating accessibility issues. iv. Development Area 6: Development within this area shall be consistent with County architectural guidelines. d. Landscaping/Buffering: In addition to the standards contained in Section 6.8 of the UDO, the following specific standards shall apply to the Project: 193 i. All required landscaping shall be installed and maintained by the developer or their successor in perpetuity; ii. Existing vegetation shall be preserved, where possible, in identified buffer areas as indicated on the approved Master Concept Plan. If existing vegetation is utilized, a minimum of fifty percent (50%) of the critical root zone of the existing tree must be within the buffer and must remain undisturbed in order to apply towards land use buffer standards; iii. If a portion of any land use buffer must be disturbed to facilitate development, the disturbed portion shall be re-planted consistent with the approved Landscape Buffer Plan (Sheet C-6.0) of the Master Plan; iv. Landscaping shall comply with the following: Buffer Type (denoted Planting(s) — per 100 linear ft. on Master Concept Plat 10' or 20' Type A • 1 Deciduous Canopy Tree Mixed Option . Deciduous Understory Tree • 2 Evergreen Understory Trees • 13 Shrubs 40' Type C . 7 Deciduous Understory Overhead Utility Trees Option • 5 Evergreen Understory Trees • 30 Shrubs 40' Type C . 3 Deciduous Canopy Trees Mixed Option • 1 Evergreen Canopy Tree • 2 Deciduous Understory Trees • 5 Evergreen Understory Trees • 40 Shrubs 40' Type B . 2 Deciduous Canopy Trees Deciduous Option • 2 Deciduous Understory Trees • 12 Shrubs Enhanced • 6 Deciduous Canopy Trees 40' Type D • 1 Evergreen Canopy Tree • 4 Deciduous Understory Trees Mixed Option . 9 Evergreen Understory Trees • 70 Shrubs • 6 ft. tall fence erected at the 194 edge of landscaping 100' Type F 10 Deciduous Canopy Trees Deciduous Option 13 Deciduous Understory Trees 80 Shrubs 200' Type F 10 Deciduous Canopy Trees Deciduous Option 13 Deciduous Understory Trees 80 Shrubs v. Planting Requirements — Street Trees. All required street trees will be installed along existing and proposed public streets, not including alleys, when above and below ground utilities and stormwater infrastructure allow as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. Street trees shall be at least 1'/2 inches in caliper at time of planting. Canopy trees required as part of land use buffers may also be applied towards the Street Tree requirement. vi. Planting Requirements — Between Lot Plantings: Between lot plantings will not be required on any Development Area except as shown as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. vii. Planting Requirements — Foundation Plantings: The required foundation plantings shall be in accordance with the following: 1. Development Area 1: Plantings will be provided within proximity to all buildings using the following standards: a. Landscape islands will be directly adjacent to the primary sidewalks to each building. Total square footage provided for all landscape islands will be equivalent to 5 feet times the total length of the three primary sides (excluding the rear) of all buildings. Landscaping will not be placed in direct proximity to the building foundation due to safety and foundation infiltration concerns. 2. Development Areas 2 — 6: Landscape area at least five feet (5) wide for a minimum of fifty percent (50%) of the primary frontage side of the building. viii. Interior landscaping shall be consistent with the following: 1. In-general: a. Unless otherwise modified herein, parking lot landscaping shall be provide consistent with Section 6.8.7 (d) (2) of the UDO; 195 b. Shade trees shall be provided at a ratio of one (1), one and one half-inch (1.5") minimum caliper tree for every ten (10) car parking spaces; Caliper size is measured at the time of planting; c. No more than ten parking spaces shall be permitted in any single continuous row without being interrupted by a terminal landscape island except when directly adjacent to a building. No terminal landscape islands will be required for the first row of parking spaces when directly adjacent to any side of any building; d. When required, terminal landscape islands will be a minimum of 200 square feet and may include pavers and / or decorative stone within the required 200 square feet of the landscape island; e. Each terminal landscape island will be planted with a minimum of one canopy tree, as well as shrubs and / or ground cover. 2. Development Area 1: a. No landscape area shall be provided between the vehicular use areas and the right of way or adjacent property line except as shown on the Landscape Buffer Plan (Sheet C6.0) included in the Rezoning Plan. Plantings required as part of the Land Use Buffers may be used to satisfy this requirement; 16 3. Development Areas 2 through 6: a. A landscape area at least five feet in width (which may include drainage and/or utility easements) shall be installed within parking areas. Plantings required as part of the Land Use Buffers may be used to satisfy this requirement. 17 ix. Rainwater harvesting shall be encouraged to serve as irrigation for landscaping including the use of all regional stormwater ponds developed within the Project. 16 Staff recommends a 10 ft.vegetated buffer shall be provided between vehicular use areas, including parking stalls,and internal access roads. These areas should exclude drainage/utility easements. Also this language contradicts applicant's recommended condition(s)on encouraging/promoting internal landscaping. 17 IBID. 196 x. The Project shall comply with the provisions of Section 6.6.4 of the UDO related to preservation of required buffers within the Major Transportation Corridor (MTC) overlay district. This includes the ability to create visual breaks in the buffer in accordance with Section 6.6.4 (A) (5). g. Parking: In addition to the standards contained in Section 6.9 of the UDO, the following specific standards shall apply to the Project: i. Space(s) shall be required based on the following standard(s): 1. Retail: 1 space for every 300 sq.ft. of gross floor area; 2. Bank/Financial Institution: 1 space for every 200 sq.ft. of gross floor area. 5 stacking spaces shall be provided per individual drive-in window; 3. Office: 1 space for every 300 sq.ft. of gross floor area; 4. Eating and Drinking Establishment: 1 space for every 40 seats or 1 space for every 50 sq.ft. of floor area for public use whichever is greater; 5. Short-Term Rental Non Host Occupied: 1 space per room plus 1 space per shift employee; 6. Manufacturing: 1 space per 1,000 sq.ft. of floor area. ii. Car wash: there will be stacking/storage space provided to accommodate a minimum of 10 vehicles waiting for access to the proposed car wash facility. h. Signage: In addition to the standards contained in Section 6.12 of the UDO, the following specific standards shall apply to the Project: a. In general: i. Signs or marketing of any kind are prohibited within the common areas/open space of the Project; ii. In addition to the requirement of Section 6.12.7 of the UDO, sign submittals shall include a photo of the actual building exterior and a rendering with the proposed sign superimposed same; iii. All signs shall be internally illuminated; iv. Window signs or graphics of shall be limited to 25% of the window surface as defined from floor to ceiling. b. Specific sign limits: i. Development Area 1: 1. Freestanding Sign: a. Maximum Number: 1 197 b. Maximum Height: 80 ft. from natural grade;'$ c. Maximum Width: 22 ft.; d. Maximum Size of Sign: 470 sq.ft. further broken down as follows: i. Logo: 380 sq.ft. ii. Cabinet: 90 sq.ft. 2. Monument Sign: a. Maximum Number: 1 b. Maximum Height: 8 ft. from natural grade; c. Maximum Width: 13 ft.; d. Maximum Size of Sign: 65 sq.ft. 3. Wall Sign — Retail Center: a. Maximum Number: 3 b. Maximum Height: N/A; c. Maximum Width: i. Logo: 9 ft; ii. Sign Cabinet: 7 ft. d. Maximum Size of Sign: i. Logo 64 sq.ft. ii. Cabinet: 206.5 sq.ft. 4. Wall Sign — Car wash: a. Maximum Number: 4 b. Maximum Height: N/A; c. Maximum Width: i. Logo: 5 ft; ii. Sign Cabinet: 20 ft. d. Maximum Size of Sign: i. Logo 25 sq.ft. ii. Cabinet: 52 sq.ft. per sign. ii. Development Areas 2 through 6: 1. Monument Sign: 18 Staff has heard concerns from BOCC members the sign height is too high. Staff is asking for direction on appropriate height and size for the Project. 198 a. Maximum Number: i. 2 signs in Development Area(s) 2 and 3; ii. 1 sign in Development Area 4; iii. 3 signs in Development Area 5 b. Maximum Height: 20 ft. from natural grade; c. Maximum Width: 16 ft.; d. Maximum Size of Sign Panel Area: 240 sq.ft.; 2. Wall Sign: a. Multi-tenant Building: i. Maximum horizontal length or span of sign shall not exceed 80% of the width of the usable, one surface storefront of a particular Tenant's space; ii. Sign shall not exceed 64 square feet in area; iii. If the width of the storefront contains more than one building/facade material, the Tenant shall use only one building/facade material width to determine 80%; iv. No sign may cover two different fagade surfaces. b. Single-tenant Building: i. One wall sign per building fagade; ii. Allowable sign area shall not exceed 1 square foot of sign area per 1 foot of building length of each fagade up to a maximum size limit of 64 square feet; iii. No sign may cover two different fagade surfaces. 3. Directional Sign: a. Limited to necessary information for patrons (e.g. entrance/exit, directional, one-way) b. May not exceed 4 square feet in sign area c. May not exceed 4 feet in height d. Maximum of four (4) per building within any particular Development Area 199 4. Temporary Real Estate, Construction, and Financing Signs: a. No sign shall exceed 24 square feet in area b. No more than two (2) signs per building site c. Construction and Financing Signs must be removed within 10 days of receipt of certificate of occupancy for any one building site. i. Lighting: In addition to the standards contained in Section 6.9 of the UDO, the following specific standards shall apply to the Project: i. All lighting shall be full-cut off fixtures; ii. Lighting in parking areas shall observe a height limit of 36 ft.; iii. All lighting shall comply with maximum foot-candle limits at property lines as noted in Section 6.11.6.A of the UDO. There shall be no net increase in existing lighting levels along the Interstate 85/40 on/off ramp beyond existing lighting installed and maintained by NC DOT; iv. Lighting within the Project shall abide by the standards detailed in Section 6.11.8 of the UDO. i. Stream Buffers: The Project shall comply with the provisions of Section 6.13 of the UDO. j. Stormwater regulations: The Project shall comply with the provisions of Section 6.14 of the UDO.19 A Master Stormwater Management Plan (SMP) shall be developed to address stormwater runoff for the entire development even though individual parcels may be responsible for installing stormwater control measures (SCMs). Stormwater facilities will be designed to meet current Ordinances with the development of each individual Development Area within the Project. Nitrogen and Phosphorus load contributions leaving the site must be held to 2.20 Ibs per acre per year and 0.33 Ibs per acre per year respectively. These standards shall be met via offset payments (nutrient buy-down payments) and/or on-site SCMs consistent with State law and the UDO. k. Erosion Control regulations. The Project shall comply with the provisions of Section 6.15 of the UDO. I. Flood regulations: The Project shall comply with the provisions of Section 6.21 of the UDO. 20 19 As detailed in the December 15, 2020 staff abstract,staff has recommendation(s)on the imposition of additional conditions associated with stormwater management. 2°At this time there are no identified floodplains on the Property. 200 VI. PERMITTED AND PROHIBITED LAND USES: a. Permitted Uses: Shall be limited to those identified uses consistent with existing definitions contained within the UDO. i. Development Area 1: Approximately 26.59± acres in area developed within Phase I of the Project. Permitted uses shall be limited to: 1. Motor Vehicle Service Station limited to no more than 60 gas dispensers with a maximum of 120 fueling stations.21122 2. Retail and Eating and Drinking Establishment uses subject to the following conditions: a. Located within a single structure no more than 70,100 sq.ft. in area; b. Accessory use shall be limited to a car wash. ii. Development Area 2: Approximately 17.07 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Eating and Drinking Establishments limited to 32,000 sq.ft. of building area; 2. Retail uses limited to 30,000 sq.ft. of building area; and 3. Office and Financial Services uses limited to 4,000 sq.ft. of building area. iii. Development Area 3: Approximately 3.88 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Eating and Drinking Establishments limited to 8,000 sq.ft. of building area; and 2. Retail Uses limited to 16,000 sq.ft. of building area iv. Development Area 4: Approximately 3.84 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Short-Term Rental- Non-Host Occupied. 21 The applicant has indicated the need for the proposed individual fuel pumps is that motorists will stop to fuel their cars then go into the retail center for a prolonged period of time thereby limiting access to the fuel pump. Staff has heard numerous concerns from adjacent property owners related to the number of proposed pumps as well as the storage tanks necessary to support same. 22 The applicant will be providing a schematic for inclusion within the conditions detailing what a fueling station will look like. 201 v. Development Area 5: Approximately 21.05 ± acres in area developed within Phase 2 of the Project. Permitted uses shall be limited to: 1. Medical Uses; 2. Office and Financial Service; 3. Manufacturing, Assembly, Processing and Distribution Uses- Food Uses; 4. Manufacturing, Assembly, Processing and Distribution Uses- Other Uses limited specifically to Research Facility with Manufacturing, totaling no more than 150,000 square feet in approximately four (4) buildings. vi. Development Area 6: Approximately 1.62± acres directly adjacent to the railroad tracks. This area will be reserved for development by others to support area transit. No buildings or parking are planned for this site as a part of the Project. Bus/Rail Passenger Shelters are permitted. b. With the exception of Development Area 1 (Travel Center), Area 4 (Short- term Rental Non-Host Occupied), and Area 6 land uses/building square footage allotments can be transferred between development areas 2, 3, and 5. c. Prohibited Uses: i. No Eating and Drinking establishment with a drive-thru facility shall be permitted to be developed on the Property except as follows: 1. A take-out window shall be permitted for picking up pre- ordered food. ii. Except for Development Area 1, no Motor Vehicle Service Station, including but not limited to gas station, convenience store/gasoline sales uses, shall be allowed on the Property. For the purposes of this provision, the term "gasoline sales" shall include petroleum, ethanol, diesel or other motor vehicle fuels;23 iii. The following Manufacturing, Assembly, Processing and Distribution Uses — Food land uses are expressly prohibited: 1. Animal Feed Preparation, Manufacturing, Packaging, and Distribution; 2. Animal Slaughtering and Processing, Packaging and Distribution; 2s This condition means the only Motor Vehicle Service land use(i.e.gas station)developed within the Project shall be in Development Area 1. 202 3. Seafood Preparation, Packaging and Distribution; 4. Starch, Vegetable Fats and Oils Manufacturing; 5. Tobacco Processing, Preparation, Packaging and Distribution. iv. All Manufacturing, Assembly, Processing and Distribution Uses — Other land uses are expressly prohibited except for Research Facility with Manufacturing land uses. v. The following Medical Uses are expressly prohibited: 1. Hospital; and 2. Veterinary Hospital. vi. The following Office and Financial Services Uses are expressly prohibited: 1. Building/Trade contractor offices with external equipment storage; and 2. Pawnshop/ payday loan services. vii. All Automotive/Transportation Uses are prohibited with the exception of: 1. Motor Vehicle Service limited to development within Development Area 1; and 2. Bus/Rail Passenger Shelters. viii. All Service Uses are prohibited with the exception of: 1. Eating and Drinking Establishments; 2. Car Wash as a customary accessory use to a Motor Vehicle Service land use limited to Development Area 1; and 3. Short-Term Rental- Non-Host Occupied limited to development within Development Area 4. VII. UTILITIES: a. Development within the Project shall be served by utility systems provided and maintained by: i. Public water - Orange Alamance Water System (OAWS) ii. Sewer services — City of Mebane Additional and/or alternative water and/or wastewater systems shall not be permitted. b. A written, signed agreement between a developer, Orange County, and the aforementioned utility providers shall be executed describing the timing, phasing, design, and financing of public water distribution and public sanitary sewer collection mains; 203 c. Water systems and water pressure shall comply with all applicable OAWS utility standards, building, and fire codes based on the proposed land use; d. Sizing/looping of utility lines shall be based on the proposed development, including water flow test data and shall be reviewed and approved by County staff and appropriate utility entity; e. Fire-flow test(s) of all installed hydrants shall be conducted, in coordination with OAWS and Orange County Emergency Services, to ensure compliance with applicable State Fire Code standards. VIII OTHER: a. Structures erected within the Project shall be designed to allow for incorporation of solar infrastructure installation on rooftops or in adjacent areas. b. Electric Vehicle Charging Stations: i. A paved EV charging station area serving no less than ten (10) vehicles including the required electrical conduit system will be constructed within Development Area 1, (completion of the charging station installation would occur at Applicant's sole discretion) ii. EV charging stations will be encouraged within other Development Areas provided that such facilities shall be ancillary to a principal land use and as a service to patrons or employees c. Consideration of L.E.E.D certified practices for components of the Project where feasible BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of published ordinances and that this ordinance is effective upon its adoption. Upon motion of Commissioner , seconded by Commissioner , the foregoing ordinance was adopted this day of ) 2021. I, Greg Wilder, Interim Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on , 2021 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. 204 WITNESS my hand and the seal of said County, this day of 12021. SEAL Clerk to the Board of Commissioners